100% found this document useful (1 vote)
1K views53 pages

Bop - Inspection and Testing

The document provides inspection and testing procedures for blowout prevention equipment (BOPE). It outlines the general requirements, including verifying casing and pressure rating requirements. It provides an example calculation for determining the appropriate maximum test pressure. It describes how BOPE tests are typically conducted prior to drilling below casing shoes. It also outlines specific testing procedures for the actuating system and accumulator units to ensure proper functioning, including isolating components, applying and monitoring pressures, and checking pumps and precharge pressures.

Uploaded by

Austin Asuquo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views53 pages

Bop - Inspection and Testing

The document provides inspection and testing procedures for blowout prevention equipment (BOPE). It outlines the general requirements, including verifying casing and pressure rating requirements. It provides an example calculation for determining the appropriate maximum test pressure. It describes how BOPE tests are typically conducted prior to drilling below casing shoes. It also outlines specific testing procedures for the actuating system and accumulator units to ensure proper functioning, including isolating components, applying and monitoring pressures, and checking pumps and precharge pressures.

Uploaded by

Austin Asuquo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 53

5.

INSPECTION AND TESTING PROCEDURES


5-1 GENERAL
a. If BOPE inspection and/or testing is required on the divisions Permit to Conduct Well Operations (Form OG 111), inspections must be made by a division representative accompanied by the operators and/or contractors representative. The division inspector must verify that all of the requirements for casing, BOPE, hole-fluid monitoring equipment, and pressure rating are satisfied. To calculate the appropriate maximum test pressure, determine the following values: 1) The hydrostatic pressure (hp) of the fluid in the well. 2) The surface pressure equivalent of 125 percent of the MPCP (see paragraph 2-5a to calculate MPCP). 3) The surface pressure equivalent of 80 percent of the MIYP of the anchor string (see Appendix D for MIYP values). Example: Well 1X b. In most cases, BOPE tests are conducted prior to drilling below the casing shoe or kick-off point (KOP). In situations where the casing is open to the formation, a sealing device (either cement or mechanical) must be placed as close as practical to the shoe or KOP (whichever is higher) so that the casings mechanical integrity can be determined. The anchor casing string, to which the BOP stack is attached, is an integral part of the BOPE and must be tested, either separately or in conjunction with the BOP stack. c. When pressure testing blowout prevention equipment, all components of the BOP stack, kill- and choke-line valves, workingstring safety valve, internal preventer, kelly cock(s), and standpipe valve must be tested in the direction of blowout flow. Clean water should be used as the test fluid, especially in critical areas. Surface casing: 13 3/8 cem 1000 Intermediate casing: 9 5/8, 40#, N-80 cem 4220 (4000 TVD) Proposed TD: 9450 MD (8800 TVD) TD formation pressure: 4200 psi Mud weight (MW): 9.6 ppg 1) hp @ shoe = (MW ppg X 0.052) X TVD = (9.6 ppg X 0.052) X 5000 = 2496 psi 2) MPCP surface test pressure = (MPCP X 1.25) hp = (3486 X 1.25) 2496 = 2360 psi 3) 80% MIYP surface test pressure = (MIYP X 0.80) hp = (5750 X 0.80) 2496 = 2104 psi In the example above, the surface test pressure must not exceed 2,100 psi to prevent rupturing the casing. In non-sensitive onshore areas, the test pressure may be limited to 1,000 psi. If the pressure determined in the equations above is below 1,000 psi, then a test plug may be considered for testing the BOPE. In some cases, the operator may require a

d. When selecting a suitable test pressure for the BOPE and anchor casing string, two factors need to be considered: the Maximum Predicted Casing Pressure (MPCP) for the well, and the Minimum Internal Yield Pressure (MIYP) of the anchor casing string. When testing casing in conjunction with the BOPE, the maximum pressure applied to the shoe of the anchor string (or KOP) must not exceed 125 percent of the MPCP or 80 percent of the MIYP, whichever is lower.

68

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

test to the full working pressure of the BOPE using a test plug. This would be followed by a separate casing test at the pressure determined from the equations above. e. When pressure testing the BOPE and/or casing, pressure must be applied until a stabilized reading can be confirmed (a minimum of three minutes). A pressure drop of more than 10 percent is unacceptable. Results of all required tests will be recorded on Division of Oil, Gas, and Geothermal Resources Form OGD9.

1) Close the ram preventer that contains the rams corresponding to the pipe size in use. 2) Close the annular preventer. 3) Open the pipe rams. 4) Perform all immediate kick-control responses involving any installed auxiliary equipment that depends on the accumulator unit for actuating energy. This would include, but not be limited to, opening any hydraulically-operated control valves in the choke system. Extend the two-minute period for preventers with very large operating volumes when performing this sequence of actions. The time extension will cover the time that fluid is moving continuously in the system. c) After following the test sequence outlined in paragraph 5-2a4b), ensure that the pressure remaining in the accumulator(s) conforms to the following requirements: 1) For accumulator units having a nominal precharge pressure of 750 psi, the remaining pressure must be 1,000 psi or higher because 1,000 psi is the average pressure required to keep an annular preventer closed on open hole. (Note that this required pressure is 50 psi higher than the API recommendation of 200 psi above the precharge pressure.) 2) For accumulator units having a nominal precharge pressure of 1,000 psi, the remaining pressure must be 1,200 psi or higher. d) If the remaining pressure is higher than the value required for the type of system tested, reconnect the charging pump and continue with the testing. If the remaining pressure is too low, the actuating system is inadequate and testing must be suspended until the inadequacy is eliminated. 5. Suspect a low precharge pressure in a seemingly adequate accumulator unit if there is an abnormally rapid pressure drop as the preventers are actuated, or if there is an abnormally slow pressure buildup in the system when the charging pumps are restarted after performing the test outlined in paragraph 5-2a4.

f.

5-2
a.

TESTING THE ACTUATING SYSTEM

Accumulator Unit 1. Determine that each valve on the unit is in good condition and operates properly with no leaks, that each is provided with a satisfactory handle, and that each valve can be operated without mechanical assistance. Determine that the accumulator is fully charged to its rated working pressure (+/- 10 percent). Determine that the level of the hydraulic fluid in the reservoir is within one inch of the level prescribed for the accumulator unit in use. For Hydril units, the prescribed level is indicated by a petcock on the reservoir near the accumulator pumps. For most other units, the fluid level of the fully charged accumulator(s) should be such that draining the pressurized fluid from the accumulator bank can be accomplished without causing the reservoir to overflow. This level will vary, depending on the dimensions of the reservoir and the number and operating characteristics of the accumulator(s). Note the total accumulator volume. If it appears inadequate according to the graphs at Appendix F, the system can be tested using the following procedure (assuming all lines and the preventer operating chambers are filled with fluid): a) Isolate the accumulator pump motor from its power supply. b) Hang the smallest OD pipe (for which pipe rams have been installed) through the preventers and perform the following test sequence within a two-minute period:

2.

3.

4.

BLOWOUT PREVENTION IN CALIFORNIA

69

The precharge pressure may be field tested using the following procedures: a) Isolate the accumulator pump motor from its power supply. b) If the accumulator unit in use is a 1,500 psi working-pressure unit with a separate control manifold, isolate the unit by closing the master valve on the pressure line between the accumulator unit and the control manifold. Do not close the master valve on the accumulator line in the 2,000 or 3,000 psi working-pressure units, as this will isolate the control manifold from the accumulator bank and the test cannot be performed. c) Open the manifold bypass valve slowly, venting the fluid from the accumulator(s) into the reservoir. WARNING: THE FLUID WILL OVERFLOW IF ITS LEVEL IS SIGNIFICANTLY HIGH WHEN COMPARED WITH THE RECOMMENDATIONS OF PARAGRAPH 5-2a3. BE CERTAIN THAT THE RESERVOIR IS VENTED TO PREVENT THE POSSIBILITY OF AIR BEING TRAPPED ABOVE THE RISING FLUID. (The reservoir will be damaged severely if the vent is missing or plugged.) If gas follows the fluid into the reservoir, a ruptured separator is indicated. This condition must be corrected before testing can be continued.

graphs in Appendix F illustrate the importance of correct precharge to the performance of the accumulator. 6. Determine that all accumulator charging pumps are functioning adequately by applying the following test: a) Record the time required to restore full working pressure after each preventer is closed. b) Obtain the volume required to close each preventer from Appendix A or B, as applicable. c) Divide the closing volume of each preventer by the recovery time (in minutes) for that preventer and compare the result with the rated output of the pumps. The calculated output should not be less than 80 percent of the rated output.

7.

