Electrical Installation Guide 2013
Electrical Installation Guide 2013
Electrical Installation Guide 2013
installation guide
2013
According to
IEC international
standards
06/2013
EIGED306001EN
ART.822690
Make the most of your energy
35, rue Joseph Monier
CS30323
F-92506 Rueil-Malmaison Cedex
RCS Nanterre 954 503 439
Capital social 896 313 776
www.schneider-electric.com
As standards, specications and designs change from time to time, please ask for conrmation
of the information given in this pubication.
Schneider Electric Industries SAS
E
l
e
c
t
r
i
c
a
l
i
n
s
t
a
l
l
a
t
i
o
n
g
u
i
d
e
A
c
c
o
r
d
i
n
g
t
o
I
E
C
i
n
t
e
r
n
a
t
i
o
n
a
l
s
t
a
n
d
a
r
d
s
2
0
1
3
This document has been
printed on ecological paper
This technical guide is the result of
a collective effort.
Illustrations and production:
AXESS - Valence -France
Printing:
Edition: 2013
Price: 40
ISBN: 978.2.9531643.3.6
N dpt lgal: 1er semestre 2008
Schneider Electric
All rights reserved in all countries
The Electrical Installation Guide is a single document covering the
techniques and standards related to low-voltage electrical installations.
It is intended for electrical professionals in companies, design ofces,
inspection organisations, etc.
This Technical Guide is aimed at professional users and is only intended
to provide them guidelines for the denition of an industrial, tertiary or
domestic electrical installation. Information and guidelines contained in this
Guide are provided AS IS. Schneider Electric makes no warranty of any
kind, whether express or implied, such as but not limited to the warranties
of merchantability and tness for a particular purpose, nor assumes any
legal liability or responsibility for the accuracy, completeness, or usefulness
of any information, apparatus, product, or process disclosed in this Guide,
nor represents that its use would not infringe privately owned rights.
The purpose of this guide is to facilitate the implementation of International
installation standards for designers & contractors, but in all cases the
original text of International or local standards in force shall prevail.
This new edition has been published to take into account changes in
techniques, standards and regulations, in particular electrical installation
standard IEC 60364 series.
We thank all the readers of the previous edition of this guide for their
comments that have helped improve the current edition.
We also thank the many people and organisations, too numerous to name
here, who have contributed in one way or another to the preparation of this
guide.
This guide has been written for electrical Engineers who have to design,
select electrical equipment, install these equipment and, inspect or
maintain low-voltage electrical installations in compliance with international
Standards of the International Electrotechnical Commission (IEC).
Which technical solution will guarantee that all relevant safety rules are
met? This question has been a permanent guideline for the elaboration of
this document.
An international Standard such as the IEC 60364 series Low voltage
Electrical Installations species extensively the rules to comply with to
ensure safety and correct operational functioning of all types of electrical
installations. As the Standard must be extensive, and has to be applicable
to all types of equipment and the technical solutions in use worldwide, the
text of the IEC rules is complex, and not presented in a ready-to-use order.
The Standard cannot therefore be considered as a working handbook, but
only as a reference document.
The aim of the present guide is to provide a clear, practical and step-
by-step explanation for the complete study of an electrical installation,
according to IEC 60364 series and other relevant IEC Standards. The rst
chapter (A) presents the methodology to be used, and refers to all chapters
of the guide according to the different steps of the study.
We all hope that you, the reader, will nd this handbook genuinely helpful.
Schneider Electric S.A.
Acknowlegements
This guide has been realized by a team of
experienced international experts, on the base
of IEC 60364 series of standard, and include the
latest developments in electrical standardization.
We shall mention particularly the following
experts and their area of expertise:
Chapter
Christian Collombet D
Bernard Jover R
Jacques Schonek D, G, L, M, N
Didier Fulchiron B
Didier Mignardot J, P
Eric Bettega E
Emmanuel Genevray E, P
Eric Breuill F
Fleur Janet K
Franck Mgret G
Geoffroy De-Labrouhe K
Jean Marc Lupin L, M
Daniel Barstz N
Jrome Lecomte H
Matthieu Guillot F, H, P
Michel Sacotte B
Schneider Electric - Electrical installation guide 2013
Tools for more efciency
in electrical installation design
Electrical installation Wiki
The Electrical Installation Guide is also available on-line as a wiki in 3 languages:
> in English electrical-installation.org
> in Russian ru.electrical-installation.org
> in Chinese electrical-installation.org
Our experts constantly contribute to its evolution. Industry and academic
professionals can collaborate too!
Online Electrical calculation Tools
A set of tools designed to help you:
pdisplay on one chart the time-current cuves of different circuit-breakers or fuses
pcheck the discrimination between two circuit-breakers or fuses, or two Residual
Current devices (RCD), search all the circuit-breakers or fuses that can be
selective/cascading with a defined circuit-breaker or fuse
pcalculate the Cross Section Area of cables and build a cable schedule
pcalculate the voltage drop of a defined cable and check the maximum length
> hto.power.schneider-electric.com
Power Management Blog
In the Schneider Electric blog, you will find the best tips about standards, tools,
software, safety and latest technical news shared by our experts. You will find even
more information about innovations and business opportunities. This is your place
to leave us your comments and to engage discussion about your expertise. You
might want to sharewith your Twitter or LinkedIn followers.
> blog.schneider-electric.com/power-management-metering-monitoring-power-quality
English
Russian
Chinese
Online tools
Schneider Electric - Electrical installation guide 2013
Ecodial Advanced Calculation 4
The new Ecodial Advanced Calculation 4 software is dedicated to electrical
installation calculation in accordance with IEC60364 international standard or
national standards.
This 4
th
generation offers new features like:
p management of operating mode (parallel transformers, back-up generators)
p discrimination analysis associating curves checking and discrimination tables,
direct access to protection settings
ID-Spec large
ID-Spec Large is a totally innovative software developed specifically to help you
design electrical systems of commercial & industrial buildings.
Main features:
p Define the general architecture of electrical installation
p Draw up the power summary
p Prepare the single line diagram
p Choose and size the MV/LV equipments
p Evaluate the Energy performance of the installation
p Edit the technical part of the specification for tender
Foreword
Etienne TISON, International Electrotechnical Commission (IEC) TC64
Chairman.
The task of the IEC Technical Committee 64 is to develop and keep up-to-
date requirements
- for the protection of persons against electrical shock, and
- for the design, verication and implementation of low voltage electrical
installations.
Series of standard such as IEC 60364 developed by IEC TC64 is
considered by the international community as the basis of the majority of
national low-voltage wiring rules.
IEC 60364 series is mainly focussed on safety due the use of electricity by
people who may not be aware of risk resulting from the use of electricity.
But modern electrical installations are increasingly complex, due to external
input such as
- electromagnetic disturbances
- energy efciency
- ...
Consequently, designers, installers and consumers need guidance on the
selection and installation of electrical equipment.
Schneider Electric has developed this Electrical Installation Guide
dedicated to low voltage electrical installations. It is based on IEC TC64
standards such as IEC 60364 series and provides additional information
in order to help designers, contractors and controllers for implementing
correct low-voltage electrical installations.
As TC64 Chairman, it is my great pleasure and honour to introduce this
guide. I am sure it will be used fruitfully by all persons involved in the
implementation of all low-voltage electrical installations.
Etienne TISON
Etienne TISON has been working with Schneider
Electric since 1978. He has been always involved
is various activities in low voltage eld.
In 2008, Etienne TISON has been appointed
Chairman of IEC TC64 as well as Chairman of
CENELEC TC64.
Electrical installation guide 2013
General rules of electrical
installation design
A
B
C
D
E
F
G
H
J
K
L
M
N
Connection to the MV utility
distribution network
Connection to the LV utility
distribution network
MV & LV architecture selection
guide
LV Distribution
Protection against electric
shocks
Sizing and protection of
conductors
LV switchgear: functions &
selection
Overvoltage protection
Energy Efciency in electrical
distribution
Power factor correction
Harmonic management
Characteristics of particular
sources and loads
P
Photovoltaic Installations
Q
Residential and other special
locations
R
EMC guidelines
Schneider Electric - Electrical installation guide 2013
General rules of electrical installation design
1 Methodology A2
2 Rules and statutory regulations A5
3 Installed power loads - Characteristics A11
4 Power loading of an installation A16
Connection to the MV utility distribution network
1 Supply of power at medium voltage B2
2 Procedure for the establishment of a new substation B5
3 Protection aspect B7
4 The consumer substation with LV metering B13
5 The consumer substation with MV metering B22
6 Constitution of MV/LV distribution substations B27
Connection to the LV utility distribution network
1 Low voltage utility distribution networks C2
2 Tariffs and metering C16
MV & LV architecture selection guide
1 Stakes for the user D3
2 Simplied architecture design process D4
3 Electrical installation characteristics D7
4 Technological characteristics D11
5 Architecture assessment criteria D13
6 Choice of architecture fundamentals D15
7 Choice of architecture details D19
8 Choice of equiment D25
9 Recommendations for architecture optimization D26
10 Glossary D30
11 ID-Spec software D31
12 Example: electrical installation in a printworks D32
LV Distribution
1 Earthing schemes E2
2 The installation system E15
3 External inuences (IEC 60364-5-51) E26
Protection against electric shocks
1 General F2
2 Protection against direct contact F4
3 Protection against indirect contact F6
4 Protection of goods due to insulation fault F17
5 Implementation of the TT system F19
6 Implementation of the TN system F23
7 Implementation of the IT system F29
8 Residual current differential devices RCDs F36
Sizing and protection of conductors
1 General G2
2 Practical method for determining the smallest allowable G7
cross-sectional area of circuit conductors
3 Determination of voltage drop G19
4 Short-circuit current G23
5 Particular cases of short-circuit current G29
6 Protective earthing conductor G36
7 The neutral conductor G41
8 Worked example of cable calculation G45
A
B
C
D
E
F
General contents
G
Schneider Electric - Electrical installation guide 2013
LV switchgear: functions & selection
1 The basic functions of LV switchgear H2
2 The switchgear H5
3 Choice of switchgear H10
4 Circuit breaker H11
5 Maintenance of low voltage switchgear H32
Overvoltage protection
1 Overvoltage characteristics of atmospheric origin J2
2 Principle of lightning protection J7
3 Design of the electrical installation protection system J13
4 Installation of SPDs J24
5 Application J28
6 Technical supplements J32
Energy Efciency in electrical distribution
1 Introduction K2
2 Energy efciency and electricity K3
3 Diagnosis through electrical measurement K6
4 Energy saving opportunities K8
5 How to evaluate energy savings K23
Power Factor Correction
1 Power factor and Reactive power L2
2 Why to improve the power factor? L6
3 How to improve the power factor? L8
4 Where to install power correction capacitors? L11
5 How to decide the optimum level of compensation? L13
6 Compensation at the terminals of a transformer L16
7 Power factor correction of induction motors L19
8 Example of an installation before and after power factor correction L21
9 The effects of harmonics L22
10 Implementation of capacitor banks L25
Harmonic management
1 The problem: M2
Why is it necessary to detect and eliminate harmonics?
2 Denition and origin of harmonics M3
3 Essential indicators of harmonic distortion and M7
measurement principles
4 Harmonic measurement in electrical networks M10
5 Main effects of hamronis in electrical installations M13
6 Standards M20
7 Solutions to attenuate harmonics M21
Characteristics of particular sources and loads
1 Protection of a LV generator set and the downstream circuits N2
2 Uninterruptible Power Supply Units (UPS) N11
3 Protection of LV/LV transformers N24
4 Lighting circuits N27
5 Asynchronous motors N45
Photovoltaic installations
1 Benets of photovoltaic energy P2
2 Background and technology P3
3 PV System and Installation Rules P10
4 PV installation architectures P18
5 Monitoring P31
General contents
J
K
L
M
N
H
P
Schneider Electric - Electrical installation guide 2013
Residential and other special locations
1 Residential and similar premises Q2
2 Bathrooms and showers Q8
3 Recommendations applicable to special installations and locations Q12
EMC guidelines
1 Electrical distribution R2
2 Earthing principles and structures R3
3 Implementation R5
4 Coupling mechanism and counter-measures R22
5 Wiring recommendations R28
Q
R
General contents
Schneider Electric - Electrical installation guide 2013
A1
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapter A
General rules of electrical
installation design
Contents
Methodology A2
Rules and statutory regulations A5
2.1 Denition of voltage ranges A5
2.2 Regulations A6
2.3 Standards A6
2.4 Quality and safety of an electrical installation A7
2.5 Initial testing of an installation A8
2.6 Put in out of danger the existing electrical installations A8
2.7 Periodic check-testing of an installation A9
2.8 Conformity assessement (with standards and specications) of
equipment used in the installation A9
2.9 Environment A10
Installed power loads - Characteristics A11
3.1 Induction motors A11
3.2 Resistive-type heating appliances and incandescent lamps
(conventional or halogen) A13
Power loading of an installation A16
4.1 Installed power (kW) A16
4.2 Installed apparent power (kVA) A16
4.3 Estimation of actual maximum kVA demand A17
4.4 Example of application of factors ku and ks A19
4.5 Diversity factor A19
4.6 Choice of transformer rating A20
4.7 Choice of power-supply sources A21
1
2
3
4
Schneider Electric - Electrical installation guide 2013
A - General rules of electrical installation design
A2
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
For the best results in electrical installation design it is recommended to read and to
use all the chapters of this guide in the order in which they are presented.
Rules and statutory regulations
Range of low-voltage extends from 0 V to 1 000 V in a.c. and from 0 V to 1 500
V in d.c. One of the rst decision id the selection of type of current between the
alternative current which corresponds to the most common type of current through
out the world and the direct current. Then designers have to select the most
appropriate rated voltage within these ranges of voltages. When connected to a LV
public network, the type of current and the rated voltage are already selected and
imposed by the Utility.
Compliance with national regulations is then the second priority of the designers
of electrical installation. Regulations may be based on national or international
standards such as the IEC 60364 series.
Selection of equipment complying with national or international product standards
and appropriate verication of the completed installation is a powerful mean for
providing a safe installation with the expected quality. Dening and complying with
the verication and testing of the electrical installation at its completion as well as
periodic time will guarantee the safety and the quality of this installation all along its
life cycle. Conformity of equipment according to the appropriate product standards
used within the installation is also of prime importance for the level of safety and
quality.
Environmental conditions will become more and more stringent and will need to
be considered at the design stage of the installation. This may include national or
regional regulations considering the material used in the equipment as well as the
dismantling of the installation at its end of life
Installed power loads - Characteristics
A review of all applications needing to be supplied with electricity is to be done. Any
possible extensions or modications during the whole life of the electrical installation
are to be considered. Such a review aimed to estimate the current owing in each
circuit of the installation and the power supplies needed.
The total current or power demand can be calculated from the data relative to the
location and power of each load, together with the knowledge of the operating modes
(steady state demand, starting conditions, non simultaneous operation, etc.)
Estimation of the maximum power demand may use various factors depending
on the type of application; type of equipment and type of circuits used within the
electrical installation.
From these data, the power required from the supply source and (where appropriate)
the number of sources necessary for an adequate supply to the installation is readily
obtained.
Local information regarding tariff structures is also required to allow the best choice
of connection arrangement to the power-supply network, e.g. at medium voltage or
low voltage level.
Connection to the MV public distribution network
Where this connection is made at the Medium Voltage level a consumer-type
substation will have to be studied, built and equipped. This substation may be an
outdoor or indoor installation conforming to relevant standards and regulations (the
low-voltage section may be studied separately if necessary). Metering at medium-
voltage or low-voltage is possible in this case.
Connection to the LV utility distribution network
Where the connection is made at the Low Voltage level the installation will be
connected to the local power network and will (necessarily) be metered according to
LV tariffs.
MV & LV architecture selection guide
The whole electrical system including the MV installation and the LV installation
is to be studied as a complete system. The customer expectations and technical
parameters will impact the architecture of the system as well as the electrical
installation characteristics.
Determination of the most suitable architecture of the MV/LV main distribution and LV
power distribution level is often the result of optimization and compromise.
Neutral earthing arrangements are chosen according to local regulations, constraints
related to the power-supply, and to the type of loads.
1 Methodology
A - General rules of electrical installation design
A3- Installed power loads - Characteristics
A4- Power loading of an installation
B Connection to the MV utility distribution
network
C - Connection to the LV utility distribution
network
D - MV & LV architecture selection guide
Schneider Electric - Electrical installation guide 2013
A3
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
The distribution equipment (panelboards, switchgears, circuit connections, ...) are
determined from building plans and from the location and grouping of loads.
The type of premises and allocation can inuence their immunity to external
disturbances.
LV distribution
The system earthing is one protective measures commonly used for the protection
against electric shocks. These systems earthings have a major impact on the LV
electrical installation architecture and they need to be analysed as early as possible.
Advantages and drawbacks are to be analysed for a correct selection.
Another aspect needing to be considered at the earlier stage is the external
inuences. In large electrical installation, different external inuences may be
encountered and need to be considered independently. As a result of these external
inuences proper selection of equipment according to their IP or IK codes has to be
made.
Protection against electric shocks
Protection against electric shock consists in providing provision for basic protection
(protection against direct contact) with provision for fault protection (protection
against indirect contact). Coordinated provisions result in a protective measure.
One of the most common protective measures consists in automatic disconnection
of supply where the provision for fault protection consists in the implementation of a
system earthing. Deep understanding of each standardized system (TT, TN and IT
system) is necessary for a correct implementation.
Sizing and protection of conductors
Selection of cross-sectional-areas of cables or isolated conductors for line
conductors is certainly one of the most important tasks of the designing process
of an electrical installation as this greatly inuences the selection of overcurrent
protective devices, the voltage drop along these conductors and the estimation of
the prospective short-circuits currents: the maximum value relates to the overcurrent
protection and the minimum value relates to the fault protection by automatic
disconnection of supply. This has to be done for each circuit of the installation.
Similar task is to be done for the neutral conductors and for the Protective Earth (PE)
conductor.
LV switchgear: functions & selection
Once the short-circuit current are estimated, protective devices can be selected for
the overcurrent protection. Circuit-breakers have also other possible functions such
as switching and isolation. A complete understanding of the functionalities offered by
all switchgear and controlgear within the installation is necessary. Correct selection
of all devices can now be done.
A comprehensive understanding of all functionalities offered by the circuit-breakers is
of prime importance as this is the device offering the largest variety of functions.
Overvoltage protection
Direct or indirect lightning strokes can damage electrical equipment at a distance of
several kilometres. Operating voltage surges, transient and industrial frequency over-
voltage can also produce the same consequences.All protective measures against
overvoltage need to be assessed. One of the most used corresponds to the use of
Surge Protective Devices (SPD). Their selection; installation and protection within the
electrical installation request some particular attention.
Energy efciency in electrical distribution
Implementation of active energy efciency measures within the electrical installation
can produce high benets for the user or owner: reduced power consumption,
reduced cost of energy, better use of electrical equipment. These measures will
most of the time request specic design for the installation as measuring electricity
consumption either per application (lighting, heating, process) or per area (oor,
workshop) present particular interest for reducing the electricity consumption still
keeping the same level of service provided to the user.
Reactive energy
The power factor correction within electrical installations is carried out locally,
globally or as a combination of both methods. Improving the power factor has a direct
impact on the billing of consumed electricity and may also have an impact on the
energy eiciency.
J Protection against voltage surges in LV
L - Power factor correction and harmonic ltering
1 Methodology
F - Protection against electric shocks
G - Sizing and protection of conductors
H - LV switchgear: functions & selection
E - LV Distribution
K Energy efciency in electrical distribution
Schneider Electric - Electrical installation guide 2013
A - General rules of electrical installation design
A4
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Harmonics
Harmonic currents in the network affect the quality of energy and are at the origin of
many disturbances as overloads, vibrations, ageing of equipment, trouble of sensitive
equipment, of local area networks, telephone networks. This chapter deals with the
origins and the effects of harmonics and explain how to measure them and present
the solutions.
Particular supply sources and loads
Particular items or equipment are studied:
b Specic sources such as alternators or inverters
b Specic loads with special characteristics, such as induction motors, lighting
circuits or LV/LV transformers
b Specic systems, such as direct-current networks
A green and economical energy
The solar energy development has to respect specic installation rules.
Generic applications
Certain premises and locations are subject to particularly strict regulations: the most
common example being residential dwellings.
EMC Guidelines
Some basic rules must be followed in order to ensure Electromagnetic Compatibility.
Non observance of these rules may have serious consequences in the operation of
the electrical installation: disturbance of communication systems, nuisance tripping of
protection devices, and even destruction of sensitive devices.
Ecodial software
Ecodial software
(1)
provides a complete design package for LV installations, in
accordance with IEC standards and recommendations.
The following features are included:
b Construction of one-line diagrams
b Calculation of short-circuit currents according to several operating modes (normal,
back-up, load shedding)
b Calculation of voltage drops
b Optimization of cable sizes
b Required ratings and settings of switchgear and fusegear
b Discrimination of protective devices
b Optimization ofswitchgear using cascading
b Verication of the protection of people and circuits
b Comprehensive print-out of the foregoing calculated design data
(1) Ecodial is a Schneider Electric software available in several
languages and standard version.
1 Methodology
N - Characteristics of particular sources and
loads
P - Photovoltaic Installations
M - Harmonic management
Q - Residential and other special locations
R - EMC guidelines
A companion tool of the Electrical Installation
Guide
Schneider Electric - Electrical installation guide 2013
A5
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Low-voltage installations are usually governed by a number of regulatory and
advisory texts, which may be classied as follows:
b Statutory regulations (decrees, factory acts, etc.)
b Codes of practice, regulations issued by professional institutions, job specications
b National and international standards for installations
b National and international standards for products
2.1 Denition of voltage ranges
IEC voltage standards and recommendations
2 Rules and statutory regulations
Three-phase four-wire or three-wire systems Single-phase three-wire systems
Nominal voltage (V) Nominal voltage (V)
50 Hz 60 Hz 60 Hz
120/208 120/240
(d)
230
(c)
240
(c)
230/400
(a)
230/400
(c)
277/480
(a)
480
347/600
600
400/690
(b)
1000 600
(a) The value of 230/400 V is the result of the evolution of 220/380 V and 240/415 V
systems which has been completed in Europe and many other countries. However,
220/380 V and 240/415 V systems still exist.
(b) The value of 400/690 V is the result of the evolution of 380/660 V systems which
has been completed in Europe and many other countries. However, 380/660 V systems
still exist.
(c) The value of 200 V or 220 V is also used in some countries.
(d) The values of 100/200 V are also used in some countries on 50 Hz or 60 Hz
systems.
Fig. A1 : Standard voltages between 100 V and 1000 V (IEC 60038 Edition 7.0 2009-06)
Series I Series II
Highest voltage Nominal system Highest voltage Nominal system
for equipment (kV) voltage (kV) for equipment (kV) voltage (kV)
3.6
(b)
3.3
(b)
3
(b)
4.40
(b)
4.16
(b)
7.2
(b)
6.6
(b)
6
(b)
12 11 10
13.2
(c)
12.47
(c)
13.97
(c)
13.2
(c)
14.52
(b)
13.8
(b)
(17.5) (15)
24 22 20
26.4
(c, e)
24.94
(c, e)
36
(d)
33
(d)
30
(d)
36.5
(2)
34.5
(c)
40.5
(d)
35
(d)
Note 1: It is recommended that in any one country the ratio between two adjacent
nominal voltages should be not less than two.
Note 2: In a normal system of Series I, the highest voltage and the lowest voltage do
not differ by more than approximately 10 % from the nominal voltage of the system.
In a normal system of Series II, the highest voltage does not differ by more than +5 %
and the lowest voltage by more than -10 % from the nominal voltage of the system.
(a) These systems are generally three-wire systems, unless otherwise indicated. The
values indicated are voltages between phases.
The values indicated in parentheses should be considered as non-preferred values. It is
recommended that these values should not be used for new systems to be constructed
in future.
(b) These values should not be used for new public distribution systems.
(c) These systems are generally four-wire systems and the values indicated are
voltages between phases. The voltage to neutral is equal to the indicated value divided
by 1.73.
(d) The unication of these values is under consideration.
(e) The values of 22.9 kV for nominal voltage and 24.2 kV or 25.8 kV for highest voltage
for equipment are also used in some countries.
Fig. A2 : AC 3 phases Standard voltages above 1 kV and not exceeding 35 kV
(IEC 60038 Edition 7.0 2009)
(a)
Schneider Electric - Electrical installation guide 2013
A - General rules of electrical installation design
A6
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2.2 Regulations
In most countries, electrical installations shall comply with more than one set of
regulations, issued by National Authorities or by recognized private bodies. It is
essential to take into account these local constraints before starting the design.
These regulations may be based on national standards derived from the IEC 60364:
Low-voltage electrical installations.
2.3 Standards
This Guide is based on relevant IEC standards, in particular IEC 60364. IEC 60364
has been established by engineering experts of all countries in the world comparing
their experience at an international level. Currently, the safety principles of IEC
60364 series, IEC 61140, 60479 series and IEC 61201 are the fundamentals of most
electrical standards in the world (see table below and next page).
IEC 60038 IEC standard voltages
IEC 60076-2 Power transformers - Temperature rise for liquid immersed transformers
IEC 60076-3 Power transformers - Insulation levels, dielectric tests and external clearances in air
IEC 60076-5 Power transformers - Ability to withstand short-circuit
IEC 60076-10 Power transformers - Determination of sound levels
IEC 60146-1-1 Semiconductor converters - General requirements and line commutated converters - Specications of basic requirements
IEC 60255-1 Measuring relays and protection equipment - Common requirements
IEC 60269-1 Low-voltage fuses - General requirements
IEC 60269-2 Low-voltage fuses - Supplementary requirements for fuses for use by authorized persons (fuses mainly for industrial applications) - Examples of
standardized systems of fuses A to J
IEC 60282-1 High-voltage fuses - Current-limiting fuses
IEC 60287-1-1 Electric cables - Calculation of the current rating - Current rating equations (100% load factor) and calculation of losses - General
IEC 60364-1 Low-voltage electrical installations - Fundamental principles, assessment of general characteristics, denitions
IEC 60364-4-41 Low-voltage electrical installations - Protection for safety - Protection against electric shock
IEC 60364-4-42 Low-voltage electrical installations - Protection for safety - Protection against thermal effects
IEC 60364-4-43 Low-voltage electrical installations - Protection for safety - Protection against overcurrent
IEC 60364-4-44 Low-voltage electrical installations - Protection for safety - Protection against voltage disturbances and electromagnetic disturbances
IEC 60364-5-51 Low-voltage electrical installations - Selection and erection of electrical equipment - Common rules
IEC 60364-5-52 Low-voltage electrical installations - Selection and erection of electrical equipment - Wiring systems
IEC 60364-5-53 Low-voltage electrical installations - Selection and erection of electrical equipment - Isolation, switching and control
IEC 60364-5-54 Low-voltage electrical installations - Selection and erection of electrical equipment - Earthing arrangements and protective conductors
IEC 60364-5-55 Low-voltage electrical installations - Selection and erection of electrical equipment - Other equipments
IEC 60364-6 Low-voltage electrical installations - Verication
IEC 60364-7-701 Low-voltage electrical installations - Requirements for special installations or locations - Locations containing a bath or shower
IEC 60364-7-702 Low-voltage electrical installations - Requirements for special installations or locations - Swimming pools and fountains
IEC 60364-7-703 Low-voltage electrical installations - Requirements for special installations or locations - Rooms and cabins containing sauna heaters
IEC 60364-7-704 Low-voltage electrical installations - Requirements for special installations or locations - Construction and demolition site installations
IEC 60364-7-705 Low-voltage electrical installations - Requirements for special installations or locations - Agricultural and horticultural premises
IEC 60364-7-706 Low-voltage electrical installations - Requirements for special installations or locations - Conducting locations with restrictive movement
IEC 60364-7-708 Low-voltage electrical installations - Requirements for special installations or locations - Caravan parks, camping parks and similar locations
IEC 60364-7-709 Low-voltage electrical installations - Requirements for special installations or locations - Marinas and similar locations
IEC 60364-7-710 Low-voltage electrical installations - Requirements for special installations or locations - Medical locations
IEC 60364-7-711 Low-voltage electrical installations - Requirements for special installations or locations - Exhibitions, shows and stands
IEC 60364-7-712 Low-voltage electrical installations - Requirements for special installations or locations - Solar photovoltaic (PV) power supply systems
IEC 60364-7-713 Low-voltage electrical installations - Requirements for special installations or locations - Furniture
IEC 60364-7-714 Low-voltage electrical installations - Requirements for special installations or locations - External lighting installations
IEC 60364-7-715 Low-voltage electrical installations - Requirements for special installations or locations - Extra-low-voltage lighting installations
IEC 60364-7-717 Low-voltage electrical installations - Requirements for special installations or locations - Mobile or transportable units
IEC 60364-7-718 Low-voltage electrical installations - Requirements for special installations or locations Communal facilities and workplaces
IEC 60364-7-721 Low-voltage electrical installations - Requirements for special installations or locations Electrical installations in caravans and motor caravans
IEC 60364-7-729 Low-voltage electrical installations - Requirements for special installations or locations Operating or maintenance gangways
IEC 60364-7-740 Low-voltage electrical installations - Requirements for special installations or locations - Temporary electrical installations for structures,
amusement devices and booths at fairgrounds, amusement parks and circuses
IEC 60364-7-753 Low-voltage electrical installations - Requirements for special installations or locations Floor and ceiling heating systems
IEC 60446 Basic and safety principles for man-machine interface, marking and identication - Identication of equipment terminals, conductors terminations
and conductors
IEC 60479-1 Effects of current on human beings and livestock - General aspects
IEC 60479-2 Effects of current on human beings and livestock - Special aspects
IEC 60479-3 Effects of current on human beings and livestock - Effects of currents passing through the body of livestock
IEC 60529 Degrees of protection provided by enclosures (IP code)
IEC 60644 Specication for high-voltage fuse-links for motor circuit applications
(Continued on next page)
Schneider Electric - Electrical installation guide 2013
A7
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
IEC 60664 Insulation coordination for equipment within low-voltage systems
IEC 60715 Dimensions of low-voltage switchgear and controlgear. Standardized mounting on rails for mechanical support of electrical devices in switchgear
and controlgear installations.
IEC 60724 Short-circuit temperature limits of electric cables with rated voltages of 1 kV (Um = 1.2 kV) and 3 kV (Um = 3.6 kV)
IEC 60755 General requirements for residual current operated protective devices
IEC 60787 Application guide for the selection of high-voltage current-limiting fuses-link for transformer circuit
IEC 60831-1 Shunt power capacitors of the self-healing type for a.c. systems having a rated voltage up to and including 1000 V - Part 1: General - Performance,
testing and rating - Safety requirements - Guide for installation and operation
IEC 60831-2 Shunt power capacitors of the self-healing type for a.c. systems having a rated voltage up to and including 1000 V - Part 2: Ageing test, self-healing
test and destruction test
IEC 60947-1 Low-voltage switchgear and controlgear - General rules
IEC 60947-2 Low-voltage switchgear and controlgear - Circuit-breakers
IEC 60947-3 Low-voltage switchgear and controlgear - Switches, disconnectors, switch-disconnectors and fuse-combination units
IEC 60947-4-1 Low-voltage switchgear and controlgear - Contactors and motor-starters - Electromechanical contactors and motor-starters
IEC 60947-6-1 Low-voltage switchgear and controlgear - Multiple function equipment - Transfer switching equipment
IEC 61000 series Electromagnetic compatibility (EMC)
IEC 61140 Protection against electric shocks - common aspects for installation and equipment
IEC 61201 Use of conventional touch voltage limits Application guide
IEC 61439-0 Low-voltage switchgear and controlgear assemblies - Specication guide
IEC 61439-1 Low-voltage switchgear and controlgear assemblies - general rules
IEC 61439-2 Low-voltage switchgear and controlgear assemblies - power switchgear and controlgear assemblies
IEC 61439-3 Low-voltage switchgear and controlgear assemblies - distribution boards intended to be operated by ordinary persons (DBO)
IEC 61439-4 Low-voltage switchgear and controlgear assemblies - Particular requirements for assemblies for construction sites (ACS)
IEC 61439-5 Low-voltage switchgear and controlgear assemblies - Assemblies for power distribution in public networks
IEC 61439-6 Low-voltage switchgear and controlgear assemblies - Busbar trunking systems (busways)
IEC 61557-1 Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of
protective measures - General requirements
IEC 61557-8 Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of
protective measures - Insulation monitoring devices for IT systems
IEC 61557-9 Electrical safety in low voltage distribution systems up to 1000 V a.c. and 1500 V d.c. - Equipment for testing, measuring or monitoring of protective
measures - Equipment for insulation fault location in IT systems
IEC 61557-12 Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. - Equipment for testing, measuring or monitoring of
protective measures - Performance measuring and monitoring devices (PMD)
IEC 61558-2-6 Safety of transformers, reactors, power supply units and similar products for supply voltages up to 1100 V - Particular requirements and test for
safety isolating transformers and power supply units incorporating isolating transformers
IEC 61643-11 (2011) Low-voltage surge protective devices - Surge protective devices connected to low-voltage power systems - Requirements and test methods
IEC 61643-12 Low-voltage surge protective devices - Surge protective devices connected to low-voltage power distribution systems - Selection and application
principles
IEC 61643-21 Low voltage surge protective devices - Surge protective devices connected to telecommunications and signalling networks - Performance
requirements and testing methods
IEC 61643-22 Low-voltage surge protective devices - Surge protective devices connected to telecommunications and signalling networks - Selection and
application principles
IEC 61921 Power capacitors - Low-voltage power factor correction banks
IEC 62271-1 High-voltage switchgear and controlgear Common specications
IEC 62271-100 High-voltage switchgear and controlgear - Alternating-current circuit-breakers
IEC 62271-101 High-voltage switchgear and controlgear - Synthetic testing
IEC 62271-102 High-voltage switchgear and controlgear - Alternating current disconnectors and earthing switches
IEC 62271-103 High-voltage switchgear and controlgear - Switches for rated voltages above 1 kV up to and including 52 kV
IEC 62271-105 High-voltage switchgear and controlgear - Alternating current switch-fuse combinations for rated voltages above 1 kV up to and including 52 kV
IEC 62271-200 High-voltage switchgear and controlgear - Alternating current metal-enclosed switchgear and controlgear for rated voltages above 1 kV and up to
and including 52 kV
IEC 62271-202 High-voltage switchgear and controlgear - High-voltage/low voltage prefabricated substations
IEC 62305-1 Protection against lightning - Part 1: General principles
IEC 62305-2 Protection against lightning - Part 2: Risk management
IEC 62305-3 Protection against lightning - Part 3: Physical damage to structures and life hazard
IEC 62305-4 Protection against lightning - Part 4: Electrical and electronic systems within structures
(Concluded)
2.4 Quality and safety of an electrical installation
In so far as control procedures are respected, quality and safety will be assured
only if:
b The design has been done according to the latest edition of the appropriate wiring
rules
b The electrical equipment comply with relevant product standards
b The initial checking of conformity of the electrical installation with the standard and
regulation has been achieved
b The periodic checking of the installation recommended is respected.
2 Rules and statutory regulations
Schneider Electric - Electrical installation guide 2013
A - General rules of electrical installation design
A8
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2.5 Initial testing of an installation
Before a utility will connect an installation to its supply network, strict pre-
commissioning electrical tests and visual inspections by the authority, or by its
appointed agent, must be satised.
These tests are made according to local (governmental and/or institutional)
regulations, which may differ slightly from one country to another. The principles of
all such regulations however, are common, and are based on the observance of
rigorous safety rules in the design and realization of the installation.
IEC 60364-6 and related standards included in this guide are based on an
international consensus for such tests, intended to cover all the safety measures and
approved installation practices normally required for residential, commercial and (the
majority of) industrial buildings. Many industries however have additional regulations
related to a particular product (petroleum, coal, natural gas, etc.). Such additional
requirements are beyond the scope of this guide.
The pre-commissioning electrical tests and visual-inspection checks for installations
in buildings include, typically, all of the following:
b Electrical continuity and conductivity tests of protective, equipotential and earth-
bonding conductors
b Insulation resistance tests between live conductors and the protective conductors
connected to the earthing arrangement
b Test of compliance of SELV and PELV circuits or for electrical separation
b Insulation resistance/impedance of oors and walls
b Protection by automatic disconnection of the supply
v For TN, by measurement of the fault loop impedance, and by verication of
the characteristics and/or the effectiveness of the associated protective devices
(overcurrent protective device and RCD)
v For TT, by measurement of the resistance RA of the earth electrode of the
exposed-conductive-parts, and by verication of the characteristics and/or the
effectiveness of the associated protective devices (overcurrent protective device and
RCD)
v For IT, by calculation or measurement of the current Id in case of a st fault at
the line conductor or at the neutral, and with the test done for TN system where
conditions are similar to TN system in case of a double insulation fault situation, with
the test done for TT system where the conditions are similar to TT system in case of
a double insulation fault situation.
b Additional protection by verifying the effectiveness of the protective
measureVerication
b Polarity test where the rules prohibit the installation of single pole switching devices
in the neutral conductor.
b Check of phase sequence in case of multiphase circuit
b Functional test of switchgear and controlgear by verifying their installation and
adjustment
b Voltage drop by measuring the circuit impedance or by using diagrams
These tests and checks are basic (but not exhaustive) to the majority of installations,
while numerous other tests and rules are included in the regulations to cover
particular cases, for example: installations based on class 2 insulation, special
locations, etc.
The aim of this guide is to draw attention to the particular features of different types
of installation, and to indicate the essential rules to be observed in order to achieve
a satisfactory level of quality, which will ensure safe and trouble-free performance.
The methods recommended in this guide, modied if necessary to comply with any
possible variation imposed by a utility, are intended to satisfy all precommissioning
test and inspection requirements.
After verication and testing an initial report must be provided including records of
inspection, records of circuits tested together with the test result and possible repairs
or improvements of the installation.
2.6 Put in out of danger the existing electrical
installations
This subject is in real progress cause of the statistics with origin electrical
installation (number of old and recognised dangerous electrical installations, existing
installations not in adequation with the future needs etc...)
Schneider Electric - Electrical installation guide 2013
A9
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2.7 Periodic check-testing of an installation
In many countries, all industrial and commercial-building installations, together with
installations in buildings used for public gatherings, must be re-tested periodically by
authorized agents.
The following tests should be performed
b Verication of RCD effectiveness and adjustments
b Appropriate measurements for providing safety of persons against effects of
electric shock and protection against damage to property against re and heat
b Conrmation that the installation is not damaged
b Identication of installation defects
Figure A3 shows the frequency of testing commonly prescribed according to the
kind of installation concerned.
Conformity of equipment with the relevant
standards can be attested in several ways
Fig A3 : Frequency of check-tests commonly recommended for an electrical installation
As for the initial verication, a reporting of periodic verication is to be provided.
2.8 Conformity assessement (with standards and
specications) of equipment used in the installation
The conformity assessement of equipment with the relevant standards can be
attested:
b By mark of conformity granted by the certication body concerned, or
b By a certicate of conformity issued by a certication body, or
b By a declaration of conformity given by the manufacturer
Declaration of conformity
As business, the declaration of conformity, including the technical documentation, is
generally used in for high voltage equipments or for specic products. In Europe, the
CE declaration is a mandatory declaration of conformity.
Note: CE marking
In Europe, the European directives require the manufacturer or his authorized
representative to afx the CE marking on his own responsibility. It means that:
b The product meets the legal requirements
b It is presumed to be marketable in Europe
The CE marking is neither a mark of origin nor a mark of conformity, it completes the
declaration of conformity and the technical documents of the equipments
Certicate of conformity
A certicate of conformity can reinforce the manufacturer's declaration and the
customer's condence. It could be requested by the regulation of the countries,
imposed by the customers (Marine, Nuclear,..), be mandatory to garanty the
maintenance or the consistency between the equipments
Mark of conformity
Marks of conformity are strong strategic tools to validate a durable conformity.
It consolidates the condence with the brand of the manufacturer. A mark of
Type of installation Testing frequency
Installations b Locations at which a risk of degradation, Annually
which require re or explosion exists
the protection b Temporary installations at worksites
of employees b Locations at which MV installations exist
b Restrictive conducting locations where
mobile equipment is used
Other cases Every 3 years
Installations in buildings According to the type of establishment From one to
used for public gatherings, and its capacity for receiving the public three years
where protection against
the risks of re and panic
are required
Residential According to local regulations Example : the REBT
in Belgium which
imposes a periodic
control each 20 years.
2 Rules and statutory regulations
Schneider Electric - Electrical installation guide 2013
A - General rules of electrical installation design
A10
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Rules and statutory regulations
conformity is delivered by certication body if the equipment meets the requirements
from an applicable referential (including the standard) and after verication of the
manufacturers quality management system.
Audit on the production and follow up on the equipments are made globally each year.
Quality assurance
A laboratory for testing samples cannot certify the conformity of an entire production
run: these tests are called type tests. In some tests for conformity to standards,
the samples are destroyed (tests on fuses, for example).
Only the manufacturer can certify that the fabricated products have, in fact,
the characteristics stated.
Quality assurance certication is intended to complete the initial declaration or
certication of conformity.
As proof that all the necessary measures have been taken for assuring the quality of
production, the manufacturer obtains certication of the quality control system which
monitors the fabrication of the product concerned. These certicates are issued
by organizations specializing in quality control, and are based on the international
standard ISO 9001: 2000.
These standards dene three model systems of quality assurance control
corresponding to different situations rather than to different levels of quality:
b Model 3 denes assurance of quality by inspection and checking of nal products.
b Model 2 includes, in addition to checking of the nal product, verication of the
manufacturing process. For example, this method is applied, to the manufacturer of
fuses where performance characteristics cannot be checked without destroying the fuse.
b Model 1 corresponds to model 2, but with the additional requirement that the
quality of the design process must be rigorously scrutinized; for example, where it is
not intended to fabricate and test a prototype (case of a custom-built product made to
specication).
2.9 Environment
The contribution of the whole electrical installation to sustainable development can
be signicantly improved through the design of the installation. Actually, it has been
shown that an optimised design of the installation, taking into account operation
conditions, MV/LV substations location and distribution structure (switchboards,
busways, cables), can reduce substantially environmental impacts (raw material
depletion, energy depletion, end of life), especially in term of energy efciency.
Beside its architecture, environmental specication of the electrical component
and equipment is a fundamental step for an eco-friendly installation. In particular to
ensure proper environmental information and anticipate regulation.
In Europe several Directives concerning electrical equipments have been published,
leading the worldwide move to more environment safe products.
a) RoHS Directive (Restriction of Hazardous Substances) : in force since July 2006
and revised on 2012. It aims to eliminate from products six hazardous substances:
lead, mercury, cadmium, hexavalent chromium, polybrominated biphenyls (PBB) or
polybrominated diphenyl ethers (PBDE) from most of end user electrical products..
Though electrical installations being large scale xed installation are not in the
scope, RoHS compliance requirement may be a recommendation for a sustainable
installation
b) WEEE Directive (Waste of Electrical and Electronic Equipment) : in force since
August 2005 and currently under revision. Its purpose is to improve the end of life
treatments for household and non household equipment, under the responsibility
of the manufacturers. As for RoHS, electrical installations are not in the scope of
this directive. However, End of Life Product information is recommended to optimise
recycling process and cost.
c) Energy Related Product , also called Ecodesign. Apart for some equipments
like lighting or motors for which implementing measures are compulsory, there
are no legal requirements that directly apply to installation. However, trend is to
provide electrical equipments with their Environmental Product Declarattion , as it is
becoming for Construction Products , to anticipate Building Market coming requirements.
d) REACh : (Registration Evaluation Authorisation of Chemicals). In force since
2009, it aims to control chemical use and restrict application when necessary to
reduce hazards to people and environment. With regards to EE and installations, it
implies any supplier shall, upon request, communicate to its customer the hazardous
substances content in its product (so called SVHC). Then, an installer should ensure
that its suppliers have the appropriate information available
In other parts of the world new legislations will follow the same objectives.
Schneider Electric - Electrical installation guide 2013
A11
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Installed power loads -
Characteristics
The examination of actual values of apparent-power required by each load enables
the establishment of:
b A declared power demand which determines the contract for the supply of energy
b The rating of the MV/LV transformer, where applicable (allowing for expected
increased load)
b Levels of load current at each distribution board
3.1 Induction motors
Current demand
The full-load current Ia supplied to the motor is given by the following formulae:
b 3-phase motor: Ia = Pn x 1,000 / 3 x U x x cos
b 1-phase motor: Ia = Pn x 1,000 / (U x x cos
where
Ia: current demand (in amps)
Pn: nominal power (in kW)
U: voltage between phases for 3-phase motors and voltage between the terminals
for single-phase motors (in volts). A single-phase motor may be connected phase-to-
neutral or phase-to-phase.
: per-unit efciency, i.e. output kW / input kW
cos : power factor, i.e. kW input / kVA input
Subtransient current and protection setting
b Subtransient current peak value can be very high ; typical value is about 12
to 15 times the rms rated value Inm. Sometimes this value can reach 25 times Inm.
b Schneider Electric circuit-breakers, contactors and thermal relays are designed to
withstand motor starts with very high subtransient current (subtransient peak value
can be up to 19 times the rms rated value Inm).
b If unexpected tripping of the overcurrent protection occurs during starting, this
means the starting current exceeds the normal limits. As a result, some maximum
switchgear withstands can be reached, life time can be reduced and even some
devices can be destroyed. In order to avoid such a situation, oversizing of the
switchgear must be considered.
b Schneider Electric switchgears are designed to ensure the protection of motor
starters against short-circuits. According to the risk, tables show the combination of
circuit-breaker, contactor and thermal relay to obtain type 1 or type 2 coordination
(see chapter N).
Motor starting current
Although high efciency motors can be found on the market, in practice their starting
currents are roughly the same as some of standard motors.
The use of start-delta starter, static soft start unit or variable speed drive allows to
reduce the value of the starting current (Example : 4 Ia instead of 7.5 Ia).
Compensation of reactive-power (kvar) supplied to induction motors
It is generally advantageous for technical and nancial reasons to reduce the current
supplied to induction motors. This can be achieved by using capacitors without
affecting the power output of the motors.
The application of this principle to the operation of induction motors is generally
referred to as power-factor improvement or power-factor correction.
As discussed in chapter L, the apparent power (kVA) supplied to an induction motor
can be signicantly reduced by the use of shunt-connected capacitors. Reduction
of input kVA means a corresponding reduction of input current (since the voltage
remains constant).
Compensation of reactive-power is particularly advised for motors that operate for
long periods at reduced power.
As noted above
cos =
kW input
kVA input
so that a kVA input reduction will increase
(i.e. improve) the value of cos .
An examination of the actual apparent-
power demands of different loads: a
necessary preliminary step in the design of a
LV installation
The nominal power in kW (Pn) of a motor
indicates its rated equivalent mechanical power
output.
The apparent power in kVA (Pa) supplied to
the motor is a function of the output, the motor
efciency and the power factor.
Pa =
Pn
cos
Schneider Electric - Electrical installation guide 2013
A - General rules of electrical installation design
A12
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
The current supplied to the motor, after power-factor correction, is given by:
I
cos
cos '
=
Ia
where cos is the power factor before compensation and cos is the power factor
after compensation, Ia being the original current.
Figure A4 below shows, in function of motor rated power, standard motor current
values for several voltage supplies.
kW hp 230 V 380 - 400 V 440 - 500 V 690 V
415 V 480 V
A A A A A A
0.18 - 1.0 - 0.6 - 0.48 0.35
0.25 - 1.5 - 0.85 - 0.68 0.49
0.37 - 1.9 - 1.1 - 0.88 0.64
- 1/2 - 1.3 - 1.1 - -
0.55 - 2.6 - 1.5 - 1.2 0.87
- 3/4 - 1.8 - 1.6 - -
- 1 - 2.3 - 2.1 - -
0.75 - 3.3 - 1.9 - 1.5 1.1
1.1 - 4.7 - 2.7 - 2.2 1.6
- 1-1/2 - 3.3 - 3.0 - -
- 2 - 4.3 - 3.4 - -
1.5 - 6.3 - 3.6 - 2.9 2.1
2.2 - 8.5 - 4.9 - 3.9 2.8
- 3 - 6.1 - 4.8 - -
3.0 - 11.3 - 6.5 - 5.2 3.8
3.7 - - - - - - -
4 - 15 9.7 8.5 7.6 6.8 4.9
5.5 - 20 - 11.5 - 9.2 6.7
- 7-1/2 - 14.0 - 11.0 - -
- 10 - 18.0 - 14.0 - -
7.5 - 27 - 15.5 - 12.4 8.9
11 - 38.0 - 22.0 - 17.6 12.8
- 15 - 27.0 - 21.0 - -
- 20 - 34.0 - 27.0 - -
15 - 51 - 29 - 23 17
18.5 - 61 - 35 - 28 21
- 25 - 44 - 34 -
22 - 72 - 41 - 33 24
- 30 - 51 - 40 - -
- 40 - 66 - 52 - -
30 - 96 - 55 - 44 32
37 - 115 - 66 - 53 39
- 50 - 83 - 65 - -
- 60 - 103 - 77 - -
45 - 140 - 80 - 64 47
55 - 169 - 97 - 78 57
- 75 - 128 - 96 - -
- 100 - 165 - 124 - -
75 - 230 - 132 - 106 77
90 - 278 - 160 - 128 93
- 125 - 208 - 156 - -
110 - 340 - 195 156 113
- 150 - 240 - 180 - -
132 - 400 - 230 - 184 134
- 200 - 320 - 240 - -
150 - - - - - - -
160 - 487 - 280 - 224 162
185 - - - - - - -
- 250 - 403 - 302 - -
200 - 609 - 350 - 280 203
220 - - - - - - -
- 300 - 482 - 361 - -
250 - 748 - 430 - 344 250
280 - - - - - - -
- 350 - 560 - 414 - -
- 400 - 636 - 474 - -
300 - - - - - - -
Fig. A4 : Rated operational power and currents (continued on next page)
Schneider Electric - Electrical installation guide 2013
A13
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
kW hp 230 V 380 - 400 V 440 - 500 V 690 V
415 V 480 V
A A A A A A
315 - 940 - 540 - 432 313
- 540 - - - 515 - -
335 - - - - - - -
355 - 1061 - 610 - 488 354
- 500 - 786 - 590 - -
375 - - - - - - -
400 - 1200 - 690 - 552 400
425 - - - - - - -
450 - - - - - - -
475 - - - - - - -
500 - 1478 - 850 - 680 493
530 - - - - - - -
560 - 1652 - 950 - 760 551
600 - - - - - - -
630 - 1844 - 1060 - 848 615
670 - - - - - - -
710 - 2070 - 1190 - 952 690
750 - - - - - - -
800 - 2340 - 1346 - 1076 780
850 - - - - - - -
900 - 2640 - 1518 - 1214 880
950 - - - - - - -
1000 - 2910 - 1673 - 1339 970
Fig. A4 : Rated operational power and currents (concluded)
3.2 Resistive-type heating appliances and
incandescent lamps (conventional or halogen)
The current demand of a heating appliance or an incandescent lamp is easily
obtained from the nominal power Pn quoted by the manufacturer (i.e. cos = 1)
(see Fig. A5).
Fig. A5 : Current demands of resistive heating and incandescent lighting (conventional or
halogen) appliances
Nominal Current demand (A)
power 1-phase 1-phase 3-phase 3-phase
(kW) 127 V 230 V 230 V 400 V
0.1 0.79 0.43 0.25 0.14
0.2 1.58 0.87 0.50 0.29
0.5 3.94 2.17 1.26 0.72
1 7.9 4.35 2.51 1.44
1.5 11.8 6.52 3.77 2.17
2 15.8 8.70 5.02 2.89
2.5 19.7 10.9 6.28 3.61
3 23.6 13 7.53 4.33
3.5 27.6 15.2 8.72 5.05
4 31.5 17.4 10 5.77
4.5 35.4 19.6 11.3 6.5
5 39.4 21.7 12.6 7.22
6 47.2 26.1 15.1 8.66
7 55.1 30.4 17.6 10.1
8 63 34.8 20.1 11.5
9 71 39.1 22.6 13
10 79 43.5 25.1 14.4
3 Installed power loads -
Characteristics
Schneider Electric - Electrical installation guide 2013
A - General rules of electrical installation design
A14
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
(2) Power-factor correction is often referred to as
compensation in discharge-lighting-tube terminology.
Cos is approximately 0.95 (the zero values of V and I
are almost in phase) but the power factor is 0.5 due to the
impulsive form of the current, the peak of which occurs late
in each half cycle
The currents are given by:
b 3-phase case: I a =
Pn
U 3
(1)
b 1-phase case: I a =
Pn
U
(1)
where U is the voltage between the terminals of the equipment.
For an incandescent lamp, the use of halogen gas allows a more concentrated light
source. The light output is increased and the lifetime of the lamp is doubled.
Note: At the instant of switching on, the cold lament gives rise to a very brief but
intense peak of current.
Fluorescent lamps and related equipment
The power Pn (watts) indicated on the tube of a uorescent lamp does not include
the power dissipated in the ballast.
The current is given by:
I a
cos
=
+ P Pn
U
ballast
Where U = the voltage applied to the lamp, complete with its related equipment.
If no power-loss value is indicated for the ballast, a gure of 25% of Pn may be used.
Standard tubular uorescent lamps
With (unless otherwise indicated):
b cos = 0.6 with no power factor (PF) correction
(2)
capacitor
b cos = 0.86 with PF correction
(2)
(single or twin tubes)
b cos = 0.96 for electronic ballast.
If no power-loss value is indicated for the ballast, a gure of 25% of Pn may be used.
Figure A6 gives these values for different arrangements of ballast.
(1) Ia in amps; U in volts. Pn is in watts. If Pn is in kW, then
multiply the equation by 1,000
Fig. A6 : Current demands and power consumption of commonly-dimensioned uorescent
lighting tubes (at 230 V-50 Hz)
Arrangement Tube power Current (A) at 230 V Tube
of lamps, starters (W)
(3)
Magnetic ballast Electronic length
and ballasts ballast (cm)
Without PF With PF
correction correction
capacitor capacitor
Single tube 18 0.20 0.14 0.10 60
36 0.33 0.23 0.18 120
58 0.50 0.36 0.28 150
Twin tubes 2 x 18 0.28 0.18 60
2 x 36 0.46 0.35 120
2 x 58 0.72 0.52 150
(3) Power in watts marked on tube
Compact uorescent lamps
Compact uorescent lamps have the same characteristics of economy and long life
as classical tubes. They are commonly used in public places which are permanently
illuminated (for example: corridors, hallways, bars, etc.) and can be mounted in
situations otherwise illuminated by incandescent lamps (see Fig. A7 next page).
Schneider Electric - Electrical installation guide 2013
A15
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Installed power loads -
Characteristics
The power in watts indicated on the tube of
a discharge lamp does not include the power
dissipated in the ballast.
Fig. A7 : Current demands and power consumption of compact uorescent lamps (at 230 V - 50 Hz)
Type of lamp Lamp power Current at 230 V
(W) (A)
Separated 10 0.080
ballast lamp 18 0.110
26 0.150
Integrated 8 0.075
ballast lamp 11 0.095
16 0.125
21 0.170
Fig. A8 : Current demands of discharge lamps
Type of Power Current In(A) Starting Luminous Average Utilization
lamp (W) demand PF not PF Ia/In Period efciency timelife of
(W) at corrected corrected (mins) (lumens lamp (h)
230 V 400 V 230 V 400 V 230 V 400 V per watt)
High-pressure sodium vapour lamps
50 60 0.76 0.3 1.4 to 1.6 4 to 6 80 to 120 9000 b Lighting of
70 80 1 0.45 large halls
100 115 1.2 0.65 b Outdoor spaces
150 168 1.8 0.85 b Public lighting
250 274 3 1.4
400 431 4.4 2.2
1000 1055 10.45 4.9
Low-pressure sodium vapour lamps
26 34.5 0.45 0.17 1.1 to 1.3 7 to 15 100 to 200 8000 b Lighting of
36 46.5 0.22 to 12000 autoroutes
66 80.5 0.39 b Security lighting,
91 105.5 0.49 station
131 154 0.69 b Platform, storage
areas
Mercury vapour + metal halide (also called metal-iodide)
70 80.5 1 0.40 1.7 3 to 5 70 to 90 6000 b Lighting of very
150 172 1.80 0.88 6000 large areas by
250 276 2.10 1.35 6000 projectors (for
400 425 3.40 2.15 6000 example: sports
1000 1046 8.25 5.30 6000 stadiums, etc.)
2000 2092 2052 16.50 8.60 10.50 6 2000
Mercury vapour + uorescent substance (uorescent bulb)
50 57 0.6 0.30 1.7 to 2 3 to 6 40 to 60 8000 b Workshops
80 90 0.8 0.45 to 12000 with very high
125 141 1.15 0.70 ceilings (halls,
250 268 2.15 1.35 hangars)
400 421 3.25 2.15 b Outdoor lighting
700 731 5.4 3.85 b Low light output
(1)
1000 1046 8.25 5.30
2000 2140 2080 15 11 6.1
(1) Replaced by sodium vapour lamps.
Note: these lamps are sensitive to voltage dips. They extinguish if the voltage falls to less than 50% of their nominal voltage, and will
not re-ignite before cooling for approximately 4 minutes.
Note: Sodium vapour low-pressure lamps have a light-output efciency which is superior to that of all other sources. However, use of
these lamps is restricted by the fact that the yellow-orange colour emitted makes colour recognition practically impossible.
Discharge lamps
Figure A8 gives the current taken by a complete unit, including all associated
ancillary equipment.
These lamps depend on the luminous electrical discharge through a gas or vapour
of a metallic compound, which is contained in a hermetically-sealed transparent
envelope at a pre-determined pressure. These lamps have a long start-up time,
during which the current Ia is greater than the nominal current In. Power and current
demands are given for different types of lamp (typical average values which may
differ slightly from one manufacturer to another).
Schneider Electric - Electrical installation guide 2013
A - General rules of electrical installation design
A16
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
A - General rules of electrical installation design
In order to design an installation, the actual maximum load demand likely to be
imposed on the power-supply system must be assessed.
To base the design simply on the arithmetic sum of all the loads existing in the
installation would be extravagantly uneconomical, and bad engineering practice.
The aim of this chapter is to show how some factors taking into account the diversity
(non simultaneous operation of all appliances of a given group) and utilization
(e.g. an electric motor is not generally operated at its full-load capability, etc.) of
all existing and projected loads can be assessed. The values given are based on
experience and on records taken from actual installations. In addition to providing
basic installation-design data on individual circuits, the results will provide a
global value for the installation, from which the requirements of a supply system
(distribution network, MV/LV transformer, or generating set) can be specied.
4.1 Installed power (kW)
The installed power is the sum of the nominal
powers of all power consuming devices in the
installation.
This is not the power to be actually supplied in
practice.
Most electrical appliances and equipments are marked to indicate their nominal
power rating (Pn).
The installed power is the sum of the nominal powers of all power-consuming
devices in the installation. This is not the power to be actually supplied in practice.
This is the case for electric motors, where the power rating refers to the output power
at its driving shaft. The input power consumption will evidently be greater
Fluorescent and discharge lamps associated with stabilizing ballasts, are other
cases in which the nominal power indicated on the lamp is less than the power
consumed by the lamp and its ballast.
Methods of assessing the actual power consumption of motors and lighting
appliances are given in Section 3 of this Chapter.
The power demand (kW) is necessary to choose the rated power of a generating set
or battery, and where the requirements of a prime mover have to be considered.
For a power supply from a LV public-supply network, or through a MV/LV transformer,
the signicant quantity is the apparent power in kVA.
4.2 Installed apparent power (kVA)
The installed apparent power is commonly assumed to be the arithmetical sum of
the kVA of individual loads. The maximum estimated kVA to be supplied however is
not equal to the total installed kVA.
The apparent-power demand of a load (which might be a single appliance) is
obtained from its nominal power rating (corrected if necessary, as noted above for
motors, etc.) and the application of the following coefcients:
= the per-unit efciency = output kW / input kW
cos = the power factor = kW / kVA
The apparent-power kVA demand of the load
Pa = Pn /( x cos )
From this value, the full-load current Ia (A)
(1)
taken by the load will be:
b Ia =
Pa x 10
V
3
for single phase-to-neutral connected load
b Ia =
Pa x 10
3
3 x U
for three-phase balanced load where:
V = phase-to-neutral voltage (volts)
U = phase-to-phase voltage (volts)
It may be noted that, strictly speaking, the total kVA of apparent power is not the
arithmetical sum of the calculated kVA ratings of individual loads (unless all loads are
at the same power factor).
It is common practice however, to make a simple arithmetical summation, the result
of which will give a kVA value that exceeds the true value by an acceptable design
margin.
When some or all of the load characteristics are not known, the values shown
in Figure A9 next page may be used to give a very approximate estimate of VA
demands (individual loads are generally too small to be expressed in kVA or kW).
The estimates for lighting loads are based on oor areas of 500 m
2
.
The installed apparent power is commonly
assumed to be the arithmetical sum of the kVA
of individual loads. The maximum estimated
kVA to be supplied however is not equal to the
total installed kVA.
(1) For greater precision, account must be taken of the factor
of maximum utilization as explained below in 4.3
4 Power loading of an ins tal la tion
Schneider Electric - Electrical installation guide 2013
A17
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. A9 : Estimation of installed apparent power
4.3 Estimation of actual maximum kVA demand
All individual loads are not necessarily operating at full rated nominal power nor
necessarily at the same time. Factors ku and ks allow the determination of the
maximum power and apparent-power demands actually required to dimension the
installation.
Factor of maximum utilization (ku)
In normal operating conditions the power consumption of a load is sometimes less
than that indicated as its nominal power rating, a fairly common occurrence that
justies the application of an utilization factor (ku) in the estimation of realistic values.
This factor must be applied to each individual load, with particular attention to
electric motors, which are very rarely operated at full load.
In an industrial installation this factor may be estimated on an average at 0.75 for
motors.
For incandescent-lighting loads, the factor always equals 1.
For socket-outlet circuits, the factors depend entirely on the type of appliances being
supplied from the sockets concerned.
For Electric Vehicle the utilization factor will be systematically estimated to 1, as it
takes a long time to load completely the batteries (several hours) and a dedicated
circuit feeding the charging station or wall box will be required by standards.
Factor of simultaneity (ks)
It is a matter of common experience that the simultaneous operation of all installed
loads of a given installation never occurs in practice, i.e. there is always some degree
of diversity and this fact is taken into account for estimating purposes by the use of a
simultaneity factor (ks).
The factor ks is applied to each group of loads (e.g. being supplied from a distribution
or sub-distribution board). The determination of these factors is the responsibility
of the designer, since it requires a detailed knowledge of the installation and the
conditions in which the individual circuits are to be exploited. For this reason, it is not
possible to give precise values for general application.
Fluorescent lighting (corrected to cos = 0.86)
Type of application Estimated (VA/m
2
) Average lighting
uorescent tube level (lux = lm/m
2
)
with industrial reector
(1)
Roads and highways 7 150
storage areas, intermittent work
Heavy-duty works: fabrication and 14 300
assembly of very large work pieces
Day-to-day work: ofce work 24 500
Fine work: drawing ofces 41 800
high-precision assembly workshops
Power circuits
Type of application Estimated (VA/m
2
)
Pumping station compressed air 3 to 6
Ventilation of premises 23
Electrical convection heaters:
private houses 115 to 146
ats and apartments 90
Ofces 25
Dispatching workshop 50
Assembly workshop 70
Machine shop 300
Painting workshop 350
Heat-treatment plant 700
(1) example: 65 W tube (ballast not included), ux 5,100 lumens (Im),
luminous efciency of the tube = 78.5 Im / W.
4 Power loading of an ins tal la tion
Schneider Electric - Electrical installation guide 2013
A - General rules of electrical installation design
A18
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Factor of simultaneity for an apartment block
Some typical values for this case are given in Figure A10, and are applicable
to domestic consumers supplied at 230/400 V (3-phase 4-wires). In the case of
consumers using electrical heat-storage units for space heating, a factor of 0.8 is
recommended, regardless of the number of consumers.
Example (see Fig. A11):
5 storeys apartment building with 25 consumers, each having 6 kVA of installed load.
The total installed load for the building is: 36 + 24 + 30 + 36 + 24 = 150 kVA
The apparent-power supply required for the building is: 150 x 0.46 = 69 kVA
From Figure A10, it is possible to determine the magnitude of currents in different
sections of the common main feeder supplying all oors. For vertical rising mains
fed at ground level, the cross-sectional area of the conductors can evidently be
progressively reduced from the lower oors towards the upper oors.
These changes of conductor size are conventionally spaced by at least 3-oor
intervals.
In the example, the current entering the rising main at ground level is:
150 x 0.46 x 10
400 3
3
=100 A
the current entering the third oor is:
(36+24) x 0.63 x 10
400 3
3
= 55 A
4
th
floor
6 consumers
36 kVA
3
rd
floor
2
nd
floor
1
st
floor
ground
floor
4 consumers
24 kVA
6 consumers
36 kVA
5 consumers
30 kVA
4 consumers
24 kVA
0.78
0.63
0.53
0.49
0.46
Fig. A11 : Application of the factor of simultaneity (ks) to an apartment block of 5 storeys
Fig. A10 : Simultaneity factors in an apartment block
Number of downstream Factor of
consumers simultaneity (ks)
2 to 4 1
5 to 9 0.78
10 to 14 0.63
15 to 19 0.53
20 to 24 0.49
25 to 29 0.46
30 to 34 0.44
35 to 39 0.42
40 to 49 0.41
50 and more 0.40
Schneider Electric - Electrical installation guide 2013
A19
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Power loading of an ins tal la tion
4.4 Example of application of factors ku and ks
An example in the estimation of actual maximum kVA demands at all levels of an
installation, from each load position to the point of supply is given Fig. A14.
In this example, the total installed apparent power is 126.6 kVA, which corresponds
to an actual (estimated) maximum value at the LV terminals of the MV/LV transformer
of 65 kVA only.
Note: in order to select cable sizes for the distribution circuits of an installation, the
current I (in amps) through a circuit is determined from the equation:
I =
kVA
U
x 10
3
3
where kVA is the actual maximum 3-phase apparent-power value shown on the
diagram for the circuit concerned, and U is the phase to- phase voltage (in volts).
4.5 Diversity factor
The term diversity factor, as dened in IEC standards, is identical to the factor of
simultaneity (ks) used in this guide, as described in 4.3. In some English-speaking
countries however (at the time of writing) diversity factor is the inverse of ks i.e. it is
always u 1.
Factor of simultaneity for distribution switchboards
Figure A12 shows hypothetical values of ks for a distribution board supplying a
number of circuits for which there is no indication of the manner in which the total
load divides between them.
If the circuits are mainly for lighting loads, it is prudent to adopt ks values close to
unity.
Fig. A12 : Factor of simultaneity for distribution boards
Circuit function Factor of simultaneity (ks)
Lighting 1
Heating and air conditioning 1
Socket-outlets 0.1 to 0.2
(1)
Lifts and catering hoist
(2)
b For the most powerful
motor 1
b For the second most
powerful motor 0.75
b For all motors 0.60
(1) In certain cases, notably in industrial installations, this factor can be higher.
(2) The current to take into consideration is equal to the nominal current of the motor,
increased by a third of its starting current.
Fig. A13 : Factor of simultaneity according to circuit function
Number of Factor of
circuits simultaneity (ks)
2 and 3 0.9
4 and 5 0.8
6 to 9 0.7
10 and more 0.6
Factor of simultaneity according to circuit function
ks factors which may be used for circuits supplying commonly-occurring loads, are
shown in Figure A13.
Schneider Electric - Electrical installation guide 2013
A - General rules of electrical installation design
A20
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig A14 : An example in estimating the maximum predicted loading of an installation (the factor values used are for demonstration purposes only)
1
Distribution
box
Workshop A 5
0.8
0.8
0.8
0.8
0.8
0.8
5
5
5
2
2
Lathe
18
3 1 1
1 0.8
0.4 1
15
10.6
2.5
2.5
15
15
Ventilation
0.28 1 18
1 1 2
1
Oven
30 fluorescent
lamps
Pedestal-
drill
Workshop B Compressor
Workshop C
no. 1
no. 2
no. 3
no. 4
no. 1
no. 2
no. 1
no. 2
no. 1
no. 2
4
4
4
4
1.6
1.6
18
3
14.4
12
1
1
1
1
2.5
2
18
15
15
2.5
Workshop A
distribution
box
0.75
Power
circuit
Power
circuit
Powver
circuit
Workshop B
distribution
box
Workshop C
distribution
box
Main
general
distribution
board
MGDB
Socket-
oulets
Socket-
oulets
Socket-
oulets
Lighting
circuit
Lighting
circuit
Lighting
circuit
0.9
0.9
0.9
0.9
10.6
3.6
3
12
4.3
1
15.6
18.9
37.8
35
5
2
65
LV / MV
Distribution
box
1 1 1
0.2 1
10/16 A
5 socket-
outlets
20 fluorescent
lamps
5 socket-
outlets
10 fluorescent
lamps
3 socket-
outlets
10/16 A
10/16 A
Utilization Apparent Utilization Apparent Simultaneity Apparent Simultaneity Apparent Simultaneity Apparent
power factor power factor power factor power factor power
(Pa) max. demand demand demand demand
kVA max. kVA kVA kVA kVA
Level 1 Level 2 Level 3
4.6 Choice of transformer rating
When an installation is to be supplied directly from a MV/LV transformer and
the maximum apparent-power loading of the installation has been determined, a
suitable rating for the transformer can be decided, taking into account the following
considerations (see Fig. A15):
b The possibility of improving the power factor of the installation (see chapter L)
b Anticipated extensions to the installation
b Installation constraints (e.g. temperature)
b Standard transformer ratings
The nominal full-load current In on the LV side of a 3-phase transformer is given by:
In
a x 10
3
=
P
U 3
where
b Pa = kVA rating of the transformer
b U = phase-to-phase voltage at no-load in volts (237 V or 410 V)
b In is in amperes.
For a single-phase transformer:
In
a x 10
3
=
P
V
where
b V = voltage between LV terminals at no-load (in volts)
Simplied equation for 400 V (3-phase load)
b In = kVA x 1.4
The IEC standard for power transformers is IEC 60076.
Fig. A15 : Standard apparent powers for MV/LV transformers
and related nominal output currents
Apparent power In (A)
kVA 237 V 410 V
100 244 141
160 390 225
250 609 352
315 767 444
400 974 563
500 1218 704
630 1535 887
800 1949 1127
1000 2436 1408
1250 3045 1760
1600 3898 2253
2000 4872 2816
2500 6090 3520
3150 7673 4436
Schneider Electric - Electrical installation guide 2013
A21
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4.7 Choice of power-supply sources
The importance of maintaining a continuous supply raises the question of the use of
standby-power plant. The choice and characteristics of these alternative sources are
part of the architecture selection, as described in chapter D.
For the main source of supply the choice is generally between a connection to the
MV or the LV network of the power-supply utility. In some cases main source of
supply can be rotating generators in the case of remote installations with difcult
access to the local Utility public grid (MV or LV) or where the reliability of the public
grid does not have the minimum level of reliability expected.
In practice, connection to a MV source may be necessary where the load exceeds
(or is planned eventually to exceed) a certain level - generally of the order of
250 kVA, or if the quality of service required is greater than that normally available
from a LV network.
Moreover, if the installation is likely to cause disturbance to neighbouring consumers,
when connected to a LV network, the supply authorities may propose a MV service.
Supplies at MV can have certain advantages: in fact, a MV consumer:
b Is not disturbed by other consumers, which could be the case at LV
b Is free to choose any type of LV earthing system
b Has a wider choice of economic tariffs
b Can accept very large increases in load
It should be noted, however, that:
b The consumer is the owner of the MV/LV substation and, in some countries,
he must build equip and maintain it at his own expense. The power utility can, in
certain circumstances, participate in the investment, at the level of the MV line for
example
b A part of the connection costs can, for instance, often be recovered if a second
consumer is connected to the MV line within a certain time following the original
consumers own connection
b The consumer has access only to the LV part of the installation, access to the
MV part being reserved to the utility personnel (meter reading, operations, etc.).
However, in certain countries, the MV protective circuit-breaker (or fused load-break
switch) can be operated by the consumer
b The type and location of the substation are agreed between the consumer and
the utility
More and more renewable energy sources such as photovoltaic panels are used
to supply low-voltage electrical installations. In some case these PV panels
are connected in parallel to the Utility grid or these PV panels are used in an
autonomous mode without connection to the public grid. Conversion from d.c. to a.c.
is then necessary as rated voltage of these PV panels are higher and higher (few
hundreds volts) and also because PV panels produce d.c. currents.
4 Power loading of an ins tal la tion
Schneider Electric - Electrical installation guide 2013
Schneider Electric - Electrical installation guide 2013
B1
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapter B
Connection to the MV utility
distribution network
Contents
Power supply at medium voltage B2
1.1 Power supply characteristics of medium-voltage networks B2
1.2 Different types of MV power supply B2
1.3 Some practical issues concerning MV distribution networks B3
Procedure for the establishment of a new substation B5
2.1 Preliminary informations B5
2.2 Project studies B6
2.3 Implementation B6
2.4 Commissioning B6
Protection aspect B7
3.1 Protection against electric shocks B7
3.2 Protection of transformer and circuits B8
3.3 Interlocks and conditioned operations B10
The consumer substation with LV metering B13
4.1 Functions of the substation with LV metering B13
4.2 Choosing MV equipment B13
4.3 Choice of MV switchgear panel for a transformer circuit B15
4.4 Choice of MV/LV transformer B16
4.5 Instructions for use of MV equipment B19
The consumer substation with MV metering B22
5.1 Functions of the substation with MV metering B22
5.2 Choice of panels B24
5.3 Parallel operation of transformers B25
Constitution of MV/LV distribution substations B27
6.1 Different types of substation B27
6.2 Indoor substation B27
6.3 Outdoor substation B29
2
1
3
4
5
6
Schneider Electric - Electrical installation guide 2013
B - Connection to the MV utility
distribution network
B2
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
The term medium voltage is commonly used for distribution systems with voltages
above 1 kV and generally applied up to and including 52 kV
(1)
. For technical and
economic reasons, the nominal voltage of medium-voltage distribution networks
rarely exceeds 35 kV.
In this chapter, networks which operate at 1000 V or less are referred to as low-
voltage (LV) networks, whereas networks requiring a step-down transformer to feed
LV networks are referred to as medium voltage (MV) networks.
1.1 Power supply characteristics of medium-voltage
networks
The characteristics of the MV network determine which switchgear is used in the MV
or MV/LV substation and are specic to individual countries. Familiarity with these
characteristics is essential when dening and implementing connections.
1.2 Different types of MV power supply
The following power supply methods may be used as appropriate for the type of
medium-voltage network.
Connection to an MV radial network: Single-line service
The substation is supplied by a tee-off from the MV radial network (overhead or
cable), also known as a spur network. This type of network supports a single supply
for loads (see Fig. B1).
The substation usually consists of an incoming panel, and overall protection is
provided by a load-break switch and fuses with earthing switches as shown in
Figure B1.
In some countries, the substation comprises a pole-mounted transformer without
a load-break switch or fuses (installed on the pole). This type of distribution is very
common in rural areas. Protection and switching devices are located remotely from
the transformer. These usually control a main overhead line to which secondary
overhead lines are connected.
The main characteristics of an MV power
supply are:
b The nominal voltage
b The short-circuit current
b The rated current used
b The earthing system
(1) According to the IEC there is no clear boundary between
medium and high voltage; local and historical factors play
a part, and limits are usually between 30 and 100 kV (see
IEV 601-01-28).The publication IEC 62271-1 "High-voltage
switchgear and controlgear; common specications"
incorporates a note in its scope: "For the use of this standard,
high voltage (see IEV 601-01-27) is the rated voltage above
1 000 V. However, the term medium voltage (see IEV 601-01-
28) is commonly used for distribution systems with voltages
above 1 kV and generally applied up to and including 52 kV.".
Overhead line
Fig. B1 : Single-line service (single supply)
1 Power supply at medium voltage
Schneider Electric - Electrical installation guide 2013
B3
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Connection to an MV loop: Ring-main service
The power supply for the substation is connected in series to the power line of the
medium-voltage distribution network to form a loop(1). This allows the line current
to pass through a busbar, making it possible for loads to have two different power
supplies (see Fig. B2).
The substation has three medium-voltage modular units or an integrated ring-main
unit supporting the following functions:
b 2 incoming panels, each with a load-break switch. These are part of the loop and
are connected to a busbar.
b 1 transformer feeder connected to the busbar. General protection is provided by
load-break switches, a combined load-break/isolating switch or a circuit breaker.
All these types of switchgear are tted with earthing switches.
All switches and earthing switches have a making capacity which enables them to
close at the networks short-circuit current. Under this arrangement, the user benets
from a reliable power supply based on two MV feeders, with downtime kept to a
minimum in the event of faults or work on the supplier network(1).
This method is used for the underground MV distribution networks found in urban
areas.
Connection to two parallel MV cables: Parallel feeders service
If two parallel underground cables can be used to supply a substation, an MV
switchboard similar to that of a ring-main station can be used (see Fig. B3).
The main difference to the ring-main station is that both load-break switches are
interlocked. This means that only one of them can be closed at any one time (if one
is closed, the other must be open).
In the event of the loss of supply, the associated incoming load-break switch must be
open and the interlocking system must enable the switch which was open to close.
This sequence can be implemented either manually or automatically.
This method is used for networks in some densely-populated or expanding urban
areas supplied by underground cables.
1.3 Some practical issues concerning MV
distribution networks
Overhead networks
Weather conditions such as wind and frost may bring wires into contact and cause
temporary (as opposed to permanent) short-circuits.
Ceramic or glass insulating materials may be broken by wind-borne debris or
carelessly discharged rearms. Shorting to earth may also result when insulating
material becomes heavily soiled.
Many of these faults are able to rectify themselves. For example, damaged insulating
materials can continue functioning undetected in a dry environment, although heavy
rain will probably cause ashover to earth (e.g. via a metallic support structure).
Similarly, heavily soiled insulating material usually causes ashover to earth in damp
conditions.
Almost invariably, fault current will take the form of an electric arc, whose intense
heat dries the currents path and, to some extent, re-establishes insulating
properties. During this time, protection devices will normally have proved effective in
eliminating the fault (fuses will blow or the circuit breaker will trip).
Experience has shown that, in the vast majority of cases, the supply can be restored
by replacing fuses or reclosing the circuit breaker.
As such, it is possible to improve the service continuity of overhead networks
signicantly by using circuit breakers with an automated reclosing facility on the
relevant feeders.
These automated facilities support a set number of reclosing operations if a rst
attempt proves unsuccessful. The interval between successive attempts can be
adjusted (to allow time for the air near the fault to deionise) before the circuit breaker
nally locks out after all the attempts (usually three) have failed.
Remote control switches can be used on cable segments within networks to further
improve service continuity. Load-break switches can also be teamed with a reclosing
circuit breaker to isolate individual sections.
(1) A medium-voltage loop is an underground distribution
network based on cables from two MV substation feeders. The
two feeders are the two ends of the loop and each is protected
by an MV circuit breaker.
The loop is usually open, i.e. divided into two sections (half-
loops), each of which is supplied by a feeder. To support this
arrangement, the two incoming load-break switches on the
substations in the loop are closed, allowing current to circulate
around the loop. On one of the stations one switch is normally
left open, determining the start of the loop.
A fault on one of the half-loops will trigger the protection device
on the associated feeder, de-energising all substations within
that half loop. Once the fault on the affected cable segment
(between two adjacent substations) has been located, the
supply to these substations can be restored from the other
feeder.
This requires some reconguration of the loop, with the load-
break switches being switched in order to move the start of
the loop to the substation immediately downstream of the fault
and open the switch on the substation immediately upstream
of the fault on the loop. These measures isolate the cable
segment where the fault has occurred and restore the supply
to the whole loop, or to most of it if the switches that have been
switched are not on substations on either side of the sole cable
segment affected by the fault.
Systems for fault location and loop reconguration with remote
control switches allow these processes to be automated.
1 Power supply at medium voltage
Fig. B2 : Ring-main service (double supply). The transformer
is protected, in accordance with the applicable standards, by a
circuit breaker or load-break switch as shown in Figure B1.
Underground cable loop
Fig. B3 : Parallel feeders service (double supply). The
transformer is protected, in accordance with local standards, by
a circuit breaker or load-break switch as shown in Figure B1.
Underground cables in parallel
Schneider Electric - Electrical installation guide 2013
B - Connection to the MV utility
distribution network
B4
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Power supply at medium voltage
Underground networks
Cable faults on underground networks can sometimes be caused by poorly arranged
cable boxes or badly laid cables. For the most part, however, faults are the result of
damage caused by tools such as pickaxes and pneumatic drills or by earthmoving
plant used by other public utilities.
Insulation faults sometimes occur in connection boxes as a result of overvoltage,
particularly at locations where an MV network is connected to an underground cable
network. In such cases, overvoltage is usually caused by atmospheric conditions,
and the reection effects of electromagnetic waves at the junction box (where
circuit impedance changes sharply) may generate sufcient strain on the cable box
insulation for a fault to occur.
Devices to protect against overvoltages, such as lightning arresters, are often
installed at these locations.
Underground cable networks suffer from fewer faults than overhead networks, but
those which do occur are invariably permanent and take longer to locate and resolve.
In the event of a fault affecting an MV loop cable, the supply can be quickly restored
to users once the cable segment where the fault occurred has been located.
Having said this, if the fault occurs at a feeder for a radial supply, it can take several
hours to locate and resolve the fault, and all the users connected in a single branch
arrangement downstream of the fault will be affected.
In cases where service continuity is essential for all or part of the installation
concerned, provision must be made for an auxiliary supply.
Remote control and monitoring for MV networks
Remote control and monitoring of MV feeders makes it possible to reduce
loss of supply resulting from cable faults by supporting fast and effective loop
reconguration. This facility relies on switches with electric controls which are tted
on a number of substations in the loop and linked to modied remote-control units.
All stations containing this equipment can have their supply restored remotely,
whereas other stations will require additional manual operations
Values of earth fault currents for MV power supply
The values of earth fault currents on distribution networks depend on the MV
substations earthing system (or neutral earthing system). They must be limited to
reduce their impact on the network and restrict possible increased potential on user
substation frames caused by the coupling of earth switches (overhead networks),
and to reduce ashover with the stations LV circuits capable of generating
dangerous levels of potential in the low voltage installation.
Where networks have both overhead and underground elements, an increased
cable earthing capacitance value may cause the earth fault current value to rise and
require measures to compensate this phenomenon. Earthing impedance will then
involve reactance (a resistor in parallel with an inductor) in line with the leakage rate:
the neutral earthing system is compensated. Compensatory impedance makes it
possible to both:
b Control earth fault current values, regardless of the amount of cabling within the
network, and
b Eliminate most temporary and semi-permanent single-phase faults naturally by
facilitating self rectication, thereby avoiding many short-term losses
The use of centralised remote control and
monitoring based on SCADA (Supervisory
Control And Data Acquisition) systems and
recent developments in digital communication
technology is increasingly common in
countries where the complexity associated with
highly interconnected networks justies the
investment required.
Schneider Electric - Electrical installation guide 2013
B5
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
B - Connection to the MV utility
distribution network
Large consumers of electricity are invariably supplied at MV.
On LV systems operating at 120/208 V (3-phase 4-wires), a load of 50 kVA might be
considered to be large, while on a 240/415 V 3-phase system a large consumer
could have a load in excess of 100 kVA. Both systems of LV distribution are common
in many parts of the world.
As a matter of interest, the IEC recommends a world standard of 230/400 V for
3-phase 4-wire systems. This is a compromise level and will allow existing systems
which operate at 220/380 V and at 240/415 V, or close to these values, to comply
with the proposed standard simply by adjusting the off-circuit tapping switches of
standard distribution transformers.
The distance over which the energy has to be transmitted is a further factor in
considering an MV or LV service. Services to small but isolated rural consumers are
obvious examples.
The decision of a MV or LV supply will depend on local circumstances and
considerations such as those mentioned above, and will generally be imposed by the
utility for the district concerned.
When a decision to supply power at MV has been made, there are two widely-
followed methods of proceeding:
1 - The power-supplier constructs a standard substation close to the consumers
premises, but the MV/LV transformer(s) is (are) located in transformer chamber(s)
inside the premises, close to the load centre
2 - The consumer constructs and equips his own substation on his own premises, to
which the power supplier makes the MV connection
In method no. 1 the power supplier owns the substation, the cable(s) to the
transformer(s), the transformer(s) and the transformer chamber(s), to which he has
unrestricted access.
The transformer chamber(s) is (are) constructed by the consumer (to plans and
regulations provided by the supplier) and include plinths, oil drains, re walls and
ceilings, ventilation, lighting, and earthing systems, all to be approved by the supply
authority.
The tariff structure will cover an agreed part of the expenditure required to provide
the service.
Whichever procedure is followed, the same principles apply in the conception and
realization of the project. The following notes refer to procedure no. 2.
2.1 Preliminary information
Before any negotiations or discussions can be initiated with the supply authorities,
the following basic elements must be established:
Maximum anticipated power (kVA) demand
Determination of this parameter is described in Chapter A, and must take into
account the possibility of future additional load requirements. Factors to evaluate at
this stage are:
b The utilization factor (ku)
b The simultaneity factor (ks)
Layout plans and elevations showing location of proposed substation
Plans should indicate clearly the means of access to the proposed substation, with
dimensions of possible restrictions, e.g. entrances corridors and ceiling height,
together with possible load (weight) bearing limits, and so on, keeping in mind that:
b The power-supply personnel must have free and unrestricted access to the
MV equipment in the substation at all times
b Only qualied and authorized consumers personnel are allowed access to the
substation
b Some supply authorities or regulations require that the part of the installation operated
by the authority is located in a separated room from the part operated by the customer.
Degree of supply continuity required
The consumer must estimate the consequences of a supply failure in terms of its
duration:
b Loss of production
b Safety of personnel and equipment
2 Procedure for the establishment
of a new substation
The consumer must provide certain data to the
utility at the earliest stage of the project.
Schneider Electric - Electrical installation guide 2013
B - Connection to the MV utility
distribution network
B6
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2.2 Project studies
From the information provided by the consumer, the power-supplier must indicate:
The type of power supply proposed, and dene:
b The kind of power-supply system: overheadline or underground-cable network
b Service connection details: single-line service, ring-main installation, or parallel
feeders, etc.
b Power (kVA) limit and fault current level
The nominal voltage and rated voltage (Highest voltage for equipment)
Existing or future, depending on the development of the system.
Metering details which dene:
b The cost of connection to the power network
b Tariff details (consumption and standing charges)
2.3 Implementation
Before any installation work is started, the ofcial agreement of the power-supplier
must be obtained. The request for approval must include the following information,
largely based on the preliminary exchanges noted above:
b Location of the proposed substation
b Single-line diagram of power circuits and connections, together with earthing-
circuit proposals
b Full details of electrical equipment to be installed, including performance
characteristics
b Layout of equipment and provision for metering components
b Arrangements for power-factor improvement if required
b Arrangements provided for emergency standby power plant (MV or LV) if eventually
required
2.4 Commissioning
When required by the authority, commissioning tests must be successfully completed
before authority is given to energize the installation from the power supply system.
Even if no test is required by the authority it is better to do the following verication tests:
b Measurement of earth-electrode resistances
b Continuity of all equipotential earth-and safety bonding conductors
b Inspection and functional testing of all MV components
b Insulation checks of MV equipment
b Dielectric strength test of transformer oil (and switchgear oil if appropriate), if
applicable
b Inspection and testing of the LV installation in the substation
b Checks on all interlocks (mechanical key and electrical) and on all automatic
sequences
b Checks on correct protective-relay operation and settings
It is also imperative to check that all equipment is provided, such that any properly
executed operation can be carried out in complete safety. On receipt of the certicate
of conformity (if required):
b Personnel of the power-supply authority will energize the MV equipment and check
for correct operation of the metering
b The installation contractor is responsible for testing and connection of the
LV installation
When nally the substation is operational:
b The substation and all equipment belongs to the consumer
b The power-supply authority has operational control over all MV switchgear in the
substation, e.g. the two incoming load-break switches and the transformer MV switch
(or CB) in the case of a RingMainUnit, together with all associated MV earthing switches
b The power-supply personnel has unrestricted access to the MV equipment
b The consumer has independent control of the MV switch (or CB) of the transformer(s)
only, the consumer is responsible for the maintenance of all substation equipment,
and must request the power-supply authority to isolate and earth the switchgear to
allow maintenance work to proceed. The power supplier must issue a signed permit-
to-work to the consumers maintenance personnel, together with keys of locked-off
isolators, etc. at which the isolation has been carried out.
2 Procedure for the establishment
of a new substation
The utility must give specic information to the
prospective consumer.
The utility must give ofcial approval of the
equipment to be installed in the substation,
and of proposed methods of installation.
After testing and checking of the installation by
an independent test authority, a certicate is
granted which permits the substation to be put
into service.
Schneider Electric - Electrical installation guide 2013
B7
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
B - Connection to the MV utility
distribution network
3 Protection aspect
The subject of protection in the electrical power industry is vast: it covers all aspects
of safety for personnel, and protection against damage or destruction of property,
plant, and equipment.
These different aspects of protection can be broadly classied according to the
following objectives:
b Protection of personnel and animals against the dangers of overvoltages and
electric shock, re, explosions, and toxic gases, etc.
b Protection of the plant, equipment and components of a power system against
the stresses of short-circuit faults, atmospheric surges (lightning) and power-system
instability (loss of synchronism) etc.
b Protection of personnel and plant from the dangers of incorrect power-system
operation, by the use of electrical and mechanical interlocking. All classes of
switchgear (including, for example, tap-position selector switches on transformers,
and so on...) have well-dened operating limits. This means that the order in which
the different kinds of switching device can be safely closed or opened is vitally
important. Interlocking keys and analogous electrical control circuits are frequently
used to ensure strict compliance with correct operating sequences.
It is beyond the scope of a guide to describe in full technical detail the numerous
schemes of protection available to power-systems engineers, but it is hoped that the
following sections will prove to be useful through a discussion of general principles.
While some of the protective devices mentioned are of universal application,
descriptions generally will be conned to those in common use on MV and
LV systems only, as dened in Sub-clause 1.1 of this Chapter.
3.1 Protection against electric shocks
Protective measures against electric shock are based on two common dangers:
b Contact with an active conductor, i.e. which is live with respect to earth in normal
circumstances. This is referred to as a direct contact hazard.
b Contact with a conductive part of an apparatus which is normally dead, but which
has become live due to insulation failure in the apparatus. This is referred to as an
indirect contact hazard.
It may be noted that a third type of shock hazard can exist in the proximity of MV or
LV (or mixed) earth electrodes which are passing earth-fault currents. This hazard
is due to potential gradients on the surface of the ground and is referred to as a
step-voltage hazard; shock current enters one foot and leaves by the other foot, and
is particular dangerous for four-legged animals. A variation of this danger, known as
a touch voltage hazard can occur, for instance, when an earthed metallic part is
situated in an area in which potential gradients exist.
Touching the part would cause current to pass through the hand and both feet.
Animals with a relatively long front-to-hind legs span are particularly sensitive to
step-voltage hazards and cattle have been killed by the potential gradients caused by
a low voltage (230/400 V) neutral earth electrode of insufciently low resistance.
Potential-gradient problems of the kind mentioned above are not normally
encountered in electrical installations of buildings, providing that equipotential
conductors properly bond all exposed metal parts of equipment and all extraneous
metal (i.e. not part of an electrical apparatus or the installation - for example
structural steelwork, etc.) to the protective-earthing conductor.
Direct-contact protection or basic protection
The main form of protection against direct contact hazards is to contain all live parts
in housings of insulating material or in metallic earthed housings, by placing out of
reach (behind insulated barriers or at the top of poles) or by means of obstacles.
Where insulated live parts are housed in a metal envelope, for example transformers,
electric motors and many domestic appliances, the metal envelope is connected to
the installation protective earthing system.
For MV switchgear, the IEC standard 62271-200 (Prefabricated Metal Enclosed
switchgear and controlgear for voltages up to 52 kV) species a minimum Protection
Index (IP coding) of IP2X which ensures the direct-contact protection. Furthermore,
the metallic enclosure has to demonstrate an electrical continuity, then establishing
a good segregation between inside and ouside of the enclosure. Proper grounding of
the enclosure further participates to the electrical protection of the operators under
normal operating conditions.
For LV appliances this is achieved through the third pin of a 3-pin plug and socket.
Total or even partial failure of insulation to the metal, can raise the voltage of the
envelope to a dangerous level (depending on the ratio of the resistance of the leakage
path through the insulation, to the resistance from the metal envelope to earth).
Protection against electric shocks and
overvoltages is closely related to the
achievement of efcient (low resistance)
earthing and effective application of the
principles of equipotential environments.
Schneider Electric - Electrical installation guide 2013
B - Connection to the MV utility
distribution network
B8
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Indirect-contact protection or fault protection
A person touching the metal envelope of an apparatus with a faulty insulation, as
described above, is said to be making an indirect contact.
An indirect contact is characterized by the fact that a current path to earth exists
(through the protective earthing (PE) conductor) in parallel with the shock current
through the person concerned.
Case of fault on L.V. system
Extensive tests have shown that, providing the potential of the metal envelope is not
greater than 50 V with respect to earth, or to any conductive material within reaching
distance, no danger exists.
Indirect-contact hazard in the case of a MV fault
If the insulation failure in an apparatus is between a MV conductor and the metal
envelope, it is not generally possible to limit the rise of voltage of the envelope to
50 V or less, simply by reducing the earthing resistance to a low value. The solution
in this case is to create an equipotential situation, as described in Sub-clause 1.1
Earthing systems.
Earth connection resistance
Insulation faults affecting the MV substations equipment (internal) or resulting from
atmospheric overvoltages (external) may generate earth currents capable of causing
physical injury or damage to equipment.
Preventive measures essentially consist of:
b Interconnecting all substation frames and connecting them to the earth bar
b Minimising earth resistance
3.2 Protection of transformer and circuits
General
The electrical equipment and circuits in a substation must be protected in order
to avoid or to control damage due to abnormal currents and/or voltages. All
equipment normally used in power system installations have standardized short-time
withstand ratings for overcurrent and overvoltage. The role of protective scheme is
to ensure that this withstand limits can never be exceeded. In general, this means
that fault conditions must be cleared as fast as possible without missing to ensure
coordination between protective devices upstream and downstream the equipement
to be protected. This means, when there is a fault in a network, generally several
protective devices see the fault at the same time but only one must act.
These devices may be:
b Fuses which clear the faulty circuit directly or together with a mechanical tripping
attachment, which opens an associated three-phase load-break switch
b Relays which act indirectly on the circuit-breaker coil
Transformer protection
Stresses due to the supply network
Some voltage surges can occur on the network such as :
b Atmospheric voltage surges
Atmospheric voltage surges are caused by a stroke of lightning falling on or near an
overhead line.
b Operating voltage surges
A sudden change in the established operating conditions in an electrical network
causes transient phenomena to occur. This is generally a high frequency or damped
oscillation voltage surge wave.
For both voltage surges, the overvoltage protection device generally used is a
varistor (Zinc Oxide).
In most cases, voltage surges protection has no action on switchgear.
Stresses due to the load
Overloading is frequently due to the coincidental demand of a number of small
loads, or to an increase in the apparent power (kVA) demand of the installation,
due to expansion in a factory, with consequent building extensions, and so on. Load
increases raise the temperature of the wirings and of the insulation material. As
a result, temperature increases involve a reduction of the equipment working life.
Overload protection devices can be located on primary or secondary side of the
transformer.
Schneider Electric - Electrical installation guide 2013
B9
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
The protection against overloading of a transformer is now provided by a digital relay
which acts to trip the circuit-breaker on the secondary side of the transformer. Such
relay, generally called thermal overload relay, articially simulates the temperature,
taking into account the time constant of the transformer. Some of them are able to
take into account the effect of harmonic currents due to non linear loads (rectiers,
computer equipment, variable speed drives).This type of relay is also able to
predict the time before overload tripping and the waiting time after tripping. So, this
information is very helpful to control load shedding operation.
In addition, larger oil-immersed transformers frequently have thermostats with two
settings, one for alarm purposes and the other for tripping.
Dry-type transformers use heat sensors embedded in the hottest part of the windings
insulation for alarm and tripping.
Internal faults
The protection of transformers by transformer-mounted devices, against the effects
of internal faults, is provided on transformers which are tted with airbreathing
conservator tanks by the classical Buchholz mechanical relay (see Fig. B4). These
relays can detect a slow accumulation of gases which results from the arcing of
incipient faults in the winding insulation or from the ingress of air due to an oil leak.
This rst level of detection generally gives an alarm, but if the condition deteriorates
further, a second level of detection will trip the upstream circuit-breaker.
An oil-surge detection feature of the Buchholz relay will trip the upstream circuit-
breaker instantaneously if a surge of oil occurs in the pipe connecting the main tank
with the conservator tank.
Such a surge can only occur due to the displacement of oil caused by a rapidly
formed bubble of gas, generated by an arc of short-circuit current in the oil.
By specially designing the cooling-oil radiator elements to perform a concerting action,
totally lled types of transformer as large as 10 MVA are now currently available.
Expansion of the oil is accommodated without an excessive rise in pressure by the
bellows effect of the radiator elements. A full description of these transformers is
given in Sub-clause 4.4 (see Fig. B5).
Evidently the Buchholz devices mentioned above cannot be applied to this design; a
modern counterpart has been developed however, which measures:
b The accumulation of gas
b Overpressure
b Overtemperature
The rst two conditions trip the upstream circuit-breaker, and the third condition trips
the downstream circuit-breaker of the transformer.
Internal phase-to-phase short-circuit
Internal phase-to-phase short-circuit must be detected and cleared by:
b 3 fuses on the primary side of the tranformer or
b An overcurrent relay that trips a circuit-breaker upstream of the transformer
Internal phase-to-earth short-circuit
This is the most common type of internal fault. It must be detected by an earth fault
relay. Earth fault current can be calculated with the sum of the 3 primary phase
currents (if 3 current transformers are used) or by a specic core current transformer.
If a great sensitivity is needed, specic core current transformer will be prefered. In
such a case, a two current transformers set is sufcient (see Fig. B6).
Protection of circuits
The protection of the circuits downstream of the transformer must comply with the
IEC 60364 requirements.
Discrimination between the protective devices upstream and
downstream of the transformer
The consumer-type substation with LV metering requires discriminative operation
between the MV fuses or MV circuit-breaker and the LV circuit-breaker or fuses.
The rating of the MV fuses will be chosen according to the characteristics of the
transformer.
The tripping characteristics of the LV circuit-breaker must be such that, for an
overload or short-circuit condition downstream of its location, the breaker will trip
sufciently quickly to ensure that the MV fuses or the MV circuit-breaker will not be
adversely affected by the passage of overcurrent through them.
The tripping performance curves for MV fuses or MV circuit-breaker and LV circuit-
breakers are given by graphs of time-to-operate against current passing through
them. Both curves have the general inverse-time/current form (with an abrupt
discontinuity in the CB curve at the current value above which instantaneous
tripping occurs).
Fig. B5 : Totally lled transformer
Fig. B4 : Transformer with conservator tank
Fig. B6 : Protection against earth fault on the MV winding
N
3
2
1
HV LV
3
2
1
E/F relay Overcurrent relay
3 Protection aspect
Schneider Electric - Electrical installation guide 2013
B - Connection to the MV utility
distribution network
B10
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
These curves are shown typically in Figure B7.
b In order to achieve discrimination (see Fig. B8):
All parts of the fuse or MV circuit-breaker curve must be above and to the right of the
CB curve.
b In order to leave the fuses unaffected (i.e. undamaged):
All parts of the minimum pre-arcing fuse curve must be located to the right of the CB
curve by a factor of 1.35 or more (e.g. where, at time T, the CB curve passes through
a point corresponding to 100 A, the fuse curve at the same time T must pass through
a point corresponding to 135 A, or more, and so on...) and, all parts of the fuse curve
must be above the CB curve by a factor of 2 or more (e.g. where, at a current level I
the CB curve passes through a point corresponding to 1.5 seconds, the fuse curve
at the same current level I must pass through a point corresponding to 3 seconds, or
more, etc.).
The factors 1.35 and 2 are based on standard maximum manufacturing tolerances
for MV fuses and LV circuit-breakers.
In order to compare the two curves, the MV currents must be converted to the
equivalent LV currents, or vice-versa.
Where a LV fuse-switch is used, similar separation of the characteristic curves of the
MV and LV fuses must be respected.
b In order to leave the MV circuit-breaker protection untripped:
All parts of the minimum MV circuit-breaker curve must be located to the right of
the LV CB curve by a factor of 1.35 or more (e.g. where, at time T, the LV CB curve
passes through a point corresponding to 100 A, the MV CB curve at the same time
T must pass through a point corresponding to 135 A, or more, and so on...) and, all
parts of the MV CB curve must be above the LV CB curve (time of LV CB curve must
be less or equal than MV CB curves minus 0.3 s)
The factors 1.35 and 0.3 s are based on standard maximum manufacturing
tolerances for MV current transformers, MV protection relay and LV circuit-breakers.
In order to compare the two curves, the MV currents must be converted to the
equivalent LV currents, or vice-versa.
Choice of protective device on the primary side of the
transformer
As explained before, for low reference current, the protection may be by fuses or by
circuit-breaker.
When the reference current is high, the protection will be achieved by circuit-breaker.
Protection by circuit-breaker provides a more sensitive transformer protection
compared with fuses. The implementation of additional protections (earth fault
protection, thermal overload protection) is easier with circuit-breakers.
3.3 Interlocks and conditioned operations
Mechanical and electrical interlocks are included on mechanisms and in the control
circuits of apparatus installed in substations, as a measure of protection against an
incorrect sequence of manuvres by operating personnel.
Mechanical protection between functions located on separate equipment
(e.g. switchboard and transformer) is provided by key-transfer interlocking.
An interlocking scheme is intended to prevent any abnormal operational manuvre.
Some of such operations would expose operating personnel to danger, some others
would only lead to an electrical incident.
Basic interlocking
Basic interlocking functions can be introduced in one given functionnal unit; some
of these functions are made mandatory by the IEC 62271-200, for metal-enclosed
MV switchgear, but some others are the result of a choice from the user.
Considering access to a MV panel, it requires a certain number of operations
which shall be carried out in a pre-determined order. It is necessary to carry out
operations in the reverse order to restore the system to its former condition. Either
proper procedures, or dedicated interlocks, can ensure that the required operations
are performed in the right sequence. Then such accessible compartment will be
classied as accessible and interlocked or accessible by procedure. Even for
users with proper rigorous procedures, use of interlocks can provide a further help
for safety of the operators.
Fig. B7 : Discrimination between MV fuse operation and LV
circuit-breaker tripping, for transformer protection
Fig. B8 : MV fuse and LV circuit-breaker conguration
U
1
MV LV U
2
D
C
Time
A
B
Current
Minimum pre-arcing
time of MV fuse
Circuit breaker
tripping
characteristic
B/A u 1.35 at any
moment in time
D/C u 2 at any
current value
Schneider Electric - Electrical installation guide 2013
B11
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Key interlocking
Beyond the interlocks available within a given functionnal unit (see also 4.2), the
most widely-used form of locking/interlocking depends on the principle of key transfer.
The principle is based on the possibility of freeing or trapping one or several keys,
according to whether or not the required conditions are satised.
These conditions can be combined in unique and obligatory sequences, thereby
guaranteeing the safety of personnel and installation by the avoidance of an incorrect
operational procedure.
Non-observance of the correct sequence of operations in either case may have
extremely serious consequences for the operating personnel, as well as for the
equipment concerned.
Note: It is important to provide for a scheme of interlocking in the basic design stage
of planning a MV/LV substation. In this way, the apparatuses concerned will be
equipped during manufacture in a coherent manner, with assured compatibility of
keys and locking devices.
Service continuity
For a given MV switchboard, the denition of the accessible compartments as well
as their access conditions provide the basis of the Loss of Service Continuity
classication dened in the standard IEC 62271-200. Use of interlocks or only proper
procedure does not have any inuence on the service continuity. Only the request for
accessing a given part of the switchboard, under normal operation conditions, results
in limiting conditions which can be more or less severe regarding the continuity of the
electrical distribution process.
