Proposed Two Storey Residence

This document outlines a 28-week schedule for constructing a proposed two-storey residence. It lists 27 activities in chronological order from securing permits to final cleaning, along with the anticipated duration of each activity in weeks. Key activities include 4 weeks for excavation, 14 weeks for concrete pouring, 18 weeks for laying concrete hollow blocks, 8 weeks each for installing electrical wires and plumbing fixtures, and 12 weeks for interior areas work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views

Proposed Two Storey Residence

This document outlines a 28-week schedule for constructing a proposed two-storey residence. It lists 27 activities in chronological order from securing permits to final cleaning, along with the anticipated duration of each activity in weeks. Key activities include 4 weeks for excavation, 14 weeks for concrete pouring, 18 weeks for laying concrete hollow blocks, 8 weeks each for installing electrical wires and plumbing fixtures, and 12 weeks for interior areas work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Proposed Two Storey Residence

ACTIVITY

DURATION

1-2

Secure Bonds, Clearances and Misc. Permits

2-3

2-9

Stake-out
Material and Equipment Procurement

3-4

Survey Works

4-5

Excavation Works

5-6

Determining Properties of Soil

5-7

Clearing of Soil

6-7

Soil Poisoning

7-8

Backfill and Compaction

8-12

Concrete Pouring

14

9-10

Installation of Tempacil

10-11

Rebar Cutting

10

11-12

Formworks

15

12-13

CHB Laying

18

13-14

Plastering

10

14-15

Stair Railing

14-19

Waterproofing

15-16

Wall Finishes

16-17

17-18

Installation of Door
Installation of Window

18-24

Installation of Ceiling

19-20

Installation of Switches and Junctions

20-21

Installation of Air Conditioning Units

21-22

Installation of Plumbing Fixtures

22-23

Installation of Electrical Wires and Fixtures

23-24

Floor Finishes

24-25

Installation of Tiles

24-26

Exterior Areas

10

25-26

Interior Areas

12

26-27

Punch List and Corrections

27-28

Final Cleaning and Demobilization

ACTIVITY DURATION
1-2
2-3
2-9
3-4
4-5
5-6
5-7
6-7
7-8
8-12
9-10
10-11
11-12
12-13
13-14
14-15
14-19
15-16
16-17
17-18
18-24
19-20
20-21
21-22
22-23
23-24
24-25
24-26
25-26
26-27
27-28

8
8
6
8
4
1
1
1
4
14
1
10
15
18
10
3
3
9
3
3
2
2
2
6
8
2
2
10
12
9
4

ES

EF

LS

LF

0
8
8
16
24
28
28
29
30
34
14
15
25
48
66
76
76
79
88
91
94
79
81
83
89
97
99
99
101
113
122

8
16
14
24
28
29
29
30
34
48
15
25
40
66
76
79
79
88
91
94
96
81
83
89
97
99
101
109
113
122
126

0
8
16
16
24
28
29
29
30
34
22
23
33
48
66
79
76
82
91
94
97
79
81
83
89
97
99
103
101
113
122

8
16
22
24
28
29
30
30
34
48
23
33
48
66
76
82
79
91
94
97
99
81
83
89
97
99
101
113
113
122
126

TOTAL
FLOAT
0
0
8
0
0
0
1
0
0
0
8
8
8
0
0
3
0
3
3
3
3
0
0
0
0
0
0
4
0
0
0

FREE
CRITICAL
FLOAT
PATH
0
YES
0
YES
0
NO
0
YES
0
YES
0
YES
0
NO
0
YES
0
YES
0
YES
0
NO
0
NO
0
NO
8
YES
0
YES
0
NO
0
YES
0
NO
0
NO
0
NO
0
NO
0
YES
0
YES
0
YES
0
YES
0
YES
0
YES
0
NO
0
YES
4
YES
0
YES

Prepared by: Neal Cristian S. Perlas