Determine that the power supply to the accumulator pump motor will not be interrupted during normal well operations. The plug at the power panel must not share a common outlet with any equipment that would necessitate unplugging the accumulator power at any time.

b. Emergency Backup System 1. High-pressure Nitrogen Backup System a) Determine that this system is charged adequately by performing the following test: 1) Ensure that a gauge is installed that will register pressure in the backup system when it is isolated from the accumulator unit. 2) Check the line valve between the backup system and the accumulator unit to ensure that the valve is closed tightly. 3) Open and close the shutoff valve on the top of each nitrogen bottle in turn, and record the pressure indicated by the gauge. (An undercharged bottle will accept the small quantity of nitrogen left in the line from the previous bottle without a significant effect on its pressure reading.) 4) Using the graph shown in Figure 11, find the pressure recorded for each cylinder and determine how much available working-fluid equivalent remains
DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

d) Wait at least 30 minutes for the temperature of the accumulator gas to return to normal, because rapid expansion of the precharge gas in the accumulator(s) during the bypass process will cool the gas significantly. e) With the bypass valve open, reconnect the charging pump motor to its power supply and observe the bypass-line port through the inspection hole in the top (or ends) of the fluid reservoir to ensure the accumulator pumps are moving fluid. Then, close the bypass valve and watch the accumulator pressure gauge. After the first few pump strokes, the pressure gauge needle should jump to the precharge pressure specified by the manufacturer, and then rise slowly to the pressure determined by the pressure switch setting. An initial pressure indication lower than the specified precharge is evidence that one or more of the accumulators in the system is precharged inadequately. This condition must be corrected before the BOPE can be approved. The

70

in the backup system. This total working-fluid equivalent should be sufficient to close and open a ram preventer and close the annular preventer on pipe. b) Determine the integrity of the system by watching the pressure gauge after all of the bottle shutoff valves have been closed. There should be no decrease in pressure. 2. Accumulator Backup System a) Determine that the active and backup bank(s) of accumulator bottles are each equipped with valves capable of isolating them from the rest of the system, and that the valve(s) for the backup system are kept closed during normal operations. b) Determine, by calculation, that the capacity of the backup bank(s) is sufficient to perform the test required by paragraph 5-2a4. c) Determine that the isolation valves can be operated by one person without mechanical assistance, and that there is a full charge in the backup bank(s) by performing the following test: 1) Close the isolation valve to the working bank(s). 2) Open the isolation valve to the backup bank(s) and notice the pressure indicated by the ACCUMULATOR pressure gauge on the control manifold. The pressure should be equal to the full working pressure of the accumulator unit. 3) Close the valve to the backup bank(s) and reopen the valve to the working bank(s). c. Control Manifold 1. Determine that the distance is at least 50 feet from the well bore to the control manifold, which may be mounted on the accumulator unit. Determine that the four-way control valves are identified as to function and the arrows showing the direction of movement of the valve handles are such that the probability of confusion during an emergency is minimized. Identification must be physically removed or otherwise obliterated from any four-way valve not connected to equipment at the wellhead. 2.

If the four-way valve for the CSO rams has been equipped with any type of guard to prevent accidental movement of the operating handle, ensure that the guard does not interfere with actuation of the preventer from the remote station. 3. Determine that access to the control manifold is unobstructed and that the four-way valve handles can be operated by a person standing in front of the manifold at a place where the valveidentification signs are clearly visible. Determine that the four-way control valves and any pressure-regulating valves can be operated by one person, without mechanical assistance of any kind. As each of the four-way valves is operated, observe the flow from the return line into the fluid reservoir to ensure flow of displaced fluid stops when the preventer has finished closing or opening. A continuation of flow indicates the four-way valve is not functioning properly or that the seal rings in the associated preventer may be defective. Either of these conditions will continue to reduce the accumulator pressure and must be corrected before testing can be continued. Determine, as nearly as is practicable, that the gauges indicating line pressure on each side of the annular-preventer regulating valve are functioning properly.

4.

5.

6.

d. Remote Station 1. Determine that a remote station, when required, is located as close as is practicable to the position normally occupied by the driller or head well puller while pipe is being pulled from the hole. If the configuration of the drilling floor permits, this distance should not be more than 10 feet. Use a remote station to close each of the preventers during the test.

5-3

2.

TESTING THE BOPE STACK, CHOKE AND KILL SYSTEM, AND AUXILIARY EQUIPMENT

a.

General. The division inspector must study the BOPE array on each well in the field so that the function of each item of BOPE is understood clearly and so conclusive testing of the entire array can be carried out.

BLOWOUT PREVENTION IN CALIFORNIA

71

Also, an operators or contractors BOPE test plan may not agree with some of the procedures suggested here; therefore, the division inspector should not contravene the operators test procedures unless there is a valid reason for doing so. For example, the system of valves can be tested by progressively closing the upstream valves and opening the downstream valves while keeping pressure on the system. This procedure permits the fastest testing of each of the valves, but some people feel that such a procedure will cause the premature failure of the valves by cutting out the valve gates and/or seats. Field experience does not support this concern; however, some rig supervisors prefer bleeding the pressure between each test. Another possible drawback to the method of testing valves through progressive upstream valve closure is that certain types of gate valves absorb some of the line pressure into the pressure-balancing system in the valve body, causing a reduction in the test pressure. Although this is not necessarily an indication of leakage in the gate area of the valve, rebuilding the test pressure with the rig pumps is very difficult in such situations because of the small volumes involved. The testing sequence outlined in this section assumes a Class IV 5M BOPE array tested against a casinghead BOPE test plug as shown in Figures 27-1 through 27-6b. The actual arrangement of equipment, valves, and gauges on a well in the field will probably vary from these illustrations; however, the general test sequences given here are adaptable to other classes and arrangements of equipment, tested with or without the test plug. CAUTION: When testing without a test plug, the division engineer must ensure that adequate pipe is run so the string will not be jacked out of the hole by the test pressures. This testing sequence also assumes that test pressures are applied with rig pumps. If a separate test pump is to be used, certain procedures outlined here will not be applicable. Again, the division inspector must modify the testing sequence to provide for conclusive testing. (If a separate test pump is used to test the equipment, it is important that the point of attachment of the testing pressure line is pressure tested after the line is removed. This can be accomplished during the pressure test of the casing required in paragraph 5-1c.) The division inspector should not require or recommend pressure testing needle-and-seat type chokes in the closed position. Although the operators instructions may include requirements for such testing, most chokes of this type are not designed to function well as full-closing valves, and they are likely to get cut out if so used. It is preferable that the

choke be available for the job it is designed to do, rather than risk compromising its integrity in testing. The pressure integrity of the choke bodies will be tested during the test outlined in paragraph 5-3b, which follows. Each adjustable choke should be cycled either manually or hydraulically to ensure that it is fully operable. Drilling and workover contractors should maintain BOPE maintenance records at the rig site. These records should indicate the manufacturer, model, nominal size, pressure rating, and overhaul history of each of the preventers. The history should show the overhaul dates, a description of any work done, the manufacturer(s) of replacement and repair parts, and the manufacturer(s) of all seals, rams, and packing elements contained in the preventer(s). If the equipment has been rented, these records should be obtained from the rental company. In the accompanying figures, Figure 27-1 is simply a diagram of the BOPE system as it should appear during normal drilling operations (the drill-ahead condition). All of the preventers are in the open position, the valves closest to the well bore (the master valves) on the kill line and the choke line are closed, the kill line high-pressure access valve and the casinghead outlet valve are closed, and all the other valves in the system are open. This configuration presents the least opportunity for choke-line plugging during circulation. This configuration may differ from one seen in the field if an operators blowout-prevention plan calls for a soft shut in. This type of shut in would be facilitated by drilling with the wellhead valves on the choke line open and the choke manifold valves open through one choke. All of the other valves in the choke manifold would be maintained in the closed position. In such cases, the division inspector should determine that the operators blowout prevention planning provides for flushing the choke line periodically to keep it free of obstructions. CAUTION: If a preventer has been closed for any reason, the hole space below that preventer must be vented through the choke line or a relief valve to bleed off any trapped pressure before the preventer is reopened. In any case, all personnel must stand away from the well bore when a preventer is opened after testing. In Figures 27-2 through 27-6, major changes are indicated in the system configurations to accommodate a particular test or series of tests. The alpha characters (a to k) that follow the figure numbers indicate changes in valve positions to test a particular item of equipment while maintaining the general configuration of the system.
DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

72

fig 27-1

FIGURE 27-1
BLOWOUT PREVENTION IN CALIFORNIA

73

fig 27-2a

74

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

FIGURE-27a

If the system is equipped with a remote-controlled hydraulic choke, the manifold (casing) pressure gauge and the standpipe (drill pipe) pressure gauge (in Figures 27-3, 27-4, and 27-5) also will be located at the choke control panel, which usually is sited on the rig floor. During testing, the division inspector should check the panel gauges to see that the panel is connected correctly and the indicated pressures agree with those on the respective gauges in the other parts of the system. Two items of auxiliary equipment, the drill pipe fullopening safety valve and the internal preventer, do not appear in the figures until they are tested with the configuration shown in Figure 27-6a and 27-6b. b. Testing all connections (except the connection of the annular preventer to the upper ram preventer), the CSO rams, the drilling spool (mud cross), the choke-manifold blowdown-line control valve, the choke bodies, the choke downstream isolation valves, the kill-line high-pressure access valve, the casinghead, and the BOPE test plug (Figure 27-2a). 1. If the testing is to be performed with a separate test pump, open the casinghead outlet valve and drain the drilling fluid from the BOP stack. If the testing is to be performed with the rig mud pumps, disregard this step. 2. Seat the BOPE test plug in the casinghead. Back the drill pipe out of the test plug, and remove the drill pipe from the hole. If fresh water is to be used as the test fluid and the mud was not drained, use water to displace the mud in the wellhead stack. In extremely cold weather, it may be necessary to buffer the water to keep it from freezing during the test. Open the casinghead outlet valve if it was not opened already in Step 1. Close the CSO rams, using the remote control panel at the drillers station. 2. 6. 7. Close the standpipe valve. Open the kill-line master valve and the chokeline master valve. Close the choke downstream-isolation valves and the choke-manifold blowdown-line control valve. Apply test pressure through the kill line, noting 3.