Interlocks in substations
In a MV/LV distribution substation which includes:
b A single incoming MV panel or two incoming panels (from parallel feeders) or two
incoming/outgoing ring-main panels
b A transformer switchgear-and-protection panel, which can include a load-break/
disconnecting switch with MV fuses and an earthing switch, or a circuit-breaker and
line disconnecting switch together with an earthing switch
b A transformer compartment
Interlocks allow manuvres and access to different panels in the following conditions:
Basic interlocks, embedded in single functionnal units
b Operation of the load-break/isolating switch
v If the panel door is closed and the associated earthing switch is open
b Operation of the line-disconnecting switch of the transformer switchgear - and
- protection panel
v If the door of the panel is closed, and
v If the circuit-breaker is open, and the earthing switch(es) is (are) open
b Closure of an earthing switch
v If the associated isolating switch(es) is (are) open
(1)
b Access to an accessible compartment of each panel, if interlocks have been
specied
v If the isolating switch for the compartment is open and the earthing switch(es) for
the compartment is (are) closed
b Closure of the door of each accessible compartment, if interlocks have been
specied
v If the earthing switch(es) for the compartment is (are) closed
Functional interlocks involving several functional units or separate equipment
b Access to the terminals of a MV/LV transformer
v If the tee-off functional unit has its switch open and its earthing switch closed.
According to the possibility of back-feed from the LV side, a condition on the LV main
breaker can be necessary.
Practical example
In a consumer-type substation with LV metering, the interlocking scheme most
commonly used is MV/LV/TR (high voltage/ low voltage/transformer).
The aim of the interlocking is:
b To prevent access to the transformer compartment if the earthing switch has not
been previously closed
b To prevent the closure of the earthing switch in a transformer switchgear-and-
protection panel, if the LV circuit-breaker of the transformer has not been previously
locked open or withdrawn
(1) If the earthing switch is on an incoming circuit, the
associated isolating switches are those at both ends of the
circuit, and these should be suitably interlocked. In such
situation, the interlocking function becomes a multi-units key
interlock.
3 Protection aspect
Schneider Electric - Electrical installation guide 2013
B - Connection to the MV utility
distribution network
B12
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Access to the MV or LV terminals of a transformer, (protected upstream by a
MV switchgear-and-protection panel, containing a MV load-break / isolating
switch, MV fuses, and a MV earthing switch) must comply with the strict procedure
described below, and is illustrated by the diagrams of Figure B9.
Note: The transformer in this example is provided with plug-in type MV terminal
connectors which can only be removed by unlocking a retaining device common to
all three phase connectors
(1)
.
The MV load-break / disconnecting switch is mechanically linked with the
MV earthing switch such that only one of the switches can be closed, i.e. closure
of one switch automatically locks the closure of the other.
Procedure for the isolation and earthing of the power transformer, and removal
of the MV plug-type shrouded terminal connections (or protective cover)
Initial conditions
b MV load-break/disconnection switch and LV circuit-breaker are closed
b MV earthing switch locked in the open position by key O
b Key O is trapped in the LV circuit-breaker as long as that circuit-breaker is closed
Step 1
b Open LV CB and lock it open with key O
b Key O is then released
Step 2
b Open the MV switch
b Check that the voltage presence indicators extinguish when the MV switch is
opened
Step 3
b Unlock the MV earthing switch with key O and close the earthing switch
b Key O is now trapped
Step 4
The access panel to the MV fuses can now be removed (i.e. is released by closure of
the MV earthing switch). Key S is located in this panel, and is trapped when the MV
switch is closed
b Turn key S to lock the MV switch in the open position
b Key S is now released
Step 5
Key S allows removal of the common locking device of the plug-type MV terminal
connectors on the transformer or of the common protective cover over the terminals,
as the case may be.
In either case, exposure of one or more terminals will trap key S in the interlock.
The result of the foregoing procedure is that:
b The MV switch is locked in the open position by key S.
Key S is trapped at the transformer terminals interlock as long as the terminals are
exposed.
b The MV earthing switch is in the closed position but not locked, i.e. may be opened
or closed. When carrying out maintenance work, a padlock is generally used to lock
the earthing switch in the closed position, the key of the padlock being held by the
engineer supervizing the work.
b The LV CB is locked open by key O, which is trapped by the closed MV earthing
switch. The transformer is therefore safely isolated and earthed.
It may be noted that the upstream terminal of the load-break disconnecting switch
may remain live in the procedure described as the terminals in question are located
in a separate non accessible compartment in the particular switchgear under
discussion. Any other technical solution with exposed terminals in the accessed
compartment would need further de-energisation and interlocks.
(1) Or may be provided with a common protective cover over
the three terminals.
Fig. B9 : Example of MV/LV/TR interlocking
S
S
S
S
S
S
Panel or door
Legend
MV switch and LV CB closed
MV fuses accessible
Transformer MV terminals accessible
Key absent
Key free
Key trapped
O
O
O
O
3 Protection aspect
Schneider Electric - Electrical installation guide 2013
B13
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
B - Connection to the MV utility
distribution network
4.1 Functions of the substation with LV metering
A consumer substation with LV metering is an electrical installation connected to a
utility supply system at a nominal voltage of 1 kV - 35 kV, and includes a single
MV/LV transformer generally not exceeding 1,250 kVA.
Functions
The substation
All component parts of the substation are located in one room, either in an existing
building, or in the form of a prefabricated housing exterior to the building.
Connection to the MV network
Connection at MV can be:
b Either by a single service cable or overhead line, or
b Via two mechanically interlocked load-break switches with two service cables from
duplicate supply feeders, or
b Via two load-break switches of a ring-main unit
The transformer
Since the use of PCB
(1)
-lled transformers is prohibited in most countries,
the preferred available technologies are:
b Oil-immersed transformers for substations located outside premises
b Dry-type, vacuum-cast-resin transformers for locations inside premises, e.g.
multistoreyed buildings, buildings receiving the public, and so on...
Metering
Metering at low voltage allows the use of small metering transformers at modest cost.
Most tariff structures take account of MV/LV transformer losses.
LV installation circuits
A low-voltage circuit-breaker, suitable for isolation duty and locking off facilities, to:
b Supply a distribution board
b Protect the transformer against overloading and the downstream circuits against
short-circuit faults.
Simplied electrical network diagram
The diagram on the following page (Figure B10) shows:
b Methods for connecting to the network (4 options):
v Spur network or single-line service
v Provisional network (can be transformed into a loop)
v Parallel feeders service
v Loop or ring-main service
b MV protection and MV/LV transformation methods
b LV metering and LV general isolation methods
b LV protection and distribution methods
b Zones accessible to different parties
4.2 Choosing MV equipment
Standards and specications
Switchgear and equipment shall conform to the following international standards:
IEC 62271-1, 62271-200, 60265-1, 62271-102, 62271-100, 62271-105
Local regulations may also demand conformance to national standards. These
include:
b France: UTE
b United Kingdom: BS
b Germany: VDE
b USA: ANSI
4 The consumer substation
with LV metering
(1) Polychlorinated biphenyl
Fig. B11 : SM6 modular unit
Schneider Electric - Electrical installation guide 2013
B - Connection to the MV utility
distribution network
B14
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. B10 : Consumer substation with LV metering
Power supply
system
Service
connection
MV protection and
MV/LV transformation
LV metering
and isolation
LV distribution
and protection
Supplier/consumer
interface
Downstream terminals
of LV isolator
Transformer
LV terminals
Protection
Protection
+
Auto-changeover
switch
Protection
Protection
Duplicate-
supply
service
Single-line service
(equipped for extension
to form a ring main)
Single-line service
Ring main
service
Automatic
LV standby
source
Permitted if only one
transformer and rated power
low enough to accomodate
the limitations of fuses
Permitted
Schneider Electric - Electrical installation guide 2013
B15
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Choosing types of equipment
Substations can be implemented in line with local standards and practices using
equipment such as:
b Modular units to support all types of layout and any subsequent expansion work
(whilst ensuring there is sufcient space)
b Compact arrangements based on the ring-main unit where the supply is provided
via a loop (single assembly comprising 3 functions). These are particularly suitable
where:
v Climatic conditions and/or pollution are very bad (integrated insulation)
v There is not enough space for a modular solution
Compartmentalised modular units in metallic enclosures
IEC 62271-200 standard
The IEC 62271-200 standard species AC metal-enclosed switchgear and
controlgear for rated voltages above 1 kV and up to and including 52 kV.
The main precepts of the standard relate to:
b Switchgear types:
v AIS (Air Insulated Switchgear)
v GIS (Gas Insulated Switchgear)
b Functional units: a switchgear component contained in a metallic enclosure and
incorporating all the main and auxiliary circuit equipment required to perform a single
function - usually a modular unit
b Compartments: a switchgear component contained in a closed metallic enclosure
(apart from the openings required for interconnection, control or ventilation). The
manufacturer denes the content (e.g. busbar, cables, switchgear, etc.) and the
number of compartments able to house the following types of switchgear:
v Fixed
v Removable
b Accessibility of individual compartments:
v Controlled by interlocking or in accordance with procedures; for compartments
which can be opened during normal operation
v Using tools; for compartments which should not be opened during normal
operation
v Zero; for compartments which must not be opened
b The LSC (Loss of Service Continuity) dening the extent to which other
compartments can remain energised when one compartment is open
v LSC1, when opening a compartment requires the other functional units to be de-
energised
v LSC2 A, when the other functional units can remain energised
v LSC2 B, when the other functional units and all the cable compartments can
remain energised
v The partition class between energised components and an open compartment,
based on the type of partition: a switchgear component contained in a metallic
enclosure and separating one compartment from another:
v PM: metallic partitions
v PI: insulating partitions
4.3 Choice of MV switchgear panel for a transformer
circuit
Three types of MV switchgear panel are generally available:
b Load-break switch and separate MV fuses in the panel
b Load-break switch/MV fuses combination
b Circuit-breaker
Seven parameters inuence the optimum choice:
b The primary current of the transformer
b The insulating medium of the transformer
b The position of the substation with respect to the load centre
b The kVA rating of the transformer
b The distance from switchgear to the transformer
b The use of separate protection relays (as opposed to direct-acting trip coils).
Note: The fuses used in the load-break/switch fuses combination have striker-pins
which ensure tripping of the 3-pole switch on the operation of one (or more) fuse(s).
4 The consumer substation
with LV metering
Schneider Electric - Electrical installation guide 2013
B - Connection to the MV utility
distribution network
B16
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4.4 Choice of MV/LV transformer
Characteristic parameters of a transformer
A transformer is characterized in part by its electrical parameters, but also by its
technology and its conditions of use.
Electrical characteristics
b Rated power (Pn): the conventional apparent-power in kVA on which other design-
parameter values and the construction of the transformer are based. Manufacturing
tests and guarantees are referred to this rating
b Frequency: for power distribution systems of the kind discussed in this guide, the
frequency will be 50 Hz or 60 Hz
b Rated primary and secondary voltages: For a primary winding capable of operating at
more than one voltage level, a kVA rating corresponding to each level must be given.
The secondary rated voltage is its open circuit value
b Rated insulation levels are given by overvoltage-withstand test values at power
frequency, and by high voltage impulse tests values which simulate lightning
discharges. At the voltage levels discussed in this guide, overvoltages caused by
MV switching operations are generally less severe than those due to lightning, so
that no separate tests for switching-surge withstand capability are made
b Off-circuit tap-selector switch generally allows a choice of up to 2.5% and 5%
level about the rated voltage of the highest voltage winding. The transformer must be
de-energized before this switch is operated
b Winding congurations are indicated in diagrammatic form by standard symbols for
star, delta and inter-connected-star windings; (and combinations of these for special
duty, e.g. six-or twelve-phase rectier transformers, etc.) and in an IEC-recommended
alphanumeric code. This code is read from left-to-right, the rst letter refers to the
highest voltage winding, the second letter to the next highest, and so on:
v Capital letters refer to the highest voltage winding
D = delta
Y = star
Z = interconnected-star (or zigzag)
N = neutral connection brought out to a terminal
v Lower-case letters are used for tertiary and secondary windings
d = delta
y = star
z = interconnected-star (or zigzag)
n = neutral connection brought out to a terminal
v A number from 0 to 11, corresponding to those, on a clock dial (0 is used instead
of 12) follows any pair of letters to indicate the phase change (if any) which occurs
during the transformation.
A very common winding conguration used for distribution transformers is that
of a Dyn 11 transformer, which has a delta MV winding with a star-connected
secondary winding the neutral point of which is brought out to a terminal. The phase
change through the transformer is +30 degrees, i.e. phase 1 secondary voltage is
at 11 oclock when phase 1 of the primary voltage is at 12 oclock, as shown in
Figure B31 page B34. All combinations of delta, star and zigzag windings produce a
phase change which (if not zero) is either 30 degrees or a multiple of 30 degrees.
IEC 60076-4 describes the clock code in detail.
Characteristics related to the technology and utilization of the transformer
This list is not exhaustive:
b Choice of technology
The insulating medium is:
v Liquid (mineral oil) or
v Solid (epoxy resin and air)
b For indoor or outdoor installation
b Altitude (<= 1,000 m is standard)
b Temperature (IEC 60076-2)
v Maximum ambient air: 40 C
v Daily maximum average ambient air: 30 C
v Annual maximum average ambient air: 20 C
For non-standard operating conditions, refer to Inuence of the Ambient temperature
and altitude on the rated current on page B7.
Description of insulation techniques
There are two basic classes of distribution transformer presently available:
b Dry type (cast in resin)
b Liquid lled (oil-immersed)
Schneider Electric - Electrical installation guide 2013
B17
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Dry type transformers
The windings of these transformers are insulated by resin between turns and by
resin and air to other windings and to frame. The resin is usually cast under vacuum
process (which is patented by major manufacturers).
It is recommended that the transformer be chosen according to the IEC 60076-11,
as follows:
b Environment class E2 (frequent condensation and/or high level of pollution)
b Climatic conditions class B2 (utilization, transport and stockage down to -25 C)
b Fire resistance (transformers exposed to re risk with low ammability and self
extinguishing in a given time)
The following description refers to the process developed by a leading European
manufacturer in this eld.
The encapsulation of a winding uses three components:
b Epoxy-resin based on biphenol A with a viscosity that ensures complete
impregnation of the windings
b Anhydride hardener modied to introduce a degree of resilience in the moulding,
essential to avoid the development of cracks during the temperature cycles occurring
in normal operation
b Pulverulent additive composed of trihydrated alumina Al (OH)3 and silica which
enhances its mechanical and thermal properties, as well as giving exceptional
intrinsic qualities to the insulation in the presence of heat.
This three-component system of encapsulation gives Class F insulation ( = 100 K)
with excellent re-resisting qualities and immediate self-extinction. These
transformers are therefore classied as nonammable.
The mouldings of the windings contain no halogen compounds (chlorine, bromine,
etc.) or other compounds capable of producing corrosive or toxic pollutants, thereby
guaranteeing a high degree of safety to personnel in emergency situations, notably
in the event of a re.
It also performs exceptionally well in hostile industrial atmospheres of dust, humidity,
etc. (see Fig. B12).
Liquid-lled transformers
The most common insulating/cooling liquid used in transformers is mineral oil.
Mineral oils are specied in IEC 60296. Being ammable, safety measures are
obligatory in many countries, especially for indoor substations. The DGPT unit
(Detection of Gas, Pressure and Temperature) ensures the protection of oil-lled
transformers. In the event of an anomaly, the DGPT causes the MV supply to the
transformer to be cut off very rapidly, before the situation becomes dangerous.
Mineral oil is bio-degradable and does not contain PCB (polychlorinated biphenyl),
which was the reason for banning askerel, i.e. Pyralne, Pyrolio, Pyroline...
On request, mineral oil can be replaced by an alternative insulating liquid, by
adapting the transformer, as required, and taking appropriate additional precautions
if necessary.
The insulating uid also acts as a cooling medium; it expands as the load and/or
the ambient temperature increases, so that all liquid-lled transformers must be
designed to accommodate the extra volume of liquid without the pressure in the tank
becoming excessive.
There are two ways in which this pressure limitation is commonly achieved:
b Hermetically-sealed totally-lled tank (up to 10 MVA at the present time)
Developed by a leading French manufacturer in 1963, this method was adopted by the
national utility in 1972, and is now in world-wide service (see Fig. B13).
Expansion of the liquid is compensated by the elastic deformation of the oil-cooling
passages attached to the tank.
The total-ll technique has many important advantages over other methods:
v Oxydation of the dielectric liquid (with atmospheric oxygen) is entirely precluded
v No need for an air-drying device, and so no consequent maintenance (inspection
and changing of saturated dessicant)
v No need for dielectric-strength test of the liquid for at least 10 years
v Simplied protection against internal faults by means of a DGPT device is possible
v Simplicity of installation: lighter and lower prole (than tanks with a conservator)
and access to the MV and LV terminals is unobstructed
v Immediate detection of (even small) oil leaks; water cannot enter the tank
b Air-breathing conservator-type tank at atmospheric pressure
Expansion of the insulating liquid is taken up by a change in the level of liquid in
an expansion (conservator) tank, mounted above the transformer main tank, as
shown in Figure B14. The space above the liquid in the conservator may be lled
with air which is drawn in when the level of liquid falls, and is partially expelled
Fig. B12 : Dry-type transformer
4 The consumer substation
with LV metering
Fig. B14 : Air-breathing conservator-type tank at atmosphere
pressure
Fig. B13 : Hermetically-sealed totally-lled tank
Schneider Electric - Electrical installation guide 2013
B - Connection to the MV utility
distribution network
B18
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
when the level rises. When the air is drawn in from the surrounding atmosphere it is
admitted through an oil seal, before passing through a dessicating device (generally
containing silica-gel crystals) before entering the conservator. In some designs of
larger transformers the space above the oil is occupied by an impermeable air bag
so that the insulation liquid is never in contact with the atmosphere. The air enters
and exits from the deformable bag through an oil seal and dessicator, as previously
described. A conservator expansion tank is obligatory for transformers rated above
10 MVA (which is presently the upper limit for total-ll type transformers).
Choice of technology
As discussed above, the choice of transformer is between liquid-lled or dry type.
For ratings up to 10 MVA, totally-lled units are available as an alternative to
conservator-type transformers.
A choice depends on a number of considerations, including:
b Safety of persons in proximity to the transformer. Local regulations and ofcial
recommendations may have to be respected
b Economic considerations, taking account of the relative advantages of each technique
The regulations affecting the choice are:
b Dry-type transformer:
v In some countries a dry-type transformer is obligatory in high apartment blocks
v Dry-type transformers impose no constraints in other situations
b Transformers with liquid insulation:
v This type of transformer is generally forbidden in high apartment blocks
v For different kinds of insulation liquids, installation restrictions, or minimum
protection against re risk, vary according to the class of insulation used
v Some countries in which the use of liquid dielectrics is highly developed, classify
the several categories of liquid according to their re performance. This latter is
assessed according to two criteria: the ash-point temperature, and the minimum
caloric power. The principal categories are shown in Figure B15 in which a
classication code is used for convenience.
Fig. B15 : Categories of dielectric uids
Code Dielectric uid Flash-point Minimum caloric power
(C) (MJ/kg)
O1 Mineral oil < 300 -
K1 High-density hydrocarbons > 300 48
K2 Esters > 300 34 - 37
K3 Silicones > 300 27 - 28
L3 Insulating halogen liquids - 12
The determination of optimal power
Oversizing a transformer
It results in:
b Excessive investment and unecessarily high no-load losses, but
b Lower on-load losses
Undersizing a transformer
It causes:
b A reduced efciency when fully loaded, (the highest efciency is attained in the
range 50% - 70% full load) so that the optimum loading is not achieved
b On long-term overload, serious consequences for
v The transformer, owing to the premature ageing of the windings insulation, and in
extreme cases, resulting in failure of insulation and loss of the transformer
v The installation, if overheating of the transformer causes protective relays to trip
the controlling circuit-breaker.
Schneider Electric - Electrical installation guide 2013
B19
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Denition of optimal power
In order to select an optimal power (kVA) rating for a transformer, the following
factors must be taken into account:
b List the power of installed power-consuming equipment as described in Chapter A
b Decide the utilization (or demand) factor for each individual item of load
b Determine the load cycle of the installation, noting the duration of loads and overloads
b Arrange for power-factor correction, if justied, in order to:
v Reduce cost penalties in tariffs based, in part, on maximum kVA demand
v Reduce the value of declared load (P(kVA) = P (kW)/cos )
b Select, among the range of standard transformer ratings available, taking into
account all possible future extensions to the installation.
It is important to ensure that cooling arrangements for the transformer are adequate.
4.5 Instructions for use of MV equipment
The purpose of this chapter is to provide general guidelines on how to avoid
or greatly reduce MV equipment degradation on sites exposed to humidity and
pollution.
Normal service conditions for indoor MV equipment
All MV equipments comply with specic standards and with the IEC 62271-1
standard Common specications for high-voltage switchgear and controlgear,
which denes the normal conditions for the installation and use of such equipment.
For instance, regarding humidity, the standard mentions:
The conditions of humidity are as follows:
b The average value of the relative humidity, measured over a period of 24 h does
not exceed 90%;
b The average value of the water vapour pressure, over a period of 24 h does not
exceed 2.2 kPa;
b The average value of the relative humidity, over a period of one month does not
exceed 90%;
b The average value of water vapour pressure, over a period of one month does not
exceed 1.8 kPa;
Under these conditions, condensation may occasionally occur.
NOTE 1: Condensation can be expected where sudden temperature changes occur
in period of high humidity.
NOTE 2: To withstand the effects of high humidity and condensation, such as a
breakdown of insulation or corrosion of metallic parts, switchgear designed for such
conditions and tested accordingly shoul be used.
NOTE 3: Condensation may be prevented by special design of the building or
housing, by suitable ventilation and heating of the station or by use of dehumifying
equipment.
As indicated in the standard, condensation may occasionally occur even under
normal conditions. The standard goes on to indicate special measures concerning
the substation premises that can be implemented to prevent condensation.
Use under severe conditions
Under certain severe conditions concerning humidity and pollution, largely beyond
the normal conditions of use mentioned above, correctly designed electrical
equipment can be subject to damage by rapid corrosion of metal parts and surface
degradation of insulating parts.
Remedial measures for condensation problems
b Carefully design or adapt substation ventilation.
b Avoid temperature variations.
b Eliminate sources of humidity in the substation environment.
b Install an air conditioning system.
b Make sure cabling is in accordance with applicable rules.
Remedial measures for pollution problems
b Equip substation ventilation openings with chevron-type bafes to reduce entry
of dust and pollution.
b Keep substation ventilation to the minimum required for evacuation of transformer
heat to reduce entry of pollution and dust.
b Use MV cubicles with a sufciently high degree of protection (IP).
b Use air conditioning systems with lters to restrict entry of pollution and dust.
b Regularly clean all traces of pollution from metal and insulating parts.
4 The consumer substation
with LV metering
Fig. B15 : SM6 metal enclosed indoor MV eqpuipment
Schneider Electric - Electrical installation guide 2013
B - Connection to the MV utility
distribution network
B20
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Ventilation
Substation ventilation is generally required to dissipate the heat produced by
transformers and to allow drying after particularly wet or humid periods.
However, a number of studies have shown that excessive ventilation can drastically
increase condensation.
Ventilation should therefore be kept to the minimum level required.
Furthermore, ventilation should never generate sudden temperature variations that
can cause the dew point to be reached.
For this reason:
Natural ventilation should be used whenever possible. If forced ventilation is
necessary, the fans should operate continuously to avoid temperature uctuations.
Guidelines for sizing the air entry and exit openings of substations are presented
hereafter.
Calculation methods
A number of calculation methods are available to estimate the required size of
substation ventilation openings, either for the design of new substations or the
adaptation of existing substations for which condensation problems have occurred.
The basic method is based on transformer dissipation.
The required ventilation opening surface areas S and S can be estimated using the
following formulas:
S
1.8 x 10
-4
P
H
and S' 1.10 x S
where:
S = Lower (air entry) ventilation opening area [m] (grid surface deducted)
S= Upper (air exit) ventilation opening area [m] (grid surface deducted)
P = Total dissipated power [W]
P is the sum of the power dissipated by:
b The transformer (dissipation at no load and due to load)
b The LV switchgear
b The MV switchgear
H = Height between ventilation opening mid-points [m]
See Fig. B16
Note:
This formula is valid for a yearly average temperature of 20 C and a maximum
altitude of 1,000 m.
It must be noted that these formulae are able to determine only one order of
magnitude of the sections S and S', which are qualied as thermal section, i.e. fully
open and just necessary to evacuate the thermal energy generated inside the MV/LV
substation.
The pratical sections are of course larger according ot the adopted technological
solution.
Indeed, the real air ow is strongly dependant:
b on the openings shape and solutions adopted to ensure the cubicle protection
index (IP): metal grid, stamped holes, chevron louvers,...
b on internal components size and their position compared to the openings:
transformer and/or retention oil box position and dimensions, ow channel between
the components, ...
b and on some physical and environmental parameters: outside ambient
temperature, altitude, magnitude of the resulting temperature rise.
The understanding and the optimization of the attached physical phenomena are
subject to precise ow studies, based on the uid dynamics laws, and realized with
specic analytic software.
Example:
Transformer dissipation = 7,970 W
LV switchgear dissipation = 750 W
MV switchgear dissipation = 300 W
The height between ventilation opening mid-points is 1.5 m.
Calculation:
Dissipated Power P = 7,970 + 750 + 300 = 9,020 W
S
1.8 x 10
-4
P
1.5
1.32 m
2
and S' 1.1 x 1.32 1.46 m
2
Schneider Electric - Electrical installation guide 2013
B21
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Ventilation opening locations
To favour evacuation of the heat produced by the transformer via natural convection,
ventilation openings should be located at the top and bottom of the wall near the
transformer. The heat dissipated by the MV switchboard is negligible.
To avoid condensation problems, the substation ventilation openings should be
located as far as possible from the switchboard (see Fig. B 17).
Type of ventilation openings
To reduce the entry of dust, pollution, mist, etc., the substation ventilation openings
should be equipped with chevron-blade bafes.
Always make sure the bafes are oriented in the right direction (see Fig. B18).
Temperature variations inside cubicles
To reduce temperature variations, always install anti-condensation heaters inside
MV cubicles if the average relative humidity can remain high over a long period of
time. The heaters must operate continuously, 24 hours a day all year long.
Never connect them to a temperature control or regulation system as this could lead
to temperature variations and condensation as well as a shorter service life for the
heating elements. Make sure the heaters offer an adequate service life (standard
versions are generally sufcient).
Temperature variations inside the substation
The following measures can be taken to reduce temperature variations inside the
substation:
b Improve the thermal insulation of the substation to reduce the effects of outdoor
temperature variations on the temperature inside the substation.
b Avoid substation heating if possible. If heating is required, make sure the regulation
system and/or thermostat are sufciently accurate and designed to avoid excessive
temperature swings (e.g. no greater than 1 C).
If a sufciently accurate temperature regulation system is not available, leave the
heating on continuously, 24 hours a day all year long.
b Eliminate cold air drafts from cable trenches under cubicles or from openings in the
substation (under doors, roof joints, etc.).
Substation environment and humidity
Various factors outside the substation can affect the humidity inside.
b Plants
Avoid excessive plant growth around the substation.
b Substation waterproong
The substation roof must not leak. Avoid at roofs for which
waterproong is difcult to implement and maintain.
b Humidity from cable trenches
Make sure cable trenches are dry under all conditions.
A partial solution is to add sand to the bottom of the cable trench.
Pollution protection and cleaning
Excessive pollution favours leakage current, tracking and ashover on insulators.
To prevent MV equipment degradation by pollution, it is possible to either protect the
equipment against pollution or regularly clean the resulting contamination.
Protection
Indoor MV switchgear can be protected by enclosures providing a sufciently high
degree of protection (IP).
Cleaning
If not fully protected, MV equipment must be cleaned regularly to prevent
degradation by contamination from pollution.
Cleaning is a critical process. The use of unsuitable products can irreversibly
damage the equipment.
For cleaning procedures, please contact your Schneider Electric correspondent.
Fig. B16 : Natural ventilation
Fig. B17 : Ventilation opening locations
S'
H
200 mm
mini
S
4 The consumer substation
with LV metering
Fig. B18 : Chevron-blade bafes
Schneider Electric - Electrical installation guide 2013
B - Connection to the MV utility
distribution network
B22
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5.1 Functions of the substation with MV metering
Functions
The substation
According to the complexity of the installation and the manner in which the load is
divided, the substation:
b Might include one room containing the MV switchboard and metering panel(s),
together with the transformer(s) and low-voltage main distribution board(s),
b Or might supply one or more transformer rooms, which include local LV distribution
boards, supplied at MV from switchgear in a main substation, similar to that
described above.
These substations may be installed, either:
b Inside a building, or
b Outdoors in prefabricated housings.
Connection to the MV network
Connection at MV can be:
b Either by a single service cable or overhead line, or
b Via two mechanically interlocked load-break switches with two service cables from
duplicate supply feeders, or
b Via two load-break switches of a ring-main unit.
Metering
Before the installation project begins, the agreement of the power-supply utility
regarding metering arrangements must be obtained.
A metering panel will be incorporated in the MV switchboard. Voltage transformers
and current transformers, having the necessary metering accuracy, may be included
in the main incoming circuit-breaker panel or (in the case of the voltage transformer)
may be installed separately in the metering panel.
Transformer rooms
If the installation includes a number of transformer rooms, MV supplies from the main
substation may be by simple radial feeders connected directly to the transformers, or
by duplicate feeders to each room, or again, by a ring-main, according to the degree
of supply availability desired.
In the two latter cases, 3-panel ring-main units will be required at each transformer
room.
Local emergency generators
Emergency standby generators are intended to maintain a power supply to essential
loads, in the event of failure of the power supply system.
Capacitors
Capacitors will be installed, according to requirements:
b In stepped MV banks at the main substation, or
b At LV in transformer rooms.
Transformers
For additional supply-security reasons, transformers may be arranged for automatic
changeover operation, or for parallel operation.
One-line diagrams
The diagrams shown in Figure B19 next page represent:
b The different methods of MV service connection, which may be one of four types:
v Single-line service
v Single-line service (equipped for extension to form a ring main)
v Duplicate supply service
v Ring main service
b General protection at MV, and MV metering functions
b Protection of outgoing MV circuits
b Protection of LV distribution circuits
5 The consumer substation
with MV metering
A consumer substation with MV metering
is an electrical installation connected to a
utility supply system at a nominal voltage of
1 kV - 35 kV and generally includes a single
MV/LV transformer which exceeds 1,250 kVA,
or several smaller transformers.
The rated current of the MV switchgear does
not normally exceed 400 A.
Schneider Electric - Electrical installation guide 2013
B23
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Power supply
system
Service connection MV protection
and metering
MV distribution and protection
of outgoing circuits
LV distribution
and protection
Supplier/consumer
interface
Downstream terminals of
MV isolator for the installation
LV terminals of
transformer
Duplicate-
supply
service
Ring-main
service
Single-line service
(equipped for
extension to form
a ring main)
Protection
+ automatic
changeover
feature
Automatic LV
standby source
Protection
Protection
LV
Automatic LV/MV
standby source
A single transformer
Single-line service
Fig. B19 : Consumer substation with MV metering
5 The consumer substation
with MV metering
Schneider Electric - Electrical installation guide 2013
B - Connection to the MV utility
distribution network
B24
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5.2 Choice of panels
A substation with MV metering includes, in addition to the panels described in 4.2,
panels specically designed for metering and, if required, for automatic or manual
changeover from one source to another.
Metering and general protection
These two functions are achieved by the association of two panels:
b One panel containing the VT
b The main MV circuit-breaker panel containing the CTs for measurement and
protection
The general protection is usually against overcurrent (overload and short-circuit) and
earth faults. Both schemes use protective relays which are sealed by the power-
supply utility.
Substation including generators
Generator in stand alone operation
If the installation needs great power supply availability, a MV standby generator set
can be used. In such a case, the installation must include an automatic changeover.
In order to avoid any posssibility of parallel operation of the generator with the power
supply network, a specic panel with automatic changeover is needed (see Fig. B20).
b Protection
Specic protective devices are intended to protect the generator itself. It must be
noted that, due to the very low short-circuit power of the generator comparing with
the power supply network, a great attention must be paid to protection discrimination.
b Control
A voltage regulator controlling an alternator is generally arranged to respond to a
reduction of voltage at its terminals by automatically increasing the excitation current
of the alternator, until the voltage is restored to normal. When it is intended that
the alternator should operate in parallel with others, the AVR (Automatic Voltage
Regulator) is switched to parallel operation in which the AVR control circuit is
slightly modied (compounded) to ensure satisfactory sharing of kvars with the other
parallel machines.
When a number of alternators are operating in parallel under AVR control, an
increase in the excitation current of one of them (for example, carried out manually
after switching its AVR to Manual control) will have practically no effect on the voltage
level. In fact, the alternator in question will simply operate at a lower power factor
(more kVA, and therefore more current) than before.
The power factor of all the other machines will automatically improve, such that the
load power factor requirements are satised, as before.
Generator operating in parallel with the utility supply network
To connect a generator set on the network, the agreement of the power supply utility
is usually required. Generally the equipement (panels, protection relays) must be
approved by the utility.
The following notes indicate some basic consideration to be taken into account for
protection and control.
b Protection
To study the connection of generator set, the power supply utility needs some data
as follows :
v Power injected on the network
v Connection mode
v Short-circuit current of the generator set
v Voltage unbalance of the generator
v etc.
Depending on the connection mode, dedicated uncoupling protection functions are
required :
v Under-voltage and over-voltage protection
v Under-frequency and over-frequency protection
v Zero sequence overvoltage protection
v Maximum time of coupling (for momentary coupling)
v Reverse real power
For safety reasons, the switchgear used for uncoupling must also be provided
with the characteristics of a disconnector (i.e total isolation of all active conductors
between the generator set and the power supply network).
Fig. B20 : Section of MV switchboard including standby supply
panel
From standby generator
P y 20,000 kVA
MV distribution
panels for
which standby
supply is
required
Automatic
changeover
panel
Busbar
transition
panel
To remainder
of the MV
switchboard
Schneider Electric - Electrical installation guide 2013
B25
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
b Control
When generators at a consumers substation operate in parallel with all the
generation of the utility power supply system, supposing the power system voltage is
reduced for operational reasons (it is common to operate MV systems within a range
of 5% of nominal voltage, or even more, where load-ow patterns require it), an
AVR set to maintain the voltage within 3% (for example) will immediately attempt to
raise the voltage by increasing the excitation current of the alternator.
Instead of raising the voltage, the alternator will simply operate at a lower power
factor than before, thereby increasing its current output, and will continue to do so,
until it is eventually tripped out by its overcurrent protective relays. This is a well-
known problem and is usually overcome by the provision of a constant power-
factor control switch on the AVR unit.
By making this selection, the AVR will automatically adjust the excitation current
to match whatever voltage exists on the power system, while at the same time
maintaining the power factor of the alternator constant at the pre-set value (selected
on the AVR control unit).
In the event that the alternator becomes decoupled from the power system, the AVR
must be automatically (rapidly) switched back to constant-voltage control.
5.3 Parallel operation of transformers
The need for operation of two or more transformers in parallel often arises due to:
b Load growth, which exceeds the capactiy of an existing transformer
b Lack of space (height) for one large transformer
b A measure of security (the probability of two transformers failing at the same time
is very small)
b The adoption of a standard size of transformer throughout an installation
Total power (kVA)
The total power (kVA) available when two or more transformers of the same
kVA rating are connected in parallel, is equal to the sum of the individual ratings,
providing that the percentage impedances are all equal and the voltage ratios are
identical.
Transformers of unequal kVA ratings will share a load practically (but not exactly)
in proportion to their ratings, providing that the voltage ratios are identical and the
percentage impedances (at their own kVA rating) are identical, or very nearly so.
In these cases, a total of more than 90% of the sum of the two ratings is normally
available.
It is recommended that transformers, the kVA ratings of which differ by more
than 2:1, should not be operated permanently in parallel.
Conditions necessary for parallel operation
All paralleled units must be supplied from the same network.
The inevitable circulating currents exchanged between the secondary circuits of
paralleled transformers will be negligibly small providing that:
b Secondary cabling from the transformers to the point of paralleling have
approximately equal lengths and characteristics
b The transformer manufacturer is fully informed of the duty intended for the
transformers, so that:
v The winding congurations (star, delta, zigzag star) of the several transformers
have the same phase change between primary and secondary voltages
v The short-circuit impedances are equal, or differ by less than 10%
v Voltage differences between corresponding phases must not exceed 0.4%
v All possible information on the conditions of use, expected load cycles, etc. should
be given to the manufacturer with a view to optimizing load and no-load losses
5 The consumer substation
with MV metering
Schneider Electric - Electrical installation guide 2013
B - Connection to the MV utility
distribution network
B26
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Common winding arrangements
As described in 4.4 Electrical characteristics-winding congurations the
relationships between primary, secondary, and tertiary windings depend on:
b Type of windings (delta, star, zigzag)
b Connection of the phase windings
Depending on which ends of the windings form the star point (for example), a
star winding will produce voltages which are 180 displaced with respect to those
produced if the opposite ends had been joined to form the star point. Similar 180
changes occur in the two possible ways of connecting phase-to-phase coils to form
delta windings, while four different combinations of zigzag connections are possible.
b The phase displacement of the secondary phase voltages with respect to the
corresponding primary phase voltages.
As previously noted, this displacement (if not zero) will always be a multiple of
30 and will depend on the two factors mentioned above, viz type of windings and
connection (i.e. polarity) of the phase windings.
By far the most common type of distribution transformer winding conguration is the
Dyn 11 connection (see Fig. B21).
Fig. B21 : Phase change through a Dyn 11 transformer
1
2 3
V
12
1
2
3
N
1
2
3
Voltage vectors
V
12
on the primary winding produces V
1N
in the
secondary winding and so on ...
Windings
correspondence
1
2
3
N
5 The consumer substation
with MV metering
Schneider Electric - Electrical installation guide 2013
B27
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
MV/LV substations are constructed according to the magnitude of the load and the
kind of power system in question.
Substations may be built in public places, such as parks, residential districts, etc. or
on private premises, in which case the power supply authority must have unrestricted
access. This is normally assured by locating the substation, such that one of its
walls, which includes an access door, coincides with the boundary of the consumers
premises and the public way.
6.1 Different types of substation
Substations may be classied according to metering arrangements (MV or LV) and
type of supply (overhead line or underground cable).
The substations may be installed:
b Either indoors in room specially built for the purpose, within a building, or
b An outdoor installation which could be :
v Installed in a dedicated enclosure prefabricated or not, with indoor equipment
(switchgear and transformer)
v Ground mounted with outdoor equipment (switchgear and transformers)
v Pole mounted with dedicated outdoor equipment (swithgear and transformers)
Prefabricated substations provide a particularly simple, rapid and competitive choice.
6.2 Indoor substation
Conception
Figure B22 shows a typical equipment layout recommended for a LV metering
substation.
Remark: the use of a cast-resin dry-type transformer does not need a reprotection
oil sump. However, periodic cleaning is needed.
6 Constitution of
MV/LV dis tri bu tion substations
Fig. B22 : Typical arrangment of switchgear panels for LV metering
LV switchgear
LV connections
from
transformer
MV connections to transformer
(included in a panel or free-standing)
2 incoming
MV panels
MV
switching
and
protection
panel
Transformer LV cable
trench
Oil sump Connection to the power-
supply network by single-core
or three-core cables,
with or without a cable trench
Current
transformers
provided by
power-supply
authority
B - Connection to the MV utility
distribution network
Schneider Electric - Electrical installation guide 2013
B - Connection to the MV utility
distribution network
B28
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Service connections and equipment interconnections
At high voltage
b Connections to the MV system are made by, and are the responsibility of the utility
b Connections between the MV switchgear and the transformers may be:
v By short copper bars where the transformer is housed in a panel forming part of
the MV switchboard
v By single-core screened cables with synthetic insulation, with possible use of plug-
in type terminals at the transformer
At low voltage
b Connections between the LV terminals of the transformer and the LV switchgear
may be:
v Single-core cables
v Solid copper bars (circular or rectangular section) with heat-shrinkable insulation
Metering (see Fig. B23)
b Metering current transformers are generally installed in the protective cover of the
power transformer LV terminals, the cover being sealed by the supply utility
b Alternatively, the current transformers are installed in a sealed compartment within
the main LV distribution cabinet
b The meters are mounted on a panel which is completely free from vibrations
b Placed as close to the current transformers as possible, and
b Are accessible only to the utility
Fig. B23 : Plan view of typical substation with LV metering
800 mini
MV supply LV distribution
Meters
100
Safety accessories
Common earth busbar
for the substation
Earthing circuits
The substation must include:
b An earth electrode for all exposed conductive parts of electrical equipment in the
substation and exposed extraneous metal including:
v Protective metal screens
v Reinforcing rods in the concrete base of the substation
Substation lighting
Supply to the lighting circuits can be taken from a point upstream or downstream
of the main incoming LV circuit-breaker. In either case, appropriate overcurrent
protection must be provided. A separate automatic circuit (or circuits) is (are)
recommended for emergency lighting purposes.
Operating switches, pushbuttons, etc. are normally located immediately adjacent to
entrances.
Lighting ttings are arranged such that:
b Switchgear operating handles and position indication markings are adequately
illuminated
b All metering dials and instruction plaques and so on, can be easily read
Schneider Electric - Electrical installation guide 2013
B29
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Materials for operation and safety
According to local safety rules, generally, the substation is provided with:
b Materials for assuring safe exploitation of the equipment including:
v Insulating stool and/or an insulating mat (rubber or synthetic)
v A pair of insulated gloves stored in an envelope provided for the purpose
v A voltage-detecting device for use on the MV equipment
v Earthing attachments (according to type of switchgear)
b Fire-extinguishing devices of the powder or CO2 type
b Warning signs, notices and safety alarms:
v On the external face of all access doors, a DANGER warning plaque and
prohibition of entry notice, together with instructions for rst-aid care for victims of
electrical accidents.
6.3 Outdoor substations
Outdoor substation with prefabricated enclosures
A prefabricated MV/LV substation complying with IEC 62271-202 standard includes :
b equipment in accordance with IEC standards
b a type tested enclosure, which means during its design, it has undergone a battery
of tests (see Fig. B24):
v Degree of protection
v Functional tests
v Temperature class
v Non-ammable materials
v Mechanical resistance of the enclosure
v Sound level
v Insulation level
v Internal arc withstand
v Earthing circuit test
v Oil retention,
Fig. B24 : Type tested substation according to IEC 62271-202 standard
Fig. B25 : The four designs according to IEC 62271-202
standard and two pictures [a] walk-in type MV/LV substation;
[b] half buried type MV/LV substation
6 Constitution of
MV/LV dis tri bu tion substations
Main benets are :
b Safety:
v For public and operators thanks to a high reproducible quality level
b Cost effective:
v Manufactured, equipped and tested in the factory
b Delivery time
v Delivered ready to be connected.
IEC 62271-202 standard includes four main designs (see Fig. B25)
b Walk-in type substation :
v Operation protected from bad weather conditions
b Non walk-in substation
v Ground space savings, and outdoors operations
b Half buried substation
v Limited visual impact
b Underground substation
v Blends completely into the environment.
Use of equipment conform
to IEC standards:
b Degree of protection
b Electromagnetic
compatibility
b Functional tests
b Temperature class
b Non-flammable
materials
Mechanical resistance
of the enclosure:
b Sound level
b Insulation level
b Internal arcing
withstand
LV
Earthing circuit test Oil retention
MV
Walk-in Non walk-in Half buried
Underground
a - b -
Schneider Electric - Electrical installation guide 2013
B - Connection to the MV utility
distribution network
B30
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6 Constitution of
MV/LV dis tri bu tion substations
Fig. B27 : Pole-mounted transformer substation
Earthing conductor 25 mm
2
copper
Protective conductor cover
LV circuit breaker D1
Safety earth mat
Lightning
arresters
Outdoor substations without enclosures (see Fig. B26)
These kinds of outdoor substation are common in some countries, based on
weatherproof equipment exposed to the elements.
These substations comprise a fenced area in which three or more concrete plinths
are installed for:
b A ring-main unit, or one or more switch-fuse or circuit-breaker unit(s)
b One or more transformer(s), and
b One or more LV distribution panel(s).
Pole mounted substations
Field of application
These substations are mainly used to supply isolated rural consumers from MV
overhead line distribution systems.
Constitution
In this type of substation, most often, the MV transformer protection is provided by
fuses.
Lightning arresters are provided, however, to protect the transformer and consumers
as shown in Figure B27.
General arrangement of equipment
As previously noted the location of the substation must allow easy access, not only
for personnel but for equipment handling (raising the transformer, for example) and
the manuvring of heavy vehicles.
Fig. B26 : Outdoor substations without enclosures
Schneider Electric - Electrical installation guide 2013
C1
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapter C
Connection to the LV utility
distribution network
Contents
Low-voltage utility distribution networks C2
1.1 Low-voltage consumers C2
1.2 Low-voltage distribution networks C10
1.3 The consumer service connection C11
1.4 Quality of supply voltage C15
Tariffs and metering C16
1
2
Schneider Electric - Electrical installation guide 2013
C - Connection to the LV utility
distribution network
C2
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.1 Low-voltage consumers
In Europe, the transition period on the voltage tolerance to 230V/400V + 10% / - 10%
has been extended for another 5 years up to the year 2008.
Low-voltage consumers are, by denition, those consumers whose loads can be
satisfactorily supplied from the low-voltage system in their locality.
The voltage of the local LV network may be 120/208 V or 240/415 V, i.e. the lower
or upper extremes of the most common 3-phase levels in general use, or at some
intermediate level, as shown in Figure C1.
An international voltage standard for 3-phase 4-wire LV systems is recommended
by the IEC 60038 to be 230/400 V.
Loads up to 250 kVA can be supplied at LV, but power-supply organizations
generally propose a MV service at load levels for which their LV networks are
marginally adequate.
1 Low-voltage utility distribution
networks
The most-common LV supplies are within the
range 120 V single phase to 240/415 V
3-phase 4-wires.
Loads up to 250 kVA can be supplied at LV, but
power-supply organizations generally propose
a MV service at load levels for which their
LV networks are marginally adequate.
An international voltage standard for 3-phase
4-wire LV systems is recommended by the
IEC 60038 to be 230/400 V
Fig. C1 : Voltage of local LV network and their associated circuit diagrams (continued on next page)
Country Frequency & tolerance Domestic (V) Commercial (V) Industrial (V)
(Hz & %)
Afghanistan 50 380/220 (a) 380/220 (a) 380/220 (a)
220 (k)
Algeria 50 1.5 220/127 (e) 380/220 (a) 10,000
220 (k) 220/127 (a) 5,500
6,600
380/220 (a)
Angola 50 380/220 (a) 380/220 (a) 380/220 (a)
220 (k)
Antigua and Barbuda 60 240 (k) 400/230 (a) 400/230 (a)
120 (k) 120/208 (a) 120/208 (a)
Argentina 50 2 380/220 (a) 380/220 (a)
220 (k) 220 (k)
Armenia 50 5 380/220 (a) 380/220 (a) 380/220 (a)
220 (k) 220 (k)
Australia 50 0.1 415/240 (a) 415/240 (a) 22,000
240 (k) 440/250 (a) 11,000
440 (m) 6,600
415/240
440/250
Austria 50 0.1 230 (k) 380/230 (a) (b) 5,000
230 (k) 380/220 (a)
Azerbaijan 50 0.1 208/120 (a) 208/120 (a)
240/120 (k) 240/120 (k)
Bahrain 50 0.1 415/240 (a) 415/240 (a) 11,000
240 (k) 240 (k) 415/240 (a)
240 (k)
Bangladesh 50 2 410/220 (a) 410/220 (a) 11,000
220 (k) 410/220 (a)
Barbados 50 6 230/115 (j) 230/115 (j) 230/400 (g)
115 (k) 200/115 (a) 230/155 (j)
220/115 (a)
Belarus 50 380/220 (a) 380/220 (a) 380/220 (a)
220 (k) 220 (k)
220/127 (a)
127 (k)
Belgium 50 5 230 (k) 230 (k) 6,600
230 (a) 230 (a) 10,000
3N, 400 3N, 400 11,000
15,000
Bolivia 50 0.5 230 (k) 400/230 (a) 400/230 (a)
230 (k)
Botswana 50 3 220 (k) 380/220 (a) 380/220 (a)
Brazil 60 3 220 (k, a) 220/380 (a) 69,000
127 (k, a) 127/220 (a) 23,200
13,800
11,200
220/380 (a)
127/220 (a)
Brunei 50 2 230 230 11,000
68,000
Bulgaria 50 0.1 220 220/240 1,000
690
380
Schneider Electric - Electrical installation guide 2013
C3
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. C1 : Voltage of local LV network and their associated circuit diagrams (continued on next page)
Cambodia 50 1 220 (k) 220/300 220/380
Cameroon 50 1 220/260 (k) 220/260 (k) 220/380 (a)
Canada 60 0.02 120/240 (j) 347/600 (a) 7,200/12,500
480 (f) 347/600 (a)
240 (f) 120/208
120/240 (j) 600 (f)
120/208 (a) 480 (f)
240 (f)
Cape Verde 220 220 380/400
Chad 50 1 220 (k) 220 (k) 380/220 (a)
Chile 50 1 220 (k) 380/220 (a) 380/220 (a)
China 50 0.5 220 (k) 380/220 (a) 380/220 (a)
220 (k) 220 (k)
Colombia 60 1 120/240 (g) 120/240 (g) 13,200
120 (k) 120 (k) 120/240 (g)
Congo 50 220 (k) 240/120 (j) 380/220 (a)
120 (k)
Croatia 50 400/230 (a) 400/230 (a) 400/230 (a)
230 (k) 230 (k)
Cyprus 50 0.1 240 (k) 415/240 11,000
415/240
Czech Republic 50 1 230 500 400,000
230/400 220,000
110,000
35,000
22,000
10,000
6,000
3,000
Denmark 50 1 400/230 (a) 400/230 (a) 400/230 (a)
Djibouti 50 400/230 (a) 400/230 (a)
Dominica 50 230 (k) 400/230 (a) 400/230 (a)
Egypt 50 0.5 380/220 (a) 380/220 (a) 66,000
220 (k) 220 (k) 33,000
20,000
11,000
6,600
380/220 (a)
Estonia 50 1 380/220 (a) 380/220 (a) 380/220 (a)
220 (k) 220 (k)
Ethiopia 50 2.5 220 (k) 380/231 (a) 15 000
380/231 (a)
Falkland Islands 50 3 230 (k) 415/230 (a) 415/230 (a)
Fidji Islands 50 2 415/240 (a) 415/240 (a) 11,000
240 (k) 240 (k) 415/240 (a)
Finland 50 0.1 230 (k) 400/230 (a) 690/400 (a)
400/230 (a)
France 50 1 400/230 (a) 400/230 20,000
230 (a) 690/400 10,000
590/100 230/400
Gambia 50 220 (k) 220/380 380
Georgia 50 0.5 380/220 (a) 380/220 (a) 380/220 (a)
220 (k) 220 (k)
Germany 50 0.3 400/230 (a) 400/230 (a) 20,000
230 (k) 230 (k) 10,000
6,000
690/400
400/230
Ghana 50 5 220/240 220/240 415/240 (a)
Gibraltar 50 1 415/240 (a) 415/240 (a) 415/240 (a)
Greece 50 220 (k) 6,000 22,000
230 380/220 (a) 20,000
15,000
6,600
Granada 50 230 (k) 400/230 (a) 400/230 (a)
Hong Kong 50 2 220 (k) 380/220 (a) 11,000
220 (k) 386/220 (a)
Hungary 50 5 220 220 220/380
Iceland 50 0.1 230 230/400 230/400
Country Frequency & tolerance Domestic (V) Commercial (V) Industrial (V)
(Hz & %)
1 Low-voltage utility distribution
networks
Schneider Electric - Electrical installation guide 2013
C - Connection to the LV utility
distribution network
C4
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. C1 : Voltage of local LV network and their associated circuit diagrams (continued on next page)
India 50 1.5 440/250 (a) 440/250 (a) 11,000
230 (k) 230 (k) 400/230 (a)
440/250 (a)
Indonesia 50 2 220 (k) 380/220 (a) 150,000
20,000
380/220 (a)
Iran 50 5 220 (k) 380/220 (a) 20,000
11,000
400/231 (a)
380/220 (a)
Iraq 50 220 (k) 380/220 (a) 11,000
6,600
3,000
380/220 (a)
Ireland 50 2 230 (k) 400/230 (a) 20,000
10,000
400/230 (a)
Israel 50 0.2 400/230 (a) 400/230 (a) 22,000
230 (k) 230 (k) 12,600
6,300
400/230 (a)
Italy 50 0.4 400/230 (a) 400/230 (a) 20,000
230 (k) 15,000
10,000
400/230 (a)
Jamaica 50 1 220/110 (g) (j) 220/110 (g) (j) 4,000
2,300
220/110 (g)
Japan (east) + 0.1 200/100 (h) 200/100 (h) 140,000
- 0.3 (up to 50 kW) 60,000
20,000
6,000
200/100 (h)
Jordan 50 380/220 (a) 380/220 (a) 400 (a)
400/230 (k)
Kazakhstan 50 380/220 (a) 380/220 (a) 380/220 (a)
220 (k) 220 (k)
220/127 (a)
127 (k)
Kenya 50 240 (k) 415/240 (a) 415/240 (a)
Kirghizia 50 380/220 (a) 380/220 (a) 380/220 (a)
220 (k) 220 (k)
220/127 (a)
127 (k)
Korea (North) 60 +0, -5 220 (k) 220/380 (a) 13,600
6,800
Korea (South) 60 100 (k) 100/200 (j)
Kuwait 50 3 240 (k) 415/240 (a) 415/240 (a)
Laos 50 8 380/220 (a) 380/220 (a) 380/220 (a)
Lesotho 220 (k) 380/220 (a) 380/220 (a)
Latvia 50 0.4 380/220 (a) 380/220 (a) 380/220 (a)
220 (k) 220 (k)
Lebanon 50 220 (k) 380/220 (a) 380/220 (a)
Libya 50 230 (k) 400/230 (a) 400/230 (a)
127 (k) 220/127 (a) 220/127 (a)
230 (k)
127 (k)
Lithuania 50 0.5 380/220 (a) 380/220 (a) 380/220 (a)
220 (k) 220 (k)
Luxembourg 50 0.5 380/220 (a) 380/220 (a) 20,000
15,000
5,000
Macedonia 50 380/220 (a) 380/220 (a) 10,000
220 (k) 220 (k) 6,600
380/220 (a)
Madagascar 50 220/110 (k) 380/220 (a) 35,000
5,000
380/220
Country Frequency & tolerance Domestic (V) Commercial (V) Industrial (V)
(Hz & %)
Schneider Electric - Electrical installation guide 2013
C5
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. C1 : Voltage of local LV network and their associated circuit diagrams (continued on next page)
1 Low-voltage utility distribution
networks
Country Frequency & tolerance Domestic (V) Commercial (V) Industrial (V)
(Hz & %)
Malaysia 50 1 240 (k) 415/240 (a) 415/240 (a)
415 (a)
Malawi 50 2.5 230 (k) 400 (a) 400 (a)
230 (k)
Mali 50 220 (k) 380/220 (a) 380/220 (a)
127 (k) 220/127 (a) 220/127 (a)
220 (k)
127 (k)
Malta 50 2 240 (k) 415/240 (a) 415/240 (a)
Martinique 50 127 (k) 220/127 (a) 220/127 (a)
127 (k)
Mauritania 50 1 230 (k) 400/230 (a) 400/230 (a)
Mexico 60 0.2 127/220 (a) 127/220 (a) 13,800
220 (k) 220 (k) 13,200
120 (l) 120 (l) 277/480 (a)
127/220 (b)
Moldavia 50 380/220 (a) 380/220 (a) 380/220 (a)
220 (k) 220 (k)
220/127 (a)
127 (k)
Morocco 50 5 380/220 (a) 380/220 (a) 225,000
220/110 (a) 150,000
60,000
22,000
20,000
Mozambique 50 380/220 (a) 380/220 (a) 6,000
10,000
Nepal 50 1 220 (k) 440/220 (a) 11,000
220 (k) 440/220 (a)
Netherlands 50 0.4 230/400 (a) 230/400 (a) 25,000
230 (k) 20,000
12,000
10,000
230/400
New Zealand 50 1.5 400/230 (e) (a) 400/230 (e) (a) 11,000
230 (k) 230 (k) 400/230 (a)
460/230 (e)
Niger 50 1 230 (k) 380/220 (a) 15,000
380/220 (a)
Nigeria 50 1 230 (k) 400/230 (a) 15,000
220 (k) 380/220 (a) 11,000
400/230 (a)
380/220 (a)
Norway 50 2 230/400 230/400 230/400
690
Oman 50 240 (k) 415/240 (a) 415/240 (a)
240 (k)
Pakistan 50 230 (k) 400/230 (a) 400/230 (a)
230 (k)
Papua New Guinea 50 2 240 (k) 415/240 (a) 22,000
240 (k) 11,000
415/240 (a)
Paraguay 50 0.5 220 (k) 380/220 (a) 22,000
220 (k) 380/220 (a)
Philippines (Rep of the) 60 0.16 110/220 (j) 13,800 13,800
4,160 4,160
2,400 2,400
110/220 (h) 440 (b)
110/220 (h)
Poland 50 0.1 230 (k) 400/230 (a) 1,000
690/400
400/230 (a)
Portugal 50 1 380/220 (a) 15,000 15,000
220 (k) 5,000 5,000
380/220 (a) 380/220 (a)
220 (k)
Qatar 50 0.1 415/240 (k) 415/240 (a) 11,000
415/240 (a)
Schneider Electric - Electrical installation guide 2013
C - Connection to the LV utility
distribution network
C6
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. C1 : Voltage of local LV network and their associated circuit diagrams (continued on next page)
Romania 50 0.5 220 (k) 220/380 (a) 20,000
220/380 (a) 10,000
6,000
220/380 (a)
Russia 50 0.2 380/220 (a) 380/220 (a) 380/220 (a)
220 (k) 220 (k)
Rwanda 50 1 220 (k) 380/220 (a) 15,000
6,600
380/220 (a)
Saint Lucia 50 3 240 (k) 415/240 (a) 11,000
415/240 (a)
Samoa 400/230
San Marino 50 1 230/220 380 15,000
380
Saudi Arabia 60 220/127 (a) 220/127 (a) 11,000
380/220 (a) 7,200
380/220 (a)
The Solomon Islands 50 2 240 415/240 415/240
Senegal 50 5 220 (a) 380/220 (a) 90,000
127 (k) 220/127 (k) 30,000
6,600
Serbia and Montenegro 50 380/220 (a) 380/220 (a) 10,000
220 (k) 220 (k) 6,600
380/220 (a)
Seychelles 50 1 400/230 (a) 400/230 (a) 11,000
400/230 (a)
Sierra Leone 50 5 230 (k) 400/230 (a) 11,000
230 (k) 400
Singapore 50 400/230 (a) 400/230 (a) 22,000
230 (k) 6,600
400/230 (a)
Slovakia 50 0.5 230 230 230/400
Slovenia 50 0.1 220 (k) 380/220 (a) 10,000
6,600
380/220 (a)
Somalia 50 230 (k) 440/220 (j) 440/220 (g)
220 (k) 220/110 (j) 220/110 (g)
110 (k) 230 (k)
South Africa 50 2.5 433/250 (a) 11,000 11,000
400/230 (a) 6,600 6,600
380/220 (a) 3,300 3,300
220 (k) 433/250 (a) 500 (b)
400/230 (a) 380/220 (a)
380/220 (a)
Spain 50 3 380/220 (a) (e) 380/220 (a) 15,000
220 (k) 220/127 (a) (e) 11,000
220/127 (a) 380/220 (a)
127 (k)
Sri Lanka 50 2 230 (k) 400/230 (a) 11,000
230 (k) 400/230 (a)
Sudan 50 240 (k) 415/240 (a) 415/240 (a)
240 (k)
Swaziland 50 2.5 230 (k) 400/230 (a) 11,000
230 (k) 400/230 (a)
Sweden 50 0.5 400/230 (a) 400/230 (a) 6,000
230 (k) 230 (k) 400/230 (a)
Switzerland 50 2 400/230 (a) 400/230 (a) 20,000
10,000
3,000
1,000
690/500
Syria 50 220 (k) 380/220 (a) 380/220 (a)
115 (k) 220 (k)
200/115 (a)
Tadzhikistan 50 380/220 (a) 380/220 (a) 380/220 (a)
220 (k) 220 (k)
220/127 (a)
127 (k)
Country Frequency & tolerance Domestic (V) Commercial (V) Industrial (V)
(Hz & %)
Schneider Electric - Electrical installation guide 2013
C7
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. C1 : Voltage of local LV network and their associated circuit diagrams (continued on next page)
1 Low-voltage utility distribution
networks
Country Frequency & tolerance Domestic (V) Commercial (V) Industrial (V)
(Hz & %)
Tanzania 50 400/230 (a) 400/230 (a) 11,000
400/230 (a)
Thailand 50 220 (k) 380/220 (a) 380/220 (a)
220 (k)
Togo 50 220 (k) 380/220 (a) 20,000
5,500
380/220 (a)
Tunisia 50 2 380/220 (a) 380/220 (a) 30,000
220 (k) 220 (k) 15,000
10,000
380/220 (a)
Turkmenistan 50 380/220 (a) 380/220 (a) 380/220 (a)
220 (k) 220 (k)
220/127 (a)
127 (k)
Turkey 50 1 380/220 (a) 380/220 (a) 15,000
6,300
380/220 (a)
Uganda + 0.1 240 (k) 415/240 (a) 11,000
415/240 (a)
Ukraine + 0.2 / - 1.5 380/220 (a) 380/220 (a) 380/220 (a)
220 (k) 220 (k) 220 (k)
United Arab Emirates 50 1 220 (k) 415/240 (a) 6,600
380/220 (a) 415/210 (a)
220 (k) 380/220 (a)
United Kingdom 50 1 230 (k) 400/230 (a) 22,000
(except Northern 11,000
Ireland) 6,600
3,300
400/230 (a)
United Kingdom 50 0.4 230 (k) 400/230 (a) 400/230 (a)
(Including Northern 220 (k) 380/220 (a) 380/220 (a)
Ireland)
United States of 60 0.06 120/240 (j) 265/460 (a) 14,400
America 120/208 (a) 120/240 (j) 7,200
Charlotte 120/208 (a) 2,400
(North Carolina) 575 (f)
460 (f)
240 (f)
265/460 (a)
120/240 (j)
120/208 (a)
United States of 60 0.2 120/240 (j) 480 (f) 13,200
America 120/208 (a) 120/240 (h) 4,800
Detroit (Michigan) 120/208 (a) 4,160
480 (f)
120/240 (h)
120/208 (a)
United States of 60 0.2 120/240 (j) 4,800 4,800
America 120/240 (g) 120/240 (g)
Los Angeles (California)
United States of 60 0.3 120/240 (j) 120/240 (j) 13,200
America 120/208 (a) 120/240 (h) 2,400
Miami (Florida) 120/208 (a) 480/277 (a)
120/240 (h)
United States of 60 120/240 (j) 120/240 (j) 12,470
America New York 120/208 (a) 120/208 (a) 4,160
(New York) 240 (f) 277/480 (a)
480 (f)
United States of 60 0.03 120/240 (j) 265/460 (a) 13,200
America 120/240 (j) 11,500
Pittsburg 120/208 (a) 2,400
(Pennsylvania) 460 (f) 265/460 (a)
230 (f) 120/208 (a)
460 (f)
230 (f)
Schneider Electric - Electrical installation guide 2013
C - Connection to the LV utility
distribution network
C8
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Country Frequency & tolerance Domestic (V) Commercial (V) Industrial (V)
(Hz & %)
United States of 60 120/240 (j) 227/480 (a) 19,900
America 120/240 (j) 12,000
Portland (Oregon) 120/208 (a) 7,200
480 (f) 2,400
240 (f) 277/480 (a)
120/208 (a)
480 (f)
240 (f)
United States of 60 0.08 120/240 (j) 277/480 (a) 20,800
America 120/240 (j) 12,000
San Francisco 4,160
(California) 277/480 (a)
120/240 (g)
United States of 60 0.08 120/240 (j) 277/480 (c) 12,470
America 120/208 (a) 120/240(h) 7,200
Toledo (Ohio) 120/208 (j) 4,800
4,160
480 (f)
277/480 (a)
120/208 (a)
Uruguay 50 1 220 (b) (k) 220 (b) (k) 15,000
6,000
220 (b)
Vietnam 50 0.1 220 (k) 380/220 (a) 35,000
15,000
10,000
6,000
Yemen 50 250 (k) 440/250 (a) 440/250 (a)
Zambia 50 2.5 220 (k) 380/220 (a) 380 (a)
Zimbabwe 50 225 (k) 390/225 (a) 11,000
390/225 (a)
Fig. C1 : Voltage of local LV network and their associated circuit diagrams (concluded)
(f) Three-phase delta:
Three-wire
(g) Three-phase delta;
Four-wire:
Earthed mid point of
one phase
(h) Three-phase open delta;
Four-wire:
Earthed mid point of one
phase
(i) Three-phase
open delta:
Earthed junction
of phases
(j) Single-phase;
Three-wire:
Earthed mid point
(k) Single-phase;
Two-wire:
Earthed end of phase
(l) Single-phase;
Two-wire
Unearthed
(m) Single-wire:
Earthed return (swer)
V k V
(b) Three-phase star:
Three-wire
Circuit diagrams
(a) Three-phase star;
Four-wire:
Earthed neutral
(c) Three-phase star;
Three-wire:
Earthed neutral
(d) Three-phase star;
Four-wire:
Non-earthed neutral
(e) Two-phase star;
Three-wire
Earthed neutral
(n) DC:
Three-wire:
Unearthed
Schneider Electric - Electrical installation guide 2013
C9
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Residential and commercial consumers
The function of a LV mains distributor is to provide service connections
(underground cable or overhead line) to a number of consumers along its route.
The current-rating requirements of distributors are estimated from the number of
consumers to be connected and an average demand per consumer.
The two principal limiting parameters of a distributor are:
b The maximum current which it is capable of carrying indenitely, and
b The maximum length of cable which, when carrying its maximum current, will not
exceed the statutory voltage-drop limit
These constraints mean that the magnitude of loads which utilities are willing to
connect to their LV distribution mains, is necessarily restricted.
For the range of LV systems mentioned in the second paragraph of this sub-clause
(1.1) viz: 120 V single phase to 240/415 V 3-phase, typical maximum permitted loads
connected to a LV distributor might
(1)
be (see Fig. C2):
(1) The Figure C2 values shown are indicative only, being
(arbitrarily) based on 60 A maximum service currents for the
rst three systems, since smaller voltage drops are allowed at
these lower voltages, for a given percentage statutory limit.
The second group of systems is (again, arbitrarily) based on a
maximum permitted service current of 120 A.
Fig. C2 : Typical maximum permitted loads connected to a LV distributor
Practices vary considerably from one power supply organization to another, and no
standardized values can be given.
Factors to be considered include:
b The size of an existing distribution network to which the new load is to be connected
b The total load already connected to the distribution network
b The location along the distribution network of the proposed new load, i.e. close to
the substation, or near the remote end of the distribution network, etc
In short, each case must be examined individually.
The load levels listed above are adequate for all normal residential consumers, and
will be sufcient for the installations of many administrative, commercial and similar
buildings.
Medium-size and small industrial consumers (with dedicated
LV lines direct from a utility supply MV/LV substation)
Medium and small industrial consumers can also be satisfactorily supplied at low-
voltage.
For loads which exceed the maximum permitted limit for a service from a distributor,
a dedicated cable can usually be provided from the LV distribution fuse- (or switch-)
board, in the power utility substation.
Generaly, the upper load limit which can be supplied by this means is restricted only
by the available spare transformer capacity in the substation.
In practice, however:
b Large loads (e.g. > 300 kVA) require correspondingly large cables, so that,
unless the load centre is close to the substation, this method can be economically
unfavourable
b Many utilities prefer to supply loads exceeding 200 kVA (this gure varies with
different suppliers) at medium voltage
For these reasons, dedicated supply lines at LV are generally applied (at 220/380 V
to 240/415 V) to a load range of 80 kVA to 250 kVA.
Consumers normally supplied at low voltage include:
b Residential dwellings
b Shops and commercial buildings
b Small factories, workshops and lling stations
b Restaurants
b Farms, etc
1 Low-voltage utility distribution
networks
System Assumed max. permitted current kVA
per consumer service
120 V 1-phase 2-wire 60 A 7.2
120/240 V 1-phase 3-wire 60 A 14.4
120/208 V 3-phase 4-wire 60 A 22
220/380 V 3-phase 4-wire 120 A 80
230/400 V 3-phase 4-wire 120 A 83
240/415 V 3-phase 4-wire 120 A 86
Schneider Electric - Electrical installation guide 2013
C - Connection to the LV utility
distribution network
C10
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.2 LV distribution networks
In European countries the standard 3-phase 4-wire distribution voltage level is
230/400 V. Many countries are currently converting their LV systems to the latest IEC
standard of 230/400 V nominal (IEC 60038). Medium
to large-sized towns and cities have underground cable distribution systems.
MV/LV distribution substations, mutually spaced at approximately 500-600 metres,
are typically equipped with:
b A 3-or 4-way MV switchboard, often made up of incoming and outgoing load-
break switches forming part of a ring main, and one or two MV circuit-breakers or
combined fuse/ load-break switches for the transformer circuits
b One or two 1,000 kVA MV/LV transformers
b One or two (coupled) 6-or 8-way LV 3-phase 4-wire distribution fuse boards, or
moulded-case circuit-breaker boards, control and protect outgoing 4-core distribution
cables, generally referred to as distributors
The output from a transformer is connected to the LV busbars via a load-break
switch, or simply through isolating links.
In densely-loaded areas, a standard size of distributor is laid to form a network,
with (generally) one cable along each pavement and 4-way link boxes located in
manholes at street corners, where two cables cross.
Recent trends are towards weather-proof cabinets above ground level, either against
a wall, or where possible, ush-mounted in the wall.
Links are inserted in such a way that distributors form radial circuits from the
substation with open-ended branches (see Fig. C3). Where a link box unites a
distributor from one substation with that from a neighbouring substation, the phase
links are omitted or replaced by fuses, but the neutral link remains in place.
In cities and large towns, standardized
LV distribution cables form a network through
link boxes. Some links are removed, so that
each (fused) distributor leaving a substation
forms a branched open-ended radial system,
as shown in Figure C3
Fig. C3 : Showing one of several ways in which a LV distribution network may be arranged for
radial branched-distributor operation, by removing (phase) links
4-way
link box
HV/LV
substation
Service
cable
Phase links
removed
Schneider Electric - Electrical installation guide 2013
C11
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
In less-densely loaded urban areas a more-
economic system of tapered radial distribution
is commonly used, in which conductors of
reduced size are installed as the distance from
a substation increases
Improved methods using insulated twisted
conductors to form a pole mounted aerial cable
are now standard practice in many countries
1 Low-voltage utility distribution
networks
This arrangement provides a very exible system in which a complete substation can
be taken out of service, while the area normally supplied from it is fed from link boxes
of the surrounding substations.
Moreover, short lengths of distributor (between two link boxes) can be isolated for
fault-location and repair.
Where the load density requires it, the substations are more closely spaced, and
transformers up to 1,500 kVA are sometimes necessary.
Other forms of urban LV network, based on free-standing LV distribution pillars,
placed above ground at strategic points in the network, are widely used in areas of
lower load density. This scheme exploits the principle of tapered radial distributors in
which the distribution cable conductor size is reduced as the number of consumers
downstream diminish with distance from the substation.
In this scheme a number of large-sectioned LV radial feeders from the distribution
board in the substation supply the busbars of a distribution pillar, from which smaller
distributors supply consumers immediately surrounding the pillar.
Distribution in market towns, villages and rural areas generally has, for many years,
been based on bare copper conductors supported on wooden, concrete or steel
poles, and supplied from pole-mounted or ground-mounted transformers.
In recent years, LV insulated conductors, twisted to form a two-core or 4-core self
supporting cable for overhead use, have been developed, and are considered to be
safer and visually more acceptable than bare copper lines.
This is particularly so when the conductors are xed to walls (e.g. under-eaves
wiring) where they are hardly noticeable.
As a matter of interest, similar principles have been applied at higher voltages, and
self supporting bundled insulated conductors for MV overhead installations are now
available for operation at 24 kV.
Where more than one substation supplies a village, arrangements are made at poles
on which the LV lines from different substations meet, to interconnect corresponding
phases.
North and Central American practice differs fundamentally from that in Europe, in
that LV networks are practically nonexistent, and 3-phase supplies to premises in
residential areas are rare.
The distribution is effectively carried out at medium voltage in a way, which again
differs from standard European practices. The MV system is, in fact, a 3-phase
4-wire system from which single-phase distribution networks (phase and neutral
conductors) supply numerous single-phase transformers, the secondary windings
of which are centre-tapped to produce 120/240 V single-phase 3-wire supplies.
The central conductors provide the LV neutrals, which, together with the MV neutral
conductors, are solidly earthed at intervals along their lengths.
Each MV/LV transformer normally supplies one or several premises directly from the
transformer position by radial service cable(s) or by overhead line(s).
Many other systems exist in these countries, but the one described appears to be
the most common.
Figure C4 (next page) shows the main features of the two systems.
1.3 The consumer-service connection
In the past, an underground cable service or the wall-mounted insulated conductors
from an overhead line service, invariably terminated inside the consumers premises,
where the cable-end sealing box, the utility fuses (inaccessible to the consumer) and
meters were installed.
A more recent trend is (as far as possible) to locate these service components in a
weatherproof housing outside the building.
The utility/consumer interface is often at the outgoing terminals of the meter(s) or,
in some cases, at the outgoing terminals of the installation main circuit-breaker
(depending on local practices) to which connection is made by utility staff, following a
satisfactory test and inspection of the installation.
A typical arrangement is shown in Figure C5 (next page).
In Europe, each utility-supply distribution
substation is able to supply at LV an area
corresponding to a radius of approximately
300 metres from the substation.
North and Central American systems of
distribution consist of a MV network from which
numerous (small) MV/LV transformers each
supply one or several consumers, by direct
service cable (or line) from the transformer
location
Service components and metering equipment
were formerly installed inside a consumers
building. The modern tendency is to locate
these items outside in a weatherproof cabinet
Schneider Electric - Electrical installation guide 2013
C - Connection to the LV utility
distribution network
C12
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. C4 : Widely-used American and European-type systems
Fig. C5 : Typical service arrangement for TT-earthed systems
N
2
N
N
1
N
3
N
N
2
1 2 3
N
13.8 kV / 2.4-4.16 kV
N 3
2
1
2 1 N
Ph N
}
HV
(1)
MV
(2)
1 ph MV / 230 V
service transformer
to isolated consumer(s)
(rural supplies)
For primary voltages > 72.5 kV
(see note) primary
winding may be:
- Delta
- Earthed star
- Earthed zigzag
Depending on the country concerned
Tertiary delta normally
(not always) used if the
primary winding is not delta
Main 3 ph and neutral
MV distributor
(1) 132 kV for example
(2) 11 kV for example
Note: At primary voltages greater than 72.5 kV in bulk-supply substations, it is common practice in some European countries
to use an earthed-star primary winding and a delta secondary winding. The neutral point on the secondary side is then
provided by a zigzag earthing reactor, the star point of which is connected to earth through a resistor.
Frequently, the earthing reactor has a secondary winding to provide LV 3-phase supplies for the substation. It is then referred
to as an earthing transformer.
LV distribution network
1 2 3
3 ph
MV / 230/400 V
4-wire distribution
transformer
Resistor replaced
by a Petersen
coil on O/H line
systems in some
countries
2.4 kV / 120-240 V
1 ph - 3 wire
distribution
transformer
Each MV/LV transformer shown
represents many similar units
CB
F
A
M
Schneider Electric - Electrical installation guide 2013
C13
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
A MCCB -moulded case circuit-breaker- which incorporates a sensitive residual-
current earth-fault protective feature is mandatory at the origin of any LV installation
forming part of a TT earthing system. The reason for this feature and related
leakage-current tripping levels are discussed in Clause 3 of Chapter G.
A further reason for this MCCB is that the consumer cannot exceed his (contractual)
declared maximum load, since the overload trip setting, which is sealed by the
supply authority, will cut off supply above the declared value. Closing and tripping of
the MCCB is freely available to the consumer, so that if the MCCB is inadvertently
tripped on overload, or due to an appliance fault, supplies can be quickly restored
following correction of the anomaly.
In view of the inconvenience to both the meter reader and consumer, the location of
meters is nowadays generally outside the premises, either:
b In a free-standing pillar-type housing as shown in Figures C6 and C7
b In a space inside a building, but with cable termination and supply authoritys fuses
located in a ush-mounted weatherproof cabinet accessible from the public way, as
shown in Figure C8 next page
b For private residential consumers, the equipment shown in the cabinet in
Figure C5 is installed in a weatherproof cabinet mounted vertically on a metal
frame in the front garden, or ush-mounted in the boundary wall, and accessible to
authorized personnel from the pavement. Figure C9 (next page) shows the general
arrangement, in which removable fuse links provide the means of isolation
1 Low-voltage utility distribution
networks
LV consumers are normally supplied according
to the TN or TT system, as described in
chapters F and G. The installation main circuit-
breaker for a TT supply must include a residual
current earth-leakage protective device. For a
TN service, overcurrent protection by circuit-
breaker or switch-fuse is required
Fig. C6 : Typical rural-type installation
In this kind of installation it is often necessary to place the main installation circuit-
breaker some distance from the point of utilization, e.g. saw-mills, pumping stations,
etc.
CB
M
F
A
Fig. C7 : Semi-urban installations (shopping precincts, etc.)
The main installation CB is located in the consumers premises in cases where it is
set to trip if the declared kVA load demand is exceeded.
CB
M
F
A
Schneider Electric - Electrical installation guide 2013
C - Connection to the LV utility
distribution network
C14
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. C8 : Town centre installations
CB
M
F
A
The service cable terminates in a ushmounted wall cabinet which contains the
isolating fuse links, accessible from the public way. This method is preferred for
esthetic reasons, when the consumer can provide a suitable metering and main-
switch location.
In the eld of electronic metering, techniques have developed which make their
use attractive by utilities either for electricity metering and for billing purposes, the
liberalisation of the electricity market having increased the needs for more data
collection to be returned from the meters. For example electronic metering can also
help utilities to understand their customers consumption proles. In the same way,
they will be useful for more and more power line communication and radio-frequency
applications as well.
In this area, prepayment systems are also more and more employed when
economically justied. They are based on the fact that for instance consumers having
made their payment at vending stations, generate tokens to pass the information
concerning this payment on to the meters. For these systems the key issues are
security and inter-operability which seem to have been addressed successfully
now. The attractiveness of these systems is due to the fact they not only replace the
meters but also the billing systems, the reading of meters and the administration of
the revenue collection.
Fig. C9 : Typical LV service arrangement for residential consumers
Isolation by
fuse links
Interface
Meter cabinet
Meter
Main
circuit
breaker
Installation
Consumer Utility
Service cable
Schneider Electric - Electrical installation guide 2013
C15
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.4 Quality of supply voltage
The quality of the LV network supply voltage in its widest sense implies:
b Compliance with statutory limits of magnitude and frequency
b Freedom from continual uctuation within those limits
b Uninterrupted power supply, except for scheduled maintenance shutdowns, or as a
result of system faults or other emergencies
b Preservation of a near-sinusoidal wave form
In this Sub-clause the maintenance of voltage magnitude only will be discussed.
In most countries, power-supply authorities have a statutory obligation to maintain
the level of voltage at the service position of consumers within the limits of 5% (or
in some cases 6% or more-see table C1) of the declared nominal value.
Again, IEC and most national standards recommend that LV appliances be designed
and tested to perform satisfactorily within the limits of 10% of nominal voltage. This
leaves a margin, under the worst conditions (of minus 5% at the service position, for
example) of 5% allowable voltage drop in the installation wiring.
The voltage drops in a typical distribution system occur as follows: the voltage at
the MV terminals of a MV/LV transformer is normally maintained within a 2% band
by the action of automatic onload tapchangers of the transformers at bulk-supply
substations, which feed the MV network from a higher-voltage subtransmission
system.
If the MV/LV transformer is in a location close to a bulk-supply substation, the 2%
voltage band may be centered on a voltage level which is higher than the nominal
MV value. For example, the voltage could be 20.5 kV 2% on a 20 kV system. In this
case, the MV/LV distribution transformer should have its MV off-circuit tapping switch
selected to the + 2.5% tap position.
Conversely, at locations remote from bulk supply substations a value of 19.5 kV
2% is possible, in which case the off-circuit tapping switch should be selected to the
- 5% position.
The different levels of voltage in a system are normal, and depend on the system
powerow pattern. Moreover, these voltage differences are the reason for the term
nominal when referring to the system voltage.
Practical application
With the MV/LV transformer correctly selected at its off-circuit tapping switch, an
unloaded transformer output voltage will be held within a band of 2% of its no-load
voltage output.
To ensure that the transformer can maintain the necessary voltage level when fully
loaded, the output voltage at no-load must be as high as possible without exceeding
the upper + 5% limit (adopted for this example). In present-day practice, the winding
ratios generally give an output voltage of about 104% at no-load
(1)
, when nominal
voltage is applied at MV, or is corrected by the tapping switch, as described above.
This would result in a voltage band of 102% to 106% in the present case.
A typical LV distribution transformer has a short-circuit reactance voltage of 5%. If it
is assumed that its resistance voltage is one tenth of this value, then the voltage drop
within the transformer when supplying full load at 0.8 power factor lagging, will be:
V% drop = R% cos + X% sin
= 0.5 x 0.8 + 5 x 0.6
= 0.4 + 3 = 3.4%
The voltage band at the output terminals of the fully-loaded transformer will therefore
be (102 - 3.4) = 98.6% to (106 - 3.4) = 102.6%.
The maximum allowable voltage drop along a distributor is therefore 98.6 - 95 = 3.6%.
This means, in practical terms, that a medium-sized 230/400 V 3-phase 4-wire
distribution cable of 240 mm
2
copper conductors would be able to supply a total load
of 292 kVA at 0.8 PF lagging, distributed evenly over 306 metres of the distributor.
Alternatively, the same load at the premises of a single consumer could be supplied
at a distance of 153 metres from the transformer, for the same volt-drop, and so on...
As a matter of interest, the maximum rating of the cable, based on calculations
derived from IEC 60287 (1982) is 290 kVA, and so the 3.6% voltage margin is not
unduly restrictive, i.e. the cable can be fully loaded for distances normally required in
LV distribution systems.
Furthermore, 0.8 PF lagging is appropriate to industrial loads. In mixed semi-
industrial areas 0.85 is a more common value, while 0.9 is generally used for
calculations concerning residential areas, so that the volt-drop noted above may be
considered as a worst case example.
1 Low-voltage utility distribution
networks
An adequate level of voltage at the consumers
supply-service terminals is essential for
satisfactory operation of equipment and
appliances. Practical values of current, and
resulting voltage drops in a typical LV system,
show the importance of maintaining a high
Power Factor as a means of reducing voltage
drop.
(1) Transformers designed for the 230/400 V IEC standard
will have a no-load output of 420 V, i.e. 105% of the nominal
voltage
Schneider Electric - Electrical installation guide 2013
C - Connection to the LV utility
distribution network
C16
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
(1) Ripple control is a system of signalling in which a voice
frequency current (commonly at 175 Hz) is injected into the
LV mains at appropriate substations. The signal is injected
as coded impulses, and relays which are tuned to the signal
frequency and which recognize the particular code will operate
to initiate a required function. In this way, up to 960 discrete
control signals are available.
2 Tariffs and metering
No attempt will be made in this guide to discuss particular tariffs, since there appears
to be as many different tariff structures around the world as there are utilities.
Some tariffs are very complicated in detail but certain elements are basic to all of
them and are aimed at encouraging consumers to manage their power consumption
in a way which reduces the cost of generation, transmission and distribution.
The two predominant ways in which the cost of supplying power to consumers can
be reduced, are:
b Reduction of power losses in the generation, transmission and distribution of
electrical energy. In principle the lowest losses in a power system are attained when
all parts of the system operate at unity power factor
b Reduction of the peak power demand, while increasing the demand at low-load
periods, thereby exploiting the generating plant more fully, and minimizing plant
redundancy
Reduction of losses
Although the ideal condition noted in the rst possibility mentioned above cannot
be realized in practice, many tariff structures are based partly on kVA demand, as
well as on kWh consumed. Since, for a given kW loading, the minimum value of kVA
occurs at unity power factor, the consumer can minimize billing costs by taking steps
to improve the power factor of the load (as discussed in Chapter L). The kVA demand
generally used for tariff purposes is the maximum average kVA demand occurring
during each billing period, and is based on average kVA demands, over xed periods
(generally 10, 30 or 60 minute periods) and selecting the highest of these values.
The principle is described below in principle of kVA maximum-demand metering.
Reduction of peak power demand
The second aim, i.e. that of reducing peak power demands, while increasing demand
at low-load periods, has resulted in tariffs which offer substantial reduction in the cost
of energy at:
b Certain hours during the 24-hour day
b Certain periods of the year
The simplest example is that of a residential consumer with a storage-type water
heater (or storage-type space heater, etc.). The meter has two digital registers, one
of which operates during the day and the other (switched over by a timing device)
operates during the night. A contactor, operated by the same timing device, closes
the circuit of the water heater, the consumption of which is then indicated on the
register to which the cheaper rate applies. The heater can be switched on and off at
any time during the day if required, but will then be metered at the normal rate. Large
industrial consumers may have 3 or 4 rates which apply at different periods during
a 24-hour interval, and a similar number for different periods of the year. In such
schemes the ratio of cost per kWh during a period of peak demand for the year, and
that for the lowest-load period of the year, may be as much as 10: 1.
Meters
It will be appreciated that high-quality instruments and devices are necessary to
implement this kind of metering, when using classical electro-mechanical equipment.
Recent developments in electronic metering and micro-processors, together with
remote ripple-control
(1)
from an utility control centre (to change peak-period timing
throughout the year, etc.) are now operational, and facilitate considerably the
application of the principles discussed.
In most countries, some tariffs, as noted above, are partly based on kVA demand,
in addition to the kWh consumption, during the billing periods (often 3-monthly
intervals). The maximum demand registered by the meter to be described, is, in fact,
a maximum (i.e. the highest) average kVA demand registered for succeeding periods
during the billing interval.
Schneider Electric - Electrical installation guide 2013
C17
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Tariffs and metering
Figure C10 shows a typical kVA demand curve over a period of two hours divided
into succeeding periods of 10 minutes. The meter measures the average value of
kVA during each of these 10 minute periods.
Fig. C10 : Maximum average value of kVA over an interval of 2 hours
0
1
2 hrs
t
kVA
Maximum average value
during the 2 hour interval
Average values
for 10 minute
periods
Principle of kVA maximum demand metering
A kVAh meter is similar in all essentials to a kWh meter but the current and voltage
phase relationship has been modied so that it effectively measures kVAh (kilo-
volt-ampere-hours). Furthermore, instead of having a set of decade counter dials,
as in the case of a conventional kWh meter, this instrument has a rotating pointer.
When the pointer turns it is measuring kVAh and pushing a red indicator before it.
At the end of 10 minutes the pointer will have moved part way round the dial (it is
designed so that it can never complete one revolution in 10 minutes) and is then
electrically reset to the zero position, to start another 10 minute period. The red
indicator remains at the position reached by the measuring pointer, and that position,
corresponds to the number of kVAh (kilo-volt-ampere-hours) taken by the load in
10 minutes. Instead of the dial being marked in kVAh at that point however it can be
marked in units of average kVA. The following gures will clarify the matter.
Supposing the point at which the red indicator reached corresponds to 5 kVAh.
It is known that a varying amount of kVA of apparent power has been owing for
10 minutes, i.e. 1/6 hour.
If now, the 5 kVAh is divided by the number of hours, then the average kVA for the
period is obtained.
In this case the average kVA for the period will be:
5 x
1
= 5 x 6 = 30 kVA
1
6
Every point around the dial will be similarly marked i.e. the gure for average kVA will
be 6 times greater than the kVAh value at any given point. Similar reasoning can be
applied to any other reset-time interval.
At the end of the billing period, the red indicator will be at the maximum of all the
average values occurring in the billing period.
The red indicator will be reset to zero at the beginning of each billing period. Electro-
mechanical meters of the kind described are rapidly being replaced by electronic
instruments. The basic measuring principles on which these electronic meters
depend however, are the same as those described above.
Schneider Electric - Electrical installation guide 2013
Schneider Electric - Electrical installation guide 2013
D1
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapter D
MV & LV architecture selection
guide
Contents
Stakes for the user D3
Simplied architecture design process D4
2.1 The architecture design D4
2.2 The whole process D5
Electrical installation characteristics D7
3.1 Activity D7
3.2 Site topology D7
3.3 Layout latitude D7
3.4 Service reliability D8
3.5 Maintainability D8
3.6 Installation exibility D8
3.7 Power demand D9
3.8 Load distribution D9
3.9 Power interruption sensitivity D9
3.10 Disturbance sensitivity D10
3.11 Disturbance capability of circuits D10
3.12 Other considerations or constraints D10
Technological characteristics D11
4.1 Environment, atmosphere D11
4.2 Service Index D11
4.3 Other considerations D12
Architecture assessment criteria D13
5.1 On-site work time D13
5.2 Environmental impact D13
5.3 Preventive maintenance level D14
5.4 Availability of electrical power supply D14
Choice of architecture fundamentals D15
6.1 Connection to the upstream network D15
6.2 MV circuit conguration D16
6.3 Number and distribution of MV/LV transformation substations D17
6.4 Number of MV/LV transformers D18
6.5 MV back-up generator D18
Choice of architecture details D19
7.1 Layout D19
7.2 Centralized or distributed layout D20
7.3 Presence of back-up generators D21
7.4 Presence of an Uninterruptible Power Supply (UPS) D22
7.5 Conguration of LV circuits D22
Choice of equiment D25
1
2
3
4
5
6
7
8
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D2
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Recommendations for architecture optimization D26
9.1 On-site work time D26
9.2 Environmental impact D26
9.3 Preventive maintenance volume D28
9.4 Electrical power availability D29
Glossary D30
ID-Spec software D31
Example: electrical installation in a printworks D32
12.1 Brief description D32
12.2 Installation characteristics D32
12.3 Technological characteristics D32
12.4 Architecture assessment criteria D33
12.5 Choice of technogical solutions D35
9
10
11
12
Schneider Electric - Electrical installation guide 2013
D3
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
D - MV & LV architecture selection guide
1 Stakes for the user
Choice of distribution architecture
The choice of distribution architecture has a decisive impact on installation
performance throughout its lifecycle:
b right from the construction phase, choices can greatly inuence the installation
time, possibilities of work rate, required competencies of installation teams, etc.
b there will also be an impact on performance during the operation phase in terms
of quality and continuity of power supply to sensitive loads, power losses in power
supply circuits,
b and lastly, there will be an impact on the proportion of the installation that can be
recycled in the end-of-life phase.
The Electrical Distribution architecture of an installation involves the spatial
conguration, the choice of power sources, the denition of different distribution
levels, the single-line diagram and the choice of equipment.
The choice of the best architecture is often expressed in terms of seeking a
compromise between the various performance criteria that interest the customer who
will use the installation at different phases in its lifecycle. The earlier we search for
solutions, the more optimization possibilities exist (see Fig. D1).
Fig. D1 : Optimization potential
A successful search for an optimal solution is also strongly linked to the ability for
exchange between the various players involved in designing the various sections of
a project:
b the architect who denes the organization of the building according to user
requirements,
b the designers of different technical sections (lighting, heating, air conditioning,
uids, etc.),
b the users representatives e.g. dening the process.
The following paragraphs present the selection criteria as well as the architecture
design process to meet the project performance criteria in the context of industrial
and tertiary buildings (excluding large sites).
Preliminary
design
Potential for
optimization
ID-Spec
Ecodial
Detailled
design
Installation
Exploitation
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D4
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Simplied architecture design
process
2.1 The architecture design
The architecture design considered in this document is positioned at the Draft
Design stage. It generally covers the levels of MV/LV main distribution, LV power
distribution, and exceptionally the terminal distribution level. (see Fig. D2).
The design of an electrical distribution architecture can be described by a 3-stage
process, with iterative possibilities. This process is based on taking account of the
installation characteristics and criteria to be satised.
MV/LV main
distribution
LV power
distribution
LV terminal
distribution
M M M M
Fig. D2 : Example of single-line diagram
Schneider Electric - Electrical installation guide 2013
D5
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Installation
characteristics
See 3
Optimisation
recommendations
See 9
Technological
characteristics
See 4
Assessment
criteria
See 5
Definitive
solution
ASSESSMENT
Schematic
diagram
Step 1
Choice of
fundamentals
See 6
Data
Deliverable
Step
Detailed
diagram
See 7
Step 2
Choice of
architecture details
Techno.
Solution
See 8
Step 3
Choice of
equipment
Fig. D3 : Flow diagram for choosing the electrical distribution architecture
Step 1: Choice of distribution architecture fundamentals
This involves dening the general features of the electrical installation. It is based
on taking account of macroscopic characteristics concerning the installation and its
usage.
These characteristics have an impact on the connection to the upstream network,
MV circuits, the number of transformer substations, etc.
At the end of this step, we have several distribution schematic diagram solutions,
which are used as a starting point for the single-line diagram. The denitive choice is
conrmed at the end of the step 2.
2 Simplied architecture design
process
2.2 The whole process
The whole process is described briey in the following paragraphs and illustrated on
Figure D3.
The process described in this document is not intended as the only solution. This
document is a guide intended for the use of electrical installation designers.
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D6
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Step 2: choice of architecture details
This involves dening the electrical installation in more detail. It is based on the
results of the previous step, as well as on satisfying criteria relative to implementation
and operation of the installation.
The process loops back into step1 if the criteria are not satised. An iterative process
allows several assessment criteria combinations to be analyzed.
At the end of this step, we have a detailed single-line diagram.
Step 3: choice of equipment
The choice of equipment to be implemented is carried out in this stage, and results
from the choice of architecture. The choices are made from the manufacturer
catalogues, in order to satisfy certain criteria.
This stage is looped back into step 2 if the characteristics are not satised.
Assessment
This assessment step allows the Engineering Ofce to have gures as a basis for
discussions with the customer and other players.
According to the result of these discussions, it may be possible to loop back into step 1.
2 Simplied architecture design
process
Schneider Electric - Electrical installation guide 2013
D7
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Espace avt et aprs illustration
mini = 5mm
3 Electrical installation
characteristics
These are the main installation characteristics enabling the dening of the
fundamentals and details of the electrical distribution architecture. For each of these
characteristics, we supply a denition and the different categories or possible values.
3.1 Activity
Denition:
Main economic activity carried out on the site.
Indicative list of sectors considered for industrial buildings:
b Manufacturing
b Food & Beverage
b Logistics
Indicative list of sectors considered for tertiary buildings:
b Ofces buildings
b Hypermarkets
b Shopping malls
3.2 Site topology
Denition:
Architectural characteristic of the building(s), taking account of the number of
buildings, number of oors, and of the surface area of each oor.
Different categories:
b Single storey building,
b Multi-storey building,
b Multi-building site,
b High-rise building.
3.3 Layout latitude
Denition:
Characteristic taking account of constraints in terms of the layout of the electrical
equipment in the building:
b aesthetics,
b accessibility,
b presence of dedicated locations,
b use of technical corridors (per oor),
b use of technical ducts (vertical).
Different categories:
b Low: the position of the electrical equipment is virtually imposed
b Medium: the position of the electrical equipment is partially imposed, to the
detriment of the criteria to be satised
b High: no constraints. The position of the electrical equipment can be dened to
best satisfy the criteria.
D - MV & LV architecture selection guide
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D8
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3.4 Service reliability
Denition:
The ability of a power system to meet its supply function under stated conditions for
a specied period of time.
Different categories:
b Minimum: this level of service reliability implies risk of interruptions related to
constraints that are geographical (separate network, area distant from power
production centers), technical (overhead line, poorly meshed system), or economic
(insufcient maintenance, under-dimensioned generation).
b Standard
b Enhanced: this level of service reliability can be obtained by special measures
taken to reduce the probability of interruption (underground network, strong meshing,
etc.)
3.5 Maintainability
Denition:
Features input during design to limit the impact of maintenance actions on the
operation of the whole or part of the installation.
Different categories:
b Minimum: the installation must be stopped to carry out maintenance operations.
b Standard: maintenance operations can be carried out during installation
operations, but with deteriorated performance. These operations must be preferably
scheduled during periods of low activity. Example: several transformers with partial
redundancy and load shedding.
b Enhanced: special measures are taken to allow maintenance operations without
disturbing the installation operations. Example: double-ended conguration.
3.6 Installation exibility
Denition:
Possibility of easily moving electricity delivery points within the installation, or to
easily increase the power supplied at certain points. Flexibility is a criterion which
also appears due to the uncertainty of the building during the pre-project summary
stage.
Different categories:
b No exibility: the position of loads is xed throughout the lifecycle, due to the high
constraints related to the building construction or the high weight of the supplied
process. E.g.: smelting works.
b Flexibility of design: the number of delivery points, the power of loads or their
location are not precisely known.
b Implementation exibility: the loads can be installed after the installation is
commissioned.
b Operating exibility: the position of loads will uctuate, according to process re-
organization.
Examples:
v industrial building: extension, splitting and changing usage
v ofce building: splitting
Schneider Electric - Electrical installation guide 2013
D9
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Electrical installation
characteristics
3.7 Power demand
Denition:
The sum of the apparent load power (in kVA), to which is applied a usage coefcient.
This represents the maximum power which can be consumed at a given time for the
installation, with the possibility of limited overloads that are of short duration.
Signicant power ranges correspond to the transformer power limits most commonly
used:
b < 630kVA
b from 630 to 1250kVA
b from 1250 to 2500kVA
b > 2500kVA
3.8 Load distribution
Denition:
A characteristic related to the uniformity of load distribution (in kVA / m) over an area
or throughout the building.
Different categories:
b Uniform distribution: the loads are generally of an average or low unit power and
spread throughout the surface area or over a large area of the building (uniform
density).
E.g.: lighting, individual workstations
b intermediate distribution: the loads are generally of medium power, placed in
groups over the whole building surface area
E.g.: machines for assembly, conveying, workstations, modular logistics sites
b localized loads: the loads are generally high power and localized in several areas
of the building (non-uniform density).
E.g.: HVAC
3.9 Power Interruption Sensitivity
Denition:
The aptitude of a circuit to accept a power interruption.
Different categories:
b Sheddable circuit: possible to shut down at any time for an indenite duration
b Long interruption acceptable: interruption time > 3 minutes *
b Short interruption acceptable: interruption time < 3 minutes *
b No interruption acceptable.
We can distinguish various levels of severity of an electrical power interruption,
according to the possible consequences:
b No notable consequence,
b Loss of production,
b Deterioration of the production facilities or loss of sensitive data,
b Causing mortal danger.
This is expressed in terms of the criticality of supplying of loads or circuits.
b Non-critical:
The load or the circuit can be shed at any time. E.g.: sanitary water heating circuit.
b Low criticality:
A power interruption causes temporary discomfort for the occupants of a building,
without any nancial consequences. Prolonging of the interruption beyond the critical
time can cause a loss of production or lower productivity. E.g.: heating, ventilation
and air conditioning circuits (HVAC).
b Medium criticality
A power interruption causes a short break in process or service. Prolonging of
the interruption beyond a critical time can cause a deterioration of the production
facilities or a cost of starting for starting back up.
E.g.: refrigerated units, lifts.
b High criticality
Any power interruption causes mortal danger or unacceptable nancial losses.
E.g.: operating theatre, IT department, security department.
* indicative value, supplied by standard EN50160:
Characteristics of the voltage supplied by public distribution
networks.
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D10
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3.10 Disturbance sensitivity
Denition
The ability of a circuit to work correctly in presence of an electrical power
disturbance.
A disturbance can lead to varying degrees of malfunctioning. E.g.: stopping working,
incorrect working, accelerated ageing, increase of losses, etc
Types of disturbances with an impact on circuit operations:
b brown-outs,
b overvoltages
b voltage distortion,
b voltage uctuation,
b voltage imbalance.
Different categories:
b low sensitivity: disturbances in supply voltages have very little effect on operations.
E.g.: heating device.
b medium sensitivity: voltage disturbances cause a notable deterioration in
operations.
E.g.: motors, lighting.
b high sensitivity: voltage disturbances can cause operation stoppages or even the
deterioration of the supplied equipment.
E.g.: IT equipment.
The sensitivity of circuits to disturbances determines the design of shared or
dedicated power circuits. Indeed it is better to separate sensitive loads from
disturbing loads. E.g.: separating lighting circuits from motor supply circuits.
This choice also depends on operating features. E.g.: separate power supply of
lighting circuits to enable measurement of power consumption.
3.11 Disturbance capability of circuits
Denition
The ability of a circuit to disturb the operation of surrounding circuits due to
phenomena such as: harmonics, in-rush current, imbalance, High Frequency
currents, electromagnetic radiation, etc.
Different categories
b Non disturbing: no specic precaution to take
b moderate or occasional disturbance: separate power supply may be necessary in
the presence of medium or high sensitivity circuits. E.g.: lighting circuit generating
harmonic currents.
b Very disturbing: a dedicated power circuit or ways of attenuating disturbances are
essential for the correct functioning of the installation. E.g.: electrical motor with a
strong start-up current, welding equipment with uctuating current.
3.12 Other considerations or constraints
b Environment
E.g.: lightning classication, sun exposure
b Specic rules
E.g.: hospitals, high rise buildings, etc.
b Rule of the Energy Distributor
Example: limits of connection power for LV, access to MV substation, etc
b Attachment loads
Loads attached to 2 independent circuits for reasons of redundancy.
b Designer experience
Consistency with previous designs or partial usage of previous designs,
standardization of sub-assemblies, existence of an installed equipment base.
b Load power supply constraints
Voltage level (230V, 400V, 690V), voltage system (single-phase, three-phase with or
without neutral, etc)
3 Electrical installation
characteristics
Schneider Electric - Electrical installation guide 2013
D11
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Espace avt et aprs illustration
mini = 5mm
4 Technological characteristics
The technological solutions considered concern the various types of MV and LV
equipment, as well as Busbar Trunking Systems .
The choice of technological solutions is made following the choice of single-line
diagram and according to characteristics given below.
4.1 Environment, atmosphere
A notion taking account of all of the environmental constraints (average ambient
temperature, altitude, humidity, corrosion, dust, impact, etc.) and bringing together
protection indexes IP and IK.
Different categories:
b Standard: no particular environmental constraints
b Enhanced: severe environment, several environmental parameters generate
important constraints for the installed equipment
b Specic: atypical environment, requiring special enhancements
4.2 Service Index
The service index (IS) is a value that allows us to characterize an LV switchboard
according to user requirements in terms of operation, maintenance, and scalability.
The different index values are indicated in the following table (Fig D4):
Operation (setting, measurement,
locking, padlocking)
Maintenance (cleaning, checking,
testing, repaining)
Upgrade (addition, modication,
site expansion)z
Level 1 IS = 1
Operation may lead to complete
stoppage of the switchboard
IS = 1
Operation may lead to complete
stoppage of the switchboard
IS = 1
Operation may lead to complete
stoppage of the switchboard
Level 2 IS = 2
Operation may lead to stoppage of
only the functional unit
IS = 2
Operation may lead to stoppage of
only the functional unit, with work on
connections
IS = 2
Operation may lead to stoppage
of only the functional unit, with
functional units provided for back-up
Level 3 IS = 3
Operation may lead to stoppage of
the power of the functional unit only
IS = 3
Operation may lead to stoppage of
only the functional unit, without work
on connections
IS = 3
Operation may lead to stoppage of
only the functional unit, with total
freedom in terms of upgrade
There are a limited number of relevant service indices (see Fig. D5)
The types of electrical connections of functional units can be denoted by a three-
letter code:
b The rst letter denotes the type of electrical connection of the main incoming
circuit,
b The second letter denotes the type of electrical connection of the main outgoing
circuit,
b The third letter denotes the type of electrical connection of the auxiliary circuits.
