0% found this document useful (0 votes)
17 views1 page

Office of The Assistant Engineer

This document is a meter sealing report from the Assistant Engineer of Eastern Power Distribution Company of A.P. Ltd. It certifies that Bhagavatula Charitable Trust Pvt. ITI has two electrical connections, numbers 21 and 85, with a sanctioned 3-phase power supply load. The meter for the connections was sealed on November 23, 2013.

Uploaded by

SainadhReddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views1 page

Office of The Assistant Engineer

This document is a meter sealing report from the Assistant Engineer of Eastern Power Distribution Company of A.P. Ltd. It certifies that Bhagavatula Charitable Trust Pvt. ITI has two electrical connections, numbers 21 and 85, with a sanctioned 3-phase power supply load. The meter for the connections was sealed on November 23, 2013.

Uploaded by

SainadhReddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Eastern Power Distribution Company of A.P. Ltd.

(A Govt. of A.P. Enterprise & An ISO 9001-2008 & ISO 27001:2005 Certified Company)

Office of the assistant engineer Operation, APEPDCL Rambilli, Visakhapatnam Dist. METER SEALING REPORT This is to certify that Bhagavatula Charitable Trust Pvt. ITI, Haripuram (Reg.No - DGE&T-12/1/2012-TC), Visakhapatnam Dist sponsored by Bhagavatula Charitable Trust (Reg.No 406/1976) is having the APCPDCL Power Supply Service Nos 21 and 85 1 2 3 4 5 6 7 8 9 Electrical connection issued in the name of Electrical connection issuing authority Date of connection Whether 3 phase connection Sanctioned power supply load Meter Sealing No Category Meter No Service No Bhagavatula Charitable Trust Divisional Engineer, Electrical Construction & Operation Atyutapuram 3 phase connection

As per the IR Rules Earthing done by the organization. Hence certified Place: Haripuram Date: 23-11-2013 Assistant Engineer Operation, APEPDCL Rambilli, Visakhapatnam Dist.

You might also like