any discrepancies between the readings on the pump pressure gauge and the choke-manifold pressure gauge. These pressure readings should be within 10 percent of each other. In addition, if a remotely controlled choke has been installed, the casing pressure gauge on the choke-control panel must be checked to see that the panel has been connected correctly and the gauge is accurate. If the system does not hold pressure, perform the following checks. a) Inspect for leakage at all pressure connections, from the mud pump through the wellhead equipment and the choke manifold. The exterior of the BOPE should have been cleaned for the test, but, in some cases, it may be necessary to hose off the entire assembly and then dry it so that minor leaks become visible. b) Observe the outlet at the casinghead outlet valve to see if fluid is bypassing the seal rings on the BOPE test plug. If there is no leakage at that point, close the casinghead outlet valve. c) If the cause of the leakage has not been determined during this testing, suspect the ram rubbers, the ram-block seal rings, or the ram-shaft packing in the CSO ram preventer. If the operator filled the hole completely before starting the test, ram-block or sealring failure will result in flow at the flow line. A ramshaft packing leak may result in return flow into the accumulator unit reservoir. This set of problems can be solved only at the technical-service level and requires disassembly of the preventer.

3.

c.

Testing the Kill-line Check Valve (Figure 27-2b) 1. Bleed off the pressure rapidly at the mud pump. The sudden pressure drop in the kill line should cause the check valve to close. This closing is sometimes accompanied by a rather loud sound. After the check valve has closed, the pressure indicated at the pump pressure gauge should drop to zero, while the reading at the choke manifold (casing) pressure gauge remains at or near the original test value. Do not attempt to test the choke manifold wing valves in conjunction with the check valve, because it is difficult to identify the point of leakage if the pressure at the choke manifold (casing) pressure gauge begins to drop.

4.

5.

8.

9.

BLOWOUT PREVENTION IN CALIFORNIA

75

fig 272b

76

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

FIGURE 27-2b

fig 27-3

FIGURE 27-3

BLOWOUT PREVENTION IN CALIFORNIA

77

4.

Bleed the test pressure at the choke manifold blow-down line control valve and open the CSO rams using the four-way valve at the accumulator unit.

2. 3.

Open the kill line control valve. Build test pressure through the drill pipe, observing pressure on the pump pressure gauge, the choke manifold (casing) pressure gauge, and the standpipe (drill pipe) pressure gauge. Close the standpipe valve and bleed the pressure at the pump. This should cause the check valve to close again. The pressure should drop to zero on the pump pressure gauge, but should remain constant at the standpipe pressure gauge and on the choke manifold pressure gauge. If pressure leakage occurs, close the lower kelly cock. If the pressure drop ceases at the choke manifold pressure gauge, but continues at a faster rate at the standpipe pressure gauge, the problem lies in the standpipe valve. If that situation does not occur, suspect the ram rubbers, the seal rings, or the ram-shaft packing in the upper pipe-ram preventer. Also, there may be concurrent leakage of the standpipe valve and the lower kelly cock, although this is unlikely.

d. Testing the Lowermost Ram Preventer, the Swivel, the Rotary Hose and Connections, and the Standpipe Connections (Figure 27-3) 1. Insert a joint of drill pipe into the test plug, making some provision for weeping pressure from the drill pipe to the wellhead stack. The weeping required for this step may be accomplished with a weep-hole sub installed between the drill-pipe joint and the test plug, or with a test plug that has a weep hole built into it. Open the standpipe valve and close the kill-line control valve. The position of the rest of the choke- and kill-line valves during this step is unimportant because none of them will be tested. Attach the kelly to the drill pipe in the BOP stack so the standpipe (drill pipe) pressure gauge will be available for testing. f. 4. Close the lowermost rams using the remote control panel at the drillers station. Apply test pressure through the drill pipe. Note any discrepancies between the readings on the pump pressure gauge and the standpipe (drill pipe) pressure gauge. These pressure readings should be within 10 percent of each other. In addition, if a remotely controlled choke has been installed, the drill pipe pressure gauge on the choke-control panel must be checked to see that the panel has been connected correctly and that the gauge is accurate. If the stack was completely filled with fluid before the test, leakage past the preventer ram blocks (ram rubbers or seal rings) will be evidenced by flow at the flow line. Leakage past the ram-shaft packing might cause a flow of fluid into the accumulator-unit reservoir. Bleed the test pressure back through the pump, and open the lowermost ram preventer using the four-way valve at the accumulator unit.

4.

2.

3.

Testing the Upper Kelly Cock (Figure 27-4b) 1. 2. Close the upper kelly cock. Open the standpipe valve. The pressure at the standpipe pressure gauge should drop to zero. Because the upper kelly cock has been closed (Step f1), little or no change should occur at the choke manifold pressure gauge. If there is pressure loss, reclose the standpipe valve and watch the standpipe pressure gauge. If the gauge shows a pressure increase, the upper kelly cock is bypassing fluid. Because it would probably be very difficult to open the upper kelly cock with test pressure on one side of the valve, it may necessary to bleed the pressure through the choke-manifold blowdown-line control valve and open the upper kelly cock.

5.

3.

6.

4.

7.

g. Testing the Lower Kelly Cock (Figure 27-4c) 1. Close both the standpipe valve and the lower kelly cock. Then, rebuild the test pressure through the kill line, observing the pressure at the pump pressure gauge and/or the choke-manifold pressure gauge. If there is pressure loss, check the standpipe pressure gauge. An increase at that gauge would indicate leakage past the lower kelly cock.

e.

Testing the Upper Pipe-ram Preventer and the Standpipe Valve (Figure 27-4a) 1. Close the upper pipe rams using the remote control panel at the drillers station.

2.

78

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

fig 27-4a

FIGURE 27-4a

BLOWOUT PREVENTION IN CALIFORNIA

79

fig 27-4b

80

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

FIGURE 27-4b

fig 27-4c

FIGURE 27-4c

BLOWOUT PREVENTION IN CALIFORNIA

81

fig 27-4d

82

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

FIGURE 27-4d

fig 27-4e

FIGURE 27-4e

BLOWOUT PREVENTION IN CALIFORNIA

83

fig 27-4f

84

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

FIGURE 27-4f

3.

If there is no pressure loss, bleed the pressure through the choke-manifold blowdown-line control valve. 2. Open the lower kelly cock and the standpipe valve.

left-outboard wing valve. Watch the choke-manifold (casing) pressure gauge for pressure drop. Test the choke-manifold right-inboard wing valve by closing it and opening the choke-manifold right-outboard wing valve. Watch the choke-manifold (casing) pressure gauge for pressure drop.

4.

h.

Testing the Kill-line Control Valve (Figure 27-4d) 1. 2. Close the kill line control valve. Rebuild the test pressure through the drill pipe, checking the pressure on the pump pressure gauge, the choke-manifold pressure gauge, and/ or the standpipe pressure gauge. Close the standpipe valve. Bleed the pressure at the pump. l. 5. Open the kill-line high-pressure access valve. If the system does not include this valve, it will be necessary to dismantle the check valve to check the kill-line master valve and the kill-line control valve in the direction of blowout flow. If there is pressure loss, check the opening at the kill-line high-pressure access valve or look into the check valve to see if the kill line control valve is leaking. k.

Testing the Choke-manifold Blowdown-line Master Valve (Figure 27-4i) 1. Close the choke-manifold blowdown-line master valve. Open the choke-manifold blowdown-line control valve, watching the choke-manifold (casing) pressure gauge for a pressure drop.

2. 3. 4.

Testing the Choke-line Control Valve (Figure 274j) 1. 2. Close the choke-line control valve. Open the choke-manifold blowdown-line master valve. The pressure should drop to zero on the choke-manifold (casing) pressure gauge and remain at the test-pressure value on the standpipe-pressure gauge.

6.

i.

Testing the Choke-manifold Outboard Wing Valve(s) and the Kill-line Master Valve (Figures 27-4e and 27-4f) 1. Test the choke-manifold left-outboard wing valve by closing it and opening the left-choke downstream isolation valve. Watch the chokemanifold (casing) pressure gauge for a pressure drop. Test the choke-manifold right-outboard wing valve by closing it and opening the right-choke, downstream isolation valve. Watch the choke manifold (casing) pressure gauge for a pressure drop. Test the kill-line master valve by closing it and opening the kill-line control valve. Watch the opening at the kill-line high-pressure access valve for leakage.

m. Testing the Choke-line Master Valve (Figure 274k) 1. 2. Close the choke-line master valve. Open the choke-line control valve. Watch the standpipe pressure gauge for a pressure drop. Open the standpipe valve and bleed the pressure back through the pump. Open the upper pipe rams, using the four-way valve at the accumulator unit.