The following letters are used:
b F for xed connections,
b D for disconnectable connections,
b W for withdrawable connections.
Service ratings are related to other mechanical parameters, such as the Protection
Index (IP), form of internal separations, the type of connection of functional units or
switchgear (Fig. D5):
Technological examples are given in chapter E2.
b Denition of the protection index: see IEC 60529: Degree of protection given by
enclosures (IP code),
b Denitions of the form and withdrawability: see IEC 61439-2: "Low-voltage
switchgear and controlgear assemblies Part 2: Power switchgear and controlgear
assemblies".
D - MV & LV architecture selection guide
Fig. D4 : Different index values
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D12
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Technological characteristics
4.3 Other considerations
Other considerations have an impact on the choice of technological solutions:
b Designer experience,
b Consistency with past designs or the partial use of past designs,
b Standardization of sub-assemblies,
b The existence of an installed equipment base,
b Utilities requirements,
b Technical criteria: target power factor, backed-up load power, presence of harmonic
generators
These considerations should be taken into account during the detailed electrical
denition phase following the draft design stage.
Fig. D5 : correspondance between service index and other mechanical parameters and relevant service index
Service rating IS 111 211 212 223 232 233 332 333
Protection Index
IP
2XX 2XB 2XB 2XB 2XB 2XB 2XB
Form 1 1 3b 2b 4a 3b 3b 3b 3b 3b
Functional Unit
Withdrawability
FFF FFF WFW WFD WFW WWW WWW WWW
Operation Switching off
the whole
switchboard
Individually switching off the functional unit and re-commissioning < 1H Individually switching off
the functional unit and
re-commissioning < 1/4h
Maintenance Working time > 1 h with total unavailability Working time
between 1/4
h and 1h,
with work on
connections
Working time between 1/4 h and 1h, without work on connections
Upgrade Extention not planned Possible
adding of
functional units
with stopping
the switchboard
Possible
adding of
functional
units without
stopping the
switchboard
Possible adding
of functional
units with
stopping the
switchboard
Possible adding
of functional
units without
stopping the
switchboard
Possible adding
of functional
units with
stopping the
switchboard
Possible
adding of
functional
units without
stopping the
switchboard
Schneider Electric - Electrical installation guide 2013
D13
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
D - MV & LV architecture selection guide
Espace avt et aprs illustration
mini = 5mm
5 Architecture assessment criteria
Certain decisive criteria are assessed at the end of the 3 stages in dening
architecture, in order to validate the architecture choice. These criteria are listed
below with the different allocated levels of priority.
5.1 On-site work time
Time for implementing the electrical equipment on the site.
Different levels of priority:
b Secondary: the on-site work time can be extended, if this gives a reduction in
overall installation costs,
b Special: the on-site work time must be minimized, without generating any
signicant excess cost,
b Critical: the on-site work time must be reduced as far as possible, imperatively,
even if this generates a higher total installation cost,
5.2 Environmental impact
Taking into consideration environmental constraints in the installation design. This
takes account of: consumption of natural resources, Joule losses (related to CO
2
emission), recyclability potential, throughout the installations lifecycle.
Different levels of priority:
b Non signicant: environmental constraints are not given any special consideration,
b Minimal: the installation is designed with minimum regulatory requirements,
b Proactive: the installation is designed with a specic concern for protecting
the environment. Excess cost is allowed in this situation. E.g.: using low-loss
transformers.
The environmental impact of an installation will be determined according to the
method carrying out an installation lifecycle analysis, in which we distinguish
between the following 3 phases:
b manufacture,
b operation,
b end of life (dismantling, recycling).
In terms of environmental impact, 3 indicators (at least) can be taken into account
and inuenced by the design of an electrical installation. Although each lifecycle
phase contributes to the three indicators, each of these indicators is mainly related to
one phase in particular:
b consumption of natural resources mainly has an impact on the manufacturing
phase,
b consumption of energy has an impact on the operation phase,
b recycleability potential has an impact on the end of life.
The following table details the contributing factors to the 3 environmental indicators
(Fig D7).
Indicators Contributors
Natural resources consumption Mass and type of materials used
Power consumption Joule losses at full load and no load
Recyclability potential Mass and type of material used
Fig D7 : Contributing factors to the 3 environmental indicators
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D14
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5 Architecture assessment criteria
5.3 Preventive maintenance level
Denition:
Number of hours and sophistication of maintenance carried out during operations in
conformity with manufacturer recommendations to ensure dependable operation of
the installation and the maintaining of performance levels (avoiding failure: tripping,
down time, etc).
Different categories:
b Standard: according to manufacturer recommendations.
b Enhanced: according to manufacturer recommendations, with a severe
environment,
b Specic: specic maintenance plan, meeting high requirements for continuity of
service, and requiring a high level of maintenance staff competency.
5.4 Availability of electrical power supply
Denition:
This is the probability that an electrical installation be capable of supplying quality
power in conformity with the specications of the equipment it is supplying. This is
expressed by an availability level:
Availability (%) = (1 - MTTR/ MTBF) x 100
MTTR (Mean Time To Repair): the average time to make the electrical system once
again operational following a failure (this includes detection of the reason for failure,
its repair and re-commissioning),
MTBF (Mean Time Between Failure): measurement of the average time for which
the electrical system is operational and therefore enables correct operation of the
application.
The different availability categories can only be dened for a given type of
installation. E.g.: hospitals, data centers.
Example of classication used in data centers:
Tier 1: the power supply and air conditioning are provided by one single channel,
without redundancy, which allows availability of 99.671%,
Tier 2: the power supply and air conditioning are provided by one single channel,
with redundancy, which allows availability of 99.741%,
Tier 3: the power supply and air conditioning are provided by several channels, with
one single redundant channel, which allows availability of 99.982%,
Tier 4: the power supply and air conditioning are provided by several channels, with
redundancy, which allows availability of 99.995%.
Schneider Electric - Electrical installation guide 2013
D15
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
D - MV & LV architecture selection guide
Espace avt et aprs illustration
mini = 5mm
6 Choice of architecture
fundamentals
The single-line diagram can be broken down into different key parts, which are
determined throughout a process in 2 successive stages. During the rst stage we
make the following choices:
b connection to the utilities network,
b conguration of MV circuits,
b number of power transformers,
b number and distribution of transformation substations,
b MV back-up generator
6.1 Connection to the upstream network
The main congurations for possible connection are as follows (see Fig. D8 for MV
service):
b LV service,
b MV single-line service,
b MV ring-main service,
b MV duplicate supply service,
b MV duplicate supply service with double busbar.
Metering, protection, disconnection devices, located in the delivery substations are
not represented on the following diagrams. They are often specic to each utilities
company and do not have an inuence on the choice of installation architecture.
For each connection, one single transformer is shown for simplication purposes, but
in the practice, several transformers can be connected.
(MLVS: Main Low Voltage Switchboard)
a) Single-line: b) Ring-main:
MLVS
LV
MV
MLVS
LV
MV
c) Duplicate supply: d) Double busbar with duplicate supply:
MLVS1
LV
MV
MLVS2
LV
MV
MLVS
LV
MV
Fig. D8 : MV connection to the utilities network
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D16
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
For the different possible congurations, the most probable and usual set of
characteristics is given in the following table:
Conguration
LV MV
Characteristic to
consider
Simple-line Ring-main Duplicate supply Duplicate supply
with double
busbars
Activity Any Any Any Hi-tech, sensitive
ofce, health-care
Any
Site topology Single building Single building Single building Single building Several buildings
Service reliability Minimal Minimal Standard Enhanced Enhanced
Power demand < 630kVA 1250kVA 2500kVA > 2500kVA > 2500kVA
Other connection
constraints
Any Isolated site Low density urban
area
High density
urban area
Urban area with
utility constraint
6.2 MV circuit conguration
The main possible connection congurations are as follows (Fig. D9):
b single feeder, one or several transformers
b open ring, one MV incomer
b open ring, 2 MV incomers
The basic conguration is a radial single-feeder architecture, with one single
transformer.
In the case of using several transformers, no ring is realised unless all of the
transformers are located in a same substation.
Closed-ring conguration is not taken into account.
a) Single feeder: b) Open ring, 1 MV substation:
MLVS 1
LV
MLVS n
LV
MLVS 1
LV
MLVS 2
LV
MLVS n
LV
c) Open ring, 2 MV substations:
MLVS 1
MV
LV
MLVS 2
MV
LV
MLVS n
MV
LV
MV MV MV MV MV
Fig. D9 : MV circuit conguration
Schneider Electric - Electrical installation guide 2013
D17
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
MV circuit conguration
Characteristic to
consider
Single feeder Open ring
1 MV substation
Open ring
2 MV substations
Site topology Any
< 25000m
Building with one
level or several
buildings
25000m
Several buildings
25000m
Maintainability Minimal or standard Enhanced Enhanced
Power demand Any > 1250kVA > 2500kVA
Disturbance sensitivity Long interruption
acceptable
Short interruption
acceptable
Short interruption
acceptable
Another exceptional conguration: power supply by 2 MV substations and connection
of the transformers to each of these 2 substations (MV double ended connection).
6 Choice of architecture
fundamentals
For the different possible congurations, the most probable and usual set of
characteristics is given in the table on Fig D10.
Fig. D10 : Typical values of the installation characteristics
6.3 Number and distribution of MV/LV
transformation substations
Main characteristics to consider to determine the transformation substations:
b Surface area of building or site
b Power demand, (to be compared with standardized transformer power),
b Load distribution
The preferred basic conguration comprises one single substation. Certain factors
contribute to increasing the number of substations (> 1):
b A large surface area (> 25000m),
b The site conguration: several buildings,
b Total power > 2500kVA,
b Sensitivity to interruption: need for redundancy in the case of a re.
Conguration
Characteristic to
consider
1 substation with
N transformers
N substations
N transformers
(identical substations)
N substations
M transformers
(different powers)
Building conguration < 25000m 25000m
1 building with several
oors
25000m
several buildings
Power demand < 2500kVA 2500kVA 2500kVA
Load distribution Localized loads Uniform distribution Medium density
Fig. D11 : Typical characteristics of the different congurations
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D18
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6 Choice of architecture
fundamentals
6.4 Number of MV/LV transformers
Main characteristics to consider to determine the number of transformers:
b Surface of building or site
b Total power of the installed loads
b Sensitivity of circuits to power interruptions
b Sensitivity of circuits to disturbances
b Installation scalability
The basic preferred conguration comprises a single transformer supplying the total
power of the installed loads. Certain factors contribute to increasing the number of
transformers (> 1), preferably of equal power:
b A high total installed power (> 1250kVA): practical limit of unit power
(standardization, ease of replacement, space requirement, etc),
b A large surface area (> 5000m): the setting up of several transformers as close as
possible to the distributed loads allows the length of LV trunking to be reduced
b A need for partial redundancy (down-graded operation possible in the case of a
transformer failure) or total redundancy (normal operation ensured in the case a
transformer failure)
b Separating of sensitive and disturbing loads (e.g.: IT, motors)
6.5 MV back-up generator
Main characteristics to consider for the implementation of an MV back-up generator:
b Site activity
b Total power of the installed loads
b Sensitivity of circuits to power interruptions
b Availability of the public distribution network
The preferred basic conguration does not include an MV generator. Certain factors
contribute to installing an MV generator:
b Site activity: process with co-generation, optimizing the energy bill,
b Low availability of the public distribution network.
Installation of a back-up generator can also be carried out at LV level.
Schneider Electric - Electrical installation guide 2013
D19
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
D - MV & LV architecture selection guide
Espace avt et aprs illustration
mini = 5mm
7 Choice of architecture details
This is the second stage in designing of the electrical installation. During this stage
we carry out the following choices are carried out:
b Layout,
b Centralized or decentralized distribution,
b Presence of back-up generators,
b Presence of uninterruptible power supplies,
b Conguration of LV circuits,
b Architecture combinations.
7.1 Layout
Position of the main MV and LV equipment on the site or in the building.
This layout choice is applied to the results of stage 1.
Selection guide:
b Place power sources as close as possible to the barycenter of power consumers,
b Reduce atmospheric constraints: building dedicated premises if the layout in the
workshop is too restrictive (temperature, vibrations, dust, etc.),
b Placing heavy equipment (transformers, generators, etc) close to walls or main
exists for ease of maintenance,
A layout example is given in the following diagram (Fig. D12):
Fig. D12 : The position of the global current consumer barycenter guides the positioning of power sources
Office Office
Finishing Finishing
Painting Painting
Panel
shop
Panel
shop
Global current
consumer
Barycenter
Global current
consumer
Barycenter
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D20
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
7.2 Centralized or distributed layout
In centralized layout, current consumers are connected to the power sources
by a star-connection. Cables are suitable for centralized layout, with point to point
links between the MLVS and current consumers or sub-distribution boards (radial
distribution, star- distribution) (Fig. D13):
In decentralized layout, current consumers are connected to sources via a busway.
Busbar trunking systems are well suited to decentralized layout, to supply many
loads that are spread out, making it easy to change, move or add connections
(Fig D14):
Fig. D13: Example of centralized layout with point to point links
Fig. D14 : Example of decentralized layout, with busbar trunking links
Factors in favour of centralized layout (see summary table in Fig. D15):
b Installation exibility: no,
b Load distribution: localized loads (high unit power loads).
Factors in favor of decentralized layout:
b Installation exibility: "Implementation" exibility (moving of workstations, etc),
b Load distribution: uniform distribution of low unit power loads
Schneider Electric - Electrical installation guide 2013
D21
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
7 Choice of architecture details
Load distribution
Flexibility Localized loads Intermediate
distribution
Uniform distributed
No exibility
Centralized Decentralized
Design exibility
Implementation
exibility
Centralized Decentralized
Operation exibility
LV switchboard
G
Fig. D16 : Connection of a back-up generator
Power supply by cables gives greater independence of circuits (lighting, power
sockets, HVAC, motors, auxiliaries, security, etc), reducing the consequences of a
fault from the point of view of power availability.
The use of busbar trunking systems allows load power circuits to be combined and
saves on conductors by taking advantage of a clustering coefcient. The choice
between cable and busbar trunking, according to the clustering coefcient, allows us
to nd an economic optimum between investment costs, implementation costs and
operating costs.
These two distribution modes are often combined.
7.3 Presence of back-up generators (Fig. D16)
Here we only consider LV back-up generators.
The electrical power supply supplied by a back-up generator is produced by an
alternator, driven by a thermal engine.
No power can be produced until the generator has reached its rated speed. This type
of device is therefore not suitable for an uninterrupted power supply.
According to the generators capacity to supply power to all or only part of the
installation, there is either total or partial redundancy.
A back-up generator functions generally disconnected from the network. A source
switching system is therefore necessary.
The generator can function permanently or intermittently. Its back-up time depends
on the quantity of available fuel.
The main characteristics to consider for implementing LV back-up generator:
b Sensitivity of loads to power interruption,
b Availability of the public distribution network,
b Other constraints (e.g.: generators compulsory in hospitals or high-vise buildings)
The presence of generators can be decided to reduce the energy bill or due to the
opportunity for co-generation. These two aspects are not taken into account in this
guide.
The presence of a back-up generator is essential if the loads cannot be shed for
an indenite duration (long interruption only acceptable) or if the utility network
availability is low.
Determining the number of back-up generator units is in line with the same criteria
as determining the number of transformers, as well as taking account of economic
and availability considerations (redundancy, start-up reliability, maintenance facility).
Fig. D15 : Recommendations for centralized or decentralized layout
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D22
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
7.4 Presence of an Uninterruptible Power Supply (UPS)
The electrical power from a UPS is supplied from a storage unit: batteries or inertia
wheel. This system allows us to avoid any power failure. The back-up time of the
system is limited: from several minutes to several hours.
The simultaneous presence of a back-up generator and a UPS unit is used for
permanently supply loads for which no failure is acceptable (Fig. D17). The back-up
time of the battery or the inertia wheel must be compatible with the maximum time
for the generator to start up and be brought on-line.
A UPS unit is also used for supply power to loads that are sensitive to disturbances
(generating a clean voltage that is independent of the network).
Main characteristics to be considered for implementing a UPS:
b Sensitivity of loads to power interruptions,
b Sensitivity of loads to disturbances.
The presence of a UPS unit is essential if and only if no failure is acceptable.
LV Switchboard
Non-critical
circuit
Critical
circuit
G
By-pass Normal
ASI
Fig. D17 : Example of connection for a UPS
MLVS
Fig. D18 : Radial single feeder conguration
7.5 Conguration of LV circuits
Main possible congurations (see gures D18 to D25):
b Radial single feeder conguration: This is the reference conguration and
the most simple. A load is connected to only one single source. This conguration
provides a minimum level of availability, since there is no redundancy in case of
power source failure.
b Two-pole conguration: The power supply is provided by 2 transformers,
connected to the same MV line. When the transformers are close, they are generally
connected in parallel to the same MLVS.
b Variant: two-pole with two MLVS: In order to increase the availability in case
of failure of the busbars or authorize maintenance on one of the transformers,
it is possible to split the MLVS into 2 parts, with a normally open link (NO). This
conguration generally requires an Automatic Transfer Switch, (ATS).
b Shedable switchboard (simple disconnectable attachment): A series of
shedable circuits can be connected to a dedicated switchboard. The connection to
the MLVS is interrupted when needed (overload, generator operation, etc)
b Interconnected switchboards: If transformers are physically distant from one
another, they may be connected by a busbar trunking. A critical load can be supplied
by one or other of the transformers. The availability of power is therefore improved,
since the load can always be supplied in the case of failure of one of the sources.
The redundancy can be:
v Total: each transformer being capable of supplying all of the installation,
v Partial: each transformer only being able to supply part of the installation. In this
case, part of the loads must be disconnected (load-shedding) in the case of one of
the transformers failing.
MLVS
NO
Fig. D20 : Two-pole conguration with two MLVS and NO link
MLVS
Fig. D19 : Two-pole conguration
Schneider Electric - Electrical installation guide 2013
D23
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
MLVS
LV swichboard
Fig. D21 : Shedable switchboard
MLVS
Busbar
MLVS
Fig. D22 : Interconnected switchboards
MLVS
Busbar
Busbar Busbar
MLVS
MLVS
Busbar
MLVS
Fig. D23 : Ring conguration
or or G UPS
Fig. D24 : Double-ended conguration with automatic transfer switch
MLVS
1
Busbar
MLVS
G
2 3
Fig. D25 : Example of a conguration combination
1: Single feeder, 2: Switchboard interconnection, 3: Double-ended
b Ring conguration: This conguration can be considered as an extension of the
conguration with interconnection between switchboards. Typically, 4 transformers
connected to the same MV line, supply a ring using busbar trunking. A given load
is then supplied power by several clustered transformers. This conguration is well
suited to extended installations, with a high load density (in kVA/m). If all of the loads
can be supplied by 3 transformers, there is total redundancy in the case of failure
of one of the transformers. In fact, each busbar can be fed power by one or other
of its ends. Otherwise, downgraded operation must be considered (with partial load
shedding). This conguration requires special design of the protection plan in order
to ensure discrimination in all of the fault circumstances.
b Double-ended power supply: This conguration is implemented in cases where
maximum availability is required. The principle involves having 2 independent power
sources, e.g.:
v 2 transformers supplied by different MV lines,
v 1 transformer and 1 generator,
v 1 transformer and 1 UPS.
An automatic transfer switch (ATS) is used to avoid the sources being parallel
connected. This conguration allows preventive and curative maintenance to be
carried out on all of the electrical distribution system upstream without interrupting
the power supply.
b Conguration combinations: An installation can be made up of several sub-
asssemblies with different congurations, according to requirements for the
availability of the different types of load. E.g.: generator unit and UPS, choice by
sectors (some sectors supplied by cables and others by busbar trunking).
7 Choice of architecture details
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D24
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
7 Choice of architecture details
For the different possible congurations, the most probable and usual set of
characteristics is given in the following table:
Conguration
Characteristic to be
considered
Radial Two-pole Sheddable load Interconnected
switchboards
Ring Double-ended
Site topology Any Any Any 1 level
5 to 25000m
1 level
5 to 25000m
Any
Location latitude Any Any Any Medium of high Medium or high Any
Maintainability Minimal Standard Minimal Standard Standard Enhanced
Power demand < 2500kVA Any Any 1250kVA > 2500kVA Any
Load distribution Localized loads Localized loads Localized load Intermediate or
uniforme distribution
Uniform distribution Localized loads
Interruptions sensitivity Long
interruption
acceptable
Long
interruption
acceptable
Sheddable Long
interruption
acceptable
Long
interruption
acceptable
Short or no
interruption
Disturbances sensitivity Low sensitivity High sensitivity Low sensitivity High sensitivity High sensitivity High sensitivity
Other constraints / / / / / Double-ended
loads
Schneider Electric - Electrical installation guide 2013
D25
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
D - MV & LV architecture selection guide
8 Choice of equipment
The choice of equipment is step 3 in the design of an electrical installation. The aim
of this step is to select equipment from the manufacturers catalogues. The choice of
technological solutions results from the choice of architecture.
List of equipment to consider:
b MV/LV substation,
b MV switchboards,
b Transformers,
b LV switchboards,
b Busbar trunking,
b UPS units,
b Power factor correction and ltering equipment.
Criteria to consider:
b Atmosphere, environment,
b Service index,
b Offer availability per country,
b Utilities requirements,
b Previous architecture choices.
The choice of equipment is basically linked to the offer availability in the country. This
criterion takes into account the availability of certain ranges of equipment or local
technical support.
The detailed selection of equipment is out of the scope of this document.
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D26
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
9 Recommendations for
architecture optimization
These recommendations are intended to guide the designer towards architecture
upgrades which allow him to improve assessment criteria.
9.1 On-site work
To be compatible with the special or critical work-site time, it is recommended to
limit uncertainties by applying the following recommendations:
b Use of proven solutions and equipment that has been validated and tested by
manufacturers (functional switchboard or manufacturer switchboard according to
the application criticality),
b Prefer the implementation of equipment for which there is a reliable distribution
network and for which it is possible to have local support (supplier well established),
b Prefer the use of factory-built equipment (MV/LV substation, busbar trunking),
allowing the volume of operations on site to be limited,
b Limit the variety of equipment implemented (e.g. the power of transformers),
b Avoid mixing equipment from different manufacturers.
9.2 Environmental impact
The optimization of the environmental assessment of an installation will involve
reducing:
b Power losses at full load and no load during installation operation,
b Overall, the mass of materials used to produce the installation.
Taken separately and when looking at only one piece of equipment, these 2
objectives may seem contradictory. However, when applied to whole installation, it
is possible to design the architecture to contribute to both objectives. The optimal
installation will therefore not be the sum of the optimal equipment taken separately,
but the result of an optimization of the overall installation.
Figure D26 gives an example of the contribution per equipment category to the
weight and energy dissipation for a 3500 kVA installation spread over 10000m.
b Installation is operating at 50% load on average, with 0,8 power factor
b Site is operating 6500 hours per years : 3 shifts + week ends with reduced activity
at night and week ends and full stop 1 month per year for site maintenance and
employees holidays.
b Power consumption is 9,1 GWh
b Reactive power is 6,8 GVARh. This reactive power will be invoiced in addition to
power consumption according to local energy
contract.
Total power usage
considered : 9,1 GWh
Losses 4% Losses
due to the
equipment
Energy
Usage
on site
Losses
due to 0,8
powerfactor
77 %
19 %
Total loss for equipment considered: 414 MWh Total mass of equipment considered: 18,900 kg
5 %
20 %
Transformers
75 %
LV cables
and trunking
10 %
44 %
Transformers
46 %
LV cables
and trunking
LV switchboard
and switchgear
LV switchboard
and switchgear
Fig. D26 : Example of the spread of losses and the weight of material for each equipment category
These data helps to understand and prioritize energy consumption and costs factors.
b Very rst factor of power consumption is... energy usage. This can be optimized
with appropriate metering and analysis of loads actual consumption.
Schneider Electric - Electrical installation guide 2013
D27
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Second is reactive energy. This lead to additional load on electrical network. and
additional energy invoicing. This can be optimized with power factor correction
solutions.
b Third is cables. Cable losses can be reduced by appropriate organisation and
design of site and use of busbar truncking instead of cables wherever accurate.
b MV to LV transformers are fourth with approx. 1% of losses.
b MV and LV switchboards come last with approximately 0,25% of losses.
Generally speaking, LV cables and trunking as well as the MV/LV transformers are
the main contributors to operating losses and the weight of equipment used.
Environmental optimization of the installation by the architecture will therefore
involve:
b reducing the length of LV circuits in the installation,
b clustering LV circuits wherever possible to take advantage of the factor of
simultaneity ks (see chapter A: General rules of electrical installation design, Chapter
Power loading of an installation, 4.3 Estimation of actual maximum kVA demand)
Objectives Resources
Reducing the length of LV
circuits
Placing MV/LV substations as close as possible to the barycenter
of all of the LV loads to be supplied
Clustering LV circuits When the simultaneity factor of a group of loads to be supplied
is less than 0.7, the clustering of circuits allows us to limit the
volume of conductors supplying power to these loads.
In real terms this involves:
b setting up sub-distribution switchboards as close as possible to
the barycenter of the groups of loads if they are localized,
b setting up busbar trunking systems as close as possible to the
barycenter of the groups of loads if they are distributed.
The search for an optimal solution may lead to consider several
clustering scenarios.
In all cases, reducing the distance between the barycenter of
a group of loads and the equipment that supplies them power
allows to reduce environmental impact.
As an example gure D28 shows the impact of clustering circuits on reducing
the distance between the barycenter of the loads of an installation and that of the
sources considered (MLVS whose position is imposed). This example concerns a
mineral water bottling plant for which:
b the position of electrical equipment (MLVS) is imposed in the premises outside of
the process area for reasons of accessibility and atmosphere constraints,
b the installed power is around 4 MVA.
In solution No.1, the circuits are distributed for each workshop.
In solution No. 2, the circuits are distributed by process functions (production lines).
9 Recommendations for
architecture optimization
Fig. D27 : Environmental optimization : Objectives and Ressources.
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D28
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Without changing the layout of electrical equipment, the second solution allows us
to achieve gains of around 15% on the weight of LV cables to be installed (gain on
lengths) and a better uniformity of transformer power.
To supplement the optimizations carried out in terms of architecture, the following
points also contribute to the optimization:
b the setting up of LV power factor correction to limit losses in the transformers and
LV circuits if this compensation is distributed,
b the use of low loss transformers,
b the use of aluminum LV busbar trunking when possible, since natural resources of
this metal are greater.
9.3 Preventive maintenance volume
Recommendations for reducing the volume of preventive maintenance:
b Use the same recommendations as for reducing the work site time,
b Focus maintenance work on critical circuits,
b Standardize the choice of equipment,
b Use equipment designed for severe atmospheres (requires less maintenance).
Solution Barycenter position
N1
Storage Workshop 3 Workshop 2 Workshop 1
Workshop 1
Barycenter
Workshop 2
Barycenter
Workshop 3
Barycenter
MLVS area
N2
Storage Workshop 3 Workshop 2 Workshop 1
Barycenter
line 1
Barycenter
line 2
Barycenter
line 3
MLVS area
Barycenter
line 3
Fig. D28 : Example of barycenter positioning
Schneider Electric - Electrical installation guide 2013
D29
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
9 Recommendations for
architecture optimization
9.4 Electrical power availability
Recommendations for improving the electrical power availability:
b Reduce the number of feeders per switchboard, in order to limit the effects of a
possible failure of a switchboard,
b Distributing circuits according to availability requirements,
b Using equipment that is in line with requirements (see Service Index, 4.2),
b Follow the selection guides proposed for steps 1 & 2 (see Fig. D3 page D5).
Recommendations to increase the level of availability:
b Change from a radial single feeder conguration to a two-pole conguration,
b Change from a two-pole conguration to a double-ended conguration,
b Change from a double-ended conguration to a uninterruptible conguration with a
UPS unit and a Static Transfer Switch
b Increase the level of maintenance (reducing the MTTR, increasing the MTBF)
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D30
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
D - MV & LV architecture selection guide
10 Glossary
Architecture: choice of a single-line diagram and technological solutions, from
connection to the utility network through to load power supply circuits.
Main MV/LV distribution: Level upstream of the architecture, from connection
to the network utility through to LV distribution equipment on the site (MLVS or
equivalent).
MLVS Main Low Voltage Switchboard: Main switchboard downstream of the
MV/LV transformer, starting point of power distribution circuits in the installation
LV power distribution: intermediate level in the architecture, downstream of the
main level through to the sub-distribution switchboards (spatial and functional
distribution of electrical power in the circuits).
LV terminal distribution: Downstream level of the architecture, downstream of the
sub-distribution switchboards through to the loads. This level of distribution is not
dealt with in this guide.
Single-line diagram: general electrical schematic diagram to represent the main
electrical equipment and their interconnection.
MV substation, transformation substation: Enclosures grouping together MV
equipment and/or MV/LV transformers. These enclosures can be shared or separate,
according to the site layout, or the equipment technology. In certain countries, the
MV substation is assimilated with the delivery substation.
Technological solution: Resulting from the choice of technology for an installation
sub-assembly, from among the different products and equipment proposed by the
manufacturer.
Characteristics: Technical or environmental data relative to the installation, enabling
the best-suited architecture to be selected.
Criteria: Parameters for assessing the installation, enabling selection of the
architecture that is the best-suited to the needs of the customer.
Schneider Electric - Electrical installation guide 2013
D31
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
D - MV & LV architecture selection guide
11 ID-Spec software
ID-Spec is a new software which aims at helping the designer to be more productive
in draft design phase and argue easily his design decisions.
It supports the designer in selecting the relevant single line diagram patterns for main
distribution and sub distribution and in adapting these patterns to his project. It also
supports the designer in equipment technology and rating selection. Its generates
automatically the corresponding design specication documentation including single
line diagram and its argument, list and specication of the corresponding equipment.
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D32
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
D - MV & LV architecture selection guide
12 Example: electrical installation
in a printworks
12.1 Brief description
Printing of personalized mailshots intended for mail order sales.
12.2 Installation characteristics
Characteristic Category
Activity Mechanical
Site topology single storey building,
10000m (8000m dedicated to the process, 2000m for
ancillary areas)
Layout latitude High
Service reliability Standard
Maintainability Standard
Installation exibility
b No exibility planned:
v HVAC
v Process utilities
v Ofce power supply
b Possible exibility:
v nishing, putting in envelopes
v special machines, installed at a later date
v rotary machines (uncertainty at the draft design stage)
Power demand 3500kVA
Load distribution Intermediate distribution
Power interruptions sensitivity
b Sheddable circuits:
v ofces (apart from PC power sockets)
v air conditioning, ofce heating
v social premises
v maintenance premises
b long interruptions acceptable:
v printing machines
v workshop HVAC (hygrometric control)
v Finishing, envelope lling
v Process utilities (compressor, recycling of cooled water)
b No interruptions acceptable:
v servers, ofce PCs
Disturbance sensitivity
b Average sensitivity:
v motors, lighting
b High sensitivity:
v IT
No special precaution to be taken due to the connection to
the EdF network (low level of disturbance)
Disturbance capability Non disturbing
Other constraints
b Building with lightning classication: lightning surge
arresters installed
b Power supply by overhead single feeder line
12.3 Technological characteristics
Criteria Category
Atmosphere, environment
b IP: standard (no dust, no water protection)
b IK: standard (use of technical pits, dedicated premises)
b C: standard (temperature regulation)
Service index 211
Offer availability by country No problem (project carried out in France)
Other criteria Nothing particular
Schneider Electric - Electrical installation guide 2013
D33
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
12.4 Architecture assessment criteria
Criteria Category
On-site work time Secondary
Environmental impact Minimal: compliance with European standard regulations
Preventive maintenance costs Standard
Power supply availability Level I
Step 1: Architecture fundamentals
Choice Main criteria Solution
Connection to upstream
network
Isolated site single branch circuit
MV Circuits Layout + criticality single feeder
Number of transformers Power > 2500kVA 2 x 2000kVA
Number and distribution of
substations
Surface area and power
distribution
2 possible solutions: 1
substation or 2 substations
b if 1 substations: NO link
between MLVS
b if 2 substations:
interconnected switchboards
MV Generator Site activity No
MLVS 1 MLVS 2 MLVS 1 MLVS 2
Trunking
LV
MV
LV
MV
LV
MV
LV
MV
Fig. D29 : Two possible single-line diagrams
12 Example: electrical installation
in a printworks
Schneider Electric - Electrical installation guide 2013
D - MV & LV architecture selection guide
D34
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Step 2: Architecture details
1 substation solution
Choice Main criteria Solution
Layout Atmospheric constraint Dedicated premises
Centralized or decentralized
layout
Uniform loads, distributed
power, scalability possibilities
Non-uniform loads, direct link
from MLVS
b Decentralized with busbar
trunking:
v nishing sector, envelope
lling
b Centralized with cables:
v special machines,
rotary machines, HVAC,
process utilities, ofces
(2 switchboards), ofce air
conditioning, social premises,
maintenance
Presence of back-up
generator
Criticality low
Network availability: standard
No back-up generator
Presence of UPS Criticality UPS unit for servers and ofce
PCs
LV circuit conguration 2 transformers, possible
partial redundancy
b Two-pole, variant 2 MLVS
+ NO link (reduction of the Isc
by MLVS, no redundancy
b process ( weak)
b sheddable circuit for non-
critical loads
MLVS 1 MLVS 2
Trunking
Machines
HVAC
Sheddable Offices
ASI
LV
MV
LV
MV
Fig. D30 : Detailed single-line diagram (1 substation)
Schneider Electric - Electrical installation guide 2013
D35
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
12.5 Choice of technological solutions:
Fig. D31 : Detailed single-line diagram (2 substations)
Choice Main criteria Solution
MV/LV substation Atmosphere, environment indoor (dedicated premises)
MV switchboard Offer availability by country SM6 (installation produced in
France)
Transformers Atmosphere, environment cast resin transfo (avoids
constraints related to oil)
LV switchboard Atmosphere, IS MLVS: Prisma + P
Sub-distribution: Prisma +
Busbar trunking Installed power to be
supplied
Canalis KS
UPS units Installed power to be
supplied, back-up time
Galaxy PW
Power factor correction Installed power, presence of
harmonics
LV, standard, automatic
(Average Q, ease of
installation)
2 substation solution
Ditto apart from:
LV circuit: 2 remote MLVS connected via busbar trunking
MLVS 1 MLVS 2
Trunking Trunking
Machines
HVAC
Sheddable
Offices
ASI
LV
MV
LV
MV
12 Example: electrical installation
in a printworks
Schneider Electric - Electrical installation guide 2013
Schneider Electric - Electrical installation guide 2013
E1
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapter E
LV Distribution
Contents
Earthing schemes E2
1.1 Earthing connections E2
1.2 Denition of standardised earthing schemes E3
1.3 Characteristics of TT, TN and IT systems E6
1.4 Selection criteria for the TT, TN and IT systems E8
1.5 Choice of earthing method - implementation E10
1.6 Installation and measurements of earth electrodes E11
The installation system E15
2.1 Distribution switchboards E15
2.2 Cables and busways E19
External inuences (IEC 60364-5-51) E26
3.1 Denition and reference standards E26
3.2 Classication E26
3.3 List of external inuences E26
3.4 Protection provided for enclosed equipment: codes IP and IK E29
1
2
3
Schneider Electric - Electrical installation guide 2013
E - Distribution in low-voltage installations
E2
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Earthing schemes
1.1 Earthing connections
Denitions
National and international standards (IEC 60364) clearly dene the various elements
of earthing connections. The following terms are commonly used in industry and in
the literature. Bracketed numbers refer to Figure E1 :
b Earth electrode (1): A conductor or group of conductors in intimate contact with,
and providing an electrical connection with Earth (cf details in section 1.6 of Chapter E.)
b Earth: The conductive mass of the Earth, whose electric potential at any point is
conventionally taken as zero
b Electrically independent earth electrodes: Earth electrodes located at such a
distance from one another that the maximum current likely to ow through one of
them does not signicantly affect the potential of the other(s)
b Earth electrode resistance: The contact resistance of an earth electrode with the
Earth
b Earthing conductor (2): A protective conductor connecting the main earthing
terminal (6) of an installation to an earth electrode (1) or to other means of earthing
(e.g. TN systems);
b Exposed-conductive-part: A conductive part of equipment which can be touched
and which is not a live part, but which may become live under fault conditions
b Protective conductor (3): A conductor used for some measures of protection against
electric shock and intended for connecting together any of the following parts:
v Exposed-conductive-parts
v Extraneous-conductive-parts
v The main earthing terminal
v Earth electrode(s)
v The earthed point of the source or an articial neutral
b Extraneous-conductive-part: A conductive part liable to introduce a potential,
generally earth potential, and not forming part of the electrical installation (4).
For example:
v Non-insulated oors or walls, metal framework of buildings
v Metal conduits and pipework (not part of the electrical installation) for water, gas,
heating, compressed-air, etc. and metal materials associated with them
b Bonding conductor (5): A protective conductor providing equipotential bonding
b Main earthing terminal (6): The terminal or bar provided for the connection of
protective conductors, including equipotential bonding conductors, and conductors
for functional earthing, if any, to the means of earthing.
Connections
The main equipotential bonding system
The bonding is carried out by protective conductors and the aim is to ensure that,
in the event of an incoming extraneous conductor (such as a gas pipe, etc.) being
raised to some potential due to a fault external to the building, no difference of
potential can occur between extraneous-conductive-parts within the installation.
The bonding must be effected as close as possible to the point(s) of entry into the
building, and be connected to the main earthing terminal (6).
However, connections to earth of metallic sheaths of communications cables require
the authorisation of the owners of the cables.
Supplementary equipotential connections
These connections are intended to connect all exposed-conductive-parts and all
extraneous-conductive-parts simultaneously accessible, when correct conditions
for protection have not been met, i.e. the original bonding conductors present an
unacceptably high resistance.
Connection of exposed-conductive-parts to the earth electrode(s)
The connection is made by protective conductors with the object of providing a low-
resistance path for fault currents owing to earth.
In a building, the connection of all metal parts
of the building and all exposed conductive parts
of electrical equipment to an earth electrode
prevents the appearance of dangerously high
voltages between any two simultaneously
accessible metal parts
Fig. E1 : An example of a block of ats in which the main
earthing terminal (6) provides the main equipotential connection;
the removable link (7) allows an earth-electrode-resistance
check
Branched
protective
conductors
to individual
consumers
Extraneous
conductive
parts
3
3
3
Main
protective
conductor
1
2
7
6
5
5
5
4
4
Heating
Water
Gas
Schneider Electric - Electrical installation guide 2013
E3
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Components (see Fig. E2)
Effective connection of all accessible metal xtures and all exposed-conductive-parts
of electrical appliances and equipment, is essential for effective protection against
electric shocks.
Fig. E2 : List of exposed-conductive-parts and extraneous-conductive-parts
Component parts to consider:
as exposed-conductive-parts as extraneous-conductive-parts
Cableways Elements used in building construction
b Conduits b Metal or reinforced concrete (RC):
b Impregnated-paper-insulated lead-covered v Steel-framed structure
cable, armoured or unarmoured v Reinforcement rods
b Mineral insulated metal-sheathed cable v Prefabricated RC panels
(pyrotenax, etc.) b Surface nishes:
Switchgear v
Floors and walls in reinforced concrete
b cradle of withdrawable switchgear
without further surface treatment
Appliances v
Tiled surface
b Exposed metal parts of class 1 insulated b
Metallic covering:
appliances v
Metallic wall covering
Non-electrical elements Building services elements other than electrical
b metallic ttings associated with cableways b Metal pipes, conduits, trunking, etc. for gas,
(cable trays, cable ladders, etc.) water and heating systems, etc.
b Metal objects: b Related metal components (furnaces, tanks,
v Close to aerial conductors or to busbars reservoirs, radiators)
v In contact with electrical equipment. b Metallic ttings in wash rooms, bathrooms,
toilets, etc.
b Metallised papers
Component parts not to be considered:
as exposed-conductive-parts as extraneous-conductive-parts
Diverse service channels, ducts, etc. b Wooden-block oors
b Conduits made of insulating material b Rubber-covered or linoleum-covered oors
b Mouldings in wood or other insulating b Dry plaster-block partition
material b Brick walls
b Conductors and cables without metallic sheaths b Carpets and wall-to-wall carpeting
Switchgear
b Enclosures made of insulating material
Appliances
b All appliances having class II insulation
regardless of the type of exterior envelope
1.2 Denition of standardised earthing schemes
The choice of these methods governs the measures necessary for protection against
indirect-contact hazards.
The earthing system qualies three originally independent choices made by the
designer of an electrical distribution system or installation:
b The type of connection of the electrical system (that is generally of the neutral
conductor) and of the exposed parts to earth electrode(s)
b A separate protective conductor or protective conductor and neutral conductor
being a single conductor
b The use of earth fault protection of overcurrent protective switchgear which clear
only relatively high fault currents or the use of additional relays able to detect and
clear small insulation fault currents to earth
In practice, these choices have been grouped and standardised as explained below.
Each of these choices provides standardised earthing systems with three
advantages and drawbacks:
b Connection of the exposed conductive parts of the equipment and of the neutral
conductor to the PE conductor results in equipotentiality and lower overvoltages but
increases earth fault currents
b A separate protective conductor is costly even if it has a small cross-sectional area
but it is much more unlikely to be polluted by voltage drops and harmonics, etc. than a
neutral conductor is. Leakage currents are also avoided in extraneous conductive parts
b Installation of residual current protective relays or insulation monitoring devices are
much more sensitive and permits in many circumstances to clear faults before heavy
damage occurs (motors, res, electrocution). The protection offered is in addition
independent with respect to changes in an existing installation
The different earthing schemes (often referred
to as the type of power system or system
earthing arrangements) described characterise
the method of earthing the installation
downstream of the secondary winding of a
MV/LV transformer and the means used for
earthing the exposed conductive-parts of the
LV installation supplied from it
1 Earthing schemes
Schneider Electric - Electrical installation guide 2013
E - Distribution in low-voltage installations
E4
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
TT system (earthed neutral) (see Fig. E3)
One point at the supply source is connected directly to earth. All exposed- and
extraneous-conductive-parts are connected to a separate earth electrode at the
installation. This electrode may or may not be electrically independent of the source
electrode. The two zones of inuence may overlap without affecting the operation of
protective devices.
TN systems (exposed conductive parts connected to the
neutral)
The source is earthed as for the TT system (above). In the installation, all exposed-
and extraneous-conductive-parts are connected to the neutral conductor. The several
versions of TN systems are shown below.
TN-C system (see Fig. E4)
The neutral conductor is also used as a protective conductor and is referred to as
a PEN (Protective Earth and Neutral) conductor. This system is not permitted for
conductors of less than 10 mm
2
or for portable equipment.
The TN-C system requires an effective equipotential environment within the
installation with dispersed earth electrodes spaced as regularly as possible since
the PEN conductor is both the neutral conductor and at the same time carries phase
unbalance currents as well as 3
rd
order harmonic currents (and their multiples).
The PEN conductor must therefore be connected to a number of earth electrodes in
the installation.
Caution: In the TN-C system, the protective conductor function has priority over
the neutral function. In particular, a PEN conductor must always be connected to
the earthing terminal of a load and a jumper is used to connect this terminal to the
neutral terminal.
TN-S system (see Fig. E5)
The TN-S system (5 wires) is obligatory for circuits with cross-sectional areas less
than 10 mm
2
for portable equipment.
The protective conductor and the neutral conductor are separate. On underground
cable systems where lead-sheathed cables exist, the protective conductor is
generally the lead sheath. The use of separate PE and N conductors (5 wires)
is obligatory for circuits with cross-sectional areas less than 10 mm
2
for portable
equipment.
TN-C-S system (see Fig. E6 below and Fig. E7 next page)
The TN-C and TN-S systems can be used in the same installation. In the TN-C-S
system, the TN-C (4 wires) system must never be used downstream of the TN-S
(5 wires) system, since any accidental interruption in the neutral on the upstream
part would lead to an interruption in the protective conductor in the downstream part
and therefore a danger.
L1
L2
L3
N
PE
Rn
Neutral
Earth
Exposed conductive parts
Earth
Fig. E3 : TT System
L1
L2
L3
PEN
Rn
Neutral
Neutral Earth
Exposed conductive parts
Fig. E4 : TN-C system
L1
L2
L3
N
PE
Rn
Fig. E5 : TN-S system
L1
L2
L3
N
PE
Bad Bad
16 mm
2
6 mm
2
16 mm
2
16 mm
2
PEN
TN-C scheme not permitted
downstream of TN-S scheme
5 x 50 mm
2
PEN
PE
Fig. E6 : TN-C-S system
Schneider Electric - Electrical installation guide 2013
E5
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
IT system (isolated or impedance-earthed neutral)
IT system (isolated neutral)
No intentional connection is made between the neutral point of the supply source
and earth (see Fig. E8).
Exposed- and extraneous-conductive-parts of the installation are connected to an
earth electrode.
In practice all circuits have a leakage impedance to earth, since no insulation
is perfect. In parallel with this (distributed) resistive leakage path, there is the
distributed capacitive current path, the two paths together constituting the normal
leakage impedance to earth (see Fig. E9).
Example (see Fig. E10)
In a LV 3-phase 3-wire system, 1 km of cable will have a leakage impedance due to
C1, C2, C3 and R1, R2 and R3 equivalent to a neutral earth impedance Zct of 3,000
to 4,000 , without counting the ltering capacitances of electronic devices.
IT system (impedance-earthed neutral)
An impedance Zs (in the order of 1,000 to 2,000 ) is connected permanently
between the neutral point of the transformer LV winding and earth (see Fig. E11).
All exposed- and extraneous-conductive-parts are connected to an earth electrode.
The reasons for this form of power-source earthing are to x the potential of a small
network with respect to earth (Zs is small compared to the leakage impedance) and to
reduce the level of overvoltages, such as transmitted surges from the MV windings,
static charges, etc. with respect to earth. It has, however, the effect of slightly
increasing the rst-fault current level.
Fig. E7 : Connection of the PEN conductor in the TN-C system
L1
L2
L3
PEN
16 mm
2
10 mm
2
6 mm
2
6 mm
2
PEN
2
4 x 95 mm
2
Correct Incorrect Correct Incorrect
PEN connected to the neutral
terminal is prohibited
S < 10 mm
TNC prohibited
N
PEN
Fig. E8 : IT system (isolated neutral)
Fig. E9 : IT system (isolated neutral)
Fig. E10 : Impedance equivalent to leakage impedances in an
IT system Fig. E11 : IT system (impedance-earthed neutral)
L1
L2
L3
N
PE
Neutral
Isolated or
impedance-earthed
Exposed conductive parts
Earth
R3 R2 R1
C3 C2 C1
MV/LV
Zct
MV/LV
MV/LV
Zs
1 Earthing schemes
Schneider Electric - Electrical installation guide 2013
E - Distribution in low-voltage installations
E6
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.3 Characteristics of TT, TN and IT systems
TT system (see Fig. E12)
The TT system:
b Technique for the protection of persons: the
exposed conductive parts are earthed and
residual current devices (RCDs) are used
b Operating technique: interruption for the rst
insulation fault
The TN system:
b Technique for the protection of persons:
v Interconnection and earthing of exposed
conductive parts and the neutral are mandatory
v Interruption for the rst fault using overcurrent
protection (circuit-breakers or fuses)
b Operating technique: interruption for the rst
insulation fault
Fig. E12 : TT system
Note: If the exposed conductive parts are earthed at a number of points, an RCD
must be installed for each set of circuits connected to a given earth electrode.
Main characteristics
b Simplest solution to design and install. Used in installations supplied directly by the
public LV distribution network.
b Does not require continuous monitoring during operation (a periodic check on the
RCDs may be necessary).
b Protection is ensured by special devices, the residual current devices (RCD), which
also prevent the risk of re when they are set to y 500 mA.
b Each insulation fault results in an interruption in the supply of power, however the
outage is limited to the faulty circuit by installing the RCDs in series (selective RCDs)
or in parallel (circuit selection).
b Loads or parts of the installation which, during normal operation, cause high leakage
currents, require special measures to avoid nuisance tripping, i.e. supply the loads
with a separation transformer or use specic RCDs (see section 5.1 in chapter F).
TN system (see Fig. E13 and Fig. E14 )
Fig. E14 : TN-S system
Fig. E13 : TN-C system
PEN
N
PE
Schneider Electric - Electrical installation guide 2013
E7
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Main characteristics
b Generally speaking, the TN system:
v requires the installation of earth electrodes at regular intervals throughout the
installation
v Requires that the initial check on effective tripping for the rst insulation fault
be carried out by calculations during the design stage, followed by mandatory
measurements to conrm tripping during commissioning
v Requires that any modication or extension be designed and carried out by a
qualied electrician
v May result, in the case of insulation faults, in greater damage to the windings of
rotating machines
v May, on premises with a risk of re, represent a greater danger due to the higher
fault currents
b In addition, the TN-C system:
v At rst glance, would appear to be less expensive (elimination of a device pole and
of a conductor)
v Requires the use of xed and rigid conductors
v Is forbidden in certain cases:
- Premises with a risk of re
- For computer equipment (presence of harmonic currents in the neutral)
b In addition, the TN-S system:
v May be used even with exible conductors and small conduits
v Due to the separation of the neutral and the protection conductor, provides a clean
PE (computer systems and premises with special risks)
IT system (see Fig. E15)
IT system:
b Protection technique:
v Interconnection and earthing of exposed
conductive parts
v Indication of the rst fault by an insulation
monitoring device (IMD)
v Interruption for the second fault using
overcurrent protection (circuit-breakers or fuses)
b Operating technique:
v Monitoring of the rst insulation fault
v Mandatory location and clearing of the fault
v Interruption for two simultaneous insulation
faults
Fig. E15 : IT system
IMD Cardew
Main characteristics
b Solution offering the best continuity of service during operation
b Indication of the rst insulation fault, followed by mandatory location and clearing,
ensures systematic prevention of supply outages
b Generally used in installations supplied by a private MV/LV or LV/LV transformer
b Requires maintenance personnel for monitoring and operation
b Requires a high level of insulation in the network (implies breaking up the network
if it is very large and the use of circuit-separation transformers to supply loads with
high leakage currents)
b The check on effective tripping for two simultaneous faults must be carried out by
calculations during the design stage, followed by mandatory measurements during
commissioning on each group of interconnected exposed conductive parts
b Protection of the neutral conductor must be ensured as indicated in section 7.2 of
Chapter G
1 Earthing schemes
Schneider Electric - Electrical installation guide 2013
E - Distribution in low-voltage installations
E8
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.4 Selection criteria for the TT, TN and IT systems
In terms of the protection of persons, the three system earthing arrangements
(SEA) are equivalent if all installation and operating rules are correctly followed.
Consequently, selection does not depend on safety criteria.
It is by combining all requirements in terms of regulations, continuity of service,
operating conditions and the types of network and loads that it is possible to
determine the best system(s) (see Fig. E16).
Selection is determined by the following factors:
b Above all, the applicable regulations which in some cases impose certain types of
SEA
b Secondly, the decision of the owner if supply is via a private MV/LV transformer
(MV subscription) or the owner has a private energy source (or a separate-winding
transformer)
If the owner effectively has a choice, the decision on the SEA is taken following
discussions with the network designer (design ofce, contractor)
The discussions must cover:
b First of all, the operating requirements (the required level of continuity of service)
and the operating conditions (maintenance ensured by electrical personnel or not,
in-house personnel or outsourced, etc.)
b Secondly, the particular characteristics of the network and the loads
(see Fig. E17 next page)
Selection does not depend on safety criteria.
The three systems are equivalent in terms
of protection of persons if all installation and
operating rules are correctly followed.
The selection criteria for the best system(s)
depend on the regulatory requirements,
the required continuity of service, operating
conditions and the types of network and loads.
Fig. E16 : Comparison of system earthing arrangements
TT TN-S TN-C IT1
(a)
IT2
(b)
Comments
Electrical characteristics
Fault current - - - - - + - - Only the IT system offers virtually negligible rst-fault currents
Fault voltage - - - + - In the IT system, the touch voltage is very low for the rst fault,
but is considerable for the second
Touch voltage +/- - - - + - In the TT system, the touch voltage is very low if system is
equipotential, otherwise it is high
Protection
Protection of persons against indirect contact + + + + + All SEAs (system earthing arrangement) are equivalent,
if the rules are followed
Protection of persons with emergency + - - + - Systems where protection is ensured by RCDs are not sensitive
generating sets to a change in the internal impedance of the source
Protection against re (with an RCD) + + Not + + All SEAs in which RCDs can be used are equivalent.
allowed The TN-C system is forbidden on premises where there is a risk of re
Overvoltages
Continuous overvoltage + + + - + A phase-to-earth overvoltage is continuous in the IT system
if there is a rst insulation fault
Transient overvoltage + - - + - Systems with high fault currents may cause transient overvoltages
Overvoltage if transformer breakdown - + + + + In the TT system, there is a voltage imbalance between
(primary/secondary) the different earth electrodes. The other systems are interconnected
to a single earth electrode
Electromagnetic compatibility
Immunity to nearby lightning strikes - + + + + In the TT system, there may be voltage imbalances between
the earth electrodes. In the TT system, there is a signicant current
loop between the two separate earth electrodes
Immunity to lightning strikes on MV lines - - - - - All SEAs are equivalent when a MV line takes a direct lightning strike
Continuous emission of an + + - + + Connection of the PEN to the metal structures of the building is
electromagnetic eld conducive to the continuous generation of electromagnetic elds
Transient non-equipotentiality of the PE + - - + - The PE is no longer equipotential if there is a high fault current
Continuity of service
Interruption for rst fault - - - + + Only the IT system avoids tripping for the rst insulation fault
Voltage dip during insulation fault + - - + - The TN-S, TNC and IT (2
nd
fault) systems generate high fault
currents which may cause phase voltage dips
Installation
Special devices - + + - - The TT system requires the use of RCDs. The IT system requires
the use of IMDs
Number of earth electrodes - + + -/+ -/+ The TT system requires two distinct earth electrodes. The IT system
offers a choice between one or two earth electrodes
Number of cables - - + - - Only the TN-C system offers, in certain cases, a reduction in
the number of cables
Maintenance
Cost of repairs - - - - - - - - The cost of repairs depends on the damage caused by
the amplitude of the fault currents
Installation damage + - - ++ - Systems causing high fault currents require a check on
the installation after clearing the fault
(a) IT-net when a rst fault occurs.
(b) IT-net when a second fault occurs.
Schneider Electric - Electrical installation guide 2013
E9
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. E17 : Inuence of networks and loads on the selection of system earthing arrangements
(1) When the SEA is not imposed by regulations, it is selected according to the level of operating characteristics (continuity of service that is
mandatory for safety reasons or desired to enhance productivity, etc.)
Whatever the SEA, the probability of an insulation failure increases with the length of the network. It may be a good idea to break up the
network, which facilitates fault location and makes it possible to implement the system advised above for each type of application.
(2) The risk of ashover on the surge limiter turns the isolated neutral into an earthed neutral. These risks are high for regions with frequent
thunder storms or installations supplied by overhead lines. If the IT system is selected to ensure a higher level of continuity of service, the
system designer must precisely calculate the tripping conditions for a second fault.
(3) Risk of RCD nuisance tripping.
(4) Whatever the SEA, the ideal solution is to isolate the disturbing section if it can be easily identied.
(5) Risks of phase-to-earth faults affecting equipotentiality.
(6) Insulation is uncertain due to humidity and conducting dust.
(7) The TN system is not advised due to the risk of damage to the generator in the case of an internal fault. What is more, when generator sets
supply safety equipment, the system must not trip for the rst fault.
(8) The phase-to-earth current may be several times higher than In, with the risk of damaging or accelerating the ageing of motor windings, or of
destroying magnetic circuits.
(9) To combine continuity of service and safety, it is necessary and highly advised, whatever the SEA, to separate these loads from the rest of
the installation (transformers with local neutral connection).
(10) When load equipment quality is not a design priority, there is a risk that the insulation resistance will fall rapidly. The TT system with RCDs
is the best means to avoid problems.
(11) The mobility of this type of load causes frequent faults (sliding contact for bonding of exposed conductive parts) that must be countered.
Whatever the SEA, it is advised to supply these circuits using transformers with a local neutral connection.
(12) Requires the use of transformers with a local TN system to avoid operating risks and nuisance tripping at the rst fault (TT) or a double fault (IT).
(12 bis) With a double break in the control circuit.
(13) Excessive limitation of the phase-to-neutral current due to the high value of the zero-phase impedance (at least 4 to 5 times the direct
impedance). This system must be replaced by a star-delta arrangement.
(14) The high fault currents make the TN system dangerous. The TN-C system is forbidden.
(15) Whatever the system, the RCD must be set to n y 500 mA.
(16) An installation supplied with LV energy must use the TT system. Maintaining this SEA means the least amount of modications on the
existing network (no cables to be run, no protection devices to be modied).
(17) Possible without highly competent maintenance personnel.
(18) This type of installation requires particular attention in maintaining safety. The absence of preventive measures in the TN system means
highly qualied personnel are required to ensure safety over time.
(19) The risks of breaks in conductors (supply, protection) may cause the loss of equipotentiality for exposed conductive parts. A TT system or a
TN-S system with 30 mA RCDs is advised and is often mandatory. The IT system may be used in very specic cases.
(20) This solution avoids nuisance tripping for unexpected earth leakage.
Type of network Advised Possible Not advised
Very large network with high-quality earth electrodes TT, TN, IT
(1)
for exposed conductive parts (10 max.) or mixed
Very large network with low-quality earth electrodes TN TN-S IT
(1)
for exposed conductive parts (> 30 ) TN-C
Disturbed area (storms) TN TT IT
(2)
(e.g. television or radio transmitter)
Network with high leakage currents (> 500 mA) TN
(4)
IT
(4)
TT
(3) (4)
Network with outdoor overhead lines TT
(5)
TN
(5) (6)
IT
(6)
Emergency standby generator set IT TT TN
(7)
Type of loads
Loads sensitive to high fault currents (motors, etc.) IT TT TN
(8)
Loads with a low insulation level (electric furnaces, TN
(9)
TT
(9)
IT
welding machines, heating elements, immersion heaters,
equipment in large kitchens)
Numerous phase-neutral single-phase loads TT
(10)
IT
(10)
(mobile, semi-xed, portable) TN-S TN-C
(10)
Loads with sizeable risks (hoists, conveyers, etc.) TN
(11)
TT
(11)
IT
(11)
Numerous auxiliaries (machine tools) TN-S TN-C TT
(12)
IT
(12 bis)
Miscellaneous
Supply via star-star connected power transformer
(13)
TT IT IT
(13)
without neutral with neutral
Premises with risk of re IT
(15)
TN-S
(15)
TN-C
(14)
TT
(15)
Increase in power level of LV utility subscription, TT
(16)
requiring a private substation
Installation with frequent modications TT
(17)
TN
(18)
IT
(18)
Installation where the continuity of earth circuits is uncertain TT
(19)
TN-S TN-C
(work sites, old installations) IT
(19)
Electronic equipment (computers, PLCs) TN-S TT TN-C
Machine control-monitoring network, PLC sensors and actuators IT
(20)
TN-S, TT
MV/LV
LV
1 Earthing schemes
Schneider Electric - Electrical installation guide 2013
E - Distribution in low-voltage installations
E10
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.5 Choice of earthing method - implementation
After consulting applicable regulations, Figures E16 and E17 can be used as an aid
in deciding on divisions and possible galvanic isolation of appropriate sections of a
proposed installation.
Division of source
This technique concerns the use of several transformers instead of employing one
high-rated unit. In this way, a load that is a source of network disturbances (large
motors, furnaces, etc.) can be supplied by its own transformer.
The quality and continuity of supply to the whole installation are thereby improved.
The cost of switchgear is reduced (short-circuit current level is lower).
The cost-effectiveness of separate transformers must be determined on a case by
case basis.
Network islands
The creation of galvanically-separated islands by means of LV/LV transformers
makes it possible to optimise the choice of earthing methods to meet specic
requirements (see Fig. E18 and Fig. E19 ).
Fig. E18 : TN-S island within an IT system
Fig. E19 : IT islands within a TN-S system
IMD
IT system
LV/LV
MV/LV
TN-S system
TN-S system
LV/LV
MV/LV TN-S
Operating room
LV/LV
IT IT
Hospital
IMD IMD
Conclusion
The optimisation of the performance of the whole installation governs the choice of
earthing system.
Including:
b Initial investments, and
b Future operational expenditures, hard to assess, that can arise from insufcient
reliability, quality of equipment, safety, continuity of service, etc.
An ideal structure would comprise normal power supply sources, local reserve
power supply sources (see section 1.4 of Chapter E) and the appropriate earthing
arrangements.
Schneider Electric - Electrical installation guide 2013
E11
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.6 Installation and measurements of earth
electrodes
The quality of an earth electrode (resistance as low as possible) depends essentially
on two factors:
b Installation method
b Type of soil
Installation methods
Three common types of installation will be discussed:
Buried ring (see Fig. E20)
This solution is strongly recommended, particularly in the case of a new building.
The electrode should be buried around the perimeter of the excavation made for
the foundations. It is important that the bare conductor be in intimate contact with
the soil (and not placed in the gravel or aggregate hard-core, often forming a base
for concrete). At least four (widely-spaced) vertically arranged conductors from the
electrode should be provided for the installation connections and, where possible,
any reinforcing rods in concrete work should be connected to the electrode.
The conductor forming the earth electrode, particularly when it is laid in an
excavation for foundations, must be in the earth, at least 50 cm below the hard-core
or aggregate base for the concrete foundation. Neither the electrode nor the vertical
rising conductors to the ground oor, should ever be in contact with the foundation
concrete.
For existing buildings, the electrode conductor should be buried around the outside
wall of the premises to a depth of at least 1 metre. As a general rule, all vertical
connections from an electrode to above-ground level should be insulated for the
nominal LV voltage (600-1,000 V).
The conductors may be:
b Copper: Bare cable (u 25 mm
2
) or multiple-strip (u 25 mm
2
and u 2 mm thick)
b Aluminium with lead jacket: Cable (u 35 mm
2
)
b Galvanised-steel cable: Bare cable (u 95 mm
2
) or multiple-strip (u 100 mm
2
and u 3 mm thick)
The approximate resistance R of the electrode in ohms:
R
L
=
2
where
L = length of conductor in metres
= resistivity of the soil in ohm-metres (see Inuence of the type of soil next page)
Earthing rods (see Fig. E21)
Vertically driven earthing rods are often used for existing buildings, and for improving
(i.e. reducing the resistance of) existing earth electrodes.
The rods may be:
b Copper or (more commonly) copper-clad steel. The latter are generally 1 or
2 metres long and provided with screwed ends and sockets in order to reach
considerable depths, if necessary (for instance, the water-table level in areas of high
soil resistivity)
b Galvanised (see note (1) next page) steel pipe u 25 mm diameter or
rod u 15 mm diameter, u 2 metres long in each case.
A very effective method of obtaining a low-
resistance earth connection is to bury a
conductor in the form of a closed loop in the
soil at the bottom of the excavation for building
foundations.
The resistance R of such an electrode (in
homogeneous soil) is given (approximately) in
ohms by:
R
L
=
2
where
L = length of the buried conductor in metres
= soil resistivity in ohm-metres
Fig. E20 : Conductor buried below the level of the foundations,
i.e. not in the concrete
For n rods: R
n L
=
1
Fig. E21 : Earthing rods
Rods connected in parallel
L u 3 m
1 Earthing schemes
Schneider Electric - Electrical installation guide 2013
E - Distribution in low-voltage installations
E12
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
It is often necessary to use more than one rod, in which case the spacing between
them should exceed the depth to which they are driven, by a factor of 2 to 3.
The total resistance (in homogeneous soil) is then equal to the resistance of one rod,
divided by the number of rods in question. The approximate resistance R obtained is:
R
n L
=
1
if the distance separating the rods > 4L
where
L = the length of the rod in metres
= resistivity of the soil in ohm-metres (see Inuence of the type of soil below)
n = the number of rods
Vertical plates (see Fig. E22)
Rectangular plates, each side of which must be u 0.5 metres, are commonly used as
earth electrodes, being buried in a vertical plane such that the centre of the plate is
at least 1 metre below the surface of the soil.
The plates may be:
b Copper of 2 mm thickness
b Galvanised
(1)
steel of 3 mm thickness
The resistance R in ohms is given (approximately), by:
R
L
=
0.8
L = the perimeter of the plate in metres
= resistivity of the soil in ohm-metres (see Inuence of the type of soil below)
Inuence of the type of soil
For a vertical plate electrode: R
L
=
0.8
(1) Where galvanised conducting materials are used for earth
electrodes, sacricial cathodic protection anodes may be
necessary to avoid rapid corrosion of the electrodes where
the soil is aggressive. Specially prepared magnesium anodes
(in a porous sack lled with a suitable soil) are available for
direct connection to the electrodes. In such circumstances, a
specialist should be consulted
Measurements on earth electrodes in similar
soils are useful to determine the resistivity
value to be applied for the design of an earth-
electrode system
Fig. E22 : Vertical plate
2 mm thickness (Cu)
Fig. E23 : Resistivity (m) for different types of soil
Fig. E24 : Average resistivity (m) values for approximate earth-elect
Type of soil Average value of resistivity
in m
Fertile soil, compacted damp ll 50
Arid soil, gravel, uncompacted non-uniform ll 500
Stoney soil, bare, dry sand, ssured rocks 3,000
Type of soil Mean value of resistivity
in m
Swampy soil, bogs 1 - 30
Silt alluvium 20 - 100
Humus, leaf mould 10 - 150
Peat, turf 5 - 100
Soft clay 50
Marl and compacted clay 100 - 200
Jurassic marl 30 - 40
Clayey sand 50 - 500
Siliceous sand 200 - 300
Stoney ground 1,500 - 3,000
Grass-covered-stoney sub-soil 300 - 500
Chalky soil 100 - 300
Limestone 1,000 - 5,000
Fissured limestone 500 - 1,000
Schist, shale 50 - 300
Mica schist 800
Granite and sandstone 1,500 - 10,000
Modied granite and sandstone 100 - 600
Schneider Electric - Electrical installation guide 2013
E13
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Measurement and constancy of the resistance between an
earth electrode and the earth
The resistance of the electrode/earth interface rarely remains constant
Among the principal factors affecting this resistance are the following:
b Humidity of the soil
The seasonal changes in the moisture content of the soil can be signicant at depths
of up to 2 meters.
At a depth of 1 metre the resistivity and therefore the resistance can vary by a ratio
of 1 to 3 between a wet winter and a dry summer in temperate regions
b Frost
Frozen earth can increase the resistivity of the soil by several orders of magnitude.
This is one reason for recommending the installation of deep electrodes, in particular
in cold climates
b Ageing
The materials used for electrodes will generally deteriorate to some extent for
various reasons, for example:
v Chemical reactions (in acidic or alkaline soils)
v Galvanic: due to stray DC currents in the earth, for example from electric railways,
etc. or due to dissimilar metals forming primary cells. Different soils acting on
sections of the same conductor can also form cathodic and anodic areas with
consequent loss of surface metal from the latter areas. Unfortunately, the most
favourable conditions for low earth-electrode resistance (i.e. low soil resistivity) are
also those in which galvanic currents can most easily ow.
b Oxidation
Brazed and welded joints and connections are the points most sensitive to oxidation.
Thorough cleaning of a newly made joint or connection and wrapping with a suitable
greased-tape binding is a commonly used preventive measure.
Measurement of the earth-electrode resistance
There must always be one or more removable links to isolate an earth electrode so
that it can be tested.
There must always be removable links which allow the earth electrode to be isolated
from the installation, so that periodic tests of the earthing resistance can be carried
out. To make such tests, two auxiliary electrodes are required, each consisting of a
vertically driven rod.
b Ammeter method (see Fig. E25)
Fig. E25 : Measurement of the resistance to earth of the earth electrode of an installation by
means of an ammeter
U
A
t2
T
t1
A R R
U
i
B R R
U
i
C R R
U
i
T t
Tt
t t
t t
t T
t T
= + =
= + =
= + =
1
1
1
1 2
1 2
2
2
2
3
When the source voltage U is constant (adjusted to be the same value for each test)
then:
R
U
i i i
T
= +
2
1 1 1
1 3 2
1 Earthing schemes
Schneider Electric - Electrical installation guide 2013
E - Distribution in low-voltage installations
E14
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Earthing schemes
In order to avoid errors due to stray earth currents (galvanic -DC- or leakage currents
from power and communication networks and so on) the test current should be
AC, but at a different frequency to that of the power system or any of its harmonics.
Instruments using hand-driven generators to make these measurements usually
produce an AC voltage at a frequency of between 85 Hz and 135 Hz.
The distances between the electrodes are not critical and may be in different
directions from the electrode being tested, according to site conditions. A number of
tests at different spacings and directions are generally made to cross-check the test
results.
b Use of a direct-reading earthing-resistance ohmmeter
These instruments use a hand-driven or electronic-type AC generator, together
with two auxiliary electrodes, the spacing of which must be such that the zone of
inuence of the electrode being tested should not overlap that of the test electrode (C).
The test electrode (C) furthest from the electrode (X) under test, passes a current
through the earth and the electrode under test, while the second test electrode (P)
picks up a voltage. This voltage, measured between (X) and (P), is due to the test
current and is a measure of the contact resistance (of the electrode under test) with
earth. It is clear that the distance (X) to (P) must be carefully chosen to give accurate
results. If the distance (X) to (C) is increased, however, the zones of resistance of
electrodes (X) and (C) become more remote, one from the other, and the curve of
potential (voltage) becomes more nearly horizontal about the point (O).
In practical tests, therefore, the distance (X) to (C) is increased until readings taken
with electrode (P) at three different points, i.e. at (P) and at approximately 5 metres
on either side of (P), give similar values. The distance (X) to (P) is generally about
0.68 of the distance (X) to (C).
Fig. E26 : Measurement of the resistance to the mass of earth of electrode (X) using an earth-
electrode-testing ohmmeter.
X C P
O
X P
O
C
voltage-drop due
to the resistance
of electrode (X)
voltage-drop due
to the resistance
of electrode (C)
V
G
VG
VG
I
a) the principle of measurement is based on assumed homogeneous soil conditions. Where the
zones of inuence of electrodes C and X overlap, the location of test electrode P is difcult to
determine for satisfactory results.
b) showing the effect on the potential gradient when (X) and (C) are widely spaced. The location
of test electrode P is not critical and can be easily determined.
Schneider Electric - Electrical installation guide 2013
E15
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
E - Distribution in low-voltage installations
2 The installation system
2.1 Distribution switchboards
A distribution switchboard is the point at which an incoming-power supply divides
into separate circuits, each of which is controlled and protected by the fuses or
switchgear of the switchboard. A distribution switchboard is divided into a number
of functional units, each comprising all the electrical and mechanical elements
that contribute to the fullment of a given function. It represents a key link in the
dependability chain.
Consequently, the type of distribution switchboard must be perfectly adapted to its
application. Its design and construction must comply with applicable standards and
working practises.
The distribution switchboard enclosure provides dual protection:
b Protection of switchgear, indicating instruments, relays, fusegear, etc. against
mechanical impacts, vibrations and other external inuences likely to interfere with
operational integrity (EMI, dust, moisture, vermin, etc.)
b The protection of human life against the possibility of direct and indirect electric
shock (see degree of protection IP and the IK index in section 3.3 of Chapter E).
Types of distribution switchboards
Distribution switchboards may differ according to the kind of application and the
design principle adopted (notably in the arrangement of the busbars).
Distribution switchboards according to specic applications
The principal types of distribution switchboards are:
b The main LV switchboard - MLVS - (see Fig. E27a)
b Motor control centres - MCC - (see Fig. E27b)
b Sub-distribution switchboards (see Fig. E28)
b Final distribution switchboards (see Fig. E29)
Distribution switchboards for specic applications (e.g. heating, lifts, industrial
processes) can be located:
b Adjacent to the main LV switchboard, or
b Near the application concerned
Sub-distribution and nal distribution switchboards are generally distributed
throughout the site.
Distribution switchboards, including the main
LV switchboard (MLVS), are critical to the
dependability of an electrical installation.
They must comply with well-dened standards
governing the design and construction of
LV switchgear assemblies
The load requirements dictate the type of
distribution switchboard to be installed
Fig. E27 : [a] A main LV switchboard - MLVS - (Prisma Plus P) with incoming circuits in the form
of busways - [b] A LV motor control centre - MCC - (Okken)
Fig. E28 : A sub-distribution switchboard (Prisma Plus G) Fig. E29 : Final distribution switchboards [a] Prisma Plus G Pack; [b] Kaedra; [c] mini-Pragma
a b c
a b
Schneider Electric - Electrical installation guide 2013
E - Distribution in low-voltage installations
E16
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Two technologies of distribution switchboards
Traditional distribution switchboards
Switchgear and fusegear, etc. are normally located on a chassis at the rear of the
enclosure. Indications and control devices (meters, lamps, pushbuttons, etc.) are
mounted on the front face of the switchboard.
The placement of the components within the enclosure requires very careful study,
taking into account the dimensions of each item, the connections to be made to it,
and the clearances necessary to ensure safe and trouble-free operation. .
Functional distribution switchboards
Generally dedicated to specic applications, these distribution switchboards are
made up of functional modules that include switchgear devices together with
standardised accessories for mounting and connections, ensuring a high level of
reliability and a great capacity for last-minute and future changes.
b Many advantages
The use of functional distribution switchboards has spread to all levels of LV
electrical distribution, from the main LV switchboard (MLVS) to nal distribution
switchboards, due to their many advantages:
v System modularity that makes it possible to integrate numerous functions in a
single distribution switchboard, including protection, control, technical management
and monitoring of electrical installations. Modular design also enhances distribution
switchboard maintenance, operation and upgrades
v Distribution switchboard design is fast because it simply involves adding functional
modules
v Prefabricated components can be mounted faster
v Finally, these distribution switchboards are subjected to type tests that ensure a
high degree of dependability.
The new Prisma Plus G and P ranges of functional distribution switchboards from
Schneider Electric cover needs up to 3200 A and offer:
v Flexibility and ease in building distribution switchboards
v Certication of a distribution switchboard complying with standard IEC 61439 and
the assurance of servicing under safe conditions
v Time savings at all stages, from design to installation, operation and modications
or upgrades
v Easy adaptation, for example to meet the specic work habits and standards in
different countries
Figures E27a, E28 and E29 show examples of functional distribution switchboards
ranging for all power ratings and gure E27b shows a high-power industrial functional
distribution switchboard.
b Main types of functional units
Three basic technologies are used in functional distribution switchboards.
v Fixed functional units (see Fig. E30)
These units cannot be isolated from the supply so that any intervention for
maintenance, modications and so on, requires the shutdown of the entire
distribution switchboard. Plug-in or withdrawable devices can however be used to
minimise shutdown times and improve the availability of the rest of the installation.
v Disconnectable functional units (see Fig. E31)
Each functional unit is mounted on a removable mounting plate and provided with a
means of isolation on the upstream side (busbars) and disconnecting facilities on the
downstream (outgoing circuit) side. The complete unit can therefore be removed for
servicing, without requiring a general shutdown.
v Drawer-type withdrawable functional units (see Fig. E32)
The switchgear and associated accessories for a complete function are mounted on
a drawer-type horizontally withdrawable chassis. The function is generally complex
and often concerns motor control.
Isolation is possible on both the upstream and downstream sides by the complete
withdrawal of the drawer, allowing fast replacement of a faulty unit without de-
energising the rest of the distribution switchboard.
A distinction is made between:
b Traditional distribution switchboards in which
switchgear and fusegear, etc. are xed to a
chassis at the rear of an enclosure
b Functional distribution switchboards for
specic applications, based on modular and
standardised design.
Fig. E30 : Assembly of a nal distribution switchboard with
xed functional units (Prisma Plus G)
Fig. E31 : Distribution switchboard with disconnectable
functional units
Fig. E32 : Distribution switchboard with withdrawable functional
units in drawers
Schneider Electric - Electrical installation guide 2013
E17
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Standards
Different standards
Certain types of distribution switchboards (in particular, functional distribution
switchboards) must comply with specic standards according to the application or
environment involved.
The reference international standards are IEC 61439-x series (Low-voltage
switchgear and controlgear assemblies), in which:
b IEC 61439-1 is dedicated to General rules
b IEC 61439-2 is dedicated to Power switchgear and controlgear Assemblies (PSC)
Standards IEC 61439-1 & 2
b Assembly system concept & denitions
v Assembly system: full range of mechanical and electrical components as dened
by the Original Manufacturer (enclosures, busbars, functional units, including
switchgear and control gear, terminals, ) which can be assembled in accordance
with the Original Manufacturers instructions, either in its factory, or on the installation
site, in order to produce various ASSEMBLIES.
Compliance with applicable standards is
essential in order to ensure an adequate
degree of dependability
Three elements of standards IEC 61439-1 & 2
contribute signicantly to dependability:
b Clear denition of functional units
b Forms of separation between adjacent
functional units in accordance with user
requirements
b Clearly dened verication tests and routine
verication
2 The installation system
Fig. E32b : Main rules dened by the IEC 61439-1&2 standard
v Original Manufacturer: The organisation that has carried out the original design and
the associated verication of an assembly system. He is responsible for the 'Design
verications' listed by IEC 61439-2 including many electrical tests.
v Assembly manufacturer: The organisation (whether or not the same as the
OM) responsible for the completed assembly. He is responsible for 'Routine
verications' on each panel produced, according to the standard. If he derivates
from the instructions of the original manufacturer he has to carry out again design
verications.
v Specier: Species the needs and constraints for design, installation, operation
and upgrading of the complete system. Checks that its requirements have been fully
integrated by the Assembly Manufacturer. Depending on the application, the specier
could be the end-user or a design ofce.
v End User: Should ask for a certied LV switchboard. By systematically requesting
routine verications, he ensures that the assembly system used is compliant.
Note: the IEC 60439-1 two categories TTA (Type-tested LV switchgear and
controlgear assemblies) and PTTA (Partially type-tested LV switchgear and
controlgear assemblies) dont exist anymore in IEC 61439-1.
b Functional units
The same standard denes functional units:
v Part of an assembly comprising all the electrical and mechanical elements that
contribute to the fullment of the same function
v The distribution switchboard includes an incoming functional unit and one or more
functional units for outgoing circuits, depending on the operating requirements of the
installation
What is more, distribution switchboard technologies use functional units that may be
xed, disconnectable or withdrawable (see see section 4.2 of Chapter D & g. E30,
E31, E32).
Schneider Electric - Electrical installation guide 2013
E - Distribution in low-voltage installations
E18
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
b Forms (see Fig. E33)
Separation of functional units within the assembly is provided by forms that are
specied for different types of operation.
The various forms are numbered from 1 to 4 with variations labelled a or b. Each
step up (from 1 to 4) is cumulative, i.e. a form with a higher number includes the
characteristics of forms with lower numbers. The standard distinguishes:
v Form 1: No separation
v Form 2: Separation of busbars from the functional units
v Form 3: Separation of busbars from the functional units and separation of all
functional units, one from another, except at their output terminals
v Form 4: As for Form 3, but including separation of the outgoing terminals of all
functional units, one from another
The decision on which form to implement results from an agreement between the
manufacturer and the user.
The Prima Plus functional range offers solutions for forms 1, 2b, 3b, 4a, 4b.
b Verication tests and routine verication
They ensure compliance of each distribution switchboard with the standard. The
availability of certicates of conformity issued by third-party bodies is a guarantee for
users.
Fig. E33 : Representation of different forms of LV functional distribution switchboards
Form 1 Form 2a Form 2b Form 3a
Busbar
Separation
Form 3b Form 4a Form 4b
Schneider Electric - Electrical installation guide 2013
E19
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Total accessibility of electrical information and
intelligent distribution switchboards are now a
reality
Two types of distribution are possible:
b By insulated wires and cables
b By busbar trunking (busways)
2 The installation system
Remote monitoring and control of the electrical installation
Remote monitoring and control are no longer limited to large installations.
These functions are increasingly used and provide considerable cost savings.
The main potential advantages are:
b Reductions in energy bills
b Reductions in structural costs to maintain the installation in running order
b Better use of the investment, notably concerning optimisation of the installation life
cycle
b Greater satisfaction for energy users (in a building or in process industries) due to
improved power availability and/or quality
The above possibilities are all the more an option given the current deregulation of
the electrical-energy sector.
Modbus is increasingly used as the open standard for communication within the
distribution switchboard and between the distribution switchboard and customer
power monitoring and control applications. Modbus exists in two forms, twisted pair
(RS 485) and Ethernet-TCP/IP (IEEE 802.3).
The www.modbus.org site presents all bus specications and constantly updates the
list of products and companies using the open industrial standard.
The use of web technologies has largely contributed to wider use by drastically
reducing the cost of accessing these functions through the use of an interface that is
now universal (web pages) and a degree of openness and upgradeability that simply
did not exist just a few years ago.
2.2 Cables and busways
Distribution by insulated conductors and cables
Denitions
b Conductor
A conductor comprises a single metallic core with or without an insulating envelope.
b Cable
A cable is made up of a number of conductors, electrically separated, but joined
mechanically, generally enclosed in a protective exible sheath.
b Cableway
The term cableway refers to conductors and/or cables together with the means of
support and protection, etc. for example : cable trays, ladders, ducts, trenches, and
so on are all cableways.
Conductor marking
Conductor identication must always respect the following three rules:
b Rule 1
The double colour green and yellow is strictly reserved for the PE and PEN
protection conductors.
b Rule 2
v When a circuit comprises a neutral conductor, it must be light blue or marked 1 for
cables with more than ve conductors
v When a circuit does not have a neutral conductor, the light blue conductor may be
used as a phase conductor if it is part of a cable with more than one conductor
b Rule 3
Phase conductors may be any colour except:
v Green and yellow
v Green
v Yellow
v Light blue (see rule 2)
Schneider Electric - Electrical installation guide 2013
E - Distribution in low-voltage installations
E20
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Conductors in a cable are identied either by their colour or by numbers (see Fig. E34).
Number of Circuit Fixed cableways
conductors
Insulated conductors Rigid and exible multi-
in circuit
conductor cables
Ph Ph Pn N PE Ph Ph Ph N PE
1 Protection or earth G/Y
2 Single-phase between phases b b BL LB
Single-phase between phase and neutral b LB BL LB
Single-phase between phase and neutral b G/Y BL G/Y
+ protection conductor
3 Three-phase without neutral b b b BL B LB
2 phases + neutral b b LB BL B LB
2 phases + protection conductor b b G/Y BL LB G/Y
Single-phase between phase and neutral b LB G/Y BL LB G/Y
+ protection conductor
4 Three-phase with neutral b b b LB BL B BL LB
Three-phase with neutral + protection conductor b b b G/Y BL B LB G/Y
2 phases + neutral + protection conductor b b LB G/Y BL B LB G/Y
Three-phase with PEN conductor b b b G/Y BL B LB G/Y
5 Three-phase + neutral + protection conductor b b b LB G/Y BL B BL LB G/Y
> 5 Protection conductor: G/Y - Other conductors: BL: with numbering
The number 1 is reserved for the neutral conductor if it exists
G/Y: Green and yellow BL: Black b : As indicated in rule 3 LB: Light blue B: Brown
Note: If the circuit includes a protection conductor and if the available cable does not
have a green and yellow conductor, the protection conductor may be:
b A separate green and yellow conductor
b The blue conductor if the circuit does not have a neutral conductor
b A black conductor if the circuit has a neutral conductor
In the last two cases, the conductor used must be marked by green and yellow
bands or markings at the ends and on all visible lengths of the conductor.
Equipment power cords are marked similar to multi-conductor cables (see Fig. E35).
Distribution and installation methods (see Fig. E36)
Distribution takes place via cableways that carry single insulated conductors or
cables and include a xing system and mechanical protection.
Fig. E34 : Conductor identication according to the type of circuit
Fig. E35 : Conductor identication on a circuit-breaker with a
phase and a neutral
Black conductor
N
Light blue conductor
Heating, etc.
Building utilities sub-distribution swichboard
Main LV switchboard
(MLVS)
Final
distribution
swichboard
Floor sub-
distribution
swichboard
Fig. E36 : Radial distribution using cables in a hotel
Schneider Electric - Electrical installation guide 2013
E21
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 The installation system
Busbar trunking (busways)
Busbar trunking is intended to distribute power (from 20 A to 5000 A) and lighting
(in this application, the busbar trunking may play a dual role of supplying electrical
power and physically holding the lights).
Busbar trunking system components
A busbar trunking system comprises a set of conductors protected by an enclosure
(see Fig. E37). Used for the transmission and distribution of electrical power, busbar
trunking systems have all the necessary features for tting: connectors, straights,
angles, xings, etc. The tap-off points placed at regular intervals make power
available at every point in the installation.
Busways, also referred to as busbar trunking
systems, stand out for their ease of installation,
exibility and number of possible connection
points
The various types of busbar trunking:
Busbar trunking systems are present at every level in electrical distribution: from
the link between the transformer and the low voltage switch switchboard (MLVS)
to the distribution of power sockets and lighting to ofces, or power distribution to
workshops.
Fig. E37 : Busbar trunking system design for distribution of currents from 25 to 4000 A.
Straight trunking Tap-off points to
distribute current
Fixing system for ceilings, walls or
raised oor, etc.
End piece
Power Unit Range of clip-on tap-off units to
connect a load (e.g.: a machine) to
the busbar trunking
Angle
Fig. E38 : Radial distribution using busways
We talk about a distributed network architecture.
Schneider Electric - Electrical installation guide 2013
E - Distribution in low-voltage installations
E22
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
There are essentially three categories of busways.
b Transformer to MLVS busbar trunking
Installation of the busway may be considered as permanent and will most likely never
be modied. There are no tap-off points.
Frequently used for short runs, it is almost always used for ratings above 1,600 /
2,000 A, i.e. when the use of parallel cables makes installation impossible. Busways
are also used between the MLVS and downstream distribution switchboards.
The characteristics of main-distribution busways authorize operational currents from
1,000 to 5,000 A and short-circuit withstands up to 150 kA.
b Sub-distribution busbar trunking with low or high tap-off densities
Downstream of main-distribution busbar trunking , two types of applications must be
supplied:
v Mid-sized premises (industrial workshops with injection presses and metalwork
machines or large supermarkets with heavy loads). The short-circuit and current
levels can be fairly high (respectively 20 to 70 kA and 100 to 1,000 A)
v Small sites (workshops with machine-tools, textile factories with small machines,
supermarkets with small loads). The short-circuit and current levels are lower
(respectively 10 to 40 kA and 40 to 400 A)
Sub-distribution using busbar trunking meets user needs in terms of:
v Modications and upgrades given the high number of tap-off points
v Dependability and continuity of service because tap-off units can be connected
under energized conditions in complete safety
The sub-distribution concept is also valid for vertical distribution in the form of 100 to
5,000 A risers in tall buildings.
b Lighting distribution busbar trunking
Lighting circuits can be distributed using two types of busbar trunking according to
whether the lighting xtures are suspended from the busbar trunking or not.
v busbar trunking designed for the suspension of lighting xtures
These busways supply and support light xtures (industrial reectors, discharge
lamps, etc.). They are used in industrial buildings, supermarkets, department stores
and warehouses. The busbar trunkings are very rigid and are designed for one or
two 25 A or 40 A circuits. They have tap-off outlets every 0.5 to 1 m.
v busbar trunking not designed for the suspension of lighting xtures
Similar to prefabricated cable systems, these busways are used to supply all types
of lighting xtures secured to the building structure. They are used in commercial
buildings (ofces, shops, restaurants, hotels, etc.), especially in false ceilings. The
busbar trunking is exible and designed for one 20 A circuit. It has tap-off outlets
every 1.2 m to 3 m.
Busbar trunking systems are suited to the requirements of a large number of
buildings.
b Industrial buildings: garages, workshops, farm buildings, logistic centers, etc.
b Commercial areas: stores, shopping malls, supermarkets, hotels, etc.
b Tertiary buildings: ofces, schools, hospitals, sports rooms, cruise liners, etc.
Standards
Busbar trunking systems must meet all rules stated in IEC 61439-6.
This denes the manufacturing arrangements to be complied with in the design
of busbar trunking systems (e.g.: temperature rise characteristics, short-circuit
withstand, mechanical strength, etc.) as well as test methods to check them.
The new standard IEC61439-6 describes in particular the design verications and
routine verications required to ensure compliance.
By assembling the system components on the site according to the assembly
instructions, the contractor benets from conformity with the standard.
The advantages of busbar trunking systems
Flexibility
b Easy to change conguration (on-site modication to change production line
conguration or extend production areas).
b Reusing components (components are kept intact): when an installation is subject
to major modications, the busbar trunking is easy to dismantle and reuse.
b Power availability throughout the installation (possibility of having a tap-off point
every meter).
b Wide choice of tap-off units.
Schneider Electric - Electrical installation guide 2013
E23
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 The installation system
Simplicity
b Design can be carried out independently from the distribution and layout of current
consumers.
b Performances are independent of implementation: the use of cables requires a lot
of derating coefcients.
b Clear distribution layout
b Reduction of tting time: the trunking system allows tting times to be reduced by
up to 50% compared with a traditional cable installation.
b Manufacturers guarantee.
b Controlled execution times: the trunking system concept guarantees that there are
no unexpected surprises when tting. The tting time is clearly known in advance
and a quick solution can be provided to any problems on site with this adaptable and
scalable equipment.
b Easy to implement: modular components that are easy to handle, simple and quick
to connect.
Dependability
b Reliability guaranteed by being factory-built
b Fool-proof units
b Sequential assembly of straight components and tap-off units making it impossible
to make any mistakes
Continuity of service
b The large number of tap-off points makes it easy to supply power to any new
current consumer. Connecting and disconnecting is quick and can be carried out in
complete safety even when energized. These two operations (adding or modifying)
take place without having to stop operations.
b Quick and easy fault location since current consumers are near to the line
b Maintenance is non existent or greatly reduced
Major contribution to sustainable development
b Busbar trunking systems allow circuits to be combined. Compared with a
traditional cable distribution system, consumption of copper raw materials and
insulators is divided by 3 due to the busbar trunking distributed network concept
(see Fig. E39).
b Reusable device and all of its components are fully recyclable.
b Does not contain PVC and does not generate toxic gases or waste.
b Reduction of risks due to exposure to electromagnetic elds.
New functional features for Canalis
Busbar trunking systems are getting even better. Among the new features we can
mention:
b Increased performance with a IP55 protection index and new ratings of 160 A
through to 1000 A (Ks).
b New lighting offers with pre-cabled lights and new light ducts.
b New xing accessories. Quick xing system, cable ducts, shared support with
VDI (voice, data, images) circuits.
I
1
I
2
I
3
I
4
I
5
I
6
I
7
I
1
I
2
I
3
I
4
I
5
I
6
I
7
Distribution type Conductors Insulators Consumption
1 000 Joules 4 kg Alu: 128 mm
1 600 Joules 12 kg Copper: 250 mm
Copper equivalent: 86 mm
Branched
ks: clustering coefficient= 0.6
ks: clustering coefficient= 0.6
Centralized
R R R R R R R
R R R R R R R
I
x
k
s
I
x
k
s
Fig. E39 : Example: 30 m of Canalis KS 250A equipped with 10 25 A, four-pole feeders
Schneider Electric - Electrical installation guide 2013
E - Distribution in low-voltage installations
E24
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Busbar trunking systems are perfectly integrated with the environment:
b white color to enhance the working environment, naturally integrated in a range of
electrical distribution products.
b conformity with European regulations on reducing hazardous materials (RoHS).
Examples of Canalis busbar trunking systems
Fig. E40 : Flexible busbar trunking not capable of supporting light ttings : Canalis KDP (20 A)
Fig. E41 : Rigid busbar trunking able to support light ttings : Canalis KBA or KBB (25 and 40 A)
Fig. E42 : Lighting duct : Canalis KBX (25 A)
Fig. E43 : A busway for medium power distribution : Canalis KN (40 up to 160 A)
Schneider Electric - Electrical installation guide 2013
E25
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. E44 : A busway for medium power distribution : Canalis KS (100 up to 1000 A)
Fig. E45 : A busway for high power distribution : Canalis KT (800 up to 1000 A)
2 The installation system
Schneider Electric - Electrical installation guide 2013
E - Distribution in low-voltage installations
E26
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 External inuences
(IEC 60364-5-51)
3.1 Denition and reference standards
Every electrical installation occupies an environment that presents a variable degree
of risk:
b For people
b For the equipment constituting the installation
Consequently, environmental conditions inuence the denition and choice of
appropriate installation equipment and the choice of protective measures for the
safety of persons.
The environmental conditions are referred to collectively as external inuences.
Many national standards concerned with external inuences include a classication
scheme which is based on, or which closely resembles, that of international standard
IEC 60364-5-51.
3.2 Classication
Each condition of external inuence is designated by a code comprising a group of
two capital letters and a number as follows:
First letter (A, B or C)
The rst letter relates to the general category of external inuence :
b A = environment
b B = utilisation
b C = construction of buildings
Second letter
The second letter relates to the nature of the external inuence.
Number
The number relates to the class within each external inuence.
Additional letter (optional)
Used only if the effective protection of persons is greater than that indicated by the
rst IP digit.
When only the protection of persons is to be specied, the two digits of the IP code
are replaced by the Xs.
Example: IP XXB.
Example
For example the code AC2 signies:
A = environment
AC = environment-altitude
AC2 = environment-altitude > 2,000 m
3.3 List of external inuences
Figure E46 below is from IEC 60364-5-51, which should be referred to if further
details are required.
External inuences shall be taken into account
when choosing:
b The appropriate measures to ensure the
safety of persons (in particular in special
locations or electrical installations)
b The characteristics of electrical equipment,
such as degree of protection (IP), mechanical
withstand (IK), etc.
If several external inuences appear at the
same time, they can have independent or
mutual effects and the degree of protection must
be chosen accordingly
Code External inuences Characteristics required for equipment
A - Environment
AA Ambient temperature (C)
Low High Specially designed equipment or appropriate arrangements
AA1 - 60 C + 5 C
AA2 - 40 C + 5 C
AA3 - 25 C + 5 C
AA4 - 5 C + 40 C Normal (special precautions in certain cases)
AA5 + 5 C + 40 C Normal
AA6 + 5 C + 60 C Specially designed equipment or appropriate arrangements
AA7 - 25 C + 55 C
AA8 - 50 C + 40 C
Fig. E46 : List of external inuences (taken from Appendix A of IEC 60364-5-51) (continued on next page)
E - Distribution in low-voltage installations
Schneider Electric - Electrical installation guide 2013
E27
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Code External inuences Characteristics required for equipment
A - Environment
AB Atmospheric humidity
Air temperature C Relative humidity % Absolute humidity g/m
3
Low High Low High Low High
AB1 - 60 C + 5 C 3 100 0.003 7 Appropriate arrangements shall be made
AB2 - 40 C + 5 C 10 100 0.1 7
AB3 - 25 C + 5 C 10 100 0.5 7
AB4 - 5 C + 40 C 5 95 1 29 Normal
AB5 + 5 C + 40 C 5 85 1 25 Normal
AB6 + 5 C + 60 C 10 100 1 35 Appropriate arrangements shall be made
AB7 - 25 C + 55 C 10 100 0.5 29
AB8 - 50 C + 40 C 15 100 0.04 36
AC Altitude
AC1 y 2000 m Normal
AC2 > 2000 m May necessitate precaution (derating factors)
AD Presence of water
AD1 Negligible Outdoor or non-weather protected locations IPX0
AD2 Free-falling drops IPX1 or IPX2
AD3 Sprays IPX3
AD4 Splashes IPX4
AD5 Jets Locations where hose water is used regularly IPX5
AD6 Waves Seashore locations (piers, beaches, quays) IPX6
AD7 Immersion Water 150 mm above the highest point and IPX7
equipment not more than 1m below the surface
AD8 Submersion Equipment is permanently and totally covered IPX8
AE Presence of foreign solid bodies
Smallest dimension Example
AE1 Negligible IP0X
AE2 Small objects 2.5 mm Tools IP3X
AE3 Very small objects 1 mm Wire IP4X
AE4 Light dust IP5X if dust penetration is not harmful to functioning
AE5 Moderate dust IP6X if dust should not penetrate
AE6 Heavy dust IP6X
AF Presence of corrosive or polluting substances
AF1 Negligible Normal
AF2 Atmospheric According to the nature of the substance
AF3 Intermittent, accidental Protection against corrosion
AF4 Continuous Equipment specially designed
AG Mechanical stress impact
AG1 Low severity Normal
AG2 Medium severity Standard where applicable or reinforced material
AG3 High severity Reinforced protection
AH Vibrations
AH1 Low severity Household or similar Normal
AH2 Medium severity Usual industrial conditions Specially designed equipment or special arrangements
AH3 High severity Severe industrial conditions
AJ Other mechanical stresses
AK Presence of ora and/or mould growth
AH1 No hazard Normal
AH2 Hazard
AL Presence of fauna
AH1 No hazard Normal
AH2 Hazard
AM Electromagnetic, electrostatic or ionising inuences / Low frequency electromagnetic phenomena / Harmonics
AM1 Harmonics, interharmonics Refer to applicable IEC standards
AM2 Signalling voltage
AM3 Voltage amplitude variations
AM4 Voltage unbalance
AM5 Power frequency variations
AM6 Induced low-frequency voltages
AM7 Direct current in a.c. networks
AM8 Radiated magnetic elds
AM9 Electric eld
AM21 Induced oscillatory voltages or currents
Fig. E46 : List of external inuences (taken from Appendix A of IEC 60364-5-51) (continued on next page)
3 External inuences
(IEC 60364-5-51)
Schneider Electric - Electrical installation guide 2013
E - Distribution in low-voltage installations
E28
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. E46 : List of external inuences (taken from Appendix A of IEC 60364-5-51) (concluded)
Code External inuences Characteristics required for equipment
A - Environment
AM22 Conducted unidirectional transients of the nanosecond time scale Refer to applicable IEC standards
AM23 Conducted unidirectional transients of the microsecond to the millisecond
time scale
AM24 Conducted oscillatory transients
AM25 Radiated high frequency phenomena
AM31 Electrostatic discharges
AM41 Ionisation
AN Solar radiation
AN1 Low Normal
AN2 Medium
AN3 High
AP Seismic effect
AP1 Negligible Normal
AP2 Low severity
AP3 Medium severity
AP4 High severity
AQ Lightning
AQ1 Negligible Normal
AQ2 Indirect exposure
AQ3 Direct exposure
AR Movement of air
AQ1 Low Normal
AQ2 Medium
AQ3 High
AS Wind
AQ1 Low Normal
AQ2 Medium
AQ3 High
B - Utilization
BA Capability of persons
BA1 Ordinary Normal
BA2 Children
BA3 Handicapped
BA4 Instructed
BA5 Skilled
BB Electrical resistance of human body
BC Contact of persons with earth potential
BC1 None Class of equipment according to IEC61140
BC2 Low
BC3 Frequent
BC4 Continuous
BD Condition of evacuation in case of emergency
BD1 Low density / easy exit Normal
BD2 Low density / difcult exit
BD3 High density / easy exit
BD4 High density / difcult exit
BE Nature of processed or stored materials
BE1 No signicant risks Normal
BE2 Fire risks
BE3 Explosion risks
BE4 Contamination risks
C - Construction of building
CA Construction materials
CA1 Non combustible Normal
CA2 Combustible
CB Building design
CB1 Negligible risks Normal
CB2 Propagation of re
CB3 Movement
CB4 lexible or unstable
Schneider Electric - Electrical installation guide 2013
E29
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 External inuences
(IEC 60364-5-51)
3.4 Protection provided for enclosed equipment:
codes IP and IK
IP code denition (see Fig. E47)
The degree of protection provided by an enclosure is indicated in the IP code,
recommended in IEC 60529.
Protection is afforded against the following external inuences:
b Penetration by solid bodies
b Protection of persons against access to live parts
b Protection against the ingress of dust
b Protection against the ingress of liquids
Note: the IP code applies to electrical equipment for voltages up to and including
72.5 kV.
Elements of the IP Code and their meanings
A brief description of the IP Code elements is given in the following chart
(see Fig. E48).
Fig. E47 : IP Code arrangement
IP 2 3 C H
Code letters
(International Protection)
First characteristic numeral
(numerals 0 to 6, or letter X)
Second characteristic numeral
(numerals 0 to 6, or letter X)
Additional letter (optional)
(letters A, B, C, D)
Supplementary letter (optional)
(letters H, M, S, W)
Where a characteristic numeral is not required to be specified,
it shall be replaced by the letter "X" ("XX" if both numerals
are omitted). Additional letters and/or supplementary letters
may be omitted without replacement.
Code letters
Element Numerals
or letters
Meaning for the protection
of equipment
Meaning for the
protection of persons
First
characteristic
numeral
0
1
2
3
4
5
6
IP
Against ingress of solid foreign
objects
(non-protected)
u 50 mm diameter
u 12.5 mm diameter
u 2.5 mm diameter
u 1.0 mm diameter
Dust-protected
Dust-tight
Against access to
hazardous parts with
(non-protected)
Back of hand
Finger
Tool
Wire
Wire
Wire
Additional
letter
(optional) A
B
C
D
Against access to
hazardous parts with
back of hand
Finger
Tool
Wire
Supplementary
letter
(optional)
H
M
S
W
Supplementary information specific to:
High-voltage apparatus
Motion during water test
Stationary during water test
Weather conditions
Second
characteristic
numeral
0
1
2
3
4
5
6
7
8
Against ingress of water with
harmful effects
(non-protected)
Vertically dripping
Dripping (15 tilted)
Spraying
Splashing
Jetting
Powerful jetting
Temporary immersion
Continuous immersion
Fig. E48 : Elements of the IP Code
Schneider Electric - Electrical installation guide 2013
E - Distribution in low-voltage installations
E30
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 External inuences
(IEC 60364-5-51)
IK Code denition
Standard IEC 62262 denes an IK code that characterises the aptitude of equipment
to resist mechanical impacts on all sides (see Fig. E49).
Fig. E49 : Elements of the IK Code
IK code Impact energy AG code
(in Joules)
00 0
01 y 0.14
02 y 0.20 AG1
03 y 0.35
04 y 0.50
05 y 0.70
06 y 1
07 y 2 AG2
08 y 5 AG3
09 y 10
10 y 20 AG4
IP and IK code specications for distribution switchboards
The degrees of protection IP and IK of an enclosure must be specied as a function
of the different external inuences dened by standard IEC 60364-5-51, in particular:
b Presence of solid bodies (code AE)
b Presence of water (code AD)
b Mechanical stresses (no code)
b Capability of persons (code BA)
b
Prisma Plus switchboards are designed for indoor installation.
