Proposed Two Storey Residence

This document outlines a 28-week schedule for constructing a proposed two-storey residence. It lists 27 activities in chronological order from securing permits to final cleaning, along with the anticipated duration of each activity in weeks. Key activities include 4 weeks for excavation, 14 weeks for concrete pouring, 18 weeks for laying concrete hollow blocks, 8 weeks each for installing electrical wires and plumbing fixtures, and 12 weeks for interior areas work.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

Proposed Two Storey Residence

This document outlines a 28-week schedule for constructing a proposed two-storey residence. It lists 27 activities in chronological order from securing permits to final cleaning, along with the anticipated duration of each activity in weeks. Key activities include 4 weeks for excavation, 14 weeks for concrete pouring, 18 weeks for laying concrete hollow blocks, 8 weeks each for installing electrical wires and plumbing fixtures, and 12 weeks for interior areas work.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Proposed Two Storey Residence

ACTIVITY

DURATION

1-2

Secure Bonds, Clearances and Misc. Permits

2-3

2-9

Stake-out
Material and Equipment Procurement

3-4

Survey Works

4-5

Excavation Works

5-6

Determining Properties of Soil

5-7

Clearing of Soil

6-7

Soil Poisoning

7-8

Backfill and Compaction

8-12

Concrete Pouring

14

9-10

Installation of Tempacil

10-11

Rebar Cutting

10

11-12

Formworks

15

12-13

CHB Laying

18

13-14

Plastering

10

14-15

Stair Railing

14-19

Waterproofing

15-16

Wall Finishes

16-17

17-18

Installation of Door
Installation of Window

18-24

Installation of Ceiling

19-20

Installation of Switches and Junctions

20-21

Installation of Air Conditioning Units

21-22

Installation of Plumbing Fixtures

22-23

Installation of Electrical Wires and Fixtures

23-24

Floor Finishes

24-25

Installation of Tiles

24-26

Exterior Areas

10

25-26

Interior Areas

12

26-27

Punch List and Corrections

27-28

Final Cleaning and Demobilization

ACTIVITY DURATION
1-2
2-3
2-9
3-4
4-5
5-6
5-7
6-7
7-8
8-12
9-10
10-11
11-12
12-13
13-14
14-15
14-19
15-16
16-17
17-18
18-24
19-20
20-21
21-22
22-23
23-24
24-25
24-26
25-26
26-27
27-28

8
8
6
8
4
1
1
1
4
14
1
10
15
18
10
3
3
9
3
3
2
2
2
6
8
2
2
10
12
9
4

ES

EF

LS

LF

0
8
8
16
24
28
28
29
30
34
14
15
25
48
66
76
76
79
88
91
94
79
81
83
89
97
99
99
101
113
122

8
16
14
24
28
29
29
30
34
48
15
25
40
66
76
79
79
88
91
94
96
81
83
89
97
99
101
109
113
122
126

0
8
16
16
24
28
29
29
30
34
22
23
33
48
66
79
76
82
91
94
97
79
81
83
89
97
99
103
101
113
122

8
16
22
24
28
29
30
30
34
48
23
33
48
66
76
82
79
91
94
97
99
81
83
89
97
99
101
113
113
122
126

TOTAL
FLOAT
0
0
8
0
0
0
1
0
0
0
8
8
8
0
0
3
0
3
3
3
3
0
0
0
0
0
0
4
0
0
0

FREE
CRITICAL
FLOAT
PATH
0
YES
0
YES
0
NO
0
YES
0
YES
0
YES
0
NO
0
YES
0
YES
0
YES
0
NO
0
NO
0
NO
8
YES
0
YES
0
NO
0
YES
0
NO
0
NO
0
NO
0
NO
0
YES
0
YES
0
YES
0
YES
0
YES
0
YES
0
NO
0
YES
4
YES
0
YES

Prepared by: Neal Cristian S. Perlas