3.

2.

4.

n. Testing the Annular Preventer and the Connection of the Annular Preventer to the Upper Ram Preventer (Figure 27-5) 1. Close the annular preventer from the remote station. Check the closing pressure at the applicable gauge on the accumulator unit. Open the choke-line master valve and close the choke-manifold, inboard wing valves and the choke-manifold blowdown-line master valve so the standpipe pressure gauge and the chokemanifold pressure gauge can be compared dur-

3.

j.

Testing the Choke Manifold Inboard Wing Valve(s) (Figures 27-4g and 27-4h) 1. Test the choke-manifold left-inboard wing valve by closing it and opening the choke-manifold

2.

BLOWOUT PREVENTION IN CALIFORNIA

85

fig 27-4g

86

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

FIGURE 27-4g

fig 27-4h

FIGURE 27-4h

BLOWOUT PREVENTION IN CALIFORNIA

87

fig 27-4i

88

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

FIGURE 27-4i

fig 27-4j

FIGURE 27-4j

BLOWOUT PREVENTION IN CALIFORNIA

89

fig 27-4k

90

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

FIGURE 27-4k

fig 27-5

FIGURE 27-5

BLOWOUT PREVENTION IN CALIFORNIA

91

fig 27-6a

92

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

FIGURE 27-6a

fig 27-6b

FIGURE 27-6b

BLOWOUT PREVENTION IN CALIFORNIA

93

ing the test, proving that the drill pipe pressure is being communicated through the weep hole to the BOP stack. The kill-line master valve is still closed from the previous testing. 3. Build test pressure through the drill pipe, reading the pressure at the standpipe pressure gauge and the choke-manifold pressure gauge. For annular preventers, the test pressure need not exceed 2,000 psi, regardless of the rated pressure of the preventer. If there is a pressure loss, suspect the packing element or the seal rings in the annular preventer. If the stack was filled with fluid prior to testing, leakage between the packing element and the drill pipe will cause flow at the flow line. Leakage past the seal rings may cause fluid returns to the accumulator-unit reservoir, but this does not always happen. This problem is best solved at the technical-service level. Bleed the test pressure through the pump, ensuring that the standpipe pressure gauge and the choke-manifold pressure gauge both drop to zero before the annular preventer is opened. Open the annular preventer, using the fourway valve at the accumulator unit.

7.

Open the drill-pipe full-opening safety valve and close the internal preventer. Again, apply pressure through the kill line until the test pressure is read on the pump pressure gauge and the choke manifold (casing) pressure gauge. Watch the opening at the top of the internal preventer for leakage. Bleed the pressure through the choke-manifold blowdown-line master valve. Remove the internal preventer and the drill-pipe fullopening safety valve. Check to see that the internal preventer is stored in such a position or marked in such a way that it is unlikely that it would be the first piece of equipment installed in the working string in the event of a kick taken while tripping the pipe.

8.

9.

10. Remove the test joint of drill pipe and the BOPE test plug. 11. Return all valves to the drill-ahead condition (Figure 27-1).

4.

5.

5-4
a.

SUBSEA BOPE INSPECTION AND TESTING

o. Testing the Internal Preventer and the Drill Pipe Full-opening Safety Valve (Figures 27-6a and 276b) 1. Detach the kelly, close the standpipe valve, and affix the drill pipe full-opening safety valve to the drill pipe. Be sure that the valve is in the open position. Affix the internal preventer to the drill pipe full-opening safety valve. Ensure the internal preventer is in the open position. Open the kill-line master valve, and pump slowly through the kill line until the fluid overflows the internal preventer, ensuring that the drill pipe and the valves are full of fluid. Close the drillpipe full-opening safety valve. Apply pressure through the kill line until the test pressure is read on the pump pressure gauge and the choke-manifold (casing) pressure gauge. Watch the opening at the top of the internal preventer for leakage. Bleed the pressure through the choke-manifold blowdown-line master valve.

Surface Inspection and Testing 1. Prior to delivery to an offshore drilling unit, the subsea BOPE components must be tested as follows: a) Each BOPE component must be tested to its rated working pressure in test facilities under shop conditions. b) Following assembly and testing in the shop, the entire BOPE stack must be tested for proper operation using the actuating system (accumulator unit) that will be used when the equipment is installed. 1) The operating system and control lines must be tested to 3,000 psi. 2) Each preventer and high-pressure connector must be tested for lowpressure leakage at 200 psi and to the rated working pressure of the piece of equipment. (However, annular preventers need not be tested to pressures greater than 5,000 psi.)

2.

3.

4. 5.

6.

94

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

The dates and results of the inspections and tests must be recorded on the shipping tags or delivery tickets. 2. After delivery to an offshore drilling unit, the unitized blowout prevention system must be tested on a test stump. a) Low-pressure and rated working-pressure tests of each component must be repeated and recorded properly in the drillers log. b) The test record must include opening and closing times, hydraulic fluid volumes required for each function, and pump-recovery times. Subsequent test-stump pressures should be limited to 70 percent of the rated working pressure of the blowout preventer stack, or the anticipated surface pressure, whichever is greater. Further testing to the full rated working pressure of the components should be limited to one test following any work that requires breaking a pressure seal in the assembly. 3. Before installing the BOPE array on a well, the accumulator unit must be tested for precharge pressure and recharging pump capability.

of the rated working pressure of the ram preventers, or to the maximum pressure expected in the upper part of the casing, whichever is greater. Subsequent pressure tests may be limited to 70 percent of the minimum internal yield strength of the upper part of the casing, provided the test pressure equals or exceeds the maximum pressure anticipated inside the upper part of the casing during drilling or completion operations. The annular preventer is exempted from this requirement. Following installation on the ocean floor, the annular preventer may be tested at 50 percent of its rated working pressure to minimize packingelement wear or damage. (A test plug or cup-type tester should be used.) A subsea test tree must be used in the blowout preventer stack while performing drill stem or production tests from mobile drilling rigs. c. Subsea Preventer Actuation Testing. In addition to the pressure testing just outlined, each of the preventers in the subsea stack must be actuated according to the following schedule: 1. Each of the pipe-ram preventers must be tested for actuation before pulling drill pipe out of the hole on each trip, or at least once each 24 hours. The annular preventers need not be actuated during this pretrip function testing as long as they are being operated during the required weekly pressure tests or at an interval not greater than once each seven days. Periodic actuation-testing is not required for the blind or blind-shear rams. These rams need only be tested when installed and prior to drilling out after each casing string has been set.

2. 4. The entire BOPE system must be inspected visually before installation, and a record of the inspection recorded in the drillers log.

b. Subsea Pressure Testing. Pressure testing of each of the subsea stack components must be performed as follows: 1. After installation. 2. After setting casing. 3. Before drilling into any known or suspected high-pressure zones. At regular intervals during drilling operations, or at least once each week. Following any repair or replacement that necessitates breaking a pressure seal in the assembly.

3.

4.

d. Testing the Subsea Actuating System. The subsea BOPE system is dependent on surface-actuated hydraulic and/or electric controls. The design of this actuating system is governed by water depth and environmental conditions. It is important to pressure test and function test the system concurrently with the blowout preventers and connectors. 1. The system must have an adequate backup system to operate each critical function. Operation of individual components of the subsea BOPE array must be alternated frequently enough between control pods and remote operating panels to ensure that each pod and all operating panels are functioning properly.

5.

2. Following installation of the BOPE stack on the ocean floor, each component, including the highpressure connectors, must be pressure-tested individually at low pressure (200 psi) and to 70 percent

BLOWOUT PREVENTION IN CALIFORNIA

95

3.

Testing must be conducted at staggered intervals to allow each drilling crew to perform the tests.

3.

Following each operational test, the choke manifold and subsea kill- and choke-line valves must be flushed with water to prevent the lines and valves from plugging. The diverter and its vent lines and valves must be checked daily for plugging by drill cuttings or other debris.

e.

Testing the Auxiliary Equipment 4. 1. The upper and lower kelly cocks, drill pipe safety valve, casing safety valve, and inside blowout preventer must be tested at the same time and to the same pressures as the ram-type blowout preventers. Each choke-manifold valve, adjustable choke, subsea kill- and choke-line valve, upper- and lower-kelly cock, drill-pipe safety valve, and internal preventer must be operated daily.

2.