Unless the rules, standards and regulations of a specic country stipulate otherwise,
Schneider Electric recommends the following IP and IK values (see Fig. E50 and
Fig. E51 )
IP recommendations
Fig. E50 : IP recommendations
Fig. E51 : IK recommendations
IK recommendations
IP codes according to conditions
Normal without risk of vertically falling water Technical rooms 30
Normal with risk of vertically falling water Hallways 31
Very severe with risk of splashing water Workshops 54/55
from all directions
IK codes according to conditions
No risk of major impact Technical rooms 07
Signicant risk of major impact that could Hallways 08 (enclosure
damage devices with door)
Maximum risk of impact that could damage Workshops 10
the enclosure
F1
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapter F
Protection against electric shocks
Contents
General F2
1.1 Electric shock F2
1.2 Protection against electric shock F3
1.3 Direct and indirect contact F3
Protection against direct contact F4
2.1 Measures of protection against direct contact F4
2.2 Additional measure of protection against direct contact F6
Protection against indirect contact F6
3.1 Measures of protection: two levels F6
3.2 Automatic disconnection for TT system F7
3.3 Automatic disconnection for TN systems F8
3.4 Automatic disconnection on a second fault in an IT system F10
3.5 Measures of protection against direct or indirect contact
without automatic disconnection of supply F13
Protection of goods in case of insulation fault F17
4.1 Measures of protection against re risk with RCDs F17
4.2 Ground Fault Protection (GFP) F17
Implementation of the TT system F19
5.1 Protective measures F19
5.2 Coordination of residual current protective devices F20
Implementation of the TN system F23
6.1 Preliminary conditions F23
6.2 Protection against indirect contact F23
6.3 High-sensitivity RCDs F27
6.4 Protection in high re-risk locations F28
6.5 When the fault current-loop impedance is particularly high F28
Implementation of the IT system F29
7.1 Preliminary conditions F29
7.2 Protection against indirect contact F30
7.3 High-sensitivity RCDs F34
7.4 Protection in high re-risk locations F35
7.5 When the fault current-loop impedance is particularly high F35
Residual current differential devices (RCDs) F36
8.1 Types of RCDs F36
8.2 Description F36
8.3 Sensitivity of RDCs to disturbances F39
1
2
3
4
5
6
7
8
Schneider Electric - Electrical installation guide 2013
F2
F - Protection against electric shock
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 General
1.1 Electric shock
An electric shock is the pathophysiological effect of an electric current through the
human body.
Its passage affects essentially the muscular, circulatory and respiratory functions and
sometimes results in serious burns. The degree of danger for the victim is a function
of the magnitude of the current, the parts of the body through which the current
passes, and the duration of current ow.
IEC publication 60479-1 updated in 2005 denes four zones of current-magnitude/
time-duration, in each of which the pathophysiological effects are described
(see Fig F1). Any person coming into contact with live metal risks an electric shock.
Curve C1 shows that when a current greater than 30 mA passes through a human
being from one hand to feet, the person concerned is likely to be killed, unless the
current is interrupted in a relatively short time.
The point 500 ms/100 mA close to the curve C1 corresponds to a probability of heart
brillation of the order of 0.14%.
The protection of persons against electric shock in LV installations must be provided
in conformity with appropriate national standards and statutory regulations, codes of
practice, ofcial guides and circulars, etc. Relevant IEC standards include: IEC 60364
series, IEC 60479 series, IEC 60755, IEC 61008 series, IEC 61009 series and IEC
60947-2.
Fig. F1 : Zones time/current of effects of AC current on human body when passing from left hand to feet
Body current
I
s
(mA)
10
20
50
100
200
500
1,000
5,000
10,000
2,000
C
1
C
2
C
3
Duration of current
flow I (ms)
A B
AC-2 AC-3 AC-4
0.1 0.2 0.5 1 2 5 10 20 50 100 200 500
1,000
2,000
5,000
10,000
AC-1
AC-4.1
AC-4.2
AC-4.3
AC-1 zone: Imperceptible
AC-2 zone: Perceptible
AC-3 zone : Reversible effects: muscular contraction
AC-4 zone: Possibility of irreversible effects
AC-4-1 zone: Up to 5%probability of heart brillation
AC-4-2 zone: Up to 50% probability of heart brillation
AC-4-3 zone: More than 50% probability of heart brillation
When a current exceeding 30 mA passes
through a part of a human body, the person
concerned is in serious danger if the current is
not interrupted in a very short time.
The protection of persons against electric
shock in LV installations must be provided in
conformity with appropriate national standards
statutory regulations, codes of practice, ofcial
guides and circulars etc.
Relevant IEC standards include: IEC 60364,
IEC 60479 series, IEC 61008, IEC 61009 and
IEC 60947-2.
A curve: Threshold of perception of current
B curve: Threshold of muscular reactions
C
1
curve: Threshold of 0% probability of ventricular
brillation
C
2
curve: Threshold of 5% probability of ventricular
brillation
C
3
curve: Threshold of 50% probability of ventricular
brillation
F3
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.2 Protection against electric shock
The fundamental rule of protection against electric shock is provided by the
document IEC 61140 which covers both electrical installations and electrical
equipment.
Hazardous-live-parts shall not be accessible and accessible conductive parts shall
not be hazardous.
This requirement needs to apply under:
b Normal conditions, and
b Under a single fault condition
Various measures are adopted to protect against this hazard, and include:
b Automatic disconnection of the power supply to the connected electrical equipment
b Special arrangements such as:
v The use of class II insulation materials, or an equivalent level of insulation
v Non-conducting location, out of arms reach or interposition of barriers
v Equipotential bonding
v Electrical separation by means of isolating transformers
1.3 Direct and indirect contact
Direct contact
A direct contact refers to a person coming into contact with a conductor which is live
in normal circumstances (see Fig. F2).
IEC 61140 standard has renamed protection against direct contact with the term
basic protection. The former name is at least kept for information.
Indirect contact
An indirect contact refers to a person coming into contact with an exposed-
conductive-part which is not normally alive, but has become alive accidentally (due
to insulation failure or some other cause).
The fault current raise the exposed-conductive-part to a voltage liable to be
hazardous which could be at the origin of a touch current through a person coming
into contact with this exposed-conductive-part (see Fig. F3).
IEC 61140 standard has renamed protection against indirect contact with the term
fault protection. The former name is at least kept for information.
Two measures of protection against direct
contact hazards are often required, since, in
practice, the rst measure may not be infallible
Standards and regulations distinguish two kinds
of dangerous contact,
b Direct contact
b Indirect contact
and corresponding protective measures
Busbars
1 2 3 N
Is: Touch current
Is
Insulation
failure
1 2 3 PE
Id
Id: Insulation fault current
Is
Fig. F2 : Direct contact Fig F3 : Indirect contact
1 General
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F4
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Protection against direct contact
Two complementary measures are commonly used as protection against the
dangers of direct contact:
b The physical prevention of contact with live parts by barriers, insulation,
inaccessibility, etc.
b Additional protection in the event that a direct contact occurs, despite or due to
failure of the above measures. This protection is based on residual-current operating
device with a high sensitivity (IAn y 30 mA) and a low operating time. These devices
are highly effective in the majority of case of direct contact.
2.1 Measures of protection against direct contact
Protection by the insulation of live parts
This protection consists of an insulation which complies with the relevant standards
(see Fig. F4). Paints, lacquers and varnishes do not provide an adequate protection.
IEC and national standards frequently
distinguish two protections:
b Complete (insulation, enclosures)
b Partial or particular
Fig. F4 : Inherent protection against direct contact by insulation of a 3-phase cable with outer
sheath
Fig. F5 : Example of isolation by envelope
Protection by means of barriers or enclosures
This measure is in widespread use, since many components and materials are
installed in cabinets, assemblies, control panels and distribution boards (see Fig. F5).
To be considered as providing effective protection against direct contact hazards,
these equipment must possess a degree of protection equal to at least IP 2X or
IP XXB (see chapter E sub-clause 3.4).
Moreover, an opening in an enclosure (door, front panel, drawer, etc.) must only be
removable, open or withdrawn:
b By means of a key or tool provided for this purpose, or
b After complete isolation of the live parts in the enclosure, or
b With the automatic interposition of another screen removable only with a key or
a tool. The metal enclosure and all metal removable screen must be bonded to the
protective earthing conductor of the installation.
Partial measures of protection
b Protection by means of obstacles, or by placing out of arms reach
This protection is reserved only to locations to which skilled or instructed
persons only have access. The erection of this protective measure is detailed in
IEC 60364-4-41.
Particular measures of protection
b Protection by use of extra-low voltage SELV (Safety Extra-Low Voltage) or by
limitation of the energy of discharge.
These measures are used only in low-power circuits, and in particular circumstances,
as described in section 3.5.
Schneider Electric - Electrical installation guide 2013
F5
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2.2 Additional measure of protection against direct
contact
All the preceding protective measures are preventive, but experience has shown
that for various reasons they cannot be regarded as being infallible. Among these
reasons may be cited:
b Lack of proper maintenance
b Imprudence, carelessness
b Normal (or abnormal) wear and tear of insulation; for instance exure and abrasion
of connecting leads
b Accidental contact
b Immersion in water, etc. A situation in which insulation is no longer effective
In order to protect users in such circumstances, highly sensitive fast tripping
devices, based on the detection of residual currents to earth (which may or may
not be through a human being or animal) are used to disconnect the power
supply automatically, and with sufcient rapidity to prevent injury to, or death by
electrocution, of a normally healthy human being (see Fig. F6).
These devices operate on the principle of differential current measurement, in which
any difference between the current entering a circuit and that leaving it (on a system
supplied from an earthed source) be owing to earth, either through faulty insulation
or through contact of an earthed part, such as a person, with a live conductor.
Standardised residual-current devices, referred to as RCDs, sufciently sensitive for
protection against direct contact are rated at 30 mA of differential current.
According to IEC 60364-4-41, additional protection by means of high sensitivity
RCDs (IAn y 30 mA) must be provided for circuits supplying socket-outlets with a
rated current y 20 A in all locations, and for circuits supplying mobile equipment with
a rated current y 32 A for use outdoors.
This additional protection is required in certain countries for circuits supplying socket-
outlets rated up to 32 A, and even higher if the location is wet and/or temporary
(such as work sites for instance).
It is also recommended to limit the number of socket-outlets protected by a RCD
(e.g. 10 socket-outlets for one RCD).
Chapter P section 3 itemises various common locations in which RCDs of
high sensitivity are obligatory (in some countries), but in any case, are highly
recommended as an effective protection against both direct and indirect contact
hazards.
An additional measure of protection against
the hazards of direct contact is provided by the
use of residual current operating device, which
operate at 30 mA or less, and are referred to as
RCDs of high sensitivity
Fig. F6 : High sensitivity RCD
2 Protection against direct contact
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F6
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Protection against indirect
contact
Exposed-conductive-parts used in the manufacturing process of an electrical
equipment is separated from the live parts of the equipment by the basic insulation.
Failure of the basic insulation will result in the exposed-conductive-parts being alive.
Touching a normally dead part of an electrical equipment which has become live due
to the failure of its insulation, is referred to as an indirect contact.
3.1 Measures of protection: two levels
Two levels of protective measures exist:
b 1
st
level: The earthing of all exposed-conductive-parts of electrical equipment in the
installation and the constitution of an equipotential bonding network (see chapter G
section 6).
b 2
sd
level: Automatic disconnection of the supply of the section of the installation
concerned, in such a way that the touch-voltage/time safety requirements are
respected for any level of touch voltage Uc
(1)
(see Fig. F7).
(1) Touch voltage Uc is the voltage existing (as the result of
insulation failure) between an exposed-conductive-part and
any conductive element within reach which is at a different
(generally earth) potential.
Protection against indirect contact hazards
can be achieved by automatic disconnection of
the supply if the exposed-conductive-parts of
equipment are properly earthed
Uc
Earth
connection
Fig. F7 : Illustration of the dangerous touch voltage Uc
Fig. F8 : Maximum safe duration of the assumed values of AC touch voltage (in seconds)
Uo (V) 50 < Uo y 120 120 < Uo y 230 230 < Uo y 400 Uo > 400
System TN or IT 0.8 0.4 0.2 0.1
TT 0.3 0.2 0.07 0.04
The greater the value of Uc, the greater the rapidity of supply disconnection required
to provide protection (see Fig. F8). The highest value of Uc that can be tolerated
indenitely without danger to human beings is 50 V CA.
Reminder of the theoretical disconnecting-time limits
Schneider Electric - Electrical installation guide 2013
F7
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3.2 Automatic disconnection for TT system
Principle
In this system all exposed-conductive-parts and extraneous-conductive-parts of
the installation must be connected to a common earth electrode. The neutral point
of the supply system is normally earthed at a pint outside the inuence area of the
installation earth electrode, but need not be so. The impedance of the earth-fault loop
therefore consists mainly in the two earth electrodes (i.e. the source and installation
electrodes) in series, so that the magnitude of the earth fault current is generally
too small to operate overcurrent relay or fuses, and the use of a residual current
operated device is essential.
This principle of protection is also valid if one common earth electrode only is used,
notably in the case of a consumer-type substation within the installation area, where
space limitation may impose the adoption of a TN system earthing, but where all
other conditions required by the TN system cannot be fullled.
Protection by automatic disconnection of the supply used in TT system is by RCD of
sensitivity:
I
n
R
i
50
A
where
R
A
is the resistance of the earth electrode for the installation
I
An
is the rated residual operating current of the RCD
For temporary supplies (to work sites, ) and agricultural and horticultural premises,
the value of 50 V is replaced by 25 V.
Example (see Fig. F9)
b The resistance of the earth electrode of substation neutral R
n
is 10 O.
b The resistance of the earth electrode of the installation R
A
is 20 O.
b The earth-fault loop current I
d
= 7.7 A.
b The fault voltage U
f
= I
d
x R
A
= 154 V and therefore dangerous, but
I
An
= 50/20 = 2.5 A so that a standard 300 mA RCD will operate in about 30 ms
without intentional time delay and will clear the fault where a fault voltage exceeding
appears on an exposed-conductive-part.
Fig. F10 : Maximum disconnecting time for AC nal circuits not exceeding 32 A
1
2
3
N
PE
R
n
= 10
Substation
earth
electrode
Installation
earth
electrode
R
A
= 20
U
f
Fig. F9 : Automatic disconnection of supply for TT system
Automatic disconnection for TT system is
achieved by RCD having a sensitivity of
I
n
R
i
50
A
where R
A
is the resistance of the
installation earth electrode
3 Protection against indirect
contact
(1) Uo is the nominal phase to earth voltage
Uo
(1)
(V) T (s)
50 < Uo y 120 0.3
120 < Uo y 230 0.2
230 < Uo y 400 0.07
Uo > 400 0.04
Specied maximum disconnection time
The tripping times of RCDs are generally lower than those required in the majority
of national standards; this feature facilitates their use and allows the adoption of an
effective discriminative protection.
The IEC 60364-4-41 species the maximum operating time of protective devices
used in TT system for the protection against indirect contact:
b For all nal circuits with a rated current not exceeding 32 A, the maximum
disconnecting time will not exceed the values indicated in Figure F10
b For all other circuits, the maximum disconnecting time is xed to 1s. This limit
enables discrimination between RCDs when installed on distribution circuits.
RCD is a general term for all devices operating on the residual-current principle.
RCCB (Residual Current Circuit-Breaker) as dened in IEC 61008 series is a specic
class of RCD.
Type G (general) and type S (Selective) of IEC 61008 have a tripping time/current
characteristics as shown in Figure F11 next page. These characteristics allow a certain
degree of selective tripping between the several combination of ratings and types, as
shown later in sub-clause 4.3. Industrial type RCD according to IEC 60947-2 provide
more possibilities of discrimination due to their exibility of time-delaying.
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F8
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3.3 Automatic disconnection for TN systems
Principle
In this system all exposed and extraneous-conductive-parts of the installation are
connected directly to the earthed point of the power supply by protective conductors.
As noted in Chapter E Sub-clause 1.2, the way in which this direct connection is
carried out depends on whether the TN-C, TN-S, or TN-C-S method of implementing
the TN principle is used. In gure F12 the method TN-C is shown, in which the
neutral conductor acts as both the Protective-Earth and Neutral (PEN) conductor. In
all TN systems, any insulation fault to earth results in a phase to neutral short-circuit.
High fault current levels allow to use overcurrent protection but can give rise to touch
voltages exceeding 50% of the phase to neutral voltage at the fault position during
the short disconnection time.
In practice for utility distribution network, earth electrodes are normally installed at
regular intervals along the protective conductor (PE or PEN) of the network, while
the consumer is often required to install an earth electrode at the service entrance.
On large installations additional earth electrodes dispersed around the premises are
often provided, in order to reduce the touch voltage as much as possible. In high-rise
apartment blocks, all extraneous conductive parts are connected to the protective
conductor at each level. In order to ensure adequate protection, the earth-fault
current
I d or 0.8
Uo
Zc
=
Uo
Zs
must be higher or equal to Ia, where:
b Uo = nominal phase to neutral voltage
b Id = the fault current
b Ia = current equal to the value required to operate the protective device in the time
specied
b Zs = earth-fault current loop impedance, equal to the sum of the impedances of the
source, the live phase conductors to the fault position, the protective conductors from
the fault position back to the source
b Zc = the faulty-circuit loop impedance (see conventional method Sub-clause 6.2)
Note: The path through earth electrodes back to the source will have (generally)
much higher impedance values than those listed above, and need not be considered.
Example (see Fig. F12)
The fault voltage Uf = =
230
2
115 V and is hazardous;
The fault loop impedance Zs=ZAB + ZBC + ZDE + ZEN + ZNA.
If ZBC and ZDE are predominant, then:
Zs
L
S
= = 2 64 3 . m , so that
= I d=
230
64.3 x10
-3
3,576 A
(~ 22 In based on a NSX160 circuit-breaker).
The instantaneous magnetic trip unit adjustment of the circuit-breaker is many time
less than this short-circuit value, so that positive operation in the shortest possible
time is assured.
Note: Some authorities base such calculations on the assumption that a voltage
drop of 20% occurs in the part of the impedance loop BANE.
This method, which is recommended, is explained in chapter F sub-clause 6.2
conventional method and in this example will give an estimated fault current of
230 x 0.8 x 10
64.3
2,816 A
3
=
(~ 18 In).
Fig. F12 : Automatic disconnection in TN system
1
2
3
PEN
NSX160
A
F
N
E
D C
B
U
f
35 mm
2
50 m
35 mm
2
Fig. F11 : Maximum operating time of RCDs (in seconds)
x I
An
1 2 5 > 5
Domestic Instantaneous 0.3 0.15 0.04 0.04
Type S 0.5 0.2 0.15 0.15
Industrial Instantaneous 0.3 0.15 0.04 0.04
Time-delay (0.06) 0.5 0.2 0.15 0.15
Time-delay (other) According to manufacturer
The automatic disconnection for TN system is
achieved by overcurrent protective devices or
RCDs
Schneider Electric - Electrical installation guide 2013
F9
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Specied maximum disconnection time
The IEC 60364-4-41 species the maximum operating time of protective devices
used in TN system for the protection against indirect contact:
b For all nal circuits with a rated current not exceeding 32 A, the maximum
disconnecting time will not exceed the values indicated in Figure F13
b For all other circuits, the maximum disconnecting time is xed to 5s. This limit
enables discrimination between protective devices installed on distribution circuits
Note: The use of RCDs may be necessary on TN-earthed systems. Use of RCDs on
TN-C-S systems means that the protective conductor and the neutral conductor must
(evidently) be separated upstream of the RCD. This separation is commonly made at
the service entrance.
Fig. F13 : Maximum disconnecting time for AC nal circuits not exceeding 32 A
1
1: Short-time delayed trip
2: Instantaneous trip
Im Uo/Zs
I
2
t
Ia Uo/Zs
t
tc = 0.4 s
I
If the protection is to be provided by a circuit-
breaker, it is sufcient to verify that the fault
current will always exceed the current-setting
level of the instantaneous or short-time delay
tripping unit (Im)
Ia can be determined from the fuse
performance curve. In any case, protection
cannot be achieved if the loop impedance Zs
or Zc exceeds a certain value
Fig. F14 : Disconnection by circuit-breaker for a TN system Fig. F15 : Disconnection by fuses for a TN system
3 Protection against indirect
contact
(1) Uo is the nominal phase to earth voltage
Uo
(1)
(V) T (s)
50 < Uo y 120 0.8
120 < Uo y 230 0.4
230 < Uo y 400 0.2
Uo > 400 0.1
Protection by means of circuit-breaker (see Fig. F14)
The instantaneous trip unit of a circuit-breaker will eliminate a short-circuit to earth in
less than 0.1 second.
In consequence, automatic disconnection within the maximum allowable time will
always be assured, since all types of trip unit, magnetic or electronic, instantaneous
or slightly retarded, are suitable: Ia = Im. The maximum tolerance authorised
by the relevant standard, however, must always be taken into consideration. It is
sufcient therefore that the fault current
Uo
Zs
or 0.8
Uo
Zc
determined by calculation
(or estimated on site) be greater than the instantaneous trip-setting current, or than
the very short-time tripping threshold level, to be sure of tripping within the permitted
time limit.
Protection by means of fuses (see Fig. F15)
The value of current which assures the correct operation of a fuse can be
ascertained from a current/time performance graph for the fuse concerned.
The fault current
Uo
Zs
or 0.8
Uo
Zc
as determined above, must largely exceed that
necessary to ensure positive operation of the fuse. The condition to observe
therefore is that Ia <
Uo
Zs
or 0.8
Uo
Zc
as indicated in Figure F15.
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F10
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Example: The nominal phase to neutral voltage of the network is 230 V and
the maximum disconnection time given by the graph in Figure F15 is 0.4 s.
The corresponding value of Ia can be read from the graph. Using the voltage (230 V)
and the current Ia, the complete loop impedance or the circuit loop impedance can
be calculated from Zs
a a
= =
230
I I
or Zc 0.8
230
. This impedance value must never be
exceeded and should preferably be substantially less to ensure satisfactory fuse
operation.
Protection by means of Residual Current Devices for
TN-S circuits
Residual Current Devices must be used where:
b The loop impedance cannot be determined precisely (lengths difcult to estimate,
presence of metallic material close to the wiring)
b The fault current is so low that the disconnecting time cannot be met by using
overcurrent protective devices
The rated tripping current of RCDs being in the order of a few amps, it is well below
the fault current level. RCDs are consequently well adapted to this situation.
In practice, they are often installed in the LV sub distribution and in many countries,
the automatic disconnection of nal circuits shall be achieved by Residual Current
Devices.
3.4 Automatic disconnection on a second fault in an
IT system
In this type of system:
b The installation is isolated from earth, or the neutral point of its power-supply
source is connected to earth through a high impedance
b All exposed and extraneous-conductive-parts are earthed via an installation earth
electrode.
First fault situation
On the occurrence of a true fault to earth, referred to as a rst fault, the fault current
is very low, such that the rule Id x R
A
y 50 V (see F3.2) is fullled and no dangerous
fault voltages can occur.
In practice the current Id is low, a condition that is neither dangerous to personnel,
nor harmful to the installation.
However, in this system:
b A permanent monitoring of the insulation to earth must be provided, coupled with
an alarm signal (audio and/or ashing lights, etc.) operating in the event of a rst
earth fault (see Fig. F16)
b The rapid location and repair of a rst fault is imperative if the full benets of the
IT system are to be realised. Continuity of service is the great advantage afforded by
the system.
For a network formed from 1 km of new conductors, the leakage (capacitive)
impedance to earth Zf is of the order of 3,500 O per phase. In normal operation, the
capacitive current
(1)
to earth is therefore:
Uo
Zf
= =
230
3,500
66 mA per phase.
During a phase to earth fault, as indicated in Figure F17 opposite page, the current
passing through the electrode resistance RnA is the vector sum of the capacitive
currents in the two healthy phases. The voltages of the healthy phases have
(because of the fault) increased to 3 the normal phase voltage, so that the capacitive
currents increase by the same amount. These currents are displaced, one from the
other by 60, so that when added vectorially, this amounts to 3 x 66 mA = 198 mA, in
the present example.
The fault voltage Uf is therefore equal to 198 x 5 x 10
-3
= 0.99 V, which is obviously
harmless.
The current through the short-circuit to earth is given by the vector sum of the
neutral-resistor current Id1 (=153 mA) and the capacitive current Id2 (198 mA).
Since the exposed-conductive-parts of the installation are connected directly to
earth, the neutral impedance Zct plays practically no part in the production of touch
voltages to earth.
In IT system the rst fault to earth should not
cause any disconnection
(1) Resistive leakage current to earth through the insulation is
assumed to be negligibly small in the example.
Fig. F16 : Phases to earth insulation monitoring device
obligatory in IT system
Schneider Electric - Electrical installation guide 2013
F11
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Second fault situation
On the appearance of a second fault, on a different phase, or on a neutral conductor,
a rapid disconnection becomes imperative. Fault clearance is carried out differently in
each of the following cases:
1
st
case
It concerns an installation in which all exposed conductive parts are bonded to a
common PE conductor, as shown in Figure F18.
In this case no earth electrodes are included in the fault current path, so that a high
level of fault current is assured, and conventional overcurrent protective devices are
used, i.e. circuit-breakers and fuses.
The rst fault could occur at the end of a circuit in a remote part of the installation,
while the second fault could feasibly be located at the opposite end of the installation.
For this reason, it is conventional to double the loop impedance of a circuit, when
calculating the anticipated fault setting level for its overcurrent protective device(s).
Where the system includes a neutral conductor in addition to the 3 phase
conductors, the lowest short-circuit fault currents will occur if one of the (two) faults is
from the neutral conductor to earth (all four conductors are insulated from earth in an
IT scheme). In four-wire IT installations, therefore, the phase-to-neutral voltage must
be used to calculate short-circuit protective levels i.e.
0.8
Uo
2 Zc
a uI
(1)
where
Uo = phase to neutral voltage
Zc = impedance of the circuit fault-current loop (see F3.3)
Ia = current level for trip setting
If no neutral conductor is distributed, then the voltage to use for the fault-current
calculation is the phase-to-phase value, i.e. 0.8
3 Uo
2 Zc
a uI
(1)
b Maximum tripping times
Disconnecting times for IT system depends on how the different installation and
substation earth electrodes are interconnected.
For nal circuits supplying electrical equipment with a rated current not exceeding
32 A and having their exposed-conductive-parts bonded with the substation earth
electrode, the maximum tripping time is given in table F8. For the other circuits
within the same group of interconnected exposed-conductive-parts, the maximum
disconnecting time is 5 s. This is due to the fact that any double fault situation within
this group will result in a short-circuit current as in TN system.
For nal circuits supplying electrical equipment with a rated current not exceeding
32 A and having their exposed-conductive-parts connected to an independent earth
electrode electrically separated from the substation earth electrode, the maximum
tripping time is given in Figure F13. For the other circuits within the same group of
non interconnected exposed-conductive-parts, the maximum disconnecting time is
1s. This is due to the fact that any double fault situation resulting from one insulation
fault within this group and another insulation fault from another group will generate a
fault current limited by the different earth electrode resistances as in TT system.
1
Id2
Id1
Id1 + Id2
2
3
N
PE
R
nA
= 5
Z
ct
= 1,500
Zf
B
U
f
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
b Protection by circuit-breaker
In the case shown in Figure F18, the adjustments of instantaneous and short-time
delay overcurrent trip unit must be decided. The times recommended here above can
be readily complied with. The short-circuit protection provided by the NSX160 circuit-
breaker is suitable to clear a phase to phase short-circuit occurring at the load ends
of the circuits concerned.
Reminder: In an IT system, the two circuits involved in a phase to phase short-circuit
are assumed to be of equal length, with the same cross sectional area conductors,
the PE conductors being the same cross sectional area as the phase conductors. In
such a case, the impedance of the circuit loop when using the conventional method
(sub clause 6.2) will be twice that calculated for one of the circuits in the TN case,
shown in Chapter F sub clause 3.3.
The resistance of circuit loop FGHJ = 2R
JH
=
L
a
2 in m where:
= resistance of copper rod 1 meter long of cross sectional area 1 mm
2
, in mO
L = length of the circuit in meters
a = cross sectional area of the conductor in mm
2
FGHJ = 2 x 22.5 x 50/35 = 64.3 mO
and the loop resistance B, C, D, E, F, G, H, J will be 2 x 64.3 = 129 mO.
The fault current will therefore be 0.8 x 3 x 230 x 10
3
/129 = 2,470 A.
b Protection by fuses
The current I
a
for which fuse operation must be assured in a time specied according
to here above can be found from fuse operating curves, as described in gure F15.
The current indicated should be signicantly lower than the fault currents calculated
for the circuit concerned.
b Protection by Residual current circuit-breakers (RCCBs)
For low values of short-circuit current, RCCBs are necessary. Protection against
indirect contact hazards can be achieved then by using one RCCB for each circuit.
2
nd
case
b It concerns exposed conductive parts which are earthed either individually (each part
having its own earth electrode) or in separate groups (one electrode for each group).
If all exposed conductive parts are not bonded to a common electrode system, then
it is possible for the second earth fault to occur in a different group or in a separately
earthed individual apparatus. Additional protection to that described above for
case 1, is required, and consists of a RCD placed at the circuit-breaker controlling
each group and each individually-earthed apparatus.
Fig. F18 : Circuit-breaker tripping on double fault situation when exposed-conductive-parts are
connected to a common protective conductor
1
Id
2
3
N
PE
NSX160
160 A
50 m
35 mm
2
50 m
35 mm
2
R
A
E
D H G
B A
K
F
J
C
Schneider Electric - Electrical installation guide 2013
F13
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. F19 : Correspondence between the earth leakage capacitance and the rst fault current
Group
earth
Case 1
PIM
N
RA Rn
RCD
Group
earth 2
Group
earth 1
Case 2
PIM
N
RA1 Rn RA2
RCD
RCD RCD
Fig. F20 : Application of RCDs when exposed-conductive-parts are earthed individually or by group on IT system
Leakage capacitance First fault current
(F) (A)
1 0.07
5 0.36
30 2.17
Note: 1 F is the 1 km typical leakage capacitance for
4-conductor cable.
The reason for this requirement is that the separate-group electrodes are bonded
through the earth so that the phase to phase short-circuit current will generally be
limited when passing through the earth bond by the electrode contact resistances
with the earth, thereby making protection by overcurrent devices unreliable. The
more sensitive RCDs are therefore necessary, but the operating current of the RCDs
must evidently exceed that which occurs for a rst fault (see Fig. F19).
3 Protection against indirect
contact
Extra-low voltage is used where the risks
are great: swimming pools, wandering-lead
hand lamps, and other portable appliances for
outdoor use, etc.
For a second fault occurring within a group having a common earth-electrode
system, the overcurrent protection operates, as described above for case 1.
Note 1: See also Chapter G Sub-clause 7.2, protection of the neutral conductor.
Note 2: In 3-phase 4-wire installations, protection against overcurrent in the neutral
conductor is sometimes more conveniently achieved by using a ring-type current
transformer over the single-core neutral conductor (see Fig. F20).
3.5 Measures of protection against direct or indirect
contact without automatic disconnection of supply
The use of SELV (Safety Extra-Low Voltage)
Safety by extra low voltage SELV is used in situations where the operation of electrical
equipment presents a serious hazard (swimming pools, amusement parks, etc.).
This measure depends on supplying power at extra-low voltage from the secondary
windings of isolating transformers especially designed according to national or to
international (IEC 60742) standard. The impulse withstand level of insulation between
the primary and secondary windings is very high, and/or an earthed metal screen
is sometimes incorporated between the windings. The secondary voltage never
exceeds 50 V rms.
Three conditions of exploitation must be respected in order to provide satisfactory
protection against indirect contact:
b No live conductor at SELV must be connected to earth
b Exposed-conductive-parts of SELV supplied equipment must not be connected to
earth, to other exposed conductive parts, or to extraneous-conductive-parts
b All live parts of SELV circuits and of other circuits of higher voltage must be
separated by a distance at least equal to that between the primary and secondary
windings of a safety isolating transformer.
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F14
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
These measures require that:
b SELV circuits must use conduits exclusively provided for them, unless cables which
are insulated for the highest voltage of the other circuits are used for the SELV circuits
b Socket outlets for the SELV system must not have an earth-pin contact. The
SELV circuit plugs and sockets must be special, so that inadvertent connection to a
different voltage level is not possible.
Note: In normal conditions, when the SELV voltage is less than 25 V, there is no
need to provide protection against direct contact hazards. Particular requirements
are indicated in Chapter P, Clause 3: special locations.
The use of PELV (Protection by Extra Low Voltage) (see Fig. F21)
This system is for general use where low voltage is required, or preferred for safety
reasons, other than in the high-risk locations noted above. The conception is similar
to that of the SELV system, but the secondary circuit is earthed at one point.
IEC 60364-4-41 denes precisely the signicance of the reference PELV. Protection
against direct contact hazards is generally necessary, except when the equipment
is in the zone of equipotential bonding, and the nominal voltage does not exceed
25 V rms, and the equipment is used in normally dry locations only, and large-area
contact with the human body is not expected. In all other cases, 6 V rms is the
maximum permitted voltage, where no direct contact protection is provided.
Fig. F21 : Low-voltage supplies from a safety isolating transformer
Fig. F22 : Safety supply from a class II separation transformer
230 V / 24 V
FELV system (Functional Extra-Low Voltage)
Where, for functional reasons, a voltage of 50 V or less is used, but not all of the
requirements relating to SELV or PELV are fullled, appropriate measures described
in IEC 60364-4-41 must be taken to ensure protection against both direct and
indirect contact hazards, according to the location and use of these circuits.
Note: Such conditions may, for example, be encountered when the circuit contains
equipment (such as transformers, relays, remote-control switches, contactors)
insufciently insulated with respect to circuits at higher voltages.
The electrical separation of circuits (see Fig. F22)
The principle of the electrical separation of circuits (generally single-phase circuits)
for safety purposes is based on the following rationale.
The two conductors from the unearthed single-phase secondary winding of a
separation transformer are insulated from earth.
If a direct contact is made with one conductor, a very small current only will ow into
the person making contact, through the earth and back to the other conductor, via
the inherent capacitance of that conductor with respect to earth. Since the conductor
capacitance to earth is very small, the current is generally below the level of perception.
As the length of circuit cable increases, the direct contact current will progressively
increase to a point where a dangerous electric shock will be experienced.
Even if a short length of cable precludes any danger from capacitive current, a low
value of insulation resistance with respect to earth can result in danger, since the
current path is then via the person making contact, through the earth and back to the
other conductor through the low conductor-to-earth insulation resistance.
For these reasons, relatively short lengths of well insulated cables are essential in
separation systems.
Transformers are specially designed for this duty, with a high degree of insulation
between primary and secondary windings, or with equivalent protection, such as an
earthed metal screen between the windings. Construction of the transformer is to
class II insulation standards.
The electrical separation of circuits is suitable
for relatively short cable lengths and high levels
of insulation resistance. It is preferably used for
an individual appliance
230 V/230 V
Schneider Electric - Electrical installation guide 2013
F15
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Protection against indirect
contact
(1) It is recommended in IEC 364-4-41 that the product of the
nominal voltage of the circuit in volts and length in metres of
the wiring system should not exceed 100,000, and that the
length of the wiring system should not exceed 500 m.
As indicated before, successful exploitation of the principle requires that:
b No conductor or exposed conductive part of the secondary circuit must be
connected to earth,
b The length of secondary cabling must be limited to avoid large capacitance values
(1)
,
b A high insulation-resistance value must be maintained for the cabling and appliances.
These conditions generally limit the application of this safety measure to an
individual appliance.
In the case where several appliances are supplied from a separation transformer, it is
necessary to observe the following requirements:
b The exposed conductive parts of all appliances must be connected together by an
insulated protective conductor, but not connected to earth,
b The socket outlets must be provided with an earth-pin connection. The earth-pin
connection is used in this case only to ensure the interconnection (bonding) of all
exposed conductive parts.
In the case of a second fault, overcurrent protection must provide automatic
disconnection in the same conditions as those required for an IT system of power
system earthing.
Class II equipment
These appliances are also referred to as having double insulation since in class
II appliances a supplementary insulation is added to the basic insulation (see
Fig. F23).
No conductive parts of a class II appliance must be connected to a protective conductor:
b Most portable or semi-xed equipment, certain lamps, and some types of
transformer are designed to have double insulation. It is important to take particular
care in the exploitation of class II equipment and to verify regularly and often that the
class II standard is maintained (no broken outer envelope, etc.). Electronic devices,
radio and television sets have safety levels equivalent to class II, but are not formally
class II appliances
b Supplementary insulation in an electrical installation: IEC 60364-4-41(Sub-clause
413-2) and some national standards such as NF C 15-100 (France) describe in
more detail the necessary measures to achieve the supplementary insulation during
installation work.
Class II equipment symbol:
Fig. F23 : Principle of class II insulation level
Active part
Basic insulation
Supplementary insulation
A simple example is that of drawing a cable into a PVC conduit. Methods are also
described for distribution switchboards.
b For ASSEMBLIES, IEC 61439-1 describes a set of requirements, for what is
referred to as total insulation, equivalent to class II equipment
b Some cables are recognised as being equivalent to class II by many national standards
Out-of-arms reach or interposition of obstacles
By these means, the probability of touching a live exposed-conductive-part, while at
the same time touching an extraneous-conductive-part at earth potential, is extremely
low (see Fig. F24 next page). In practice, this measure can only be applied in a dry
location, and is implemented according to the following conditions:
b The oor and the wall of the chamber must be non-conducting, i.e. the resistance
to earth at any point must be:
v > 50 kO (installation voltage y 500 V)
v > 100 kO (500 V < installation voltage y 1000 V)
Resistance is measured by means of MEGGER type instruments (hand-operated
generator or battery-operated electronic model) between an electrode placed on the
oor or against the wall, and earth (i.e. the nearest protective earth conductor). The
electrode contact area pressure must be evidently be the same for all tests.
Different instruments suppliers provide electrodes specic to their own product, so
that care should be taken to ensure that the electrodes used are those supplied with
the instrument.
In principle, safety by placing simultaneously-
accessible conductive parts out-of-reach, or by
interposing obstacles, requires also a non-
conducting oor, and so is not an easily applied
principle
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F16
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Earth-free equipotential chambers
In this scheme, all exposed-conductive-parts, including the oor
(1)
are bonded by
suitably large conductors, such that no signicant difference of potential can exist
between any two points. A failure of insulation between a live conductor and the
metal envelope of an appliance will result in the whole cage being raised to phase-
to-earth voltage, but no fault current will ow. In such conditions, a person entering
the chamber would be at risk (since he/she would be stepping on to a live oor).
Suitable precautions must be taken to protect personnel from this danger (e.g. non-
conducting oor at entrances, etc.). Special protective devices are also necessary to
detect insulation failure, in the absence of signicant fault current.
Fig. F24 : Protection by out-of arms reach arrangements and the interposition of non-conducting obstacles
Electrical
apparatus
Electrical
apparatus
< 2 m
Electrical
apparatus
Insulated
walls
Insulated
obstacles
> 2 m
Insulated floor
2.5 m
3 Protection against indirect
contact
Earth-free equipotential chambers are
associated with particular installations
(laboratories, etc.) and give rise to a number of
practical installation difculties
b The placing of equipment and obstacles must be such that simultaneous contact
with two exposed-conductive-parts or with an exposed conductive-part and an
extraneous-conductive-part by an individual person is not possible.
b No exposed protective conductor must be introduced into the chamber concerned.
b Entrances to the chamber must be arranged so that persons entering are not at
risk, e.g. a person standing on a conducting oor outside the chamber must not be
able to reach through the doorway to touch an exposed-conductive-part, such as a
lighting switch mounted in an industrial-type cast-iron conduit box, for example.
(1) Extraneous conductive parts entering (or leaving) the
equipotential space (such as water pipes, etc.) must be
encased in suitable insulating material and excluded from the
equipotential network, since such parts are likely to be bonded
to protective (earthed) conductors elsewhere in the installation.
Fig. F25 : Equipotential bonding of all exposed-conductive-parts simultaneously accessible
Insulating material
Conductive
floor
M
Schneider Electric - Electrical installation guide 2013
F17
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Protection of goods
in case of insulation fault
The standards consider the damage (mainly re) of goods due to insulation faults
to be high. Therefore, for location with high risk of re, 300 mA Residual Current
Devices must be used. For the other locations, some standards relies on technique
called Ground Fault Protection (GFP).
4.1 Measures of protection against re risk with
RCDs
RCDs are very effective devices to provide protection against re risk due to
insulation fault. This type of fault current is actually too low to be detected by the
other protection (overcurrent, reverse time).
For TT, IT TN-S systems in which leakage current can appear, the use of 300 mA
sensitivity RCDs provides a good protection against re risk due to this type of fault.
An investigation has shown that the cost of the res in industrial and tertiary
buildings can be very great.
The analysis of the phenomena shows that re risk due to electicity is linked to
overheating due to a bad coordination between the maximum rated current of the
cable (or isolated conductor) and the overcurrent protection setting.
Overheating can also be due to the modication of the initial method of installation
(addition of cables on the same support).
This overheating can be the origin of electrical arc in humid environment. These
electrical arcs evolve when the fault current-loop impedance is greater than 0.6 O
and exist only when an insulation fault occurs. Some tests have shown that a
300 mA fault current can induce a real risk of re (see Fig. F26).
4.2 Ground Fault Protection (GFP)
Different type of ground fault protections (see Fig. F27)
Three types of GFP are possible dependind on the measuring device installed :
b Residual Sensing RS
The insulation fault current is calculated using the vectorial sum of currents of
current transformers secondaries. The current transformer on the neutral conductor
is often outside the circuit-breaker.
b Source Ground Return SGR
The insulation fault current is measured in the neutral earth link of the
LV transformer. The current transformer is outside the circuit-breaker.
b Zero Sequence ZS
The insulation fault is directly measured at the secondary of the current
transformer using the sum of currents in live conductors. This type of GFP is only
used with low fault current values.
RCDs are very effective devices to provide
protection against re risk due to insulation
fault because they can detect leakage current
(ex : 300 mA) wich are too low for the other
protections, but sufcient to cause a re
Fig. F26 : Origin of res in buildings
Beginning of fire
Humid dust
Id << 300 mA
Some tests have shown that a very low leakage
current (a few mA) can evolve and, from 300 mA,
induce a re in humid and dusty environment.
L1
L2
L3
N
R
L1
L2
L3
N
PE
R
L1
L2
L3
N
R
RS system SGR system ZS system
Fig. F27 : Different types of ground fault protections
F - Protection against electric shock
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F18
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Positioning GFP devices in the installation
4 Protection of goods
in case of insulation fault
Type / installation level Main-distribution Sub-distribution Comments
Source Ground Return v Used
(SGR)
Residual Sensing (RS) v b Often used
(SGR)
Zero Sequence v b Rarely used
(SGR)
v Possible
b Recommended or required
Schneider Electric - Electrical installation guide 2013
F19
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5 Implementation of the TT system
5.1 Protective measures
Protection against indirect contact
General case
Protection against indirect contact is assured by RCDs, the sensitivity IAn of which
complies with the condition
I n
50 V
R
i
A
(1)
The choice of sensitivity of the residual current device is a function of the resistance
R
A
of the earth electrode for the installation, and is given in Figure F28.
IAn Maximum resistance of the earth electrode
(50 V) (25 V)
3 A 16 O 8 O
1 A 50 O 25 O
500 mA 100 O 50 O
300 mA 166 O 83 O
30 mA 1666 O 833 O
Fig. F28 : The upper limit of resistance for an installation earthing electrode which must not be
exceeded, for given sensitivity levels of RCDs at U
L
voltage limits of 50 V and 25 V
Case of distribution circuits (see Fig. F29)
IEC 60364-4-41 and a number of national standards recognize a maximum tripping
time of 1 second in installation distribution circuits (as opposed to nal circuits). This
allows a degree of selective discrimination to be achieved:
b At level A: RCD time-delayed, e.g. S type
b At level B: RCD instantaneous
Case where the exposed conductive parts of an appliance, or group of
appliances, are connected to a separate earth electrode (see Fig. F30)
Protection against indirect contact by a RCD at the circuit-breaker level protecting
each group or separately-earthed individual appliance.
In each case, the sensitivity must be compatible with the resistance of the earth
electrode concerned.
High-sensitivity RCDs (see Fig. F31)
According to IEC 60364-4-41, high sensitivity RCDs (y 30 mA) must be used for
protection of socket outlets with rated current y 20 A in all locations. The use of such
RCDs is also recommended in the following cases:
b Socket-outlet circuits in wet locations at all current ratings
b Socket-outlet circuits in temporary installations
b Circuits supplying laundry rooms and swimming pools
b Supply circuits to work-sites, caravans, pleasure boats, and travelling fairs
See 2.2 and chapter P, section 3
Fig. F29 : Distribution circuits
Fig. F30 : Separate earth electrode Fig. F31 : Circuit supplying socket-outlets
A
B
RCD RCD
RCD
RA1 RA2
Distant location
(1) 25 V for work-site installations, agricultural establishments, etc.
F - Protection against electric shock
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F20
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
In high re risk locations (see Fig. F32)
RCD protection at the circuit-breaker controlling all supplies to the area at risk is
necessary in some locations, and mandatory in many countries.
The sensitivity of the RCD must be y 500 mA, but a 300 mA sensitivity is
recommended.
Protection when exposed conductive parts are not connected
to earth (see Fig. F33)
(In the case of an existing installation where the location is dry and provision of
an earthing connection is not possible, or in the event that a protective earth wire
becomes broken).
RCDs of high sensitivity (y 30 mA) will afford both protection against indirect-contact
hazards, and the additional protection against the dangers of direct-contact.
Fig. F32 : Fire-risk location
Fire-risk
location
Fig. F33 : Unearthed exposed conductive parts (A)
5.2 Coordination of residual current protective
devices
Discriminative-tripping coordination is achieved either by time-delay or by subdivision
of circuits, which are then protected individually or by groups, or by a combination of
both methods.
Such discrimination avoids the tripping of any RCD, other than that immediately
upstream of a fault position:
b With equipment currently available, discrimination is possible at three or four
different levels of distribution :
v At the main general distribution board
v At local general distribution boards
v At sub-distribution boards
v At socket outlets for individual appliance protection
b In general, at distribution boards (and sub-distribution boards, if existing) and on
individual-appliance protection, devices for automatic disconnection in the event of
an indirect-contact hazard occurring are installed together with additional protection
against direct-contact hazards.
Discrimination between RCDs
The general specication for achieving total discrimination between two RCDs is as
follow:
b The ratio between the rated residual operating currents must be > 2
b Time delaying the upstream RCD
Discrimination is achieved by exploiting the several levels of standardized sensitivity:
30 mA, 100 mA, 300 mA and 1 A and the corresponding tripping times, as shown
opposite page in Figure F34.
Schneider Electric - Electrical installation guide 2013
F21
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5 Implementation of the TT system
Discrimination at 2 levels (see Fig. F35)
Protection
b Level A: RCD time-delayed setting I (for industrial device) or type S (for domestic
device) for protection against indirect contacts
b Level B: RCD instantaneous, with high sensitivity on circuits supplying socket-
outlets or appliances at high risk (washing machines, etc.) See also Chapter P
Clause 3
Schneider Electric solutions
b Level A: Compact or Acti 9 circuit-breaker with adaptable RCD module
(Vigicompact NSX160), setting I or S type
b Level B: Circuit-breaker with integrated RCD module (DPN Vigi) or adaptable
RCD module (e.g. Vigi iC60) or Vigicompact NSX
Note: The setting of upstream RCCB must comply with selectivity rules and take into
account all the downstream earth leakage currents.
Discrimination at 3 or 4 levels (see Fig. F36)
Protection
b Level A: RCD time-delayed (setting III)
b Level B: RCD time-delayed (setting II)
b Level C: RCD time-delayed (setting I) or type S
b Level D: RCD instantaneous
Schneider Electric solutions
b Level A: Circuit-breaker associated with RCD and separate toroidal transformer
(Vigirex RH)
b Level B: Vigicompact NSX or Vigirex
b Level C: Vigirex, Vigicompact NSX or Vigi iC60
b Level D:
v Vigicompact NSX or
v Vigirex or
v Acti 9 with integrated or adaptable RCD module : Vigi iC60 or DPN Vigi
Note: The setting of upstream RCCB must comply with selectivity rules and take into
account all the downstream earth leakage currents
Fig. F34 : Total discrimination at 2 levels
t (ms)
40
10
60
100
130
150
200
250
500
1,000
300
10,000
15
Current
(mA)
30
1
0
0
1
5
0
60
3
0
0
5
0
0
6
0
0
1
,
0
0
0
1 1.5 10 100 500 1,000 (A)
I
II
selective RCDs
domestic
and industrial
(settings I and II)
RCD 30 mA
general domestic
and industrial setting 0
S
Fig. F35 : Total discrimination at 2 levels
A
B
RCD 300 mA
type S
RCD
30 mA
Fig. F36 : Total discrimination at 3 or 4 levels
A
B
C
D
Relay with separate
toroidal CT 3 A
delay time 500 ms
RCCB 1 A
delay time 250 ms
RCCB
30 mA
RCCB 300 A
delay time 50 ms
or type S
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F22
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5 Implementation of the TT system
Fig. F37 : Typical 3-level installation, showing the protection of distribution circuits in a TT-earthed system. One motor is provided with specic protection
Masterpact
MV/LV
Vigi NG125
300 mA
selective
Reflex
iC60 diff.
30 mA
Vigi NG125 LMA
instantaneous
300 mA
Leakage current
of the filter: 20 mA
Terminal
board
Discont.
Vigicompact
NSX100
Setting 1
300 mA
NSX100 MA
NSX400
Leakage current equal to 3.5 mA per
socket outlet (Information technology
equipement): max 4 sockets outlets.
Discriminative protection at three levels (see Fig. F37)
Schneider Electric - Electrical installation guide 2013
F23
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6 Implementation of the TN system
6.1 Preliminary conditions
At the design stage, the maximum permitted lengths of cable downstream of a
protective circuit-breaker (or set of fuses) must be calculated, while during the
installation work certain rules must be fully respected.
Certain conditions must be observed, as listed below and illustrated in Figure F38.
1. PE conductor must be regularly connected to earth as much as possible.
2. The PE conductor must not pass through ferro-magnetic conduit, ducts, etc. or
be mounted on steel work, since inductive and/or proximity effects can increase the
effective impedance of the conductor.
3. In the case of a PEN conductor (a neutral conductor which is also used as a
protective conductor), connection must be made directly to the earth terminal of an
appliance (see 3 in Figure F38) before being looped to the neutral terminal of the
same appliance.
4. Where the conductor y 6 mm
2
for copper or 10 mm
2
for aluminium, or where a
cable is movable, the neutral and protective conductors should be separated (i.e. a
TN-S system should be adopted within the installation).
5. Earth faults may be cleared by overcurrent-protection devices, i.e. by fuses and
circuit-breakers.
The foregoing list indicates the conditions to be respected in the implementation of a
TN scheme for the protection against indirect contacts.
Fig. F38 : Implementation of the TN system of earthing
Notes:
b The TN scheme requires that the LV neutral of the MV/LV transformer, the exposed
conductive parts of the substation and of the installation, and the extraneous conductive
parts in the substation and installation, all be earthed to a common earthing system.
b For a substation in which the metering is at low-voltage, a means of isolation is required at
the origin of the LV installation, and the isolation must be clearly visible.
b A PEN conductor must never be interrupted under any circumstances. Control and
protective switchgear for the several TN arrangements will be:
v 3-pole when the circuit includes a PEN conductor,
v Preferably 4-pole (3 phases + neutral) when the circuit includes a neutral with a separate
PE conductor.
RpnA
PEN
TN-C system TN-C-S system
PE N
3
4
5
5
2 2
5
1
Three methods of calculation are commonly
used:
b The method of impedances, based on the
trigonometric addition of the system resistances
and inductive reactances
b The method of composition
b The conventional method, based on an
assumed voltage drop and the use of prepared
tables
6.2 Protection against indirect contact
Methods of determining levels of short-circuit current
In TN-earthed systems, a short-circuit to earth will, in principle, always provide
sufcient current to operate an overcurrent device.
The source and supply mains impedances are much lower than those of the
installation circuits, so that any restriction in the magnitude of earth-fault currents
will be mainly caused by the installation conductors (long exible leads to appliances
greatly increase the fault-loop impedance, with a corresponding reduction of short-
circuit current).
The most recent IEC recommendations for indirect-contact protection on TN earthing
systems only relates maximum allowable tripping times to the nominal system
voltage (see Figure F12 in Sub-clause 3.3).
F - Protection against electric shock
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F24
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
The reasoning behind these recommendations is that, for TN systems, the current
which must ow in order to raise the potential of an exposed conductive part to 50 V
or more is so high that one of two possibilities will occur:
b Either the fault path will blow itself clear, practically instantaneously, or
b The conductor will weld itself into a solid fault and provide adequate current to
operate overcurrent devices
To ensure correct operation of overcurrent devices in the latter case, a reasonably
accurate assessment of short-circuit earth-fault current levels must be determined at
the design stage of a project.
A rigorous analysis requires the use of phase-sequence-component techniques
applied to every circuit in turn. The principle is straightforward, but the amount of
computation is not considered justiable, especially since the zero-phase-sequence
impedances are extremely difcult to determine with any reasonable degree of
accuracy in an average LV installation.
Other simpler methods of adequate accuracy are preferred. Three practical methods
are:
b The method of impedances, based on the summation of all the impedances
(positive-phase-sequence only) around the fault loop, for each circuit
b The method of composition, which is an estimation of short-circuit current at
the remote end of a loop, when the short-circuit current level at the near end of the
loop is known
b The conventional method of calculating the minimum levels of earth-fault
currents, together with the use of tables of values for obtaining rapid results
These methods are only reliable for the case in which the cables that make up the
earth-fault-current loop are in close proximity (to each other) and not separated by
ferro-magnetic materials.
Method of impedances
This method summates the positive-sequence impedances of each item (cable, PE
conductor, transformer, etc.) included in the earth-fault loop circuit from which the
short-circuit earth-fault current is calculated, using the formula:
I =
( )
+
( )
Uo
R X
2 2
where
(ER)
2
= (the sum of all resistances in the loop)
2
at the design stage of a project.
and (EX)
2
= (the sum of all inductive reactances in the loop)
2
and Uo = nominal system phase-to-neutral voltage.
The application of the method is not always easy, because it supposes a knowledge
of all parameter values and characteristics of the elements in the loop. In many
cases, a national guide can supply typical values for estimation purposes.
Method of composition
This method permits the determination of the short-circuit current at the end of
a loop from the known value of short-circuit at the sending end, by means of the
approximate formula:
I I
I
sc
sc
Uo
=
U+Zs
where
Isc = upstream short-circuit current
I = end-of-loop short-circuit current
Uo = nominal system phase voltage
Zs = impedance of loop
Note: in this method the individual impedances are added arithmetically
(1)
as
opposed to the previous method of impedances procedure.
Conventional method
This method is generally considered to be sufciently accurate to x the upper limit
of cable lengths.
Principle
The principle bases the short-circuit current calculation on the assumption that the
voltage at the origin of the circuit concerned (i.e. at the point at which the circuit
protective device is located) remains at 80% or more of the nominal phase to neutral
voltage. The 80% value is used, together with the circuit loop impedance, to compute
the short-circuit current.
For calculations, modern practice is to use
software agreed by National Authorities, and
based on the method of impedances, such as
Ecodial. National Authorities generally also
publish Guides, which include typical values,
conductor lengths, etc.
(1) This results in a calculated current value which is less than
that it would actually ow. If the overcurrent settings are based
on this calculated value, then operation of the relay, or fuse, is
assured.
Schneider Electric - Electrical installation guide 2013
F25
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6 Implementation of the TN system
This coefcient takes account of all voltage drops upstream of the point considered.
In LV cables, when all conductors of a 3-phase 4-wire circuit are in close proximity
(which is the normal case), the inductive reactance internal to and between
conductors is negligibly small compared to the cable resistance.
This approximation is considered to be valid for cable sizes up to 120 mm
2
.
Above that size, the resistance value R is increased as follows:
The maximum length of any circuit of a
TN-earthed installation is:
m a
0.8 Uo Sph
+ ( ) 1 I
Fig. F39 : Calculation of L max. for a TN-earthed system, using
the conventional method
Core size (mm
2
) Value of resistance
S = 150 mm
2
R+15%
S = 185 mm
2
R+20%
S = 240 mm
2
R+25%
Imagn
Id
L
C
PE
SPE Sph
A B
The maximum length of a circuit in a TN-earthed installation is given by the formula:
L
m a
max
0.8 Uo Sph
=
+ ( ) 1 I
where:
Lmax = maximum length in metres
Uo = phase volts = 230 V for a 230/400 V system
= resistivity at normal working temperature in ohm-mm
2
/metre
(= 22.5 10
-3
for copper; = 36 10
-3
for aluminium)
Ia = trip current setting for the instantaneous operation of a circuit-breaker, or
Ia = the current which assures operation of the protective fuse concerned, in the
specied time.
m
Sph
SPE
=
Sph = cross-sectional area of the phase conductors of the circuit concerned in mm
2
SPE = cross-sectional area of the protective conductor concerned in mm
2
.
(see Fig. F39)
Tables
The following tables, applicable to TN systems, have been established according to
the conventional method described above.
The tables give maximum circuit lengths, beyond which the ohmic resistance of the
conductors will limit the magnitude of the short-circuit current to a level below that
required to trip the circuit-breaker (or to blow the fuse) protecting the circuit, with
sufcient rapidity to ensure safety against indirect contact.
Correction factor m
Figure F40 indicates the correction factor to apply to the values given in Figures F41
to F44 next pages, according to the ratio Sph/SPE, the type of circuit, and the
conductor materials.
The tables take into account:
b The type of protection: circuit-breakers or fuses
b Operating-current settings
b Cross-sectional area of phase conductors and protective conductors
b Type of system earthing (see Fig. F45 page F27)
b Type of circuit-breaker (i.e. B, C or D)
(1)
The tables may be used for 230/400 V systems.
Equivalent tables for protection by Compact and Acti 9 circuit-breakers (Schneider
Electric) are included in the relevant catalogues.
Fig. F40 : Correction factor to apply to the lengths given in tables F41 to F44 for
TN systems
Circuit Conductor m = Sph/SPE (or PEN)
material m = 1 m = 2 m = 3 m = 4
3P + N or P + N Copper 1 0.67 0.50 0.40
Aluminium 0.62 0.42 0.31 0.25
The following tables give the length of circuit
which must not be exceeded, in order that
persons be protected against indirect contact
hazards by protective devices
(1) For the denition of type B, C, D circuit-breakers, refer to
chapter H, clause 4.2
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F26
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Circuits protected by general purpose circuit-breakers (Fig. F41)
Nominal Instantaneous or short-time-delayed tripping current Im (amperes)
cross-
sectional
area
of
conductors
mm
2
50 63 80 100 125 160 200 250 320 400 500 560 630 700 800 875 1000 1120 1250 1600 2000 2500 3200 4000 5000 6300 8000 10000 12500
1.5 100 79 63 50 40 31 25 20 16 13 10 9 8 7 6 6 5 4 4
2.5 167 133 104 83 67 52 42 33 26 21 17 15 13 12 10 10 8 7 7 5 4
4 267 212 167 133 107 83 67 53 42 33 27 24 21 19 17 15 13 12 11 8 7 5 4
6 400 317 250 200 160 125 100 80 63 50 40 36 32 29 25 23 20 18 16 13 10 8 6 5 4
10 417 333 267 208 167 133 104 83 67 60 53 48 42 38 33 30 27 21 17 13 10 8 7 5 4
16 427 333 267 213 167 133 107 95 85 76 67 61 53 48 43 33 27 21 17 13 11 8 7 5 4
25 417 333 260 208 167 149 132 119 104 95 83 74 67 52 42 33 26 21 17 13 10 8 7
35 467 365 292 233 208 185 167 146 133 117 104 93 73 58 47 36 29 23 19 15 12 9
50 495 396 317 283 251 226 198 181 158 141 127 99 79 63 49 40 32 25 20 16 13
70 417 370 333 292 267 233 208 187 146 117 93 73 58 47 37 29 23 19
95 452 396 362 317 283 263 198 158 127 99 79 63 50 40 32 25
120 457 400 357 320 250 200 160 125 100 80 63 50 40 32
150 435 388 348 272 217 174 136 109 87 69 54 43 35
185 459 411 321 257 206 161 128 103 82 64 51 41
240 400 320 256 200 160 128 102 80 64 51
Circuits protected by Compact or Acti 9
circuit-breakers for industrial or
domestic use (Fig. F42 to Fig. F44)
Fig. F41 : Maximum circuit lengths (in metres) for different sizes of copper conductor and instantaneous-tripping-current settings for general-purpose circuit-breakers
in 230/400 V TN system with m = 1
Sph Rated current (A)
mm
2
1 2 3 4 6 10 16 20 25 32 40 50 63 80 100 125
1.5 1200 600 400 300 200 120 75 60 48 37 30 24 19 15 12 10
2.5 1000 666 500 333 200 125 100 80 62 50 40 32 25 20 16
4 1066 800 533 320 200 160 128 100 80 64 51 40 32 26
6 1200 800 480 300 240 192 150 120 96 76 60 48 38
10 800 500 400 320 250 200 160 127 100 80 64
16 800 640 512 400 320 256 203 160 128 102
25 800 625 500 400 317 250 200 160
35 875 700 560 444 350 280 224
50 760 603 475 380 304
Fig. F42 : Maximum circuit lengths (in meters) for different sizes of copper conductor and rated currents for type B
(1)
circuit-breakers in a 230/400 V single-phase or
three-phase TN system with m = 1
(1) For the denition of type B and C circuit-breakers refer to
chapter H clause 4.2.
Sph Rated current (A)
mm
2
1 2 3 4 6 10 16 20 25 32 40 50 63 80 100 125
1.5 600 300 200 150 100 60 37 30 24 18 15 12 9 7 6 5
2.5 500 333 250 167 100 62 50 40 31 25 20 16 12 10 8
4 533 400 267 160 100 80 64 50 40 32 25 20 16 13
6 600 400 240 150 120 96 75 60 48 38 30 24 19
10 667 400 250 200 160 125 100 80 63 50 40 32
16 640 400 320 256 200 160 128 101 80 64 51
25 625 500 400 312 250 200 159 125 100 80
35 875 700 560 437 350 280 222 175 140 112
50 760 594 475 380 301 237 190 152
Fig. F43 : Maximum circuit lengths (in metres) for different sizes of copper conductor and rated currents for type C
(1)
circuit-breakers in a 230/400 V single-phase or
three-phase TN system with m = 1
Schneider Electric - Electrical installation guide 2013
F27
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6 Implementation of the TN system
Example
A 3-phase 4-wire (230/400 V) installation is TN-C earthed. A circuit is protected by a
type B circuit-breaker rated at 63 A, and consists of an aluminium cored cable with
50 mm
2
phase conductors and a neutral conductor (PEN) of 25 mm
2
.
What is the maximum length of circuit, below which protection of persons against
indirect-contact hazards is assured by the instantaneous magnetic tripping relay of
the circuit-breaker?
Figure F42 gives, for 50 mm
2
and a 63 A type B circuit-breaker, 603 metres, to which
must be applied a factor of 0.42 (Figure F40 for m
Sph
SPE
= = 2).
The maximum length of circuit is therefore:
603 x 0.42 = 253 metres.
Particular case where one or more exposed conductive part(s)
is (are) earthed to a separate earth electrode
Protection must be provided against indirect contact by a RCD at the origin of any
circuit supplying an appliance or group of appliances, the exposed conductive parts
of which are connected to an independent earth electrode.
The sensitivity of the RCD must be adapted to the earth electrode resistance (RA2 in
Figure F45). See specications applicable to TT system.
6.3 High-sensitivity RCDs (see Fig. F31)
According to IEC 60364-4-41, high sensitivity RCDs (y 30 mA) must be used for
protection of socket outlets with rated current y 20 A in all locations. The use of such
RCDs is also recommended in the following cases:
b Socket-outlet circuits in wet locations at all current ratings
b Socket-outlet circuits in temporary installations
b Circuits supplying laundry rooms and swimming pools
b Supply circuits to work-sites, caravans, pleasure boats, and travelling fairs
See 2.2 and chapter P, al section 3.
Sph Rated current (A)
mm
2
1 2 3 4 6 10 16 20 25 32 40 50 63 80 100 125
1.5 429 214 143 107 71 43 27 21 17 13 11 9 7 5 4 3
2.5 714 357 238 179 119 71 45 36 29 22 18 14 11 9 7 6
4 571 381 286 190 114 71 80 46 36 29 23 18 14 11 9
6 857 571 429 286 171 107 120 69 54 43 34 27 21 17 14
10 952 714 476 286 179 200 114 89 71 57 45 36 29 23
16 762 457 286 320 183 143 114 91 73 57 46 37
25 714 446 500 286 223 179 143 113 89 71 57
35 625 700 400 313 250 200 159 125 80 100
50 848 543 424 339 271 215 170 136 109
Fig. F44 : Maximum circuit lengths (in metres) for different sizes of copper conductor and rated currents for type D
(1)
circuit-breakers in a 230/400 V single-phase or
three-phase TN system with m = 1
(1) For the denition of type D circuit-breaker refer to chapter H
Sub-clause 4.2.
Fig. F45 : Separate earth electrode
RA1 RA2
Distant location
Fig. F46 : Circuit supplying socket-outlets
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F28
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6.4 Protection in high re-risk location
According to IEC 60364-422-3.10, circuits in high re-risk locations must be
protected by RCDs of sensitivity y 500 mA. This excludes the TN-C arrangement and
TN-S must be adopted.
A preferred sensitivity of 300 mA is mandatory in some countries (see Fig. F47).
6.5 When the fault current-loop impedance is
particularly high
When the earth-fault current is limited due to an inevitably high fault-loop impedance,
so that the overcurrent protection cannot be relied upon to trip the circuit within the
prescribed time, the following possibilities should be considered:
Suggestion 1 (see Fig. F48)
b Install a circuit-breaker which has a lower instantaneous magnetic tripping level, for
example:
2In y Irm y 4In
This affords protection for persons on circuits which are abnormally long. It must
be checked, however, that high transient currents such as the starting currents of
motors will not cause nuisance trip-outs.
b Schneider Electric solutions
v Type G Compact (2Im y Irm y 4Im)
v Type B Acti 9 circuit-breaker
Suggestion 2 (see Fig. F49)
b Install a RCD on the circuit. The device does not need to be highly-sensitive
(HS) (several amps to a few tens of amps). Where socket-outlets are involved, the
particular circuits must, in any case, be protected by HS (y 30 mA) RCDs; generally
one RCD for a number of socket outlets on a common circuit.
b Schneider Electric solutions
v RCD Vigi NG125 : IAn = 1 or 3 A
v Vigicompact REH or REM: IAn = 3 to 30 A
v Type B Acti 9 circuit-breaker
Suggestion 3
Increase the size of the PE or PEN conductors and/or the phase conductors, to
reduce the loop impedance.
Suggestion 4
Add supplementary equipotential conductors. This will have a similar effect to that
of suggestion 3, i.e. a reduction in the earth-fault-loop resistance, while at the same
time improving the existing touch-voltage protection measures. The effectiveness
of this improvement may be checked by a resistance test between each exposed
conductive part and the local main protective conductor.
For TN-C installations, bonding as shown in Figure F50 is not allowed, and
suggestion 3 should be adopted.
Fig. F47 : Fire-risk location
Fire-risk
location
Fig. F48 : Circuit-breaker with low-set instantaneous magnetic
tripping
2 y Irm y 4In
PE or PEN
Great length of cable
Fig. F49 : RCD protection on TN systems with high earth-fault-
loop impedance
Fig. F50 : Improved equipotential bonding
Phases
Neutral
PE
6 Implementation of the TN system
Schneider Electric - Electrical installation guide 2013
F29
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
7 Implementation of the IT system
The basic feature of the IT earthing system is that, in the event of a short-circuit to
earth fault, the system can continue to operate without interruption. Such a fault is
referred to as a rst fault.
In this system, all exposed conductive parts of an installation are connected via
PE conductors to an earth electrode at the installation, while the neutral point of the
supply transformer is:
b Either isolated from earth
b Or connected to earth through a high resistance (commonly 1,000 ohms or more)
This means that the current through an earth fault will be measured in milli-amps,
which will not cause serious damage at the fault position, or give rise to dangerous
touch voltages, or present a re hazard. The system may therefore be allowed to
operate normally until it is convenient to isolate the faulty section for repair work. This
enhances continuity of service.
In practice, the system earthing requires certain specic measures for its satisfactory
exploitation:
b Permanent monitoring of the insulation with respect to earth, which must signal
(audibly or visually) the occurrence of the rst fault
b A device for limiting the voltage which the neutral point of the supply transformer
can reach with respect to earth
b A rst-fault location routine by an efcient maintenance staff. Fault location is
greatly facilitated by automatic devices which are currently available
b Automatic high-speed tripping of appropriate circuit-breakers must take place in
the event of a second fault occurring before the rst fault is repaired. The second
fault (by denition) is an earth fault affecting a different live conductor than that of the
rst fault (can be a phase or neutral conductor)
(1)
.
The second fault results in a short-circuit through the earth and/or through
PE bonding conductors.
7.1 Preliminary conditions (see Fig. F51 and Fig. F52)
(1) On systems where the neutral is distributed, as shown in
Figure F56.
Minimum functions required Components and devices Examples
Protection against overvoltages (1) Voltage limiter Cardew C
at power frequency
Neutral earthing resistor (2) Resistor Impedance Zx
(for impedance earthing variation)
Overall earth-fault monitor (3) Permanent insulation Vigilohm TR22A
with alarm for rst fault condition monitor PIM with alarm feature or XM 200
Automatic fault clearance (4) Four-pole circuit-breakers Compact circuit-breaker
on second fault and (if the neutral is distributed) or RCD-MS
protection of the neutral all 4 poles trip
conductor against overcurrent
Location of rst fault (5) With device for fault-location Vigilohm system
on live system, or by successive
opening of circuits
Fig. F51 : Essential functions in IT schemes and examples with Schneider Electric products
Fig. F52 : Positions of essential functions in 3-phase 3-wire IT-earthed system
L1
L2
L3
N
HV/LV
4
4
2
1
3
5
4
F - Protection against electric shock
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F30
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
7.2 Protection against indirect contact
First-fault condition
The earth-fault current which ows under a rst-fault condition is measured in milli-
amps.
The fault voltage with respect to earth is the product of this current and the
resistance of the installation earth electrode and PE conductor (from the faulted
component to the electrode). This value of voltage is clearly harmless and could
amount to several volts only in the worst case (1,000 O earthing resistor will pass
230 mA
(1)
and a poor installation earth-electrode of 50 ohms, would give 11.5 V, for
example).
An alarm is given by the permanent insulation monitoring device.
Principle of earth-fault monitoring
A generator of very low frequency a.c. current, or of d.c. current, (to reduce the
effects of cable capacitance to negligible levels) applies a voltage between the
neutral point of the supply transformer and earth. This voltage causes a small current
to ow according to the insulation resistance to earth of the whole installation, plus
that of any connected appliance.
Low-frequency instruments can be used on a.c. systems which generate transient
d.c. components under fault conditions. Certain versions can distinguish between
resistive and capacitive components of the leakage current.
Modern equipment allow the measurement of leakage-current evolution, so that
prevention of a rst fault can be achieved.
Examples of equipment
b Manual fault-location (see Fig. F53)
The generator may be xed (example: XM100) or portable (example: GR10X
permitting the checking of dead circuits) and the receiver, together with the magnetic
clamp-type pick-up sensor, are portable.
Modern monitoring systems greatly facilitate
rst-fault location and repair
(1) On a 230/400 V 3-phase system.
Fault-location systems comply with
IEC 61157-9 standard
Fig. F53 : Non-automatic (manual) fault location
P12
P50
P100
ON/OFF
GR10X
RM10N
XM100
XM100
b Fixed automatic fault location (see Fig. F54 next page)
The monitoring relay XM100, together with the xed detectors XD1 or XD12 (each
connected to a toroidal CT embracing the conductors of the circuit concerned)
provide a system of automatic fault location on a live installation.
Moreover, the level of insulation is indicated for each monitored circuit, and two
levels are checked: the rst level warns of unusually low insulation resistance so that
preventive measures may be taken, while the second level indicates a fault condition
and gives an alarm.
Schneider Electric - Electrical installation guide 2013
F31
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
7 Implementation of the IT system
Fig. F54 : Fixed automatic fault location
Fig. F55 : Automatic fault location and insulation-resistance data logging
XD1
XD1 XD1 XD12
1 to 12 circuits
Toroidal CTs
XM100
XM100
b Automatic monitoring, logging, and fault location (see Fig. F55)
The Vigilohm System also allows access to a printer and/or a PC which provides
a global review of the insulation level of an entire installation, and records the
chronological evolution of the insulation level of each circuit.
The central monitor XM100, together with the localization detectors XD08 and XD16,
associated with toroidal CTs from several circuits, as shown below in Figure F55,
provide the means for this automatic exploitation.
XM100
XD08 XD16
XM100
XL08
897
XL16
678
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F32
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Implementation of permanent insulation-monitoring (PIM) devices
b Connection
The PIM device is normally connected between the neutral (or articicial neutral)
point of the power-supply transformer and its earth electrode.
b Supply
Power supply to the PIM device should be taken from a highly reliable source. In
practice, this is generally directly from the installation being monitored, through
overcurrent protective devices of suitable short-circuit current rating.
b Level settings
Certain national standards recommend a rst setting at 20% below the insulation
level of the new installation. This value allows the detection of a reduction of the
insulation quality, necessitating preventive maintenance measures in a situation of
incipient failure.
The detection level for earth-fault alarm will be set at a much lower level.
By way of an example, the two levels might be:
v New installation insulation level: 100 kO
v Leakage current without danger: 500 mA (re risk at > 500 mA)
v Indication levels set by the consumer:
- Threshold for preventive maintenance: 0.8 x 100 = 80 kO
- Threshold for short-circuit alarm: 500 O
Notes:
v Following a long period of shutdown, during which the whole, or part of the installation
remains de-energized, humidity can reduce the general level of insulation resistance.
This situation, which is mainly due to leakage current over the damp surface of
healthy insulation, does not constitute a fault condition, and will improve rapidly as the
normal temperature rise of current-carrying conductors reduces the surface humidity.
v The PIM device (XM) can measure separately the resistive and the capacitive
current components of the leakage current to earth, thereby deriving the true
insulation resistance from the total permanent leakage current.
The case of a second fault
A second earth fault on an IT system (unless occurring on the same conductor
as the rst fault) constitutes a phase-phase or phase-to-neutral fault, and whether
occurring on the same circuit as the rst fault, or on a different circuit, overcurrent
protective devices (fuses or circuit-breakers) would normally operate an automatic
fault clearance.
The settings of overcurrent tripping relays and the ratings of fuses are the basic
parameters that decide the maximum practical length of circuit that can be
satisfactorily protected, as discussed in Sub-clause 6.2.
Note: In normal circumstances, the fault current path is through common
PE conductors, bonding all exposed conductive parts of an installation, and so the
fault loop impedance is sufciently low to ensure an adequate level of fault current.
Where circuit lengths are unavoidably long, and especially if the appliances of a
circuit are earthed separately (so that the fault current passes through two earth
electrodes), reliable tripping on overcurrent may not be possible.
In this case, an RCD is recommended on each circuit of the installation.
Where an IT system is resistance earthed, however, care must be taken to ensure
that the RCD is not too sensitive, or a rst fault may cause an unwanted trip-out.
Tripping of residual current devices which satisfy IEC standards may occur at values
of 0.5 IAn to IAn, where IAn is the nominal residual-current setting level.
Methods of determining levels of short-circuit current
A reasonably accurate assessment of short-circuit current levels must be carried out
at the design stage of a project.
A rigorous analysis is not necessary, since current magnitudes only are important for
the protective devices concerned (i.e. phase angles need not be determined) so that
simplied conservatively approximate methods are normally used. Three practical
methods are:
b The method of impedances, based on the vectorial summation of all the (positive-
phase-sequence) impedances around a fault-current loop
b The method of composition, which is an approximate estimation of short-circuit
current at the remote end of a loop, when the level of short-circuit current at the near
end of the loop is known. Complex impedances are combined arithmetically in this
method
b The conventional method, in which the minimum value of voltage at the origin of
a faulty circuit is assumed to be 80% of the nominal circuit voltage, and tables are
used based on this assumption, to give direct readings of circuit lengths.
Three methods of calculation are commonly
used:
b The method of impedances, based on the
trigonometric addition of the system resistances
and inductive reactances
b The method of composition
b The conventional method, based on an
assumed voltage drop and the use of prepared
tables
Schneider Electric - Electrical installation guide 2013
F33
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
7 Implementation of the IT system
These methods are reliable only for the cases in which wiring and cables which
make up the fault-current loop are in close proximity (to each other) and are not
separated by ferro-magnetic materials.
Methods of impedances
This method as described in Sub-clause 6.2, is identical for both the IT and
TN systems of earthing.
Methods of composition
This method as described in Sub-clause 6.2, is identical for both the IT and
TN systems of earthing.
Conventional method (see Fig. F56)
The principle is the same for an IT system as that described in Sub-clause 6.2 for a
TN system : the calculation of maximum circuit lengths which should not be exceeded
downstream of a circuit-breaker or fuses, to ensure protection by overcurrent devices.
It is clearly impossible to check circuit lengths for every feasible combination of two
concurrent faults.
All cases are covered, however, if the overcurrent trip setting is based on the
assumption that a rst fault occurs at the remote end of the circuit concerned,
while the second fault occurs at the remote end of an identical circuit, as already
mentioned in Sub-clause 3.4. This may result, in general, in one trip-out only
occurring (on the circuit with the lower trip-setting level), thereby leaving the system
in a rst-fault situation, but with one faulty circuit switched out of service.
b For the case of a 3-phase 3-wire installation the second fault can only cause a
phase/phase short-circuit, so that the voltage to use in the formula for maximum
circuit length is 3 Uo.
The maximum circuit length is given by:
L
a m
max
0.8 Uo 3 Sph
2
=
+ ( ) I 1
metres
b For the case of a 3-phase 4-wire installation the lowest value of fault current will
occur if one of the faults is on a neutral conductor. In this case, Uo is the value to use
for computing the maximum cable length, and
L
a m
max
0.8 Uo S1
2
=
+ ( ) I 1
metres
i.e. 50% only of the length permitted for a TN scheme
(1)
The software Ecodial is based on the method
of impedance
The maximum length of an IT earthed circuit is:
b For a 3-phase 3-wire scheme
L
a m
max
0.8 Uo 3 Sph
2
=
+ ( ) I 1
b For a 3-phase 4-wire scheme
L
a m
max
0.8 Uo S1
2
=
+ ( ) I 1
(1) Reminder: There is no length limit for earth-fault protection
on a TT scheme, since protection is provided by RCDs of high
sensitivity.
Fig. F56 : Calculation of Lmax. for an IT-earthed system, showing fault-current path for a double-fault condition
Id
PE
Non distributed neutral
C
D
Id
A
B
N
Id
PE
Distributed neutral
Id
N
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F34
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
(1) The tables are those shown in Sub-clause 6.2 (Figures
F41 to F44). However, the table of correction factors (Figure
F57) which takes into account the ratio Sph/SPE, and of the
type of circuit (3-ph 3-wire; 3-ph 4-wire; 1-ph 2-wire) as well
as conductor material, is specic to the IT system, and differs
from that for TN.
In the preceding formulae:
Lmax = longest circuit in metres
Uo = phase-to-neutral voltage (230 V on a 230/400 V system)
= resistivity at normal operating temperature (22.5 x 10
-3
ohms-mm
2
/m for copper,
36 x 10
-3
ohms-mm
2
/m for aluminium)
Ia = overcurrent trip-setting level in amps, or Ia = current in amps required to clear
the fuse in the specied time
m
Sph
SPE
=
SPE = cross-sectional area of PE conductor in mm
2
S1 = S neutral if the circuit includes a neutral conductor
S1 = Sph if the circuit does not include a neutral conductor
Tables
The following tables have been established according to the conventional method
described above.
The tables give maximum circuit lengths, beyond which the ohmic resistance of
the conductors will limit the magnitude of the short-circuit current to a level below
that required to trip the circuit-breaker (or to blow the fuse) protecting the circuit,
with sufcient rapidity to ensure safety against indirect contact. The tables take into
account:
b The type of protection: circuit-breakers or fuses, operating-current settings
b Cross-sectional area of phase conductors and protective conductors
b Type of earthing scheme
b Correction factor: Figure F57 indicates the correction factor to apply to the lengths
given in tables F40 to F43, when considering an IT system
The following tables
(1)
give the length of circuit
which must not be exceeded, in order that
persons be protected against indirect contact
hazards by protective devices
Fig. F57 : Correction factor to apply to the lengths given in tables F41 to F44 for TN systems
Circuit Conductor m = Sph/SPE (or PEN)
material m = 1 m = 2 m = 3 m = 4
3 phases Copper 0.86 0.57 0.43 0.34
Aluminium 0.54 0.36 0.27 0.21
3ph + N or 1ph + N Copper 0.50 0.33 0.25 0.20
Aluminium 0.31 0.21 0.16 0.12
Example
A 3-phase 3-wire 230/400 V installation is IT-earthed.
One of its circuits is protected by a circuit-breaker rated at 63 A, and consists of an
aluminium-cored cable with 50 mm
2
phase conductors. The 25 mm
2
PE conductor
is also aluminum. What is the maximum length of circuit, below which protection of
persons against indirect-contact hazards is assured by the instantaneous magnetic
tripping relay of the circuit-breaker?
Figure F42 indicates 603 metres, to which must be applied a correction factor of 0.36
(m = 2 for aluminium cable).
The maximum length is therefore 217 metres.
7.3 High-sensitivity RCDs
According to IEC 60364-4-41, high sensitivity RCDs (y 30 mA) must be used for
protection of socket outlets with rated current y 20 A in all locations. The use of such
RCDs is also recommended in the following cases:
b Socket-outlet circuits in wet locations at all current ratings
b Socket-outlet circuits in temporary installations
b Circuits supplying laundry rooms and swimming pools
b Supply circuits to work-sites, caravans, pleasure boats, and travelling fairs
See 2.2 and chapter P, al section 3
Fig. F62 : Circuit supplying socket-outlets
Schneider Electric - Electrical installation guide 2013
F35
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
7 Implementation of the IT system
7.4 Protection in high re-risk locations
Protection by a RCD of sensitivity y 500 mA at the origin of the circuit supplying the
re-risk locations is mandatory in some countries (see Fig. F59).
A preferred sensitivity of 300 mA may be adopted.
7.5 When the fault current-loop impedance is
particularly high
When the earth-fault current is restricted due to an inevitably high fault-loop
impedance, so that the overcurrent protection cannot be relied upon to trip the circuit
within the prescribed time, the following possibilities should be considered:
Suggestion 1 (see Fig. F60)
b Install a circuit-breaker which has an instantaneous magnetic tripping element with
an operation level which is lower than the usual setting, for example:
2In y Irm y 4In
This affords protection for persons on circuits which are abnormally long. It must
be checked, however, that high transient currents such as the starting currents of
motors will not cause nuisance trip-outs.
b Schneider Electric solutions
v Compact NSX with G trip unit or Micrologic trip unit (2Im y Irm y 4Im)
v Type B Acti 9 circuit-breaker
Suggestion 2 (see Fig. F61)
Install a RCD on the circuit. The device does not need to be highly-sensitive (HS)
(several amps to a few tens of amps). Where socket-outlets are involved, the
particular circuits must, in any case, be protected by HS (y 30 mA) RCDs; generally
one RCD for a number of socket outlets on a common circuit.
b Schneider Electric solutions
v RCD Vigi NG125 : IAn = 1 or 3 A
v Vigicompact MH or ME: IAn = 3 to 30 A
Suggestion 3
Increase the size of the PE conductors and/or the phase conductors, to reduce the
loop impedance.
Suggestion 4 (see Fig. F62)
Add supplementary equipotential conductors. This will have a similar effect to that
of suggestion 3, i.e. a reduction in the earth-fault-loop resistance, while at the same
time improving the existing touch-voltage protection measures. The effectiveness
of this improvement may be checked by a resistance test between each exposed
conductive part and the local main protective conductor.
Fig. F59 : Fire-risk location
Fig. F60 : A circuit-breaker with low-set instantaneous
magnetic trip
Fig. F61 : RCD protection Fig. F62 : Improved equipotential bonding
Phases
Neutral
PE
2 y I rm y 4I n
PE
Great length of cable
Fire-risk
location
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F36
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. F64 : Industrial-type CB with RCD module
8.1 Description of RCDs
Principle
The essential features are shown schematically in Figure F63 below.
A magnetic core encompasses all the current-carrying conductors of an electric
circuit and the magnetic ux generated in the core will depend at every instant on
the arithmetical sum of the currents; the currents passing in one direction being
considered as positive (I1), while those passing in the opposite direction will be
negative (I2).
In a normally healthy circuit I1 + I2 = 0 and there will be no ux in the magnetic core,
and zero e.m.f. in its coil.
An earth-fault current Id will pass through the core to the fault, but will return to the
source via the earth, or via protective conductors in a TN-earthed system.
The current balance in the conductors passing through the magnetic core therefore
no longer exists, and the difference gives rise to a magnetic ux in the core.
The difference current is known as the residual current and the principle is referred
to as the residual current principle.
The resultant alternating ux in the core induces an e.m.f. in its coil, so that a current
I3 ows in the tripping-device operating coil. If the residual current exceeds the value
required to operate the tripping device either directly or via an electronic relay, then
the associated circuit-breaker will trip.
8.2 Types of RCDs
Residual current devices (RCD) are commonly incorporated in or associated with the
following components:
b Industrial-type moulded-case circuit-breakers (MCCB) and air circuit-breakers
(ACB) conforming to IEC 60947-2 and its appendix B and M
b Industrial type miniature circuit-breakers (MCB) conforming to IEC 60947-2 and its
appendix B and M
b Household and similar miniature circuit-breakers (MCB) complying with IEC 60898,
IEC 61008, IEC 61009
b Residual load switch conforming to particular national standards
b Relays with separate toroidal (ring-type) current transformers, conforming to
IEC 60947-2 Appendix M
RCDs are mandatorily used at the origin of TT-earthed installations, where their
ability to discriminate with other RCDs allows selective tripping, thereby ensuring the
level of service continuity required.
Industrial type circuit-breakers with integrated or adaptable
RCD module (see Fig. F64)
Industrial circuit-breakers with an integrated
RCD are covered in IEC 60947-2 and its
appendix B
Industrial type circuit-breaker
Vigi Compact
Acti 9 DIN-rail industrial
Circuit-breaker with adaptable Vigi RCD module
Adaptable residual current circuit-breakers, including DIN-rail mounted units (e.g.
Compact or Acti 9), are available, to which may be associated an auxiliary RCD
module (e.g. Vigi).
The ensemble provides a comprehensive range of protective functions (isolation,
protection against short-circuit, overload, and earth-fault.
8 Residual current devices (RCDs)
Fig. F63 : The principle of RCD operation
I1 I2
I3
Schneider Electric - Electrical installation guide 2013
F37
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. F65 : Domestic residual current circuit-breakers (RCCBs) for earth leakage protection
Household or domestic circuit-breakers with
an integrated RCD are covered in IEC 60898,
IEC 61008 and IEC 61009
The incoming-supply circuit-
breaker can also have time-
delayed characteristics and
integrate a RCD (type S).
Monobloc Dclic Vigi residual current circuit-breakers
intended for protection of terminal socket-outlet circuits
in domestic and tertiary sector applications.
RCDs with separate toroidal CTs can be used in association with circuit-breakers or
contactors.
Residual current circuit-breakers and RCDs with separate
toroidal current transformer (see Fig. F66)
Residual current load break switches are
covered by particular national standards.
RCDs with separate toroidal current
transformers are standardized in IEC 60947-2
appendix M
Fig. F66 : RCDs with separate toroidal current transformers (Vigirex)
Household and similar miniature circuit-breakers with RCD
(see Fig. F65)
8 Residual current devices (RCDs)
8.3 Sensitivity of RCDs to disturbances
In certain cases, aspects of the environment can disturb the correct operation of
RCDs:
b nuisance tripping: Break in power supply without the situation being really
hazardous. This type of tripping is often repetitive, causing major inconvenience and
detrimental to the quality of the user's electrical power supply.
b non-tripping, in the event of a hazard. Less perceptible than nuisance tripping,
these malfunctions must still be examined carefully since they undermine user safety.
This is why international standards dene 3 categories of RCDs according to their
immunity to this type of disturbance (see below).
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F38
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.2 s 50 s
0.5U
U
Umax
Fig. F68 : Standardized 1.2/50 s voltage transient wave
t
0.5
0.9
1
0.1
I
Fig. F69 : Standardized current-impulse wave 8/20 s
10 s (f = 100 kHz)
t
100%
I
90%
10%
ca.0.5 s
60%
Fig. F67 : Standardized 0.5 s/100 kHz current transient wave
Main disturbance types
Permanent earth leakage currents
Every LV installation has a permanent leakage current to earth, which is either due
to:
b Unbalance of the intrinsic capacitance between live conductors and earth for three-
phase circuits or
b Capacitance between live conductors and earth for single-phase circuits
The larger the installation the greater its capacitance with consequently increased
leakage current.
The capacitive current to earth is sometimes increased signicantly by ltering
capacitors associated with electronic equipment (automation, IT and computer-
based systems, etc.).
In the absence of more precise data, permanent leakage current in a given
installation can be estimated from the following values, measured at 230 V 50 Hz:
Single-phase or three-phase line: 1.5 mA /100m
b Heating oor: 1mA / kW
b Fax terminal, printer: 1 mA
b Microcomputer, workstation: 2 mA
b Copy machine: 1.5 mA
Since RCDs complying with IEC and many national standards may operate under,
the limitation of permanent leakage current to 0.25 IAn, by sub-division of circuits
will, in practice, eliminate any unwanted tripping.
For very particular cases, such as the extension, or partial renovation of extended
IT-earthed installations, the manufacturers must be consulted.
High frequency components (harmonics, transients, etc.), are generated by
computer equipment power supplies, converters, motors with speed regulators,
uorescent lighting systems and in the vicinity of high power switching devices and
reactive energy compensation banks.
Part of these high frequency currents may ow to earth through parasitic
capacitances. Although not hazardous for the user, these currents can still cause the
tripping of differential devices.
Energization
The initial energization of the capacitances mentioned above gives rise to high
frequency transient currents of very short duration, similar to that shown in
Figure F67.
The sudden occurrence of a rst-fault on an IT-earthed system also causes transient
earth-leakage currents at high frequency, due to the sudden rise of the two healthy
phases to phase/phase voltage above earth.
Common mode overvoltages
Electrical networks are subjected to overvoltages due to lightning strikes or to abrupt
changes of system operating conditions (faults, fuse operation, switching, etc.).
These sudden changes often cause large transient voltages and currents in inductive
and capacitive circuits. Records have established that, on LV systems, overvoltages
remain generally below 6 kV, and that they can be adequately represented by the
conventional 1.2/50 s impulse wave (see Fig. F68).
These overvoltages give rise to transient currents represented by a current impulse
wave of the conventional 8/20 s form, having a peak value of several tens of
amperes (see Fig. F69).
The transient currents ow to earth via the capacitances of the installation.
Non-sinusoidal fault currents: RCDs type AC, A, B
Standard IEC 60755 (General requirements for residual current operated protective
devices) denes three types of RCD depending on the characteristics of the fault
current:
b Type AC
RCD for which tripping is ensured for residual sinusoidal alternating currents.
b Type A
RCD for which tripping is ensured:
v for residual sinusoidal alternating currents,
v for residual pulsating direct currents,
Schneider Electric - Electrical installation guide 2013
F39
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. F70 : External inuence classication according to IEC 60364-3 standard
Disturbed
network
Inuence of
the electrical
network
Clean network
Super-
immunized
residual current
protections
Type A SI: k
SI k
Super immunized
residual current
protections
SI k
Super immunized
residual current
protections
+
SI k
Super immunized
residual current
protections
+
Standard
immunized
residual current
protections
Type AC
Appropriate
additional
protection
(sealed cabinet
or unit)
Appropriate
additional
protection
(sealed cabinet
or unit +
overpressure)
AF1 AF2 AF3 AF4
b External
inuences:
negligible,
b External
inuences:
presence
of corrosive
or polluting
atmospheric
agents,
b External
inuences:
intermittent
or accidental
action of
certain
common
chemicals,
b External
inuences:
permanent
action of
corrosive
or polluting
chemicals
b Equipment
characteristics:
normal.
b Equipment
characteristics:
e.g. conformity
with salt mist
or atmospheric
pollution tests.
b Equipment
characteristics:
corrosion
protection.
b Equipment
characteristics:
specically
studied
according to
the type of
products.
Examples of exposed sites External inuences
Iron and steel works. Presence of sulfur, sulfur vapor, hydrogen
sulde.
Marinas, trading ports, boats, sea edges, naval
shipyards.
Salt atmospheres, humid outside, low
temperatures.
Swimming pools, hospitals, food & beverage. Chlorinated compounds.
Petrochemicals. Hydrogen, combustion gases, nitrogen
oxides.
Breeding facilities, tips. Hydrogen sulde.
8 Residual current devices (RCDs)
b Type B
RCD for which tripping is ensured:
v as for type A,
v for pure direct residual currents which may result from three-phase rectifying
circuits.
Cold: in the cases of temperatures under - 5 C, very high sensitivity
electromechanical relays in the RCD may be welded by the condensation freezing
action.
Type Si devices can operate under temperatures down to - 25 C.
Atmospheres with high concentrations of chemicals or dust: the special alloys
used to make the RCDs can be notably damaged by corrosion. Dust can also block
the movement of mechanical parts.
See the measures to be taken according to the levels of severity dened by
standards in Fig. F70.
Regulations dene the choice of earth leakage protection and its implementation.
The main reference texts are as follows:
b Standard IEC 60364-3:
v This gives a classication (AFx) for external inuences in the presence of corrosive
or polluting substances.
v It denes the choice of materials to be used according to extreme inuences.
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F40
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Device type Nuisance
trippings
Non-trippings
High
frequency
leakage
current
Fault current Low
temperatures
(down to
- 25 C)
Corrosion
Dust
Rectied
alternating
Pure direct
AC
b
A
b b b
SI
b b b b b b
B
b b b b b b
Fig. F71 : Immunity level of Schneider Electric RCDs
Immunity to nuisance tripping
Type SI RCDs have been designed to avoid nuisance tripping or non-tripping in case
of polluted network , lightning effect, high frequency currents, RF waves, etc. Figure
F72 below indicates the levels of tests undergone by this type of RCDs.
Disturbance type Rated test wave Immunity
Acti 9 :
ID-RCCB, DPN Vigi, Vigi iC60,
Vigi C120, Vigi NG125
SI type
Continuous disturbances
Harmonics 1 kHz Earth leakage current = 8 x IAn
Transient disturbances
Lightning induced overvoltage 1.2 / 50 s pulse (IEC/
EN 61000-4-5)
4.5 kV between conductors 5.5 kV
/ earth
Lightning induced current 8 / 20 s pulse (IEC/EN
61008)
5 kA peak
Switching transient, indirect
lightning currents
0.5 s / 100 kHz ring
wave
(IEC/EN 61008)
400 A peak
Downstream surge arrester
operation, capacitance loading
10 ms pulse 500 A
Electromagnetic compatibility
Inductive load switchings
uorescent lights, motors, etc.)
Repeated bursts (IEC
61000-4-4)
5 kV / 2.5 kHz
4 kV / 400 kHz
Fluorescent lights, thyristor
controlled circuits, etc.
RF conducted waves
(level 4 IEC 61000-4-6)
(level 4 IEC 61000-4-16)
30 V (150 kHz to 230 MHz)
250 mA (15 kHz to 150 kHz)
RF waves (TV&
radio, broadcact,
telecommunications,etc.)
RF radiated waves
80 MHz to 1 GHz
(IEC 61000-4-3)
30 V / m
Fig. F72 : Immunity to nuisance tripping tests undergone by Schneider Electric RCDs
Immunity level for Schneider Electric residual current devices
The Schneider Electric range comprises various types of RCDs allowing earth
leakage protection to be adapted to each application. The table below indicates the
choices to be made according to the type of probable disturbances at the point of
installation.
Schneider Electric - Electrical installation guide 2013
F41
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Recommendations concerning the installation of RCDs with
separate toroidal current transformers
The detector of residual current is a closed magnetic circuit (usually circular) of
very high magnetic permeability, on which is wound a coil of wire, the ensemble
constituting a toroidal (or ring-type) current transformer.
Because of its high permeability, any small deviation from perfect symmetry of
the conductors encompassed by the core, and the proximity of ferrous material
(steel enclosure, chassis members, etc.) can affect the balance of magnetic forces
sufciently, at times of large load currents (motor-starting current, transformer
energizing current surge, etc.) to cause unwanted tripping of the RCD.
Unless particular measures are taken, the ratio of operating current IAn to maximum
phase current Iph (max.) is generally less than 1/1,000.
This limit can be increased substantially (i.e. the response can be desensitized) by
adopting the measures shown in Figure F73, and summarized in Figure F74.
Fig. F73 : Three measures to reduce the ratio IAn/Iph (max.)
L
L = twice the diameter of
the magnetic ring core
Fig. F74 : Means of reducing the ratio I n/Iph (max.)
Measures Diameter Sensitivity
(mm) diminution factor
Careful centralizing of cables through the ring core 3
Oversizing of the ring core 50 100 2
80 200 2
120 300 6
Use of a steel or soft-iron shielding sleeve 50 4
b Of wall thickness 0.5 mm 80 3
b Of length 2 x inside diameter of ring core 120 3
b Completely surrounding the conductors and 200 2
overlapping the circular core equally at both ends
These measures can be combined. By carefully centralizing the cables in a ring core
of 200 mm diameter, where a 50 mm core would be large enough, and using a sleeve,
the ratio 1/1,000 could become 1/30,000.
8 Residual current devices (RCDs)
Schneider Electric - Electrical installation guide 2013
F - Protection against electric shock
F42
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Choice of characteristics of a residual-current circuit-breaker
(RCCB - IEC 61008)
Rated current
The rated current of a RCCB is chosen according to the maximum sustained load
current it will carry.
b If the RCCB is connected in series with, and downstream of a circuit-breaker, the
rated current of both items will be the same, i.e. In u In1 (see Fig. F75a)
b If the RCCB is located upstream of a group of circuits, protected by circuit-
breakers, as shown in Figure F75b, then the RCCB rated current will be given by:
In u ku x ks (In1 + In2 + In3 + In4)
Electrodynamic withstand requirements
Protection against short-circuits must be provided by an upstream SCPD (Short-
Circuit Protective Device) but it is considered that where the RCCB is located in the
same distribution box (complying with the appropriate standards) as the downstream
circuit-breakers (or fuses), the short-circuit protection afforded by these (outgoing-
circuit) SCPDs is an adequate alternative. Coordination between the RCCB and
the SCPDs is necessary, and manufacturers generally provide tables associating
RCCBs and circuit-breakers or fuses.
Fig. F75 : Residual current circuit-breakers (RCCBs)
In1
In1 In2 In3 In4
In
In
a b
8 Residual current devices (RCDs)
Schneider Electric - Electrical installation guide 2013
G1
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapter G
Sizing and protection of conductors
Contents
General G2
1.1 Methodology and denition G2
1.2 Overcurrent protection principles G4
1.3 Practical values for a protective scheme G4
1.4 Location of protective devices G6
1.5 Conductors in parallel G6
Practical method for determining the smallest allowable G7
cross-sectional area of circuit conductors
2.1 General method for cables G7
2.2 Recommended simplied approach for cables G15
2.3 Busbar trunking systems G17
Determination of voltage drop G19
3.1 Maximum voltage drop limit G19
3.2 Calculation of voltage drop in steady load conditions G20
Short-circuit current G23
4.1 Short-circuit current at the secondary terminals of G23
a MV/LV distribution transformer
4.2 3-phase short-circuit current (Isc) at any point within G24
a LV installation
4.3 Isc at the receiving end of a feeder in terms of the Isc G27
at its sending end
4.4 Short-circuit current supplied by an alternator or an inverter G28
Particular cases of short-circuit current G29
5.1 Calculation of minimum levels of short-circuit current G29
5.2 Verication of the withstand capabilities of cables under G34
short-circuit conditions
Protective earthing conductor G36
6.1 Connection and choice G36
6.2 Conductor sizing G37
6.3 Protective conductor between MV/LV transformer and G39
the main general distribution board (MGDB)
6.4 Equipotential conductor G40
The neutral conductor G41
7.1 Sizing the neutral conductor G41
7.2 Protection of the neutral conductor G43
7.3 Breaking of the neutral conductor G43
7.4 Isolation of the neutral conductor G43
Worked example of cable calculation G45
1
2
3
4
5
6
7
8
Schneider Electric - Electrical installation guide 2013
G - Sizing and protection of conductors
G2
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 General
1.1 Methodology and denition
Methodology (see Fig. G1 )
Following a preliminary analysis of the power requirements of the installation, as
described in Chapter B Clause 4, a study of cabling
(1)
and its electrical protection is
undertaken, starting at the origin of the installation, through the intermediate stages
to the nal circuits.
The cabling and its protection at each level must satisfy several conditions at the
same time, in order to ensure a safe and reliable installation, e.g. it must:
b Carry the permanent full load current, and normal short-time overcurrents
b Not cause voltage drops likely to result in an inferior performance of certain loads,
for example: an excessively long acceleration period when starting a motor, etc.
Moreover, the protective devices (circuit-breakers or fuses) must:
b Protect the cabling and busbars for all levels of overcurrent, up to and including
short-circuit currents
b Ensure protection of persons against indirect contact hazards, particularly in
TN- and IT- earthed systems, where the length of circuits may limit the magnitude
of short-circuit currents, thereby delaying automatic disconnection (it may be
remembered that TT- earthed installations are necessarily protected at the origin by
a RCD, generally rated at 300 mA).
The cross-sectional areas of conductors are determined by the general method
described in Sub-clause 2 of this Chapter. Apart from this method some national
standards may prescribe a minimum cross-sectional area to be observed for reasons
of mechanical endurance. Particular loads (as noted in Chapter N) require that the
cable supplying them be oversized, and that the protection of the circuit be likewise
modied.
Fig. G1 : Flow-chart for the selection of cable size and protective device rating for a given circuit
(1) The term cabling in this chapter, covers all insulated
conductors, including multi-core and single-core cables and
insulated wires drawn into conduits, etc.
Component parts of an electric circuit and its
protection are determined such that all normal
and abnormal operating conditions are satised
Power demand:
- kVA to be supplied
- Maximum load current I
B
Conductor sizing:
- Selection of conductor type and insulation
- Selection of method of installation
- Taking account of correction factors for
different environment conditions
- Determination of cross-sectional areas using
tables giving the current carrying capability
Verification of the maximum voltage drop:
- Steady state conditions
- Motor starting conditions
Calculation of short-circuit currents:
- Upstream short-circuit power
- Maximum values
- Minimum values at conductor end
Selection of protective devices:
- Rated current
- Breaking capability
- Implementation of cascading
- Check of discrimination
Schneider Electric - Electrical installation guide 2013
G3
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. G2 : Calculation of maximum load current IB
Denitions
Maximum load current: IB
b At the nal circuits level, this current corresponds to the rated kVA of the load.
In the case of motor-starting, or other loads which take a high in-rush current,
particularly where frequent starting is concerned (e.g. lift motors, resistance-type
spot welding, and so on) the cumulative thermal effects of the overcurrents must be
taken into account. Both cables and thermal type relays are affected.
b At all upstream circuit levels this current corresponds to the kVA to be supplied,
which takes account of the factors of simultaneity (diversity) and utilization, ks and ku
respectively, as shown in Figure G2.
Main distribution
board
Sub-distribution
board
80 A 60 A 100 A
M
Normal load
motor current
50 A
Combined factors of simultaneity
(or diversity) and utilization:
ks x ku = 0.69
IB = (80+60+100+50) x 0.69 = 200 A
50 A
Maximum permissible current: Iz
This is the maximum value of current that the cabling for the circuit can carry
indenitely, without reducing its normal life expectancy.
The current depends, for a given cross sectional area of conductors, on several
parameters:
b Constitution of the cable and cable-way (Cu or Alu conductors; PVC or EPR etc.
insulation; number of active conductors)
b Ambient temperature
b Method of installation
b Inuence of neighbouring circuits
Overcurrents
An overcurrent occurs each time the value of current exceeds the maximum load
current IB for the load concerned.
This current must be cut off with a rapidity that depends upon its magnitude, if
permanent damage to the cabling (and appliance if the overcurrent is due to a
defective load component) is to be avoided.
