Multilevel Project Control: Board and Directors Level
This document outlines a three level project control system for monitoring multilevel projects. At the top board and director level, high level reports are provided on schedules, S-curves, and overall program progress. The second project manager level involves design and construction summaries by element and slippage reports. The third construction manager level focuses on monitoring contractor schedules and progress by element.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
42 views1 page
Multilevel Project Control: Board and Directors Level
This document outlines a three level project control system for monitoring multilevel projects. At the top board and director level, high level reports are provided on schedules, S-curves, and overall program progress. The second project manager level involves design and construction summaries by element and slippage reports. The third construction manager level focuses on monitoring contractor schedules and progress by element.