96

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

APPENDIX A A1

BLOWOUT PREVENTION IN CALIFORNIA

97

APPENDIX A A2

98

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

APPENDIX B B1

BLOWOUT PREVENTION IN CALIFORNIA

99

APPENDIX B

B2

100

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

APPENDIX C

BLOWOUT PREVENTION IN CALIFORNIA

101

APPENDIX D

102

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

APPENDIX E

BLOWOUT PREVENTION IN CALIFORNIA

103

APPENDIX F F1

104

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

APPENDIX F

F2

BLOWOUT PREVENTION IN CALIFORNIA

105

APPENDIX F Fig. F3

106

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

APPENDIX G

BLOWOUT PREVENTION IN CALIFORNIA

107

SELECTED REFERENCES
OIL AND GAS WELLS
1. Adams, J. J., 1975, Low-choke pressure method of well control generally not recommended: Oil and Gas Jour., Sept. 29, pressure. 109-115 2. American Association of Oilwell Drilling Contractors, 1958, Prevention and control of blowouts. 3. American Petroleum Institute, 1957, Classification of blowout prevention equipment and practices: Paper 801-33-M. 4. 1982, API recommended practice for care and use of marine drilling risers: API RP 2K, Second Edition, Jan. 5. 1984, API recommended practice for design and operation of marine drilling riser systems: API RP 2Q, Second Edition, Apr. 15. 6. 1988, API specification for line pipe: API Spec 5L, 37th Edition, May 31. 7. 1983, API specification for wellhead and christmas tree equipment: API Spec 6A, 15th Edition, Apr. 1. 8. 1985, Specification for rotary drilling equipment: API Specification 7, 35th Edition, May 1. 9. 1984, Recommended practices for blowout prevention equipment systems for drilling wells: API RP 53, Second Edition, May 25. 10. 1981, Recommended practices for occupational safety and health for oil and gas well drilling and servicing operations: API RP 54, First Edition, Jan. 11. 1987, Recommended practices for well control operations: API RP 59, First Edition, Aug 20. 12. Bell, F. S., 1957, High pressure drilling and blowout prevention: Oil and Gas Jour., Oct. 14, p. 139-166. 13. California Dept. of Industrial Relations, 1959, Petroleum safety orders - drilling and production: Div. of Industrial Safety, Title 8, Art. 55. 14. Christman, Stan A., 1972, Offshore fracture gradients and casing setting depths: SPE paper 4133, presented at the SPE-AIME 47th Annual Fall Meeting, San Antonio, Oct 8-11, 1972. 15. Daneshy, A. A., 1973, Experimental investigation of hydraulic fracturing through perforations: Jour. Petroleum Technology, Oct., p. 1201-1206. 16. Dawson, J. A., 1966, Offshore safety - drilling operations: Soc. Petroleum Engineers, SPE 1551, Fourth Annual Fall Meeting. 17. Gaines, T., 1955, How to prevent blowouts: World Oil, Oct. 18. Goins, W. C. Jr., 1968, Guidelines for blowout prevention: World Oil, Oct. 19. 1969, Blowout Prevention: Gulf Publishing Co., Vol. 14. 20. Green, H. R. Sr., 1965, Installing and testing BOPs: Oil and Gas Jour., July 26, p. 170-172. 21. Hauser, Robert L. and Guerard, William F., Jr., 1993, A history of oil- and gas-well blowouts in California: California Dept. of Conservation, Division of Oil, Gas, and Geothermal Resources. 22. Horn, A. J., 1950, Well blowouts in California drilling operations, causes and suggestions for prevention: Amer. Petroleum Institute, Drilling and Production Practices. 23. Hubbert, M. D. and Willis, D. G., The mechanics of hydraulic fracturing: SPE Reprint Series 5, Well completions, p. 241-254. 24. McGhee, E., 1958, Blowout preventer testing: Oil and Gas Jour., Aug. 11, p. 95-97. 25. McGivern, W. P., 1969, Blowout preventer controls: Calif. Oil World, May p. 7-8.

108

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

26. Records, L. R., 1970, Effective well control must begin when the well is planned: Oil and Gas Jour., July 6, p. 104-110. 27. U. S. Dept. of the Interior, 1988, Oil and gas and sulfur operations in the Outer Continental Shelf; final rule: Minerals Management Service, 30 CFR Parts 250 and 256, April 1, 1988.

28. Univ. of Texas, Petroleum Extension Service, 1971, Lessons in rotary drilling, Unit III, - Lesson 3, Blowout prevention. 29. Walker, F. L., 1959, Needed, closer supervision of equipment used for blowout prevention: Oil and Gas Jour., July 27, p. 171-175.

GEOTHERMAL WELLS
1. Campbell, G. E., 1974, Geothermal well drilling and completion practices in California including casing and abandonment programs and examples of blowouts: California Division of Oil, Gas, and Geothermal Resources unpublished report. 2. Rehm, W. A. and Goins, W. C. Jr., 1978, Geothermal blowout control, phase I, study of existing technology: Maurer Engineering Inc., Houston, Texas.

BLOWOUT PREVENTION IN CALIFORNIA

109

GLOSSARY OF BOPE AND ASSOCIATED TERMS


-AACCUMULATOR - A pressure vessel, precharged with nitrogen above a movable barrier, used in the BOPE actuating system to accumulate and store hydraulic fluid under pressure. ACCUMULATOR BACKUP - A particular type of emergency backup system consisting of additional accumulators that are normally isolated from the working bank(s) of accumulators in the actuating system. ACCUMULATOR SIZE FACTOR - A number by which the required working fluid volume may be multiplied to arrive at the total accumulator bottle volume necessary for the accumulator unit. This factor is a function of the precharge pressure and the rated working pressure of the accumulator unit. ACCUMULATOR UNIT (Actuating Unit, Closing Unit) A compact assembly of pumps, valves, accumulators, and other items used to maintain and restore the volume of working fluid needed to operate the components of the wellhead stack. ACTUATING SYSTEM (Operating and Control System, Closing System) - The entire array of equipment that stores, pumps, and controls the hydraulic fluid needed to operate the components of the wellhead stack. Consists of the accumulator unit, emergency backup system, control manifold, remote operating station(s), and the control lines to the wellhead equipment. In subsea equipment, also includes the control pods, subsea accumulators, and other specialized items. ACTUATING UNIT - See Accumulator Unit. ANCHOR STRING - The string of casing inside of which pressures are directly affected by well-control activities using the BOP stack. Usually, the innermost casing string that is connected to, or hung inside the casinghead. ANNULAR PREVENTER (Bag Preventer) - A hydraulically or pneumatically operated device that can seal the annular space around almost any object in the well bore. Most can seal off an open hole in an emergency. Compression or inflation of some type of elastomer packing element effects the seal. API RING - See Ring-joint Gasket. AUXILIARY EQUIPMENT - The accessories to the BOP stack that assist in preventing or controlling kicks. Consists of the fill-up line, the kelly cock(s), the safety valve(s), and the internal preventer(s).

-BBOP - Abbreviation for Blowout Preventer. BOPE - Abbreviation for Blowout Prevention Equipment. BACKUP SYSTEM - See Emergency Backup System. BAG PREVENTER - See Annular Preventer. BAILING GATE - A full-closing gate valve, usually operated manually, that can be installed above the casinghead to provide a means of closing off the well bore when a regular BOP stack is not required. BALL VALVE - A valve containing a ball with a hole through it. The ball can be rotated so the hole is either in line with, or at right angles to, the center line of the pipe to which the valve is attached. May or may not be full throughbore. Not to be used for any type of choking or throttling activity. BANJO BOX - A large-capacity, thick-walled drilling spool used when drilling with air. Absorbs turbulence, reduces annular velocities, and routes returning air and drill cuttings to the blooie line. BELL NIPPLE (Flow Nipple, Mud Riser, Pitcher Nipple) A component of the BOP stack or marine riser system, installed as the uppermost element. It has an inside diameter equal to or greater than the throughbore of the preventers. It is belled at the top to guide tubulars into the hole and equipped with a side outlet to direct mud returns to the flow line. Usually equipped with a second side outlet for the attachment of the fill-up line. BLIND RAMS (Blank, CSO, Complete Shut Off, Master Rams) - Rams that are not intended to seal off against any tubular goods in the well bore. They seal against each other to close off the hole. See also Ram-Type Preventer.

110

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

BLIND-SHEAR RAMS - Blind rams with a built-in cutting blade that will shear pipe in the hole, allowing the blind-ram faces to seal the hole. Used primarily in subsea BOP stacks. BLOOIE LINE - A large-diameter pipe used in air drilling operations that routes returning air and drill cuttings to a muffler. The line is equipped with dual-purpose high-pressure nozzles that spray either water to settle dust or sodium hydroxide and/or hydrogen peroxide to neutralize hydrogen sulfide. BLOWOUT - An uncontrolled flow of well fluids and/or formation fluids from a well bore to the surface or into lower-pressured subsurface zones (underground blowout). BLOWOUT PREVENTER (BOP) - A valve attached to the casinghead of a well, allowing the well to be sealed at the surface and confining well fluids to the well bore. BLOWOUT PREVENTER DRILL (Preventer Drill) - A training procedure to ensure rig crews are familiar with the correct operating practices to be followed in the use of the BOPE. A dry run of all blowout prevention actions, up to and including closing a preventer to shut in a well. BLOWOUT PREVENTER STACK (Wellhead Stack) The wellhead assembly of well control equipment, including all of the preventers, spools, and valves connected to the casinghead. BLOWOUT PREVENTION EQUIPMENT (BOPE) - The entire array of equipment installed at a well to control kicks and prevent blowouts. Consists of preventers, an actuating system, a choke and kill system, and auxiliary equipment. BOLL WEEVIL PLUG - See Test Plug. BUTTERFLY VALVE - A fast-acting low-pressure valve having as the flow-control device a flat plate in the flow path that is wider than the inside diameter of the valve. The valve is closed by rotating the shaft to which the plate is attached until the sides of the plate contact the sides of the flow path. -CCSO RAMS - See Blind Rams. CASING HANGER - A slip and packer assembly that clamps around the top of a string of casing and fits into the casinghead, supporting a predetermined portion (weight) of the casing.