Overcurrents of relatively short duration can however, occur in normal operation; two
types of overcurrent are distinguished:
b Overloads
These overcurrents can occur in healthy electric circuits, for example, due to a
number of small short-duration loads which occasionally occur co-incidentally: motor
starting loads, and so on. If either of these conditions persists however beyond a
given period (depending on protective-relay settings or fuse ratings) the circuit will be
automatically cut off.
b Short-circuit currents
These currents result from the failure of insulation between live conductors or/and
between live conductors and earth (on systems having low-impedance-earthed
neutrals) in any combination, viz:
v 3 phases short-circuited (and to neutral and/or earth, or not)
v 2 phases short-circuited (and to neutral and/or earth, or not)
v 1 phase short-circuited to neutral (and/or to earth)
1 General
Schneider Electric - Electrical installation guide 2013
G - Sizing and protection of conductors
G4
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.2 Overcurrent protection principles
A protective device is provided at the origin of the circuit concerned (see Fig. G3 and
Fig. G4).
b Acting to cut-off the current in a time shorter than that given by the I
2
t
characteristic of the circuit cabling
b But allowing the maximum load current IB to ow indenitely
The characteristics of insulated conductors when carrying short-circuit currents
can, for periods up to 5 seconds following short-circuit initiation, be determined
approximately by the formula:
I
2
t = k
2
S
2
which shows that the allowable heat generated is proportional to the
squared cross-sectional-area of the condutor.
where
t: Duration of short-circuit current (seconds)
S: Cross sectional area of insulated conductor (mm
2
)
I: Short-circuit current (A r.m.s.)
k: Insulated conductor constant (values of k
2
are given in Figure G52 )
For a given insulated conductor, the maximum permissible current varies according
to the environment. For instance, for a high ambient temperature (ua1 > ua2), Iz1 is
less than Iz2 (see Fig. G5). u means temperature.
Note:
v ISC: 3-phase short-circuit current
v ISCB: rated 3-ph. short-circuit breaking current of the circuit-breaker
v Ir (or Irth)
(1)
: regulated nominal current level; e.g. a 50 A nominal circuit-breaker
can be regulated to have a protective range, i.e. a conventional overcurrent tripping
level (see Fig. G6 opposite page) similar to that of a 30 A circuit-breaker.
1.3 Practical values for a protective scheme
The following methods are based on rules laid down in the IEC standards, and are
representative of the practices in many countries.
General rules
A protective device (circuit-breaker or fuse) functions correctly if:
b Its nominal current or its setting current In is greater than the maximum load
current IB but less than the maximum permissible current Iz for the circuit, i.e.
IB y In y Iz corresponding to zone a in Figure G6
b Its tripping current I2 conventional setting is less than 1.45 Iz which corresponds
to zone b in Figure G6
The conventional setting tripping time may be 1 hour or 2 hours according to local
standards and the actual value selected for I2. For fuses, I2 is the current (denoted
If) which will operate the fuse in the conventional time.
Fig. G3 : Circuit protection by circuit-breaker
t
I
I
2
t cable
characteristic
IB Ir ISCB Iz
Circuit-breaker
tripping curve
ICU
Maximum
load
current
Temporary
overload
t
I
I
2
t cable
characteristic
IB Ir cIz Iz
Fuse curve
Temporary
overload
Fig. G4 : Circuit protection by fuses
(1) Both designations are commonly used in different
standards.
1 2
a1 > a2
5 s
I
2
t = k
2
S
2
Iz1 < Iz2
t
I
Fig. G5 : I
2
t characteristic of an insulated conductor at two different ambient temperatures
Schneider Electric - Electrical installation guide 2013
G5
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 General
Loads Circuit cabling
M
a
x
i
m
u
m
l
o
a
d
c
u
r
r
e
n
t
I
z
1
.
4
5
I
z
M
a
x
i
m
u
m
l
o
a
d
c
u
r
r
e
n
t
I
B
Protective device
0
zone a
zone b
zone c
I
n
I
2
Iz IB
1.45 Iz
Isc
ISCB
N
o
m
i
n
a
l
c
u
r
r
e
n
t
I
n
o
r
i
t
s
r
e
g
u
l
a
t
e
d
c
u
r
r
e
n
t
I
r
C
o
n
v
e
n
t
i
o
n
a
l
o
v
e
r
c
u
r
r
e
n
t
t
r
i
p
c
u
r
r
e
n
t
I
2
3
-
p
h
s
h
o
r
t
-
c
i
r
c
u
i
t
f
a
u
l
t
-
c
u
r
r
e
n
t
b
r
e
a
k
i
n
g
r
a
t
i
n
g
Fig. G6 : Current levels for determining circuir breaker or fuse characteristics
IB y In y Iz zone a
I2 y 1.45 Iz zone b
ISCB u ISC zone c
b Its 3-phase short-circuit fault-current breaking rating is greater than the 3-phase
short-circuit current existing at its point of installation. This corresponds to zone c in
Figure G6.
Applications
b Protection by circuit-breaker
By virtue of its high level of precision the current I2 is always less than 1.45 In (or
1.45 Ir) so that the condition I2 y 1.45 Iz (as noted in the general rules above) will
always be respected.
v Particular case
If the circuit-breaker itself does not protect against overloads, it is necessary to
ensure that, at a time of lowest value of short-circuit current, the overcurrent device
protecting the circuit will operate correctly. This particular case is examined in Sub-
clause 5.1.
b Protection by fuses
The condition I2 y 1.45 Iz must be taken into account, where I2 is the fusing (melting
level) current, equal to k2 x In (k2 ranges from 1.6 to 1.9) depending on the particular
fuse concerned.
A further factor k3 has been introduced ( k =
k
1.45
3
2
) such that I2 y 1.45 Iz
will be valid if In y Iz/k3.
For fuses type gG:
In < 16 A k3 = 1.31
In u 16 A k3 = 1.10
Moreover, the short-circuit current breaking capacity of the fuse ISCF must exceed
the level of 3-phase short-circuit current at the point of installation of the fuse(s).
b Association of different protective devices
The use of protective devices which have fault-current ratings lower than the fault
level existing at their point of installation are permitted by IEC and many national
standards in the following conditions:
v There exists upstream, another protective device which has the necessary short-
circuit rating, and
v The amount of energy allowed to pass through the upstream device is less than
that which can be withstood without damage by the downstream device and all
associated cabling and appliances.
Criteria for fuses:
IB y In y Iz/k3 and ISCF u ISC.
Criteria for circuit-breakers:
IB y In y Iz and ISCB u ISC.
Schneider Electric - Electrical installation guide 2013
G - Sizing and protection of conductors
G6
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
In pratice this arrangement is generally exploited in:
v The association of circuit-breakers/fuses
v The technique known as cascading or series rating in which the strong
current-limiting performance of certain circuit-breakers effectively reduces the
severity of downstream short-circuits
Possible combinations which have been tested in laboratories are indicated in certain
manufacturers catalogues.
1.4 Location of protective devices
General rule (see Fig. G7a)
A protective device is necessary at the origin of each circuit where a reduction of
permissible maximum current level occurs.
Possible alternative locations in certain circumstances
(see Fig. G7b)
The protective device may be placed part way along the circuit:
b If AB is not in proximity to combustible material, and
b If no socket-outlets or branch connections are taken from AB
Three cases may be useful in practice:
b Consider case (1) in the diagram
v AB y 3 metres, and
v AB has been installed to reduce to a practical minimum the risk of a short-circuit
(wires in heavy steel conduit for example)
b Consider case (2)
v The upstream device P1 protects the length AB against short-circuits in
accordance with Sub-clause 5.1
b Consider case (3)
v The overload device (S) is located adjacent to the load. This arrangement is
convenient for motor circuits. The device (S) constitutes the control (start/stop) and
overload protection of the motor while (SC) is: either a circuit-breaker (designed for
motor protection) or fuses type aM
v The short-circuit protection (SC) located at the origin of the circuit conforms with
the principles of Sub-clause 5.1
Circuits with no protection (see Fig. G7c)
Either
b The protective device P1 is calibrated to protect the cable S2 against overloads
and short-circuits
Or
b Where the breaking of a circuit constitutes a risk, e.g.
v Excitation circuits of rotating machines
v circuits of large lifting electromagnets
v the secondary circuits of current transformers
No circuit interruption can be tolerated, and the protection of the cabling is of
secondary importance.
1.5 Conductors in parallel
Conductors of the same cross-sectional-area, the same length, and of the same
material, can be connected in parallel.
The maximum permissible current is the sum of the individual-core maximum
currents, taking into account the mutual heating effects, method of installation, etc.
Protection against overload and short-circuits is identical to that for a single-cable
circuit.
The following precautions should be taken to avoid the risk of short-circuits on the
paralleled cables:
b Additional protection against mechanical damage and against humidity, by the
introduction of supplementary protection
b The cable route should be chosen so as to avoid close proximity to combustible
materials
A protective device is, in general, required at the
origin of each circuit
Fig. G7 : Location of protective devices
P
P
2
P
3
P
4
50 mm
2
10 mm
2
25 mm
2
P
2
P
3
Case (1) Case (2)
Short-circuit
protective
device
P
1
sc
s
B
Overload
protective
device
B
B
< 3 m
A
Case (3)
P
1
: iC60 rated 15A
S
2
:
1.5 mm
2
2.5 mm
2
a
b
c
1 General
Schneider Electric - Electrical installation guide 2013
G7
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
G - Sizing and protection of conductors
2 Practical method for determining
the smallest allowable cross-
sectional area of circuit conductors
The reference international standard for the study of cabling is IEC 60364-5-52:
Electrical installation of buildings - Part 5-52: Selection and erection of electrical
equipment - Wiring system.
A summary of this standard is presented here, with examples of the most commonly
used methods of installation. The current-carrying capacities of conductors in all
different situations are given in annex A of the standard. A simplied method for use
of the tables of annex A is proposed in informative annex B of the standard.
2.1 General method for cables
Possible methods of installation for different types of
conductors or cables
The different admissible methods of installation are listed in Figure G8, in
conjonction with the different types of conductors and cables.
Fig. G8 : Selection of wiring systems (table 52-1 of IEC 60364-5-52)
Conductors and cables Method of installation
Without Clipped Conduit Cable trunking Cable Cable ladder On Support
xings direct (including ducting Cable tray insulators wire
skirting trunking, Cable brackets
ush oor trunking)
Bare conductors +
Insulated conductors + + + +
Sheathed Multi-core + + + + + + 0 +
cables
(including
armoured Single-core 0 + + + + + 0 +
and
mineral
insulated)
+ Permitted.
Not permitted.
0 Not applicable, or not normally used in practice.
Espace avt et aprs illustration
Possible methods of installation for different situations:
Different methods of installation can be implemented in different situations. The
possible combinations are presented in Figure G9.
The number given in this table refer to the different wiring systems considered.
Fig. G9 : Erection of wiring systems (table 52-2 of IEC 60364-5-52)
Situations Method of installation
Without With Conduit Cable trunking Cable Cable ladder On Support
xings xings (including ducting cable tray, insulators wire
skirting trunking, cable brackets
ush oor trunking)
Building voids 40, 46, 0 15, 16, 43 30, 31, 32,
15, 16 41, 42 33, 34
Cable channel 56 56 54, 55 0 44, 45 30, 31, 32,
33, 34
Buried in ground 72, 73 0 70, 71 70, 71 0
Embedded in structure 57, 58 3 1, 2, 50, 51, 52, 53 44, 45 0
59, 60
Surface mounted 20, 21 4, 5 6, 7, 8, 9, 12, 13, 14 6, 7, 30, 31, 32, 36
22, 23 8, 9 33, 34
Overhead 0 10, 11 30, 31, 32 36 35
33, 34
Immersed 80 80 0 0 0
Not permitted.
0 Not applicable, or not normally used in practice.
Schneider Electric - Electrical installation guide 2013
G - Sizing and protection of conductors
G8
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. G10 : Examples of methods of installation (part of table 52-3 of IEC 60364-5-52) (continued on next page)
Examples of wiring systems and reference methods of
installations
An illustration of some of the many different wiring systems and methods of
installation is provided in Figure G10.
Several reference methods are dened (with code letters A to G), grouping
installation methods having the same characteristics relative to the current-carrying
capacities of the wiring systems.
Item No. Methods of installation Description Reference method of
installation to be used to
obtain current-carrying
capacity
1 Insulated conductors or single-core A1
cables in conduit in a thermally
insulated wall
2 Multi-core cables in conduit in a A2
thermally insulated wall
4 Insulated conductors or single-core B1
cables in conduit on a wooden, or
masonry wall or spaced less than
0,3 x conduit diameter from it
5 Multi-core cable in conduit on a B2
wooden, or mansonry wall or spaced
less than 0,3 x conduit diameter
from it
20 Single-core or multi-core cables: C
- xed on, or sapced less than 0.3 x cable
diameter from a wooden wall
30 On unperforated tray C
Room
Room
0.3 D
e
0.3 D
e
Schneider Electric - Electrical installation guide 2013
G9
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Practical method for determining
the smallest allowable cross-
sectional area of circuit conductors
Fig. G10 : Examples of methods of installation (part of table 52-3 of IEC 60364-5-52)
Item No. Methods of installation Description Reference method of
installation to be used to
obtain current-carrying
capacity
31 On perforated tray E or F
36 Bare or insulated conductors on G
insulators
70 Multi-core cables in conduit or in cable D
ducting in the ground
71 Single-core cable in conduit or in cable D
ducting in the ground
0.3 D
e
0.3 D
e
Maximum operating temperature:
The current-carrying capacities given in the subsequent tables have been
determined so that the maximum insulation temperature is not exceeded for
sustained periods of time.
For different type of insulation material, the maximum admissible temperature is
given in Figure G11.
Type of insulation Temperature limit C
Polyvinyl-chloride (PVC) 70 at the conductor
Cross-linked polyethylene (XLPE) and ethylene 90 at the conductor
propylene rubber (EPR)
Mineral (PVC covered or bare exposed to touch) 70 at the sheath
Mineral (bare not exposed to touch and not in 105 at the seath
contact with combustible material)
Fig. G11 : Maximum operating temperatures for types of insulation (table 52-4 of IEC 60364-5-52)
Correction factors:
In order to take environnement or special conditions of installation into account,
correction factors have been introduced.
The cross sectional area of cables is determined using the rated load current I
B
divided by different correction factors, k
1
, k
2
, ...:
I'
I
B
B
k k
=
1 2
...
I
B
is the corrected load current, to be compared to the current-carrying capacity of
the considered cable.
Schneider Electric - Electrical installation guide 2013
G - Sizing and protection of conductors
G10
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
(see also Fig. G10)
b Ambient temperature
The current-carrying capacities of cables in the air are based on an average air
temperature equal to 30 C. For other temperatures, the correction factor is given in
Figure G12 for PVC, EPR and XLPE insulation material.
The related correction factor is here noted k
1
.
The current-carrying capacities of cables in the ground are based on an average
ground temperature equal to 20 C. For other temperatures, the correction factor is
given in Figure G13 for PVC, EPR and XLPE insulation material.
The related correction factor is here noted k
2
.
Fig. G12 : Correction factors for ambient air temperatures other than 30 C to be applied to the
current-carrying capacities for cables in the air (from table A.52-14 of IEC 60364-5-52)
Ambient temperature C Insulation
PVC XLPE and EPR
10 1.22 1.15
15 1.17 1.12
20 1.12 1.08
25 1.06 1.04
35 0.94 0.96
40 0.87 0.91
45 0.79 0.87
50 0.71 0.82
55 0.61 0.76
60 0.50 0.71
65 - 0.65
70 - 0.58
75 - 0.50
80 - 0.41
Fig. G13 : Correction factors for ambient ground temperatures other than 20 C to be applied to
the current-carrying capacities for cables in ducts in the ground (from table A.52-15 of
IEC 60364-5-52)
Ground temperature C Insulation
PVC XLPE and EPR
10 1.10 1.07
15 1.05 1.04
25 0.95 0.96
30 0.89 0.93
35 0.84 0.89
40 0.77 0.85
45 0.71 0.80
50 0.63 0.76
55 0.55 0.71
60 0.45 0.65
65 - 0.60
70 - 0.53
75 - 0.46
80 - 0.38
Schneider Electric - Electrical installation guide 2013
G11
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Practical method for determining
the smallest allowable cross-
sectional area of circuit conductors
Fig. G14 : Correction factors for cables in buried ducts for soil thermal resistivities other than 2.5
K.m/W to be applied to the current-carrying capacities for reference method D (table A52.16 of
IEC 60364-5-52)
Thermal resistivity, K.m/W 1 1.5 2 2.5 3
Correction factor 1.18 1.1 1.05 1 0.96
Fig. G15 : Correction factor k3 depending on the nature of soil
Nature of soil k3
Very wet soil (saturated) 1.21
Wet soil 1.13
Damp soil 1.05
Dry soil 1.00
Very dry soil (sunbaked) 0.86
b Soil thermal resistivity
The current-carrying capacities of cables in the ground are based on a ground
resistivity equal to 2.5 K.m/W. For other values, the correction factor is given in
Figure G14.
The related correction factor is here noted k3.
Based on experience, a relationship exist between the soil nature and resistivity.
Then, empiric values of correction factors k3 are proposed in Figure G15, depending
on the nature of soil.
b Grouping of conductors or cables
The current-carrying capacities given in the subsequent tables relate to single
circuits consisting of the following numbers of loaded conductors:
v Two insulated conductors or two single-core cables, or one twin-core cable
(applicable to single-phase circuits);
v Three insulated conductors or three single-core cables, or one three-core cable
(applicable to three-phase circuits).
Where more insulated conductors or cables are installed in the same group, a group
reduction factor (here noted k4) shall be applied.
Examples are given in Figures G16 to G18 for different congurations (installation
methods, in free air or in the ground).
Figure G16 gives the values of correction factor k4 for different congurations of
unburied cables or conductors, grouping of more than one circuit or multi-core
cables.
Fig. G16 : Reduction factors for groups of more than one circuit or of more than one multi-core cable (table A.52-17 of IEC 60364-5-52)
Arrangement Number of circuits or multi-core cables Reference methods
(cables touching) 1 2 3 4 5 6 7 8 9 12 16 20
Bunched in air, on a 1.00 0.80 0.70 0.65 0.60 0.57 0.54 0.52 0.50 0.45 0.41 0.38 Methods A to F
surface, embedded or
enclosed
Single layer on wall, oor 1.00 0.85 0.79 0.75 0.73 0.72 0.72 0.71 0.70 No further reduction Method C
or unperforated tray factor for more than
Single layer xed directly 0.95 0.81 0.72 0.68 0.66 0.64 0.63 0.62 0.61 nine circuits or
under a wooden ceiling multi-core cables
Single layer on a 1.00 0.88 0.82 0.77 0.75 0.73 0.73 0.72 0.72 Methods E and F
perforated horizontal or
vertical tray
Single layer on ladder 1.00 0.87 0.82 0.80 0.80 0.79 0.79 0.78 0.78
support or cleats etc.
Schneider Electric - Electrical installation guide 2013
G - Sizing and protection of conductors
G12
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Method of installation Number Number of three-phase Use as a
of tray circuits multiplier to
rating for
1 2 3
Perforated 31 1 0.98 0.91 0.87 Three cables in
trays horizontal
2 0.96 0.87 0.81 formation
3 0.95 0.85 0.78
Vertical 31 1 0.96 0.86 Three cables in
perforated vertical
trays 2 0.95 0.84 formation
Ladder 32 1 1.00 0.97 0.96 Three cables in
supports, horizontal
cleats, etc... 33 2 0.98 0.93 0.89 formation
34 3 0.97 0.90 0.86
Perforated 31 1 1.00 0.98 0.96 Three cables in
trays trefoil formation
2 0.97 0.93 0.89
3 0.96 0.92 0.86
Vertical 31 1 1.00 0.91 0.89
perforated
trays 2 1.00 0.90 0.86
Ladder 32 1 1.00 1.00 1.00
supports,
cleats, etc... 33 2 0.97 0.95 0.93
34 3 0.96 0.94 0.90
Fig. G17 : Reduction factors for groups of more than one circuit of single-core cables to be applied to reference rating for one circuit of single-core cables in free air
- Method of installation F. (table A.52.21 of IEC 60364-5-52)
Figure G17 gives the values of correction factor k
4
for different congurations of
unburied cables or conductors, for groups of more than one circuit of single-core
cables in free air.
Touching
20 mm
225 mm
20 mm
Touching
20 mm
Touching
225 mm
Spaced
20 mm
2De
De
2De
De
2De
De
Schneider Electric - Electrical installation guide 2013
G13
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Practical method for determining
the smallest allowable cross-
sectional area of circuit conductors
Fig. G18 : Reduction factors for more than one circuit, single-core or multi-core cables laid
directly in the ground. Installation method D. (table 52-18 of IEC 60364-5-52)
Number Cable to cable clearance (a)
a
of circuits Nil (cables One cable 0.125 m 0.25 m 0.5 m
touching) diameter
2 0.75 0.80 0.85 0.90 0.90
3 0.65 0.70 0.75 0.80 0.85
4 0.60 0.60 0.70 0.75 0.80
5 0.55 0.55 0.65 0.70 0.80
6 0.50 0.55 0.60 0.70 0.80
a
Multi-core cables
a
Single-core cables
a a
a a
Figure G18 gives the values of correction factor k4 for different congurations of
cables or conductors laid directly in the ground.
b Harmonic current
The current-carrying capacity of three-phase, 4-core or 5-core cables is based on
the assumption that only 3 conductors are fully loaded.
However, when harmonic currents are circulating, the neutral current can be
signicant, and even higher than the phase currents. This is due to the fact that the
3
rd
harmonic currents of the three phases do not cancel each other, and sum up in
the neutral conductor.
This of course affects the current-carrying capacity of the cable, and a correction
factor noted here k5 shall be applied.
In addition, if the 3
rd
harmonic percentage h
3
is greater than 33%, the neutral current
is greater than the phase current and the cable size selection is based on the neutral
current. The heating effect of harmonic currents in the phase conductors has also to
be taken into account.
The values of k5 depending on the 3
rd
harmonic content are given in Figure G19.
Fig. G19 : Correction factors for harmonic currents in four-core and ve-core cables (table D.52.1
of IEC 60364-5-52)
Third harmonic content Correction factor
of phase current % Size selection is based Size selection is based
on phase current on neutral current
0 - 15 1.0
15 - 33 0.86
33 - 45 0.86
> 45 1.0
(1)
(1) If the neutral current is more than 135 % of the phase current and the cable size is selected
on the basis of the neutral current then the three phase conductors will not be fully loaded. The
reduction in heat generated by the phase conductors offsets the heat generated by the neutral
conductor to the extent that it is not necessary to apply any reduction factor to the current
carrying capacity for three loaded conductors.
Schneider Electric - Electrical installation guide 2013
G - Sizing and protection of conductors
G14
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Admissible current as a function of nominal cross-sectional
area of conductors
IEC standard 60364-5-52 proposes extensive information in the form of tables
giving the admissible currents as a function of cross-sectional area of cables. Many
parameters are taken into account, such as the method of installation, type of
insulation material, type of conductor material, number of loaded conductors.
As an example, Figure G20 gives the current-carrying capacities for different
methods of installation of PVC insulation, three loaded copper or aluminium
conductors, free air or in ground.
Fig. G20 : Current-carrying capacities in amperes for different methods of installation, PVC insulation, three loaded conductors, copper or aluminium, conductor
temperature: 70 C, ambient temperature: 30 C in air, 20 C in ground (table A.52.4 of IEC 60364-5-52)
Nominal Installation methods
cross-sectional A1 A2 B1 B2 C D
area of conductors
(mm
2
)
1 2 3 4 5 6 7
Copper
1.5 13.5 13 15.5 15 17.5 18
2.5 18 17.5 21 20 24 24
4 24 23 28 27 32 31
6 31 29 36 34 41 39
10 42 39 50 46 57 52
16 56 52 68 62 76 67
25 73 68 89 80 96 86
35 89 83 110 99 119 103
50 108 99 134 118 144 122
70 136 125 171 149 184 151
95 164 150 207 179 223 179
120 188 172 239 206 259 203
150 216 196 - - 299 230
185 245 223 - - 341 258
240 286 261 - - 403 297
300 328 298 - - 464 336
Aluminium
2.5 14 13.5 16.5 15.5 18.5 18.5
4 18.5 17.5 22 21 25 24
6 24 23 28 27 32 30
10 32 31 39 36 44 40
16 43 41 53 48 59 52
25 57 53 70 62 73 66
35 70 65 86 77 90 80
50 84 78 104 92 110 94
70 107 98 133 116 140 117
95 129 118 161 139 170 138
120 149 135 186 160 197 157
150 170 155 - - 227 178
185 194 176 - - 259 200
240 227 207 - - 305 230
300 261 237 - - 351 260
Schneider Electric - Electrical installation guide 2013
G15
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Practical method for determining
the smallest allowable cross-
sectional area of circuit conductors
2.2 Recommended simplied approach for cables
In order to facilitate the selection of cables, 2 simplied tables are proposed, for
unburied and buried cables.
These tables summarize the most commonly used congurations and give easier
access to the information.
b Unburied cables:
Fig. G21a : Current-carrying capacity in amperes (table B.52-1 of IEC 60364-5-52)
Reference Number of loaded conductors and type of insulation
methods
A1 2 PVC 3 PVC 3 XLPE 2 XLPE
A2 3 PVC 2 PVC 3 XLPE 2 XLPE
B1 3 PVC 2 PVC 3 XLPE 2 XLPE
B2 3 PVC 2 PVC 3 XLPE 2 XLPE
C 3 PVC 2 PVC 3 XLPE 2 XLPE
E 3 PVC 2 PVC 3 XLPE 2 XLPE
F 3 PVC 2 PVC 3 XLPE 2 XLPE
1 2 3 4 5 6 7 8 9 10 11 12 13
Size (mm
2
)
Copper
1.5 13 13
.
5 14.5 15.5 17 18.5 19.5 22 23 24 26 -
2.5 17.5 18 19.5 21 23 25 27 30 31 33 36 -
4 23 24 26 28 31 34 36 40 42 45 49 -
6 29 31 34 36 40 43 46 51 54 58 63 -
10 39 42 46 50 54 60 63 70 75 80 86 -
16 52 56 61 68 73 80 85 94 100 107 115 -
25 68 73 80 89 95 101 110 119 127 135 149 161
35 - - - 110 117 126 137 147 158 169 185 200
50 - - - 134 141 153 167 179 192 207 225 242
70 - - - 171 179 196 213 229 246 268 289 310
95 - - - 207 216 238 258 278 298 328 352 377
120 - - - 239 249 276 299 322 346 382 410 437
150 - - - - 285 318 344 371 395 441 473 504
185 - - - - 324 362 392 424 450 506 542 575
240 - - - - 380 424 461 500 538 599 641 679
Aluminium
2.5 13.5 14 15 16.5 18.5 19.5 21 23 24 26 28 -
4 17.5 18.5 20 22 25 26 28 31 32 35 38 -
6 23 24 26 28 32 33 36 39 42 45 49 -
10 31 32 36 39 44 46 49 54 58 62 67 -
16 41 43 48 53 58 61 66 73 77 84 91 -
25 53 57 63 70 73 78 83 90 97 101 108 121
35 - - - 86 90 96 103 112 120 126 135 150
50 - - - 104 110 117 125 136 146 154 164 184
70 - - - 133 140 150 160 174 187 198 211 237
95 - - - 161 170 183 195 211 227 241 257 289
120 - - - 186 197 212 226 245 263 280 300 337
150 - - - - 226 245 261 283 304 324 346 389
185 - - - - 256 280 298 323 347 371 397 447
240 - - - - 300 330 352 382 409 439 470 530
Schneider Electric - Electrical installation guide 2013
G - Sizing and protection of conductors
G16
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Correction factors are given in Figure G21b for groups of several circuits or multi-
core cables:
Fig. G21b : Reduction factors for groups of several circuits or of several multi-core cables
(table B.52-3 of IEC 60364-5-52)
Arrangement Number of circuits or multi-core cables
1 2 3 4 6 9 12 16 20
Embedded or enclosed 1.00 0.80 0.70 0.70 0.55 0.50 0.45 0.40 0.40
Single layer on walls, oors 1.00 0.85 0.80 0.75 0.70 0.70 - - -
or on unperforatedtrays
Single layer xed directly 0.95 0.80 0.70 0.70 0.65 0.60 - - -
under a ceiling
Single layer on perforated 1.00 0.90 0.80 0.75 0.75 0.70 - - -
horizontal trays or on vertical trays
Single layer on cable 1.00 0.85 0.80 0.80 0.80 0.80 - - -
ladder supports or cleats, etc...
Fig. G22 : Current-carrying capacity in amperes (table B.52-1 of IEC 60364-5-52)
b Buried cables:
Installation Size Number of loaded conductors and type of insulation
method mm
2
Two PVC Three PVC Two XLPE Three XLPE
D Copper
1.5 22 18 26 22
2.5 29 24 34 29
4 38 31 44 37
6 47 39 56 46
10 63 52 73 61
16 81 67 95 79
25 104 86 121 101
35 125 103 146 122
50 148 122 173 144
70 183 151 213 178
95 216 179 252 211
120 246 203 287 240
150 278 230 324 271
185 312 258 363 304
240 361 297 419 351
300 408 336 474 396
D Aluminium
2.5 22 18.5 26 22
4 29 24 34 29
6 36 30 42 36
10 48 40 56 47
16 62 52 73 61
25 80 66 93 78
35 96 80 112 94
50 113 94 132 112
70 140 117 163 138
95 166 138 193 164
120 189 157 220 186
150 213 178 249 210
185 240 200 279 236
240 277 230 322 272
300 313 260 364 308
Schneider Electric - Electrical installation guide 2013
G17
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Practical method for determining
the smallest allowable cross-
sectional area of circuit conductors
2.3 Busbar trunking systems
The selection of busbar trunking systems is very straightforward, using the data
provided by the manufacturer. Methods of installation, insulation materials, correction
factors for grouping are not relevant parameters for this technology.
The cross section area of any given model has been determined by the manufacturer
based on:
b The rated current,
b An ambient air temperature equal to 35 C,
b 3 loaded conductors.
Rated current
The rated current can be calculated taking account of:
b The layout,
b The current absorbed by the different loads connected along the trunking system.
Ambient temperature
A correction factor has to be applied for temperature higher than 35 C. The
correction factor applicable to medium and high power range (up to 4,000 A) is given
in Figure G23a.
Fig. G23a : Correction factor for air temperature higher than 35 C
C 35 40 45 50 55
Correction factor 1 0.97 0.93 0.90 0.86
Neutral current
Where 3
rd
harmonic currents are circulating, the neutral conductor may be carrying a
signicant current and the corresponding additional power losses must be taken into
account.
Figure G23b represents the maximum admissible phase and neutral currents (per
unit) in a high power busbar trunking system as functions of 3
rd
harmonic level.
Fig. G23b : Maximum admissible currents (p.u.) in a busbar trunking system as functions of the
3
rd
harmonic level.
0 10 20 30 40
3
rd
harmonic current level (%)
M
a
x
i
m
u
m
a
d
m
i
s
s
i
b
l
e
c
u
r
r
e
n
t
(
p
.
u
)
50 60 70
Neutral conductor
Phase conductor
80 90
0
0.2
0.4
0.6
0.8
1
1.2
1.4
Schneider Electric - Electrical installation guide 2013
G - Sizing and protection of conductors
G18
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Practical method for determining
the smallest allowable cross-
sectional area of circuit conductors
The layout of the trunking system depends on the position of the current consumers,
the location of the power source and the possibilities for xing the system.
v One single distribution line serves a 4 to 6 meter area
v Protection devices for current consumers are placed in tap-off units, connected
directly to usage points.
v One single feeder supplies all current consumers of different powers.
Once the trunking system layout is established, it is possible to calculate the
absorbed current I
n
on the distribution line.
I
n
is equal to the sum of absorbed currents by the current I
n
consumers: I
n
= E I
B
.
The current consumers do not all work at the same time and are not permanently on
full load, so we have to use a clustering coefcient k
S
: I
n
= E (I
B
. k
S
).
Application Number of current consumers Ks Coefcient
Lighting, Heating 1
Distribution (engineering
workshop)
2...3
4...5
6...9
10...40
40 and over
0.9
0.8
0.7
0.6
0.5
Note : for industrial installations, remember to take account of upgrading of the machine
equipment base. As for a switchboard, a 20 % margin is recommended:
I
n
s I
B
x k
s
x 1.2.
Fig G24 : Clustering coefcient according to the number of current consumers
Schneider Electric - Electrical installation guide 2013
G19
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Determination of voltage drop
The impedance of circuit conductors is low but not negligible: when carrying
load current there is a voltage drop between the origin of the circuit and the load
terminals. The correct operation of a load (a motor, lighting circuit, etc.) depends
on the voltage at its terminals being maintained at a value close to its rated value.
It is necessary therefore to determine the circuit conductors such that at full-load
current, the load terminal voltage is maintained within the limits required for correct
performance.
This section deals with methods of determining voltage drops, in order to check that:
b They comply with the particular standards and regulations in force
b They can be tolerated by the load
b They satisfy the essential operational requirements
3.1 Maximum voltage drop
Maximum allowable voltage-drop vary from one country to another. Typical values for
LV installations are given below in Figure G25.
Fig. G25 : Maximum voltage-drop between the service-connection point and the point of utilization
Fig. G26 : Maximum voltage drop
Type of installations Lighting Other uses
circuits (heating and power)
A low-voltage service connection from 3% 5%
a LV public power distribution network
Consumers MV/LV substation supplied 6% 8%
from a public distribution MV system
These voltage-drop limits refer to normal steady-state operating conditions and do
not apply at times of motor starting, simultaneous switching (by chance) of several
loads, etc. as mentioned in Chapter A Sub-clause 4.3 (factor of simultaneity, etc.).
When voltage drops exceed the values shown in Figure G25, larger cables (wires)
must be used to correct the condition.
The value of 8%, while permitted, can lead to problems for motor loads; for example:
b In general, satisfactory motor performance requires a voltage within 5% of its
rated nominal value in steady-state operation,
b Starting current of a motor can be 5 to 7 times its full-load value (or even higher).
If an 8% voltage drop occurs at full-load current, then a drop of 40% or more will
occur during start-up. In such conditions the motor will either:
v Stall (i.e. remain stationary due to insufcient torque to overcome the load torque)
with consequent over-heating and eventual trip-out
v Or accelerate very slowly, so that the heavy current loading (with possibly
undesirable low-voltage effects on other equipment) will continue beyond the normal
start-up period
b Finally an 8% voltage drop represents a continuous power loss, which, for continuous
loads will be a signicant waste of (metered) energy. For these reasons it is
recommended that the maximum value of 8% in steady operating conditions should not
be reached on circuits which are sensitive to under-voltage problems (see Fig. G26).
Load
LV consumer
5%
(1)
8%
(1)
MV consumer
(1) Between the LV supply point and the load
Schneider Electric - Electrical installation guide 2013
G - Sizing and protection of conductors
G20
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3.2 Calculation of voltage drop in steady load
conditions
Use of formulae
Figure G27 below gives formulae commonly used to calculate voltage drop in a
given circuit per kilometre of length.
If:
b IB: The full load current in amps
b L: Length of the cable in kilometres
b R: Resistance of the cable conductor in O/km
R
km
S
R
km
S
=
( )
=
( )
22.5 mm
c.s.a. in mm
for copper
36 mm
c.s.a. in mm
for aluminium
2
2
2
2
/
/
Note: R is negligible above a c.s.a. of 500 mm
2
b X: inductive reactance of a conductor in O/km
Note: X is negligible for conductors of c.s.a. less than 50 mm
2
. In the absence of any
other information, take X as being equal to 0.08 O/km.
b : phase angle between voltage and current in the circuit considered, generally:
v Incandescent lighting: cos = 1
v Motor power:
- At start-up: cos = 0.35
- In normal service: cos = 0.8
b Un: phase-to-phase voltage
b Vn: phase-to-neutral voltage
For prefabricated pre-wired ducts and bustrunking, resistance and inductive
reactance values are given by the manufacturer.
Fig. G27 : Voltage-drop formulae
Circuit Voltage drop (AU)
in volts in %
Single phase: phase/phase U cos X sin = + ( ) 2IB R L
100 U
Un
Single phase: phase/neutral U cos X sin = + ( ) 2IB R L
100 U
Vn
Balanced 3-phase: 3 phases
U cos X sin = + ( ) 3 IB R L
100 U
Un
(with or without neutral)
Simplied table
Calculations may be avoided by using Figure G28 next page, which gives, with
an adequate approximation, the phase-to-phase voltage drop per km of cable per
ampere, in terms of:
b Kinds of circuit use: motor circuits with cos close to 0.8, or lighting with a cos
close to 1.
b Type of cable; single-phase or 3-phase
Voltage drop in a cable is then given by:
K x IB x L
K is given by the table,
IB is the full-load current in amps,
L is the length of cable in km.
The column motor power cos = 0.35 of Figure G28 may be used to compute the
voltage drop occurring during the start-up period of a motor (see example no. 1 after
the Figure G28).
Schneider Electric - Electrical installation guide 2013
G21
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
c.s.a. in mm
2
Single-phase circuit Balanced three-phase circuit
Motor power Lighting Motor power Lighting
Normal service Start-up Normal service Start-up
Cu Al cos = 0.8 cos = 0.35 cos = 1 cos = 0.8 cos = 0.35 cos = 1
1.5 24 10.6 30 20 9.4 25
2.5 14.4 6.4 18 12 5.7 15
4 9.1 4.1 11.2 8 3.6 9.5
6 10 6.1 2.9 7.5 5.3 2.5 6.2
10 16 3.7 1.7 4.5 3.2 1.5 3.6
16 25 2.36 1.15 2.8 2.05 1 2.4
25 35 1.5 0.75 1.8 1.3 0.65 1.5
35 50 1.15 0.6 1.29 1 0.52 1.1
50 70 0.86 0.47 0.95 0.75 0.41 0.77
70 120 0.64 0.37 0.64 0.56 0.32 0.55
95 150 0.48 0.30 0.47 0.42 0.26 0.4
120 185 0.39 0.26 0.37 0.34 0.23 0.31
150 240 0.33 0.24 0.30 0.29 0.21 0.27
185 300 0.29 0.22 0.24 0.25 0.19 0.2
240 400 0.24 0.2 0.19 0.21 0.17 0.16
300 500 0.21 0.19 0.15 0.18 0.16 0.13
Fig. G28 : Phase-to-phase voltage drop AU for a circuit, in volts per ampere per km
Examples
Example 1 (see Fig. G29)
A three-phase 35 mm
2
copper cable 50 metres long supplies a 400 V motor taking:
b 100 A at a cos = 0.8 on normal permanent load
b 500 A (5 In) at a cos = 0.35 during start-up
The voltage drop at the origin of the motor cable in normal circumstances (i.e. with
the distribution board of Figure G29 distributing a total of 1,000 A) is 10 V phase-to-
phase.
What is the voltage drop at the motor terminals:
b In normal service?
b During start-up?
Solution:
b Voltage drop in normal service conditions:
U% 100
U
=
Un
Table G28 shows 1 V/A/km so that:
AU for the cable = 1 x 100 x 0.05 = 5 V
AU total = 10 + 5 = 15 V = i.e.
15
400
100 3 x .75% =
This value is less than that authorized (8%) and is satisfactory.
b Voltage drop during motor start-up:
AUcable = 0.52 x 500 x 0.05 = 13 V
Owing to the additional current taken by the motor when starting, the voltage drop at
the distribution board will exceed 10 Volts.
Supposing that the infeed to the distribution board during motor starting is
900 + 500 = 1,400 A then the voltage drop at the distribution board will increase
approximately pro rata, i.e.
10
14
1,400
1,000
V
x
=
AU distribution board = 14 V
AU for the motor cable = 13 V
AU total = 13 + 14 = 27 V i.e.
27
400
100 6 x .75% =
a value which is satisfactory during motor starting.
Fig. G29 : Example 1
1,000 A
400 V
50 m / 35 mm
2
Cu
IB = 100 A
(500 A during start-up)
3 Determination of voltage drop
Schneider Electric - Electrical installation guide 2013
G - Sizing and protection of conductors
G22
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Determination of voltage drop
Example 2 (see Fig. G30)
A 3-phase 4-wire copper line of 70 mm
2
c.s.a. and a length of 50 m passes a current
of 150 A. The line supplies, among other loads, 3 single-phase lighting circuits, each
of 2.5 mm
2
c.s.a. copper 20 m long, and each passing 20 A.
It is assumed that the currents in the 70 mm
2
line are balanced and that the three
lighting circuits are all connected to it at the same point.
What is the voltage drop at the end of the lighting circuits?
Solution:
b Voltage drop in the 4-wire line:
U% 100
U
=
Un
Figure G28 shows 0.55 V/A/km
AU line = 0.55 x 150 x 0.05 = 4.125 V phase-to-phase
which gives:
4 125
3
2.38 V =
.
phase to neutral.
b Voltage drop in any one of the lighting single-phase circuits:
AU for a single-phase circuit = 18 x 20 x 0.02 = 7.2 V
The total voltage drop is therefore
7.2 + 2.38 = 9.6 V
9.6 V
V
.2%
230
100 4 x =
This value is satisfactory, being less than the maximum permitted voltage drop of 6%.
Fig. G30 : Example 2
50 m / 70 mm
2
Cu
IB = 150 A
20 m / 2.5 mm
2
Cu
IB = 20 A
Schneider Electric - Electrical installation guide 2013
G23
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
G - Sizing and protection of conductors
4 Short-circuit current
A knowledge of 3-phase symmetrical short-circuit current values (Isc) at strategic
points of an installation is necessary in order to determine switchgear (fault current
rating), cables (thermal withstand rating), protective devices (discriminative trip
settings) and so on...
In the following notes a 3-phase short-circuit of zero impedance (the so-called bolted
short-circuit) fed through a typical MV/LV distribution transformer will be examined.
Except in very unusual circumstances, this type of fault is the most severe, and is
certainly the simplest to calculate.
Short-circuit currents occurring in a network supplied from a generator and also in
DC systems are dealt with in Chapter N.
The simplied calculations and practical rules which follow give conservative results
of sufcient accuracy, in the large majority of cases, for installation design purposes.
4.1 Short-circuit current at the secondary terminals
of a MV/LV distribution transformer
The case of one transformer
b In a simplied approach, the impedance of the MV system is assumed to be
negligibly small, so that: I
I
I sc
n
Usc
n
P
U
= =
x 100
where
x 10
and:
3
20
3
P = kVA rating of the transformer
U
20
= phase-to-phase secondary volts on open circuit
In = nominal current in amps
Isc = short-circuit fault current in amps
Usc = short-circuit impedance voltage of the transformer in %.
Typical values of Usc for distribution transformers are given in Figure G31.
Fig. G31 : Typical values of Usc for different kVA ratings of transformers with MV windings y 20 kV
b Example
400 kVA transformer, 420 V at no load
Usc = 4%
I I . n sc = = = =
4
420 3
550
5 0
4
13 7
00 x 10
x
A
5 x 100
kA
3
The case of several transformers in parallel feeding a busbar
The value of fault current on an outgoing circuit immediately downstream of
the busbars (see Fig. G32) can be estimated as the sum of the Isc from each
transformer calculated separately.
It is assumed that all transformers are supplied from the same MV network, in which
case the values obtained from Figure G31 when added together will give a slightly
higher fault-level value than would actually occur.
Other factors which have not been taken into account are the impedance of the
busbars and of the circuit-breakers.
The conservative fault-current value obtained however, is sufciently accurate for
basic installation design purposes. The choice of circuit-breakers and incorporated
protective devices against short-circuit fault currents is described in Chapter H Sub-
clause 4.4.
Knowing the levels of 3-phase symmetrical
short-circuit currents (Isc) at different points
in an installation is an essential feature of its
design
Transformer rating Usc in %
(kVA) Oil-immersed Cast-resin
dry type
50 to 750 4 6
800 to 3,200 6 6
Fig. G32 : Case of several transformers in parallel
Isc
1
Isc
1
+ Isc
2
+ Isc
3
Isc
2
Isc
3
Schneider Electric - Electrical installation guide 2013
G24
G - Sizing and protection of conductors
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4.2 3-phase short-circuit current (Isc) at any point
within a LV installation
In a 3-phase installation Isc at any point is given by:
I sc
U
ZT
=
20
3
where
U
20
= phase-to-phase voltage of the open circuited secondary windings of the power
supply transformer(s).
Z
T
= total impedance per phase of the installation upstream of the fault location (in O)
Method of calculating Z
T
Each component of an installation (MV network, transformer, cable, circuit-breaker,
busbar, and so on...) is characterized by its impedance Z, comprising an element
of resistance (R) and an inductive reactance (X). It may be noted that capacitive
reactances are not important in short-circuit current calculations.
The parameters R, X and Z are expressed in ohms, and are related by the sides of a
right angled triangle, as shown in the impedance diagram of Figure G33.
The method consists in dividing the network into convenient sections, and to
calculate the R and X values for each.
Where sections are connected in series in the network, all the resistive elements in
the section are added arithmetically; likewise for the reactances, to give R
T
and X
T
.
The impedance (Z
T
) for the combined sections concerned is then calculated from
Z R X
T T T
= +
2 2
Any two sections of the network which are connected in parallel, can, if
predominantly both resistive (or both inductive) be combined to give a single
equivalent resistance (or reactance) as follows:
Let R1 and R2 be the two resistances connected in parallel, then the equivalent
resistance R3 will be given by:
R
R
3
1
=
x R
R + R
2
1 2
or for reactances X
X
3
1
=
x X
X + X
2
1 2
It should be noted that the calculation of X3 concerns only separated circuit without
mutual inductance. If the circuits in parallel are close togother the value of X3 will be
notably higher.
Determination of the impedance of each component
b Network upstream of the MV/LV transformer (see Fig. G34)
The 3-phase short-circuit fault level P
SC
, in kA or in MVA
(1)
is given by the power
supply authority concerned, from which an equivalent impedance can be deduced.
(1) Short-circuit MVA: 3 E
L
Isc where:
b E
L
= phase-to-phase nominal system voltage expressed in
kV (r.m.s.)
b Isc = 3-phase short-circuit current expressed in kA (r.m.s.)
(2) up to 36 kV
A formula which makes this deduction and at the same time converts the impedance
to an equivalent value at LV is given, as follows:
Zs
U
Psc
=
0
2
where
Zs = impedance of the MV voltage network, expessed in milli-ohms
Uo = phase-to-phase no-load LV voltage, expressed in volts
Psc = MV 3-phase short-circuit fault level, expressed in kVA
The upstream (MV) resistance Ra is generally found to be negligible compared with
the corresponding Xa, the latter then being taken as the ohmic value for Za. If more
accurate calculations are necessary, Xa may be taken to be equal to 0.995 Za and
Ra equal to 0.1 Xa.
Figure G36 gives values for Ra and Xa corresponding to the most common MV
(2)
short-circuit levels in utility power-supply networks, namely, 250 MVA and 500 MVA.
Psc Uo (V) Ra (mO) Xa (mO)
250 MVA 420 0.07 0.7
500 MVA 420 0.035 0.351
Fig. G34 : The impedance of the MV network referred to the LV side of the MV/LV transformer
Fig. G33 : Impedance diagram
Z
X
R
Schneider Electric - Electrical installation guide 2013
G25
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
b Transformers (see Fig. G35)
The impedance Ztr of a transformer, viewed from the LV terminals, is given by the
formula:
Ztr
U
Pn
x
Usc
=
20
2
100
where:
U
20
= open-circuit secondary phase-to-phase voltage expressed in volts
Pn = rating of the transformer (in kVA)
Usc = the short-circuit impedance voltage of the transformer expressed in %
The transformer windings resistance Rtr can be derived from the total losses as
follows:
Pcu n
Pcu
n
= = 3
3
2
2
I
I
x Rtr so that Rtr
x 10
3
in milli-ohms
where
Pcu = total losses in watts
In = nominal full-load current in amps
Rtr = resistance of one phase of the transformer in milli-ohms (the LV and
corresponding MV winding for one LV phase are included in this resistance value).
Xtr Ztr Rtr =
2 2
For an approximate calculation Rtr may be ignored since X
~ Z in standard
distribution type transformers.
(1) For 50 Hz systems, but 0.18 mO/m length at 60 Hz
Rated Oil-immersed Cast-resin
Power Usc (%) Rtr (mO) Xtr (mO) Ztr (mO) Usc (%) Rtr (mO) Xtr (mO) Ztr (mO)
(kVA)
100 4 37.9 59.5 70.6 6 37.0 99.1 105.8
160 4 16.2 41.0 44.1 6 18.6 63.5 66.2
200 4 11.9 33.2 35.3 6 14.1 51.0 52.9
250 4 9.2 26.7 28.2 6 10.7 41.0 42.3
315 4 6.2 21.5 22.4 6 8.0 32.6 33.6
400 4 5.1 16.9 17.6 6 6.1 25.8 26.5
500 4 3.8 13.6 14.1 6 4.6 20.7 21.2
630 4 2.9 10.8 11.2 6 3.5 16.4 16.8
800 6 2.9 12.9 13.2 6 2.6 13.0 13.2
1,000 6 2.3 10.3 10.6 6 1.9 10.4 10.6
1,250 6 1.8 8.3 8.5 6 1.5 8.3 8.5
1,600 6 1.4 6.5 6.6 6 1.1 6.5 6.6
2,000 6 1.1 5.2 5.3 6 0.9 5.2 5.3
Fig. G35 : Resistance, reactance and impedance values for typical distribution 400 V transformers with MV windings y 20 kV
b Circuit-breakers
In LV circuits, the impedance of circuit-breakers upstream of the fault location must
be taken into account. The reactance value conventionally assumed is 0.15 mO per
CB, while the resistance is neglected.
b Busbars
The resistance of busbars is generally negligible, so that the impedance is practically
all reactive, and amounts to approximately 0.15 mO/metre
(1)
length for LV busbars
(doubling the spacing between the bars increases the reactance by about 10% only).
b Circuit conductors
The resistance of a conductor is given by the formula: Rc
L
S
=
where
= the resistivity constant of the conductor material at the normal operating
temperature being:
v 22.5 mO.mm
2
/m for copper
v 36 mO.mm
2
/m for aluminium
L = length of the conductor in m
S = c.s.a. of conductor in mm
2
4 Short-circuit current
Schneider Electric - Electrical installation guide 2013
G26
G - Sizing and protection of conductors
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Cable reactance values can be obtained from the manufacturers. For c.s.a. of less
than 50 mm
2
reactance may be ignored. In the absence of other information, a value
of 0.08 mO/metre may be used (for 50 Hz systems) or 0.096 mO/metre (for 60 Hz
systems). For prefabricated bus-trunking and similar pre-wired ducting systems, the
manufacturer should be consulted.
b Motors
At the instant of short-circuit, a running motor will act (for a brief period) as a
generator, and feed current into the fault.
In general, this fault-current contribution may be ignored. However, if the total
power of motors running simultaneously is higher than 25% of the total power
of transformers, the inuence of motors must be taken into account. Their total
contribution can be estimated from the formula:
Iscm = 3.5 In from each motor i.e. 3.5mIn for m similar motors operating concurrently.
The motors concerned will be the 3-phase motors only; single-phase-motor
contribution being insignicant.
b Fault-arc resistance
Short-circuit faults generally form an arc which has the properties of a resistance.
The resistance is not stable and its average value is low, but at low voltage this
resistance is sufcient to reduce the fault-current to some extent. Experience has
shown that a reduction of the order of 20% may be expected. This phenomenon will
effectively ease the current-breaking duty of a CB, but affords no relief for its fault-
current making duty.
b Recapitulation table (see Fig. G36)
Fig. G36 : Recapitulation table of impedances for different parts of a power-supply system
U
20
: Phase-to-phase no-load secondary voltage of MV/LV transformer (in volts).
Psc: 3-phase short-circuit power at MV terminals of the MV/LV transformers (in kVA).
Pcu: 3-phase total losses of the MV/LV transformer (in watts).
Pn: Rating of the MV/LV transformer (in kVA).
Usc: Short-circuit impedance voltage of the MV/LV transfomer (in %).
R
T
: Total resistance. X
T
: Total reactance
(1) = resistivity at normal temperature of conductors in service
b = 22.5 mO x mm
2
/m for copper
b = 36 mO x mm
2
/m for aluminium
(2) If there are several conductors in parallel per phase, then divide the resistance of one conductor by the number of
conductors. The reactance remains practically unchanged.
Parts of power-supply system R (mO) X (mO)
Supply network
Figure G34
Transformer
Figure G35
Rtr is often negligible compared to Xtr with
for transformers > 100 kVA
Circuit-breaker Negligible XD = 0.15 mO/pole
Busbars Negligible for S > 200 mm
2
in the formula: XB = 0.15 mO/m
(1)
Circuit conductors
(2)
(1)
Cables: Xc = 0.08 mO/m
Motors See Sub-clause 4.2 Motors
(often negligible at LV)
Three-phase short
circuit current in kA
I sc
U
R X T T
=
+
20
2 2
3
M
Pcu
n
=
3
2
I
Rtr
x 10
3
Ztr Rtr
2 2
Ztr
U
Pn
x
Usc
=
20
2
100
R
L
S
=
Ra
Xa
= 0.1 Xa Za Za
U
Psc
= = 0 995
20
2
. ;
R
L
S
=
Schneider Electric - Electrical installation guide 2013
G27
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. G37 : Example of short-circuit current calculations for a LV installation supplied at 400 V (nominal) from a 1,000 kVA MV/LV transformer
LV installation R (mO) X (mO) RT (mO) XT (mO)
MV network 0.035 0.351
Psc = 500 MVA
Transformer 2.24 8.10
20 kV/420 V
Pn = 1000 kVA
Usc = 5%
Pcu = 13.3 x 10
3
watts
Single-core cables
5 m copper Xc = 0.08 x 5 = 0.40 2.41 8.85 Isc1 = 26 kA
4 x 240 mm
2
/phase
Main RD = 0 XD = 0.15
circuit-breaker
Busbars RB = 0 XB = 1.5 2.41 10.5 Isc2 = 22 kA
10 m
Three-core cable
100 m Xc = 100 x 0.08 = 8 26.1 18.5 Isc3 = 7.4 kA
95 mm
2
copper
Three-core cable
20 m Xc = 20 x 0.08 = 1.6 71.1 20.1 Isc4 = 3.2 kA
10 mm
2
copper
nal circuits
Rc x = =
22.5
4
0.12
5
240
Rc x = = 22.5 2 .68
100
95
3
Rc x = = 22.5
20
10
45
4.3 Isc at the receiving end of a feeder as a function
of the Isc at its sending end
The network shown in Figure G38 typies a case for the application of Figure G39
next page, derived by the method of composition (mentioned in Chapter F Sub-
clause 6.2). These tables give a rapid and sufciently accurate value of short-circuit
current at a point in a network, knowing:
b The value of short-circuit current upstream of the point considered
b The length and composition of the circuit between the point at which the short-
circuit current level is known, and the point at which the level is to be determined
It is then sufcient to select a circuit-breaker with an appropriate short-circuit fault
rating immediately above that indicated in the tables.
If more precise values are required, it is possible to make a detailed calculation
(see Sub-Clause 4.2) or to use a software package, such as Ecodial. In such a case,
moreover, the possibility of using the cascading technique should be considered,
in which the use of a current limiting circuit-breaker at the upstream position would
allow all circuit-breakers downstream of the limiter to have a short-circuit current
rating much lower than would otherwise be necessary (See chapter H Sub-Clause 4.5).
Method
Select the c.s.a. of the conductor in the column for copper conductors (in this
example the c.s.a. is 47.5 mm
2
).
Search along the row corresponding to 47.5 mm
2
for the length of conductor equal
to that of the circuit concerned (or the nearest possible on the low side). Descend
vertically the column in which the length is located, and stop at a row in the middle
section (of the 3 sections of the Figure) corresponding to the known fault-current
level (or the nearest to it on the high side).
In this case 30 kA is the nearest to 28 kA on the high side. The value of short-circuit
current at the downstream end of the 20 metre circuit is given at the intersection of
the vertical column in which the length is located, and the horizontal row corresponding
to the upstream Isc (or nearest to it on the high side).
This value in the example is seen to be 14.7 kA.
The procedure for aluminium conductors is similar, but the vertical column must be
ascended into the middle section of the table.
In consequence, a DIN-rail-mounted circuit-breaker rated at 63 A and Isc of 25 kA
(such as a NG 125N unit) can be used for the 55 A circuit in Figure G38.
A Compact rated at 160 A with an Isc capacity of 25 kA (such as a NS160 unit) can
be used to protect the 160 A circuit.
Fig. G38 : Determination of downstream short-circuit current
level Isc using Figure G39
400 V
Isc = 28 kA
IB = 55 A IB = 160 A
47,5 mm
2
, Cu
20 m
Isc = ?
I sc
R X T T
=
+
420
3
2 2
b Example of short-circuit calculations (see Fig. G37)
4 Short-circuit current
Schneider Electric - Electrical installation guide 2013
G28
G - Sizing and protection of conductors
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Short-circuit current
Fig. G39 : Isc at a point downstream, as a function of a known upstream fault-current value and the length and c.s.a. of the intervening conductors,
in a 230/400 V 3-phase system
Note: for a 3-phase system having 230 V between phases, divide the above lengths by 3
Copper 230 V / 400 V
c.s.a. of phase Length of circuit (in metres)
conductors (mm
2
)
1.5 1.3 1.8 2.6 3.6 5.2 7.3 10.3 14.6 21
2.5 1.1 1.5 2.1 3.0 4.3 6.1 8.6 12.1 17.2 24 34
4 1.2 1.7 2.4 3.4 4.9 6.9 9.7 13.7 19.4 27 39 55
6 1.8 2.6 3.6 5.2 7.3 10.3 14.6 21 29 41 58 82
10 2.2 3.0 4.3 6.1 8.6 12.2 17.2 24 34 49 69 97 137
16 1.7 2.4 3.4 4.9 6.9 9.7 13.8 19.4 27 39 55 78 110 155 220
25 1.3 1.9 2.7 3.8 5.4 7.6 10.8 15.2 21 30 43 61 86 121 172 243 343
35 1.9 2.7 3.8 5.3 7.5 10.6 15.1 21 30 43 60 85 120 170 240 340 480
47.5 1.8 2.6 3.6 5.1 7.2 10.2 14.4 20 29 41 58 82 115 163 231 326 461
70 2.7 3.8 5.3 7.5 10.7 15.1 21 30 43 60 85 120 170 240 340
95 2.6 3.6 5.1 7.2 10.2 14.5 20 29 41 58 82 115 163 231 326 461
120 1.6 2.3 3.2 4.6 6.5 9.1 12.9 18.3 26 37 52 73 103 146 206 291 412
150 1.2 1.8 2.5 3.5 5.0 7.0 9.9 14.0 19.8 28 40 56 79 112 159 224 317 448
185 1.5 2.1 2.9 4.2 5.9 8.3 11.7 16.6 23 33 47 66 94 133 187 265 374 529
240 1.8 2.6 3.7 5.2 7.3 10.3 14.6 21 29 41 58 83 117 165 233 330 466 659
300 2.2 3.1 4.4 6.2 8.8 12.4 17.6 25 35 50 70 99 140 198 280 396 561
2x120 2.3 3.2 4.6 6.5 9.1 12.9 18.3 26 37 52 73 103 146 206 292 412 583
2x150 2.5 3.5 5.0 7.0 9.9 14.0 20 28 40 56 79 112 159 224 317 448 634
2x185 2.9 4.2 5.9 8.3 11.7 16.6 23 33 47 66 94 133 187 265 375 530 749
553x120 3.4 4.9 6.9 9.7 13.7 19.4 27 39 55 77 110 155 219 309 438 619
3x150 3.7 5.3 7.5 10.5 14.9 21 30 42 60 84 119 168 238 336 476 672
3x185 4.4 6.2 8.8 12.5 17.6 25 35 50 70 100 141 199 281 398 562
Isc upstream Isc downstream
(in kA) (in kA)
100 93 90 87 82 77 70 62 54 45 37 29 22 17.0 12.6 9.3 6.7 4.9 3.5 2.5 1.8 1.3 0.9
90 84 82 79 75 71 65 58 51 43 35 28 22 16.7 12.5 9.2 6.7 4.8 3.5 2.5 1.8 1.3 0.9
80 75 74 71 68 64 59 54 47 40 34 27 21 16.3 12.2 9.1 6.6 4.8 3.5 2.5 1.8 1.3 0.9
70 66 65 63 61 58 54 49 44 38 32 26 20 15.8 12.0 8.9 6.6 4.8 3.4 2.5 1.8 1.3 0.9
60 57 56 55 53 51 48 44 39 35 29 24 20 15.2 11.6 8.7 6.5 4.7 3.4 2.5 1.8 1.3 0.9
50 48 47 46 45 43 41 38 35 31 27 22 18.3 14.5 11.2 8.5 6.3 4.6 3.4 2.4 1.7 1.2 0.9
40 39 38 38 37 36 34 32 30 27 24 20 16.8 13.5 10.6 8.1 6.1 4.5 3.3 2.4 1.7 1.2 0.9
35 34 34 33 33 32 30 29 27 24 22 18.8 15.8 12.9 10.2 7.9 6.0 4.5 3.3 2.4 1.7 1.2 0.9
30 29 29 29 28 27 27 25 24 22 20 17.3 14.7 12.2 9.8 7.6 5.8 4.4 3.2 2.4 1.7 1.2 0.9
25 25 24 24 24 23 23 22 21 19.1 17.4 15.5 13.4 11.2 9.2 7.3 5.6 4.2 3.2 2.3 1.7 1.2 0.9
20 20 20 19.4 19.2 18.8 18.4 17.8 17.0 16.1 14.9 13.4 11.8 10.1 8.4 6.8 5.3 4.1 3.1 2.3 1.7 1.2 0.9
15 14.8 14.8 14.7 14.5 14.3 14.1 13.7 13.3 12.7 11.9 11.0 9.9 8.7 7.4 6.1 4.9 3.8 2.9 2.2 1.6 1.2 0.9
10 9.9 9.9 9.8 9.8 9.7 9.6 9.4 9.2 8.9 8.5 8.0 7.4 6.7 5.9 5.1 4.2 3.4 2.7 2.0 1.5 1.1 0.8
7 7.0 6.9 6.9 6.9 6.9 6.8 6.7 6.6 6.4 6.2 6.0 5.6 5.2 4.7 4.2 3.6 3.0 2.4 1.9 1.4 1.1 0.8
5 5.0 5.0 5.0 4.9 4.9 4.9 4.9 4.8 4.7 4.6 4.5 4.3 4.0 3.7 3.4 3.0 2.5 2.1 1.7 1.3 1.0 0.8
4 4.0 4.0 4.0 4.0 4.0 3.9 3.9 3.9 3.8 3.7 3.6 3.5 3.3 3.1 2.9 2.6 2.2 1.9 1.6 1.2 1.0 0.7
3 3.0 3.0 3.0 3.0 3.0 3.0 2.9 2.9 2.9 2.9 2.8 2.7 2.6 2.5 2.3 2.1 1.9 1.6 1.4 1.1 0.9 0.7
2 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 1.9 1.9 1.9 1.8 1.8 1.7 1.6 1.4 1.3 1.1 1.0 0.8 0.6
1 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.9 0.9 0.9 0.8 0.8 0.7 0.6 0.6 0.5
Aluminium 230 V / 400 V
c.s.a. of phase Length of circuit (in metres)
conductors (mm
2
)
2.5 1.4 1.9 2.7 3.8 5.4 7.6 10.8 15.3 22
4 1.1 1.5 2.2 3.1 4.3 6.1 8.6 12.2 17.3 24 35
6 1.6 2.3 3.2 4.6 6.5 9.2 13.0 18.3 26 37 52
10 1.9 2.7 3.8 5.4 7.7 10.8 15.3 22 31 43 61 86
16 2.2 3.1 4.3 6.1 8.7 12.2 17.3 24 35 49 69 98 138
25 1.7 2.4 3.4 4.8 6.8 9.6 13.5 19.1 27 38 54 76 108 153 216
35 1.7 2.4 3.4 4.7 6.7 9.5 13.4 18.9 27 38 54 76 107 151 214 302
47.5 1.6 2.3 3.2 4.6 6.4 9.1 12.9 18.2 26 36 51 73 103 145 205 290 410
70 2.4 3.4 4.7 6.7 9.5 13.4 19.0 27 38 54 76 107 151 214 303 428
95 2.3 3.2 4.6 6.4 9.1 12.9 18.2 26 36 51 73 103 145 205 290 411
120 2.9 4.1 5.8 8.1 11.5 16.3 23 32 46 65 92 130 184 259 367
150 3.1 4.4 6.3 8.8 12.5 17.7 25 35 50 71 100 141 199 282 399
185 2.6 3.7 5.2 7.4 10.4 14.8 21 30 42 59 83 118 167 236 333 471
240 1.2 1.6 2.3 3.3 4.6 6.5 9.2 13.0 18.4 26 37 52 73 104 147 208 294 415
300 1.4 2.0 2.8 3.9 5.5 7.8 11.1 15.6 22 31 44 62 88 125 177 250 353 499
2x120 1.4 2.0 2.9 4.1 5.8 8.1 11.5 16.3 23 33 46 65 92 130 184 260 367 519
2x150 1.6 2.2 3.1 4.4 6.3 8.8 12.5 17.7 25 35 50 71 100 141 200 282 399
2x185 1.9 2.6 3.7 5.2 7.4 10.5 14.8 21 30 42 59 83 118 167 236 334 472
2x240 2.3 3.3 4.6 6.5 9.2 13.0 18.4 26 37 52 74 104 147 208 294 415 587
3x120 2.2 3.1 4.3 6.1 8.6 12.2 17.3 24 34 49 69 97 138 195 275 389 551
3x150 2.3 3.3 4.7 6.6 9.4 13.3 18.8 27 37 53 75 106 150 212 299 423 598
3x185 2.8 3.9 5.5 7.8 11.1 15.7 22 31 44 63 89 125 177 250 354 500 707
3x240 3.5 4.9 6.9 9.8 13.8 19.5 28 39 55 78 110 156 220 312 441 623
4.4 Short-circuit current supplied by a generator or
an inverter: Please refer to Chapter N
Schneider Electric - Electrical installation guide 2013
G29
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5 Particular cases of short-circuit
current
5.1 Calculation of minimum levels of short-circuit
current
In general, on LV circuits, a single protective device protects against all levels of
current, from the overload threshold through the maximum rated short-circuit current-
breaking capability of the device.
In certain cases, however, overload protective devices and separate short-circuit
protective devices are used.
Examples of such arrangements
Figures G40 to G42 show some common arrangements where overload and
short-circuit protections are achieved by separate devices.
If a protective device in a circuit is intended
only to protect against short-circuit faults, it is
essential that it will operate with certainty at the
lowest possible level of short-circuit current that
can occur on the circuit
aM fuses
(no protection
against overload)
Load breaking contactor
with thermal overload relay
Circuit breaker with
instantaneous magnetic
short-circuit protective relay only
Load breaking contactor
with thermal overload relay
Circuit breaker D
Load with
incorporated
overload
protection
S1
S2 < S1
Fig. G42a : Circuit-breaker D provides protection against short-
circuit faults as far as and including the load
Fig. G40 : Circuit protected by aM fuses
Fig. G41 : Circuit protected by circuit-breaker without thermal
overload relay
Protection to be provided Protection generally provided Additional protection
by the variable speed drive if not provided by the
variable speed drive
Cable overload Yes CB / Thermal relay
Motor overload Yes CB / Thermal relay
Downstream short-circuit Yes
Variable speed drive overload Yes
Overvoltage Yes
Undervoltage Yes
Loss of phase Yes
Upstream short-circuit Circuit-breaker
(short-circuit tripping)
Internal fault Circuit-breaker
(short-circuit and
overload tripping)
Downstream earth fault (self protection) RCD u 300 mA
(indirect contact)
Direct contact fault RCD y 30 mA
Figure G42b : Protection to be provided for variable speeed drive applications
As shown in Figures G40 and G41, the most common circuits using separate
devices control and protect motors.
Figure G42a constitutes a derogation in the basic protection rules, and is generally
used on circuits of prefabricated bustrunking, lighting rails, etc.
Variable speed drive
Figure G42b shows the functions provided by the variable speed drive, and if
necessary some additional functions provided by devices such as circuit-breaker,
thermal relay, RCD.
G - Sizing and protection of conductors
Schneider Electric - Electrical installation guide 2013
G - Sizing and protection of conductors
G30
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Conditions to be fullled
The protective device must therefore satisfy the two following conditions:
b Its fault-current breaking rating must be greater than Isc, the 3-phase short-circuit
current at its point of installation
b Elimination of the minimum short-circuit current possible in the circuit, in a time tc
compatible with the thermal constraints of the circuit conductors, where:
tc
K S
sc
min
i
2 2
2
I
(valid for tc < 5 seconds)
Comparison of the tripping or fusing performance curve of protective devices, with
the limit curves of thermal constraint for a conductor shows that this condition is
satised if:
b Isc (min) > Im (instantaneous or short timedelay circuit-breaker trip setting current
level), (see Fig. G43)
b Isc (min) > Ia for protection by fuses. The value of the current Ia corresponds to
the crossing point of the fuse curve and the cable thermal withstand curve
(see Fig. G44 and G45)
The protective device must fulll:
b instantaneous trip setting Im < Isc
min
for a
circuit-breaker
b fusion current Ia < Isc
min
for a fuse
Fig. G45 : Protection by gG-type fuses
I
t
Im
t =
k
2
S
2
I
2
I
t
Ia
t =
k
2
S
2
I
2
Fig. G43 : Protection by circuit-breaker
I
t
Ia
t =
k
2
S
2
I
2
Fig. G44 : Protection by aM-type fuses
Schneider Electric - Electrical installation guide 2013
G31
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Practical method of calculating Lmax
The limiting effect of the impedance of long circuit conductors on the value of
short-circuit currents must be checked and the length of a circuit must be restricted
accordingly.
The method of calculating the maximum permitted length has already been
demonstrated in TN- and IT- earthed schemes for single and double earth faults,
respectively (see Chapter F Sub-clauses 6.2 and 7.2). Two cases are considered
below:
1 - Calculation of L
max
for a 3-phase 3-wire circuit
The minimum short-circuit current will occur when two phase wires are short-
circuited at the remote end of the circuit (see Fig. G46).
In practice this means that the length of circuit
downstream of the protective device must not
exceed a calculated maximum length:
L
0.8 U Sph
2 m
max =
I
Load
P
0.8 U L
Using the conventional method, the voltage at the point of protection P is assumed
to be 80% of the nominal voltage during a short-circuit fault, so that 0.8 U = Isc Zd,
where:
Zd = impedance of the fault loop
Isc = short-circuit current (ph/ph)
U = phase-to-phase nominal voltage
For cables y 120 mm
2
, reactance may be neglected, so that
Zd
2L
=
Sph
(1)
where:
= resistivity of conductor material at the average temperature during a short-circuit,
Sph = c.s.a. of a phase conductor in mm
2
L = length in metres
The condition for the cable protection is Im y Isc with Im = magnetic trip current
setting of the CB.
This leads to Im y
0.8 U
Zd
which gives L y
0.8 U Sph
2 m I
with U = 400 V
= 1.25 x 0.018 = 0.023 O.mm
2
/m
(2)
(Cu)
Lmax = maximum circuit length in metres
L
k Sph
m
max =
I
2 - Calculation of Lmax for a 3-phase 4-wire 230/400 V circuit
The minimum Isc will occur when the short-circuit is between a phase conductor and
the neutral.
A calculation similar to that of example 1 above is required, but using the following
formulae (for cable y 120 mm
2
(1)
).
b Where Sn for the neutral conductor = Sph for the phase conductor
L
3,333 Sph
m
max =
I
b If Sn for the neutral conductor < Sph, then
L 6,666
Sph
m
where max =
+
=
I
1
1 m
m
Sph
Sn
For larger c.s.a.s than those listed, reactance values must be combined with those of
resistance to give an impedance. Reactance may be taken as 0.08 mO/m for cables
(at 50 Hz). At 60 Hz the value is 0.096 mO/m.
Fig G46 : Denition of L for a 3-phase 3-wire circuit
(1) For larger c.s.a.s, the resistance calculated for the
conductors must be increased to account for the non-uniform
current density in the conductor (due to skin and proximity
effects)
Suitable values are as follows:
150 mm
2
: R + 15%
185 mm
2
: R + 20%
240 mm
2
: R + 25%
300 mm
2
: R + 30%
(2) The factor 1.25 applied to the copper resistivity is due
to the elevated temperature of the conductor when passing
short-circuit current. This value of 1.25 corresponds to the max
temperature of EPR or XLPE cables.
5 Particular cases of short-circuit
current
Schneider Electric - Electrical installation guide 2013
G - Sizing and protection of conductors
G32
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Tabulated values for Lmax
Figure G47 below gives maximum circuit lengths (Lmax) in metres, for:
b 3-phase 4-wire 400 V circuits (i.e. with neutral) and
b 1-phase 2-wire 230 V circuits
protected by general-purpose circuit-breakers.
In other cases, apply correction factors (given in Figure G53) to the lengths obtained.
The calculations are based on the above methods, and a short-circuit trip level within
20% of the adjusted value Im.
For the 50 mm
2
c.s.a., calculation are based on a 47.5 mm
2
real c.s.a.
Fig. G47 : Maximum circuit lengths in metres for copper conductors (for aluminium, the lengths must be multiplied by 0.62)
Operating current c.s.a. (nominal cross-sectional-area) of conductors (in mm
2
)
level Im of the
instantaneous
magnetic tripping
element (in A) 1.5 2.5 4 6 10 16 25 35 50 70 95 120 150 185 240
50 100 167 267 400
63 79 133 212 317
80 63 104 167 250 417
100 50 83 133 200 333
125 40 67 107 160 267 427
160 31 52 83 125 208 333
200 25 42 67 100 167 267 417
250 20 33 53 80 133 213 333 467
320 16 26 42 63 104 167 260 365 495
400 13 21 33 50 83 133 208 292 396
500 10 17 27 40 67 107 167 233 317
560 9 15 24 36 60 95 149 208 283 417
630 8 13 21 32 63 85 132 185 251 370
700 7 12 19 29 48 76 119 167 226 333 452
800 6 10 17 25 42 67 104 146 198 292 396
875 6 10 15 23 38 61 95 133 181 267 362 457
1000 5 8 13 20 33 53 83 117 158 233 317 400 435
1120 4 7 12 18 30 48 74 104 141 208 283 357 388 459
1250 4 7 11 16 27 43 67 93 127 187 253 320 348 411
1600 5 8 13 21 33 52 73 99 146 198 250 272 321 400
2000 4 7 10 17 27 42 58 79 117 158 200 217 257 320
2500 5 8 13 21 33 47 63 93 127 160 174 206 256
3200 4 6 10 17 26 36 49 73 99 125 136 161 200
4000 5 8 13 21 29 40 58 79 100 109 128 160
5000 4 7 11 17 23 32 47 63 80 87 103 128
6300 5 8 13 19 25 37 50 63 69 82 102
8000 4 7 10 15 20 29 40 50 54 64 80
10000 5 8 12 16 23 32 40 43 51 64
12500 4 7 9 13 19 25 32 35 41 51
Figures G48 to G50 next page give maximum circuit length (Lmax) in metres for:
b 3-phase 4-wire 400 V circuits (i.e. with neutral) and
b 1-phase 2-wire 230 V circuits
protected in both cases by domestic-type circuit-breakers or with circuit-breakers
having similar tripping/current characteristics.
In other cases, apply correction factors to the lengths indicated. These factors are
given in Figure G51 next page.
Schneider Electric - Electrical installation guide 2013
G33
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. G50 : Maximum length of copper-conductor circuits in metres protected by D-type circuit-breakers
Fig. G48 : Maximum length of copper-conductor circuits in metres protected by B-type circuit-breakers
Fig. G49 : Maximum length of copper-conductor circuits in metres protected by C-type circuit-breakers
Fig. G51 : Correction factor to apply to lengths obtained from Figures G47 to G50
Circuit detail
3-phase 3-wire 400 V circuit or 1-phase 2-wire 400 V circuit (no neutral) 1.73
1-phase 2-wire (phase and neutral) 230 V circuit 1
3-phase 4-wire 230/400 V circuit or 2-phase 3-wire 230/400 V circuit Sph / S neutral = 1 1
(i.e with neutral)
Sph / S neutral = 2 0.67
Note: IEC 60898 accepts an upper short-circuit-current tripping range of 10-50 In for
type D circuit-breakers. European standards, and Figure G50 however, are based on
a range of 10-20 In, a range which covers the vast majority of domestic and similar
installations.
Rated current of c.s.a. (nominal cross-sectional-area) of conductors (in mm
2
)
circuit-breakers (in A) 1.5 2.5 4 6 10 16 25 35 50
6 200 333 533 800
10 120 200 320 480 800
16 75 125 200 300 500 800
20 60 100 160 240 400 640
25 48 80 128 192 320 512 800
32 37 62 100 150 250 400 625 875
40 30 50 80 120 200 320 500 700
50 24 40 64 96 160 256 400 560 760
63 19 32 51 76 127 203 317 444 603
80 15 25 40 60 100 160 250 350 475
100 12 20 32 48 80 128 200 280 380
125 10 16 26 38 64 102 160 224 304
Rated current of c.s.a. (nominal cross-sectional-area) of conductors (in mm2)
circuit-breakers (in A) 1.5 2.5 4 6 10 16 25 35 50
6 100 167 267 400 667
10 60 100 160 240 400 640
16 37 62 100 150 250 400 625 875
20 30 50 80 120 200 320 500 700
25 24 40 64 96 160 256 400 560 760
32 18.0 31 50 75 125 200 313 438 594
40 15.0 25 40 60 100 160 250 350 475
50 12.0 20 32 48 80 128 200 280 380
63 9.5 16.0 26 38 64 102 159 222 302
80 7.5 12.5 20 30 50 80 125 175 238
100 6.0 10.0 16.0 24 40 64 100 140 190
125 5.0 8.0 13.0 19.0 32 51 80 112 152
Rated current of c.s.a. (nominal cross-sectional-area) of conductors (in mm2)
circuit-breakers (in A) 1.5 2.5 4 6 10 16 25 35 50
1 429 714
2 214 357 571 857
3 143 238 381 571 952
4 107 179 286 429 714
6 71 119 190 286 476 762
10 43 71 114 171 286 457 714
16 27 45 71 107 179 286 446 625 848
20 21 36 57 86 143 229 357 500 679
25 17.0 29 46 69 114 183 286 400 543
32 13.0 22 36 54 89 143 223 313 424
40 11.0 18.0 29 43 71 114 179 250 339
50 9.0 14.0 23 34 57 91 143 200 271
63 7.0 11.0 18.0 27 45 73 113 159 215
80 5.0 9.0 14.0 21 36 57 89 125 170
100 4.0 7.0 11.0 17.0 29 46 71 100 136
125 3.0 6.0 9.0 14.0 23 37 57 80 109
5 Particular cases of short-circuit
current
Schneider Electric - Electrical installation guide 2013
G - Sizing and protection of conductors
G34
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Examples
Example 1
In a 1-phase 2-wire installation the protection is provided by a 50 A circuit-breaker
type NSX80HMA, the instantaneous short-circuit current trip, is set at 500 A
(accuracy of 20%), i.e. in the worst case would require 500 x 1,2 = 600 A to trip.
The cable c.s.a. = 10 mm
2
and the conductor material is copper.
In Figure G47, the row Im = 500 A crosses the column c.s.a. = 10 mm
2
at the value
for Lmax of 67 m. The circuit-breaker protects the cable against short-circuit faults,
therefore, provided that its length does not exceed 67 metres.
Example 2
In a 3-phase 3-wire 400 V circuit (without neutral), the protection is provided by a
220 A circuit-breaker type NSX250N with an instantaneous short-circuit current trip
unit type MA set at 2,000 A ( 20%), i.e. a worst case of 2,400 A to be certain of
tripping. The cable c.s.a. = 120 mm
2
and the conductor material is copper.
In Figure G47 the row Im = 2,000 A crosses the column c.s.a. = 120 mm
2
at the
value for Lmax of 200 m. Being a 3-phase 3-wire 400 V circuit (without neutral), a
correction factor from Figure G51 must be applied. This factor is seen to be 1.73.
The circuit-breaker will therefore protect the cable against short-circuit current,
provided that its length does not exceed 200 x 1.73= 346 metres.
5.2 Verication of the withstand capabilities of
cables under short-circuit conditions
Thermal constraints
When the duration of short-circuit current is brief (several tenths of a second
up to ve seconds maximum) all of the heat produced is assumed to remain in
the conductor, causing its temperature to rise. The heating process is said to be
adiabatic, an assumption that simplies the calculation and gives a pessimistic result,
i.e. a higher conductor temperature than that which would actually occur, since in
practice, some heat would leave the conductor and pass into the insulation.
For a period of 5 seconds or less, the relationship I
2
t = k
2
S
2
characterizes the
time in seconds during which a conductor of c.s.a. S (in mm
2
) can be allowed to
carry a current I, before its temperature reaches a level which would damage the
surrounding insulation.
The factor k
2
is given in Figure G52 below.
In general, verication of the thermal-withstand
capability of a cable is not necessary, except in
cases where cables of small c.s.a. are installed
close to, or feeding directly from, the main
general distribution board
Fig. G52 : Value of the constant k
2
The method of verication consists in checking that the thermal energy I
2
t per
ohm of conductor material, allowed to pass by the protecting circuit-breaker (from
manufacturers catalogues) is less than that permitted for the particular conductor (as
given in Figure G53 below).
Fig. G53 : Maximum allowable thermal stress for cables I
2
t (expressed in ampere
2
x second x 10
6
)
Insulation Conductor copper (Cu) Conductor aluminium (Al)
PVC 13,225 5,776
XLPE 20,449 8,836
S (mm
2
) PVC XLPE
Copper Aluminium Copper Aluminium
1.5 0.0297 0.0130 0.0460 0.0199
2.5 0.0826 0.0361 0.1278 0.0552
4 0.2116 0.0924 0.3272 0.1414
6 0.4761 0.2079 0.7362 0.3181
10 1.3225 0.5776 2.0450 0.8836
16 3.3856 1.4786 5.2350 2.2620
25 8.2656 3.6100 12.7806 5.5225
35 16.2006 7.0756 25.0500 10.8241
50 29.839 13.032 46.133 19.936
Schneider Electric - Electrical installation guide 2013
G35
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5 Particular cases of short-circuit
current
Example
Is a copper-cored XLPE cable of 4 mm
2
c.s.a. adequately protected by a
iC60N circuit-breaker?
Figure G53 shows that the I
2
t value for the cable is 0.3272 x 10
6
, while the maximum
let-through value by the circuit-breaker, as given in the manufacturers catalogue, is
considerably less (< 0.1.10
6
A
2
s).
The cable is therefore adequately protected by the circuit-breaker up to its full rated
breaking capability.
Electrodynamic constraints
For all type of circuit (conductors or bus-trunking), it is necessary to take
electrodynamic effects into account.
To withstand the electrodynamic constraints, the conductors must be solidly xed
and the connection must be strongly tightened.
For bus-trunking, rails, etc. it is also necessary to verify that the electrodynamic
withstand performance is satisfactory when carrying short-circuit currents. The peak
value of current, limited by the circuit-breaker or fuse, must be less than the busbar
system rating. Tables of coordination ensuring adequate protection of their products
are generally published by the manufacturers and provide a major advantage of such
systems.
Schneider Electric - Electrical installation guide 2013
G36
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
G - Sizing and protection of conductors
6 Protective earthing conductor
(PE)
6.1 Connection and choice
Protective (PE) conductors provide the bonding connection between all exposed
and extraneous conductive parts of an installation, to create the main equipotential
bonding system. These conductors conduct fault current due to insulation failure
(between a phase conductor and an exposed conductive part) to the earthed neutral
of the source. PE conductors are connected to the main earthing terminal of the
installation.
The main earthing terminal is connected to the earthing electrode (see Chapter E)
by the earthing conductor (grounding electrode conductor in the USA).
PE conductors must be:
b Insulated and coloured yellow and green (stripes)
b Protected against mechanical and chemical damage
In IT and TN-earthed schemes it is strongly recommended that PE conductors
should be installed in close proximity (i.e. in the same conduits, on the same cable
tray, etc.) as the live cables of the related circuit. This arrangement ensures the
minimum possible inductive reactance in the earth-fault current carrying circuits.
It should be noted that this arrangement is originally provided by bus-trunking.
Connection
PE conductors must:
b Not include any means of breaking the continuity of the circuit (such as a switch,
removable links, etc.)
b Connect exposed conductive parts individually to the main PE conductor, i.e. in
parallel, not in series, as shown in Figure G54
b Have an individual terminal on common earthing bars in distribution boards.
TT scheme
The PE conductor need not necessarily be installed in close proximity to the live
conductors of the corresponding circuit, since high values of earth-fault current are
not needed to operate the RCD-type of protection used in TT installations.
IT and TN schemes
The PE or PEN conductor, as previously noted, must be installed as close as
possible to the corresponding live conductors of the circuit and no ferro-magnetic
material must be interposed between them. A PEN conductor must always be
connected directly to the earth terminal of an appliance, with a looped connection
from the earth terminal to the neutral terminal of the appliance (see Fig. G55).
b TN-C scheme (the neutral and PE conductor are one and the same, referred to as
a PEN conductor)
The protective function of a PEN conductor has priority, so that all rules governing
PE conductors apply strictly to PEN conductors
b TN-C to TN-S transition
The PE conductor for the installation is connected to the PEN terminal or bar (see
Fig. G56) generally at the origin of the installation. Downstream of the point of
separation, no PE conductor can be connected to the neutral conductor.
Fig. G55 : Direct connection of the PEN conductor to the earth
terminal of an appliance
PE
PE
Correct
Incorrect
Fig. G54 : A poor connection in a series arrangement will leave
all downstream appliances unprotected
Fig. G56 : The TN-C-S scheme
PEN
PEN PE
N
Espace avt et aprs illustration
G - Sizing and protection of conductors
Schneider Electric - Electrical installation guide 2013
G37
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Types of materials
Materials of the kinds mentioned below in Figure G57 can be used for PE conductors,
provided that the conditions mentioned in the last column are satised.
Fig. G57 : Choice of protective conductors (PE)
6.2 Conductor sizing
Figure G58 below is based on IEC 60364-5-54. This table provides two methods of
determining the appropriate c.s.a. for both PE or PEN conductors.
Fig. G58 : Minimum cross section area of protective conductors
(1) Data valid if the prospective conductor is of the same material as the line conductor. Otherwise, a correction factor must be applied.
(2) When the PE conductor is separated from the circuit phase conductors, the following minimum values must be respected:
b 2.5 mm
2
if the PE is mechanically protected
b 4 mm
2
if the PE is not mechanically protected
(3) For mechanical reasons, a PEN conductor, shall have a cross-sectional area not less than 10 mm
2
in copper or 16 mm
2
in aluminium.
(4) Refer to table G53 for the application of this formula.
(1) In TN and IT schemes, fault clearance is generally achieved by overcurrent devices (fuses or circuit-breakers) so that the impedance
of the fault-current loop must be sufciently low to assure positive protective device operation. The surest means of achieving a low loop
impedance is to use a supplementary core in the same cable as the circuit conductors (or taking the same route as the circuit conductors).
This solution minimizes the inductive reactance and therefore the impedance of the loop.
(2) The PEN conductor is a neutral conductor that is also used as a protective earth conductor. This means that a current may be owing
through it at any time (in the absence of an earth fault). For this reason an insulated conductor is recommended for PEN operation.
(3) The manufacturer provides the necessary values of R and X components of the impedances (phase/PE, phase/PEN) to include in the
calculation of the earth-fault loop impedance.
(4) Possible, but not recomended, since the impedance of the earth-fault loop cannot be known at the design stage. Measurements on the
completed installation are the only practical means of assuring adequate protection for persons.
(5) It must allow the connection of other PE conductors. Note: these elements must carry an indivual green/yellow striped visual indication,
15 to 100 mm long (or the letters PE at less than 15 cm from each extremity).
(6) These elements must be demountable only if other means have been provided to ensure uninterrupted continuity of protection.
(7) With the agreement of the appropriate water authorities.
(8) In the prefabricated pre-wired trunking and similar elements, the metallic housing may be used as a PEN conductor, in parallel with the
corresponding bar, or other PE conductor in the housing.
(9) Forbidden in some countries only. Universally allowed to be used for supplementary equipotential conductors.
Type of protective earthing conductor (PE) IT scheme TN scheme TT scheme Conditions to be respected
Supplementary In the same cable Strongly Strongly recommended Correct The PE conductor must
conductor as the phases, or in recommended be insulated to the same
the same cable run level as the phases
Independent of the Possible
(1)
Possible
(1) (2)
Correct b The PE conductor may
phase conductors be bare or insulated
(2)
Metallic housing of bus-trunking or of other Possible
(3)
PE possible
(3)
Correct b The electrical continuity
prefabricated prewired ducting
(5)
PEN possible
(8)
must be assured by protection
External sheath of extruded, mineral- insulated Possible
(3)
PE possible
(3)
Possible
against deterioration by
conductors (e.g. pyrotenax type systems) PEN not recommended
(2)(3)
mechanical, chemical and
Certain extraneous conductive elements
(6)
Possible
(4)
PE possible
(4)
Possible
electrochemical hazards
such as: PEN forbidden
b Their conductance
b Steel building structures must be adequate
b Machine frames
b Water pipes
(7)
Metallic cable ways, such as, conduits
(9)
, Possible
(4)
PE possible
(4)
Possible
ducts, trunking, trays, ladders, and so on PEN not recommended
(2)(4)
Forbidden for use as PE conductors, are: metal conduits
(9)
, gas pipes, hot-water pipes, cable-armouring tapes
(9)
or wires
(9)
c.s.a. of phase Minimum c.s.a. of Minimum c.s.a. of
conductors Sph (mm
2
) PE conductor (mm
2
) PEN conductor (mm
2
)
Cu Al
Simplied S
ph
y 16 S
ph
(2)
S
ph
(3)
S
ph
(3)
method
(1)
16 < S
ph
y 25 16 16
25 < S
ph
y 35 25
35 < S
ph
y 50 S
ph
/2 S
ph
/2
S
ph
> 50 S
ph
/2
Adiabatic method Any size
S
t
k
PE/PEN =
I
2
(3) (4)
6 Protective earthing conductor
(PE)
Schneider Electric - Electrical installation guide 2013
G38
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
G - Sizing and protection of conductors
The two methods are:
b Adiabatic (which corresponds with that described in IEC 60724)
This method, while being economical and assuring protection of the conductor
against overheating, leads to small c.s.a.s compared to those of the corresponding
circuit phase conductors. The result is sometimes incompatible with the necessity
in IT and TN schemes to minimize the impedance of the circuit earth-fault loop, to
ensure positive operation by instantaneous overcurrent tripping devices. This method
is used in practice, therefore, for TT installations, and for dimensioning an earthing
conductor
(1)
.
b Simplied
This method is based on PE conductor sizes being related to those of the
corresponding circuit phase conductors, assuming that the same conductor material
is used in each case.
Thus, in Figure G58 for:
Sph y 16 mm
2
SPE = Sph
16 < Sph y 35 mm
2
SPE = 16 mm
2
Sph > 35 mm
2
S
Sph
PE =
2
Note: when, in a TT scheme, the installation earth electrode is beyond the zone of
inuence of the source earthing electrode, the c.s.a. of the PE conductor can be
limited to 25 mm
2
(for copper) or 35 mm
2
(for aluminium).
The neutral cannot be used as a PEN conductor unless its c.s.a. is equal to or larger
than 10 mm
2
(copper) or 16 mm
2
(aluminium).
Moreover, a PEN conductor is not allowed in a exible cable. Since a PEN conductor
functions also as a neutral conductor, its c.s.a. cannot, in any case, be less than that
necessary for the neutral, as discussed in Subclause 7.1 of this Chapter.
This c.s.a. cannot be less than that of the phase conductors unless:
b The kVA rating of single-phase loads is less than 10% of the total kVA load, and
b Imax likely to pass through the neutral in normal circumstances, is less than the
current permitted for the selected cable size.
Furthermore, protection of the neutral conductor must be assured by the protective
devices provided for phase-conductor protection (described in Sub-clause 7.2 of this
Chapter).
Values of factor k to be used in the formulae
These values are identical in several national standards, and the temperature rise
ranges, together with factor k values and the upper temperature limits for the different
classes of insulation, correspond with those published in IEC 60724 (1984).
The data presented in Figure G59 are those most commonly needed for LV installation
design.
(1) Grounding electrode conductor
Fig. G59 : k factor values for LV PE conductors, commonly used in national standards and
complying with IEC 60724
k values Nature of insulation
Polyvinylchloride (PVC) Cross-linked-polyethylene
(XLPE)
Ethylene-propylene-rubber
(EPR)
Final temperature (C) 160 250
Initial temperature (C) 30 30
Insulated conductors Copper 143 176
not incoporated in
Aluminium 95 116
cables or bare
Steel 52 64
conductors in contact
with cable jackets
Conductors of a Copper 115 143
multi-core-cable
Aluminium 76 94
Schneider Electric - Electrical installation guide 2013
G39
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6.3 Protective conductor between MV/LV transformer
and the main general distribution board (MGDB)
All phase and neutral conductors upstream of the main incoming circuit-breaker
controlling and protecting the MGDB are protected by devices at the MV side of the
transformer. The conductors in question, together with the PE conductor, must be
dimensioned accordingly. Dimensioning of the phase and neutral conductors from
the transformer is exemplied in Sub-clause 7.5 of this chapter (for circuit C1 of the
system illustrated in Fig. G65).
Recommended conductor sizes for bare and insulated PE conductors from the
transformer neutral point, shown in Figure G60, are indicated below in Figure G61.
The kVA rating to consider is the sum of all (if more than one) transformers
connected to the MGDB.
These conductors must be sized according to
national practices
PE
MGDB
Main earth bar
for the LV installation
Fig. G60 : PE conductor to the main earth bar in the MGDB
Fig. G61 : Recommended c.s.a. of PE conductor between the MV/LV transformer and the MGDB,
as a function of transformer ratings and fault-clearance times.
Transformer Conductor Bare PVC-insulated XLPE-insulated
rating in kVA material conductors conductors conductors
(230/400 V Copper t(s) 0.2 0.5 - 0.2 0.5 - 0.2 0.5 -
output) Aluminium t(s) - 0.2 0.5 - 0.2 0.5 - 0.2 0.5
y100 c.s.a. of PE 25 25 25 25 25 25 25 25 25
160 conductors 25 25 35 25 25 50 25 25 35
200 SPE (mm
2
) 25 35 50 25 35 50 25 25 50
250 25 35 70 35 50 70 25 35 50
315 35 50 70 35 50 95 35 50 70
400 50 70 95 50 70 95 35 50 95
500 50 70 120 70 95 120 50 70 95
630 70 95 150 70 95 150 70 95 120
800 70 120 150 95 120 185 70 95 150
1,000 95 120 185 95 120 185 70 120 150
1,250 95 150 185 120 150 240 95 120 185
The table indicates the c.s.a. of the conductors in mm
2
according to:
b The nominal rating of the MV/LV transformer(s) in kVA
b The fault-current clearance time by the MV protective devices, in seconds
b The kinds of insulation and conductor materials
If the MV protection is by fuses, then use the 0.2 seconds columns.
In IT schemes, if an overvoltage protection device is installed (between the
transformer neutral point and earth) the conductors for connection of the device
should also be dimensioned in the same way as that described above for
PE conductors.
6 Protective earthing conductor
(PE)
Schneider Electric - Electrical installation guide 2013
G40
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
G - Sizing and protection of conductors
6 Protective earthing conductor
(PE)
Fig. G62 : Supplementary equipotential conductors
M
1
M
2
Between two exposed conductive parts
if SPE1 y SPE2
then SLS = SPE1
Between an exposed conductive part
and a metallic structure
M
1
Metal structures
(conduits, girders)
2
SPE1 SPE1 SPE2
SPE
SLS SLS
SLS =
6.4 Equipotential conductor
The main equipotential conductor
This conductor must, in general, have a c.s.a. at least equal to half of that of the
largest PE conductor, but in no case need exceed 25 mm
2
(copper) or 35 mm
2
(aluminium) while its minimum c.s.a. is 6 mm
2
(copper) or 10 mm
2
(aluminium).
Supplementary equipotential conductor
This conductor allows an exposed conductive part which is remote from the nearest
main equipotential conductor (PE conductor) to be connected to a local protective
conductor. Its c.s.a. must be at least half of that of the protective conductor to which
it is connected.
If it connects two exposed conductive parts (M1 and M2 in Figure G62) its c.s.a.
must be at least equal to that of the smaller of the two PE conductors (for M1 and
M2). Equipotential conductors which are not incorporated in a cable, should be
protected mechanically by conduits, ducting, etc. wherever possible.
Other important uses for supplementary equipotential conductors concern the
reduction of the earth-fault loop impedance, particulary for indirect-contact protection
schemes in TN- or IT-earthed installations, and in special locations with increased
electrical risk (refer to IEC 60364-4-41).
Schneider Electric - Electrical installation guide 2013
G41
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
7 The neutral conductor
The c.s.a. and the protection of the neutral conductor, apart from its current-carrying
requirement, depend on several factors, namely:
b The type of earthing system, TT, TN, etc.
b The harmonic currents
b The method of protection against indirect contact hazards according to the
methods described below
The color of the neutral conductor is statutorily blue. PEN conductor, when insulated,
shall be marked by one of the following methods :
b Green-and-yellow throughout its length with, in addition, light blue markings at the
terminations, or
b Light blue throughout its length with, in addition, green-and-yellow markings at the
terminations
7.1 Sizing the neutral conductor
Inuence of the type of earthing system
TT and TN-S schemes
b Single-phase circuits or those of c.s.a. y 16 mm
2
(copper) 25 mm
2
(aluminium): the
c.s.a. of the neutral conductor must be equal to that of the phases
b Three-phase circuits of c.s.a. > 16 mm
2
copper or 25 mm
2
aluminium: the c.s.a. of
the neutral may be chosen to be:
v Equal to that of the phase conductors, or
v Smaller, on condition that:
- The current likely to ow through the neutral in normal conditions is less than the
permitted value Iz. The inuence of triplen
(1)
harmonics must be given particular
consideration or
- The neutral conductor is protected against short-circuit, in accordance with the
following Sub-clause G-7.2
- The size of the neutral conductor is at least equal to 16 mm
2
in copper or 25 mm
2
in
aluminium
TN-C scheme
The same conditions apply in theory as those mentioned above, but in practice,
the neutral conductor must not be open-circuited under any circumstances since
it constitutes a PE as well as a neutral conductor (see Figure G58 c.s.a. of PEN
conductor column).
IT scheme
In general, it is not recommended to distribute the neutral conductor, i.e. a 3-phase
3-wire scheme is preferred. When a 3-phase 4-wire installation is necessary,
however, the conditions described above for TT and TN-S schemes are applicable.
Inuence of harmonic currents
Effects of triplen harmonics
Harmonics are generated by the non-linear loads of the installation (computers,
uorescent lighting, rectiers, power electronic choppers) and can produce high
currents in the Neutral. In particular triplen harmonics of the three Phases have a
tendency to cumulate in the Neutral as:
b Fundamental currents are out-of-phase by 2t/3 so that their sum is zero
b On the other hand, triplen harmonics of the three Phases are always positioned in
the same manner with respect to their own fundamental, and are in phase with each
other (see Fig. G63a). (1) Harmonics of order 3 and multiple of 3
Fig. G63a : Triplen harmonics are in phase and cumulate in the Neutral
+ I
1 H1
I
1 H3
I
2 H1
+ I
2 H3
I
3 H1
I
k H1
I
N
=
1
3
+
+
I
3 H3
I
k H3
0 + I
H3
1
3
3
G - Sizing and protection of conductors
Schneider Electric - Electrical installation guide 2013
G42
G - Sizing and protection of conductors
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Figure G63b shows the load factor of the neutral conductor as a function of the
percentage of 3
rd
harmonic.
In practice, this maximum load factor cannot exceed 3.
Reduction factors for harmonic currents in four-core and ve-core cables with
four cores carrying current
The basic calculation of a cable concerns only cables with three loaded conductors
i.e there is no current in the neutral conductor. Because of the third harmonic current,
there is a current in the neutral. As a result, this neutral current creates an hot
environment for the 3 phase conductors and for this reason, a reduction factor for
phase conductors is necessary (see Fig. G63).
Reduction factors, applied to the current-carrying capacity of a cable with three
loaded conductors, give the current-carrying capacity of a cable with four loaded
conductors, where the current in the fourth conductor is due to harmonics. The
reduction factors also take the heating effect of the harmonic current in the phase
conductors into account.
b Where the neutral current is expected to be higher than the phase current, then the
cable size should be selected on the basis of the neutral current
b Where the cable size selection is based on a neutral current which is not
signicantly higher than the phase current, it is necessary to reduce the tabulated
current carrying capacity for three loaded conductors
b If the neutral current is more than 135% of the phase current and the cable size is
selected on the basis of the neutral current then the three phase conductors will not
be fully loaded. The reduction in heat generated by the phase conductors offsets the
heat generated by the neutral conductor to the extent that it is not necessary to apply
any reduction factor to the current carrying capacity for three loaded conductors.
b In order to protect cables, the fuse or circuit-breaker has to be sized taking into
account the greatest of the values of the line currents (phase or neutral). However,
there are special devices (for example the Compact NSX circuit breaker equipped
with the OSN tripping unit), that allow the use of a c.s.a. of the phase conductors
smaller than the c.s.a. of the neutral conductor. A big economic gain can thus be
made.
Fig. G63b : Load factor of the neutral conductor vs the percentage of 3
rd
harmonic
0 20 40 60 80 100
I
Neutral
I
Phase
i
3
(%)
0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
Fig. G63 : Reduction factors for harmonic currents in four-core and ve-core cables
(according to IEC 60364-5-52)
Third harmonic content Reduction factor
of phase current
Size selection is based on Size selection is based on
(%) phase current neutral current
0 - 15 1.0 -
15 - 33 0.86 -
33 - 45 - 0.86
> 45 - 1.0
(1)
Compact NSX100 circuit breaker
(1) If the neutral current is more than 135 % of the phase current and the cable size is selected
on the basis of the neutral current then the three phase conductors will not be fully loaded. The
reduction in heat generated by the phase conductors offsets the heat generated by the neutral
conductor to the extent that it is not necessary to apply any reduction factor to the current
carrying capacity for three loaded conductors.
Schneider Electric - Electrical installation guide 2013
G43
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Examples
Consider a three-phase circuit with a design load of 37 A to be installed using four-
core PVC insulated cable clipped to a wall, installation method C. From Figure G24,
a 6 mm
2
cable with copper conductors has a current-carrying capacity of 40 A and
hence is suitable if harmonics are not present in the circuit.
b If 20 % third harmonic is present, then a reduction factor of 0,86 is applied and the
design load becomes: 37/0.86 = 43 A.
For this load a 10 mm
2
cable is necessary.
In this case, the use of a special protective device (Compact NSX equipped with the
OSN trip unit for instance) would allow the use of a 6 mm
2
cable for the phases and
of 10 mm
2
for the neutral.
b If 40 % third harmonic is present, the cable size selection is based on the neutral
current which is: 37 x 0,4 x 3 = 44,4 A and a reduction factor of 0,86 is applied,
leading to a design load of: 44.4/0.86 = 51.6 A.
For this load a 10 mm
2
cable is suitable.
b If 50 % third harmonic is present, the cable size is again selected on the basis of
the neutral current, which is: 37 x 0,5 x 3 = 55,5 A .In this case the rating factor is
1 and a 16 mm
2
cable is required.
In this case, the use of a special protective device (Compact NSX equipped with the
OSN trip for instance) would allow the use of a 6 mm
2
cable for the phases and of
10 mm
2
for the neutral.
7.2 Protection of the neutral conductor
(see Fig. G64 next page)
Protection against overload
If the neutral conductor is correctly sized (including harmonics), no specic
protection of the neutral conductor is required because it is protected by the phase
protection.
However, in practice, if the c.s.a. of the neutral conductor is lower than the phase
c.s.a, a neutral overload protection must be installed.
Protection against short-circuit
If the c.s.a. of the neutral conductor is lower than the c.s.a. of the phase conductor,
the neutral conductor must be protected against short-circuit.
If the c.s.a. of the neutral conductor is equal or greater than the c.s.a. of the phase
conductor, no specic protection of the neutral conductor is required because it is
protected by the phase protection.
