0% found this document useful (0 votes)
61 views1 page

New Micros

The document is a lab requirements list from the Department of Electrical Engineering at United Institute of Technology in Naini, Allahabad. It details various electrical items needed for machine and power system labs, including MCBs, wiring, fire extinguishers, switches, and lights. Quantities and specifications are provided for the items, which are requested urgently to equip and supply power to the labs for student use.

Uploaded by

Rudra Mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views1 page

New Micros

The document is a lab requirements list from the Department of Electrical Engineering at United Institute of Technology in Naini, Allahabad. It details various electrical items needed for machine and power system labs, including MCBs, wiring, fire extinguishers, switches, and lights. Quantities and specifications are provided for the items, which are requested urgently to equip and supply power to the labs for student use.

Uploaded by

Rudra Mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

UNITED INSTITUTE OF TECHNOLOGY, NAINI, ALLAHABAD DEPARTMENT OF ELECTRICAL ENGINEERING Date: Lab Requirement S.

No Item Specification 32 Ampere AC AC 2x2x2 ft3 4x2x2 ft3 2 inch 1 inch 16A,230 V 1 phase AC 4 point 200 page 5x3 ft2 Quantity 1 5 points 1 point 2 2 1 1 Roll 2 5 4 point 3 22 20 Lab To placed in supply mains for simulation lab Machine Lab Machine Lab Machine Lab Machine Lab Machine Lab Machine Lab Machine Lab Machine Lab Power System Lab Power System Lab For All labs And Department Machine Lab and Power System Lab Urgent Remarks / /20

1. 1 MCB 2. 3. 4. 5. 2 3 Phase Wiring 3 1 phase wiring 4 Fire extinguisher Foundation

6. Flexible Pipe 7. Insulation Tape 8. Handle Cap Main Switch 9. Wiring 10. Extension Board 11. Gallery Lights 12. Registers 13. Rubber Mat

Principal, UIT Department

HOD, EN