CASINGHEAD - A heavy steel fitting that connects to the first string of casing and provides a housing for the slips and packing assemblies by which subsequent strings of casing are suspended and the annuli sealed off. CASINGHEAD TEST PLUG - See Test Plug. CHECK VALVE - A valve that permits flow in one direction only. CHOKE - A device with a fixed or variable aperture, used during kick-control procedures to control the flow rate and regulate the back pressure of liquid and/or gas in the well bore. CHOKE LINE - The high-pressure piping connecting the BOP outlets or the side openings of the mud cross to the choke manifold. CHOKE MANIFOLD (Control Manifold) - The system of valves, chokes, piping, and gauges used to control flow from the annulus and regulate pressures in the working string/annulus flow system. CLAMP CONNECTION - A non-API pressure-sealing device used to join two equipment components together without using conventional, bolted flange joints. Each component is equipped with a clamp hub that is held to the hub of an adjacent component by a clamp containing two to four bolts. CLOSING RATIO (Close Ratio) - The ratio of the kick pressure in the wellbore (y) to the preventer closingchamber pressure necessary to close the preventer on a kick (x). Expressed as y:x. CLOSING UNIT - See Accumulator Unit. COMPLETE SHUTOFF (CSO) RAMS - See Blind Rams. CONDUCTOR PIPE - A short string of pipe, usually of large diameter, used to protect the well bore against caving by unconsolidated surface formations and to convey the circulating mud returns to the flow line. CONNECTION GAS - Analogous to trip gas, but occurs during a connection rather than a trip. An isolated occurrence of connection gas may not indicate increasing formation pressure, but a pattern of steadily increasing connection gas may do so. CONTROL LINES - The hydraulic lines connecting the control manifold to the hydraulically controlled preventers and valves at the wellhead.

BLOWOUT PREVENTION IN CALIFORNIA

111

CONTROL MANIFOLD - A system of valves and piping used to control the flow of hydraulic fluid from the accumulator unit to the various components of the BOP stack. CONTROL POD - A unitized assembly of control valves and regulators used to control the functions of the BOPE on a subsea stack. CONTROL VALVE - The valve connected to the BOP stack that controls fluid access from the kill line to the well bore and from the well bore to the choke line. In a BOPE system requiring doubling-up (redundancy) of these valves on the choke and kill lines, the outer valve is referred to as the control valve. CRITICAL WELL - A well in a sensitive location described in Section 1720a, Title 14, California Code of Regulations. CSO RAMS - See Blind Rams. CUP TESTER - A working-string-mounted accessory that is equipped with up-facing cups that seal against the casing walls when pressured from above and can be run through the preventer stack to any depth of interest in the casing string. May be used in lieu of a bridge plug or hanger-type test plug when testing BOPE. -DDIVERTER SYSTEM - A system consisting of an annular preventer and large-diameter vent lines attached to the well head or the marine riser to direct any annular flow away from the rig. Its function differs from that of the regular preventers in that flow is not stopped, just directed away from the rig floor. DOWNHOLE MUD MOTOR - See Mud Motor. DRILL PIPE SAFETY VALVE - See Pipe Safety Valve. DRILL STRING FLOAT - A check valve, run as an integral unit in the drill string, that allows fluid to be circulated down the drill string while preventing backflow. DRILLING SPOOL - A component of the wellhead BOP stack with both ends either flanged or hubbed. It must have an internal diameter at least equal to the throughbore of the preventers and may have side openings for connecting auxiliary lines. (See also Mud Cross.) DRIVE PIPE (Drive Casing) - A short string of largediameter pipe driven into the ground or the sea floor to prevent sloughing of unconsolidated formations into the

hole and/or conduct hole fluids to the flow line. (See also Conductor Pipe.) -EEMERGENCY BACKUP SYSTEM - A required accessory system to the accumulator unit that provides an independent source of usable fluid, or equivalent, to operate the wellhead equipment. May be high pressure nitrogen type or accumulator type. -FFILL-UP LINE - A line, usually connected into the bell nipple above the BOP stack, used to add mud to the hole during trips to keep the hole full. FLANGED CONNECTION - An API-type connection employing two facing, bolted- or studded-plates with a deformable metal API ring-gasket seated in ring grooves to provide a pressure seal. FLOW LINE - A line connecting the bell nipple at the top of the BOP stack to the hole-fluid storage and reconditioning area. FLOW NIPPLE - See Bell Nipple. FORMATION FRACTURE GRADIENT - The pressure per unit of true vertical depth that could be expected to fracture a formation at a particular point in the well bore. (Expressed in psi/ft.) FORMATION PRESSURE GRADIENT - The known or estimated formation pressure per unit of true vertical depth. A normal formation pressure gradient may be assumed to equal that of a column of formation-density salt water extending from the depth in question to the surface, approximately 0.444 psi/ft. in California. FOUR-WAY VALVE - A valve on the accumulator-unit manifold that controls the flow of hydraulic fluid to and from the wellhead equipment. Each valve has an inlet port from the accumulator(s) and output ports to the preventer opening line, the preventer closing line, and the accumulator unit reservoir. FULL-HOLE INDICATOR - See Mud Return Indicator. FULL-OPENING VALVE - Any valve that, in the open position, has a throughbore at least as large as the throughbore of the valve body, itself.

112

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

-GGATE VALVE - A valve utilizing a stem-driven sliding gate to open or close the flow passage. May or may not be full opening. -HHANGER-TYPE TEST PLUG - See Test Plug. HOLE-FLUID MONITORING EQUIPMENT - BOPE accessories mounted in the circulating system that indicate or record information concerning hole-fluid conditions. The equipment monitors the volume of fluid in the system, as indicated by the mud-pit level and may indicate the gas content, the presence or absence of flow, and/or the changing physical conditions of the fluid. HYDROSTATIC GRADIENT - The pressure exerted per unit by true vertical height by a column of a particular liquid at rest. A function of fluid density, expressed in psi/ft. HYDROSTATIC HEAD - The pressure that a column of fluid at rest exerts in all directions at any point in the column. A function of fluid density and true vertical height of the fluid column above a point. -IINSIDE BLOWOUT PREVENTER - See Internal Preventer. INTERNAL PREVENTER - A surface-installed working-string check valve that permits stripping back to bottom and reestablishing circulation to control a kick taken while tripping. -KKELLY COCK, LOWER - A strippable full-opening valve mounted on the lower end of the kelly that may be closed to protect or isolate the rotary hose and standpipe system during kick-control operations. KELLY COCK, UPPER - A ball-type or flapper-type valve mounted between the kelly and the swivel that performs the same function as the lower kelly cock and serves as a backup to the lower kelly cock in BOPE systems required to have both types. KICK - The unwanted entry of formation fluids into the wellbore, resulting in a rise in the level of hole fluid in the storage system. If control is not reestablished, a kick may result in a blowout.

KILL LINE - A high-pressure line connecting the hole fluid pump(s) directly to the well bore beneath at least one preventer, permitting fluid to be pumped into the hole when a preventer is closed during a kick. -LLOST CIRCULATION - Loss of hole fluid into the formation, resulting in lost or reduced returns, lowering the fluid level in the hole-fluid storage system, and possible loss of hydrostatic pressure that could lead to underbalance and the introduction of a kick. LOWER MARINE RISER PACKAGE - A unitized array of equipment connected to the lower end of the marine riser. Contains variable equipment components, depending on the design of the BOPE system. Usually contains, from the bottom up, a high-pressure connector to the BOP stack, two control pods, and a flexible joint to the marine riser. May also contain an annular preventer, multiplex signal decoder(s), sonar signal receptors, etc. Usually, the package can be recovered separately from the BOP stack so the components can be worked on or the vessel can be moved without removing the preventers from a wellhead. -MMARINE RISER - Large-diameter pipe system that provides a fluid pathway between ocean-floor equipment and the drilling vessel. Usually integrated with the choke and kill lines. Deep-water systems may be equipped with flotation devices to support part of the weight of the riser pipe, reducing the strain on the risertensioning system. MASTER VALVE - The valve in the choke and kill lines closer to the BOP stack in a BOPE system that requires redundant valves. MINIMUM INTERNAL YIELD PRESSURE - The lowest internal pressure at which permanent deformation of a given casing will occur. MUD CROSS - A component of the wellhead BOP stack with both ends either flanged or hubbed, having side openings for connecting auxiliary lines and an internal diameter at least equal to the throughbore of the preventers. (See also Drilling Spool.) MUD MOTOR (Downhole Mud Motor) - The principal component of a type of hole-drilling system that does not require rotation of the drill string by means of a rotary table at the surface. Instead, the bit is turned by a downhole turbine that is powered by circulating fluid.