7.3 Breaking of the neutral conductor
(see Fig. G64 next page)
The need to break or not the neutral conductor is related to the protection against
indirect contact.
In TN-C scheme
The neutral conductor must not be open-circuited under any circumstances since it
constitutes a PE as well as a neutral conductor.
In TT, TN-S and IT schemes
In the event of a fault, the circuit-breaker will open all poles, including the neutral
pole, i.e. the circuit-breaker is omnipolar.
The action can only be achieved with fuses in an indirect way, in which the operation
of one or more fuses triggers a mechanical trip-out of all poles of an associated
series-connected load-break switch.
7.4 Isolation of the neutral conductor
(see Fig. G64 next page)
It is considered to be the good practice that every circuit be provided with the means
for its isolation.
7 The neutral conductor
Schneider Electric - Electrical installation guide 2013
G44
G - Sizing and protection of conductors
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. G64 : The various situations in which the neutral conductor may appear
TT TN-C TN-S IT
Single-phase
(Phase-Neutral)
(B)
or or
Single-phase
(Phase-Phase)
(A) (A)
or or
Three-phase
four wires
Sn u Sph
(B)
or
Three-phase
four wires
Sn < Sph
(B)
or
N N N N
N
N
N N
N
N N
N N N
N
(A) Authorized for TT or TN-S systems if a RCD is installed at the origin of the circuit or upstream of it, and if no articial
neutral is distributed downstream of its location
(B) The neutral overcurrent protection is not necessary:
b If the neutral conductor is protected against short-circuits by a device placed upstream, or,
b If the circuit is protected by a RCD which sensitivity is less than 15% of the neutral admissible current.
7 The neutral conductor
Schneider Electric - Electrical installation guide 2013
G45
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Worked example of cable calculation (see Fig. G65)
The installation is supplied through a 630 kVA transformer. The process requires
a high degree of supply continuity and part of the installation can be supplied by a
250 kVA standby generator. The global earthing system is TN-S, except for the most
critical loads supplied by an isolation transformer with a downstream IT conguration.
The single-line diagram is shown in Figure G65 below. The results of a computer
study for the circuit from transformer T1 down to the cable C7 is reproduced on
Figure G66. This study was carried out with Ecodial software (a Schneider Electric
product).
This is followed by the same calculations carried out by the simplied method
described in this guide.
630 kVA 400V 50 Hz
250 kVA 400V 50 Hz
180 kvar
C1
Q1
B2
B6 B13
C3
Q3 Q16
C16
R16
T1
Q7
ku = 1.0
I
B
= 254.71 A
P = 150 kW
C7
L7
P = 125 kVA
U = 400 V
Q11
C11
T11
Q12
C12
G
Q5
G5
C5
Q8
ku = 1.0
I
B
= 254.71 A
P = 150 kW
C8
L8
Q14
ku = 1.0
I
B
= 84,90 A
P = 50 kW
C14
L14
Q15
ku = 1.0
I
B
= 84,90 A
P = 50 kW
C15
L15
Q10
ku = 1.0
I
B
= 169,81 A
P = 100 kW
C10
L10
20 m
Q4
C4
Fig. G65 : Example of single-line diagram
8 Worked example of cable
calculation
G - Sizing and protection of conductors
Schneider Electric - Electrical installation guide 2013
G46
G - Sizing and protection of conductors
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Calculation using software Ecodial
Fig. G66 : Partial results of calculation carried out with Ecodial software (Schneider Electric)
General network characteristics
Earthing system TN-S
Neutral distributed No
Voltage (V) 400
Frequency (Hz) 50
Upstream fault level (MVA) 500
Resistance of MV network (mO) 0.0351
Reactance of MV network (mO) 0.351
Transformer T1
Rating (kVA) 630
Short-circuit impedance voltage (%) 4
Transformer resistance RT (mO) 3.472
Transformer reactance XT (mO) 10.64
3-phase short-circuit current Ik
3
(kA) 21.54
Cable C1
Length (m) 5
Maximum load current (A) 860
Type of insulation PVC
Ambient temperature (C) 30
Conductor material Copper
Single-core or multi-core cable Single
Installation method F
Number of layers 1
Phase conductor selected csa (mm
2
) 2 x 240
Neutral conductor selected csa (mm
2
) 2 x 240
PE conductor selected csa (mm
2
) 1 x 120
Voltage drop AU (%) 0.122
3-phase short-circuit current Ik
3
(kA) 21.5
Courant de dfaut phase-terre Id (kA) 15.9
Circuit-breaker Q1
Load current (A) 860
Type Compact
Reference NS1000N
Rated current (A) 1000
Number of poles and protected poles 4P4d
Tripping unit Micrologic 5.0
Overload trip Ir (A) 900
Short-delay trip Im / Isd (A) 9000
Tripping time tm (ms) 50
Switchboard B2
Reference Linergy 1250
Rated current (A) 1050
Circuit breaker Q3
Load current (A) 509
Type Compact
Reference NSX630F
Rated current (A) 630
Number of poles and protected poles 4P4d
Tripping unit Micrologic 2.3
Overload trip Ir (A) 510
Short-delay trip Im / Isd (A) 5100
Cable C3
Length 20
Maximum load current (A) 509
Type of insulation PVC
Ambient temperature (C) 30
Conductor material Copper
Single-core or multi-core cable Single
Installation method F
Phase conductor selected csa (mm
2
) 2 x 95
Neutral conductor selected csa (mm
2
) 2 x 95
PE conductor selected csa (mm
2
) 1 x 95
Cable voltage drop AU (%) 0.53
Total voltage drop AU (%) 0.65
3-phase short-circuit current Ik
3
(kA) 19.1
1-phase-to-earth fault current Id (kA) 11.5
Switchboard B6
Reference Linergy 800
Rated current (A) 750
Circuit-breaker Q7
Load current (A) 255
Type Compact
Reference NSX400F
Rated current (A) 400
Number of poles and protected poles 3P3d
Tripping unit Micrologic 2.3
Overload trip Ir (A) 258
Short-delay trip Im / Isd (A) 2576
Cable C7
Length 5
Maximum load current (A) 255
Type of insulation PVC
Ambient temperature (C) 30
Conductor material Copper
Single-core or multi-core cable Single
Installation method F
Phase conductor selected csa (mm2) 1 x 95
Neutral conductor selected csa (mm2) -
PE conductor selected csa (mm2) 1 x 50
Cable voltage drop AU (%) 0.14
Total voltage drop AU (%) 0.79
3-phase short-circuit current Ik
3
(kA) 18.0
1-phase-to-earth fault current Id (kA) 10.0
The same calculation using the simplied method
recommended in this guide
b Dimensioning circuit C1
The MV/LV 630 kVA transformer has a rated no-load voltage of 420 V. Circuit C1
must be suitable for a current of:
IB = =
630 x 10
x 420
866 A per phase
3
3
Schneider Electric - Electrical installation guide 2013
G47
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Two single-core PVC-insulated copper cables in parallel will be used for each phase.
These cables will be laid on cable trays according to method F.
Each conductor will therefore carry 433A. Figure G21a indicates that for 3 loaded
conductors with PVC isolation, the required c.s.a. is 240mm.
The resistance and the inductive reactance, for the two conductors in parallel, and
for a length of 5 metres, are:
R = =
22.5 x 5
240 x 2
0.23 m (cable resistance: 22.5 mO.mm
2
/m)
X = 0,08 x 5 = 0,4 mO (cable reactance: 0.08 mO/m)
b Dimensioning circuit C3
Circuit C3 supplies two 150kW loads with cos = 0.85, so the total load current is:
I
3 x 400 x 0.85
A = =
300 x 10
509
3
B
Two single-core PVC-insulated copper cables in parallel will be used for each phase.
These cables will be laid on cable trays according to method F.
Each conductor will therefore carry 255A. Figure G21a indicates that for 3 loaded
conductors with PVC isolation, the required c.s.a. is 95mm.
The resistance and the inductive reactance, for the two conductors in parallel, and
for a length of 20 metres, are:
R = =
22.5 x 20
95 x 2
2.37 m
X = 0.08 x 20 = 1.6 m
b Dimensioning circuit C7
Circuit C7 supplies one 150kW load with cos = 0.85, so the total load current is:
I
3 x 400 x 0.85
A = =
150 x 10
255
B
3
One single-core PVC-insulated copper cable will be used for each phase. The cables
will be laid on cable trays according to method F.
Each conductor will therefore carry 255A. Figure G21a indicates that for 3 loaded
conductors with PVC isolation, the required c.s.a. is 95mm.
The resistance and the inductive reactance for a length of 20 metres is:
R = =
22.5 x 5
95
1.18 m
X = 0.08 x 5 = 0.4 m
(cable resistance: 22.5 m.mm
2
/m)
(cable reactance: 0.08 m/m)
(cable resistance: 22.5 m.mm
2
/m)
(cable reactance: 0.08 m/m)
b Calculation of short-circuit currents for the selection of circuit-breakers Q1,
Q3, Q7 (see Fig. G67)
Circuit components R (mO) X (mO) Z (mO) Ikmax (kA)
Upstream MV network, 0,035 0,351
500MVA fault level
(see Fig. G34)
Transformer 630kVA, 4% 2.9 10.8
(see Fig. G35)
Cable C1 0.23 0.4
Sub-total 3.16 11.55 11.97 20.2
Cable C3 2.37 1.6
Sub-total 5.53 13.15 14.26 17
Cable C7 1.18 0.4
Sub-total 6.71 13.55 15.12 16
Fig. G67 : Example of short-circuit current evaluation
8 Worked example of cable
calculation
Schneider Electric - Electrical installation guide 2013
G48
G - Sizing and protection of conductors
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
8 Worked example of cable
calculation
b The protective conductor
When using the adiabatic method, the minimum c.s.a. for the protective earth
conductor (PE) can be calculated by the formula given in Figure G58:
I
k
S =
.t
PE
2
For circuit C1, I = 20.2kA and k = 143.
t is the maximum operating time of the MV protection, e.g. 0.5s
This gives:
100 mm
143
0.5 20200
k
t . I
S
2
2
PE
=
= =
A single 120 mm
2
conductor is therefore largely sufcient, provided that it also
satises the requirements for indirect contact protection (i.e. that its impedance is
sufciently low).
Generally, for circuits with phase conductor c.s.a. Sph 50 mm
2
, the PE conductor
minimum c.s.a. will be Sph / 2. Then, for circuit C3, the PE conductor will be 95mm2,
and for circuit C7, the PE conductor will be 50mm
2
.
b Protection against indirect-contact hazards
For circuit C3 of Figure G65, Figures F41 and F40, or the formula given page F25
may be used for a 3-phase 4-wire circuit.
The maximum permitted length of the circuit is given by:
L
0.8 x U x S
x (1 + m) x I
=
0 ph
max
a
L = 75 m
0.8 x 230 2 x 95
22.5 x 10 x (1+2) x 630 x 11
=
max -3
(The value in the denominator 630 x 11 is the maximum current level at which the
instantaneous short-circuit magnetic trip of the 630 A circuit-breaker operates).
The length of 20 metres is therefore fully protected by instantaneous over-current
devices.
b Voltage drop
The voltage drop is calculated using the data given in Figure G28, for balanced
three-phase circuits, motor power normal service (cos = 0.8).
The results are summarized on gure G68:
Fig. G68 : Voltage drop introduced by the different cables
The total voltage drop at the end of cable C7 is then: 0.77%.
C1 C3 C7
c.s.a. 2 x 240mm 2 x 95mm 1 x 95mm
U per conductor
(V/A/km) see Fig. G28
0.21 0.42 0.42
Load current (A) 866 509 255
Length (m) 5 20 5
Voltage drop (V) 0.45 2.1 0.53
Voltage drop (%) 0.11 0.53 0.13
H1
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapter H
LV switchgear: functions &
selection
Contents
The basic functions of LV switchgear H2
1.1 Electrical protection H2
1.2 Isolation H3
1.3 Switchgear control H4
The switchgear H5
2.1 Elementary switching devices H5
2.2 Combined switchgear elements H9
Choice of switchgear H10
3.1 Switchgear selection H10
3.2 Tabulated functional capabilities of LV switchgear H10
Circuit-breaker H11
4.1 Standards and description H11
4.2 Fundamental characteristics of a circuit-breaker H13
4.3 Other characteristics of a circuit-breaker H15
4.4 Selection of a circuit-breaker H18
4.5 Coordination between circuit-breakers H22
4.6 Discrimination MV/LV in a consumers substation H28
4.7 Circuit- breakers suitable for IT systems H29
4.8 Ultra rapid circuit breaker H29
Maintenance of low voltage switchgear H32
1
2
3
4
5
H2
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H - LV switchgear: functions & selection
Schneider Electric - Electrical installation guide 2013
1 The basic functions of
LV switchgear
The role of switchgear is:
b Electrical protection
b Safe isolation from live parts
b Local or remote switching
National and international standards dene the manner in which electric circuits of
LV installations must be realized, and the capabilities and limitations of the various
switching devices which are collectively referred to as switchgear.
The main functions of switchgear are:
b Electrical protection
b Electrical isolation of sections of an installation
b Local or remote switching
These functions are summarized below in Figure H1.
Electrical protection at low voltage is (apart from fuses) normally incorporated in
circuit-breakers, in the form of thermal-magnetic devices and/or residual-current-
operated tripping devices (less-commonly, residual voltage- operated devices
- acceptable to, but not recommended by IEC).
In addition to those functions shown in Figure H1, other functions, namely:
b Over-voltage protection
b Under-voltage protection
are provided by specic devices (lightning and various other types of voltage-surge
arrester, relays associated with contactors, remotely controlled circuit-breakers, and
with combined circuit-breaker/isolators and so on)
Fig. H1 : Basic functions of LV switchgear
1.1 Electrical protection
The aim is to avoid or to limit the destructive or dangerous consequences of
excessive (short-circuit) currents, or those due to overloading and insulation failure,
and to separate the defective circuit from the rest of the installation.
A distinction is made between the protection of:
b The elements of the installation (cables, wires, switchgear)
b Persons and animals
b Equipment and appliances supplied from the installation
The protection of circuits
v Against overload; a condition of excessive current being drawn from a healthy
(unfaulted) installation
v Against short-circuit currents due to complete failure of insulation between
conductors of different phases or (in TN systems) between a phase and neutral (or
PE) conductor
Protection in these cases is provided either by fuses or circuit-breaker, in the
distribution board at the origin of the nal circuit (i.e. the circuit to which the load
is connected). Certain derogations to this rule are authorized in some national
standards, as noted in chapter H1 sub-clause 1.4.
The protection of persons
According to IEC61364 41, Automatic disconnection in case of fault is a protective
measure permitted for safety
v Circuit breaker or fuses can be used as protective devices that "automatically
interrupt the supply to the line conductor of a circuit or equipment in the event
of a fault of negligible impedance between the line conductor and an exposed-
conductive-part or a protective conductor in the circuit or equipment within the
disconnection time required " (IEC 60364-411)
v Against insulation failures. According to the system of earthing for the installation
(TN, TT or IT) the protection will be provided by fuses or circuit-breakers, residual
current devices, and/or permanent monitoring of the insulation resistance of the
installation to earth
Electrical protection assures:
b Protection of circuit elements against the
thermal and mechanical stresses of short-circuit
currents
b Protection of persons in the event of
insulation failure
b Protection of appliances and apparatus being
supplied (e.g. motors, etc.)
Electrical protection Isolation Control
against
b Overload currents b Isolation clearly indicated b Functional switching
b Short-circuit currents by an authorized fail-proof b Emergency switching
b Insulation failure mechanical indicator b Emergency stopping
b A gap or interposed insulating b Switching off for
barrier between the open mechanical maintenance
contacts, clearly visible
H3
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
The protection of electric motors
v Against overheating, due, for example, to long term overloading, stalled rotor,
single-phasing, etc. Thermal relays, specially designed to match the particular
characteristics of motors are used.
Such relays may, if required, also protect the motor-circuit cable against overload.
Short-circuit protection is provided either by type aM fuses or by a circuit-breaker
from which the thermal (overload) protective element has been removed, or
otherwise made inoperative.
1.2 Isolation
The aim of isolation is to separate a circuit or apparatus (such as a motor, etc.) from
the remainder of a system which is energized, in order that personnel may carry out
work on the isolated part in perfect safety.
In principle, all circuits of an LV installation shall have means to be isolated.
In practice, in order to maintain an optimum continuity of service, it is preferred to
provide a means of isolation at the origin of each circuit.
An isolating device must full the following requirements:
b All poles of a circuit, including the neutral (except where the neutral is a PEN
conductor) must open
(1)
b It must be provided with a locking system in open position with a key (e.g. by
means of a padlock) in order to avoid an unauthorized reclosure by inadvertence
b It must comply with a recognized national or international standard
(e.g. IEC 60947-3) concerning clearance between contacts, creepage distances,
overvoltage withstand capability, etc.:
Other requirements apply:
v Verication that the contacts of the isolating device are, in fact, open.
The verication may be:
- Either visual, where the device is suitably designed to allow the contacts to be seen
(some national standards impose this condition for an isolating device located at the
origin of a LV installation supplied directly from a MV/LV transformer)
- Or mechanical, by means of an indicator solidly welded to the operating shaft
of the device. In this case the construction of the device must be such that, in the
eventuality that the contacts become welded together in the closed position, the
indicator cannot possibly indicate that it is in the open position
v Leakage currents. With the isolating device open, leakage currents between the
open contacts of each phase must not exceed:
- 0.5 mA for a new device
- 6.0 mA at the end of its useful life
v Voltage-surge withstand capability, across open contacts. The isolating device,
when open must withstand a 1.2/50
s impulse, having a peak value of 6, 8 or 12 kV
according to its service voltage, as shown in Figure H2. The device must satisfy
these conditions for altitudes up to 2,000 metres. Correction factors are given in
IEC 60664-1 for altitudes greater than 2,000 metres.
Consequently, if tests are carried out at sea level, the test values must be increased
by 23% to take into account the effect of altitude. See standard IEC 60947.
1 The basic functions of
LV switchgear
A state of isolation clearly indicated by an
approved fail-proof indicator, or the visible
separation of contacts, are both deemed to
satisfy the national standards of many countries
(1) the concurrent opening of all live conductors, while not
always obligatory, is however, strongly recommended (for
reasons of greater safety and facility of operation). The neutral
contact opens after the phase contacts, and closes before
them (IEC 60947-1).
Service (nominal Impulse withstand
voltage peak voltage category
(V) (for 2,000 metres)
(kV)
III IV
230/400 4 6
400/690 6 8
690/1,000 8 12
Fig. H2 : Peak value of impulse voltage according to normal service voltage of test specimen.
The degrees III and IV are degrees of pollution dened in IEC 60664-1
H4
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H - LV switchgear: functions & selection
Schneider Electric - Electrical installation guide 2013
1.3 Switchgear control
In broad terms control signies any facility for safely modifying a load-carrying
power system at all levels of an installation. The operation of switchgear is an
important part of power-system control.
Functional control
This control relates to all switching operations in normal service conditions for
energizing or de-energizing a part of a system or installation, or an individual piece
of equipment, item of plant, etc.
Switchgear intended for such duty must be installed at least:
b At the origin of any installation
b At the nal load circuit or circuits (one switch may control several loads)
Marking (of the circuits being controlled) must be clear and unambiguous.
In order to provide the maximum exibility and continuity of operation, particularly
where the switching device also constitutes the protection (e.g. a circuit-breaker or
switch-fuse) it is preferable to include a switch at each level of distribution, i.e. on
each outgoing way of all distribution and subdistribution boards.
The manuvre may be:
b Either manual (by means of an operating lever on the switch) or
b Electric, by push-button on the switch or at a remote location (load-shedding and
reconnection, for example)
These switches operate instantaneously (i.e. with no deliberate delay), and those
that provide protection are invariably omni-polar
(1)
.
The main circuit-breaker for the entire installation, as well as any circuit-breakers
used for change-over (from one source to another) must be omni-polar units.
Emergency switching - emergency stop
An emergency switching is intended to de-energize a live circuit which is, or could
become, dangerous (electric shock or re).
An emergency stop is intended to halt a movement which has become dangerous.
In the two cases:
b The emergency control device or its means of operation (local or at remote
location(s)) such as a large red mushroom-headed emergency-stop pushbutton must
be recognizable and readily accessible, in proximity to any position at which danger
could arise or be seen
b A single action must result in a complete switching-off of all live conductors
(2) (3)
b A break glass emergency switching initiation device is authorized, but in
unmanned installations the re-energizing of the circuit can only be achieved by
means of a key held by an authorized person
It should be noted that in certain cases, an emergency system of braking, may
require that the auxiliary supply to the braking-system circuits be maintained until
nal stoppage of the machinery.
Switching-off for mechanical maintenance work
This operation assures the stopping of a machine and its impossibility to be
inadvertently restarted while mechanical maintenance work is being carried out
on the driven machinery. The shutdown is generally carried out at the functional
switching device, with the use of a suitable safety lock and warning notice at the
switch mechanism.
(1) One break in each phase and (where appropriate) one
break in the neutral.
(2) Taking into account stalled motors.
(3) In a TN schema the PEN conductor must never be
opened, since it functions as a protective earthing wire as well
as the system neutral conductor.
1 The basic functions of
LV switchgear
Switchgear-control functions allow system
operating personnel to modify a loaded system
at any moment, according to requirements,
and include:
b Functional control (routine switching, etc.)
b Emergency switching
b Maintenance operations on the power system
H5
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 The switchgear
2.1 Elementary switching devices
Disconnector (or isolator) (see Fig. H5)
This switch is a manually-operated, lockable, two-position device (open/closed)
which provides safe isolation of a circuit when locked in the open position. Its
characteristics are dened in IEC 60947-3. A disconnector is not designed to make
or to break current
(1)
and no rated values for these functions are given in standards.
It must, however, be capable of withstanding the passage of short-circuit currents
and is assigned a rated short-time withstand capability, generally for 1 second,
unless otherwise agreed between user and manufacturer. This capability is normally
more than adequate for longer periods of (lower-valued) operational overcurrents,
such as those of motor-starting. Standardized mechanical-endurance, overvoltage,
and leakage-current tests, must also be satised.
Load-breaking switch (see Fig. H6)
This control switch is generally operated manually (but is sometimes provided with
electrical tripping for operator convenience) and is a non-automatic two-position
device (open/closed).
It is used to close and open loaded circuits under normal unfaulted circuit conditions.
It does not consequently, provide any protection for the circuit it controls.
IEC standard 60947-3 denes:
b The frequency of switch operation (600 close/open cycles per hour maximum)
b Mechanical and electrical endurance (generally less than that of a contactor)
b Current making and breaking ratings for normal and infrequent situations
When closing a switch to energize a circuit there is always the possibility that
an unsuspected short-circuit exists on the circuit. For this reason, load-break
switches are assigned a fault-current making rating, i.e. successful closure against
the electrodynamic forces of short-circuit current is assured. Such switches are
commonly referred to as fault-make load-break switches. Upstream protective
devices are relied upon to clear the short-circuit fault
Category AC-23 includes occasional switching of individual motors. The switching
of capacitors or of tungsten lament lamps shall be subject to agreement between
manufacturer and user.
The utilization categories referred to in Figure H7 do not apply to an equipment
normally used to start, accelerate and/or stop individual motors.
Example
A 100 A load-break switch of category AC-23 (inductive load) must be able:
b To make a current of 10 In (= 1,000 A) at a power factor of 0.35 lagging
b To break a current of 8 In (= 800 A) at a power factor of 0.45 lagging
b To withstand short duration short-circuit currents when closed
(1) i.e. a LV disconnector is essentially a dead system
switching device to be operated with no voltage on either side
of it, particularly when closing, because of the possibility of an
unsuspected short-circuit on the downstream side. Interlocking
with an upstream switch or circuit-breaker is frequently used.
Fig. H7 : Utilization categories of LV AC switches according to IEC 60947-3
Fig. H5 : Symbol for a disconnector (or isolator)
Fig. H6 : Symbol for a load-break switch
Utilization category Typical applications Cos Making Breaking
Frequent Infrequent current x In current x In
operations operations
AC-20A AC-20B Connecting and disconnecting - - -
under no-load conditions
AC-21A AC-21B Switching of resistive loads 0.95 1.5 1.5
including moderate overloads
AC-22A AC-22B Switching of mixed resistive 0.65 3 3
and inductive loads, including
moderate overloads
AC-23A AC-23B Switching of motor loads or 0.45 for I y 100 A 10 8
other highly inductive loads 0.35 for I > 100 A
H - LV switchgear: functions & selection
H6
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H - LV switchgear: functions & selection
Schneider Electric - Electrical installation guide 2013
Remote control switch (see Fig. H8)
This device is extensively used in the control of lighting circuits where the depression
of a pushbutton (at a remote control position) will open an already-closed switch or
close an opened switch in a bistable sequence.
Typical applications are:
b Two-way switching on stairways of large buildings
b Stage-lighting schemes
b Factory illumination, etc.
Auxiliary devices are available to provide:
b Remote indication of its state at any instant
b Time-delay functions
b Maintained-contact features
Contactor (see Fig. H9)
The contactor is a solenoid-operated switching device which is generally held
closed by (a reduced) current through the closing solenoid (although various
mechanically-latched types exist for specic duties). Contactors are designed to
carry out numerous close/open cycles and are commonly controlled remotely by
on-off pushbuttons. The large number of repetitive operating cycles is standardized in
table VIII of IEC 60947-4-1 by:
b The operating duration: 8 hours; uninterrupted; intermittent; temporary of 3, 10, 30,
60 and 90 minutes
b Utilization category: for example, a contactor of category AC3 can be used for the
starting and stopping of a cage motor
b The start-stop cycles (1 to 1,200 cyles per hour)
b Mechanical endurance (number of off-load manuvres)
b Electrical endurance (number of on-load manuvres)
b A rated current making and breaking performance according to the category of
utilization concerned
Example:
A 150 A contactor of category AC3 must have a minimum current-breaking capability
of 8 In (= 1,200 A) and a minimum current-making rating of 10 In (= 1,500 A) at a
power factor (lagging) of 0.35.
Discontactor
(1)
A contactor equipped with a thermal-type relay for protection against overloading
denes a discontactor. Discontactors are used extensively for remote push-button
control of lighting circuits, etc., and may also be considered as an essential element
in a motor controller, as noted in sub-clause 2.2. combined switchgear elements.
The discontactor is not the equivalent of a circuit-breaker, since its short-circuit
current breaking capability is limited to 8 or 10 In. For short-circuit protection
therefore, it is necessary to include either fuses or a circuit-breaker in series with,
and upstream of, the discontactor contacts.
Fuses (see Fig. H10)
The rst letter indicates the breaking range:
b g fuse-links (full-range breaking-capacity fuse-link)
b a fuse-links (partial-range breaking-capacity fuse-link)
The second letter indicates the utilization category; this letter denes with accuracy
the time-current characteristics, conventional times and currents, gates.
For example
b gG indicates fuse-links with a full-range breaking capacity for general application
b gM indicates fuse-links with a full-range breaking capacity for the protection of
motor circuits
b aM indicates fuse-links with a partial range breaking capacity for the protection of
motor circuits
Fuses exist with and without fuse-blown mechanical indicators. Fuses break a
circuit by controlled melting of the fuse element when a current exceeds a given
value for a corresponding period of time; the current/time relationship being
presented in the form of a performance curve for each type of fuse. Standards dene
two classes of fuse:
b Those intended for domestic installations, manufactured in the form of a cartridge
for rated currents up to 100 A and designated type gG in IEC 60269-1 and 3
b Those for industrial use, with cartridge types designated gG (general use); and gM
and aM (for motor-circuits) in IEC 60269-1 and 2
Fig. H8 : Symbol for a bistable remote control switch
Control
circuit
Power
circuit
Fig. H9 : Symbol for a contactor
(1) This term is not dened in IEC publications but is commonly
used in some countries.
Two classes of LV cartridge fuse are very
widely used:
b For domestic and similar installations type gG
b For industrial installations type gG, gM or aM
Fig. H10 : Symbol for fuses
H7
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
The main differences between domestic and industrial fuses are the nominal
voltage and current levels (which require much larger physical dimensions) and
their fault-current breaking capabilities. Type gG fuse-links are often used for the
protection of motor circuits, which is possible when their characteristics are capable
of withstanding the motor-starting current without deterioration.
A more recent development has been the adoption by the IEC of a fuse-type gM for
motor protection, designed to cover starting, and short-circuit conditions. This type of
fuse is more popular in some countries than in others, but at the present time the
aM fuse in combination with a thermal overload relay is more-widely used.
A gM fuse-link, which has a dual rating is characterized by two current values. The
rst value In denotes both the rated current of the fuse-link and the rated current of
the fuseholder; the second value Ich denotes the time-current characteristic of the
fuse-link as dened by the gates in Tables II, III and VI of IEC 60269-1.
These two ratings are separated by a letter which denes the applications.
For example: In M Ich denotes a fuse intended to be used for protection of
motor circuits and having the characteristic G. The rst value In corresponds to
the maximum continuous current for the whole fuse and the second value Ich
corresponds to the G characteristic of the fuse link. For further details see note at the
end of sub-clause 2.1.
An aM fuse-link is characterized by one current value In and time-current
characteristic as shown in Figure H14 next page.
Important: Some national standards use a gI (industrial) type fuse, similar in all main
essentails to type gG fuses.
Type gI fuses should never be used, however, in domestic and similar installations.
Fusing zones - conventional currents
The conditions of fusing (melting) of a fuse are dened by standards, according to
their class.
Class gG fuses
These fuses provide protection against overloads and short-circuits.
Conventional non-fusing and fusing currents are standardized, as shown in
Figure H12 and in Figure H13.
b The conventional non-fusing current Inf is the value of current that the fusible
element can carry for a specied time without melting.
Example: A 32 A fuse carrying a current of 1.25 In (i.e. 40 A) must not melt in less
than one hour (table H13)
b The conventional fusing current If (= I2 in Fig. H12) is the value of current which
will cause melting of the fusible element before the expiration of the specied time.
Example: A 32 A fuse carrying a current of 1.6 In (i.e. 52.1 A) must melt in one hour
or less
IEC 60269-1 standardized tests require that a fuse-operating characteristic lies
between the two limiting curves (shown in Figure H12) for the particular fuse under
test. This means that two fuses which satisfy the test can have signicantly different
operating times at low levels of overloading.
gM fuses require a separate overload relay, as
described in the note at the end of this sub-clause
2.1.
1 hour
t
Minimum
pre-arcing
time curve
Fuse-blow
curve
I
Inf I2
2 The switchgear
Fig. H12 : Zones of fusing and non-fusing for gG and gM fuses
(1) Ich for gM fuses
Fig. H13 : Zones of fusing and non-fusing for LV types gG and gM class fuses (IEC 60269-1
and 60269-2-1)
Rated current
(1)
Conventional non- Conventional Conventional
In (A) fusing current fusing current time (h)
Inf I2
In y 4 A 1.5 In 2.1 In 1
4 < In < 16 A 1.5 In 1.9 In 1
16 < In y 63 A 1.25 In 1.6 In 1
63 < In y 160 A 1.25 In 1.6 In 2
160 < In y 400 A 1.25 In 1.6 In 3
400 < In 1.25 In 1.6 In 4
H8
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H - LV switchgear: functions & selection
Schneider Electric - Electrical installation guide 2013
b The two examples given above for a 32 A fuse, together with the foregoing notes
on standard test requirements, explain why these fuses have a poor performance in
the low overload range
b It is therefore necessary to install a cable larger in ampacity than that normally
required for a circuit, in order to avoid the consequences of possible long term
overloading (60% overload for up to one hour in the worst case)
By way of comparison, a circuit-breaker of similar current rating:
b Which passes 1.05 In must not trip in less than one hour; and
b When passing 1.25 In it must trip in one hour, or less (25% overload for up to one
hour in the worst case)
Class aM (motor) fuses
These fuses afford protection against short-circuit currents only and must necessarily
be associated with other switchgear (such as discontactors or circuit-breakers) in
order to ensure overload protection < 4 In. They are not therefore autonomous. Since
aM fuses are not intended to protect against low values of overload current, no levels
of conventional non-fusing and fusing currents are xed. The characteristic curves for
testing these fuses are given for values of fault current exceeding approximately 4 In
(see Fig. H14), and fuses tested to IEC 60269 must give operating curves which fall
within the shaded area.
Note: the small arrowheads in the diagram indicate the current/time gate values
for the different fuses to be tested (IEC 60269).
Rated short-circuit breaking currents
A characteristic of modern cartridge fuses is that, owing to the rapidity of fusion
in the case of high short-circuit current levels
(1)
, a current cut-off begins before
the occurrence of the rst major peak, so that the fault current never reaches its
prospective peak value (see Fig. H15).
This limitation of current reduces signicantly the thermal and dynamic stresses
which would otherwise occur, thereby minimizing danger and damage at the fault
position. The rated short-circuit breaking current of the fuse is therefore based on the
rms value of the AC component of the prospective fault current.
No short-circuit current-making rating is assigned to fuses.
Reminder
Short-circuit currents initially contain DC components, the magnitude and duration of
which depend on the XL/R ratio of the fault current loop.
Close to the source (MV/LV transformer) the relationship Ipeak / Irms (of
AC component) immediately following the instant of fault, can be as high as 2.5
(standardized by IEC, and shown in Figure H16 next page).
At lower levels of distribution in an installation, as previously noted, XL is small
compared with R and so for nal circuits Ipeak / Irms ~ 1.41, a condition which
corresponds with Figure H15.
The peak-current-limitation effect occurs only when the prospective rms
AC component of fault current attains a certain level. For example, in the Figure H16
graph, the 100 A fuse will begin to cut off the peak at a prospective fault current
(rms) of 2 kA (a). The same fuse for a condition of 20 kA rms prospective current
will limit the peak current to 10 kA (b). Without a current-limiting fuse the peak
current could attain 50 kA (c) in this particular case. As already mentioned, at lower
distribution levels in an installation, R greatly predominates XL, and fault levels are
generally low. This means that the level of fault current may not attain values high
enough to cause peak current limitation. On the other hand, the DC transients (in this
case) have an insignicant effect on the magnitude of the current peak, as previously
mentioned.
Note: On gM fuse ratings
A gM type fuse is essentially a gG fuse, the fusible element of which corresponds to
the current value Ich (ch = characteristic) which may be, for example, 63 A. This is
the IEC testing value, so that its time/ current characteristic is identical to that of a
63 A gG fuse.
This value (63 A) is selected to withstand the high starting currents of a motor, the
steady state operating current (In) of which may be in the 10-20 A range.
This means that a physically smaller fuse barrel and metallic parts can be used,
since the heat dissipation required in normal service is related to the lower gures
(10-20 A). A standard gM fuse, suitable for this situation would be designated 32M63
(i.e. In M Ich).
The rst current rating In concerns the steady-load thermal performance of the
fuselink, while the second current rating (Ich) relates to its (short-time) starting-
current performance. It is evident that, although suitable for short-circuit protection,
Class aM fuses protect against short-circuit
currents only, and must always be associated
with another device which protects against
overload
(1) For currents exceeding a certain level, depending on the
fuse nominal current rating, as shown below in Figure H16.
x I n
t
4 I n
Fuse- b l o wn
cu r v e
Mini m um
pre-arcing
time cu r v e
Fig. H14 : Standardized zones of fusing for type aM fuses (all
current ratings)
I
0.005 s
0.02 s
0.01 s
t
Prospective
fault-current peak
rms value of the AC
component of the
prospective fault curent
Current peak
limited by the fuse
Tf Ta
Ttc
Tf: Fuse pre-arc fusing time
Ta: Arcing time
Ttc: Total fault-clearance time
Fig. H15 : Current limitation by a fuse
H9
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
overload protection for the motor is not provided by the fuse, and so a separate
thermal-type relay is always necessary when using gM fuses. The only advantage
offered by gM fuses, therefore, when compared with aM fuses, are reduced physical
dimensions and slightly lower cost.
2.2 Combined switchgear elements
Single units of switchgear do not, in general, full all the requirements of the three
basic functions, viz: Protection, control and isolation.
Where the installation of a circuit-breaker is not appropriate (notably where the
switching rate is high, over extended periods) combinations of units specically
designed for such a performance are employed. The most commonly-used
combinations are described below.
Switch and fuse combinations
Two cases are distinguished:
b The type in which the operation of one (or more) fuse(s) causes the switch to open.
This is achieved by the use of fuses tted with striker pins, and a system of switch
tripping springs and toggle mechanisms (see Fig. H17)
b The type in which a non-automatic switch is associated with a set of fuses in a
common enclosure.
In some countries, and in IEC 60947-3, the terms switch-fuse and fuse-switch
have specic meanings, viz:
v A switch-fuse comprises a switch (generally 2 breaks per pole) on the upstream
side of three xed fuse-bases, into which the fuse carriers are inserted (see Fig. H18)
v A fuse-switch consists of three switch blades each constituting a double-break per
phase.
These blades are not continuous throughout their length, but each has a gap in the
centre which is bridged by the fuse cartridge. Some designs have only a single break
per phase, as shown in Figure H19.
Fig. H17 : Symbol for an automatic tripping switch-fuse
Fig. H19 : Symbol for a non-automatic switch-fuse
Fig. H18 : Symbol for a non-automatic fuse-switch
2 The switchgear
Fig. H16 : Limited peak current versus prospective rms values
of the AC component of fault current for LV fuses
1 2 5 10 20 50 100
1
2
5
10
20
50
100
(a)
(b)
(c)
Peak current
cut-off
characteristic
curves
Maximum possible current
peak characteristic
i.e. 2.5 Irms (IEC)
160A
100A
50A
Nominal
fuse
ratings
Prospective fault
current (kA) peak
AC component of prospective
fault current (kA) rms
Fig. H20 : Symbol for a fuse disconnector + discontactor
Fig. H21 : Symbol for a fuse-switch disconnector + discontactor
The current range for these devices is limited to 100 A maximum at 400 V 3-phase,
while their principal use is in domestic and similar installations. To avoid confusion
between the rst group (i.e. automatic tripping) and the second group, the term
switch-fuse should be qualied by the adjectives automatic or non-automatic.
Fuse disconnector + discontactor
Fuse - switch-disconnector + discontactor
As previously mentioned, a discontactor does not provide protection against short-
circuit faults. It is necessary, therefore, to add fuses (generally of type aM) to perform
this function. The combination is used mainly for motor control circuits, where the
disconnector or switch-disconnector allows safe operations such as:
b The changing of fuse links (with the circuit isolated)
b Work on the circuit downstream of the discontactor (risk of remote closure of the
discontactor)
The fuse-disconnector must be interlocked with the discontactor such that no opening
or closing manuvre of the fuse disconnector is possible unless the discontactor is
open ( Figure H20), since the fuse disconnector has no load-switching capability.
A fuse-switch-disconnector (evidently) requires no interlocking (Figure H21).
The switch must be of class AC22 or AC23 if the circuit supplies a motor.
Circuit-breaker + contactor
Circuit-breaker + discontactor
These combinations are used in remotely controlled distribution systems in which the
rate of switching is high, or for control and protection of a circuit supplying motors.
3 Choice of switchgear
3.1 Switchgear selection
Software is being used more and more in the eld of optimal selection of switchgear.
Each circuit is considered one at a time, and a list is drawn up of the required
protection functions and exploitation of the installation, among those mentioned in
Figure H22 and summarized in Figure H1.
A number of switchgear combinations are studied and compared with each other
against relevant criteria, with the aim of achieving:
b Satisfactory performance
b Compatibility among the individual items; from the rated current In to the fault-level
rating Icu
b Compatibility with upstream switchgear or taking into account its contribution
b Conformity with all regulations and specications concerning safe and reliable
circuit performance
In order to determine the number of poles for an item of switchgear, reference is
made to chapter G, clause 7 Fig. G64. Multifunction switchgear, initially more costly,
reduces installation costs and problems of installation or exploitation. It is often found
that such switchgear provides the best solution.
3.2 Tabulated functional capabilities of LV
switchgear
After having studied the basic functions of LV switchgear (clause 1, Figure H1) and
the different components of switchgear (clause 2), Figure H22 summarizes the
capabilities of the various components to perform the basic functions.
(1) Where cut-off of all active conductors is provided
(2) It may be necessary to maintain supply to a braking system
(3) If it is associated with a thermal relay (the combination is commonly referred to as a discontactor)
(4) In certain countries a disconnector with visible contacts is mandatory at the origin of a LV installation supplied directly from a MV/LV transformer
(5) Certain items of switchgear are suitable for isolation duties (e.g. RCCBs according to IEC 61008) without being explicitly marked as such
Isolation Control Electrical protection
Switchgear Functional Emergency Emergency Switching for Overload Short-circuit Electric
item switching stop mechanical shock
(mechanical) maintenance
Isolator (or b
disconnector)
(4)
Switch
(5)
b b b
(1)
b
(1) (2)
b
Residual b b b
(1)
b
(1) (2)
b b
device
(RCCB)
(5)
Switch- b b b
(1)
b
(1) (2)
b
disconnector
Contactor b b
(1)
b
(1) (2)
b b
(3)
Remote control b b
(1)
b
switch
Fuse b b b
Circuit b b
(1)
b
(1) (2)
b b b
breaker
Circuit-breaker b b b
(1)
b
(1) (2)
b b b
disconnector
(5)
Residual b b b
(1)
b
(1) (2)
b b b b
and overcurrent
circuit-breaker
(RCBO)
(5)
Point of Origin of each All points where, In general at the At the supply At the supply Origin of each Origin of each Origin of circuits
installation circuit for operational incoming circuit point to each point to each circuit circuit where the
(general reasons it may to every machine machine earthing system
principle) be necessary distribution and/or on the is appropriate
to stop the board machine TN-S, IT, TT
process concerned
Fig. H22 : Functions fullled by different items of switchgear
H - LV switchgear: functions & selection H - LV switchgear: functions & selection
H10
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Schneider Electric - Electrical installation guide 2013
H11
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Circuit-breaker
The circuit-breaker/disconnector fullls all of the
basic switchgear functions, while, by means of
accessories, numerous other possibilities exist
As shown in Figure H23 the circuit-breaker/ disconnector is the only item of
switchgear capable of simultaneously satisfying all the basic functions necessary in
an electrical installation.
Moreover, it can, by means of auxiliary units, provide a wide range of other functions,
for example: indication (on-off - tripped on fault); undervoltage tripping; remote
control etc. These features make a circuit-breaker/ disconnector the basic unit of
switchgear for any electrical installation.
Fig. H23 : Functions performed by a circuit-breaker/disconnector
4.1 Standards and description
Standards
For industrial LV installations the relevant IEC standards are, or are due to be:
b 60947-1: general rules
b 60947-2: part 2: circuit-breakers
b 60947-3: part 3: switches, disconnectors, switch-disconnectors and fuse
combination units
b 60947-4: part 4: contactors and motor starters
b 60947-5: part 5: control-circuit devices and switching elements
b 60947-6: part 6: multiple function switching devices
b 60947-7: part 7: ancillary equipment
b 60947-8: Part 8: Control units for built-in thermal protection (PTC) for rotating
electrical machines.
For domestic and similar LV installations, the appropriate standard is IEC 60898, or
an equivalent national standard.
Description
Figure H24 shows schematically the main parts of a LV circuit-breaker and its four
essential functions:
b The circuit-breaking components, comprising the xed and moving contacts and
the arc-dividing chamber
b The latching mechanism which becomes unlatched by the tripping device on
detection of abnormal current conditions
This mechanism is also linked to the operation handle of the breaker.
b A trip-mechanism actuating device:
v Either: a thermal-magnetic device, in which a thermally-operated bi-metal strip
detects an overload condition, while an electromagnetic striker pin operates at
current levels reached in short-circuit conditions, or
v An electronic relay operated from current transformers, one of which is installed on
each phase
b A space allocated to the several types of terminal currently used for the main
power circuit conductors
Domestic circuit-breakers (see Fig. H25 next page) complying with IEC 60898 and
similar national standards perform the basic functions of:
b Isolation
b Protection against overcurrent
Power circuit terminals
Trip mechanism and
protective devices
Latching mechanism
Contacts and arc-diving
chamber
Fool-proof mechanical
indicator
Fig. H24 : Main parts of a circuit-breaker
Industrial circuit-breakers must comply with
IEC 60947-1 and 60947-2 or other equivalent
standards.
Domestic-type circuit-breakers must comply with
IEC standard 60898, or an equivalent national
standard
Functions Possible conditions
Isolation b
Control Functional b
Emergency switching b (With the possibility of a tripping
coil for remote control)
Switching-off for mechanical b
maintenance
Protection Overload b
Short-circuit b
Insulation fault b (With differential-current relay)
Undervoltage b (With undervoltage-trip coil)
Remote control b Added or incorporated
Indication and measurement b (Generally optional with an
electronic tripping device)
H - LV switchgear: functions & selection
H12
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H - LV switchgear: functions & selection
Schneider Electric - Electrical installation guide 2013
Some models can be adapted to provide sensitive detection (30 mA) of earth-
leakage current with CB tripping, by the addition of a modular block, while other
models (RCBOs, complying with IEC 61009 and CBRs complying with IEC 60947-2
Annex B) have this residual current feature incorporated as shown in Figure H26.
Apart from the above-mentioned functions further features can be associated with
the basic circuit-breaker by means of additional modules, as shown in Figure H27;
notably remote control and indication (on-off-fault).
O-OFF
O-OFF
O-OFF
-
-
1
2
3
4
5
Fig. H27 : Acti 9 system
of LV modular switchgear components
Fig. H29 : Example of air circuit-breakers. Masterpact
provides many control features in its
Micrologic tripping unit
Moulded-case circuit-breakers complying with IEC 60947-2 are available from 100
to 630 A and provide a similar range of auxiliary functions to those described above
(see Figure H28).
Air circuit-breakers of large current ratings, complying with IEC 60947-2, are
generally used in the main switch board and provide protector for currents from
630 A to 6300 A, typically.(see Figure H29).
In addition to the protection functions, the Micrologic unit provides optimized
functions such as measurement (including power quality functions), diagnosis,
communication, control and monitoring.
Fig. H25 : Domestic-type circuit-breaker providing overcurrent
protection and circuit isolation features
Fig. H26 : Domestic-type circuit-breaker as above (Fig. H25)
with incorparated protection against electric shocks
Fig. H28 : Example of a Compact NSX industrial type of circuit-
breaker capable of numerous auxiliary functions
H13
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Circuit-breaker
4.2 Fundamental characteristics of a circuit-breaker
The fundamental characteristics of a circuit-breaker are:
b Its rated voltage Ue
b Its rated current In
b Its tripping-current-level adjustment ranges for overload protection (Ir
(1)
or Irth
(1)
)
and for short-circuit protection (Im)
(1)
b Its short-circuit current breaking rating (Icu for industrial CBs; Icn for domestic-
type CBs).
Rated operational voltage (Ue)
This is the voltage at which the circuit-breaker has been designed to operate, in
normal (undisturbed) conditions.
Other values of voltage are also assigned to the circuit-breaker, corresponding to
disturbed conditions, as noted in sub-clause 4.3.
Rated current (In)
This is the maximum value of current that a circuit-breaker, tted with a specied
overcurrent tripping relay, can carry indenitely at an ambient temperature stated by
the manufacturer, without exceeding the specied temperature limits of the current
carrying parts.
Example
A circuit-breaker rated at In = 125 A for an ambient temperature of 40 C will be
equipped with a suitably calibrated overcurrent tripping relay (set at 125 A). The
same circuit-breaker can be used at higher values of ambient temperature however,
if suitably derated. Thus, the circuit-breaker in an ambient temperature of 50 C
could carry only 117 A indenitely, or again, only 109 A at 60 C, while complying
with the specied temperature limit.
Derating a circuit-breaker is achieved therefore, by reducing the trip-current setting
of its overload relay, and marking the CB accordingly. The use of an electronic-type
of tripping unit, designed to withstand high temperatures, allows circuit-breakers
(derated as described) to operate at 60 C (or even at 70 C) ambient.
Note: In for circuit-breakers (in IEC 60947-2) is equal to Iu for switchgear generally,
Iu being the rated uninterrupted current.
Frame-size rating
A circuit-breaker which can be tted with overcurrent tripping units of different current
level-setting ranges, is assigned a rating which corresponds to the highest current-
level-setting tripping unit that can be tted.
Example
A Compact NSX630N circuit-breaker can be equipped with 11 electronic trip units
from 150 A to 630 A. The size of the circuit-breaker is 630 A.
Overload relay trip-current setting (Irth or Ir)
Apart from small circuit-breakers which are very easily replaced, industrial circuit-
breakers are equipped with removable, i.e. exchangeable, overcurrent-trip relays.
Moreover, in order to adapt a circuit-breaker to the requirements of the circuit
it controls, and to avoid the need to install over-sized cables, the trip relays are
generally adjustable. The trip-current setting Ir or Irth (both designations are
in common use) is the current above which the circuit-breaker will trip. It also
represents the maximum current that the circuit-breaker can carry without tripping.
That value must be greater than the maximum load current IB, but less than the
maximum current permitted in the circuit Iz (see chapter G, sub-clause 1.3).
The thermal-trip relays are generally adjustable from 0.7 to 1.0 times In, but when
electronic devices are used for this duty, the adjustment range is greater; typically 0.4
to 1 times In.
Example (see Fig. H30)
A NSX630N circuit-breaker equipped with a 400 A Micrologic 6.3E overcurrent trip
relay, set at 0.9, will have a trip-current setting:
Ir = 400 x 0.9 = 360 A
Note: For circuit-breakers equipped with non-adjustable overcurrent-trip relays,
Ir = In. Example: for iC60N 20 A circuit-breaker, Ir = In = 20 A.
(1) Current-level setting values which refer to the current-
operated thermal and instantaneous magnetic tripping
devices for over-load and short-circuit protection.
0.4 In
160 A 360 A 400 A 630 A
Rated current of
the tripping unit
In
Overload trip
current setting
Ir
Adjustment
range
Circuit breaker
frame-size rating
Fig. H30 : Example of a NSX630N circuit-breaker equipped with
a Micrologic 6.3E trip unit adjusted to 0.9, to give Ir = 360 A
H14
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H - LV switchgear: functions & selection
Schneider Electric - Electrical installation guide 2013
Short-circuit relay trip-current setting (Im)
Short-circuit tripping relays (instantaneous or slightly time-delayed) are intended to
trip the circuit-breaker rapidly on the occurrence of high values of fault current. Their
tripping threshold Im is:
b Either xed by standards for domestic type CBs, e.g. IEC 60898, or,
b Indicated by the manufacturer for industrial type CBs according to related
standards, notably IEC 60947-2.
For the latter circuit-breakers there exists a wide variety of tripping devices which
allow a user to adapt the protective performance of the circuit-breaker to the
particular requirements of a load (see Fig. H31, Fig. H32 and Fig. H33).
Fig. H31 : Tripping-current ranges of overload and short-circuit protective devices for LV circuit-breakers
I(A
Im
t (s )
Ir
Icu Ii
Fig. H33 : Performance curve of a circuit-breaker electronic protective scheme
Ir: Overload (thermal or long-delay) relay trip-current
setting
Im: Short-circuit (magnetic or short-delay) relay trip-
current setting
Ii: Short-circuit instantaneous relay trip-current setting.
Icu: Breaking capacity
I(A
Im
t (s )
Ir
Icu
Fig. H32 : Performance curve of a circuit-breaker thermal-
magnetic protective scheme
(1) 50 In in IEC 60898, which is considered to be unrealistically high by most European manufacturers (Schneider Electric = 10 to 14 In).
(2) For industrial use, IEC standards do not specify values. The above values are given only as being those in common use.
Type of Overload Short-circuit protection
protective protection
relay
Domestic Thermal- Ir = In Low setting Standard setting High setting circuit
breakers magnetic type B type C type D
IEC 60898 3 In y Im y 5 In 5 In y Im y 10 In 10 In y Im y 20 In
(1)
Modular Thermal- Ir = In Low setting Standard setting High setting
industrial
(2)
magnetic xed type B or Z type C type D or K
circuit-breakers 3.2 In y xed y 4.8 In 7 In y xed y 10 In 10 In y xed y 14 In
Industrial
(2)
Thermal- Ir = In xed Fixed: Im = 7 to 10 In
circuit-breakers magnetic Adjustable: Adjustable:
IEC 60947-2 0.7 In y Ir y In - Low setting : 2 to 5 In
- Standard setting: 5 to 10 In
Electronic Long delay Short-delay, adjustable
0.4 In y Ir y In 1.5 Ir y Im y 10 Ir
Instantaneous (I) xed
I = 12 to 15 In
H15
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Isolating feature
A circuit-breaker is suitable for isolating a circuit if it fullls all the conditions
prescribed for a disconnector (at its rated voltage) in the relevant standard (see
sub-clause 1.2). In such a case it is referred to as a circuit-breaker-disconnector and
marked on its front face with the symbol
All Acti 9, Compact NSX and Masterpact LV switchgear of Schneider Electric ranges
are in this category.
Rated short-circuit breaking capacity (Icu or Icn)
The short-circuit current-breaking rating of a CB is the highest (prospective) value
of current that the CB is capable of breaking without being damaged. The value
of current quoted in the standards is the rms value of the AC component of the
fault current, i.e. the DC transient component (which is always present in the worst
possible case of short-circuit) is assumed to be zero for calculating the standardized
value. This rated value (Icu) for industrial CBs and (Icn) for domestic-type CBs is
normally given in kA rms.
Icu (rated ultimate s.c. breaking capacity) and Ics (rated service s.c. breaking
capacity) are dened in IEC 60947-2 together with a table relating Ics with Icu for
different categories of utilization A (instantaneous tripping) and B (time-delayed
tripping) as discussed in subclause 4.3.
Tests for proving the rated s.c. breaking capacities of CBs are governed by
standards, and include:
b Operating sequences, comprising a succession of operations, i.e. closing and
opening on short-circuit
b Current and voltage phase displacement. When the current is in phase with the
supply voltage (cos for the circuit = 1), interruption of the current is easier than
that at any other power factor. Breaking a current at low lagging values of cos is
considerably more difcult to achieve; a zero power-factor circuit being (theoretically)
the most onerous case.
In practice, all power-system short-circuit fault currents are (more or less) at lagging
power factors, and standards are based on values commonly considered to be
representative of the majority of power systems. In general, the greater the level of
fault current (at a given voltage), the lower the power factor of the fault-current loop,
for example, close to generators or large transformers.
Figure H34 below extracted from IEC 60947-2 relates standardized values of cos
to industrial circuit-breakers according to their rated Icu.
b Following an open - time delay - close/open sequence to test the Icu capacity of a
CB, further tests are made to ensure that:
v The dielectric withstand capability
v The disconnection (isolation) performance and
v The correct operation of the overload protection
have not been impaired by the test.
4.3 Other characteristics of a circuit-breaker
Rated insulation voltage (Ui)
This is the value of voltage to which the dielectric tests voltage (generally greater
than 2 Ui) and creepage distances are referred to.
The maximum value of rated operational voltage must never exceed that of the rated
insulation voltage, i.e. Ue y Ui.
Familiarity with the following characteristics of
LV circuit-breakers is often necessary when
making a nal choice.
4 Circuit-breaker
The short-circuit current-breaking performance
of a LV circuit-breaker is related (approximately)
to the cos of the fault-current loop. Standard
values for this relationship have been
established in some standards
Icu cos
6 kA < Icu y 10 kA 0.5
10 kA < Icu y 20 kA 0.3
20 kA < Icu y 50 kA 0.25
50 kA < Icu 0.2
Fig. H34 : Icu related to power factor (cos ) of fault-current circuit (IEC 60947-2)
H16
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H - LV switchgear: functions & selection
Schneider Electric - Electrical installation guide 2013
Rated impulse-withstand voltage (Uimp)
This characteristic expresses, in kV peak (of a prescribed form and polarity) the value
of voltage which the equipment is capable of withstanding without failure, under test
conditions.
Generally, for industrial circuit-breakers, Uimp = 8 kV and for domestic types,
Uimp = 6 kV.
Category (A or B) and rated short-time withstand current (Icw)
As already briey mentioned (sub-clause 4.2) there are two categories of
LV industrial switchgear, A and B, according to IEC 60947-2:
b Those of category A, for which there is no deliberate delay in the operation of the
instantaneous short-circuit magnetic tripping device (see Fig. H35), are generally
moulded-case type circuit-breakers, and
b Those of category B for which, in order to discriminate with other circuit-breakers
on a time basis, it is possible to delay the tripping of the CB, where the fault-current
level is lower than that of the short-time withstand current rating (Icw) of the CB
(see Fig. H36). This is generally applied to large open-type circuit-breakers and
to certain heavy-duty moulded-case types. Icw is the maximum current that the B
category CB can withstand, thermally and electrodynamically, without sustaining
damage, for a period of time given by the manufacturer.
Rated making capacity (Icm)
Icm is the highest instantaneous value of current that the circuit-breaker can
establish at rated voltage in specied conditions. In AC systems this instantaneous
peak value is related to Icu (i.e. to the rated breaking current) by the factor k, which
depends on the power factor (cos ) of the short-circuit current loop (as shown in
Figure H37 ).
In a correctly designed installation, a circuit-
breaker is never required to operate at its
maximum breaking current Icu. For this reason
a new characteristic Ics has been introduced.
It is expressed in IEC 60947-2 as a percentage
of Icu (25, 50, 75, 100%)
Icu cos Icm = kIcu
6 kA < Icu y 10 kA 0.5 1.7 x Icu
10 kA < Icu y 20 kA 0.3 2 x Icu
20 kA < Icu y 50 kA 0.25 2.1 x Icu
50 kA y Icu 0.2 2.2 x Icu
Fig. H37 : Relation between rated breaking capacity Icu and rated making capacity Icm at
different power-factor values of short-circuit current, as standardized in IEC 60947-2
Example: A Masterpact NW08H2 circuit-breaker has a rated breaking capacity
Icu of 100 kA. The peak value of its rated making capacity Icm will be
100 x 2.2 = 220 kA.
Rated service short-circuit breaking capacity (Ics)
The rated breaking capacity (Icu) or (Icn) is the maximum fault-current a circuit-
breaker can successfully interrupt without being damaged. The probability of such
a current occurring is extremely low, and in normal circumstances the fault-currents
are considerably less than the rated breaking capacity (Icu) of the CB. On the other
hand it is important that high currents (of low probability) be interrupted under good
conditions, so that the CB is immediately available for reclosure, after the faulty
circuit has been repaired. It is for these reasons that a new characteristic (Ics) has
been created, expressed as a percentage of Icu, viz: 25, 50, 75, 100% for industrial
circuit-breakers. The standard test sequence is as follows:
b O - CO - CO
(1)
(at Ics)
b Tests carried out following this sequence are intended to verify that the CB is in a
good state and available for normal service
For domestic CBs, Ics = k Icn. The factor k values are given in IEC 60898 table XIV.
In Europe it is the industrial practice to use a k factor of 100% so that Ics = Icu.
(1) O represents an opening operation.
CO represents a closing operation followed by an opening
operation.
I(A)
Im
t (s)
Fig. H35 : Category A circuit-breaker
I(A )
Im
t (s )
Icu Icw I
Fig. H36 : Category B circuit-breaker
H17
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Circuit-breaker
Fault-current limitation
The fault-current limitation capacity of a CB concerns its ability, more or less
effective, in preventing the passage of the maximum prospective fault-current,
permitting only a limited amount of current to ow, as shown in Figure H38.
The current-limitation performance is given by the CB manufacturer in the form of
curves (see Fig. H39).
b Diagram (a) shows the limited peak value of current plotted against the rms
value of the AC component of the prospective fault current (prospective fault-
current refers to the fault-current which would ow if the CB had no current-limiting
capability)
b Limitation of the current greatly reduces the thermal stresses (proportional I
2
t) and
this is shown by the curve of diagram (b) of Figure H39, again, versus the rms value
of the AC component of the prospective fault current.
LV circuit-breakers for domestic and similar installations are classied in certain
standards (notably European Standard EN 60 898). CBs belonging to one class (of
current limiters) have standardized limiting I
2
t let-through characteristics dened by
that class.
In these cases, manufacturers do not normally provide characteristic performance
curves.
Many designs of LV circuit-breakers feature
a short-circuit current limitation capability,
whereby the current is reduced and prevented
from reaching its (otherwise) maximum peak
value (see Fig. H38). The current-limitation
performance of these CBs is presented in
the form of graphs, typied by that shown in
Figure H39, diagram (a)
150 kA
Limited
current peak
(A
2
x s)
2.10
5
4,5.10
5
Prospective AC
component (rms)
a)
Limited
current
peak
(kA)
N
o
n
-
l
i
m
i
t
e
d
c
u
r
r
e
n
t
c
h
a
r
a
c
t
e
r
i
s
t
i
c
s
150 kA
22
Prospective AC
component (rms)
b)
Fig. H39 : Performance curves of a typical LV current-limiting circuit-breaker
Current limitation reduces both thermal and
electrodynamic stresses on all circuit elements
through which the current passes, thereby
prolonging the useful life of these elements.
Furthermore, the limitation feature allows
cascading techniques to be used (see 4.5)
thereby signicantly reducing design and
installation costs
The advantages of current limitation
The use of current-limiting CBs affords numerous advantages:
b Better conservation of installation networks: current-limiting CBs strongly attenuate
all harmful effects associated with short-circuit currents
b Reduction of thermal effects: Conductors (and therefore insulation) heating is
signicantly reduced, so that the life of cables is correspondingly increased
b Reduction of mechanical effects: forces due to electromagnetic repulsion are lower,
with less risk of deformation and possible rupture, excessive burning of contacts, etc.
b Reduction of electromagnetic-interference effects:
v Less inuence on measuring instruments and associated circuits,
telecommunication systems, etc.
These circuit-breakers therefore contribute towards an improved exploitation of:
b Cables and wiring
b Prefabricated cable-trunking systems
b Switchgear, thereby reducing the ageing of the installation
Example
On a system having a prospective shortcircuit current of 150 kA rms, a Compact L
circuit-breaker limits the peak current to less than 10% of the calculated prospective
peak value, and the thermal effects to less than 1% of those calculated.
Cascading of the several levels of distribution in an installation, downstream of a
limiting CB, will also result in important savings.
The technique of cascading, described in sub-clause 4.5 allows, in fact, substantial
savings on switchgear (lower performance permissible downstream of the limiting
CB(s)) enclosures, and design studies, of up to 20% (overall).
Discriminative protection schemes and cascading are compatible, in the Compact
NSX range, up to the full short-circuit breaking capacity of the switchgear. Fig. H38 : Prospective and actual currents
Icc
t
Limited
current peak
Limited
current
tc
Prospectice
fault-current
Prospectice
fault-current peak
H18
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H - LV switchgear: functions & selection
Schneider Electric - Electrical installation guide 2013
4.4 Selection of a circuit-breaker
Choice of a circuit-breaker
The choice of a CB is made in terms of:
b Electrical characteristics of the installation for which the CB is intended
b Its eventual environment: ambient temperature, in a kiosk or switchboard
enclosure, climatic conditions, etc.
b Short-circuit current breaking and making requirements
b Operational specications: discriminative tripping, requirements (or not) for
remote control and indication and related auxiliary contacts, auxiliary tripping coils,
connection
b Installation regulations; in particular: protection of persons
b Load characteristics, such as motors, uorescent lighting, LV/LV transformers
The following notes relate to the choice LV circuit-breaker for use in distribution
systems.
Choice of rated current in terms of ambient temperature
The rated current of a circuit-breaker is dened for operation at a given ambient
temperature, in general:
b 30 C for domestic-type CBs
b 40 C for industrial-type CBs
Performance of these CBs in a different ambient temperature depends mainly on the
technology of their tripping units (see Fig. H40).
The choice of a range of circuit-breakers is
determined by: the electrical characteristics of
the installation, the environment, the loads and
a need for remote control, together with the type
of telecommunications system envisaged
Ambient
temperature
Single CB
in free air
Circuit breakers installed
in an enclosure
Ambient
temperature
Temperature of air
surrouding the
circuit breakers
Fig. H40 : Ambient temperature
Circuit-breakers with uncompensated thermal
tripping units have a trip current level that
depends on the surrounding temperature
Uncompensated thermal magnetic tripping units
Circuit-breakers with uncompensated thermal tripping elements have a tripping-
current level that depends on the surrounding temperature. If the CB is installed
in an enclosure, or in a hot location (boiler room, etc.), the current required to trip
the CB on overload will be sensibly reduced. When the temperature in which the
CB is located exceeds its reference temperature, it will therefore be derated. For
this reason, CB manufacturers provide tables which indicate factors to apply at
temperatures different to the CB reference temperature. It may be noted from typical
examples of such tables (see Fig. H41) that a lower temperature than the reference
value produces an up-rating of the CB. Moreover, small modular-type CBs mounted
in juxtaposition, as shown typically in Figure H27, are usually mounted in a small
closed metal case. In this situation, mutual heating, when passing normal load
currents, generally requires them to be derated by a factor of 0.8.
Example
What rating (In) should be selected for a iC60N?
b Protecting a circuit, the maximum load current of which is estimated to be 34 A
b Installed side-by-side with other CBs in a closed distribution box
b In an ambient temperature of 50 C
A iC60N circuit-breaker rated at 40 A would be derated to 35.6 A in ambient air at
50 C (see Fig. H41). To allow for mutual heating in the enclosed space, however, the
0.8 factor noted above must be employed, so that, 35.6 x 0.8 = 28.5 A, which is not
suitable for the 34 A load.
A 50 A circuit-breaker would therefore be selected, giving a (derated) current rating
of 44 x 0.8 = 35.2 A.
Compensated thermal-magnetic tripping units
These tripping units include a bi-metal compensating strip which allows the overload
trip-current setting (Ir or Irth) to be adjusted, within a specied range, irrespective of
the ambient temperature.
For example:
b In certain countries, the TT system is standard on LV distribution systems, and
domestic (and similar) installations are protected at the service position by a circuit-
breaker provided by the supply authority. This CB, besides affording protection
against indirect-contact hazard, will trip on overload; in this case, if the consumer
exceeds the current level stated in his supply contract with the power authority. The
circuit-breaker (y 60 A) is compensated for a temperature range of - 5 C to + 40 C.
b LV circuit-breakers at ratings y 630 A are commonly equipped with compensated
tripping units for this range (- 5 C to + 40 C)
H19
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Circuit-breaker
Electronic trip units
An important advantage with electronic tripping units is their stable performance
in changing temperature conditions. However, the switchgear itself often imposes
operational limits in elevated temperatures, so that manufacturers generally provide
an operating chart relating the maximum values of permissible trip-current levels to
the ambient temperature (see Fig. H42).
Moreover, electronic trip units can provide information that can be used for a better
management of the electrical distribution, including energy efciency and power
quality.
iC60a, iC60H: curve C. iC60N: curves B and C (reference temperature: 30 C)
Rating (A) 20 C 25 C 30 C 35 C 40 C 45 C 50 C 55 C 60 C
1 1.05 1.02 1.00 0.98 0.95 0.93 0.90 0.88 0.85
2 2.08 2.04 2.00 1.96 1.92 1.88 1.84 1.80 1.74
3 3.18 3.09 3.00 2.91 2.82 2.70 2.61 2.49 2.37
4 4.24 4.12 4.00 3.88 3.76 3.64 3.52 3.36 3.24
6 6.24 6.12 6.00 5.88 5.76 5.64 5.52 5.40 5.30
10 10.6 10.3 10.0 9.70 9.30 9.00 8.60 8.20 7.80
16 16.8 16.5 16.0 15.5 15.2 14.7 14.2 13.8 13.5
20 21.0 20.6 20.0 19.4 19.0 18.4 17.8 17.4 16.8
25 26.2 25.7 25.0 24.2 23.7 23.0 22.2 21.5 20.7
32 33.5 32.9 32.0 31.4 30.4 29.8 28.4 28.2 27.5
40 42.0 41.2 40.0 38.8 38.0 36.8 35.6 34.4 33.2
50 52.5 51.5 50.0 48.5 47.4 45.5 44.0 42.5 40.5
63 66.2 64.9 63.0 61.1 58.0 56.7 54.2 51.7 49.2
Fig. H41 : Examples of tables for the determination of derating/uprating factors to apply to CBs
with uncompensated thermal tripping units, according to temperature
Electronic tripping units are highly stable in
changing temperature levels
In (A) Coeff.
2,000 1
NW20 withdrawable with
horizontal plugs
NW20 L1 withdrawable
with on edge plugs
1,890 0.95
1,800 0.90
20 50 55 60 35 40 45 25 30
C
Fig. H42 : Derating of Masterpact NW20 circuit-breaker, according to the temperature
Masterpact NW20 version 40C 45C 50C 55C 60C
H1/H2/H3 Withdrawable with In (A) 2,000 2,000 2,000 1,980 1,890
horizontal plugs Maximum 1 1 1 0.99 0.95
adjustment Ir
L1 Withdrawable with In (A) 2,000 200 1,900 1,850 1,800
on-edge plugs Maximum 1 1 0.95 0.93 0.90
adjustment Ir
Compact NSX100-250 equippment with TM-D or TM-G trip units
Rating Temperature (C)
(A) 10 15 20 25 30 35 40 45 50 55 60 65 70
16 18.4 18.7 18 18 17 16.6 16 15.6 15.2 14.8 14.5 14 13.8
25 28.8 28 27.5 25 26.3 25.6 25 24.5 24 23.5 23 22 21
32 36.8 36 35.2 34.4 33.6 32.8 32 31.3 30.5 30 29.5 29 28.5
40 46 45 44 43 42 41 40 39 38 37 36 35 34
50 57.5 56 55 54 52.5 51 50 49 48 47 46 45 44
63 72 71 69 68 66 65 63 61.5 60 58 57 55 54
80 92 90 88 86 84 82 80 78 76 74 72 70 68
100 115 113 110 108 105 103 100 97.5 95 92.5 90 87.5 85
125 144 141 138 134 131 128 125 122 119 116 113 109 106
160 184 180 176 172 168 164 160 156 152 148 144 140 136
200 230 225 220 215 210 205 200 195 190 185 180 175 170
250 288 281 277 269 263 256 250 244 238 231 225 219 213
H20
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H - LV switchgear: functions & selection
Schneider Electric - Electrical installation guide 2013
Selection of an instantaneous, or short-time-delay, tripping
threshold
Figure H43 below summarizes the main characteristics of the instantaneous or
short-time delay trip units.
Selection of a circuit-breaker according to the short-circuit
breaking capacity requirements
The installation of a circuit-breaker in a LV installation must full one of the two
following conditions:
b Either have a rated short-circuit breaking capacity Icu (or Icn) which is equal to or
exceeds the prospective short-circuit current calculated for its point of installation, or
b If this is not the case, be associated with another device which is located
upstream, and which has the required short-circuit breaking capacity
In the second case, the characteristics of the two devices must be co-ordinated
such that the energy permitted to pass through the upstream device must not
exceed that which the downstream device and all associated cables, wires and other
components can withstand, without being damaged in any way. This technique is
protably employed in:
b Associations of fuses and circuit-breakers
b Associations of current-limiting circuit-breakers and standard circuit-breakers.
The technique is known as cascading (see sub-clause 4.5 of this chapter)
The selection of main and principal circuit-breakers
A single transformer
If the transformer is located in a consumers substation, certain national standards
require a LV circuit-breaker in which the open contacts are clearly visible such as
Compact NSX withdrawable circuit-breaker.
Example (see Fig. H44 opposite page)
What type of circuit-breaker is suitable for the main circuit-breaker of an installation
supplied through a 250 kVA MV/LV (400 V) 3-phase transformer in a consumers
substation?
In transformer = 360 A
Isc (3-phase) = 8.9 kA
A Compact NSX400N with an adjustable tripping-unit range of 160 A - 400 A and a
short-circuit breaking capacity (Icu) of 50 kA would be a suitable choice for this duty.
The installation of a LV circuit-breaker requires
that its short-circuit breaking capacity (or that of
the CB together with an associated device) be
equal to or exceeds the calculated prospective
short-circuit current at its point of installation
The circuit-breaker at the output of the smallest
transformer must have a short-circuit capacity
adequate for a fault current which is higher
than that through any of the other transformer
LV circuit-breakers
Fig. H43 : Different tripping units, instantaneous or short-time-delayed
Type Tripping unit Applications
Low setting b Sources producing low short-circuit-
type B current levels
(standby generators)
b Long lengths of line or cable
Standard setting b Protection of circuits: general case
type C
High setting b Protection of circuits having high initial
type D or K transient current levels
(e.g. motors, transformers, resistive loads)
12 In b Protection of motors in association with
type MA discontactors
(contactors with overload protection)
I
t
I
t
I
t
I
t
H21
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Several transformers in parallel (see Fig. H45)
b The circuit-breakers CBP outgoing from the LV distribution board must each be
capable of breaking the total fault current from all transformers connected to the
busbars, viz: Isc1 + Isc2 + Isc3
b The circuit-breakers CBM, each controlling the output of a transformer, must be
capable of dealing with a maximum short-circuit current of (for example) Isc2 + Isc3
only, for a short-circuit located on the upstream side of CBM1.
From these considerations, it will be seen that the circuit-breaker of the smallest
transformer will be subjected to the highest level of fault current in these
circumstances, while the circuit-breaker of the largest transformer will pass the
lowest level of short-circuit current
b The ratings of CBMs must be chosen according to the kVA ratings of the
associated transformers
Note: The essential conditions for the successful operation of 3-phase transformers
in parallel may be summarized as follows:
1. the phase shift of the voltages, primary to secondary, must be the same in all units
to be paralleled.
2. the open-circuit voltage ratios, primary to secondary, must be the same in all units.
3. the short-circuit impedance voltage (Zsc%) must be the same for all units.
For example, a 750 kVA transformer with a Zsc = 6% will share the load correctly
with a 1,000 kVA transformer having a Zsc of 6%, i.e. the transformers will be loaded
automatically in proportion to their kVA ratings. For transformers having a ratio of kVA
ratings exceeding 2, parallel operation is not recommended.
Figure H46 indicates, for the most usual arrangement (2 or 3 transformers of
equal kVA ratings) the maximum short-circuit currents to which main and principal
CBs (CBM and CBP respectively, in Figure H45) are subjected. It is based on the
following hypotheses:
b The short-circuit 3-phase power on the MV side of the transformer is 500 MVA
b The transformers are standard 20/0.4 kV distribution-type units rated as listed
b The cables from each transformer to its LV circuit-breaker comprise 5 metres of
single core conductors
b Between each incoming-circuit CBM and each outgoing-circuit CBP there is
1 metre of busbar
b The switchgear is installed in a oormounted enclosed switchboard, in an ambient-
air temperature of 30 C
Moreover, this table shows selected circuit-breakers of M-G manufacture
recommended for main and principal circuit-breakers in each case.
Example (see Fig. H47 next page)
b Circuit-breaker selection for CBM duty:
For a 800 kVA transformer In = 1.126 A; Icu (minimum) = 38 kA (from Figure H46),
the CBM indicated in the table is a Compact NS1250N (Icu = 50 kA)
b Circuit-breaker selection for CBP duty:
The s.c. breaking capacity (Icu) required for these circuit-breakers is given in the
Figure H46 as 56 kA.
A recommended choice for the three outgoing circuits 1, 2 and 3 would be current-
limiting circuit-breakers types NSX400 L, NSX250 L and NSX100 L. The Icu rating in
each case = 150 kA.
Compact
NSX400N
250 kVA
20 kV/400 V
MV
Tr1
LV
CBM
A1
B1
CBP
MV
Tr2
LV
CBM
A2
B2
CBP
MV
Tr3
LV
CBM
A3
B3
E
Fig. H44 : Example of a transformer in a consumers substation
Fig. H45 : Transformers in parallel
4 Circuit-breaker
Fig. H46 : Maximum values of short-circuit current to be interrupted by main and principal circuit-breakers (CBM and CBP respectively), for several transformers in parallel
Number and kVA ratings Minimum S.C breaking Main circuit-breakers (CBM) Minimum S.C breaking Rated current In of
of 20/0.4 kV transformers capacity of main CBs total discrimination with out capacity of principal CBs principal circuit-breaker
(Icu) kA going circuit-breakers (CBP) (Icu) kA (CPB) 250A
2 x 400 14 NW08N1/NS800N 27 NSX250F
3 x 400 28 NW08N1/NS800N 42 NSX250N
2 x 630 22 NW10N1/NS1000N 42 NSX250N
3 x 630 44 NW10N1/NS1000N 67 NSX250S
2 x 800 19 NW12N1/NS1250N 38 NSX250N
3 x 800 38 NW12N1/NS1250N 56 NSX250H
2 x 1,000 23 NW16N1/NS1600N 47 NSX250N
3 x 1,000 47 NW16N1/NS1600N 70 NSX250H
2 x 1,250 29 NW20N1/NS2000N 59 NSX250H
3 x 1,250 59 NW20N1/NS2000N 88 NSX250S
2 x 1,600 38 NW25N1/NS2500N 75 NSX250S
3 x 1,600 75 NW25N1/NS2500N 113 NSX250L
2 x 2,000 47 NW32N1/NS3200N 94 NSX250S
3 x 2,000 94 NW32N1/NS3200N 141 NSX250L
H22
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H - LV switchgear: functions & selection
Schneider Electric - Electrical installation guide 2013
These circuit-breakers provide the advantages of:
v Absolute discrimination with the upstream (CBM) breakers
v Exploitation of the cascading technique, with its associated savings for all
downstream components
Choice of outgoing-circuit CBs and nal-circuit CBs
Use of table G40
From this table, the value of 3-phase short-circuit current can be determined rapidly
for any point in the installation, knowing:
b The value of short-circuit current at a point upstream of that intended for the CB
concerned
b The length, c.s.a., and the composition of the conductors between the two points
A circuit-breaker rated for a short-circuit breaking capacity exceeding the tabulated
value may then be selected.
Detailed calculation of the short-circuit current level
In order to calculate more precisely the short-circuit current, notably, when the short-
circuit current-breaking capacity of a CB is slightly less than that derived from the
table, it is necessary to use the method indicated in chapter G clause 4.
Two-pole circuit-breakers (for phase and neutral) with one protected pole only
These CBs are generally provided with an overcurrent protective device on the
phase pole only, and may be used in TT, TN-S and IT schemes. In an IT scheme,
however, the following conditions must be respected:
b Condition (B) of table G67 for the protection of the neutral conductor against
overcurrent in the case of a double fault
b Short-circuit current-breaking rating: A 2-pole phase-neutral CB must, by
convention, be capable of breaking on one pole (at the phase-to-phase voltage) the
current of a double fault equal to 15% of the 3-phase short-circuit current at the point
of its installation, if that current is y 10 kA; or 25% of the 3-phase short-circuit current
if it exceeds 10 kA
b Protection against indirect contact: this protection is provided according to the
rules for IT schemes
Insufcient short-circuit current breaking rating
In low-voltage distribution systems it sometimes happens, especially in heavy-duty
networks, that the Isc calculated exceeds the Icu rating of the CBs available for
installation, or system changes upstream result in lower level CB ratings being
exceeded
b Solution 1: Check whether or not appropriate CBs upstream of the CBs affected
are of the current-limiting type, allowing the principle of cascading (described in sub-
clause 4.5) to be applied
b Solution 2: Install a range of CBs having a higher rating. This solution is
economically interesting only where one or two CBs are affected
b Solution 3: Associate current-limiting fuses (gG or aM) with the CBs concerned, on
the upstream side. This arrangement must, however, respect the following rules:
v The fuse rating must be appropriate
v No fuse in the neutral conductor, except in certain IT installations where a double
fault produces a current in the neutral which exceeds the short-circuit breaking rating
of the CB. In this case, the blowing of the neutral fuse must cause the CB to trip on
all phases
4.5 Coordination between circuit-breakers
Cascading or Back-up protection
Denition of the cascading technique
By limiting the peak value of short-circuit current passing through it, a current-limiting
CB permits the use, in all circuits downstream of its location, of switchgear and
circuit components having much lower short-circuit breaking capacities, and thermal
and electromechanical withstand capabilities than would otherwise be necessary.
Reduced physical size and lower performance requirements lead to substantial
economy and to the simplication of installation work. It may be noted that, while a
current-limiting circuit-breaker has the effect on downstream circuits of (apparently)
increasing the source impedance during short-circuit conditions, it has no such
effect in any other condition; for example, during the starting of a large motor (where
a low source impedance is highly desirable). The range of Compact NSX current-
limiting circuit-breakers with powerful limiting performances is particularly interesting.
Short-circuit fault-current levels at any point in
an installation may be obtained from tables
The technique of cascading uses the
properties of current-limiting circuit-breakers
to permit the installation of all downstream
switchgear, cables and other circuit components
of signicantly lower performance than would
otherwise be necessary, thereby simplifying and
reducing the cost of an installation
CBP1
3 Tr
800 kVA
20 kV/400 V
CBM
400 A
CBP2
100 A
CBP3
200 A
Fig. H47 : Transformers in parallel
H23
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Circuit-breaker
Conditions of implementation
Most national standards admit the cascading technique, on condition that the
amount of energy let through by the limiting CB is less than the energy all
downstream CBs and components are able to withstand without damage.
In practice this can only be veried for CBs by tests performed in a laboratory. Such
tests are carried out by manufacturers who provide the information in the form of
tables, so that users can condently design a cascading scheme based on the
combination of recommended circuit-breaker types. As an example, Figure H48
indicates the cascading possibilities of circuit-breaker types iC60, C120 and NG125
when installed downstream of current-limiting CBs Compact NSX 250 N, H or L for a
230/400 V or 240/415 V 3-phase installation.
In general, laboratory tests are necessary to
ensure that the conditions of implementation
required by national standards are met and
compatible switchgear combinations must be
provided by the manufacturer
Fig. H48 : Example of cascading possibilities on a 230/400 V or 240/415 V 3-phase installation
kA rms
Short-circuit 150 NSX250L
breaking capacity
70 NSX250H
of the upstream
50 NSX250N
(limiter) CBs
Possible short-circuit 150 NG125L
breaking capacity of
70 NG125L
the downstream CBs
36 NG125N NG125N
(beneting from the
30 iC60N/H<=32A iC60N/H<=32 A iC60N/H<=32A
cascading technique)
30 iC60L<=25A iC60L<=25A iC60L<=25A
25 iC60H>=40A iC60H>=40A iC60H>=40A
iC120N/H iC120N/H iC120N/H
20 iC60N>=40A iC60N>=40A iC60N>=40A
Advantages of cascading
The current limitation benets all downstream circuits that are controlled by the
current-limiting CB concerned.
The principle is not restrictive, i.e. current-limiting CBs can be installed at any point in
an installation where the downstream circuits would otherwise be inadequately rated.
The result is:
b Simplied short-circuit current calculations
b Simplication, i.e. a wider choice of downstream switchgear and appliances
b The use of lighter-duty switchgear and appliances, with consequently lower cost
b Economy of space requirements, since light-duty equipment have generally a
smaller volume
Principles of discriminative tripping (selectivity)
Discrimination (selectivity) is achieved by automatic protective devices if a fault
condition, occurring at any point in the installation, is cleared by the protective device
located immediately upstream of the fault, while all other protective devices remain
unaffected (see Fig. H49).
Isc
A
B
Isc
Total discrimination
Isc B Ir B
0
0
Isc
Isc B Is Ir B
Is = discrimination limit
B only opens
Partial discrimination
A and B open
Fig. H49 : Total and partial discrimination
Discrimination may be total or partial, and
based on the principles of current levels, or
time-delays, or a combination of both. A more
recent development is based on the logic
techniques.
The Schneider Electric system takes
advantages of both current-limitation and
discrimination
H24
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H - LV switchgear: functions & selection
Schneider Electric - Electrical installation guide 2013
Discrimination between circuit-breakers A and B is total if the maximum value of
short-circuit-current on circuit B (Isc B) does not exceed the short-circuit trip setting
of circuit-breaker A (Im A). For this condition, B only will trip (see Fig. H50).
Discrimination is partial if the maximum possible short-circuit current on circuit B
exceeds the short-circuit trip-current setting of circuit-breaker A. For this maximum
condition, both A and B will trip (see Fig. H51).
Protection against overload : discrimination based on current levels
(see Fig. H52a)
This method is realized by setting successive tripping thresholds at stepped levels,
from downstream relays (lower settings) towards the source (higher settings).
Discrimination is total or partial, depending on particular conditions, as noted above.
As a rule of thumb, discrimination is achieved when:
b IrA/IrB > 2:
Protection against low level short-circuit currents : discrimination based on
stepped time delays (see Fig. H52b)
This method is implemented by adjusting the time-delayed tripping units, such that
downstream relays have the shortest operating times, with progressively longer
delays towards the source.
In the two-level arrangement shown, upstream circuit-breaker A is delayed
sufciently to ensure total discrimination with B (for example: Masterpact with
electronic trip unit).
Discrimination based on a combination of the two previous methods
(see Fig. H52c)
A time-delay added to a current level scheme can improve the overall discrimination
performance.
The upstream CB has two high-speed magnetic tripping thresholds:
b Im A: delayed magnetic trip or short-delay electronic trip
b Ii: instantaneous strip
Discrimination is total if Isc B < Ii (instantaneous).
Protection against high level short-circuit currents: discrimination based on
arc-energy levels
This technology implemented in the Compact NSX range (current limiting circuit-
breaker) is extremely effective for achievement of total discrimination.
Principle: When a very high level short-circuit current is detected by the two circuits-
breaker A and B, their contacts open simultaneously. As a result, the current is highly
limited.
b The very high arc-energy at level B induces the tripping of circuit-breaker B
b Then, the arc-energy is limited at level A and is not sufcient to induce the tripping
of A
As a rule of thumb, the discrimination between Compact NSX is total if the size ratio
between A and B is greater than 2.5.
t
Im A Is c B Ir A Ir B
B A
Is c A
I
A and B open B only opens
Fig. H51 : Partial discrimination between CBs A and B
t
Im A Ir A Ir B
B A
Isc B
I
Fig. H50 : Total discrimination between CBs A and B
I
t
Ir A Ir B
B A
a) b)
I
t
Isc B
t
A
B
A
B
c)
t
Im A
delayed
Isc B
I
B A
Ii A
instantaneous
Fig. H52 : Discrimination
H25
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Circuit-breaker
Discrimination quality
Discrimination is total if Is > Isc(D2), i.e. Isd1 > Isc(D2).
This normally implies:
b a relatively low level Isc(D2),
b a large difference between the ratings of circuit-breakers D1 and D2.
Current discrimination is normally used in nal distribution.
Current-level discrimination
This technique is directly linked to the staging of the Long Time (LT) tripping curves
of two serial-connected circuit-breakers.
Discrimination based on time-delayed tripping
uses CBs referred to as selective (in some
countries).
Implementation of these CBs is relatively simple
and consists in delaying the instant of tripping
of the several series-connected circuit-breakers
in a stepped time sequence
Fig. H53 : Current discrimination
The discrimination limit ls is:
b Is = Isd2 if the thresholds lsd1 and lsd2 are too close or merge,
b Is = Isd1 if the thresholds lsd1 and lsd2 are sufciently far apart.
As a rule, current discrimination is achieved when:
b Ir1 / Ir2 < 2,
b Isd1 / Isd2 > 2.
The discrimination limit is:
b Is = Isd1.
Time discrimination
This is the extension of current discrimination and is obtained by staging over time
of the tripping curves. This technique consists of giving a time delay of t to the Short
Time (ST) tripping of D1.
Fig. H54 : Time discrimination
D1
D2
Isd 2 Isd1 Ir2 Ir1
t D2 D1
I
D1
D2
Isd 2 Isd1 Ii1 Ir2 Ir1
t
D2 D1
I
t
H26
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H - LV switchgear: functions & selection
Schneider Electric - Electrical installation guide 2013
The thresholds (Ir1, Isd1) of D1 and (Ir2, Isd2) comply with the staging rules of
current discrimination.
The discrimination limit ls of the association is at least equal to li1, the instantaneous
threshold of D1.
Discrimination quality
There are two possible applications:
b on nal and/or intermediate feeders
A category circuit-breakers can be used with time-delayed tripping of the
upstream circuit-breaker. This allows extension of current discrimination up
to the instantaneous threshold li1 of the upstream circuit-breaker: Is = li1.
If Isc(D2) is not too high - case of a nal feeder - total discrimination
can be obtained.
b on the incomers and feeders of the MSB
At this level, as continuity of supply takes priority, the installation
characteristics allow use of B category circuit-breakers designed for
time-delayed tripping. These circuit-breakers have a high thermal withstand
(Icw u 50% Icn for t = 1s): Is = Icw1.
Even for high lsc(D2), time discrimination normally provides total
discrimination: Icw1 > Icc(D2).
Note: Use of B category circuit-breakers means that the installation must withstand
high electrodynamic and thermal stresses.
Consequently, these circuit-breakers have a high instantaneous threshold li that can
be adjusted and disabled in order to protect the busbars if necessary.
Practical example of discrimination at several levels with Schneider Electric
circuit-breakers (with electronic trip units)
"Masterpact NT is totally selective with any moulded-case Compact NSX circuit
breaker, i.e., the downstream circuit-breaker will trip for any short-circuit value up to
its breaking capacity. Further, all Compact NSX CBs are totally selective, as long as
the ration between sizes is greater than 1.6 and the ratio between ratings is greater
than 2.5. The same rules apply for the total selectivity with the miniature circuit-
breakers Acti 9 further downstream (see Fig. H55).
Fig. H55 : 4 level discrimination with Schneider Electric circuit breakers : Masterpact NT
Compact NSX and Acti 9
I
t
Icc B
A
Icc
B
Only B opens
Current-breaking
time for B
Non tripping
time of A
Ir B
Masterpact NT06
630 A
Compact NSX
250 A
Compact NSX
100 A
Acti 9
iC60
H27
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Energy discrimination with current limitation
Cascading between 2 devices is normally achieved by using the tripping of the
upstream circuit-breaker A to help the downstream circuit-breaker B to break the
current. The discrimination limit Is is consequently equal to the ultimate breaking
current Icu B of circuit-breaker B acting alone, as cascading requires the tripping of
both devices.
The energy discrimination technology implemented in Compact NSX circuit-breakers
allows to improve the discrimination limit to a value higher than the ultimate breaking
current Icu B of the downstream circuit-breaker. The principle is as follows:
b The downstream limiting circuit-breaker B sees a very high short-circuit current.
The tripping is very fast (<1 ms) and then, the current is limited
b The upstream circuit-breaker A sees a limited short-circuit current compared to its
breaking capability, but this current induces a repulsion of the contacts. As a result,
the arcing voltage increases the current limitation. However, the arc energy is not
high enough to induce the tripping of the circuit-breaker. So, the circuit-breaker A
helps the circuit-breaker B to trip, without tripping itself. The discrimination limit can
be higher than Icu B and the discrimination becomes total with a reduced cost of the
devices
Natural total discriminitation with Compact NSX
The major advantage of the Compact NSX range is to provide a natural total
discrimination between two series-connected devices if:
b The ratio of the two trip-unit current ratings is > 1.6
b The ratio of rated currents of the two circuit-breakers is > 2.5
Logic discrimination or Zone Sequence Interlocking ZSI
This type of discrimination can be achieved with circuit-breakers equipped with
specially designed electronic trip units (Compact, Masterpact): only the Short Time
Protection (STP) and Ground Fault Protection (GFP) functions of the controlled
devices are managed by Logic Discrimination. In particular, the Instantaneous
Protection function - inherent protection function - is not concerned.
Settings of controlled circuit-breakers
b time delay: there are no rules, but staging (if any)of the time delays of time
discrimination must be applied ( tD1 u tD2 u tD3),
b thresholds: there are no threshold rules to be applied, but natural staging of the
protection device ratings must be complied with (IcrD1 u IcrD2 u IcrD3).
Note: This technique ensures discrimination even with circuit-breakers of similar
ratings.
Principles
Activation of the Logic Discrimination function is via transmission of information on
the pilot wire:
b ZSI input:
v low level (no downstream faults): the Protection function is on standby with a
reduced time delay (y 0,1 s),
v high level (presence of downstream faults): the relevant Protection function moves
to the time delay status set on the device.
b ZSI output:
v low level: the trip unit detects no faults and sends no orders,
v high level: the trip unit detects a fault and sends an order.
Operation
A pilot wire connects in cascading form the protection devices of an installation
(see Fig. H56). When a fault occurs, each circuit-breaker upstream of the fault
(detecting a fault) sends an order (high level output) and moves the upstream circuit-
breaker to its natural time delay (high level input). The circuitbreaker placed just
above the fault does not receive any orders (low level input) and thus trips almost
instantaneously.
Discrimination schemes based on logic
techniques are possible, using CBs equipped
with electronic tripping units designed for
the purpose (Compact, Masterpact) and
interconnected with pilot wires
Fig. H56 : Logic discrimination.
pilot wire
interlocking
order
interlocking
order
D1
D2
D3
4 Circuit-breaker
H28
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H - LV switchgear: functions & selection
Schneider Electric - Electrical installation guide 2013
4.6 Discrimination MV/LV in a consumers
substation
In general the transformer in a consumers substation is protected by MV fuses,
suitably rated to match the transformer, in accordance with the principles laid down
in IEC 60787 and IEC 60420, by following the advice of the fuse manufacturer.
The basic requirement is that a MV fuse will not operate for LV faults occurring
downstream of the transformer LV circuit-breaker, so that the tripping characteristic
curve of the latter must be to the left of that of the MV fuse pre-arcing curve.
This requirement generally xes the maximum settings for the LV circuit-breaker
protection:
b Maximum short-circuit current-level setting of the magnetic tripping element
b Maximum time-delay allowable for the short-circuit current tripping element
(see Fig. H57)
Example:
b Short-circuit level at MV terminals of transformer: 250 MVA
b Transformer MV/LV: 1,250 kVA 20/0.4 kV
b MV fuses: 63 A
b Cabling, transformer - LV circuit-breaker: 10 metres single-core cables
b LV circuit-breaker: Compact NSX 2000 set at 1,800 A (Ir)
What is the maximum short-circuit trip current setting and its maximum time delay
allowable?
The curves of Figure H58 show that discrimination is assured if the short-time delay
tripping unit of the CB is set at:
b A level y 6 Ir = 10.8 kA
b A time-delay setting of step 1 or 2
Fig. H57 : Example
63 A
1,250 kVA
20 kV / 400 V
Compact
NS2000
set at 1,800 A
Full-load current
1,760 A
3-phase
short-circuit
current level
31.4 kA
I
t
(s)
Step 4
Step 3
Step 2
Step 1 0.50
0.1
0.2
10
100
200
1,000
NS 2000
set at
1,800 A
1,800 A
Ir
Isc maxi
31.4 kA
10 kA
0.01
Minimum pre-arcing
curve for 63 A HV fuses
(current referred to the
secondary side of the
transformer)
1 4 6
8
Fig. H58 : Curves of MV fuses and LV circuit-breaker
Discrimination quality
This technique enables:
b easy achievement as standard of discrimination on 3 levels or more,
b elimination of important stresses on the installation, relating to time-
delayed tripping of the protection device, in event of a fault directly on the
upstream busbars.
All the protection devices are thus virtually instantaneous,
b easy achievement of downstream discrimination with non-controlled
circuit-breakers.
H29
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Circuit-breaker
Fig. H60 : Example of ultra rapid power circuit breaker: Masterpact UR (Schneider Electric)
4.7 Circuit- breakers suitable for IT systems
In IT system, circuit breakers may have to face an unusual situation called double
earth fault when a second fault to earth occurs in presence of a rst fault on the
opposite side of a circuit breaker (see Fig : H59).
In that case circuit breaker has to clear the fault with phase to phase voltage across
a single pole instead of phase to neutral voltage. Breaking capacity of the breaker
may be modied in such a situation.
Annex H of IEC60947-2 deals with this situation and circuit breaker used in IT
system shall have been tested according to this annex.
When a circuit-breaker has not been tested according to this annex, a marking by
the symbol
IT
shall be used on the nameplate.
Regulation in some countries may add additional requirements.
4.8 Ultra rapid circuit breaker
As installed power increases, electrical distribution has to shift from a LV design to
a HV design. Indeed, a high short-circuit level can be a threat to the installation and
make impossible the selection of low voltage equipments (Switchboard and bus bars,
circuit breaker)
These situations could be met in the following applications: Bus bars coupling
onboard merchant vessels, off shore platform, loop networks (in industry), where
the current and energy are important because of the installed power (several
transformers or generators in parallel) and HV design not easy.
Two solutions could be used:
b Pyrotechnic interruption switching device
b Power circuit breaker based solution
Some power circuit breakers with additionnal feature (based on the Thomson effect
technology for instance) provide an ultra rapid opening system on very high short-
circuit level (see Fig. H59). The breaking performance makes it possible to limit the
short-circuit current and prospective energy, and consequently protect the electrical
installation against the electrodynamic and thermal effects of short-circuit.
Fig. H59 : Double earth fault situation
Earthing system: IT
H30
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H - LV switchgear: functions & selection
Schneider Electric - Electrical installation guide 2013
By inserting a tie breaker (see Fig. H62) - Masterpact UR - to separate the sources
under fault conditions, the short circuit at (A) will consist in:
b a limited short circuit coming from generator G1 and G2 interrupted by the
Masterpact UR (see curve 2)
b a non limited short circuit from generators G3 and G4 (see curve 3).
Fig. H62 : diagram of the network
I
1
Masterpact
UR
I
2
I
2
I
1
I
3
I
3
I peak
(ms)
0
I peak
(ms)
0
G3
(A)
= limited +
M2
G4 G1
M1
G2
I
1
non limited
I
1
Masterpact UR
limited by
I
2
non limited
Curve 2 Curve 3
Example of limitation offered by Masterpact UR in decoupling bus bars in case
of short circuit (see Fig. H61):
When a short-circuit occurs downstream in the installation (A) with no tie breaker, the
short-circuit level will be the total sum of all the generated power (illustrated by curve 1).
Fig. H61 : Diagram of the network
I
1
I
2
I
2
I
1
I
3
I
3
I peak
(ms)
0
G3
(A)
= +
M2
G4 G1
M1
G2 I
2
I
1
I
3 =
non limited
+
I
2
I
1
non limited
Curve 1
-
H31
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Circuit-breaker
Fig. H63 : diagram of the network
The resulting short circuit level is illustrated by curve 4 (see Fig.H63):
The consequence of the strong limitation of the short circuit current and the
prospective energy allows the design of a LV network instead of a MV design.
This also prevents the network from being totally shutdown (black out) in case of
short circuit in the main switchboard.
The following table (Fig. H64) give some example of limitation with MAsterpact UR
as a tie breaker between source 1 & 2
Fig. H64 : Example of limitation by Masterpact UR for 690 V - 60 hz network. (IEC 947-2)
Source 2 Source 1
50 55 60 65 70 75 80 85 90 95 100 110
50 169 207 183 229 193 240 203 251 213 262 224 273 234 284 244 295 254 306 264 317 274 327 295 349
55 176 229 189 240 199 251 210 262 220 273 230 284 240 295 250 306 260 317 270 327 281 338 301 360
60 178 240 191 251 201 262 211 273 220 284 230 295 240 306 249 317 259 327 269 338 278 349 298 371
65 181 251 194 262 204 273 214 284 223 295 233 306 242 317 252 327 262 338 272 349 281 360 301 382
70 185 262 198 273 207 284 217 295 226 306 236 317 246 327 255 338 265 349 275 360 284 371 304 393
75 189 273 201 284 211 295 220 306 230 317 240 327 249 338 259 349 268 360 278 371 288 382 307 404
80 192 284 205 295 214 306 224 317 233 327 243 338 252 349 262 360 272 371 281 382 291 393 310 415
85 196 295 208 306 218 317 227 327 237 338 246 349 256 360 265 371 275 382 284 393 294 404 313 426
90 199 306 212 317 221 327 231 338 240 349 249 360 259 371 268 382 278 393 288 404 297 415 316 437
95 204 317 216 327 225 338 235 349 244 360 253 371 263 382 272 393 282 404 291 415 301 426 320 448
100 209 327 221 338 230 349 239 360 249 371 258 382 268 393 277 404 287 415 296 426 306 437 325 458
110 218 349 230 360 239 371 248 382 258 393 267 404 276 415 286 426 295 437 305 448 314 458 333 480
Limited
No limited
xxx Example
I peak
(ms)
0
I
2
I
1
I
3 = limited +
Curve 4
H32
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Schneider Electric - Electrical installation guide 2013
5 Maintenance of low voltage
switchgear
IEC60364-6 requires initial and periodic verications of electrical installations. The
electrical switchboard and all its equipment continue to age whether they operate
or not. This aging process is due mainly to environmental inuences and operating
conditions. To ensure that Low voltage switchgear and especially circuit breakers
retains the operating and safety characteristics specied in the catalogue for the
whole of its service life, it is recommended that:
b The device is installed in optimum environmental and operating conditions
b Routine inspections and regular maintenance are carried out by qualied
personnel.
A switchboard and the switchgear age, whether they are in operation or not. Ageing
is due primarily to the inuence of the environment and the operating conditions.
Inuence of the environment
A device placed in a given environment is subjected to its effects. The main
environmental factors that accelerate device ageing are:
- temperature
- vibration
- relative humidity
- salt environment
- dust
- corrosive atmospheres.
- percent load
- current harmonics
Preventive maintenance
Preventive maintenance consists in carrying out, at predetermined intervals or
according to prescribed criteria, checks intended to reduce the probability of a failure
or deterioration in the operation of a system.
There are two types of preventive maintenance:
Periodic maintenance
For each type of product, maintenance recommendations are laid out by the
technical department. These verication procedures, intended to maintain systems or
their subassemblies in correct operating condition over the targeted service life, must
be carried out according to the time intervals stipulated in this document.
Conditional maintenance
To a certain extent, conditional-maintenance operations are a means to reduce (but
not eliminate) the recommended periodic-maintenance operations (thus limited to
the strict minimum) that require an annual shutdown of the installation.
These operations are launched when programmed alarms indicate that a predened
threshold has been reached. (Number of operation > durability, aging indicators)
Electronic trip units in power circuit breaker can propose such functions. Conditional
maintenance is the means to optimise installation maintenance.
Maintenance level
There are three recommended maintenance levels.
The table below indicates maintenance operations and their intervals according to
the level:
Fig. H65 : Maintenance level
Level Maintenance interval Maintenance operations
Level II 1 year Visual inspection and functional testing, replacement of
faulty accessories
Level III 2 years As for level II plus servicing operation and subassembly
tests
Level IV 5 years As for level III plus diagnostics and repairs (by
manufacturer)
H - LV switchgear: functions & selection
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H33
Schneider Electric - Electrical installation guide 2013
5 Maintenance of low voltage
switchgear
The intervals stated are for normal environmental and
operating conditions.
Provided all the environmental conditions are more favourable, maintenance
intervals can be longer (for example, Level III maintenance can be carried out every
3 years).
If just one of the conditions is more severe, maintenance must be carried out more
frequently
Functions linked specically to safety require particular intervals.
Note:
It is advisable to test that the remote safety stop commands and the earth leakage
protection (Vigi module) work at regular intervals (every 6 months).
Example of maintenance recommendation for Power Circuit Breaker (>630A)
The case
The case is an essential element in the circuit breaker.
First of all, it ensures a number of safety functions:
- functional insulation between the phases themselves and between the phases and
the exposed conductive parts in order to resist transient overvoltages caused by the
distribution system
- a barrier avoiding direct user contact with live parts
- protection against the effects of electrical arcs and overpressures caused by
short-circuits.
Secondly, it serves to support the entire pole operating mechanism as well as the
mechanical and electrical accessories of the circuit breaker.
On the case, there should be:
- no traces of grime (grease), excessive dust or condensation which all reduce
insulation
- no signs of burns or cracks which would reduce the mechanical solidity of the case
and thus its capacity to withstand short-circuits.
Preventive maintenance for cases consists of a visual inspection of its condition and
cleaning with a dry cloth or a vacuum cleaner. All cleaning products with solvents are
strictly forbidden. It is advised to measure the insulation every ve years and following
trips due to a short-circuit. The product must be replaced if there are signs of burns or
cracks.
