0% found this document useful (0 votes)
60 views3 pages

Design Sheet: I. Techinical Proposal For Upgrading Ext'G Oily Containment Facility For Transfer Pit. 11

1) The document proposes upgrading an existing oily containment facility to prevent overflow during heavy rain. 2) It calculates the rain catchment area and flow rate, and determines the existing facility has insufficient capacity. 3) Three technical proposals are presented: adding a sump, adding a kerb around the ground floor, or modifying the existing drain to have greater capacity. All proposals would provide the required 11.94 m3 containment.

Uploaded by

Tu Tu Dar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views3 pages

Design Sheet: I. Techinical Proposal For Upgrading Ext'G Oily Containment Facility For Transfer Pit. 11

1) The document proposes upgrading an existing oily containment facility to prevent overflow during heavy rain. 2) It calculates the rain catchment area and flow rate, and determines the existing facility has insufficient capacity. 3) Three technical proposals are presented: adding a sump, adding a kerb around the ground floor, or modifying the existing drain to have greater capacity. All proposals would provide the required 11.94 m3 containment.

Uploaded by

Tu Tu Dar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD

DOC. NO.

63-XXX-DC-0XX

DESIGN SHEET
SHEET NO.
C0936

I.

TECHINICAL PROPOSAL FOR UPGRADING EXT'G OILY CONTAINMENT FACILITY FOR TRANSFER PIT. 11 12 m (Rain Direction) Rain Catchment Area

6.6

Area-1

(Ra

Ground Floor

(Rain Direct tion)

17.4 m

Roof

Area-2

Scupper Drain RAIN CATCHMENT FLOOR PLAN GROUND FLOOR PLAN Roof Protection

Sump

HeavyRain 45degree
7.3

GL. 6.6 ELEVATION VIEW 0.7 Open Structure (No Clading)

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD

DOC. NO.

63-XXX-DC-0XX

DESIGN SHEET
SHEET NO.
C0936

1)

SPECIFICATON MAX. AMOUNT OF RAIN IN ONE DAY = 555 mm/day (As per Vopak Spec.)

2)

CATCHMENT AREA & FLOW RATE BY CONSIDERING ONLY RAIN WATER, CATCHMENT AREA-1 CATCHMENT AREA-2 TOTAL CATCHMENT AREA DUE TO HEAVY RAIN, TOTAL FLOW RATE DURING HEAVY RAIN,

A1 = A2 = A= = =

79.20 71.28 150.48 3.48 0.97

m2 m2 m2 m3/hr l/sec

3)

EXISTING CONTAINMENT CAPACITY CHECK TOTAL EXT'G DRAIN LENGTH PROVIDED WIDTH OF EXT'G DRAIN AVG. DEPTH OF EXT'G DRAIN EXT'G DRAIN CAPACITY EXT'G SUMP CAPACITY ASSUME OIL LEAKAGE COLLECTED IN DRAIN & SUMP (BEFORE RAINING) TOTAL EXT'G CAPACITY AVAILABLE TO COLLECT ADDITIONAL RAIN WATER INTO DRAIN & SUMP = = = = = = 46.80 0.30 0.15 2.11 1.00 1.50 m m m m3 m3 m3

1.61 m3

4)

MAX. TIME TO START PUMPING OUT WATER TO SLOP TANK (EXT'G FACILITY) THEREFORE, MAX. TIME ALLOWED TO REACH TO THE OVERFLOW LEVEL DUE TO HEAVY RAIN AVOIDING OVERFLOW TO PUBLIC DRAIN

28 min.

OVERSEAS TECHNICAL ENGINEERING AND CONSTRUCTION PTE LTD

DOC. NO.

63-XXX-DC-0XX

DESIGN SHEET
SHEET NO.
C0936

5)

TECHINICAL PROPOSAL-1 TO OVERCOME CHEMICAL OVERFLOW TO PUBLIC DRAIN ASSUME MAX. HEAVY RAIN DURATION = 3.00 hr (WITHOUT PUMPING OUT TO THE SLOP TANK DURING HEAVY RAIN) REQUIRED CONTAINMENT CAPACITY TOTAL CONTAINMENT CAPACITY REQUIRED BY CONSIDRING EXT'G OIL LEAKAGE BEFORE RAIN A) PROPOSAL OF ADDITIONAL SUMP B) PROPOSAL OF KERB AROUND GROUND FLOOR REQUIRED KERB HEIGHT KERB HEIGHT PROVIDED = = 0.052 m 0.100 m = 10.44 m3

= =

11.94 m3 1.00 m3

OK!

6)

TECHINICAL PROPOSAL-2 TO OVERCOME CHEMICAL OVERFLOW TO PUBLIC DRAIN ASSUME MAX. HEAVY RAIN DURATION = 3.00 hr (WITHOUT PUMPING OUT TO THE SLOP TANK DURING HEAVY RAIN) REQUIRED CONTAINMENT CAPACITY TOTAL CONTAINMENT CAPACITY REQUIRED BY CONSIDRING EXT'G OIL LEAKAGE BEFORE RAIN A) PROPOSAL OF KERB AROUND GROUND FLOOR REQUIRED KERB HEIGHT KERB HEIGHT PROVIDED = = 0.057 m 0.100 m = 10.44 m3

11.94 m3

OK!

7)

TECHINICAL PROPOSAL-3 TO OVERCOME CHEMICAL OVERFLOW TO PUBLIC DRAIN ASSUME MAX. HEAVY RAIN DURATION = 3.00 hr (WITHOUT PUMPING OUT TO THE SLOP TANK DURING HEAVY RAIN) REQUIRED CONTAINMENT CAPACITY TOTAL CONTAINMENT CAPACITY REQUIRED BY CONSIDRING EXT'G OIL LEAKAGE BEFORE RAIN = 10.44 m3

11.94 m3

A) PROPOSING MODIFICATION OF EXT'G DRAIN TO BIGGER CAPACITY DRAIN PROPOSED DRAIN WIDTH REQUIRED DRAIN AVG. DEPTH = = 0.60 m 0.43 m

You might also like