BLOWOUT PREVENTION IN CALIFORNIA

113

MUD RETURN INDICATOR (Full-hole Indicator) - A device attached to the pitcher nipple or flow line that senses flow and indicates to the driller that the hole is full of circulating fluid. MUD RISER - See Bell Nipple. MUD VOLUME MEASURING DEVICE - Any device in the circulating system that is installed for the purpose of indicating the level or volume of circulating fluid. MUD WEIGHT RECORDER - A graphical display of the output from any device in the hole-fluid monitoring system that measures fluid density continuously. MUFFLER - An enlargement of the blooie line at the separator end that suppresses noise caused by air drilling and/or steam discharge. -OOPENING RATIO (Open Ratio) - The ratio of the opening chamber pressure (z) necessary to open a preventer to the pressure in the wellbore (y). Expressed as z:y. OPERATING AND CONTROL SYSTEM - See Actuating System. OVERBURDEN - The pressure exerted on a formation at any depth due to the weight of the overlying rocks. Generally assumed to be 1 psi/ft. of burial depth. -PPACKOFF - See Stripper. PIPE RAMS - Rams with contoured faces designed to seal off the annular space around pipe. Unless the newer variable rams are used, a separate preventer with appropriately sized rams is required for each size of pipe used in an operation. (See also Ram-type Preventer.) PIPE SAFETY VALVE - A full-opening valve positioned on the rig floor, with connections or adapters to match the pipe in use. The valve is used to close off the inside of the working string to prevent internal flow. PIT DRILL - A category of blowout drill that measures the crews ability to respond to kick indications. It takes the crew from the initial signs of a kick to the point where they observe the flow line for spontaneous flow. A preventer is not actuated unless the drill is permitted to continue. PIT LEVEL INDICATOR - A level-measuring device installed in a mud pit to measure relative changes in the volume of a particular pit.

PIT VOLUME TOTALIZER - A device in the hole-fluid monitoring system that accepts the output from a series of pit level indicators and that displays the total level change from all of the monitored pits. PITCHER NIPPLE - See Bell Nipple. PLUG VALVE - A valve in which the operator is a tapered plug with a hole through it. The plug can be rotated so the hole is either in line with, or at right angles to, the center line of the pipe to which the valve is attached. It may or may not be a full-throughbore valve. This valve is not to be used for any type of choking or throttling activity. PRECHARGE PRESSURE - The pressure to which an accumulator vessel is charged with nitrogen before pumping hydraulic fluid into it for storage and use. Depending on the type of accumulator, this pressure will be above a guided float or inside an elastomer bladder or diaphragm. Also, the pressure remaining in an accumulator vessel after all the stored fluid has been driven out. PRESSURE REGULATING VALVE - An adjustable valve in the accumulator-unit control manifold that regulates the pressure of the hydraulic fluid in the operating chambers of the wellhead equipment. PREVENTER - See Blowout Preventer. PREVENTER DRILL - See Blowout Preventer Drill. PUMP-DOWN PREVENTER - An alternative to the surface-mounted internal preventer. A small-diameter check valve that can be dropped into the working string and pumped down until it locks into a profile sub near the bottom of the string. Once it has been pumped into place, it permits pumping down through the working string while preventing back flow. -RRAM-TYPE PREVENTER - A wellhead-mounted gate valve that seals off open space in the well bore by forcing two horizontal gates (rams) into sealing contact against one another and against a seal seat in the top of the preventer body. (See also Pipe Rams and Blind Rams.) RATED WORKING PRESSURE - The highest pressure that an item of equipment should be required to contain in normal use. REMOTE STATION - A panel containing a series of control buttons or levers that will operate the four-way valves on the control manifold from a remote location.

114

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

RING-JOINT GASKET - A metal ring that fits into the ring groove on a flange-type or clamp-type connection, providing the pressure seal as the flange or clamp bolts are tightened. These gaskets are designated as type R, solid rings with oval or octagonal cross sections. They are usually used in lower-pressure installations, or type RX and BX, having irregular octagonal cross sections with pressure-balancing holes drilled vertically through the body of the ring. These are referred to as pressure-energized rings. ROTATING HEAD - A rotating pressure-sealing device used when performing well operations with air, gas, or foam as a circulating fluid, or in any other conditions that would, or might, result in an underbalance of wellbore pressure versus formation pressure. -SSAFETY VALVE - See Pipe Safety Valve. SHEAR RAMS - See Blind-Shear Rams. SLAB GATE VALVE - A mechanical, positive-sealing device consisting of a hydraulically operated, singlegate valve that is used as the base for a geothermal BOP stack. SPOOL - See Drilling Spool. STRIPPER (Packoff) - A device, usually employed immediately beneath the working floor, containing an elastomer packing element that depends on pressure below the element to effect a tight seal in the annulus. Used primarily to strip hole fluid from the outside of the pipe and contain low- or moderate-hole pressures when tripping pipe. Cannot be depended on to contain high hole pressures. STRIPPING DRILL - A special category of blowoutpreventer drill in which a few joints of pipe are stripped through the preventer(s) that would be used for stripping operations in the event of a well kick. SURFACTANT - A chemical element or compound that tends to concentrate at a molecular interface. Used in drilling fluids to control the degree of emulsification, aggregation, interfacial tension, foaming, defoaming, wetting, etc. SWABBING - Temporary lowering of the effective pressure against the formation due to incorrect pipe-pulling procedures. The pipe is pulled at a rate that does not permit hole fluid to flow past the tool joints fast enough to maintain the hydrostatic pressure at the bottom of the hole.

-TTARGETED TURN - A method of changing direction in pressure piping that involves installing a bull plug or blind flange opposite the fluid-entry arm in one arm of a tee or cross. This will inhibit erosion. TEST JOINT (Testing Sub) - A pipe joint or sub designed for use with a test plug to provide a closing surface when pressure testing the pipe rams or annular preventer. TEST PLUG (Hanger-type Test Plug, Boll Weevil Plug, Casinghead Test Plug) - A tool designed to seat in the casinghead below the BOP stack. It permits high-pressure testing of BOPE system components without risking pressure damage to the casing string or exposed formations. TESTING SUB - See Test Joint. TOP DRIVE - A powered swivel that rotates the drill string. TRIP - The process of removing all or part of the working string from the well bore (tripping out), running the string into the well bore (tripping in), or both processes in sequence (round tripping). TRIP GAS - An accumulation of gas that enters the well bore when hole-fluid circulation is interrupted during a trip. Usually attributable to lowering hydrostatic pressure due to swabbing. Should be viewed as a warning sign to the crew, because it is a possible indication of increasing formation pressure. -UUNDERGROUND BLOWOUT - A situation in which kick fluids are forced into a formation at a depth other than that of fluid entry, usually because of excessive surface-pressure containment. In cases where the BOP anchor string is cemented to a shallow depth, this type of blowout usually will occur immediately below the shoe of the casing, from which point well fluids are likely to come to the surface outside the well bore (through fractures). USABLE FLUID - The volume of fluid that can be withdrawn from an accumulator unit between the full working pressure of the unit and the lowest acceptable pressure for the type of unit involved (1,000 psi for 750 psi precharge units and 1,200 psi for 1,000 psi precharge units). -WWELLHEAD STACK - The entire array of blowoutprevention equipment that is connected to the casinghead. Consists of the pitcher nipple (on surface stacks), the preventers, and the drilling spools (mud crosses).

BLOWOUT PREVENTION IN CALIFORNIA

115

WING LINE - Any tubular line that is attached to the sides of a device containing the principal fluid pathway. The wing line provides for fluid ingress and/or egress and serves as a point of attachment for valves, chokes, and other control devices. Wing lines usually are attached to the mud cross, the choke manifold, or the wellhead.

WING VALVE - Any valve installed in a wing line. The term usually applies to valves installed near the attachment of the wing line to the device providing the principal fluid pathway.