Arc chutes (for Air Circuit breaker)
During a short-circuit, the arc chute serves to extinguish the arc and to absorb the
high level of energy along the entire path of the short-circuit. It also contributes
to arc extinction under rated current conditions. An arc chute that is not in good
condition may not be capable of fully clearing the short-circuit and ultimately result
in the destruction of the circuit breaker. The arc chutes for air circuit breaker must
be regularly checked. The ns of the arc chutes may be blackened but must not be
signicantly damaged. What is more, the lters must not be blocked to avoid internal
overpressures. It is advised to use a vacuum cleaner rather than a cloth to remove
dust from the outside of the arc chutes.
Fig. H66 : Example of maintenance recommendation for Power Circuit Breaker (>630A)
H34
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Schneider Electric - Electrical installation guide 2013
Main contacts (for Air Circuit breaker)
The contacts make and break the current under normal conditions (rated current for
the installation) and under exceptional conditions (overloads and short-circuits). The
contacts are eroded by the many opening and closing cycles and can be particularly
deteriorated by short-circuit currents.
Worn contacts may result in abnormal temperature rise and accelerate device ageing.
It is imperative to remove the arc chutes and visually check contact wear at least once
a year and following each short-circuit.
The contact-wear indicators constitute an absolute minimum value that must not be
overrun.
Device and chassis mechanisms
Mechanical operation of the circuit breaker may be hindered by dust, knocks,
aggressive atmospheres, no greasing or excessive greasing. Operating safety is
ensured by dusting and general cleaning, proper greasing and regular opening and
closing of the circuit breaker.
Operating cycles
The imperative need to ensure continuity of service in an installation generally means
that power circuit breakers are rarely operated. If, on the one hand, an excessive
number of operating cycles accelerates device ageing, it is also true that a lack of
operation over a long period can result in mechanical malfunctions. Regular operation
is required to maintain the normal performance level of each part involved in the
opening and closing cycles.
In installations where power circuit breakers are used in source changeover systems, it
is advised to periodically operate the circuit breaker for the alternate source.
Fig. H66 : Example of maintenance recommendation for Power Circuit Breaker (>630A) (continued)
H - LV switchgear: functions & selection
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
H35
Schneider Electric - Electrical installation guide 2013
Fig. H66 : Example of maintenance recommendation for Power Circuit Breaker (>630A) (continued)
5 Maintenance of low voltage
switchgear
Electronic trip unit
If an electric fault occurs in the installation, the electronic trip unit detects the fault
and orders the circuit breaker to open and thus protect life and property. Electronic
components and circuit boards are sensitive to the environment (ambient temperature,
humid and corrosive atmospheres) and to severe operating conditions (magnetic
elds, vibrations, etc.). To ensure correct operation, it is necessary to periodically
check:
- the chain of action resulting in a trip
- the response time as a function of the level of the fault current.
Depending on the operating and environment conditions, it is advised to estimate their
service life and to replace them if necessary to avoid any risk of non-operation when
they are needed.
Auxiliary circuits
Control auxiliaries
MX and XF shunt releases are respectively used to remotely open and close the circuit
breaker using an electrical order or by a supervisor via a communication network.
The MN undervoltage release is used to break the power circuit if the distribution
system voltage drops or fails in order to protect life (emergency off) or property.
Preventive maintenance consists in periodically checking operation at minimum values.
Depending on the operating and environment conditions, it is advised to
estimate their service life and to replace them if necessary to avoid any risk of
non-operation when they are needed.
Auxiliary wiring
Auxiliary wiring is used to transmit orders to the various control devices and to transmit
status-condition information. Incorrect connections or damaged insulation may result in
either non-operation of the circuit breaker or nuisance tripping.
Auxiliary wiring must be regularly checked and replaced as needed, particularly if
there are vibrations, high ambient temperatures or corrosive atmospheres.
Indication contacts
The contacts indicating the status of the circuit-breaker (ON / OFF), of the chassis
(CE, CD, CT), a trip due to an electrical fault (SDE) or that the circuit breaker is
ready to close (PF) provide the operator with the status information required to react
correspondingly. Any incorrect indications may result in erroneous device operation
that could endanger life and property. Contact failure (wear, loose connections)
may result from vibrations, corrosion or abnormal temperature rise and preventive
maintenance must ensure that contacts correctly conduct or isolate according to their
positions.
Gear motor
The gear motor (MCH) automatically recharges the operating-mechanism springs
as soon as the circuit breaker is closed. The gear motor makes it possible to
instantaneously reclose the device following an opening. This function may be
indispensable for safety reasons. The charging lever serves simply as a backup
means if the auxiliary voltage fails. Given the mechanical forces exerted to charge the
mechanism, the gear motor wears quickly. Periodic checks on gear-motor operation
and the charging time are required to ensure the device closing function.
Schneider Electric - Electrical installation guide 2013
Schneider Electric - Electrical installation guide 2013
J1
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapter J
Overvoltage protection
Contents
Overvoltage of atmospheric origin J2
1.1 Overvoltage denitions J2
1.2 Overvoltage characteristics of atmospheric origin J3
1.3 Effects on electrical installations J3
1.4 Characterization of the lightning wave J6
Principle of lightning protection J7
2.1 General rules J7
2.2 Building protection system J7
2.3 Electrical installation protection system J9
2.4 The Surge Protection Device (SPD) J10
Design of the electrical installation protection system J13
3.1 Design rules J13
3.2 Elements of the protection system J14
3.3 Common characteristics of SPDs according to the installation
characteristics J16
3.4 Selection of a Type 1 SPD J19
3.5 Selection of a Type 2 SPD J19
3.6 Selection of external Short Circuit Protection Device (SCPD) J20
3.7 SPD and protection device coordination table J22
Installation of SPDs J24
4.1 Connection J24
4.2 Cabling rules J26
Application J28
5.1 Installation examples J28
5.2 SPD for photovoltaic applications J29
Technical supplements J32
6.1 Lightning protection standards J32
6.2 The components of a SPD J32
6.3 End-of-life indication J34
6.4 Detailed characteristics of the external SCPD J34
6.5 Propagation of a lightning wave J36
6.6 Example of lightning current in TT system J37
1
2
3
4
5
6
Schneider Electric - Electrical installation guide 2013
J - Overvoltage protection
J2
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Overvoltage of atmospheric
origin
1.1 Overvoltage denitions
1.1.1 Various types of overvoltage
An overvoltage is a voltage pulse or wave which is superimposed on the rated
voltage of the network (see Fig. J1).
Voltage
Lightning type impulse
(duration = 100 s)
"Operating impulse"
type dumped ring wave
(F = 100 kHz to 1 MHz)
Irms
Fig. J1 : Examples of overvoltage
This type of overvoltage is characterized by (see Fig. J2):
b the rise time tf (in s);
b the gradient S (in kV/s).
An overvoltage disturbs equipment and produces electromagnetic radiation.
Moreover, the duration of the overvoltage (T) causes an energy peak in the electric
circuits which could destroy equipment.
Voltage (V or kV)
U max
50 %
t
Rise time (tf)
Voltage surge duration (T)
Fig. J2 : Main characteristics of an overvoltage
Four types of overvoltage can disturb electrical installations and loads:
b Switching surges:
high-frequency overvoltages or burst disturbance (see Fig. J1) caused by a change
in the steady state in an electrical network (during operation of switchgear).
b Power-frequency overvoltages:
overvoltages of the same frequency as the network (50, 60 or 400 Hz) caused
by a permanent change of state in the network (following a fault: insulation fault,
breakdown of neutral conductor, etc.).
b Overvoltages caused by electrostatic discharge:
very short overvoltages (a few nanoseconds) of very high frequency caused by
the discharge of accumulated electric charges (for example, a person walking on a
carpet with insulating soles is electrically charged with a voltage of several kilovolts).
b Overvoltages of atmospheric origin.
Schneider Electric - Electrical installation guide 2013
J3
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Lightning strokes in a few gures:
Lightning ashes produce an extremely large
quantity of pulsed electrical energy (see Fig. J4)
b of several thousand amperes (and several
thousand volts),
b of high frequency (approximately 1
megahertz),
b of short duration (from a microsecond to a
millisecond).
1.2 Overvoltage characteristics of atmospheric
origin
Between 2000 and 5000 storms are constantly undergoing formation throughout the
world. These storms are accompanied by lightning strokes which represent a serious
hazard for persons and equipment. Lightning ashes hit the ground at an average of
30 to 100 strokes per second, i.e. 3 billion lightning strokes each year.
The table in Figure J3 shows the characteristic lightning strike values. As can be
seen, 50% of lightning strokes have a current exceeding 33 kA and 5% a current
exceeding 65 kA. The energy conveyed by the lightning stroke is therefore very high.
Lightning also causes a large number of res, mostly in agricultural areas (destroying
houses or making them unt for use). High-rise buildings are especially prone to
lightning strokes.
1.3 Effects on electrical installations
Lightning damages electrical and electronic systems in particular: transformers,
electricity meters and electrical appliances on both residential and industrial
premises.
The cost of repairing the damage caused by lightning is very high. But it is very hard
to assess the consequences of:
b disturbances caused to computers and telecommunication networks;
b faults generated in the running of programmable logic controller programs and
control systems.
Moreover, the cost of operating losses may be far higher than the value of the
equipment destroyed.
Fig. J3 : Lightning discharge values given by the IEC 62305 standard
Cumulative probability
(%)
Peak current
(kA)
Gradient
(kA/s)
95 7 9.1
50 33 24
5 65 65
1 140 95
0 270
Subsequent arcs
t
3
t
2
t
1
Arc leader
l
l/2
Lightning
current
Time
Fig. J4 : Example of lightning current
1 Overvoltage of atmospheric
origin
Schneider Electric - Electrical installation guide 2013
J - Overvoltage protection
J4
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.3.1 Lightning stroke impacts
Lightning strokes can affect the electrical (and/or electronic) systems of a building in
two ways:
b by direct impact of the lightning stroke on the building (see Fig. J5 a);
b by indirect impact of the lightning stroke on the building:
v A lightning stroke can fall on an overhead electric power line supplying a building
(see Fig. J5 b). The overcurrent and overvoltage can spread several kilometres from
the point of impact.
v A lightning stroke can fall near an electric power line (see Fig. J5 c). It is the
electromagnetic radiation of the lightning current that produces a high current and an
overvoltage on the electric power supply network.
In the latter two cases, the hazardous currents and voltages are transmitted by the
power supply network.
v A lightning stroke can fall near a building (see Fig. J5 d). The earth potential
around the point of impact rises dangerously.
In all cases, the consequences for electrical installations and loads can be dramatic.
Lightning is a high-frequency electrical
phenomenon which causes overvoltages on
all conductive items, especially on electrical
cabling and equipment.
Electrical
installation
Installation
earth lead
a
b
c
d
Fig. J5 : Various types of lightning impact
Lightning falls on an unprotected building. Lightning falls near an overhead line. Lightning falls near a building.
Electrical
installation
Installation
earth lead
Electrical
installation
Installation
earth lead
Electrical
installation
Installation
earth lead
The lightning current ows to earth via the more or
less conductive structures of the building with very
destructive effects:
b thermal effects: Very violent overheating of
materials, causing re,
b mechanical effects: Structural deformation,
b thermal ashover: Extremely dangerous
phenomenon in the presence of ammable or
explosive materials (hydrocarbons, dust, etc.).
The lightning current generates overvoltages
through electromagnetic induction in the distribution
system.
These overvoltages are propagated along the line to
the electrical equipment inside the buildings.
The lightning stroke generates the same types of
overvoltage as those described opposite.
In addition, the lightning current rises back from
the earth to the electrical installation, thus causing
equipment breakdown.
The building and the installations inside the
building are generally destroyed
The electrical installations inside the building are generally destroyed.
Fig. J6 : Consequence of a lightning stoke impact
Schneider Electric - Electrical installation guide 2013
J5
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.3.2 The various modes of propagation
b Common mode
Common-mode overvoltages appear between live conductors and earth: phase-to-
earth or neutral-to-earth (see Fig. J7). They are dangerous especially for appliances
whose frame is connected to earth due to risks of dielectric breakdown.
Fig. J7 : Common mode
Fig. J8 : Differential mode
Ph
Imd
N
Imd
U voltage surge
differential mode
Equipment
Ph
Imc
Imc
N
Voltage surge
common mode
Equipment
b Differential mode
Differential-mode overvoltages appear between live conductors:
phase-to-phase or phase-to-neutral (see Fig. J8). They are especially dangerous for
electronic equipment, sensitive hardware such as computer systems, etc.
1 Overvoltage of atmospheric
origin
Schneider Electric - Electrical installation guide 2013
J - Overvoltage protection
J6
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.4 Characterization of the lightning wave
Analysis of the phenomena allows denition of the types of lightning current and
voltage waves.
b 2 types of current wave are considered by the IEC standards:
v 10/350 s wave: to characterize the current waves from a direct lightning stroke
(see Fig. J9);
These two types of lightning current wave are used to dene tests on SPDs
(IEC standard 61643-11) and equipment immunity to lightning currents.
The peak value of the current wave characterizes the intensity of the lightning stroke.
b The overvoltages created by lightning strokes are characterized by a 1.2/50 s
voltage wave (see Fig. J11).
This type of voltage wave is used to verify equipment's withstand to overvoltages of
atmospheric origin (impulse voltage as per IEC 61000-4-5).
1 Overvoltage of atmospheric
origin
Fig. J9 : 10/350 s current wave
350
10
Max.
100 %
I
50 %
t
(s)
20
8
Max.
100 %
I
50 %
t
(s)
v 8/20 s wave: to characterize the current waves from an indirect lightning stroke
(see Fig. J10).
Fig. J10 : 8/20 s current wave
Max.
100 %
50 %
1.2
50
t
V
(s)
Fig. J11 : 1.2/50 s voltage wave
Schneider Electric - Electrical installation guide 2013
J7
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
J - Overvoltage protection
2 Principle of lightning protection
2.1 General rules
2.1.1 Procedure to prevent risks of lightning strike
The basic principle for protection of an installation against the risk of lightning strikes
is to prevent the disturbing energy from reaching sensitive equipment. To achieve
this, it is necessary to:
b capture the lightning current and channel it to earth via the most direct path
(avoiding the vicinity of sensitive equipment);
b perform equipotential bonding of the installation;
This equipotential bonding is implemented by bonding conductors, supplemented by
Surge Protection Devices (SPDs) or spark gaps (e.g., antenna mast spark gap).
b minimize induced and indirect effects by installing SPDs and/or lters.
Two protection systems are used to eliminate or limit overvoltages: they are known
as the building protection system (for the outside of buildings) and the electrical
installation protection system (for the inside of buildings).
2.2 Building protection system
The role of the building protection system is to protect it against direct lightning
strokes.
The system consists of:
b the capture device: the lightning protection system;
b down-conductors designed to convey the lightning current to earth;
b "crow's foot" earth leads connected together;
b links between all metallic frames (equipotential bonding) and the earth leads.
When the lightning current ows in a conductor, if potential differences appear
between it and the frames connected to earth that are located in the vicinity, the
latter can cause destructive ashovers.
The system for protecting a building against the
effects of lightning must include:
b protection of structures against direct lightning
strokes;
b protection of electrical installations against
direct and indirect lightning strokes.
2.2.1 The 3 types of lightning protection system
Three types of building protection are used:
b The lightning rod (simple rod or with triggering system)
The lightning rod is a metallic capture tip placed at the top of the building. It is
earthed by one or more conductors (often copper strips) (see Fig. J12).
Fig. J12 : Lightning rod (simple rod or with triggering system)
Earth
down-conductor
(copper strip)
Check
terminal
"Crow's foot"
earth lead
Simple
lightning rod
Schneider Electric - Electrical installation guide 2013
J - Overvoltage protection
J8
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2.2.2 Consequences of building protection for the electrical
installation's equipment
50% of the lightning current discharged by the building protection system rises back
into the earthing networks of the electrical installation (see Fig. J15): the potential
rise of the frames very frequently exceeds the insulation withstand capability of
the conductors in the various networks (LV, telecommunications, video cable, etc.).
Moreover, the ow of current through the down-conductors generates induced
overvoltages in the electrical installation.
Electrical
installation
Installation
earth lead
I
i
Fig. J15 : Direct lightning back current
b The lightning rod with taut wires
These wires are stretched above the structure to be protected. They are used to
protect special structures: rocket launching areas, military applications and protection
of high-voltage overhead lines (see Fig. J13).
b The lightning conductor with meshed cage (Faraday cage)
This protection involves placing numerous down conductors/tapes symmetrically all
around the building. (see Fig. J14).
This type of lightning protection system is used for highly exposed buildings housing
very sensitive installations such as computer rooms.
Fig. J13 : Taut wires
Tin plated copper 25 mm
2
h
d > 0.1 h
Metal post
Frame grounded earth belt
Fig. J14 : Meshed cage (Faraday cage)
As a consequence, the building protection
system does not protect the electrical
installation: it is therefore compulsory to provide
for an electrical installation protection system.
Schneider Electric - Electrical installation guide 2013
J9
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
SPD
SPD
If L*>30m
Underground
MV supply
MV supply
Fig. J16 : Example of protection of a large-scale electrical installation
2.3 Electrical installation protection system
The main objective of the electrical installation protection system is to limit
overvoltages to values that are acceptable for the equipment.
The electrical installation protection system consists of:
b one or more SPDs depending on the building conguration;
b the equipotential bonding: metallic mesh of exposed conductive parts.
2.3.1 Implementation
The procedure to protect the electrical and electronic systems of a building is as
follows.
Search for information
b Identify all sensitive loads and their location in the building.
b Identify the electrical and electronic systems and their respective points of entry
into the building.
b Check whether a lightning protection system is present on the building or in the
vicinity.
b Become acquainted with the regulations applicable to the building's location.
b Assess the risk of lightning strike according to the geographic location, type of
power supply, lightning strike density, etc.
Solution implementation
b Install bonding conductors on frames by a mesh.
b Install a SPD in the LV incoming switchboard.
b Install an additional SPD in each subdistribution board located in the vicinity of
sensitive equipment (see Fig. J16).
If L*>30m
Underground
MV supply
SPD
SPD
SPD
SPD
SPD
MV supply
2 Principle of lightning protection
* the phenomena of wave reection is increasing from L=10m
Schneider Electric - Electrical installation guide 2013
J - Overvoltage protection
J10
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2.4 The Surge Protection Device (SPD)
The Surge Protection Device (SPD) is a component of the electrical installation
protection system.
This device is connected in parallel on the power supply circuit of the loads that it
has to protect (see Fig. J17). It can also be used at all levels of the power supply
network.
This is the most commonly used and most efcient type of overvoltage protection.
Principle
SPD is designed to limit transient overvoltages of atmospheric origin and divert
current waves to earth, so as to limit the amplitude of this overvoltage to a value that
is not hazardous for the electrical installation and electric switchgear and controlgear.
SPD eliminates overvoltages:
b in common mode, between phase and neutral or earth;
b in differential mode, between phase and neutral.
In the event of an overvoltage exceeding the operating threshold, the SPD
b conducts the energy to earth, in common mode;
b distributes the energy to the other live conductors, in differential mode.
The three types of SPD:
b Type 1 SPD
The Type 1 SPD is recommended in the specic case of service-sector and industrial
buildings, protected by a lightning protection system or a meshed cage.
It protects electrical installations against direct lightning strokes. It can discharge
the back-current from lightning spreading from the earth conductor to the network
conductors.
Type 1 SPD is characterized by a 10/350 s current wave.
b Type 2 SPD
The Type 2 SPD is the main protection system for all low voltage electrical
installations. Installed in each electrical switchboard, it prevents the spread of
overvoltages in the electrical installations and protects the loads.
Type 2 SPD is characterized by an 8/20 s current wave.
b Type 3 SPD
These SPDs have a low discharge capacity. They must therefore mandatorily be
installed as a supplement to Type 2 SPD and in the vicinity of sensitive loads.
Type 3 SPD is characterized by a combination of voltage waves (1.2/50 s) and
current waves (8/20 s).
Incoming
circuit breaker
SPD
Lightning
current
Sensitive loads
Fig. J17 : Principle of protection system in parallel
Surge Protection Devices (SPD) are used for
electric power supply networks, telephone
networks, and communication and automatic
control buses.
Schneider Electric - Electrical installation guide 2013
J11
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
b Type 1 SPD
v Iimp: Impulse current
This is the peak value of a current of 10/350 s waveform that the SPD is capable of
discharging 5 times.
v I: Autoextinguish follow current
Applicable only to the spark gap technology.
This is the current (50 Hz) that the SPD is capable of interrupting by itself after
ashover. This current must always be greater than the prospective short-circuit
current at the point of installation.
b Type 2 SPD
v Imax: Maximum discharge current
This is the peak value of a current of 8/20 s waveform that the SPD is capable of
discharging once.
b Type 3 SPD
v Uoc: Open-circuit voltage applied during class III (Type 3) tests.
2.4.1 Characteristics of SPD
International standard IEC 61643-11 Edition 1.0 (03/2011) denes the characteristics
and tests for SPD connected to low voltage distribution systems (see Fig. J19).
b Common characteristics
v Uc: Maximum continuous operating voltage
This is the A.C. or D.C. voltage above which the SPD becomes active. This value is
chosen according to the rated voltage and the system earthing arrangement.
v Up: Voltage protection level (at In)
This is the maximum voltage across the terminals of the SPD when it is active. This
voltage is reached when the current owing in the SPD is equal to In. The voltage
protection level chosen must be below the overvoltage withstand capability of the
loads (see section 3.2). In the event of lightning strokes, the voltage across the
terminals of the SPD generally remains less than Up.
v In: Nominal discharge current
This is the peak value of a current of 8/20 s waveform that the SPD is capable of
discharging 15 times.
Direct lightning stroke Indirect lightning stroke
IEC 61643-1 Class I test Class II test Class III test
IEC 61643-11/2007
Type 1 :
T1 Type 2 :
T2 Type 3 :
T3
EN/IEC 61643-11 Type 1 Type 2 Type 3
Former VDE 0675v B C D
Type of test wave 10/350 8/20 1.2/50 + 8/20
Note 1: There exist
T1
+
T2
SPD (or Type 1 + 2 SPD) combining protection of loads against direct and indirect lightning strokes.
Note 2:
some T2
SPD can also be declared as
T3 .
Fig. J18 : SPD standard denition
I
n
I
max
< 1 mA
I
U
U
p
U
c
Fig. J19 : Time/current characteristic of a SPD with varistor
In green, the guaranteed
operating range of the SPD.
2 Principle of lightning protection
b SPD normative denition
Schneider Electric - Electrical installation guide 2013
J - Overvoltage protection
J12
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Principle of lightning protection
2.4.2 Main applications
b Low Voltage SPD
Very different devices, from both a technological and usage viewpoint, are
designated by this term. Low voltage SPDs are modular to be easily installed inside
LV switchboards.
There are also SPDs adaptable to power sockets, but these devices have a low
discharge capacity.
b SPD for communication networks
These devices protect telephon networks, switched networks and automatic control
networks (bus) against overvoltages coming from outside (lightning) and those
internal to the power supply network (polluting equipment, switchgear operation,
etc.).
Such SPDs are also installed in RJ11, RJ45, ... connectors or integrated into loads.
Schneider Electric - Electrical installation guide 2013
J13
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Design of the electrical
installation protection system
3.1 Design rules
For a power distribution system, the main characteristics used to dene the lightning
protection system and select a SPD to protect an electrical installation in a building
are:
b SPD
v quantity of SPD;
v type;
v level of exposure to dene the SPD's maximum discharge current Imax.
b Short circuit protection device
v maximum discharge current Imax;
v short-circuit current Isc at the point of installation.
The logic diagram in the Figure J20 below illustrates this design rule.
Isc
at the installation point ?
Is there a lightning rod
on the building or within
50 metres of the building ?
Type 1 + Type2
or
Type 1+2
SPD
Risks level ?
Type2
SPD
Surge Protective
Device (SPD)
Short Circuit
Protection Device (SCPD)
No
Yes
Low
20 kA
Medium
40 kA
High
65 kA
Imax
25 kA 12,5 kA
mini.
Iimp
Risks level ?
Fig. J20 : Logic diagram for selection of a protection system
The other characteristics for selection of a SPD are predened for an electrical
installation.
b number of poles in SPD;
b voltage protection level Up;
b operating voltage Uc.
This sub-section J3 describes in greater detail the criteria for selection of the
protection system according to the characteristics of the installation, the equipment
to be protected and the environment.
To protect an electrical installation in a building,
simple rules apply for the choice of
b SPD(s);
b its protection system.
J - Overvoltage protection
Schneider Electric - Electrical installation guide 2013
J14
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
J - Overvoltage protection
3.2 Elements of the protection system
3.2.1 Location and type of SPD
The type of SPD to be installed at the origin of the installation depends on whether
or not a lightning protection system is present. If the building is tted with a lightning
protection system (as per IEC 62305), a Type 1 SPD should be installed.
For SPD installed at the incoming end of the installation, the IEC 60364 installation
standards lay down minimum values for the following 2 characteristics:
b Nominal discharge current In = 5 kA (8/20) s;
b Voltage protection level Up (at In) < 2.5 kV.
The number of additional SPDs to be installed is determined by:
b the size of the site and the difculty of installing bonding conductors. On large
sites, it is essential to install a SPD at the incoming end of each subdistribution
enclosure.
b the distance separating sensitive loads to be protected from the incoming-end
protection device. When the loads are located more than 30 meters away from
the incoming-end protection device, it is necessary to provide for additional ne
protection as close as possible to sensitive loads. The phenomena of wave reection
is increasing from 10 meters (see chapter 6.5)
b the risk of exposure. In the case of a very exposed site, the incoming-end SPD
cannot ensure both a high ow of lightning current and a sufciently low voltage
protection level. In particular, a Type 1 SPD is generally accompanied by a Type 2
SPD.
The table in Figure J21 below shows the quantity and type of SPD to be set up on
the basis of the two factors dened above.
Fig. J21 : The 4 cases of SPD implementation
Note : The Type 1 SPD is installed in the electrical switchboard connected to the earth lead of the lightning protection system.
A SPD must always be installed at the origin of
the electrical installation.
D
D
Is there a lightning rod on the building or
within 50 metres of the building ?
No
Yes
Incoming
circuit breaker
Type 2
SPD
Type 3
SPD
one Type 2 SPD in main switchboard
one Type 2/Type 3 SPD in the enclosure close to sensitive equipment
Incoming
circuit breaker
Type 1
+
Type 2
SPD
Type 3
SPD
one Type 1 and one Type 2 SPD (or one Type 1+2 SPD)
in the main switchboard
one Type 2/Type 3 SPD in the enclosure close to sensitive equipment
Incoming
circuit breaker
Type 1
+
Type 2
SPD
one Type 1 and one Type 2 SPD (or one Type 1+2 SPD)
in the main switchboard
Incoming
circuit breaker
Type 2
SPD
one Type 2 SPD in the main switchboard
D < 30 m
D > 30 m
D
i
s
t
a
n
c
e
(
D
)
s
e
p
a
r
a
t
i
n
g
s
e
n
s
i
t
i
v
e
e
q
u
i
p
m
e
n
t
f
r
o
m
l
i
g
h
t
n
i
n
g
p
r
o
t
e
c
t
i
o
n
s
y
s
t
e
m
i
n
s
t
a
l
l
e
d
i
n
m
a
i
n
s
w
i
t
c
h
b
o
a
r
d
D
D
Schneider Electric - Electrical installation guide 2013
J15
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3.2.2 Protection distributed levels
Several protection levels of SPD allows the energy to be distributed among several
SPDs, as shown in Figure J22 in which the three types of SPD are provided for:
b Type 1: when the building is tted with a lightning protection system and located at
the incoming end of the installation, it absorbs a very large quantity of energy;
b Type 2: absorbs residual overvoltages;
b Type 3: provides "ne" protection if necessary for the most sensitive equipment
located very close to the loads.
3 Design of the electrical
installation protection system
Type 1
SPD
Main LV
Switchboard
(incoming protection)
Subdistribution
Board
Fine Protection
Enclosure
Type 2
SPD
Discharge Capacity (%)
Type 3
SPD
90 % 9 % 1 %
Sensitive
Equipment
Fig. J22 : Fine protection architecture
Note: The Type 1 and 2 SPD can be combined in a single SPD
N L1 L3 L2
Fig. J23 : The PRD1 25r SPD fulls the two functions of Type 1 and Type 2 (Type 1+2) in the same product
PRD1 25 r PRD1 25 r
Schneider Electric - Electrical installation guide 2013
J16
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
J - Overvoltage protection
The most common values of Uc chosen according to the system earthing
arrangement.
TT, TN: 260, 320, 340, 350 V
IT: 440, 460 V
3.3.2 Voltage protection level Up (at In)
The 443-4 section of IEC 60364 standard, Selection of equipment in the
installation, helps with the choice of the protection level Up for the SPD in function
of the loads to be protected. The table of Figure J25 indicates the impulse withstand
capability of each kind of equipment.
SPDs connected
between
System conguration of distribution network
TT TN-C TN-S IT with
distributed
neutral
IT without
distributed
neutral
Line conductor and
neutral conductor
1.1 Uo NA 1.1 Uo 1.1 Uo NA
Each line conductor and
PE conductor
1.1 Uo NA 1.1 Uo 3Uo Vo
Neutral conductor and PE
conductor
Uo NA Uo Uo NA
Each line conductor and
PEN conductor
NA 1.1 Uo NA NA NA
NA: not applicable
NOTE 1: Uo is the line-to-neutral voltage, Vo is the line-to-line voltage of the low voltage system.
NOTE 2: This table is based on IEC 61643-1 amendment 1.
Fig. J24 : Stipulated minimum value of Uc for SPDs depending on the system earthing
arrangement (based on Table 53C of the IEC 60364-5-53 standard)
(1) As per IEC 60038.
(2) In Canada and the United States, for voltages exceeding 300 V relative to earth, the impulse
withstand voltage corresponding to the immediately higher voltage in the column is applicable.
(3) This impulse withstand voltage is applicable between live conductors and the PE conductor
Nominal voltage of Required impulse withstand voltage for
the installation
(1)
V kV
Three-phase Single-phase Equipment at Equipment of Appliances Specially
systems
(2)
systems with the origin of distribution and protected
middle point the installation nal circuits equipment
(impulse (impulse (impulse (impulse
withstand withstand withstand withstand
category IV) category III) category II) category I)
120-240 4 2.5 1.5 0.8
230/400
(2)
- 6 4 2.5 1.5
277/480
(2)
400/690 - 8 6 4 2.5
1,000 - Values subject to system engineers
Fig. J25 : Equipment impulse withstand category for an installation in conformity with IEC 60364
(Table 44B).
3.3 Common characteristics of SPDs according to
the installation characteristics
3.3.1 Operating voltage Uc
Depending on the system earthing arrangement, the maximum continuous operating
voltage Uc of SPD must be equal to or greater than the values shown in the table in
Figure J24.
Schneider Electric - Electrical installation guide 2013
J17
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Design of the electrical
installation protection system
b Equipment of overvoltage category I is
only suitable for use in the xed installation of
buildings where protective means are applied
outside the equipment to limit transient
overvoltages to the specied level.
Examples of such equipment are those
containing electronic circuits like computers,
appliances with electronic programmes, etc.
b Equipment of overvoltage category II is
suitable for connection to the xed electrical
installation, providing a normal degree of
availability normally required for current-using
equipment.
Examples of such equipment are household
appliances and similar loads.
b Equipment of overvoltage category III is for
use in the xed installation downstream of,
and including the main distribution board,
providing a high degree of availability.
Examples of such equipment are distribution
boards, circuit-breakers, wiring systems
including cables, bus-bars, junction boxes,
switches, socket-outlets) in the xed
installation, and equipment for industrial use
and some other equipment, e.g. stationary
motors with permanent connection to the
xed installation.
b Equipment of overvoltage category IV is
suitable for use at, or in the proximity of,
the origin of the installation, for example
upstream of the main distribution board.
Examples of such equipment are electricity
meters, primary overcurrent protection
devices and ripple control units.
Fig. J26 : Overvoltage category of equipment
The "installed" Up performance should be compared with the impulse withstand
capability of the loads.
SPD has a voltage protection level Up that is intrinsic, i.e. dened and tested
independently of its installation. In practice, for the choice of Up performance of a
SPD, a safety margin must be taken to allow for the overvoltages inherent in the
installation of the SPD (see Fig. J27).
Fig. J27 : "Installed" Up
= Up + U1 + U2 Up
Installed
Up
Loads
to be
protected
U1
U2
The "installed" voltage protection level Up generally adopted to protect sensitive
equipment in 230/400 V electrical installations is 2.5 kV (overvoltage category II,
see Fig. J28).
Note:
If the stipulated voltage protection level cannot be achieved
by the incoming-end SPD or if sensitive equipment items are
remote (see section 3.2.1), additional coordinated SPD must
be installed to achieve the required protection level.
Schneider Electric - Electrical installation guide 2013
J18
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
J - Overvoltage protection
3.3.3 Number of poles
b Depending on the system earthing arrangement, it is necessary to provide for a
SPD architecture ensuring protection in common mode (CM) and differential mode
(DM).
Fig. J28 : Protection need according to the system earthing arrangement
TT TN-C TN-S IT
Phase-to-neutral (DM) Recommended
1
- Recommended Not useful
Phase-to-earth (PE or PEN) (CM) Yes Yes Yes Yes
Neutral-to-earth (PE) (CM) Yes - Yes Yes
2
Note:
b Common-mode overvoltage
A basic form of protection is to install a SPD in common mode between phases and
the PE (or PEN) conductor, whatever the type of system earthing arrangement used.
b Differential-mode overvoltage
In the TT and TN-S systems, earthing of the neutral results in an asymmetry due to
earth impedances which leads to the appearance of differential-mode voltages, even
though the overvoltage induced by a lightning stroke is common-mode.
2P, 3P and 4P SPDs (see Fig. J29)
b These are adapted to the TT and TN-S systems.
b They provide protection merely against common-mode overvoltages.
Fig. J29 : 2P, 3P, 4P SPDs
1P + N, 3P + N SPDs (see Fig. J30)
b These are adapted to the TT and TN-S systems.
b They provide protection against common-mode and differential-mode overvoltages.
Fig. J30 : 1P + N, 3P + N SPDs
1
The protection between phase and neutral can either be incorporated in the SPD placed at the origin of the
installation, or be remoted close to the equipment to be protected
2
If neutal distributed
Schneider Electric - Electrical installation guide 2013
J19
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Design of the electrical
installation protection system
3.4 Selection of a Type 1 SPD
3.4.1 Impulse current Iimp
b Where there are no national regulations or specic regulations for the type of
building to be protected:
the impulse current Iimp shall be at least 12.5 kA (10/350 s wave) per branch in
accordance with IEC 60364-5-534.
b Where regulations exist:
standard 62305-2 denes 4 levels: I, II, III and IV
The table in Figure J31 shows the different levels of Iimp in the regulatory case.
Fig. J31 : Table of Iimp values according to the building's voltage protection level (based on
IEC/EN 62305-2)
Protection level
as per EN 62305-2
External lightning
protection system
designed to handle direct
ash of:
Minimum required Iimp for
Type 1 SPD for line-neutral
network
I 200 kA 25 kA/pole
II 150 kA 18.75 kA/pole
III / IV 100 kA 12.5 kA/pole
3.4.2 Autoextinguish follow current I
This characteristic is applicable only for SPDs with spark gap technology. The
autoextinguish follow current I must always be greater than the prospective short-
circuit current Isc at the point of installation.
3.5 Selection of a Type 2 SPD
3.5.1 Maximum discharge current Imax
The maximum discharge current Imax is dened according to the estimated
exposure level relative to the building's location.
The value of the maximum discharge current (Imax) is determined by a risk analysis
(see table in Figure J32).
Fig. J32 : Recommended maximum discharge current Imax according to the exposure level
Exposure level
Low Medium High
Building environment Building located in an urban
or suburban area of grouped
housing
Building located in a plain Building where there is a
specic risk: pylon, tree,
mountainous region, wet area
or pond, etc.
Recommended Imax
value (k)
20 40 65
Schneider Electric - Electrical installation guide 2013
J20
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
J - Overvoltage protection
3.6 Selection of external Short Circuit Protection
Device (SCPD)
3.6.1 Risks to be avoided at end of life of the SPDs
b Due to ageing
In the case of natural end of life due to ageing, protection is of the thermal type. SPD
with varistors must have an internal disconnector which disables the SPD.
Note: End of life through thermal runaway does not concern SPD with gas discharge
tube or encapsulated spark gap.
b Due to a fault
The causes of end of life due to a short-circuit fault are:
v Maximum discharge capacity exceeded.
This fault results in a strong short circuit.
v A fault due to the distribution system (neutral/phase switchover, neutral
disconnection).
v Gradual deterioration of the varistor.
The latter two faults result in an impedant short circuit.
The installation must be protected from damage resulting from these types of fault:
the internal (thermal) disconnector dened above does not have time to warm up,
hence to operate.
A special device called "external Short Circuit Protection Device (external SCPD) ",
capable of eliminating the short circuit, should be installed. It can be implemented by
a circuit breaker or fuse device.
3.6.2 Characteristics of the external SCPD
The external SCPD should be coordinated with the SPD. It is designed to meet the
following two constraints:
Lightning current withstand
The lightning current withstand is an essential characteristic of the SPD's external
Short Circuit Protection Device.
The external SCPD must not trip upon 15 successive impulse currents at In.
Short-circuit current withstand
b The breaking capacity is determined by the installation rules (IEC 60364
standard):
The external SCPD should have a breaking capacity equal to or greater than the
prospective short-circuit current Isc at the installation point (in accordance with the
IEC 60364 standard).
b Protection of the installation against short circuits
In particular, the impedant short circuit dissipates a lot of energy and should be
eliminated very quickly to prevent damage to the installation and to the SPD.
The right association between a SPD and its external SCPD must be given by the
manufacturer.
The protection devices (thermal and short
circuit) must be coordinated with the SPD to
ensure reliable operation, i.e.
b ensure continuity of service:
v withstand lightning current waves;
v not generate excessive residual voltage.
b ensure effective protection against all types of
overcurrent:
v overload following thermal runaway of the
varistor;
v short circuit of low intensity (impedant);
v short circuit of high intensity.
Schneider Electric - Electrical installation guide 2013
J21
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Design of the electrical
installation protection system
3.6.3 Installation mode for the external SCPD
b Device "in series"
The SCPD is described as "in series" (see Fig. J33) when the protection is
performed by the general protection device of the network to be protected (for
example, connection circuit breaker upstream of an installation).
Fig. J33 : SCPD "in series"
b Device "in parallel"
The SCPD is described as "in parallel" (see Fig. J34) when the protection is
performed specically by a protection device associated with the SPD.
b The external SCPD is called a "disconnecting circuit breaker" if the function is
performed by a circuit breaker.
b The disconnecting circuit breaker may or may not be integrated into the SPD.
Fig. J34 : SCPD "in parallel"
Note:
In the case of a SPD with gas discharge tube or encapsulated spark gap, the SCPD
allows the current to be cut immediately after use.
Schneider Electric - Electrical installation guide 2013
J22
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
J - Overvoltage protection
3.6.4 Guarantee of protection
The external SCPD should be coordinated with the SPD, and tested and guaranteed
by the SPD manufacturer in accordance with the recommendations of the IEC
61643-11 standard (NF EN 61643-1) Chap. 7.7.3. It should also be installed in
accordance with the manufacturer's recommendations.
When this device is integrated, conformity with product standard IEC 61643-11
naturally ensures protection.
Fig. J35 : SPDs with external SCPD, non-integrated (iC60 + PRD 40r) and integrated (Quick
PRD 40r)
+
3.6.5 Summary of external SCPDs characteristics
A detailed analysis of the characteristics is given in section 6.4.
The table in Figure J36 shows, on an example, a summary of the characteristics
according to the various types of external SCPD.
Installation mode for the
external SCPD
In series In parallel
Fuse protection
associated
Circuit breaker protection
associated
Circuit breaker protection
integrated
Surge protection of
equipment
= = = =
SPDs protect the equipment satisfactorily whatever the kind of associated external SCPD
Protection of installation
at end of life
- = + + +
No guarantee of protection
possible
Manufacturer's guarantee Full guarantee
Protection from impedant short
circuits not well ensured
Protection from short circuits perfectly ensured
Continuity of service at
end of life
- - + + +
The complete installation is
shut down
Only the SPD circuit is shut down
Maintenance at end
of life
- - = + +
Shutdown of the installation
required
Change of fuses Immediate resetting
Fig. J36 : Characteristics of end-of-life protection of a Type 2 SPD according to the external SCPDs
3.7 SPD and protection device coordination table
The table in Figure J37 below shows the coordination of disconnecting circuit
breakers (external SCPD) for Type 1 and 2 SPDs of the Schneider Electric brand for
all levels of short-circuit currents.
Coordination between SPD and its disconnecting circuit breakers, indicated and
guaranteed by Schneider Electric, ensures reliable protection (lightning wave
withstand, reinforced protection of impedant short-circuit currents, etc.)
Schneider Electric - Electrical installation guide 2013
J23
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Design of the electrical
installation protection system
50
70
36
25
15
10
6
8 kA
20 kA
Low risk Medium risk
No lightning rod
Dedicated protection to be added
when equipment is more than 30m
from switchboard.
Lightning rod on
the building or within
50 m of the building
High risk Maximum risk
40 kA 65 kA 12.5 kA 25 kA
Isc (kA)
Type 2 - class II Type 1 - class I
Quick
iPRD20r
Quick
iPRD 40r
iC60L
20A
(1)
iPF 8/
iPRD 8r
iC60H
20A
(1)
iC60N
20A
(1)
iPF 8/
iPRD 8r
iPF 8/
iPRD 8r
iC60L
25A
(1)
iPF 20/
iPRD 20r
iC60H
25A
(1)
iC60N
25A
(1)
iPF 20/
iPRD20r
iPF 20/
iPRD 20r
NG125N
(2)
40A
(2)
iPF 40/
iPRD 40r
iC60H
40A
(1)
iC60N
40A
(1)
iPF 40/
iPRD 40r
iPF 40/
iPRD 40r
NG125N
(2)
50A
(2)
iPF 65/
iPRD 65r
NG125L
80A
(1)
PRD1
(3)
Master
NG125H
80A
(1)
PRD1
Master
NG125N
80A
(1)
PRD1
25r
NG125H
80A
(1)
PRF1
(3)
12.5r
NG125N
80A
(1)
PRF1
(3)
12.5r
C120H or
NG125N
80A
(1)
PRF1
(3)
12.5r
iC60H
50A
(1)
iC60N
50A
(1)
iPF 65/
iPRD 65r
iPF 65/
iPRD 65r
C120N
80A
(1)
PRF1 12.5r
(3)
NG125L
80A
(1)
PRF1
(3)
12.5r
iQuick
PRDxx
Imax Imax
SCPD
not integrated
SCPD integrated
Need a more specic study
Fig. J37 : Coordination table between SPDs and their disconnecting circuit breakers of the Schneider Electric brand
(1): All circuit breakers are C curve - (2): NG 125 L for 1P & 2P - (3): Also Type 2 (class II) tested
3.7.1 Coordination with upstream protection devices
Coordination with overcurrent protection devices
In an electrical installation, the external SCPD is an apparatus identical to the
protection apparatus: this makes it possible to apply discrimination and cascading
techniques for technical and economic optimization of the protection plan.
Coordination with residual current devices
If the SPD is installed downstream of an earth leakage protection device, the latter
should be of the "si" or selective type with an immunity to pulse currents of at least 3
kA (8/20 s current wave).
Note: S type residual current devices in conformity with the IEC
61008 or IEC 61009-1 standards comply with this requirement.
Schneider Electric - Electrical installation guide 2013
J - Overvoltage protection
J24
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Installation of SPDs
4.1 Connection
One of the essential characteristics for the protection of equipment is the maximum
voltage protection level (installed Up) that the equipment can withstand at its
terminals. Accordingly, a SPD should be chosen with a voltage protection level
Up adapted to protection of the equipment (see Fig. J38). The total length of the
connection conductors is
L = L1+L2+L3.
For high-frequency currents, the impedance per unit length of this connection is
approximately 1 H/m.
Hence, applying Lenz's law to this connection: U = L di/dt
The normalized 8/20 s current wave, with a current amplitude of 8 kA, accordingly
creates a voltage rise of 1000 V per metre of cable.
U =1 x 10
-6
x 8 x 10
3
/8 x 10
-6
= 1000 V
Fig. J38 : Connections of a SPD L < 50 cm
U equipment
disconnection
circuit-breaker
load to be
protected
U2
Up
U1
SPD
L3
L2
L1
L = L1 + L2 + L3 < 50 cm
As a result the voltage across the equipment terminals, installed Up, is:
installed Up = Up + U1 + U2
If L1+L2+L3 = 50 cm, and the wave is 8/20 s with an amplitude of 8 k, the voltage
across the equipment terminals will be Up + 500 V.
4.1.1 Connection in plastic enclosure
Figure J39a below shows how to connect a SPD in plastic enclosure.
Fig. J39a : Example of connection in plastic enclosure
L
1
L
2
L
3
SPD
Earth distribution
block
to load
Circuit breaker
Earth auxiliairy
block
Connections of a SPD to the loads should be as
short as possible in order to reduce the value of
the voltage protection level (installed Up) on the
terminals of the protected equipment.
The total length of SPD connections to the
network and the earth terminal block should not
exceed 50 cm.
Schneider Electric - Electrical installation guide 2013
J25
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4.1.2 Connection in metallic enclosure
In the case of a switchgear assembly in a metallic enclosure, it may be wise to
connect the SPD directly to the metallic enclosure, with the enclosure being used as
a protective conductor (see Fig. J39b).
This arrangement complies with standard IEC 61439-2 and the ASSEMBLY
manufacturer must make sure that the characteristics of the enclosure make this use
possible.
4.1.3 Conductor cross section
The recommended minimum conductor cross section takes into account:
b The normal service to be provided: Flow of the lightning current wave under a
maximum voltage drop (50 cm rule).
Note: Unlike applications at 50 Hz, the phenomenon of lightning being high-
frequency, the increase in the conductor cross section does not greatly reduce its
high-frequency impedance.
b The conductors' withstand to short-circuit currents: The conductor must resist a
short-circuit current during the maximum protection system cutoff time.
IEC 60364 recommends at the installation incoming end a minimum cross section of:
v 4 mm (Cu) for connection of Type 2 SPD;
v 16 mm (Cu) for connection of Type 1 SPD (presence of lightning protection
system).
Fig. J39b : Example of connection in metallic enclosure
L
1
L
2
L
3
to load
SPD
Earth distribution
block
Circuit breaker
4 Installation of SPDs
Schneider Electric - Electrical installation guide 2013
J - Overvoltage protection
J26
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4.2 Cabling rules
b Rule 1:
The rst rule to comply with is that the length of the SPD connections between the
network (via the external SCPD) and the earthing terminal block should not exceed
50 cm.
Figure J40 shows the two possibilities for connection of a SPD.
Fig. 40 : SPD with separate or integrated external SCPD
Imax: 65kA (8/20)
In: 20kA (8/20)
Up: 1, 5kV
Uc: 340Va
d
1
d
2
d
3
d
1
+
d
2
+
d
3
<
5
0
cm
S
C
P
D
S
P
D
d
1
d
3
d
1 +
d
3
35 cm
SPD
Q
uick PR
D
b Rule 2:
The conductors of protected outgoing feeders:
b should be connected to the terminals of the external SCPD or the SPD;
b should be separated physically from the polluted incoming conductors.
They are located to the right of the terminals of the SPD and the SCPD (see
Fig. J41).
Fig. 41 : The connections of protected outgoing feeders are to the right of the SPD terminals
iQuick PRDxx
Protected feeders Power supply
Schneider Electric - Electrical installation guide 2013
J27
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Installation of SPDs
b Rule 3:
The incoming feeder phase, neutral and protection (PE) conductors should run one
beside another in order to reduce the loop surface (see Fig. J42).
b Rule 4:
The incoming conductors of the SPD should be remote from the protected outgoing
conductors to avoid polluting them by coupling (see Fig. J42).
b Rule 5:
The cables should be pinned against the metallic parts of the enclosure (if any) in
order to minimize the surface of the frame loop and hence benet from a shielding
effect against EM disturbances.
In all cases, it must be checked that the frames of switchboards and enclosures are
earthed via very short connections.
Finally, if shielded cables are used, big lengths should be avoided, because they
reduce the efciency of shielding (see Fig. J42).
Fig. 42 : Example of improvement of EMC by a reduction in the loop surfaces and common
impedance in an electric enclosure
Clean cables polluted by
neighbouring polluted cables
Clean cable paths separated
from polluted cable paths
protected
outgoing
feeders
protected
outgoing
feeders
Large
frame
loop
surface
Intermediate
earth
terminal
Intermediate
earth terminal
Main earth
terminal
Main earth
terminal
NO
YES
Intermediate
earth
terminal
Intermediate
earth terminal
Main earth
terminal
Main earth
terminal
Small
frame
loop
surface
NO
YES
Schneider Electric - Electrical installation guide 2013
J - Overvoltage protection
J28
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5 Application
5.1 Installation examples
Fig. J43 : Application example: supermarket
iC60
40 A
PRD
40 kA
iC60
20 A
PRD
8 kA
iC60
20 A
PRD
8 kA
ID
"si"
ID
"si"
160 kVA
Solutions and schematic diagram
b The surge arrester selection guide has made it possible to determine the precise
value of the surge arrester at the incoming end of the installation and that of the
associated disconnection circuit breaker.
b As the sensitive devices (Uimp < 1.5 kV) are located more than 30 m from the
incoming protection device, the ne protection surge arresters must be installed as
close as possible to the loads.
b To ensure better continuity of service for cold room areas:
v"si" type residual current circuit breakers will be used to avoid nuisance tripping
caused by the rise in earth potential as the lightning wave passes through.
b For protection against atmospheric overvoltages:
v install a surge arrester in the main switchboard
v install a ne protection surge arrester in each switchboard (1 and 2) supplying the
sensitive devices situated more than 30 m from the incoming surge arrester
v install a surge arrester on the telecommunications network to protect the devices
supplied, for example re alarms, modems, telephones, faxes.
Cabling recommendations
b Ensure the equipotentiality of the earth terminations of the building.
b Reduce the looped power supply cable areas.
Installation recommendations
b Install a surge arrester, Imax = 40 kA (8/20 s) and a iC60 disconnection circuit
breaker rated at 20 A.
b Install ne protection surge arresters, Imax = 8 kA (8/20 s) and the associated
iC60 disconnection circuit breakers rated at 20
Fig. J44 : Telecommunications network
MV/LV transformer
Main
switchboard
Switchboard 1 Switchboard
2
Heating Lighting Freezer Refrigerator
Storeroom lighting Power outlets
Fire-ghting system Alarm
IT system Checkout
Schneider Electric - Electrical installation guide 2013
J29
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5 Application
Fig. J45 : SPD DC choice
5.2 SPD for Photovoltaic application
Overvoltage may occur in electrical installations for various reasons. It may be
caused by:
b The distribution network as a result of lightning or any work carried out.
b Lightning strikes (nearby or on buildings and PV installations, or on lightning
conductors).
b Variations in the electrical eld due to lightning.
Like all outdoor structures, PV installations are exposed to the risk of lightning which
varies from region to region. Preventive and arrest systems and devices should be in
place.
5.2.1. Protection by equipotential bonding
The rst safeguard to put in place is a medium (conductor) that ensures equipotential
bonding between all the conductive parts of a PV installation.
The aim is to bond all grounded conductors and metal parts and so create equal
potential at all points in the installed system.
5.2.2. Protection by surge protection devices (SPDs)
SPDs are particularly important to protect sensitive electrical equipments like AC/DC
Inverter, monitoring devices and PV modules, but also other sensitive equipments
powered by the 230 VAC electrical distribution network. The following method of risk
assessment is based on the evaluation of the critical length L
crit
and its comparison
with L the cumulative length of the d.c. lines.
SPD protection is required if L L
crit
.
L
crit
depends on the type of PV installation and is calculated as the following table
(Fig.J45) sets out:
Type of installation Individual residential
premises
Terrestrial production
plant
Service/Industrial/
Agricultural/Buildings
L
crit
(in m) 115/Ng 200/Ng 450/Ng
L L
crit
Surge protective device(s) compulsory on DC side
L < L
crit
Surge protective device(s) not compulsory on DC side
L is the sum of:
b the sum of distances between the inverter(s) and the junction box(es),
taking into account that the lengths of cable located in the same conduit are
counted only once, and
b the sum of distances between the junction box and the connection points
of the photovoltaic modules forming the string, taking into account that the
lengths of cable located in the same conduit are counted only once.
Ng is arc lightning density (number of strikes/km/year).
Schneider Electric - Electrical installation guide 2013
J - Overvoltage protection
J30
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Installing an SPD
The number and location of SPDs on the DC side depend on the length of
the cables between the solar panels and inverter. The SPD should be installed
in the vicinity of the inverter if the length is less than 10 metres. If it is greater
than 10 metres, a second SPD is necessary and should be located in the box
close to the solar panel, the rst one is located in the inverter area.
To be efcient, SPD connection cables to the L+ / L- network and between
the SPDs earth terminal block and ground busbar must be as short as
possible less than 2.5 metres (d1+d2<50 cm).
SPD Protection
Location PV modules or
Array boxes
Inverter
DC side
Inverter AC side Main board
L
DC
L
AC
Lightning rod
Criteria < 10 m > 10 m < 10 m > 10 m Yes No
Type of
SPD
No
need
"SPD 1"
Type 2*
"SPD 2"
Type 2*
No need "SPD 3"
Type 2*
"SPD 4"
Type 1*
"SPD 4"
Type 2 if
Ng > 2,5 &
overhead
line
* Type 1 separation distance according to EN 62305 is not observed.
Fig. J46 : SPD selection
SPD
1
Array box Generator box AC box
Main LV switch
board
SPD
2
L
DC
SPD
3
SPD
4
L
AC
Schneider Electric - Electrical installation guide 2013
J31
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5 Application
Safe and reliable photovoltaic energy generation
Depending on the distance between the "generator" part and the "conversion" part, it may be necessary to install two surge arresters or more, to ensure protection of
each of the two parts.
Fig. J47 : SPD location
- + - + - +
-
+
-
+
> 4 mm
2
d1 + d2 < 50 cm
d3
d2
d1
d1 + d3 < 50 cm
d2 + d3 < 50 cm
N
L
d y 10 m
- + - + - +
-
+
-
+
d3
d2
d1
N
L
d >10 m
d3
IPRD-DC
2
d2
d1
IPRD-DC
1
IPRD-DC
1
Schneider Electric - Electrical installation guide 2013
J - Overvoltage protection
J32
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6.1 Lightning protection standards
The IEC 62305 standard parts 1 to 4 (NF EN 62305 parts 1 to 4) reorganizes and
updates the standard publications IEC 61024 (series), IEC 61312 (series) and IEC
61663 (series) on lightning protection systems.
b Part 1 - General principles:
This part presents general information on lightning and its characteristics and
general data, and introduces the other documents.
b Part 2 - Risk management:
This part presents the analysis making it possible to calculate the risk for a structure
and to determine the various protection scenarios in order to permit technical and
economic optimization.
b Part 3 - Physical damage to structures and life hazard:
This part describes protection from direct lightning strokes, including the lightning
protection system, down-conductor, earth lead, equipotentiality and hence SPD with
equipotential bonding (Type 1 SPD).
b Part 4 - Electrical and electronic systems within structures:
This part describes protection from the induced effects of lightning, including the
protection system by SPD (Types 2 and 3), cable shielding, rules for installation of
SPD, etc.
This series of standards is supplemented by:
b the IEC 61643 series of standards for the denition of surge protection products
(see sub-section 2);
b the IEC 60364-4 and -5 series of standards for application of the products in LV
electrical installations (see sub-section 3).
6.2 The components of a SPD
The SPD chiey consists of (see Fig. J48):
1) one or more nonlinear components: the live part (varistor, gas discharge tube,
etc.);
2) a thermal protective device (internal disconnector) which protects it from thermal
runaway at end of life (SPD with varistor);
3) an indicator which indicates end of life of the SPD;
Some SPDs allow remote reporting of this indication;
4) an external SCPD which provides protection against short circuits (this device can
be integrated into the SPD).
1
2
3
4
Fig. J48 : Diagram of a SPD
6 Technical supplements
Schneider Electric - Electrical installation guide 2013
J33
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6.2.1 Technology of the live part
Several technologies are available to implement the live part. They each have
advantages and disadvantages:
b Zener diodes;
b The gas discharge tube (controlled or not controlled);
b The varistor (zinc oxide varistor).
The table below shows the characteristics and the arrangements of 3 commonly
used technologies.
Component Gas Discharge Tube
(GDT)
Encapsulated spark
gap
Zinc oxide varistor GDT and varistor in
series
Encapsulated spark
gap and varistor in
parallel
Characteristics
Operating mode Voltage switching Voltage switching Voltage limiting Voltage-switching and
-limiting in series
Voltage-switching and
-limiting in parallel
Operating curves u
I
u
I
Application
b Telecom network
b LV network
(associated with
varistor)
LV network LV network LV network LV network
Type Type 2 Type 1 Type 1 ou Type 2 Type 1+ Type 2 Type 1+ Type 2
Fig. J49 : Summary performance table
Note: Two technologies can be installed in the same SPD (see Fig. J50)
N L1 L3 L2
Fig. J50 : The Schneider Electric brand PRD SPD incorporates a gas discharge tube between
neutral and earth and varistors between phase and neutral
6 Technical supplements
Schneider Electric - Electrical installation guide 2013
J - Overvoltage protection
J34
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6.3 End-of-life indication
End-of-life indicators are associated with the internal disconnector and the external
SCPD of the SPD to informs the user that the equipment is no longer protected
against overvoltages of atmospheric origin.
Local indication
This function is generally required by the installation codes.
The end-of-life indication is given by an indicator (luminous or mechanical) to the
internal disconnector and/or the external SCPD.
When the external SCPD is implemented by a fuse device, it is necessary to provide
for a fuse with a striker and a base equipped with a tripping system to ensure this
function.
Integrated disconnecting circuit breaker
The mechanical indicator and the position of the control handle allow natural end-of-
life indication.
6.3.1 Local indication and remote reporting
iQuick PRD SPD of the Schneider Electric brand is of the "ready to wire" type with an
integrated disconnecting circuit breaker.
Local indication
iQuick PRD SPD (see Fig. J51) is tted with local mechanical status indicators:
b the (red) mechanical indicator and the position of the disconnecting circuit breaker
handle indicate shutdown of the SPD;
b the (red) mechanical indicator on each cartridge indicates cartridge end of life.
Remote reporting (see Fig. J52)
iQuick PRD SPD is tted with an indication contact which allows remote reporting of:
b cartridge end of life;
b a missing cartridge, and when it has been put back in place;
b a fault on the network (short circuit, disconnection of neutral, phase/neutral
reversal);
b local manual switching.
As a result, remote monitoring of the operating condition of the installed SPDs
makes it possible to ensure that these protective devices in standby state are always
ready to operate.
6.3.2 Maintenance at end of life
When the end-of-life indicator indicates shutdown, the SPD (or the cartridge in
question) must be replaced.
In the case of the iQuick PRD SPD, maintenance is facilitated:
b The cartridge at end of life (to be replaced) is easily identiable by the Maintenance
Department.
b The cartridge at end of life can be replaced in complete safety, because a safety
device prohibits closing of the disconnecting circuit breaker if a cartridge is missing.
6.4 Detailed characteristics of the external SCPD
6.4.1 Current wave withstand
The current wave withstand tests on external SCPDs show as follows:
b For a given rating and technology (NH or cylindrical fuse), the current wave
withstand capability is better with an aM type fuse (motor protection) than with a gG
type fuse (general use).
b For a given rating, the current wave withstand capability is better with a circuit
breaker than with a fuse device.
Figure J53 below shows the results of the voltage wave withstand tests:
b to protect a SPD dened for Imax = 20 kA, the external SCPD to be chosen is
either a MCCB 16 A or a Fuse aM 63 A,
Note: in this case, a Fuse gG 63 A is not suitable.
b to protect a SPD dened for Imax = 40 kA, the external SCPD to be chosen is
either a MCCB 63 A or a Fuse aM 125 A,
Fig. J51 : iQuick PRD 3P +N SPD of the Schneider
Electric brand
Fig. J52 : Installation of indicator light with a iQuick PRD
SPD
Schneider Electric - Electrical installation guide 2013
J35
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6 Technical supplements
6.4.2 Installed Up voltage protection level
In general:
b The voltage drop across the terminals of a circuit breaker is higher than that across
the terminals of a fuse device. This is because the impedance of the circuit-breaker
components (thermal and magnetic tripping devices) is higher than that of a fuse.
However:
b The difference between the voltage drops remains slight for current waves not
exceeding 10 kA (95% of cases);
b The installed Up voltage protection level also takes into account the cabling
impedance. This can be high in the case of a fuse technology (protection device
remote from the SPD) and low in the case of a circuit-breaker technology (circuit
breaker close to, and even integrated into the SPD).
Note: The installed Up voltage protection level is the sum of the voltage drops:
v in the SPD;
v in the external SCPD;
v in the equipment cabling.
6.4.3 Protection from impedant short circuits
An impedant short circuit dissipates a lot of energy and should be eliminated very
quickly to prevent damage to the installation and to the SPD.
Figure J54 compares the response time and the energy limitation of a protection
system by a 63 A aM fuse and a 25 A circuit breaker.
These two protection systems have the same 8/20 s current wave withstand
capability (27 kA and 30 kA respectively).
MCB 16 A
Fuse aM 63 A
Fuse gG 63 A
10 30 50
I kA
(8/20) s
20 40
Fuse gG 125 A
MCB 63 A
MCB 40 A
Withstand Melting or tripping
Fig. J53 : Comparison of SCPDs voltage wave withstand capabilities for Imax = 20 kA and Imax = 40 kA
0,01
2
s
350 2000 A 350 2000 A
As
10
4
MCB 25 A Fuse aM 63 A
Fig. J54 : Comparison of time/current and energy limitations curves for a circuit
breaker and a fuse having the same 8/20 s current wave withstand capability
In green colour,
the impedant
short circuit area
Schneider Electric - Electrical installation guide 2013
J - Overvoltage protection
J36
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6.5 Propagation of a lightning wave
Electrical networks are low-frequency and, as a result, propagation of the voltage
wave is instantaneous relative to the frequency of the phenomenon: at any point of a
conductor, the instantaneous voltage is the same.
The lightning wave is a high-frequency phenomenon (several hundred kHz to a
MHz):
b The lightning wave is propagated along a conductor at a certain speed relative to
the frequency of the phenomenon. As a result, at any given time, the voltage does
not have the same value at all points on the medium (see Fig. J55).
Fig. J55 : Propagation of a lightning wave in a conductor
Cable
Voltage wave
b A change of medium creates a phenomenon of propagation and/or reection of the
wave depending on:
v the difference of impedance between the two media;
v the frequency of the progressive wave (steepness of the rise time in the case of a
pulse);
v the length of the medium.
In the case of total reection in particular, the voltage value may double.
Example: case of protection by a SPD
Modelling of the phenomenon applied to a lightning wave and tests in laboratory
showed that a load powered by 30 m of cable protected upstream by a SPD at
voltage Up sustains, due to reection phenomena, a maximum voltage of 2 x Up
(see Fig. J56). This voltage wave is not energetic.
Fig. J56 : Reection of a lightning wave at the termination of a cable
Ui Uo
2000
0
3 2 4 5 6 7 8 9 10
Cable
Ui = Voltage at SPD level
Uo = Voltage at cable termination
Ui
Uo
V
s
Corrective action
Of the three factors (difference of impedance, frequency, distance), the only one that
can really be controlled is the length of cable between the SPD and the load to be
protected. The greater this length, the greater the reection.
Generally for the overvoltage fronts faced in a building, reection phenomena are
signicant from 10 m and can double the voltage from 30 m (see Fig. J57).
It is necessary to install a second SPD in ne protection if the cable length exceeds
10 m between the incoming-end SPD and the equipment to be protected.
Schneider Electric - Electrical installation guide 2013
J37
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6 Technical supplements
Fig. J57 : Maximum voltage at the extremity of the cable according to its length to a
front of incident voltage =4kV/us
1
2
0
10 m 20 m 30 m 40 m 50 m 0
Up
6.6 Example of lightning current in TT system
Common mode SPD between phase and PE or phase and PEN is installed whatever
type of system earthing arrangement (see Fig. J58).
The neutral earthing resistor R1 used for the pylons has a lower resistance than the
earthing resistor R2 used for the installation.
The lightning current will ow through circuit ABCD to earth via the easiest path. It
will pass through varistors V1 and V2 in series, causing a differential voltage equal to
twice the Up voltage of the SPD (Up1 + Up2) to appear at the terminals of A and C
at the entrance to the installation in extreme cases.
To protect the loads between Ph and N effectively, the differential mode voltage
(between A and C) must be reduced.
Another SPD architecture is therefore used (see Fig. J59)
The lightning current ows through circuit ABH which has a lower impedance than
circuit ABCD, as the impedance of the component used between B and H is null (gas
lled spark gap). In this case, the differential voltage is equal to the residual voltage
of the SPD (Up2).
Fig. J58 : Common protection only
I
I
I
I
SPD
Fig. J59 : Common and differential protection
SPD
I
I
I
Schneider Electric - Electrical installation guide 2013
Schneider Electric - Electrical installation guide 2013
K1
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapter K
Energy efciency
in electrical distribution
Contents
Energy Efciency in brief K2
Energy efciency and electricity K3
2.1 An international appetite for regulation K3
2.2 NF EN 15232 standard K3
2.3 How to achieve energy efciency K3
Diagnosis through electrical measurement K6
3.1 Electrical measurements K6
3.2 Adapted measuring instruments K6
Energy saving opportunities K8
4.1 Motor-related savings opportunities K8
4.2 Lighting K11
4.3 Power factor correction and harmonic ltering K13
4.4 Load management K14
4.5 Communication and information systems K15
4.6 Designing information and monitoring systems K18
How to evaluate energy savings K23
5.1 IPMVP and EVO procedures K23
5.2 Achieving sustainable performance K25
1
2
3
4
5
Schneider Electric - Electrical installation guide 2013
K - Energy efciency in electrical distribution
K2
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Energy Efciency in brief
The aim of this chapter is to facilitate communication between the designers of
electrical installations and the energy consumers who use them. Consumers
frequently require advice on how best to reduce consumption and the amount they
spend on energy.
While there are a number of factors inuencing attitudes and opinions towards
energy efciency, particularly the increasing cost of energy and a growing awareness
of our responsibilities towards the environment, legislation probably has the greatest
impact on changing behaviour and practices. Various governments across the world
are setting themselves energy saving targets and passing regulations to ensure
these are met. Reducing greenhouse gas emissions is a global target set at the
Kyoto Earth Summit in 1997 and was nally ratied by 169 countries in December
2006.
Under the Kyoto Protocol industrialised countries have agreed to reduce their
collective emissions of greenhouse gases by 5.2% compared to the year 1990
between 2008 and 2012 (this represents a 29% reduction in terms of the emissions
levels expected for 2012 prior to the Protocol). One of Europes targets is a 20%
reduction in for CO2 by 2020.
Given that 50% of CO2 emissions can be attributed to electricity consumption
associated with residential and commercial buildings, and that the use of domestic
appliances and other equipment such as ventilation and air conditioning systems
increases, a specic focus is done concerning buildings:
b All new buildings constructed must consume 50% less energy.
b 1 in 10 existing buildings must reduce consumption by 30% each year.
As far as most countries are concerned, it is clear that 80% of the buildings which
will be standing in 2020 have already been constructed. The refurbishment of
existing building stock and improving energy management is vital in meeting
emission reduction targets. Given that in the western world, most buildings have
already undergone thermal performance upgrades such as cavity wall insulation,
loft insulation and double-glazing, the only potential for further savings lies in
reducing the amount of energy consumed. Action to improve the thermal and energy
performance of existing buildings will almost certainly become compulsory in order to
meet the targets that have been set out.
Regarding the industrial segment, electrical energy represents 40% of consumed
energy. Amongst these 40%, the rate due to motors is 80%. Focusing efforts
on motors consumption reduction is clearly a good way to start to do savings.
Technology exists to help promote energy efciency on many levels, from reducing
electricity consumption to managing other energy sources more efciently. Ambitious
regulatory measures may be required to ensure these technologies are adopted
quickly enough to achieve the 2020 targets.
K3
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
K - Energy efciency in electrical distribution
Energy saving regulations affect all buildings,
both new and existing, as well as their electrical
installations.
2 Energy efciency and
electricity
2.1 An international appetite for regulation
The Kyoto Protocol saw governments start to set out clear commitments in terms of
quantitative targets and specic agendas for reducing CO
2
emissions.
In addition to their Kyoto obligations, many countries have set themselves xed,
long-term targets in line with the latest EEIG (European Economic Interest Group)
recommendations to the UNFCCC (United Nations Framework Convention on
Climate Change) regarding energy saving and based on stabilising CO
2
levels.
The European Union is setting a good example with its rm commitment, signed
by all the national EU leaders in March 2007, to a 20% reduction by 2020. Known
as 3x20, this agreement aims to reduce CO2 emissions by 20%, improve energy
efciency by 20% and increase the contribution made by renewable energies to 20%.
Some European Countries are looking at a 50% reduction by 2050. Reaching these
targets, however, wiII require signicant changes, with governments stepping up their
use of regulations, legislation and standardisation.
Across the world, legislation and regulations are serving to underline stakeholder
obligations and put taxation and nancial structures in place.
b In the USA
v The Energy Policy Act of 2005,
v Construction regulations,
v Energy regulations (10CFR434),
v Energy management programmes for various states (10CFR420),
v Rules for energy conservation for consumer products (10CFR430).
b In China
v Energy conservation law,
v Architecture law (energy efciency and construction),
v Renewable energy law,
b In the European Union
v The EU Emission Trading Scheme
v The Energy Performance of Building Directive
v The European Ecodesign Directive (Directive 2009/125/EC) concerning Energy
Using Products (EUP) and Energy Related Products (ERP)
v The Energy End-use Efciency and Energy Services Directive.
2.2 NF EN 15232 (for more information about french
regulations related to Energy Efciency, see the french
version of the book, chapter "Efcacit nergtique de la
distribution lectrique")
2.3 How to achieve energy efciency
Whilst it is currently possible to obtain energy savings of up to 30%, this potential
reduction can only really be understood in terms of the differences which exist
between active and passive forms of energy efciency.
Active and passive energy efciency
Passive energy efciency is achieved by such measures as reducing heat loss and
using equipment which requires little energy. Active energy efciency is achieved by
putting in place an infrastructure for measuring, monitoring and controlling energy
use with a view to making lasting changes.
TIt is possible to build on the savings achieved here by performing analyses and
introducing more suitable remedial measures. For example, although savings of
between 5% and 15% may be obtained by improving how installations are used or
by optimising the equipment itself (decommissioning redundant systems, adjusting
motors and heating), more signicant savings can also be achieved.
v Up to 40% on energy for motors by using control and automation mechanisms to
manage motorised systems,
v Up to 30% on lighting by introducing an automated management mechanism
based on optimal use.
It is important to remember, however, that savings may be lost through.
b Unplanned/unmanaged downtime affecting equipment and processes
b A lack of automation/adjustment mechanisms (motors, heating)
b A failure to ensure energy saving measures are adopted at all times.
K - Energy efciency in electrical distribution
K4
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. K1 : Les 4 conditions de la prennit des conomies
1 Quantifying 2 Implementation of basic measures 3 Automation 4 Monitoring and improvement
b Kilowatt hour meters
b Energy quality meters
b Low-consumption devices
b Thermal insulation materials
b Energy quality improvement
b Energy reliability improvement
b Building management systems
b Lighting control systems
b Motor control systems
b Home control systems
b Power management software
b Remote monitoring systems
Fig. K2 : and monitoring technology ensures savings are sustained over the long term.
E
n
e
r
g
y
c
o
n
s
u
m
p
t
i
o
n
70 %
100 %
Time
E
f
f
i
c
i
e
n
t
d
e
v
i
c
e
s
a
n
d
e
q
u
i
p
m
e
n
t
U
s
a
g
e
o
p
t
i
m
i
s
e
d
b
y
a
u
t
o
m
a
t
i
o
n
Monitoring and support
b Up to 8% lost per year without a
monitoring and support programme
b Up to 12% lost per year without
systems for control and adjustment
A realistic approach would be to establish the identity of energy consumers and
adopt passive followed by active saving measures, before nally implementing
inspection and support devices to ensure that any savings made can be sustained
over the long term. This involves a four-stage process:
b The rst stage is concerned with diagnosis and primarily aims to get a better idea
of where and how energy is being consumed. This requires the development of
initial measures and a comparative assessment process with a view to evaluating
performance, dening the main areas for improvement and estimating achievable
energy saving levels. The logic behind this approach is based on the realisation that
you can only improve what you can measure.
b The next stage involves establishing basic requirements in terms of passive
energy efciency. These include:
v Replacing existing equipment/devices with low-consumption alternatives (bulbs,
motors, etc.),
v Improving thermal insulation and ensuring that energy quality auxiliaries work in a
stable environment where savings can be sustained over time.
b The stage that follows this involves automation and active energy efciency.
Anything responsible for energy consumption must be subjected to a process of
active management aimed at achieving permanent savings.
Active energy efciency does not require highly energy-efcient devices and
equipment to be already installed, as the approach can be applied to all types of
equipment. Good management is essential for maximum efciency there is no
point in having low-consumption bulbs if you are going to waste energy by leaving
them switched on in empty rooms!
All things considered, energy management is the key to optimising use and
eliminating waste.
b The nal stage consists of implementing basic changes, introducing automation
and putting in place an infrastructure based around monitoring, support and
continuous improvement. This infrastructure and the ongoing processes associated
with it will underpin the pursuit of energy efciency over future years (see Fig. K1).
The key to sustainable savings
As Figure K2 illustrates, energy savings amounting to 30% are readily achievable
as things stand, although annual losses of 8% must be expected if there is neither
proper support nor monitoring of key indicators. It is clear, therefore, that information
is crucial to ensuring that energy savings are sustained over the long term.
K5
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. K3 : Energy efciency solutions based on the life cycle
Energy audit
and measurement
Industrial and
building processes
Low-consumption
devices, thermal
insulation, power
factor correction,
etc.
Adopt basic
measures
Passive energy
efficiency
Active energy efficiency
Optimisation via
adjustment and
automation
Variable speed drives
(when appropriate),
lighting/air conditioning
control, etc..
Monitor,
support,
improve
Control,
improve
Installation of meters,
monitoring devices,
energy saving analysis software
2 Energy efciency and
electricity
Consequently, energy monitoring and information systems are essential and must be
put in place to deal with the challenges ahead.
Approaches to energy efciency must have a proper structure if signicant long-term
savings are to be achieved, but only those companies with sufcient resources to
actively intervene at any stage of a process will be in a position to pass the savings
promised on to their customers. This is where Schneider Electric can help with its
approach based on managing the life cycle of customer products (see Fig. K3).
Ultimately, the objectives set can only be achieved by sharing risks and developing a
win-win relationship between those involved in the approach.
The reports provided by the energy monitoring or information systems can be
used to formulate suitable energy efciency projects in line with different strategies
acceptable to all those involved.
b Start with a simple project involving relatively little expense and geared towards
quick wins, before going on to make more signicant investments (this is often the
preferred business solution).
b Think in terms of how the investment for a project can and must be recouped when
devising a project (this is a popular method for assessing and selecting projects). The
advantage of this method is the simplicity of the analysis involved. Its disadvantage is
the impossibility of tracking the full impact of a project over the long term.
b Other, more complex strategies may be selected. These involve an analysis of
various management parameters such as the current net value or the internal
return-on-investment rate. Whilst the analysis required under these strategies
demands more work, they provide a more precise indication of the overall impact
of the project.
K - Energy efciency in electrical distribution
K6
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Diagnosis through electrical
measurement
3.1 Electrical measurements
Voltage and current, two key values for understanding (almost)
everything
As far as electrical measurements are concerned, voltage and current are the two
values on which other values are based (power, energy, power factor, etc.).
You should have a full range of measuring devices capable of providing the specic
measurements required for the application. You can signicantly increase the value of
your information by obtaining other data from the same measurements:
b Operating positions for devices (start/stop, open/closed, etc.)
b Number of operating hours/switching operations
b Motor load
b Battery charge
b Equipment failures
b etc.
There is no such thing as a one-size-ts-all solution. It is a question of nding the
best compromise, in technological and nancial terms, for the particular needs of the
given situation, whilst remembering that measurement accuracy involves costs which
have to be compared against the anticipated returns on investment.
In addition, when the operators electrical network is expected to undergo frequent
changes given the activities in which it is involved, these changes should prompt a
search for immediate and signicant optimisation measures.
Approaches to energy efciency also need to take other parameters into account
(temperature, light, pressure, etc.), since, assuming energy is transformed without
any losses, the energy consumed by a piece of equipment may exceed the useful
energy it produces. One example of this is a motor, which converts the energy it
consumes into heat as well as mechanical energy.
Collecating relevant electrical data for specic objectives
As well as contributing towards energy efciency, the information gleaned from
electrical data is commonly used to support a number of other objectives:
b Increasing user understanding and providing opportunities for optimising
equipment and procedures
b Optimising functionality and extending the service life of equipment associated with
the electrical network
b Playing a pivotal role in increasing the productivity of associated processes
(industrial or even administrative/management procedures) by avoiding/reducing
periods of lost productivity and guaranteeing the availability of a high-quality energy
supply
3.2 Adapted measuring instruments
Electronic equipment is increasingly replacing analogical equipment in electrical
installations. It supports more accurate measurement of new values and is able to
make these available to users at both local and remote locations.
All these various measuring devices (referred to as PMD for Performance
Measuring and Monitoring Device) have to meet the requirements of international
standard IEC 61557-12. According to this standard, devices have a code denoting
their installation options, operating temperature range and accuracy class.
As a result, it has become signicantly easier to select and identify these
devices (see Fig. K4).
A number of devices have been designed for inclusion in this category. These include
Sepam overload and measuring relays, TeSys U motor controllers, NRC 12 capacitor
battery controllers and Galaxy outage-free supply devices. The new Masterpact and
Compact circuit breakers with integrated Micrologic measuring devices (see Fig. K5)
also simplify matters by multiplying measurement points.
It is also now possible to broadcast measurements via digital networks. The table
in Figure K6 shows examples of measurements available via Modbus, RS485 or
Ethernet.
Fig. K4 : Identifying measuring devices in accordance
with IEC 61557-12
c = Current measurement
S : with external sensor, D : direct measurement
v = Voltage measurement
S : avec capteur extrieur, D : mesure directe
Temperature class
Active energy accuracy class
PMD / cv / Ktt / p
Unit of measurement PM700 (Schneider Electric)
Code : PMD/SD/K55/1
Fig. K5 : Compact NSX circuit breaker equipped with a
Micrologic trip unit and TeSys U controller (Schneider Electric)
K7
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Diagnosis through electrical
measurement
Units of
measurement
MV measurement
and overload relays
LV measurement
and overload relays
Capacitor battery
controllers
Monitoring and
insulation devices
Examples Circuit monitoring
device, kilowatt hour
meter
Sepam Masterpact and
Compact Micrologic
circuit breakers
Varlogic Vigilohm system
Control of energy consumption
Energy, inst., max., min.
b b b b
-
Energy, reclosing capability
b b b
- -
Power factor, inst.
b b b
- -
Cos inst. - - -
b
-
Improved energy availability
Current, inst., max., min., imbalance
b b b b
-
Current, wave form capture
b b b
- -
Voltage, inst., max., min., imbalance
b b b b
-
Voltage, wave form capture
b b b
- -
Device status
b b b b
-
Fault history
b b b
- -
Frequency, inst., max., min.
b b b
- -
THDu, THDi
b b b b
-
Improved electrical installation management
Load temperature, thermal state of
load and device
b b
-
b
-
Insulation resistance - - - -
b
Motor controllers LV variable speed
drives
LV soft starters MV soft starters Outage-free supply
devices
Examples TeSys U ATV.1 ATS.8 Motorpact RVSS Galaxy
Control of energy consumption
Energy, inst., max., min. -
b
-
b b
Energy, reclosing capability -
b b b
-
Power factor, inst. - -
b b b
Improved energy availability
Current, inst., max., min., imbalance
b b b b b
Current, wave form capture - - -
b b
Device status
b b b b b
Fault history
b b b b
-
THDu, THDi -
b
- - -
Improved electrical installation management
Load temperature, thermal state of
load and device
b b b b b
Motor running hours -
b b b
-
Battery follow up - - - -
b
Fig. K6 : Examples of measurements available via Modbus, RS485 or Ethernet
K - Energy efciency in electrical distribution
K8
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Energy saving opportunities
A number of different measures can be adopted to save energy (see Fig. K7).
b Reduce energy use
These measures try to achieve the same results by consuming less (e.g. installing
highly energy-efcient lights which provide the same quality of light but consume less
energy) or reduce energy consumption by taking care to use no more energy than is
strictly necessary (e.g. another method would be to have fewer lights in a room which
is too brightly lit).
b Save energy
These measures reduce costs per unit rather than reducing the total amount of
energy used. For example, day-time activities could be performed at night to in order
to take advantage of cheaper rates. Similarly, work could be scheduled to avoid peak
hours and demand response programmes.
b Energy reliability
As well as contributing to operational efciency by avoiding lost production, these
measures avoid the energy losses associated with frequent restarts and the extra
work generated when batches of products go to waste.
Fig. K7 : An overall strategy for energy management
Overall strategy for
energy management
Reduce
consumption
Optimise
energy
costs
Improve
reliability and
availability
Everyone immediately thinks of equipment for transforming energy (motors, lighting/
heating devices) when considering areas where savings can be made. Less obvious,
perhaps, are the potential savings offered by the various control devices and
programmes associated with this type of equipment.
4.1 Motor-related savings opportunities
Motorised systems are one of the potential areas where energy savings can be
made.
Choice/replacement of the motor
Those wishing to improve passive energy efciency often consider replacing motors
as a starting point, especially if the existing motors are old and require rewinding.
This trend is reinforced by the determination of major countries to stop low-efciency
motor sales in the near future.
Based on the IEC60034-30 Standards denition of three efciency classes (IE1, IE2,
IE3), many countries have dened a plan to gradually force IE1 and IE2 motor sales
to meet IE3 requirements.
In the EU, for example, motors of less than 375 kW have to be IE3-compliant by
January 2015 (EC 640/2009).
There are two reasons for replacing an old motor:
b To benet from the advantages offered by new high-performance motors (see
Fig. K8)
Depending on their rated power, high-performance motors can improve operational
efciency by up to 10% compared to standard motors. By comparison, motors which
have undergone rewinding see their efciency reduced by 3% to 4% compared to the
original motor.
Fig. K8 : Denition of energy efciency classes for LV motors,
according to Standard IEC60034-30
Motors represent 80% of electrical energy
consumption in the industry segment
70
75
80
85
90
95
1 10 100
Nominal value (kW)
E
f
f
i
c
i
e
n
c
y
(
%
)
IE1 4 poles
IE2 4 poles
IE3 4 poles
K9
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Energy saving opportunities
Fig. K10 : Motor starter examples: TeSys D Direct on line contactors, Star Delta starter, Altistart
softstarter
b To avoid oversizing
In the past, designers tended to install oversized motors in order to provide an
adequate safety margin and eliminate the risk of failure, even in conditions which
were highly unlikely to occur. Studies show that at least one-third of motors are
clearly oversized and operate at below 50% of their nominal load.
However:
v Oversized motors are more expensive.
v Oversized motors are sometimes less efcient than correctly sized motors: motors
are at their most effective working point when operating between 30% and 100%
of rated load and are built to sustain short periods at 120% of their rated load.
Efciency declines rapidly when loads are below 30%.
v The power factor drops drastically when the motor does not work at full load, which
can lead to charges being levied for reactive power.
Knowing that energy costs account for over 97% of the lifecycle costs of a motor,
investing in a more expensive but more efcient motor can quickly be very protable.
However, before deciding whether to replace a motor, it is essential:
b to take the motors remaining life cycle into consideration.
b to remember that the expense of replacing a motor even if it is clearly oversized,
may not be justied if its load is very small or if it is only used infrequently (e.g. less
than 800 hours per year see Fig. K9).
b to ensure that the new motors critical performance characteristics (such as speed)
are equivalent to those of the existing motor.
Operation of the motor
Other approaches are also possible to improve the energy efciency of motors:
b Improving active energy efciency by simply stopping motors when they no longer
need to be running. This method may require improvements to be made in terms of
automation, training or monitoring, and operator incentives may have to be offered.
If an operator is not accountable for energy consumption, he/she may well forget to
stop a motor at times when it is not required.
b Monitoring and correcting all the components in drive chains, starting with those
on the larger motors, which may affect the overall efciency. This may involve, for
example, aligning shafts or couplings as required. An angular offset of 0.6 mm in a
coupling can result in a power loss of as much as 8%.
Control of the motor
To ensure the best overall energy efciency, the motors control system must be
chosen carefully, depending on the motors application:
b For a constant speed application, motor starters provide cheap, low-energy-
consumption solutions. Three kinds of starters can be used, depending on the
systems constraints:
v Direct on line starter (contactor)
v Star Delta starter: to limit the inrush current, provided that the load allows a starting
torque of 1/3 of nominal torque
v Soft starter: when Star Delta starter is not suitable to perform a limited inrush
current function and if softbraking is needed.
Example of starter applications: ventilation, water storage pumps, waste water
treatment stirring units, constant speed conveyors, etc.
Fig. K9 : Life cycle cost reduction for IE2 and IE3 motors
compared to IE1 motors, depending on the number of
operating hours per year
Savings can be made by:
b Replacing an oversized old motor with an
appropriate high-efciency motor
b Operating the motor cleverly
b Choosing an appropriate motor starter/
controller
The method for starting/controlling a motor
should always be based on a system-level
analysis, considering several factors such as
variable speed requirements, overall efciency
and cost, mechanical constraints, reliability, etc.
LC1 D65A LC3 D32A ATS48
-4%
-2%
0%
2%
4%
6%
8%
10%
0 1000 2000 3000 4000 5000 6000 7000 8000
Operating hours per year
R
e
d
u
c
t
i
o
n
i
n
L
i
f
e
c
y
c
l
e
c
o
s
t
c
o
m
p
a
r
e
d
t
o
I
E
1
(
%
)
IE2 1.1kW
IE2 11 kW
IE3 1.1 kW
IE3 11 kW
K - Energy efciency in electrical distribution
K10
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
b When the application requires varying the speed, a Variable Speed Drive (VSD)
provides a very efcient active solution as it limits the speed of the motor to limit
energy consumption.
It competes favourably with conventional mechanical solutions (valves, dampers and
throttles, etc.), used especially in pumps and fans, where their operating principle
causes energy to be lost by blocking ducts while motors are operating at full speed.
VSDs also offer improved control as well as reduced noise, transient effects and
vibration. Further advantages can be obtained by using these VSDs in conjunction
with control devices tailored to meet individual requirements.
As VSDs are expensive devices which generate additional energy losses and can
be a source of electrical pollution, their usage should be limited to applications that
intrinsically require variable speed.
Example of applications for VSDs: hoisting, positioning in machine tools, closed-loop
control: circular pumping or ventilation (without throttle) or booster pumps, complex
control electronics, etc.
b To handle loads that change depending on application requirements, starters,
VSDs, or a combination of both with an appropriate control strategy (see cascading
pumps example Fig. K12) should be considered, in order to provide the most
efcient and protable overall solution.
Example of applications: HVAC for buildings, goods transport, water supply systems,
etc.
The method for starting/controlling a motor should always be based on a system-
level analysis, considering several factors such as variable speed requirements,
overall efciency and cost, mechanical constraints, reliability, etc.
Fig. K11 : Altivar drives of various power ratings
Fig. K12 : Example of cascading pumps, which skilfully
combine starters and a variable speed drive to offer a exible
but not too expensive solution
Altivar 12 (< 4 kW ) Altivar 21 (< 75 kW) Altivar 71 (< 630 kW)
4 external
pump
Variable speed
pump
(joker pump)
Pressure
sensor
ATV61
K11
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4.2 Lighting
Lighting can account for over 35% of energy consumption in buildings, depending on
the types of activities carried out in them. Lighting control is one of the easiest ways
to make substantial energy savings for very little investment and is one of the most
common energy saving measures.
Lighting systems for commercial buildings are governed by standards, regulations
and building codes. Lighting not only needs to be functional, but must also meet
occupational health and safety requirements and be t for purpose.
In many cases ofce lighting is excessive and there is considerable scope for making
passive energy savings. These can be achieved by replacing inefcient luminaires,
by replacing obsolete lights with high-performance/low-consumption alternatives and
by installing electronic ballasts. These kinds of approach are especially appropriate
in areas where lighting is required constantly or for long periods and savings cannot
be achieved by simply switching lights off. The time taken to recoup investments
varies from case to case, but many projects require a period of around two years.
Lights and electronic ballasts
More efcient lights may be a possibility, depending on the needs, type and age of
the lighting system. For example, new uorescent lights are now available, although
ballasts also need to be replaced when lights are changed.
New types of ballast are also available, offering signicant energy savings compared
to the earlier electromagnetic ballasts. For example, T8 lights with electronic ballasts
use between 32% and 40% less electricity than T12 lights tted with electromagnetic
ballasts.
Having said this, electronic ballasts do have a number of disadvantages compared
with magnetic ballasts. Their operating frequency (between 20,000 and 60,000 Hz)
can introduce harmonic noise or distortion into the electrical network and presents
the risk of overheating or reducing the service life of transformers, motors and
neutral lines. There is even a danger of overvoltage trips being deactivated and
electronic components sustaining damage. However, these problems are mainly
restricted to facilities with heavy lighting loads and a large number of electronic
ballasts. Most current types of electronic ballast feature passive ltering in order to
keep harmonic distortion to less than 20 percent of fundamental current, or even 5%
for more sensitive facilities (hospitals, sensitive manufacturing environments, and so
on).
Other types of lighting may be more appropriate, depending on the conditions
involved. An assessment of lighting needs will focus on evaluating the activities
performed and the required levels of illumination and colour rendering. Many existing
lighting systems were designed to provide more light than required. Designing a new
system to closely t lighting needs makes it easier to calculate and ultimately achieve
savings.
Apart from the issue of savings, and without forgetting the importance of complying
with the relevant standards and regulations, there are other advantages associated
with retrotting lighting systems. These include lower maintenance costs, the chance
to make adjustments based on needs (ofce areas, walk-through areas etc.),
greater visual comfort (by eradicating the frequency beat and ickering typically
associated with migraine and eye strain) and improved colour rendering.
Reectors
A less common passive energy efciency measure, but one which is worth
considering in tandem with the use of lights tted with ballasts, is to replace the
reectors diverting light to areas where it is needed. Advances in materials and
design have resulted in better quality reectors which can be tted to existing lights.
These reectors intensify useful light, so that fewer lights may be required in some
cases. Energy can be saved without having to compromise on lighting quality.
New, high-performance reectors offer a spectral efciency of over 90%
(see Fig. K13). This means:
b Two lights can be replaced by a single light, with potential savings of 50% or more
in terms of the energy costs associated with lighting.
b Existing luminaires can be retrotted by installing mirror-type reectors without
having to adjust the distance between them. This has the advantage of simplifying
the retrotting process and reducing the work involved, with minimal changes made
to the existing ceiling design.
+
+
Above: Around 70% of a fluorescent tubes
light is directed sideways and upwards.
Below: The new silver surfaces are designed to reflect
the maximum amount of light downwards.
+
Fig. K13 : Illustration of the general operating principle for high-
performance reectors
4 Energy saving opportunities
K - Energy efciency in electrical distribution
K12
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Lighting control
The passive energy saving measures described above leave further scope for
making savings. The aim of lighting control programmes is to give users the required
levels of convenience and exibility, whilst supporting active energy savings and cost
reduction by switching lights off as soon as they are no longer needed. There are a
number of technologies available with various degrees of sophistication, although
the time taken to recoup investments is generally short at six to twelve months. A
multitude of different devices are currently available too (see Fig. K14).
Fig. K14 : A selection of lighting control devices: timers, light sensors, movement sensors
b Timers to turn off lights after a certain period has passed. These are best used in
areas where the typical time spent or period of activity is clearly dened (such as
corridors).
b Occupancy/movement sensors to turn off lights when no movement has been
detected for a certain period. These are particularly well suited to areas where
the time spent or period of activity cannot be accurately predicted (storerooms,
stairwells, etc.).
b Photoelectric cells/daylight harvesting sensors to control lights near windows.
When sufcient daylight is available, lights are turned off or switched to night-light
mode.
b Programmable clocks to switch lights on and off at predetermined times (shop
fronts, ofce lights at nights and weekends)
b Dimmable lights to provide a low level of illumination (night light) at off-peak
periods (e.g. a car park requiring full illumination until midnight, but where lower
levels will sufce between midnight and dawn)
b Voltage regulators, ballasts or special electronic devices to optimise energy
consumption for lights (uorescent tubes, high-pressure sodium lights, etc.)
b Wireless remote control devices for simple and economical retrotting of existing
applications
These various technologies may be combined and can also be used to create a
specic effect or atmosphere. For example, programmable lighting panels in meeting
areas (for board meetings, presentations, conferences, etc.) have a number of
different light settings which can be changed at the ick of a switch.
K13
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Energy saving opportunities
Centralised lighting management
Some of the lighting control systems currently available, such as those based on the
KNX protocol, have the additional advantage of supporting integration into building
management systems (see Fig. K15).
They offer greater exibility of management and centralised monitoring, and provide
more scope for energy savings by enabling lighting controls to be integrated into
other systems (e.g. air conditioning). Certain systems enable energy savings of 30%,
although efciency levels will depend on the application involved and this must be
chosen with some care.
Fig. K15 : An example of links established using Schneider Electrics KNX system
If this type of system is to produce results, the design and implementation stage
must begin with an audit of energy consumption and a study of the lighting system
with a view to devising the best lighting solution and identifying potential reductions
in terms of both costs and energy consumption. As far as this kind of technology
is concerned, Schneider Electric also has solutions for ofces as well as exterior
lighting, car parking facilities, parks and landscaped gardens.
4.3 Power factor correction and harmonic ltering
b If the energy distribution company imposes penalties for reactive power
consumption, improving power factor correction is a typically passive energy saving
measure. It takes immediate effect after implementation and does not require any
changes to procedures or staff behaviour. The investment involved can be recouped
in less than a year.
See Chapter L for further details.
b Many types of equipment (variable speed drives, electronic ballasts, etc.) and
computers generate harmonics within their line supply. The effects produced can
sometimes be signicant (transient overvoltages causing protection relays to trip,
or heat and vibration potentially reducing the efciency and service life of such
equipment as capacitor banks used for power factor correction). Harmonic ltering is
another typical passive energy saving measure to consider.
See Chapter M for further details.
Touch panel
Control station
Binary input
module External movement
sensor
KNX bus
Trancent
pushbutton
Internal
movement sensor
K - Energy efciency in electrical distribution
K14
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4.4 Load management
As part of their drive towards synchronizing the consumption and production of
electrical energy over the long term, energy distribution companies tailor their rates
to encourage consumers to reduce their requirements during peak periods.
A number of different strategies are possible, depending on consumption levels and
operating requirements: restricting demand (see Fig. K16), avoiding peak periods,
load scheduling or even generating additional energy on site.
Fig. K16 : An example of a load-management strategy
kW
Time
Reduced peak
demand
Peak demand
Peak demand rescheduled
to keep it below a given
threshold
b Demand restriction
Energy distribution companies can use this solution in supply contracts containing
optional or emergency (involving compulsory limits) restrictive clauses whose
application is determined by the consumer (based on special rates). This
management policy is typically used during the hottest or coldest months of the
year when companies and private customers have very high requirements for
ventilation, air conditioning and heating, and when electricity consumption exceeds
normal demand considerably. Reducing consumption in this way can prove
problematic in residential and service sector environments, as they may considerably
inconvenience building occupants. Customers from industry may show more of an
interest in this type of scheme and could benet from contracts reducing unit costs
by up to 30% if they have a high number of non-essential loads.
b Peak demand avoidance
This method involves moving consumption peaks in line with the different rates
available. The idea is to reduce bills, even if overall consumption remains the same
b Load scheduling
This management strategy is an option for companies able to benet from lower
rates by scheduling consumption for all their processes where time of day is neither
important nor critical.
b Additional energy generation on site
The use of generating sets to supply energy improves operational exibility by
providing the energy needed to continue normal operations during periods of peak
or restricted demand. An automated control system can be congured to manage
this energy production in line with needs and the rates applicable at any given
time. When energy supplied from outside becomes more expensive than energy
generated internally, the control system automatically switches between the two.
K15
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Energy saving opportunities
4.5 Communication and information systems
Information systems
Whether it relates to measurements, operating statuses or rate bases, raw data can
only be useful when converted into usable information and distributed on a need-
to-know basis to all those involved in energy efciency with a view to improving the
expertise of all participants in the energy management process. Data must also
be explained, as people can only develop the management and intervention skills
integral to any effective energy saving policy if they fully understand the issues
involved. Data distribution must produce actions, and these actions will have to
continue if energy efciency is to be sustained (see Fig. K19).
However, this cycle of operations requires an effective communication network to be
in place.
Fig. K17 : Operating cycle for data essential to energy efciency
Data analysis
(raw data converted
into usable information)
Action
(understanding
aiding results)
Communication
(information
aiding understanding)
Data gathering
The information system can then be used on a daily basis by the operators at the
various locations where electricity is consumed (for industrial processes, lighting,
air conditioning, and so on) to achieve the energy efciency objectives specied by
company management. It can also ensure these same locations make a positive
contribution to company operations (in terms of product volumes, conditions for
supermarket shoppers, temperatures in cold rooms, etc.).
Monitoring systems
b For quick audits which can be performed on an ongoing basis.
Encouraging familiarity with data and distributing it can help keep everything up to
date, but electrical networks develop rapidly and are permanently raising questions
about their ability to cope with such new developments.
With this in mind, a system for monitoring the transfer and consumption of energy is
able to provide all the information needed to carry out a full audit of the site. As well
as electricity, this audit would cover water, air, gas and steam.
Measurements, comparative analyses and standardised energy consumption data
can be used to determine the efciency of processes and industrial installations.
b For rapid, informed decision making
Suitable action plans can be implemented. These include control and automation
systems for lighting and buildings, variable speed drives, process automation, etc.
Recording information on effective equipment use makes it possible to determine
accurately the available capacity on the network or a transformer and to establish
how and when maintenance work should be performed (ensuring measures are
taken neither too soon nor too late).
Communication networks
Information and monitoring systems are synonymous with both intranet and Internet
communication networks, with exchanges taking place within computer architectures
designed on a user-specic basis.
K - Energy efciency in electrical distribution
K16
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
b Intranet
For the most part, data exchange in the industrial sector uses Web technologies
permanently installed on the companys communications network, typically an
intranet network for the sole use of the operator.
As far as industrial data exchange between systems connected via a physical
transmission link, such as RS485 and modem (GSM, radio, etc.), is concerned,
the Modbus protocol is very widely used with metering and protection devices for
electrical networks. Initially created by Schneider Electric, this is now a standard
protocol.
In practice, electrical data is recorded on industrial Web servers installed in
enclosures. The popular TCP/IP standard protocol is used for transmitting this data
in order to reduce the ongoing maintenance costs associated with any computer
network. This same principle is used by Schneider Electric to communicate data
associated with promoting energy efciency. No additional software is needed a
PC with an Internet browser is all that is required. The fact that enclosures are
autonomous removes the need for an additional computer system. As such, all
energy efciency data is recorded and can be communicated in the usual manner via
intranet networks, GSM, xed telephony, etc
b Internet
Remote monitoring and control improve data availability and accessibility, whilst
offering greater exibility in terms of servicing. Figure K18 shows a diagram of this
type of installation. Connection to a server and a standard Web browser makes it
much easier to use data and export it to Microsoft Excel spreadsheets for the
purpose of tracing power curves in real time.
Fig. K18 : Example of an intranet information network protected by a server
(EGX400 Schneider Electric) and monitored from the Internet network
PM710
power
meters
PM850
power
meters
Modbus
serial link
Company
HTML server
Intranet
Internet
http://
http://
b Architectures
Historically and for many years, monitoring and control systems were centralised and
based on SCADA automation systems (Supervisory Control And Data Acquisition).
These days, a distinction is made between three architecture levels (see Fig. 19 on
the next page).
v Level 1 architecture
Thanks to the new capabilities associated with Web technology, recent times
have witnessed the development of a new concept for intelligent equipment. This
equipment can be used at a basic level within the range of monitoring systems,
offering access to information on electricity throughout the site. Internet access can
also be arranged for all services outside the site.
K17
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Energy saving opportunities
v Level 2 architecture
This system has been specically designed for electricians and adapted to meet the
demands of electrical networks.
This architecture is based on a centralised monitoring system designed to satisfy
all the monitoring requirements for the electrical network. As might be expected,
installation and maintenance work requires less expertise than for Level 3, since all
the electrical distribution devices are already contained in a specialised library. In
addition, acquisition costs can be kept to a minimum, as there are few requirements
in terms of system integration.
Level 2 and Level 3 can be used side by side at certain sites.
v Level 3 architecture
Investment in this type of system is usually restricted to top-of-the-range facilities
consuming large amounts of energy or using equipment which is highly sensitive to
variations in energy quality and has high demands in terms of electricity availability.
To ensure these high demands for availability are met, the system often requires
responsibility to be taken for installation components as soon as the rst fault
occurs. This should be done in a transparent manner (any impact should be clear).
In view of the substantial front-end costs, the expertise required to implement the
system correctly and the update costs generated as the network develops, potential
investors may be deterred and they may require highly detailed prior analyses to be
conducted.
Power Logic
ION Entreprise
specialised
monitoring
systems
Standard
Web browser
1
2
3
Intelligent
energy
management
equipment
Other services
Equipment
server
Energy
management
equipment
Equipment
gateway
Energy
management
equipment
Other
services
Process Equipment
gateway
General
site
monitoring
Specialised
network
monitoring
Function
levels
Basic
monitoring
Standard network Vulnerable electrical networks Top-of-the-range sites
System
complexity
General
monitoring
system
Fig. K19 : Layout of a monitoring system
K - Energy efciency in electrical distribution
K18
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4.6 Designing information and monitoring systems
In reality, systems for monitoring and energy control are physically very similar and
overlap with the electrical distribution architecture whose layout they often replicate.
The arrangements shown in Figure K20 to Figure K24 represent possible examples
and reect the requirements typically associated with the distribution involved
(in terms of feeder numbers, the amount and quality of energy required, digital
networks, management mode, etc.). They help to visualise and explain all the various
services which can be used to promote energy efciency.
Fig. K20 : Monitoring architecture for a small site which only supports sub-metering
Receiver
feeder
Power
incomer
Micrologic E
Compact NSX 63
to 630 A circuit
breaker
Main LV distribution board
Modbus - RS485
Installation monitoring
(PowerView software on PC)
Modbus TCP/IP
EGX100 gateway
Heating/air
conditioning feeder
PM9C
power meters
Lighting
feeder
Unmonitored
feeders
(sockets, etc.)
Secondary
feeder which
has been shed
Load-shedding
contactor
Intranet
Modbus - Ethernet TCP/IP
http://
K19
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Energy saving opportunities
Fig. K22 : Architecture for large multiple-site arrangements
Monitoring and
control (PC browser)
Sites energy
management system:
ION Entreprise
Companys energy
management system:
ION EEM
Buildings and
automation
systems
Large industrial site 1
Intranet
Monitoring and
control (PC browser)
Sites energy
management system:
ION Entreprise
Large industrial site 2
Monitoring
and control
(PC browser)
Intranet
Other data
resources
relating to energy
Distributor
data
sources
Management
systems
(EAM, ERP)
Intranet
http://
http:// http://
Receiver
feeder
Power
incomer
Main LV distribution
board for site A
Monitoring and
control of sites
A and B (PC browser)
EGX400
Web server
EGX400
Web server
Heating/air
conditioning
feeder
PM9C
power meters
Lighting
feeder
Unmonitored
feeders
(sockets, etc.)
Secondary
feeder
which has
been shed
Receiver
feeder
Heating/air
conditioning
feeder
Lighting
feeder
Unmonitored
feeders
(sockets, etc.)