116

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

Selected Index
A
Accumulator 21, 23-24, 45, 69, 104-106, 110 Fluid moved vs. pressure 104-106 Precharge pressure 6, 11, 22-24, 27, 45-46, 69, 114 Size factor 26, 110 Type 46 Accumulator emergency backup. See Emergency backup system Accumulator unit 6, 9, 21-26, 45-46, 63, 110 Bypass valve 70 Rated working pressure 2, 17, 23-25, 69-70 Reservoir fluid level 17, 69 Testing procedure 6, 9, 69-70 Actuating system 110 Component 21-33 Control station (control manifold) 9, 11, 29-31, 46-47, 70-71 Four-way valve 29, 112 Hydraulic control lines 31 Hydraulic fluid 33, 46 Pressure regulating valve 19, 26, 29-30, 45, 71, 114 Subsea BOP stack 45 Surface BOP stack 21 Actuating unit. See Accumulator unit Anchor string 13-14, 42, 68, 110 Annular preventer. See Blowout preventer, annular API ring (ring-joint gasket) 18, 110, 115 API stack component code 2, 42 Auxiliary equipment 110 Banjo box (geothermal BOPE system) 61-62, 64-65, 110 Casing safety valve 56 Fill-up line 112 Subsea BOP stack 57 Surface BOP stack 5-6, 8-11, 36 Internal preventer 113 Subsea BOP stack 17, 56 Surface BOP stack 5-6, 8-11, 17, 37, 67, 85, 92-94 Kelly cock 113 Subsea BOP stack 17, 55 Surface BOP stack 5-6, 8-11, 17, 36-38, 64, 66, 78-84 Pipe safety valve (drill pipe safety valve) 114 Subsea BOP stack 11, 17, 55, 94-95 Surface BOP stack 5-11, 17, 37, 64, 67-68, 92-94 Standpipe 36, 38, 75-77, 79-93 Banjo box. See Auxiliary equipment Bell nipple (flow nipple, mud riser, pitcher nipple) 5, 9, 11, 36, 41, 57, 110 Blind ram. See Blowout preventer, ram type Blind-shear ram. See Blowout preventer, ram type Blooie line 61-62, 64,-65, 111 Blowout preventer 111 Annular 2, 4-10, 12-13, 17-20, 32, 40, 42-44, 49, 62-67, 73-74, 76-77, 79-84, 86-93, 99-100, 110 Operating specifications 99-100 Regulated pressure to 19, 31 Testing procedure 31, 85 Internal 5-6, 8-11, 17, 37, 56, 64, 67, 92-93, 94, 113 Ram type 2, 4, 5-10, 12, 17, 19-21, 42-44, 64-67, 73-84, 86-93, 97-98, 114 Blind [complete shut-off (CSO)] 6, 9, 20, 110 Blind-shear 21, 42, 95, 111 Operating specifications 97-98 Pipe 6, 9-10, 17, 20-21, 42, 49, 65-66, 114 Slab gate valve (geothermal BOP stack) 61, 64, 115 Testing procedure 31, 71-96 Blowout preventer drill 1, 17 Blowout preventer stack (wellhead stack) 111 Boll weevil plug. See Test plug Bope system Description Geothermal well Class HA 62 Class HD 62-63 Class HM 63-64 Class HMA 64-65 Class LD 64, 66 Class LP 64, 66 Oil and gas well Offshore (subsea BOP stack) Class V 11-12 Onshore Class I 4 Class II 4-6 Class III 6-9 Class IV 9-11 Selection 2-3 Butterfly valve 4, 111

C
Casing hanger 111 Casinghead 111 Casinghead test plug. See Test plug Casing safety valve. See Auxiliary equipment Casing yield pressure. See Pressure, casing yield Check valve. See Kill system, components Chicksan connection. See Choke system, requirements, swivel fittings

B
Backup system. See Emergency backup system Bag preventer. See Blowout preventer, annular Bailing gate 19, 110 Ball valve 4, 7-8, 10, 110

BLOWOUT PREVENTION IN CALIFORNIA

117

Choke system Components Choke 8-11, 17, 34-35, 53-54, 64, 67, 111 Installation 35 Pressure testing discouraged 72 Types Geothermal well 64 Oil and gas well 34 Choke line 7, 12, 33-35, 73-74, 76-77, 79-93, 111 Choke manifold 33-35, 53-55, 111 Control valve 34, 47, 112 Master valve 34, 47, 113 Geothermal well 63-67 Oil and gas well Offshore (subsea BOP stack) 47-55 Onshore 8-11, 33-35, 72-77, 79-93 Requirements Connections 34 Flexible lines 34, 50-52 Swivel joints 33 Line size Geothermal well 62-64 Oil and gas well 34 Pressure rating 34 Testing procedure 71-90 Clamp connection 111 Closing ratio (close ratio) 97-98, 111 Closing unit. See Accumulator unit Complete shutoff ram. See Blowout preventer, ram type Conductor pipe 111 Connection gas 111 Control lines. See Actuating system, hydraulic control lines Control manifold. See Actuating system, control station Control pod (subsea) 47, 112 Control station. See Actuating system Control valve. See Choke system or Kill system, components Critical well 1, 17, 112 CSO ram. See Blowout preventer, ram type, blind Cup tester 112

E
Emergency backup system 112 Nitrogen bottle size 27-28 Testing procedure 70 Type Accumulator 27 High-pressure nitrogen 26-27 Working fluid volume vs. pressure 28

F
Fill-up line. See Auxiliary equipment Flange data (API) 107 Flanged connection 18, 34-35, 112 Float valve 56 Flow line 8-11, 38-39, 112 Flow line indicator. See Mud return indicator Flow nipple. See Bell nipple Formation fracture gradient 112 Formation fracture pressure. See Pressure, formation fracture Four-way valve. See Actuating system, control station Full hole indicator. See Mud return indicator Full-opening valve 4-5, 7-10, 34-35, 37, 53, 55, 112

G
Gate valve 4, 7-8, 10, 17, 61, 63, 67, 72, 113 Guide structure (subsea BOP stack) 58 Guideline system (subsea BOP stack) 58

H
Hanger test plug. See Test plug Hole fluid monitoring equipment 2, 11, 13, 37-39, 113 Class A 11, 39 Class B 11, 39 Class C 11, 39 Hydrostatic gradient 113 Hydrostatic head 113

I D
Diverter system 112 Components Diverters 2, 4, 40 Selector valve 4, 40 Vent line 4, 40, 63 Geothermal well 62-63 Oil and gas well Offshore (subsea BOP stack) 4, 40-42 Onshore 4 Downhole mud motor. See Mud motor Drill pipe safety valve. See Auxiliary equipment, pipe safety valve Drill string float 112 Drilling spool 112 Drive pipe (drive casing) 42, 112 Inside blowout preventer. See Auxiliary equipment, internal preventer Internal preventer. See Auxiliary equipment

K
Kelly cock, lower. See Auxiliary equipment Kelly cock, upper. See Auxiliary equipment Kick 17, 40, 113 Kill system Components Check valve 7-11, 36, 75, 111 Control valve 9, 11, 36, 63, 67, 112 Kill line 33, 35, 113

118

DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES

Master valve 36, 47, 113 Geothermal well 60 Oil and gas well Offshore (subsea BOP stack) 47-49, 53-54 Onshore 6-12, 33, 35-36, 72-93 Requirements Connections 35, 53 Line size 35 Swivel fitting 35 Testing procedure 72, 74-75

L
Lost circulation 113 Lower marine riser package 47, 113

Plug valve 4, 114 Precharge pressure. See Accumulator Pressure Casing yield 13-14 Formation fracture 13-14 Pressure rating requirement. See entry for specific equipment Pressure rating selection MACP (maximum allowable casing pressure) 13 MPCP (maximum predicted casing pressure) 13 Pressure regulating valve. See Actuating system, control station Preventer. See Blowout preventer Preventer drill. See Blowout preventer drill Pump-down check valve (pump-down preventer) 56, 114

M
MACP (maximum allowable casing pressure). See Pressure rating selection Marine riser system (subsea BOPE) 56-58, 113 Bouyancy devices 58 Flexible joint (ball joint) 57 Remotely operated connector 56-57 Riser section (joint) 57 Telescopic joint (slip joint) 57 Tensioner 57-58 Master valve. See Choke system or Kill system, components Minimum internal yield pressure. See Pressure, casing yield MPCP (maximum predicted casing pressure). See Pressure rating selection Mud cross. See Drilling spool Mud motor 11, 36, 113 Mud return indicator 11, 39, 114 Mud riser. See Bell nipple Mud volume measuring device 11, 39, 114 Mud weight recorder 114 Muffler (geothermal BOPE system) 61-62, 65, 114

R
Ram-type preventer. See Blowout preventer, ram type Rated working pressure 114. See also entry for specific equipment Remote station. See Actuating system, control station Ring joint gasket. See API ring Rotating head 2, 62-63, 115

S
Safety valve. See Auxiliary equipment, pipe safety valve Shear rams. See Blowout preventer, ram type, blindshear Slab gate valve. See Blowout preventer, ram type Spool. See Drilling spool Stripper (packoff) 115 Stripping drill 115 Surfactant 115 Swabbing 115

T
Targeted turn 115. See also Choke system or Kill system, requirements Test joint (testing sub) 115 Test plug 68, 71-74, 76-77, 79-84, 86-93, 115 Testing sub. See Test joint Top drive 36, 55, 115 Trip 115 Trip gas 115

N
Nitrogen backup system. See Emergency backup system

O
Opening ratio 97-98, 114 Operating and control system. See Actuating system Overburden 114

U P
Packoff. See Stripper Pipe ram. See Blowout preventer, ram type Pipe safety valve. See Auxiliary equipment Pit drill 114 Pit level indicator 11, 39, 114 Pit volume totalizer 11, 39, 114 Pitcher nipple. See Bell nipple Underground blowout 4, 115 Usable fluid 6, 9, 11, 24, 115

W
Wellhead stack 2, 61, 68, 115

BLOWOUT PREVENTION IN CALIFORNIA

M07(4-06-UCP-2M)

119

California Department of Conservation

Division of Oil, Gas, & Geothermal Resources

www.conservation.ca.gov