Secondary
feeder
which has
been shed
Load-shedding
contactor
Internet
Ethernet TCP/IP
Power
incomer
Main LV distribution
board for site B
Monitoring and
control of sites
A and B (PC browser)
PM9C
power meters Load-shedding
contactor
Optional centralised
PowerView monitoring
Compact NSX
with Micrologic control
and measurement unit
http:// http://
Compact NSX with
Micrologic control
and measurement unit
Fig. K21 : Monitoring and control architecture for a company with several small sites
K - Energy efciency in electrical distribution
K20
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. K23 : Monitoring and control architecture for a large, sensitive industrial site
ION 7850
power
meter Masterpact
Meters
Water
Gas
Power
incomer
Compact NSX
circuit breakers
with
Micrologic E
Compact NS
circuit breaker
with
Micrologic P
Main LV
distribution
board
Main high energy
availability
distribution board
Feeders which have been shed
Load-shedding
contactor
Load-shedding
contactor
PM9C
power
meter
Remote control
Compact NSX source
changeover system
Automation
Ethernet TCP/IP
Modbus - RS485
image
??
Monitoring and
control (PC browser)
GE
ION Entreprise
centralised monitoring
+ Web server
Intranet
=
~
=
~
Inverter
and bypass
Micrologic E
Compact NSX
63 to 630 A
circuit breakers
Sensitive feeders and term for service continuity and availability.
- Preventive/predictive/strategic maintenance
- Measurement of electrical parameters with harmonic
analyses and diagnostics
Modbus
Ethernet
EGX100
gateway
Micrologic E
Compact
NSX circuit
breakers
Secondary distribution board
Modbus - RS485
Modbus
Ethernet
EGX100 gateway
Sub-metering
and monitoring
Sub-metering
only
Feeders with no preventive
maintenance or below 63 A,
but to be included in sub-metering
Small feeders
without
sub-metering
Secondary
feeder
which has
been shed
Load shedding
for consumption
peaks with
sub-metering
and monitoring
Major feeders for
controlling big consumers
Load-shedding
contactor
PM9C
power meter
Concentrator
ME3ZR
kilowatt
hour meter
EN40
kilowatt
hour meter
http://
K21
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Energy saving opportunities
Fig. K24 : Architecture for a large service-industry site
PM850
power
meter
CVC controller and
Web server load shedding,
Xenta 731 Modbus-Ethernet gateway
CVC controller and
Web server
load shedding,
Xenta 731
Modbus-Ethernet
gateway
Meters
Water
Gas
Power
incomer
Compact NSX
circuit breakers
with
Micrologic E
Main LV distribution board
Secondary distribution board
Feeders which
have been shed
Sub-metering
and monitoring
Sub-metering only
Load-shedding
contactor
PM9C
power
meter
PM9C power
meter
Lighting
feeder
CVC feeder
(fan coil units)
Lighting
feeder
CVC feeder
(fan coil units)
PM9C power
meter
PM9C
power
meter
Lan Talk - Ethernet TCP/IP
Modbus - RS485
Lan Talk-FTT-10
Modbus - RS485
Monitoring
and control
(PC browser)
VISTA centralised
monitoring
Unmonitored
feeders
(sockets, etc.)
Unmonitored
feeders
(sockets, etc.)
Intranet
Secondary distribution board
Sub-metering only
PM9C
power
meter
ME3ZR
kilowatt
hour
meter
EN40
kilowatt
hour meter
Load-shedding
contactor
Masterpact
ME3ZR
kilowatt
hour meter
EN40
kilowatt
hour meter
Xenta 411
or 421 logic
input module
Xenta 411
or 421 logic
input module
g
http://
K - Energy efciency in electrical distribution
K22
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Energy saving opportunities
In addition, these diagrams make it clear that the choice of components is
determined by the choice of architecture (for example, the sensors must be right
for the digital bus). The reverse also applies, however, since the initial choice of
architecture may be affected by a technological/economic assessment of component
installation and the results sought. In fact, the cost (in terms of purchase and
installation) of these components, which sometimes have the same name but
different characteristics, may vary widely and produce very variable results:
b A measuring device can measure one or more parameters with or without using
calculations (energy, power, cos ).
b Replacing a standard circuit breaker with a circuit breaker containing an electronic
control unit can provide a great deal of information on a digital bus (effective and
instantaneous measurements of currents, phase-to-neutral and phase-to-phase
voltages, imbalances of phase currents and phase-to-phase voltages, frequency,
total or phase-specic active and reactive power, etc.).
When designing these systems, therefore, it is very important to dene objectives for
energy efciency and be familiar with all the technological solutions, including their
respective advantages, disadvantages and any restrictions affecting their application
(see Fig. K27).
To cover all the various scenarios, it may be necessary to search through various
hardware catalogues or simply consult a manufacturer offering a wide range of
electrical distribution equipment and information systems. Certain manufacturers,
including Schneider Electric, offer advisory and research services to assist those
looking to select and implement all these various pieces of equipment.
Energy savings Cost optimisation Availability and
reliability
Variable speed drives
p p p p p
High-performance
motors and transformers
p p p
Supply for MV motors
p p p
Power factor correction
p p p p
Harmonics management
p p p p
Circuit conguration
p p p
Auxiliary generators
p p p p p
Outage-free supply
devices (see page N11)
p p p
Smooth starting
p p p p p
iMCC
p p p p
Architecture based on
intelligent equipment
Level 1
p p p
Specialised, centralised
architecture for
electricians
Level 2
p p p p p p
General/conventional,
centralised architecture
Level 3
p p p p p p
Fig. K27 : Solutions chart
K23
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5 How to evaluate energy savings
One of the main obstacles facing those interested in devising and implementing
energy efciency projects is the lack of reliable nancial data to provide a convincing
business case. The higher the investment, the greater the need for credible proof of
the proposed advantages. As such, it is very important to have reliable methods for
quantifying results when investing in energy efciency.
5.1 IPMVP and EVO procedures
To cater for this need, EVO (Efciency Evaluation Organization), the body
responsible for evaluating performance, has published the IPMVP (International
Performance Measurement and Verication Protocol). This guide describes the
procedures used when measuring, calculating and documenting the savings
achieved as a result of various energy efciency projects. So far, EVO has
published three volumes of the IPMVP, the rst of which, Concepts and Options
for Determining Energy and Water Savings, outlines methods of varying cost and
accuracy for establishing total savings made or those made solely in terms of energy
efciency. Schneider Electric uses this document when putting together energy
efciency projects.
IPMVP principles and features
Before implementing the energy efciency solution, a study based on IPMVP
principles should be carried out over a specic period in order to dene the
relationship which exists between energy use and operating conditions. During this
period, reference values are dened by taking direct measurements or by simply
studying the energy bills for the site.
After implementation, this reference data is used to estimate the amount of energy,
referred to as adjusted-baseline energy, which would have been consumed had
the solution not been implemented. The energy saved is the difference between this
adjusted-baseline energy and the energy which was actually measured.
If a verication and measurement plan is put together as part of an IPMVP
programme, it needs to be:
b Accurate
Verication and measurement reports should be as accurate as possible for the
budget available. The costs involved in verication and measurement should normally
be comparatively low in terms of the anticipated savings.
b Complete
The study of energy savings should reect the full impact of the project.
b Conservative
Where doubts exist in terms of results, verication and measurement procedures
should underestimate the savings being considered.
b Consistent
The energy efciency report should cover the following factors in a consistent
manner:
v The various types of energy efciency project
v The various types of experts involved in each project
v The various periods involved in each project
v The energy efciency projects and the new energy supply projects
b Relevant
Identifying savings must involve measuring performance parameters which are
relevant or less well known, with estimates being made for less critical or more
predictable parameters.
b Transparent
All the measurements involved in the verication and measurement plan must be
presented in a clear and detailed manner.
The information provided in this chapter is
taken from Volume 1 of the IPMVP guide
published by EVO (see www.evo-world.org)
K - Energy efciency in electrical distribution
K24
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
IPMVP options
Four study levels or options have been dened in line with the objectives assigned
to this energy efciency approach:
b Retrotting isolation systems with measurements of all key parameters = Option A
b Retrotting isolation systems with measurements of all parameters = Option B
b Whole facility = Option C
b Calibrated simulation = Option D
Fig. K28 sets out these options in a table. The algorithm in Fig. K29 shows the
process of selecting options for a project.
Option A Option B Option C Option D
Financial objective Retrot isolation systems: key
parameter measurement
Retrot isolation systems: all
parameter measurement
Whole facility Calibrated simulation
Description Savings are calculated
using data from the main
performance parameter(s)
dening energy consumption
for the system involved in the
energy efciency solution.
Estimates are used for
parameters not chosen for
actual measurements.
Savings are calculated using
actual energy consumption
data for the system involved in
the energy efciency solution.
Savings are established using
actual energy consumption
data for the facility or a section
of it. Data for energy use
within the facility as a whole
is gathered on an ongoing
basis throughout the reporting
period.
Savings are established by
simulating energy consumption
for the facility or a section of it.
There must be evidence that
the simulation procedures are
providing an adequate model
of the facilitys actual energy
performance.
Savings calculation An engineering calculation
is performed for the energy
consumed during the baseline
period and the reporting period
based on:
b Ongoing or short-term
measurements of the main
performance parameter(s),
b And estimated values.
Ongoing or short-term
measurements of the energy
consumed during the baseline
period and the reporting period
An analysis of data on the
energy consumed during
the baseline period and the
reporting period for the whole
facility. Routine adjustments
are required, using techniques
such as simple comparison or
regression analysis.
Energy use simulation,
calibrated with hourly or
monthly utility billing data
When to use option On the one hand, the results
obtained using this option
are rather equivocal given
that some parameters are
estimated. Having said this,
it is a much less expensive
method than Option B.
Option B is more expensive
than Option A, as all
parameters are measured. It is
the better option, however, for
customers who require a high
level of accuracy.
For complex energy
management programmes
affecting many systems within
a facility, Option C supports
savings and helps to simplify
the processes involved.
Option D is only used when
there is no baseline data
available. This may be the
case where a site did not have
a meter before the solution
was implemented or where
acquiring baseline data would
involve too much time or
expense.
Fig. K28 : Summary of IPMVP options
K25
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Start
Measurement
of on-site
factors or ECM
performance
Facility performance ECM performance
No
No
No
No
No
Yes
Yes
Yes
Yes
Yes
No
Yes
Able to isolate
ECM with meter(s)?
Need proof
of full performance?
Install isolation
meters for all
parameters and
assess interactive
effects.
Install isolation meters for
key parameters, assess
interactive effects and
estimate well known
parameters.
Need to assess
each ECM
separately?
Analysis of
main meter data
Simulate
system
or facility.
Obtain
calibration
data
Calibrate
simulation.
Simulate with
and without
ECM(s).
Donnes de
rfrence ou donnes
de la priode documente
manquantes ?
Missing baseline
or reporting
period data?
Option B
Retrofit isolation:
measurement of
all parameters
Option A
Retrofit isolation:
measurement
of key parameters
Option C
Whole facility
Option D
Calibrated
simulation
Expected
savings >10%?
Fig. K29 : Process for selecting an IPMVP option for a project
Energy performance curve
Energy
conservation
measures
Contact
with
support
services
Savings with ongoing services
Savings without proper maintenance
Energy
audit and
consulting
Fig. K30 : Ensuring performance is sustainable over time
5.2. Achieving sustainable performance
Once the energy audits have been completed, the energy saving measures have
been implemented and the savings have been quantied, it is essential to follow the
procedures below to ensure performance can be sustained over time. Performance
tends to deteriorate if there is no continuous improvement cycle in place (see Fig. K30).
5 How to evaluate energy savings
K - Energy efciency in electrical distribution
K26
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
A continuous improvement cycle will only work if there is an energy monitoring
system in place, and this system is used effectively and maintained. The system
supports a continuous and proactive analysis of energy use at the site, and informs
recommendations for improving the electrical distribution system.
Support services, either on site or at a remote location (accessible via telephone,
e-mail, VPN (Virtual Private Network) or any other type of long-distance connection),
are often required to ensure optimal performance for this type of system and the best
use of the collected data. Thanks to their contribution in terms of experience and
availability, these services also complement the operators in-house services. The
services available may include:
b Monitoring the performance of measuring devices
b Updating and adapting software
b Managing databases (e.g. archives)
b Continuously adapting the monitoring system in line with changing control
requirements.
5 How to evaluate energy savings
Schneider Electric - Electrical installation guide 2013
L1
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapter L
Power Factor Correction
Contents
Power factor and Reactive power L2
1.1 Denition of Power Factor L2
1.2 Denition of reactive power L2
1.3 The nature of reactive power L4
1.4 Reactive power of capacitors L4
1.5 Equipment and appliances requiring reactive energy L4
1.6 Practical values of Power Factor L5
Why to improve the power factor? L6
2.1 Reduction in the cost of electricity L6
2.2 Technical/economic optimization L6
How to improve the power factor? L8
3.1 Theoretical principles L8
3.2 By using what equipment? L8
3.3 The choice between a xed or automatically-regulated bank L10
of capacitors
Where to install power factor correction capacitors? L11
4.1 Global compensation L11
4.2 Compensation by sector L11
4.3 Individual compensation L12
How to determine the optimum level of compensation? L13
5.1 General method L13
5.2 Simplied method L13
5.3 Method based on the avoidance of tariff penalties L15
5.4 Method based on reduction of declared maximum apparent
power (kVA) L15
Compensation at the terminals of a transformer L16
6.1 Compensation to increase the available active power output L16
6.2 Compensation of reactive energy absorbed by the transformer L17
Power factor correction of induction motors L19
7.1 Connection of a capacitor bank and protection settings L19
7.2 How self-excitation of an induction motor can be avoided L20
Example of an installation before and L21
after power-factor correction
The effects of harmonics L22
9.1 Problems arising from power-system harmonics L22
9.2 Risk of resonance L23
9.3 Possible solutions L23
Implementation of capacitor banks L26
10.1 Capacitor elements L26
10.2 Choice of protection, control devices and connecting cables L27
1
2
3
4
5
6
7
8
9
10
Schneider Electric - Electrical installation guide 2013
L - Power Factor Correction
L2
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Power factor and Reactive
power
1.1 Denition of power factor
The Power Factor is an indicator of the quality of design and management of an
electrical installation. It relies on two very basic notions: active and apparent power.
The active power P (kW) is the real power transmitted to loads such as motors,
lamps, heaters, and computers. The electrical active power is transformed into
mechanical power, heat or light.
In a circuit where the applied r.m.s. voltage is V
rms
and the circulating r.m.s. current is
I
rms
, the apparent power S (kVA) is the product: V
rms
x I
rms
.
The apparent power is the basis for electrical equipment rating.
The Power Factor is the ratio of the active power P (kW) to the apparent power S
(kVA):
=
P(kW)
S(kVA)
The load may be a single power-consuming item, or a number of items (for example
an entire installation).
The value of power factor will range from 0 to 1.
1.2 Denition of reactive power
For most electrical loads like motors, the current I is lagging behind the voltage V by
an angle .
If currents and voltages are perfectly sinusoidal signals, a vector diagram can
be used for representation.
In this vector diagram, the current vector can be split into two components: one
in phase with the voltage vector (component I
a
), one in quadrature (lagging by
90 degrees) with the voltage vector (component I
r
). See Fig. L1.
I
a
is called the "active" component of the current.
I
r
is called the "reactive" component of the current.
The previous diagram drawn up for currents also applies to powers, by multiplying
each current by the common voltage V.
We thus dene:
Apparent power: S = V x I (kVA)
Active power: P = V x Ia (kW)
Reactive power: Q = V x Ir (kvar)
In this diagram, we can see that:
b Power Factor: P/S = cos
This formula is applicable for sinusoidal voltage and current. This is why the Power
Factor is then designated as "Displacement Power Factor".
b Q/S = sin
b Q/P = tan
A simple formula is obtained, linking apparent, active and reactive power: S = P + Q
A power factor close to unity means that the apparent power S is minimal. This
means that the electrical equipment rating is minimal for the transmission of a given
active power P to the load. The reactive power is then small compared with the active
power.
A low value of power factor indicates the opposite condition.
Useful formulae (for balanced and near-balanced loads on 4-wire systems):
b Active power P (in kW)
v Single phase (1 phase and neutral): P = V.I.cos
v Single phase (phase to phase): P = U.I.cos
v Three phase (3 wires or 3 wires + neutral): P = \3.U.I.cos
b Reactive power Q (in kvar)
v Single phase (1 phase and neutral): P = V.I.sin
v Single phase (phase to phase): Q = U.I.sin
v Three phase (3 wires or 3 wires + neutral): P = \3.U.I.sin
Fig. L1 : Current vector diagram
Fig. L2 : Power vector diagram
I
Ir
Ia V
P
S
Q
Schneider Electric - Electrical installation guide 2013
L3
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Power factor and Reactive
power
b Apparent power S (in kVA)
v Single phase (1 phase and neutral): S = V.I
v Single phase (phase to phase): S = U.I
v Three phase (3 wires or 3 wires + neutral): P = \3.U.I
where:
V = Voltage between phase and neutral
U = Voltage between phases
I = Line current
= Phase angle between vectors V and I.
An example of power calculations (see Fig. L3)
Fig. L3 : Example in the calculation of active and reactive power
Type of Apparent power Active power Reactive power
circuit S (kVA) P (kW) Q (kvar)
Single-phase (phase and neutral) S = VI P = VI cos Q = VI sin
Single-phase (phase to phase) S = UI P = UI cos Q = UI sin
Example 5 kW of load 10 kVA 5 kW 8.7 kvar
cos = 0.5
Three phase 3-wires or 3-wires + neutral S = 3 UI P = 3 UI cos Q = 3 UI sin
Example Motor Pn = 51 kW 65 kVA 56 kW 33 kvar
cos = 0.86
= 0.91 (motor efciency)
The calculations for the three-phase example above are as follows:
Pn = delivered shaft power = 51 kW
P = active power consumed
P=
Pn
56 kW
= =
51
0 91 .
S = apparent power
S=
P
cos
6 kVA
= =
56
0 86
5
.
So that, on referring to diagram Figure L15 or using a pocket calculator, the value of
tan corresponding to a cos of 0.86 is found to be 0.59
Q = P tan = 56 x 0.59 = 33 kvar (see Figure L2b).
Alternatively
Q - 65 - 56 33 kvar
2
= = = S P
2 2 2
Q = 33 kvar
P = 56 kW
S
=
6
5
k
V
A
Fig. L2b : Calculation power diagram
Schneider Electric - Electrical installation guide 2013
L - Power Factor Correction
L4
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.3 The nature of reactive power
All inductive (i.e. electromagnetic) machines and devices that operate on AC systems
convert electrical energy from the power system generators into mechanical work
and heat. This energy is measured by kWh meters, and is referred to as active
energy.
In order to perform this conversion, magnetic elds have to be established in the
machines. The magnetic eld is created by the circulation of current in coils, which
are mainly inductive. The current in these coils is therefore lagging by 90 relative to
the voltage, and represent the reactive current absorbed by the machine.
It should be noted that while reactive current does not draw power from the system,
it does cause power losses in transmission and distribution systems by heating the
conductors.
In practical power systems, load currents are invariably inductive, and impedances
of transmission and distribution systems predominantly inductive as well. The
combination of inductive current passing through an inductive reactance produces
the worst possible conditions of voltage drop (i.e. in direct phase opposition to the
system voltage).
For these two reasons (transmission power losses and voltage drop), the Network
Operators work for reducing the amount of reactive (inductive) current as much as
possible.
1.4 Reactive power of capacitors
The current owing through capacitors is leading the voltage by 90. The
corresponding current vector is then in opposition to the current vector of inductive
loads. This why capacitors are commonly used in the electrical systems, in order to
compensate the reactive power absorbed by inductive loads such as motors.
Inductive-reactive power is conventionally positive (absorbed by an inductive load),
while capacitive-reactive power is negative (supplied by a capacitive load).
As reactive-inductive loads and line reactance are responsible for voltage drops,
reactive-capacitive currents have the reverse effect on voltage levels and produce
voltage-rises in power systems.
1.5 Equipment and appliances requiring reactive
energy
All AC equipment and appliances that include electromagnetic devices, or depend
on magnetically coupled windings, require some degree of reactive current to create
magnetic ux.
The most common items in this class are transformers, reactors, motors and
discharge lamps with magnetic ballasts (see Fig. L5).
The proportion of reactive power (kvar) with respect to active power (kW) when a
piece of equipment is fully loaded varies according to the item concerned being:
b 65-75% for asynchronous motors (corresponding to a Power Factor 0.8 0.85)
b 5-10% for transformers (corresponding to a Power Factor close to 0.995)
Fig. L5 : Power consuming items that also require reactive
energy
Q
(kvar)
S
(kVA)
P
(kW)
Fig. L4 : An electric motor requires active power P and reactive
power Q from the power system
Schneider Electric - Electrical installation guide 2013
L5
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Power factor and Reactive
power
1.6 Practical values of power factor
Average power factor values for the most commonly-used equipment and
appliances (see Fig. L6)
Equipment and appliances cos tan
b Common loaded at 0% 0.17 5.80
induction motor 25% 0.55 1.52
50% 0.73 0.94
75% 0.80 0.75
100% 0.85 0.62
b Incandescent lamps 1.0 0
b Fluorescent lamps (uncompensated) 0.5 1.73
b Fluorescent lamps (compensated) 0.93 0.39
b Discharge lamps 0.4 to 0.6 2.29 to 1.33
b Ovens using resistance elements 1.0 0
b Induction heating ovens (compensated) 0.85 0.62
b Dielectric type heating ovens 0.85 0.62
b Resistance-type soldering machines 0.8 to 0.9 0.75 to 0.48
b Fixed 1-phase arc-welding set 0.5 1.73
b Arc-welding motor-generating set 0.7 to 0.9 1.02 to 0.48
b Arc-welding transformer-rectier set 0.7 to 0.8 1.02 to 0.75
b Arc furnace 0.8 0.75
Fig. L6 : Values of cos and tan for commonly-used equipment
Schneider Electric - Electrical installation guide 2013
L - Power Factor Correction
L6
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
L - Power Factor Correction
2.1 Reduction in the cost of electricity
Good management in the consumption of reactive energy brings economic
advantages.
These notes are based on an actual tariff structure commonly applied in Europe,
designed to encourage consumers to minimize their consumption of reactive energy.
The installation of power-factor correction equipment on installations permits the
consumer to reduce his electricity bill by maintaining the level of reactive-power
consumption below a value contractually agreed with the power supply authority.
In this particular tariff, reactive energy is billed according to the tan criterion.
As previously noted:
tan =
Q (kvar)
P (kW)
The same ratio applies to energies:
tan =
Q (kvarh)
P (kWh)
The power supply authority delivers reactive energy for free:
b If the reactive energy represents less than 40% of the active energy (tan < 0.4)
for a maximum period of 16 hours each day (from 06-00 h to 22-00 h) during the
most-heavily loaded period (often in winter)
b Without limitation during light-load periods in winter, and in spring and summer.
During the periods of limitation, reactive energy consumption exceeding 40% of
the active energy (i.e. tan > 0.4) is billed monthly at the current rates. Thus, the
quantity of reactive energy billed in these periods will be:
kvarh (to be billed) = kWh (tan - 0.4) where:
v kWh is the active energy consumed during the periods of limitation
v kWh tan is the total reactive energy during a period of limitation
v 0.4 kWh is the amount of reactive energy delivered for free during a period of
limitation
tan = 0.4 corresponds to a power factor of 0.93 so that, if steps are taken to ensure
that during the limitation periods the power factor never falls below 0.93,
the consumer will have nothing to pay for the reactive power consumed.
Against the nancial advantages of reduced billing, the consumer must balance the
cost of purchasing, installing and maintaining the power factor correction equipment
and controlling switchgear, automatic control equipment (where stepped levels of
compensation are required) together with the additional kWh consumed by the
losses of the equipment, etc. It may be found that it is more economic to provide
partial compensation only, and that paying for some of the reactive energy consumed
is less expensive than providing 100% compensation.
The question of power-factor correction is a matter of optimization, except in very
simple cases.
2.2 Technical/economic optimization
A high power factor allows the optimization of the components of an installation.
Overating of certain equipment can be avoided, but to achieve the best results, the
correction should be effected as close to the individual inductive items as possible.
Reduction of cable size
Figure L7 shows the required increase in the size of cables as the power factor is
reduced from unity to 0.4, for the same active power transmitted.
Improvement of the power factor of an
installation presents several technical and
economic advantages, notably in the reduction
of electricity bills
2 Why to improve the power
factor?
Power factor improvement allows the use of
smaller transformers, switchgear and cables,
etc. as well as reducing power losses and
voltage drop in an installation
Fig. L7 : Multiplying factor for cable size as a function of cos
Multiplying factor 1 1.25 1.67 2.5
for the cross-sectional
area of the cable core(s)
cos 1 0.8 0.6 0.4
Schneider Electric - Electrical installation guide 2013
L7
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Why to improve the power
factor?
(1) Since other benets are obtained from a high value of
power factor, as previously noted.
Reduction of losses (P, kW) in cables
Losses in cables are proportional to the current squared, and are measured by the
kWh meter of the installation. Reduction of the total current in a conductor by 10% for
example, will reduce the losses by almost 20%.
Reduction of voltage drop
Power factor correction equipment reduce or even cancel completely the (inductive)
reactive current in upstream conductors, thereby reducing or eliminating voltage
drops.
Note: Over compensation will produce a voltage rise at the equipment level.
Increase in available power
By improving the power factor of a load supplied from a transformer, the current
through the transformer will be reduced, thereby allowing more load to be added. In
practice, it may be less expensive to improve the power factor
(1)
, than to replace the
transformer by a larger unit.
This matter is further elaborated in clause 6.
Schneider Electric - Electrical installation guide 2013
L - Power Factor Correction
L8
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 How to improve the power factor?
3.1 Theoretical principles
An inductive load having a low power factor requires the generators and
transmission/distribution systems to pass reactive current (lagging the system
voltage by 90 degrees) with associated power losses and exaggerated voltage
drops, as noted in sub-clause 1.3. If a bank of shunt capacitors is added to the load,
its (capacitive) reactive current will take the same path through the power system
as that of the load reactive current. Since, as pointed out in sub-clause 1.3, this
capacitive current Ic (which leads the system voltage by 90 degrees) is in direct
phase opposition to the load reactive current (IL). The two components owing
through the same path will cancel each other, such that if the capacitor bank is
sufciently large and Ic = IL, there will be no reactive current ow in the system
upstream of the capacitors.
This is indicated in Figure L8 (a) and (b) which show the ow of the reactive
components of current only.
In this gure:
R represents the active-power elements of the load
L represents the (inductive) reactive-power elements of the load
C represents the (capacitive) reactive-power elements of the power-factor correction
equipment (i.e. capacitors).
It will be seen from diagram (b) of Figure L9, that the capacitor bank C appears
to be supplying all the reactive current of the load. For this reason, capacitors are
sometimes referred to as generators of leading vars.
In diagram (c) of Figure L9, the active-power current component has been added,
and shows that the (fully-compensated) load appears to the power system as having
a power factor of 1.
In general, it is not economical to fully compensate an installation.
Figure L9 uses the power diagram discussed in sub-clause 1.2 (see Fig. L2) to
illustrate the principle of compensation by reducing a large reactive power Q to a
smaller value Q by means of a bank of capacitors having a reactive power Qc.
In doing so, the magnitude of the apparent power S is seen reduced to S.
Qc can be calculated by the following formula deduced from gure L9:
Qc=P.(tan()-tan()')
Example:
A motor consumes 100 kW at a power factor of 0.75 (i.e. tan = 0.88). To improve
the power factor to 0.93 (i.e. tan = 0.4), the reactive power of the capacitor bank
must be : Qc = 100 (0.88 - 0.4) = 48 kvar
The selected level of compensation and the calculation of rating for the capacitor
bank depend on the particular installation. The factors requiring attention are
explained in a general way in clause 5, and in clauses 6 and 7 for transformers and
motors.
Note: Before starting a compensation project, a number of precautions should be
observed. In particular, oversizing of motors should be avoided, as well as the no-
load running of motors. In this latter condition, the reactive energy consumed by a
motor results in a very low power factor (~ 0.17); this is because the kW taken by the
motor (when it is unloaded) are very small.
3.2 By using what equipment?
Compensation at LV
At low voltage, compensation is provided by:
b Fixed-value capacitor
b Equipment providing automatic regulation, or banks which allow continuous
adjustment according to requirements, as loading of the installation changes
Note: When the installed reactive power of compensation exceeds 800 kvar, and the
load is continuous and stable, it is often found to be economically advantageous to
install capacitor banks at the medium voltage level.
Improving the power factor of an installation
requires a bank of capacitors which acts as a
source of reactive energy. This arrangement is
said to provide reactive energy compensation
C L
R
IL - IC IL IL IC
Load
C L
R
IL - IC = 0 IL IL IC
Load
C L
R
IR IR IR + IL IL IC
Load
a) Reactive current components only ow pattern
b) When IC = IL, all reactive power is supplied from the
capacitor bank
c) With load current added to case (b)
Fig. L8 : Showing the essential features of power-factor
correction
Qc
'
P
S
S'
Q
Q'
Fig. L9 : Diagram showing the principle of compensation:
Qc = P (tan - tan )
L - Power Factor Correction
Schneider Electric - Electrical installation guide 2013
L9
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fixed capacitors (see Fig. L10)
This arrangement employs one or more capacitor(s) to form a constant level of
compensation. Control may be:
b Manual: by circuit-breaker or load-break switch
b Semi-automatic: by contactor
b Direct connection to an appliance and switched with it
These capacitors are applied:
b At the terminals of inductive devices (motors and transformers)
b At busbars supplying numerous small motors and inductive appliance for which
individual compensation would be too costly
b In cases where the level of load is reasonably constant
Compensation can be carried out by a
xed value of capacitance in favourable
circumstances
Compensation is more-commonly effected by
means of an automatically-controlled stepped
bank of capacitors
Fig. L11 : Example of automatic-compensation-regulating equipment
Automatic capacitor banks (see Fig. L11)
This kind of equipment provides automatic control of compensation, maintaining the
power factor within close limits around a selected level. Such equipment is applied at
points in an installation where the active-power and/or reactive-power variations are
relatively large, for example:
b At the busbars of a general power distribution board
b At the terminals of a heavily-loaded feeder cable
Fig. L10 : Example of xed-value compensation capacitors
3 How to improve the power factor?
Schneider Electric - Electrical installation guide 2013
L - Power Factor Correction
L10
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
The principles of, and reasons, for using automatic
compensation
A bank of capacitors is divided into a number of sections, each of which is controlled
by a contactor. Closure of a contactor switches its section into parallel operation with
other sections already in service. The size of the bank can therefore be increased or
decreased in steps, by the closure and opening of the controlling contactors.
A control relay monitors the power factor of the controlled circuit(s) and is arranged
to close and open appropriate contactors to maintain a reasonably constant
system power factor (within the tolerance imposed by the size of each step of
compensation). The current transformer for the monitoring relay must evidently
be placed on one phase of the incoming cable which supplies the circuit(s) being
controlled, as shown in Figure L12.
Power factor correction equipment including static contactors (thyristors) instead of
usual contactors is particularly suitable for a certain number of installations using
equipment with fast cycle and/or sensitive to transient surges.
The advantages of static contactors are :
b Immediate response to all power factor uctuation (response time as low as 40 ms
according to regulator option)
b Unlimited number of operations
b Elimination of transient phenomena on the network on capacitor switching
b Fully silent operation
By closely matching compensation to that required by the load, the possibility of
producing overvoltages at times of low load will be avoided, thereby preventing
an overvoltage condition, and possible damage to appliances and equipment.
Overvoltages due to excessive reactive compensation depend partly on the value of
source impedance.
Automatically-regulated banks of capacitors
allow an immediate adaptation of compensation
to match the level of load
Varmetric
relay
CT In / 5 A cl 1
U I
Fig. L12 : The principle of automatic-compensation control
3.3 The choice between a xed or automatically-
regulated bank of capacitors
Commonly-applied rules
Where the kvar rating of the capacitors is less than, or equal to 15% of the supply
transformer rating, a xed value of compensation is appropriate. Above the 15%
level, it is advisable to install an automatically-controlled bank of capacitors.
The location of low-voltage capacitors in an installation constitutes the mode of
compensation, which may be global (one location for the entire installation), partial
(section-by-section), local (at each individual device), or some combination of the
latter two. In principle, the ideal compensation is applied at a point of consumption
and at the level required at any instant.
In practice, technical and economic factors govern the choice.
3 How to improve the power factor?
Schneider Electric - Electrical installation guide 2013
L11
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Where to install power factor
correction capacitors?
Where a load is continuous and stable, global
compensation can be applied
4.1 Global compensation (see Fig. L13)
Principle
The capacitor bank is connected to the busbars of the main LV distribution board for
the installation, and remains in service during the period of normal load.
Advantages
The global type of compensation:
b Reduces the tariff penalties for excessive consumption of kvars
b Reduces the apparent power kVA demand, on which standing charges are usually
based
b Relieves the supply transformer, which is then able to accept more load if
necessary
Comments
b Reactive current still ows in all conductors of cables leaving (i.e. downstream of)
the main LV distribution board
b For the above reason, the sizing of these cables, and power losses in them, are
not improved by the global mode of compensation.
Fig. L14 : Compensation by sector
Compensation by sector is recommended
when the installation is extensive, and where the
load/time patterns differ from one part of
the installation to another
M M M M
no. 2 no. 2
no. 1
4.2 Compensation by sector (see Fig. L14)
Principle
Capacitor banks are connected to busbars of each local distribution board, as shown
in Figure L14.
A signicant part of the installation benets from this arrangement, notably the feeder
cables from the main distribution board to each of the local distribution boards at
which the compensation measures are applied.
Advantages
The compensation by sector:
b Reduces the tariff penalties for excessive consumption of kvars
b Reduces the apparent power kVA demand, on which standing charges are usually
based
b Relieves the supply transformer, which is then able to accept more load if
necessary
b The size of the cables supplying the local distribution boards may be reduced, or
will have additional capacity for possible load increases
b Losses in the same cables will be reduced
Comments
b Reactive current still ows in all cables downstream of the local distribution boards
b For the above reason, the sizing of these cables, and the power losses in them,
are not improved by compensation by sector
b Where large changes in loads occur, there is always a risk of overcompensation
and consequent overvoltage problems
Fig. L13 : Global compensation
M M M M
no.1
Schneider Electric - Electrical installation guide 2013
L - Power Factor Correction
L12
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Individual compensation should be considered
when the power of motor is signicant with
respect to power of the installation
4.3 Individual compensation
Principle
Capacitors are connected directly to the terminals of inductive circuit (notably motors,
see further in Clause 7). Individual compensation should be considered when the
power of the motor is signicant with respect to the declared power requirement
(kVA) of the installation.
The kvar rating of the capacitor bank is in the order of 25% of the kW rating of the
motor. Complementary compensation at the origin of the installation (transformer)
may also be benecial.
Advantages
Individual compensation:
b Reduces the tariff penalties for excessive consumption of kvars
b Reduces the apparent power kVA demand
b Reduces the size of all cables as well as the cable losses
Comments
b Signicant reactive currents no longer exist in the installation
4 Where to install power factor
correction capacitors?
Schneider Electric - Electrical installation guide 2013
L13
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
L - Power Factor Correction
5.1 General method
Listing of reactive power demands at the design stage
This listing can be made in the same way (and at the same time) as that for the
power loading described in chapter A. The levels of active and reactive power
loading, at each level of the installation (generally at points of distribution and sub-
distribution of circuits) can then be determined.
Technical-economic optimization for an existing installation
The optimum rating of compensation capacitors for an existing installation can be
determined from the following principal considerations:
b Electricity bills prior to the installation of capacitors
b Future electricity bills anticipated following the installation of capacitors
b Costs of:
v Purchase of capacitors and control equipment (contactors, relaying, cabinets, etc.)
v Installation and maintenance costs
v Cost of dielectric heating losses in the capacitors, versus reduced losses in cables,
transformer, etc., following the installation of capacitors
Several simplied methods applied to typical tariffs (common in Europe) are shown
in sub-clauses 5.3 and 5.4.
5.2 Simplied method
General principle
An approximate calculation is generally adequate for most practical cases, and may
be based on the assumption of a power factor of 0.8 (lagging) before compensation.
In order to improve the power factor to a value sufcient to avoid tariff penalties (this
depends on local tariff structures, but is assumed here to be 0.93) and to reduce
losses, volt-drops, etc. in the installation, reference can be made to Figure L15 next
page.
From the gure, it can be seen that, to raise the power factor of the installation from
0.8 to 0.93 will require 0.355 kvar per kW of load. The rating of a bank of capacitors
at the busbars of the main distribution board of the installation would be
Q (kvar) = 0.355 x P (kW).
This simple approach allows a rapid determination of the compensation capacitors
required, albeit in the global, partial or independent mode.
Example
It is required to improve the power factor of a 666 kVA installation from 0.75 to 0.928.
The active power demand is 666 x 0.75 = 500 kW.
In Figure L15, the intersection of the row cos = 0.75 (before correction) with
the column cos = 0.93 (after correction) indicates a value of 0.487 kvar of
compensation per kW of load.
For a load of 500 kW, therefore, 500 x 0.487 = 244 kvar of capacitive compensation
is required.
Note: this method is valid for any voltage level, i.e. is independent of voltage.
5 How to determine the optimum
level of compensation?
Schneider Electric - Electrical installation guide 2013
L - Power Factor Correction
L14
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Before kvar rating of capacitor bank to install per kW of load, to improve cos (the power factor) or tan ,
compensation to a given value
tan 0.75 0.59 0.48 0.46 0.43 0.40 0.36 0.33 0.29 0.25 0.20 0.14 0.0
tan cos cos 0.80 0.86 0.90 0.91 0.92 0.93 0.94 0.95 0.96 0.97 0.98 0.99 1
2.29 0.40 1.557 1.691 1.805 1.832 1.861 1.895 1.924 1.959 1.998 2.037 2.085 2.146 2.288
2.22 0.41 1.474 1.625 1.742 1.769 1.798 1.831 1.840 1.896 1.935 1.973 2.021 2.082 2.225
2.16 0.42 1.413 1.561 1.681 1.709 1.738 1.771 1.800 1.836 1.874 1.913 1.961 2.022 2.164
2.10 0.43 1.356 1.499 1.624 1.651 1.680 1.713 1.742 1.778 1.816 1.855 1.903 1.964 2.107
2.04 0.44 1.290 1.441 1.558 1.585 1.614 1.647 1.677 1.712 1.751 1.790 1.837 1.899 2.041
1.98 0.45 1.230 1.384 1.501 1.532 1.561 1.592 1.628 1.659 1.695 1.737 1.784 1.846 1.988
1.93 0.46 1.179 1.330 1.446 1.473 1.502 1.533 1.567 1.600 1.636 1.677 1.725 1.786 1.929
1.88 0.47 1.130 1.278 1.397 1.425 1.454 1.485 1.519 1.532 1.588 1.629 1.677 1.758 1.881
1.83 0.48 1.076 1.228 1.343 1.370 1.400 1.430 1.464 1.497 1.534 1.575 1.623 1.684 1.826
1.78 0.49 1.030 1.179 1.297 1.326 1.355 1.386 1.420 1.453 1.489 1.530 1.578 1.639 1.782
1.73 0.50 0.982 1.232 1.248 1.276 1.303 1.337 1.369 1.403 1.441 1.481 1.529 1.590 1.732
1.69 0.51 0.936 1.087 1.202 1.230 1.257 1.291 1.323 1.357 1.395 1.435 1.483 1.544 1.686
1.64 0.52 0.894 1.043 1.160 1.188 1.215 1.249 1.281 1.315 1.353 1.393 1.441 1.502 1.644
1.60 0.53 0.850 1.000 1.116 1.144 1.171 1.205 1.237 1.271 1.309 1.349 1.397 1.458 1.600
1.56 0.54 0.809 0.959 1.075 1.103 1.130 1.164 1.196 1.230 1.268 1.308 1.356 1.417 1.559
1.52 0.55 0.769 0.918 1.035 1.063 1.090 1.124 1.156 1.190 1.228 1.268 1.316 1.377 1.519
1.48 0.56 0.730 0.879 0.996 1.024 1.051 1.085 1.117 1.151 1.189 1.229 1.277 1.338 1.480
1.44 0.57 0.692 0.841 0.958 0.986 1.013 1.047 1.079 1.113 1.151 1.191 1.239 1.300 1.442
1.40 0.58 0.665 0.805 0.921 0.949 0.976 1.010 1.042 1.076 1.114 1.154 1.202 1.263 1.405
1.37 0.59 0.618 0.768 0.884 0.912 0.939 0.973 1.005 1.039 1.077 1.117 1.165 1.226 1.368
1.33 0.60 0.584 0.733 0.849 0.878 0.905 0.939 0.971 1.005 1.043 1.083 1.131 1.192 1.334
1.30 0.61 0.549 0.699 0.815 0.843 0.870 0.904 0.936 0.970 1.008 1.048 1.096 1.157 1.299
1.27 0.62 0.515 0.665 0.781 0.809 0.836 0.870 0.902 0.936 0.974 1.014 1.062 1.123 1.265
1.23 0.63 0.483 0.633 0.749 0.777 0.804 0.838 0.870 0.904 0.942 0.982 1.030 1.091 1.233
1.20 0.64 0.450 0.601 0.716 0.744 0.771 0.805 0.837 0.871 0.909 0.949 0.997 1.058 1.200
1.17 0.65 0.419 0.569 0.685 0.713 0.740 0.774 0.806 0.840 0.878 0.918 0.966 1.007 1.169
1.14 0.66 0.388 0.538 0.654 0.682 0.709 0.743 0.775 0.809 0.847 0.887 0.935 0.996 1.138
1.11 0.67 0.358 0.508 0.624 0.652 0.679 0.713 0.745 0.779 0.817 0.857 0.905 0.966 1.108
1.08 0.68 0.329 0.478 0.595 0.623 0.650 0.684 0.716 0.750 0.788 0.828 0.876 0.937 1.079
1.05 0.69 0.299 0.449 0.565 0.593 0.620 0.654 0.686 0.720 0.758 0.798 0.840 0.907 1.049
1.02 0.70 0.270 0.420 0.536 0.564 0.591 0.625 0.657 0.691 0.729 0.769 0.811 0.878 1.020
0.99 0.71 0.242 0.392 0.508 0.536 0.563 0.597 0.629 0.663 0.701 0.741 0.783 0.850 0.992
0.96 0.72 0.213 0.364 0.479 0.507 0.534 0.568 0.600 0.634 0.672 0.712 0.754 0.821 0.963
0.94 0.73 0.186 0.336 0.452 0.480 0.507 0.541 0.573 0.607 0.645 0.685 0.727 0.794 0.936
0.91 0.74 0.159 0.309 0.425 0.453 0.480 0.514 0.546 0.580 0.618 0.658 0.700 0.767 0.909
0.88 0.75 0.132 0.82 0.398 0.426 0.453 0.487 0.519 0.553 0.591 0.631 0.673 0.740 0.882
0.86 0.76 0.105 0.255 0.371 0.399 0.426 0.460 0.492 0.526 0.564 0.604 0.652 0.713 0.855
0.83 0.77 0.079 0.229 0.345 0.373 0.400 0.434 0.466 0.500 0.538 0.578 0.620 0.687 0.829
0.80 0.78 0.053 0.202 0.319 0.347 0.374 0.408 0.440 0.474 0.512 0.552 0.594 0.661 0.803
0.78 0.79 0.026 0.176 0.292 0.320 0.347 0.381 0.413 0.447 0.485 0.525 0.567 0.634 0.776
0.75 0.80 0.150 0.266 0.294 0.321 0.355 0.387 0.421 0.459 0.499 0.541 0.608 0.750
0.72 0.81 0.124 0.240 0.268 0.295 0.329 0.361 0.395 0.433 0.473 0.515 0.582 0.724
0.70 0.82 0.098 0.214 0.242 0.269 0.303 0.335 0.369 0.407 0.447 0.489 0.556 0.698
0.67 0.83 0.072 0.188 0.216 0.243 0.277 0.309 0.343 0.381 0.421 0.463 0.530 0.672
0.65 0.84 0.046 0.162 0.190 0.217 0.251 0.283 0.317 0.355 0.395 0.437 0.504 0.645
0.62 0.85 0.020 0.136 0.164 0.191 0.225 0.257 0.291 0.329 0.369 0.417 0.478 0.620
0.59 0.86 0.109 0.140 0.167 0.198 0.230 0.264 0.301 0.343 0.390 0.450 0.593
0.57 0.87 0.083 0.114 0.141 0.172 0.204 0.238 0.275 0.317 0.364 0.424 0.567
0.54 0.88 0.054 0.085 0.112 0.143 0.175 0.209 0.246 0.288 0.335 0.395 0.538
0.51 0.89 0.028 0.059 0.086 0.117 0.149 0.183 0.230 0.262 0.309 0.369 0.512
0.48 0.90 0.031 0.058 0.089 0.121 0.155 0.192 0.234 0.281 0.341 0.484
Fig. L15 : kvar to be installed per kW of load, to improve the power factor of an installation
Value selected as an example on section 5.2
Value selected as an example on section 5.4
Schneider Electric - Electrical installation guide 2013
L15
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5.3 Method based on the avoidance of tariff
penalties
The following method allows calculation of the rating of a proposed capacitor bank,
based on billing details, where the tariff structure corresponds with (or is similar to)
the one described in sub-clause 2.1 of this chapter.
The method determines the minimum compensation required to avoid these charges
which are based on kvarh consumption.
The procedure is as follows:
b Refer to the bills covering consumption for the 5 months of winter (in France these
are November to March inclusive).
Note: in tropical climates the summer months may constitute the period of heaviest
loading and highest peaks (owing to extensive air conditioning loads) so that a
consequent variation of high-tariff periods is necessary in this case. The remainder of
this example will assume Winter conditions in France.
b Identify the line on the bills referring to reactive-energy consumed and kvarh
to be charged. Choose the bill which shows the highest charge for kvarh (after
checking that this was not due to some exceptional situation).
For example: 15,966 kvarh in January.
b Evaluate the total period of loaded operation of the installation for that month, for
instance: 220 hours (22 days x 10 hours). The hours which must be counted are
those occurring during the heaviest load and the highest peak loads occurring on
the power system. These are given in the tariff documents, and are (commonly)
during a 16-hour period each day, either from 06.00 h to 22.00 h or from 07.00 h to
23.00 h according to the region. Outside these periods, no charge is made for kvarh
consumption.
b The necessary value of compensation in kvar = kvarh billed/number of hours of
operation
(1)
= Qc
The rating of the installed capacitor bank is generally chosen to be slightly larger
than that calculated.
Certain manufacturers can provide slide rules especially designed to facilitate
these kinds of calculation, according to particular tariffs. These devices and
accompanying documentation advice on suitable equipment and control schemes,
as well as drawing attention to constraints imposed by harmonic voltages on the
power system. Such voltages require either over dimensioned capacitors (in terms of
heat-dissipation, voltage and current ratings) and/or harmonic-suppression inductors
or lters.
5.4 Method based on reduction of declared
maximum apparent power (kVA)
For consumers whose tariffs are based on a xed charge per kVA declared, plus a
charge per kWh consumed, it is evident that a reduction in declared kVA would be
benecial. The diagram of Figure L16 shows that as the power factor improves, the
kVA value diminishes for a given value of kW (P). The improvement of the power
factor is aimed at (apart from other advantages previously mentioned) reducing the
declared level and never exceeding it, thereby avoiding the payment of an excessive
price per kVA during the periods of excess, and/or tripping of the the main circuit-
breaker. Figure L15 (previous page) indicates the value of kvar of compensation per
kW of load, required to improve from one value of power factor to another.
Example:
A supermarket has a declared load of 122 kVA at a power factor of 0.7 lagging, i.e.an
active-power load of 85.4 kW. The particular contract for this consumer was based on
stepped values of declared kVA (in steps of 6 kVA up to 108 kVA, and 12 kVA steps
above that value, this is a common feature in many types of two-part tariff). In the
case being considered, the consumer was billed on the basis of
132 kVA. Referring to Figure L15, it can be seen that a 60 kvar bank of capacitors
will improve the power factor of the load from 0.7 to 0.95 (0.691 x 85.4 = 59 kvar
in the gure). The declared value of kVA will then be
85.4
0.95
9 kVA = 0 , i.e. an
improvement of 30%.
For 2-part tariffs based partly on a declared value
of kVA, Figure L17 allows determination of the
kvar of compensation required to reduce the
value of kVA declared, and to avoid exceeding it
Qc
'
P = 85.4 kW
Cos = 0.7
Cos '= 0.95
S = 122 kVA
S' = 90 kVA
Q = 87.1 kvar
Qc = 59 kvar
Q' = 28.1 kvar
S
S'
Q
Q'
Fig. L16 : Reduction of declared maximum kVA by power-
factor improvement
5 How to determine the optimum
level of compensation?
In the case of certain (common) types of
tariff, an examination of several bills covering
the most heavily-loaded period of the year
allows determination of the kvar level of
compensation required to avoid kvarh (reactive-
energy) charges. The pay-back period of a
bank of power-factor-correction capacitors
and associated equipment is generally about
18 months
(1) In the billing period, during the hours for which
reactive energy is charged for the case considered above:
Qc
15,996 kvarh
220 h
73 kvar = =
Schneider Electric - Electrical installation guide 2013
L - Power Factor Correction
L16
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6.1 Compensation to increase the available active
power output
Steps similar to those taken to reduce the declared maximum kVA, i.e. improvement
of the load power factor, as discussed in subclause 5.4, will maximise the available
transformer capacity, i.e. to supply more active power.
Cases can arise where the replacement of a transformer by a larger unit, to overcome
a load growth, may be avoided by this means. Figure L17 shows directly the power
(kW) capability of fully-loaded transformers at different load power factors, from
which the increase of active-power output can be obtained as the value of power
factor increases.
6 Compensation at the terminals
of a transformer
The installation of a capacitor bank can avoid
the need to change a transformer in the event of
a load increase
Example: (see Fig. L18 )
An installation is supplied from a 630 kVA transformer loaded at 450 kW (P1) with a
mean power factor of 0.8 lagging. The apparent power S
450
0.8
5 kVA 1 62 = =
The corresponding reactive power
Q1 S1 P1 337 kvar
2 2
= =
The anticipated load increase P2 = 100 kW at a power factor of 0.7 lagging.
The apparent power
S
100
0.7
kVA 2 143 = =
The corresponding reactive power
Q2 S2 P2 1 kvar
2 2
= = 02
What is the minimum value of capacitive kvar to be installed, in order to avoid a
change of transformer?
Total power now to be supplied:
P = P1 + P2 = 550 kW
The maximum reactive power capability of the 630 kVA transformer when delivering
550 kW is:
Qm S P
2 2
=
Qm 6 5 307 kvar
2 2
= = 30 50
Total reactive power required by the installation before compensation:
Q1 + Q2 = 337 + 102 = 439 kvar
So that the minimum size of capacitor bank to install:
Qkvar = 439 - 307 = 132 kvar
It should be noted that this calculation has not taken account of load peaks and their
duration.
The best possible improvement, i.e. correction which attains a power factor of
1 would permit a power reserve for the transformer of 630 - 550 = 80 kW.
The capacitor bank would then have to be rated at 439 kvar.
Fig. L17 : Active-power capability of fully-loaded transformers, when supplying loads at different values of power factor
Q
Q
P P1
S1
S
Q1
P2
S2
Q2
Q m
Fig. L18 : Compensation Q allows the installation-load
extension S2 to be added, without the need to replace the
existing transformer, the output of which is limited to S
tan cos Nominal rating of transformers (in kVA)
100 160 250 315 400 500 630 800 1000 1250 1600 2000
0.00 1 100 160 250 315 400 500 630 800 1000 1250 1600 2000
0.20 0.98 98 157 245 309 392 490 617 784 980 1225 1568 1960
0.29 0.96 96 154 240 302 384 480 605 768 960 1200 1536 1920
0.36 0.94 94 150 235 296 376 470 592 752 940 1175 1504 1880
0.43 0.92 92 147 230 290 368 460 580 736 920 1150 1472 1840
0.48 0.90 90 144 225 284 360 450 567 720 900 1125 1440 1800
0.54 0.88 88 141 220 277 352 440 554 704 880 1100 1408 1760
0.59 0.86 86 138 215 271 344 430 541 688 860 1075 1376 1720
0.65 0.84 84 134 210 265 336 420 529 672 840 1050 1344 1680
0.70 0.82 82 131 205 258 328 410 517 656 820 1025 1312 1640
0.75 0.80 80 128 200 252 320 400 504 640 800 1000 1280 1600
0.80 0.78 78 125 195 246 312 390 491 624 780 975 1248 1560
0.86 0.76 76 122 190 239 304 380 479 608 760 950 1216 1520
0.91 0.74 74 118 185 233 296 370 466 592 740 925 1184 1480
0.96 0.72 72 115 180 227 288 360 454 576 720 900 1152 1440
1.02 0.70 70 112 175 220 280 350 441 560 700 875 1120 1400
L - Power Factor Correction
Schneider Electric - Electrical installation guide 2013
L17
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6.2 Compensation of reactive energy absorbed by
the transformer
The nature of transformer inductive reactances
All previous references have been to shunt connected devices such as those used
in normal loads, and power factor-correcting capacitor banks etc. The reason for
this is that shunt connected equipment requires (by far) the largest quantities of
reactive energy in power systems; however, series-connected reactances, such as
the inductive reactances of power lines and the leakage reactance of transformer
windings, etc., also absorb reactive energy.
Where metering is carried out at the MV side of a transformer, the reactive-energy
losses in the transformer may (depending on the tariff) need to be compensated. As
far as reactive-energy losses only are concerned, a transformer may be represented
by the elementary diagram of Figure L19. All reactance values are referred to
the secondary side of the transformer, where the shunt branch represents the
magnetizing-current path. The magnetizing current remains practically constant (at
about 1.8% of full-load current) from no load to full load, in normal circumstances,
i.e. with a constant primary voltage, so that a shunt capacitor of xed value can be
installed at the MV or LV side, to compensate for the reactive energy absorbed.
Reactive-power absorption in series-connected
(leakage ux) reactance XL
A simple illustration of this phenomenon is given by the vector diagram of
Figure L20.
The reactive-current component through the load = I sin so that QL = VI sin .
The reactive-current component from the source = I sin so that QE = EI sin .
It can be seen that E > V and sin > sin .
The difference between EI sin and VI sin gives the kvar per phase absorbed
by XL.
It can be shown that this kvar value is equal to I
2
XL (which is analogous to the I
2
R
active power (kW) losses due to the series resistance of power lines, etc.).
From the I
2
XL formula it is very simple to deduce the kvar absorbed at any load value
for a given transformer, as follows:
If per-unit values are used (instead of percentage values) direct multiplication of I
and XL can be carried out.
Example:
A 630 kVA transformer with a short-circuit reactance voltage of 4% is fully loaded.
What is its reactive-power (kvar) loss?
XL = 0.04 pu and I = 1 pu
loss = I
2
XL = 1
2
x 0.04 = 0.04 pu kvar
where 1 pu = 630 kVA
The 3-phase kvar losses are 630 x 0.04 = 25.2 kvar (or, quite simply, 4% of 630 kVA).
At half load i.e. I = 0.5 pu the losses will be
0.5
2
x 0.04 = 0.01 pu = 630 x 0.01 = 6.3 kvar and so on...
This example, and the vector diagram of Figure L20 show that:
b The power factor at the primary side of a loaded transformer is different (normally
lower) than that at the secondary side (due to the absorption of vars)
b Full-load kvar losses due to leakage reactance are equal to the transformer
percentage reactance (4% reactance means a kvar loss equal to 4% of the kVA rating
of the transformer)
b kvar losses due to leakage reactance vary according to the current
(or kVA loading) squared
Where metering is carried out at the MV side
of a transformer, the reactive-energy losses in
the transformer may need to be compensated
(depending on the tariff)
Fig. L19 : Transformer reactances per phase
Perfect transformer
Primary
winding
Secondary
winding
Magnetizing
reactance
Leakage reactance
The reactive power absorbed by a transformer
cannot be neglected, and can amount to (about)
5% of the transformer rating when supplying
its full load. Compensation can be provided by
a bank of capacitors. In transformers, reactive
power is absorbed by both shunt (magnetizing)
and series (leakage ux) reactances. Complete
compensation can be provided by a bank of
shunt-connected LV capacitors
XL
E
Source
V
Load
E
'
I sin
I
I sin
I
'
V
IXL
Fig. L20 : Reactive power absorption by series inductance
6 Compensation at the terminals
of a transformer
Schneider Electric - Electrical installation guide 2013
L - Power Factor Correction
L18
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
To determine the total kvar losses of a transformer the constant magnetizing-current
circuit losses (approx. 1.8% of the transformer kVA rating) must be added to the
foregoing series losses. Figure L21 shows the no-load and full-load kvar losses for
typical distribution transformers. In principle, series inductances can be compensated
by xed series capacitors (as is commonly the case for long MV transmission lines).
This arrangement is operationally difcult, however, so that, at the voltage levels
covered by this guide, shunt compensation is always applied.
In the case of MV metering, it is sufcient to raise the power factor to a point where
the transformer plus load reactive-power consumption is below the level at which a
billing charge is made. This level depends on the tariff, but often corresponds to a
tan value of 0.31 (cos of 0.955).
6 Compensation at the terminals
of a transformer
Rated power (kVA) Reactive power (kvar) to be compensated
No load Full load
100 2.5 6.1
160 3.7 9.6
250 5.3 14.7
315 6.3 18.4
400 7.6 22.9
500 9.5 28.7
630 11.3 35.7
800 20 54.5
1000 23.9 72.4
1250 27.4 94.5
1600 31.9 126
2000 37.8 176
Fig. L21 : Reactive power consumption of distribution transformers with 20 kV primary windings
IXL
I
V (Load voltage)
E (Input voltage)
Load
current
I0 Compensation current
Fig. L22 : Overcompensation of load to completely compensate transformer reactive-power losses
As a matter of interest, the kvar losses in a transformer can be completely
compensated by adjusting the capacitor bank to give the load a (slightly) leading
power factor. In such a case, all of the kvar of the transformer is being supplied from
the capacitor bank, while the input to the MV side of the transformer is at unity power
factor, as shown in Figure L22.
In practical terms, therefore, compensation for transformer-absorbed kvar is included
in the capacitors primarily intended for power factor correction of the load, either
globally, partially, or in the individual mode. Unlike most other kvar-absorbing items,
the transformer absorption (i.e. the part due to the leakage reactance) changes
signicantly with variations of load level, so that, if individual compensation is applied
to the transformer, then an average level of loading will have to be assumed.
Fortunately, this kvar consumption generally forms only a relatively small part of the
total reactive power of an installation, and so mismatching of compensation at times
of load change is not likely to be a problem.
Figure L21 indicates typical kvar loss values for the magnetizing circuit (no-load
kvar columns), as well as for the total losses at full load, for a standard range of
distribution transformers supplied at 20 kV (which include the losses due to the
leakage reactance).
Schneider Electric - Electrical installation guide 2013
L19
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
L - Power Factor Correction
7.1 Connection of a capacitor bank and protection
settings
General precautions
Because of the small kW consumption, the power factor of a motor is very low at no-
load or on light load. The reactive current of the motor remains practically constant at
all loads, so that a number of unloaded motors constitute a consumption of reactive
power which is generally detrimental to an installation, for reasons explained in
preceding sections.
Two good general rules therefore are that unloaded motors should be switched off,
and motors should not be oversized (since they will then be lightly loaded).
Connection
The bank of capacitors should be connected directly to the terminals of the motor.
Special motors
It is recommended that special motors (stepping, plugging, inching, reversing motors,
etc.) should not be compensated.
Effect on protection settings
After applying compensation to a motor, the current to the motor-capacitor
combination will be lower than before, assuming the same motor-driven load
conditions. This is because a signicant part of the reactive component of the motor
current is being supplied from the capacitor, as shown in Figure L23.
Where the overcurrent protection devices of the motor are located upstream of the
motor capacitor connection (and this will always be the case for terminal-connected
capacitors), the overcurrent relay settings must be reduced in the ratio:
cos before compensation / cos after compensation
For motors compensated in accordance with the kvar values indicated in Figure L24
(maximum values recommended for avoidance of self-excitation of standard
induction motors, as discussed in sub-clause 7.2), the above-mentioned ratio
will have a value similar to that indicated for the corresponding motor speed in
Figure L25.
7 Power factor correction of
induction motors
Individual motor compensation is recommended
where the motor power (kVA) is large with
respect to the declared power of the installation
Speed in rpm Reduction factor
750 0.88
1000 0.90
1500 0.91
3000 0.93
Active
power
Reactive
power
supplied
by capacitor
Power
made
available
C
Transformer
Before
compensation
After
compensation
Motor
M M
Fig. L23 : Before compensation, the transformer supplies all
the reactive power; after compensation, the capacitor supplies
a large part of the reactive power Fig. L25 : Reduction factor for overcurrent protection after compensation
3-phase motors 230/400 V
Nominal power kvar to be installed
Speed of rotation (rpm)
kW hp 3000 1500 1000 750
22 30 6 8 9 10
30 40 7.5 10 11 12.5
37 50 9 11 12.5 16
45 60 11 13 14 17
55 75 13 17 18 21
75 100 17 22 25 28
90 125 20 25 27 30
110 150 24 29 33 37
132 180 31 36 38 43
160 218 35 41 44 52
200 274 43 47 53 61
250 340 52 57 63 71
280 380 57 63 70 79
355 482 67 76 86 98
400 544 78 82 97 106
450 610 87 93 107 117
Figure L24 : Maximum kvar of power factor correction applicable to motor terminals without risk
of self excitation
Schneider Electric - Electrical installation guide 2013
L - Power Factor Correction
L20
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
7.2 How self-excitation of an induction motor can be
avoided
When a motor is driving a high-inertia load, the motor will continue to rotate (unless
deliberately braked) after the motor supply has been switched off.
The magnetic inertia of the rotor circuit means that an emf will be generated in the
stator windings for a short period after switching off, and would normally reduce to
zero after 1 or 2 cycles, in the case of an uncompensated motor.
Compensation capacitors however, constitute a 3-phase reactive load for this
decaying emf, which causes capacitive currents to ow through the stator windings.
These stator currents will produce a rotating magnetic eld in the rotor which acts
exactly along the same axis and in the same direction as that of the decaying
magnetic eld.
The rotor ux consequently increases; the stator currents increase; and the voltage
at the terminals of the motor increases; sometimes to dangerously-high levels. This
phenomenon is known as self-excitation and is one reason why AC generators
are not normally operated at leading power factors, i.e. there is a tendency to
spontaneously (and uncontrollably) self excite.
Notes:
1. The characteristics of a motor being driven by the inertia of the load are not
rigorously identical to its no-load characteristics. This assumption, however, is
sufciently accurate for practical purposes.
2. With the motor acting as a generator, the currents circulating are largely reactive,
so that the braking (retarding) effect on the motor is mainly due only to the load
represented by the cooling fan in the motor.
3. The (almost 90 lagging) current taken from the supply in normal circumstances by
the unloaded motor, and the (almost 90 leading) current supplied to the capacitors
by the motor acting as a generator, both have the same phase relationship to
the terminal voltage. It is for this reason that the two characteristics may be
superimposed on the graph.
In order to avoid self-excitation as described above, the kvar rating of the capacitor
bank must be limited to the following maximum value:
Qc y 0.9 x Io x Un x 3 where Io = the no-load current of the motor and Un =
phase-to-phase nominal voltage of the motor in kV. Figure L24 previous page gives
appropriate values of Qc corresponding to this criterion.
Example
A 75 kW, 3,000 rpm, 400 V, 3-phase motor may have a capacitor bank no larger
than 17 kvar according to Figure L24. The table values are, in general, too small to
adequately compensate the motor to the level of cos normally required. Additional
compensation can, however, be applied to the system, for example an overall bank,
installed for global compensation of a number of smaller appliances.
High-inertia motors and/or loads
In any installation where high-inertia motor driven loads exist, the circuit-breakers or
contactors controlling such motors should, in the event of total loss of power supply,
be rapidly tripped.
If this precaution is not taken, then self excitation to very high voltages is likely to
occur, since all other banks of capacitors in the installation will effectively be in
parallel with those of the high-inertia motors.
The protection scheme for these motors should therefore include an overvoltage
tripping relay, together with reverse-power checking contacts (the motor will feed
power to the rest of the installation, until the stored inertial energy is dissipated).
If the capacitor bank associated with a high inertia motor is larger than that
recommended in Figure L24, then it should be separately controlled by a circuit-
breaker or contactor, which trips simultaneously with the main motor-controlling
circuit-breaker or contactor, as shown in Figure L26.
Closing of the main contactor is commonly subject to the capacitor contactor being
previously closed.
When a capacitor bank is connected to the
terminals of an induction motor, it is important
to check that the size of the bank is less than
that at which self-excitation can occur
Fig. L26 : Connection of the capacitor bank to the motor
7 Power factor correction of
induction motors
Schneider Electric - Electrical installation guide 2013
L21
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
L - Power Factor Correction
8 Example of an installation
before and after power-factor
correction
cos = 0.75
workshop
kVA
kW kvar
630 kVA
400 V
Installation before P.F. correction
b kvarh are billed heavily above the declared
level
b Apparent power kVA is significantly greater
than the kW demand
b The corresponding excess current causes
losses (kWh) which are billed
b The installation must be over-dimensioned
kVA=kW+kvar
Characteristics of the installation
500 kW cos = 0.75
b Transformer is overloaded
b The power demand is
S =
P
=
500
= 665 kVA
cos 0.75
S = apparent power
b The current flowing into the installation
downstream of the circuit breaker is
I =
P
= 960 A
3U cos
b Losses in cables are calculated as a
function of the current squared: 960
2
P=I
2
R
cos = 0.75
b Reactive energy is supplied through the
transformer and via the installation wiring
b The transformer, circuit breaker, and cables
must be over-dimensioned
Installation after P.F. correction
kVA=kW+kvar
b The consumption of kvarh is
v Eliminated, or
v Reduced, according to the cos required
b The tariff penalties
v For reactive energy where applicable
v For the entire bill in some cases are
eliminated
b The fixed charge based on kVA demand is
adjusted to be close to the active power kW
demand
cos
Note: In fact, the cos of the workshop remains at 0.75 but cos for all the
installation upstream of the capacitor bank to the transformer LV terminals
is 0.928.
As mentioned in Sub-clause 6.2 the cos at the HV side of the transformer
will be slightly lower
(2)
, due to the reactive power losses in the transformer.
= 0.75
workshop
kVA
kW
630 kVA
400 V
250 kvar
Characteristics of the installation
500 kW cos = 0.928
b Transformer no longer overloaded
b The power-demand is 539 kVA
b There is 14% spare-transformer capacity
available
b The current flowing into the installation
through the circuit breaker is 778 A
b The losses in the cables are
reduced to
778
2
= 65% of the former value,
960
2
thereby economizing in kWh consumed
cos = 0.928
b Reactive energy is supplied by the capacitor
bank
Capacitor bank rating is 250 kvar
in 5 automatically-controlled steps of 50 kvar.
(1)
Fig. L27 : Technical-economic comparison of an installation before and after power-factor correction
(1) The arrows denote vector quantities.
(2) Particularly in the pre-corrected case.
Schneider Electric - Electrical installation guide 2013
L - Power Factor Correction
L22
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
9.1 Problems arising from power-system harmonics
The presence of harmonics in electrical systems means that current and voltage are
distorted and deviate from sinusoidal waveforms.
Designers are requested to pay more and more attention to energy savings and
improved availability of electricity. This is why harmonics are a growing concern in the
management of electrical systems today.
Harmonics have existed from the earliest days of the industry and were (and still
are) caused by the non-linear magnetizing impedances of transformers, reactors,
uorescent lamp ballasts, etc In addition, power electronic devices have become
abundant today because of their capabilities for precise process control and energy
savings benets. However, they also bring drawbacks to electrical distribution
systems: harmonics.
Harmonic currents caused by nonlinear loads connected to the distribution system
are owing through the system impedances, and in turn distorts the supply voltage.
Such loads are increasingly more abundant in all industrial, commercial, and
residential installations and their percentage of the total load is growing steadily.
Examples include:
b Industrial equipment (welders, induction furnaces, battery chargers, DC power
supplies)
b Variable Speed Drives for AC and DC motors
b Uninterruptible Power Supplies (UPS)
b Ofce equipment (PCs, printers, servers, displays, etc.)
b Household appliances (TVs, microwave ovens, uorescent lighting, washing
machines and dryers,light dimmers)
Harmonic currents increase the r.m.s. current in electrical systems and deteriorate
the supply voltage quality. They stress the electrical network and potentially damage
equipment. They may disrupt normal operation of devices and increase operating
costs.
Symptoms of problematic harmonic levels include overheating of transformers,
motors and cables, thermal tripping of protective devices and logic faults of digital
devices. In addition, the life span of many devices is reduced by elevated operating
temperatures.
Capacitors are especially sensitive to harmonic components of the supply voltage
due to the fact that capacitive reactance decreases as the frequency increases. In
practice, this means that a relatively small percentage of harmonic voltage can cause
a signicant current to ow in the capacitor circuit.
A number of features may be used in various ways to reduce the consequences of
harmonics. In this section, practical means of reducing the inuence of harmonics
are recommended, with particular reference to capacitor banks. A more detailed
overview is presented in chapter M: Harmonic
9 The effects of harmonics
L - Power Factor Correction
Schneider Electric - Electrical installation guide 2013
L23
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
9.2 Risk of resonance
Considering the simplied circuit represented on Figure L28 (no PFC capacitors
connected):
The voltage distortion V
h
at the busbar level results from two different factors:
v connection of non-linear loads generating harmonic currents I
h
,
v voltage distortion U
h
present on the supply network due to non-linear loads outside
of the considered circuit (incoming harmonic voltage).
A signicant indicator of harmonic importance is the percentage of non-linear loads
N
LL
, calculated by the formula:
Power of non-linear loads
Power of supply transformer
= N
LL(%)
The connection of PFC capacitors (without reactors) results in the amplication of
harmonic currents at the busbar level, and an increase of the voltage distortion.
Capacitors are linear reactive devices, and consequently do not generate harmonics.
The installation of capacitors in a power system (in which the impedances are
predominantly inductive) can, however, result in total or partial resonance occurring
at one of the harmonic frequencies.
Because of harmonics, the current I
C
circulating through the PFC capacitors is
higher compared to the situation where only the fundamental current I
1
is present.
If the natural frequency of the capacitor bank/ power-system reactance combination
is close to a particular harmonic, then partial resonance will occur, with amplied
values of voltage and current at the harmonic frequency concerned. In this particular
case, the elevated current will cause overheating of the capacitor, with degradation of
the dielectric, which may result in its eventual failure.
The order h
0
of the natural resonant frequency between the system inductance and
the capacitor bank is given by:
Q
S
h
SC
0
Where:
S
SC
= the level of system short-circuit power (kVA) at the point of connection of the
capacitor
Q = capacitor bank rating in kvar
h
0
= the order of the natural frequency f
0
, i.e. f
0
/50 for a 50 Hz system, or f
0
/60 for a
60 Hz system.
For example:
Transformer power rating: S = 630kVA
Short-circuit voltage: u
SC
= 6%
Short-circuit power at the busbar level: S
SC
~ 10 MVA
Reactive power of the capacitor bank: Q = 350 kvar
Then:
5 . 5
350
10 . 10
Q
S
h
3
SC
0
The natural frequency of the capacitor/system-inductance combination is close to the
5th harmonic frequency of the system.
For a 50Hz system, the natural frequency f
0
is then equal to f
0
= 50 x h
0
= 50 x 5.5 =
275 Hz
9.3 Possible solutions
Standard capacitors
The presence of harmonics in the supply voltage results in abnormally high current
levels through the capacitors. An allowance is made for this by designing capacitors
for an r.m.s. value of current equal to 1.3 times the nominal rated current. All series
elements, such as connections, fuses, switches, etc., associated with the capacitors
are similarly oversized, between 1.3 to 1.5 times the nominal ratings.
Standard capacitors can be used if the percentage of non-linear loads is lower than
10% (N
LL
s 10%).
Fig. L29 : Simplied circuit diagram
Fig. L28 : Simplied circuit diagram
Non-linear
loads
Linear
load
V
h
U
h
Supply network
I
h
Non-linear
Capacitor
bank
loads
Linear
load
V
h
U
h
Supply network
I
h
9 The effects of harmonics
Schneider Electric - Electrical installation guide 2013
L - Power Factor Correction
L24
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Capacitors with increased current rating
Capacitors with improved current capability ("heavy duty") can be used in order to
increase the safety margin. The technology of these capacitors allows a higher over-
current compared to what is strictly requested by the standards.
Another possibility is to use capacitors with increased rated current and voltage.
As the same reactive power must be generated, the capacitors must have the same
capacitance.
With a rated voltage U
N
(higher than the system voltage U), the rated current I
N
and
the rated power
Q
N
will be given by the formulas:
U
U
I
I
N N
and
2
N N
U
U
Q
Q
Capacitors with improved current rating can be used if the percentage of non-linear
loads is lower than 20% (N
LL
s 20%).
Connection of Power Factor Correction capacitors with
detuned reactors
In order to attenuate the effects of harmonics (signicant increase of capacitor
current as well as high current and voltage distortion ), reactors should be associated
to capacitors. Reactors and capacitors are congured in a series resonant circuit,
tuned so that the series resonant frequency is below the lowest harmonic frequency
present in the system.
The use of detuned reactors thus prevents harmonic resonance problems, avoids the
risk of overloading the capacitors and helps reduce voltage harmonic distortion in the
network.
The tuning frequency can be expressed by the relative impedance of the reactor (in
%, relative to the capacitor impedance), or by the tuning order, or directly in Hz.
The most common values of relative impedance are 5.7, 7 and 14 % (14 % is used
with high level of 3rd harmonic voltages).
In this arrangement, the presence of the reactor increases the fundamental
frequency voltage (50 or 60Hz) across the capacitor.
This feature is taken into account by using capacitors which are designed with
a rated voltage U
N
higher than the network service voltage U
S
, as shown on the
following table.
Fig. L30 : Simplied circuit diagram
Fig. L31 : Correspondance between relative impedance, tuning order and tuning frequency
Fig. L32 : Typical values of capacitor rated voltage
Relative impedance
(%)
Tuning order Tuning frequency
@50Hz (Hz)
Tuning frequency
@60Hz (Hz)
5.7 4.2 210 250
7 3.8 190 230
14 2.7 135 160
Capacitor Rated Voltage U
N
(V) Network Service Voltage U
S
(V)
50 Hz 60 Hz
400 690 400 480 600
Relative Impedance
(%)
5,7 480 830 480 575 690
7
14 480 480
Non-linear
Capacitor
bank
+
detuned
reactor
loads
Linear
load
V
h
U
h
Supply network
I
h
Schneider Electric - Electrical installation guide 2013
L25
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Summary
Practical rules are given in the following table, for selection of the suitable
conguration, depending on the system parameters:
b S
SC
= 3-phase short-circuit power in kVA at the busbar level
b S
n
= sum of the kVA ratings of all transformers supplying (i.e. directly connected to)
the busbar
b G
h
= sum of the kVA ratings of all harmonic-generating devices (static converters,
inverters, variable speed drives, etc.) connected to the busbar. If the ratings of some
of these devices are quoted in kW only, assume an average power factor of 0.7 to
obtain the kVA ratings
G
h
s S
SC
/120 S
SC
/120 < G
h
s S
SC
/70 S
SC
/70 < G
h
s S
SC
/30 G
h
> S
SC
/30
Standard capacitors Heavy Duty
capacitors or
capacitors with
voltage rating
increased by 10%
Heavy Duty
capacitors or
capacitors with
voltage rating
increased by 20%
+ detuned reactor
Harmonic ltering
necessary
See chapter M
"Harmonic
management"
G
h
s 0.1 x S
n
0.1 x S
n
< G
h
s 0.2 x S
n
0.2 x S
n
< G
h
s 0.5 x S
n
G
h
> 0.5 x S
n
Standard capacitors Heavy Duty
capacitors or
capacitors with
voltage rating
increased by 10%
Heavy Duty
capacitors or
capacitors with
voltage rating
increased by 20%
+ detuned reactor
Harmonic ltering
necessary
See chapter M
"Harmonic
management"
Simplied rule (if transformer rating s 2MVA):
Fig. L33 : Simplied rules
General rule (for any size of transformer):
9 The effects of harmonics
Schneider Electric - Electrical installation guide 2013
L - Power Factor Correction
L26
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
L - Power Factor Correction
10.1 Capacitor elements
Technology
Capacitors at low voltage are dry-type units (i.e. are not impregnated by liquid
dielectric) comprising metallised polypropylene self-healing lm in the form of a two-
lm roll.
Self-healing is a process by which the capacitor restores itself in the event of a fault
in the dielectric which can happen during high overloads, voltage transients, etc.
When insulation breaks down, a short duration arc is formed (Figure L34 - top). The
intense heat generated by this arc causes the metallization in the vicinity of the arc to
vaporise (Fig. L34 - middle).
Simultaneously it re-insulates the electrodes and maintains the operation and
integrity of the capacitor (Fig. L34 - bottom).
10 Implementation of capacitor
banks
Fig. L34 : Illustration of self-healing phenomena
Protection scheme
Capacitors must be associated with overload protection devices (fuses, or circuit
breaker, or overload relay + contactor), in order to limit the consequences of over-
currents. This may occur in case of overvoltage or high harmonic distortion.
In addition to external protection devices, capacitors are protected by a high-quality
system (Pressure Sensitive Disconnector, also called tear-off fuse) which switches
off the capacitors if an internal fault occurs. This enables safe disconnection and
electrical isolation at the end of the life of the capacitor.
The protection system operates as follows:
b Current levels greater than normal, but insufcient to trigger the over-current
protection sometimes occur, e.g. due to a microscopic ow in the dielectric lm. Such
faults often reseal due to local heating caused by the leakage current,
b If the leakage current persists, the defect may produce gas by vaporizing of the
metallisation at the faulty location. This will gradually build up a pressure within the
container. Pressure can only lead to vertical expansion by bending lid outwards.
Connecting wires break at intended spots. Capacitor is disconnected irreversibly.
Figure 1 - (a) Metal layer - (b) Polypropylene film
(a)
(b)
Figure 2
Figure 3
Schneider Electric - Electrical installation guide 2013
L27
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. L35 : Cross-section view of a three-phase capacitor after Pressure Sensitive Device
operated: bended lid and disconnected wires
Fig. L36 : Main characteristics of capacitors according to IEC 60831-1/2
Main electrical characteristics, according to IEC standard 60831-1/2: "Shunt power
capacitors of the self-healing type for a.c. systems having a rated voltage up to and
including 1 000 V".
Electrical characteristics
Capacitance tolerance 5 % to +10 % for units and banks up to 100 kvar
5 % to +5 % for units and banks above 100 kvar
Temperature range Min: from -50 to +5C
Max: from +40 to +55C
Permissible current overload 1.3 x I
N
Permissible voltage overload 1.1 x U
N
, 8 h every 24 h
1.15 x U
N
, 30 min every 24 h
1.2 x U
N
, 5min
1.3 x U
N
, 1min
2.15 x U
N
for 10 s (type test)
Discharging unit to 75 V in 3 min or less
10.2 Choice of protection, control devices and
connecting cables
The choice of upstream cables, protection and control devices depends on the
current loading.
For capacitors, the current is a function of:
b The system voltage (fundamental and harmonics),
b The power rating.
The rated current I
N
of a 3-phase capacitor bank is equal to:
.U 3
Q
I
N
with:
b Q: power rating (kvar)
b U: phase-to-phase voltage (kV)
Overload protection devices have to be implemented and set according to the
expected harmonic distortion. The following table summarizes the harmonic voltages
to be considered in the different congurations, and the corresponding maximum
overload factor I
MP
/I
N
. (I
MP
= maximum permissible current)
Cross-section wiew of a three-phase capacitor after
Pressure Sensitive Device operated: bended lid and
disconnected wires.
10 Implementation of capacitor
banks
Schneider Electric - Electrical installation guide 2013
L - Power Factor Correction
L28
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Conguration Harmonic order THDu
max (%)
I
MP
/I
N
3 5 7 11 13
Standard capacitors 5 1.5
Heavy Duty capacitors 7 1.8
Capacitors + 5.7% reactor 0.5 5 4 3.5 3 10 1.31
Capacitors + 7% reactor 0.5 6 4 3.5 3 8 1.19
Capacitors + 14% reactor 3 8 7 3.5 3 6 1.12
Fig. L37 : Typical permissible overload currents
Short time delay setting of circuit breakers (short-circuit protection) should be set at
10 x I
N
in order to be insensitive to inrush current.
Example 1:
50 kvar 400V 50 Hz Standard capacitors
72A
0.4 3
50
I
N
Long time delay setting: 1.5 x 72 = 108 A
Short time delay setting: 10 x 72 = 720 A
Example 2:
50 kvar 400V 50 Hz Capacitors + 5.7% detuned reactor
72A I
N
Long time delay setting: 1.31 x 72 = 94 A
Short time delay setting: 10 x I
N
= 720 A
Upstream cables
Figure L38 next page gives the minimum recommended cross section area of the
upstream cable for capacitor banks.
Cables for control
The minimum cross section area of these cables will be 1.5 mm
2
for 230 V. For the
secondary side of the current transformer, the recommended cross section area is
> 2.5 mm
2
.
Schneider Electric - Electrical installation guide 2013
L29
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
10 Implementation of capacitor
banks
Fig L38 : Cross-section of cables connecting medium and high power capacitor banks
(1)
(1) Minimum cross-section not allowing for any correction
factors (installation mode, temperature, etc.). The calculations
were made for single-pole cables laid in open air at 30 C.
Bank power Copper Aluminium
(kvar) cross- section cross- section
230 V 400 V (mm
2
) (mm
2
)
5 10 2.5 16
10 20 4 16
15 30 6 16
20 40 10 16
25 50 16 25
30 60 25 35
40 80 35 50
50 100 50 70
60 120 70 95
70 140 95 120
90-100 180 120 185
200 150 240
120 240 185 2 x 95
150 250 240 2 x 120
300 2 x 95 2 x 150
180-210 360 2 x 120 2 x 185
245 420 2 x 150 2 x 240
280 480 2 x 185 2 x 300
315 540 2 x 240 3 x 185
350 600 2 x 300 3 x 240
385 660 3 x 150 3 x 240
420 720 3 x 185 3 x 300
Voltage transients
High-frequency voltage and current transients occur when switching a capacitor
bank into service. The maximum voltage peak does not exceed (in the absence of
harmonics) twice the peak value of the rated voltage when switching uncharged
capacitors.
In the case of a capacitor being already charged at the instant of switch closure,
however, the voltage transient can reach a maximum value approaching 3 times the
normal rated peak value.
This maximum condition occurs only if:
b The existing voltage at the capacitor is equal to the peak value of rated voltage,
and
b The switch contacts close at the instant of peak supply voltage, and
b The polarity of the power-supply voltage is opposite to that of the charged
capacitor
In such a situation, the current transient will be at its maximum possible value, viz:
Twice that of its maximum when closing on to an initially uncharged capacitor, as
previously noted.
For any other values of voltage and polarity on the pre-charged capacitor, the
transient peaks of voltage and current will be less than those mentioned above.
In the particular case of peak rated voltage on the capacitor having the same polarity
as that of the supply voltage, and closing the switch at the instant of supply-voltage
peak, there would be no voltage or current transients.
Where automatic switching of stepped banks of capacitors is considered, therefore,
care must be taken to ensure that a section of capacitors about to be energized is
fully discharged.
The discharge delay time may be shortened, if necessary, by using discharge
resistors of a lower resistance value.
Schneider Electric - Electrical installation guide 2013
Schneider Electric - Electrical installation guide 2013
M1
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapter M
Harmonic management
Contents
The problem: why is it necessary to manage harmonics? M2
Denition and origin of harmonics M3
2.1 Denition M3
2.2 Origin of harmonics M5
Essential indicators of harmonic distortion M7
and measurement principles
3.1 Power factor M7
3.2 Crest factor M8
3.3 Harmonic spectrum M9
3.4 r.m.s. values M9
3.5 Usefulness of the various indicators M9
Harmonic measurement in electrical networks M10
4.1 Procedures for harmonic measurement M10
4.2 Harmonic measurement devices M11
4.3 Which harmonic orders must be monitored and mitigated? M12
Main effects of harmonics in electrical installations M13
5.1 Resonance M13
5.2 Increased losses M13
5.3 Overload of equipment M15
5.4 Disturbances affecting sensitive loads M19
5.5 Economic impact M19
Standards M20
Solutions to mitigate harmonics M21
7.1 Basic solutions M21
7.2 Harmonic ltering M22
7.3 The method M24
1
2
3
4
7
5
6
Schneider Electric - Electrical installation guide 2013
M2
M - Harmonic management
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 The problem: why is it necessary
to manage harmonics?
Harmonic disturbances
Harmonics owing in distribution networks represent disturbances in the ow of
electricity. The quality of electrical power is deteriorated, and the efciency of the
system is decreased.
Here are the main risks linked to harmonics:
b Overload of distribution networks due to the increase of r.m.s. currents,
b Overload of neutral conductors, which current can exceed the phase currents,
b Overload, vibration and premature ageing of generators, transformers and motors
as well as increased transformer hum,
b Overload and premature ageing of Power Factor Correction capacitors,
b Distortion of the supply voltage that can disturb sensitive loads,
b Disturbance in communication networks and telephone lines.
Economic impact of disturbances
All these disturbances have an economic impact:
b Premature ageing of equipment means it must be replaced sooner, unless
oversized right from the start,
b Overload on the distribution network means higher equipment rating, increased
subscribed power level for the industrial customer, and increased power losses,
b Unexpected current distortion can lead to nuisance tripping and production halt.
A necessary concern for the design and management of
electrical installations
Harmonics are the result of the always expanding number of power electronic
devices. They have become abundant today because of their capabilities for
precise process control and energy saving benets. Typical examples are Variable
Speed Drives in the Industry, and Compact Fluorescent Lamps in commercial and
residential areas.
International standards have been published in order to help the designers of
equipment and installations. Harmonic emission limits have been set, so that no
unexpected and negative impact of harmonics should be encountered. In parallel to
a better understanding of effects, solutions have been developed by the Industry.
Harmonic consideration is now a full part of the design of electrical installations.
Schneider Electric - Electrical installation guide 2013
M3
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Denition and origin of harmonics
2.1 Denition
The presence of harmonics in electrical systems means that current and voltage are
distorted and deviate from sinusoidal waveforms.
Harmonic currents are caused by non-linear loads connected to the distribution
system. A load is said to be non-linear when the current it draws does not have the
same waveform as the supply voltage. The ow of harmonic currents through system
impedances in turn creates voltage harmonics, which distort the supply voltage.
On Figure M1 are presented typical current waveforms for single-phase (top) and
three-phase non-linear loads (bottom).
M - Harmonic management
Fig. M1 : Examples of distorted current waveforms
The Fourier theorem states that all non-sinusoidal periodic functions can be
represented as the sum of terms (i.e. a series) made up of:
b A sinusoidal term at the fundamental frequency,
b Sinusoidal terms (harmonics) whose frequencies are whole multiples of the
fundamental frequency,
b A DC component, where applicable.
The harmonic of order h (commonly referred to as simply the h
th
harmonic) in a
signal is the sinusoidal component with a frequency that is h times the fundamental
frequency.
The equation for the harmonic expansion of a periodic function y (t) is presented
below:
( ) ( )
=
=
+ =
h
1 h
h h 0
- t h sin 2 Y Y t y
where:
b Y
0
: value of the DC component, generally zero and considered as such hereinafter,
b Y
h
: r.m.s. value of the harmonic of order h,
b : angular frequency of the fundamental frequency,
b
h
: displacement of the harmonic component at t = 0.
Schneider Electric - Electrical installation guide 2013
M - Harmonic management
M4
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Figure M2 shows an example of a current wave affected by harmonic distortion on
a 50Hz electrical distribution system. The distorted signal is the sum of a number of
superimposed harmonics:
b The value of the fundamental frequency (or rst order harmonic) is 50 Hz,
b The 3
rd
order harmonic has a frequency of 150 Hz,
b The 5
th
order harmonic has a frequency of 250 Hz,
b Etc
Total
Fundamental
50 Hz
Harmonic
3 (150 Hz)
Harmonic
5 (250 Hz)
Harmonic
7 (350 Hz)
Harmonic
9 (450 Hz)
I peak
(I
c
)
I rms (I
G
)
I
h1
I
h3
I
h5
I
h7
I
h8
Fig. M2 : Example of a current containing harmonics and expansion of the overall current into its
harmonic orders 1 (fundamental), 3, 5, 7 and 9
Individual harmonic component (or harmonic component of
order h)
The individual harmonic component is dened as the percentage of harmonics for
order h with respect to the fundamental. Particularly:
( )
1
h
h
U
U
100 % u =
for harmonic voltages
( )
1
h
h
100 % =
for harmonic currents
Total Harmonic Distortion (THD)
The Total Harmonic Distortion (THD) is an indicator of the distortion of a signal. It is
widely used in Electrical Engineering and Harmonic management in particular.
For a signal y, the THD is dened as:
1
h
h
1
h
+ + +
=
=
=
=
...
THD is the ratio of the r.m.s. value of all the harmonic components of the signal y, to
the fundamental Y
1
.
H is generally taken equal to 50, but can be limited in most cases to 25.
Note that THD can exceed 1 and is generally expressed as a percentage.
Schneider Electric - Electrical installation guide 2013
M5
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Current or voltage THD
For current harmonics, the equation is:
=
=
=
H h
2 h
2
1
h
i
I
I
THD
By introducing the total r.m.s value of the current:
=
=
=
H h
1 h
2
h rms
I I
we obtain the
following relation:
1
I
I
THD
2
1
rms
i
=
equivalent to:
2
i 1 rms
THD 1 I I + =
Example: for THD
i
= 40%, we get:
( ) 1 I 1 1 I 1 I I
1 1
2
1 rms
+ = + =
For voltage harmonics, the equation is:
=
=
=
H h
2 h
2
1
h
THD
2.2 Origin of harmonics
Harmonic currents
Equipment comprising power electronics circuits are typical non-linear loads and
generate harmonic currents. Such loads are increasingly frequent in all industrial,
commercial and residential installations and their percentage in overall electrical
consumption is growing steadily.
Examples include:
b Industrial equipment (welding machines, arc and induction furnaces, battery
chargers),
b Variable Speed Drives for AC or DC motors,
b Uninterruptible Power Supplies,
b Ofce equipment (PCs, printers, servers, etc.),
b Household appliances (TV sets, microwave ovens, uorescent lighting, light
dimmers).
Harmonic voltages
In order to understand the origin of harmonic voltages, let's consider the simplied
diagram on Fig. M3.
2 Denition and origin of harmonics
Fig. M3 : Single-line diagram showing the impedance of the supply circuit for a non-linear load
Non-linear
load
A
Z
h
B
I
h
Schneider Electric - Electrical installation guide 2013
M - Harmonic management
M6
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
The reactance of a conductor increases as a function of the frequency of the current
owing through the conductor. For each harmonic current (order h), there is therefore
an impedance Z
h
in the supply circuit.
The total system can be split into different circuits:
b One circuit representing the ow of current at the fundamental frequency,
b One circuit representing the ow of harmonic currents.
When the harmonic current of order h ows through impedance Z
h
, it creates a
harmonic voltage U
h
, where U
h
= Z
h
x I
h
(by Ohm's law).
The voltage at point B is therefore distorted. All devices supplied via point B receive
a distorted voltage.
For a given harmonic current, the voltage distortion is proportional to the impedance
in the distribution network.
Flow of harmonic currents in distribution networks
The non-linear loads can be considered to inject the harmonic currents upstream
into the distribution network, towards the source. The harmonic currents generated
by the different loads sum up at the busbar level creating the harmonic distortion.
Because of the different technologies of loads, harmonic currents of the same order
are generally not in phase. This diversity effect results in a partial summation.
Non-linear
load
Z
l
I 50 Hz
I
h
V
h
V
h
= Harmonic voltage
= Z
h
x I
h
Z
h
Non-linear
load
Fig. M4 : Split of circuit into fundamental and harmonic circuits
Fig. M5 : Flow of harmonic currents in a distribution network
A
MV/LV
Devices drawing rectified
current (televisions,
computer hardware, etc.)
Fluorescent or
discharge lamps
Variable-speed drive
Rectifier
Arc furnace
Welding machine
Linear loads
G
Backup power
supply
Power-factor
correction
Ih
e
Ih
d
Ih
b
Ih
a
(do not create
harmonics)
Harmonic
disturbances to
distribution network
and other users
2 Denition and origin of harmonics
Schneider Electric - Electrical installation guide 2013
M7
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Essential indicators of harmonic
distortion and measurement
principles
A number of indicators are used to quantify and evaluate the harmonic distortion in
current and voltage waveforms, namely:
b Power factor
b Crest factor
b Harmonic spectrum
b R.m.s. value
These indicators are indispensable in determining any necessary corrective action.
3.1 Power factor
The power factor is the ratio of the active power P (kW) to the apparent power S
(kVA). See Chapter L.
( )
( ) kVA S
kW P
=
The Power Factor must not be mixed-up with the Displacement Power Factor (cos),
relative to fundamental signals only.
As the apparent power is calculated from the r.m.s. values, the Power Factor
integrates voltage and current distortion.
When the voltage is sinusoidal or virtually sinusoidal (THDu ~ 0), it may be said that
the active power is only a function of the fundamental current. Then:
= cos I U P P
1 1 1
Consequently:
rms 1
1 1
I U
cos I U
S
P
= =
As:
2
i
rms
1
THD 1
1
I
I
+
= (see 2.1), hence:
2
i
THD 1
cos
Figure M6 shows a graph of /cos as a function of THD
i
, for THD
u
~ 0.
M - Harmonic management
Fig. M6 : Variation of /cos as a function of THD
i
, for THD
u
~ 0
0 20 40 60 80 100 120 140
0.2
0.4
0.6
0.8
1
1.2
0
THDi (%)
/cos
kW
Schneider Electric - Electrical installation guide 2013
M - Harmonic management
M8
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3.2 Crest factor
The crest factor is the ratio between the value of the peak current or voltage
(I
M
or U
M
) and its r.m.s. value.
b For a sinusoidal signal, the crest factor is therefore equal to 2.
b For a non-sinusoidal signal, the crest factor can be either greater than or less than 2.
The crest factor for the current drawn by non-linear loads is commonly much higher
than2. It is generally between 1.5 and 2 and can even reach 5 in critical cases.
A high crest factor signals high current peaks which, when detected by protection
devices, can cause nuisance tripping.
Examples:
Figure M7 represents the current absorbed by a compact uorescent lamp.
I
r.m.s.
: 0.16A
I
M
: 0.6A
THD
i
: 145%
Crest factor: 3.75
Fig. M7 : Typical current waveform of a compact uorescent lamp
Figure M8 represents the voltage supplying non-linear loads through a high
impedance line, with a typical "at top" distorted waveform.
V
r.m.s.
: 500V
V
M
: 670V
THD
u
: 6.2%
Crest factor: 1.34
A
V
0 0.0s 0.01s 0.02s 0.03s
-0.8
-0.6
-0.4
-0.2
0
0.2
0.4
0.8
0.6
0
Fig. M8 : Typical voltage waveform in case of high impedance line supplying non-linear loads
0.0s 0.02s 0.04s
-600
-400
-200
0
200
400
600
Schneider Electric - Electrical installation guide 2013
M9
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3.3 Harmonic spectrum
The harmonic spectrum is the representation of the amplitude of each harmonic
order with respect to its frequency.
Figure M9 shows an example of harmonic spectrum for a rectangular signal.
Each type of device causing harmonics draws a particular form of current, with
a particular harmonic content. This characteristic can be displayed by using the
harmonic spectrum.
3.4 r.m.s. value
The r.m.s. value of voltage and current can be calculated as a function of the r.m.s.
value of the various harmonic components:
2
H
2
2
2
1
H
1 h
2
h rms
I ... I I I I + + + = =
=
2
H
2
2
2
1
H
1 h
2
h rms
V ... V V V V + + + = =
=
3.5 Usefulness of the various indicators
THD
u
is an indicator of the distortion of the voltage wave. Below are given indicative
values of THDu and the corresponding consequences in an installation:
b 5%: normal situation, no risk of malfunctions,
b 5 to 8%: signicant harmonic distortion, some malfunctions are possible,
b 8%: major harmonic distortion, malfunctions are probable. In-depth analysis and
the installation of mitigation devices are required.
THD
i
is an indicator of the distortion of the current wave. The current distortion can
be different in the different parts of an installation. The origin of possible disturbances
can be detected by measuring the THD
i
of different circuits.
Below are given indicative values of THD
i
and the corresponding phenomena for a
whole installation:
b 10%: normal situation, no risk of malfunctions,
b 10 to 50%: signicant harmonic distortion with a risk of temperature rise and the
resulting need to oversize cables and sources,
b 50%: major harmonic distortion, malfunctions are probable. In-depth analysis and
the installation of mitigation devices are required.
Power factor is used to determine the rating for the different devices of the
installation.
Crest factor is used to characterise the aptitude of a generator (or UPS) to supply
high instantaneous currents. For example, computer equipment draws highly
distorted current for which the crest factor can reach 3 to 5.
Harmonic spectrum provides a different representation of electrical signals and can
be used to evaluate their distortion.
3 Essential indicators of harmonic
distortion and measurement
principles
U(t)
1
t
2 3 4 5 6
H %
100
33
20
1 0
h
Fig. M9 : Harmonic spectrum for a rectangular signal U(t)
Schneider Electric - Electrical installation guide 2013
M - Harmonic management
M10
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4.1 Procedures for harmonic measurement
Harmonic measurements are carried out on industrial or commercial sites:
b Preventively, to obtain an overall idea on distribution-network status (network
mapping),
b In view of corrective action, to determine the origin of a disturbance and determine
the solutions required to eliminate it,
b To check the validity of a solution (followed by modications in the distribution
network to check the reduction of harmonic disturbances)
The harmonic indicators can be measured:
b By an expert present on the site for a limited period of time (one day), giving
precise, but limited perception,
b By instrumentation devices installed and operating for a signicant period of time
(at least one week) giving a reliable overview of the situation,
b Or by devices permanently installed in the distribution network, allowing a follow-up
of Power Quality.
One-shot or corrective actions
This kind of action is carried-out in case of observed disturbances, for which
harmonics are suspected. In order to determine the origin of the disturbances,
measurements of current and voltage are performed:
b At the supply source level,
b On the busbars of the main distribution switchboard (or on the MV busbars),
b On each outgoing circuit in the main distribution switchboard (or on the MV
busbars).
For accurate results, it is necessary to know the precise operating conditions of
the installation and particularly the status of the capacitor banks (operating or not,
number of connected steps).
The results of measurement will help the analysis in order to:
b Determine any necessary derating of equipment in the installation, or
b Quantify any necessary harmonic protection and ltering systems to be installed in
the distribution network, or
b Check the compliance of the electrical installation with the applicable standards or
Utility regulations (maximum permissible harmonic emission).
Long-term or preventive actions
For a number of reasons, the installation of permanent measurement devices in the
distribution network is very valuable.
b The presence of an expert on site is limited in time and it is not always possible
to observe all the possible situations. Only a number of measurements at different
points in the installation and over a sufciently long period (one week to a month)
provide an overall view of operation and take into account all the situations that can
occur following:
v Fluctuations in the supply source,
v Variations in the operation of the installation,
v The addition of new equipment in the installation.
b Measurement devices installed in the distribution network prepare and facilitate the
diagnosis of the experts, thus reducing the number and duration of their visits.
b Permanent measurement devices detect any new disturbances arising following
the installation of new equipment, the implementation of new operating modes or
uctuations in the supply network.
b For an overall evaluation of network status (preventive analysis), this avoids:
v Renting of measurement equipment,
v Calling in experts,
v Having to connect and disconnect the measurement equipment. For the overall
evaluation of network status, the analysis on the main low-voltage distribution
switchboards (MLVS) can often be carried out by the incoming device and/or the
measurement devices equipping each outgoing circuit,
b For corrective actions, it is possible to:
v Determine the operating conditions at the time of the incident,
v Draw-up a map of the distribution network and evaluate the implemented solution.
The diagnosis may be improved by the use of additional dedicated equipment in
case of specic problem.
4 Harmonic measurement in
electrical networks
Schneider Electric - Electrical installation guide 2013
M11
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Harmonic measurement in
electrical networks
4.2 Harmonic measurement devices
Measurement devices provide instantaneous and average information concerning
harmonics. Instantaneous values are used for analysis of disturbances linked to
harmonics. Average values are used for Power Quality assessment.
The most recent measurement devices are designed referring to IEC standard
61000-4-7: "Electromagnetic compatibility (EMC) Part 4-7: Testing and
measurement techniques General guide on harmonics and interharmonics
measurements and instrumentation, for power supply systems and equipment
connected thereto".
The supplied values include:
b The harmonic spectrum of currents and voltages (amplitudes and percentage of
the fundamental),
b The THD for current and voltage,
b For specic analysis: the phase angle between harmonic voltage and current of
the same order and the phase of the harmonics with respect to a common reference
(e.g. the fundamental voltage).
Average values are indicators of the long-term Power Quality. Typical and relevant
statistical data are for example measures averaged by periods of 10 minutes, during
observation periods of 1 week.
In order to meet the Power Quality objectives, 95% of the measured values should
be less than specied values.
Fig. M10 gives the maximum harmonic voltage in order to meet the requirements
of standard EN50160: "Voltage characteristics of electricity supplied by public
distribution networks", for Low and Medium Voltage.
Portable instruments
The traditional observation and measurement methods include:
b Oscilloscope
An initial indication on the distortion affecting a signal can be obtained by viewing the
current or the voltage on an oscilloscope.
The waveform, when it diverges from a sinusoidal, clearly indicates the presence of
harmonics. Current and voltage peaks can be observed.
Note, however, that this method does not offer precise quantication of the harmonic
components.
b Digital analyser
Only recent digital analysers can determine the values of all the mentioned indicators
with sufcient accuracy.
They are using digital technology, specically a high performance algorithm called
Fast Fourier Transform (FFT). Current or voltage signals are digitized and the
algorithm is applied on data relative to time windows of 10 (50Hz systems) or 12
periods (for 60Hz systems) of the power frequency.
The amplitude and phase of harmonics up to the 40th or 50th order are calculated,
depending on the class of measurement.
Fig. M10 : Values of individual harmonic voltages at the supply terminals for orders up to 25 given in percent of the fundamental voltage U
1
Odd harmonics Odd harmonic s Even harmonic
Not multiples of 3 Multiples of 3
Order h Relative amplitude Order h Relative amplitude Order h Relative amplitude
U
h
: %
U
h
: %
U
h
: %
5 6 3 5 2 2
7 5 9 1.5 4 1
11 3.5 15 0.5 6...24 0.5
13 3 21 0.5
17 2
19 1.5
23 1.5
25 1.5
Schneider Electric - Electrical installation guide 2013
M - Harmonic management
M12
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Processing of the successive values calculated using the FFT (smoothing,
classication, statistics) can be carried out by the measurement device or by external
software.
Functions of digital analysers
b Calculate the values of the harmonic indicators (power factor, crest factor,
individual harmonic amplitude, THD)
b In multi-channel analysers, supply virtually in real time the simultaneous spectral
decomposition of the currents and voltages
b Carry out various complementary functions (corrections, statistical detection,
measurement management, display, communication, etc.)
b Storage of data
Fixed instruments
Panel instrumentation provides continuous information to the Manager of the
electrical installation. Data can be accessible through dedicated power monitoring
devices or through the digital trip units of circuit breakers.
Fig. M13 : Example of electronic trip units of circuit-breakers
providing harmonic related information
Fig. M11 : Implementation of a digital Power Quality recorder
in a cabinet
Fig. M12 : Example of Power and Energy meter
4 Harmonic measurement in
electrical networks
4.3 Which harmonic orders must be monitored and
mitigated?
The most signicant harmonic orders in three-phase distribution networks are the
odd orders (3, 5, 7, 9, 11, 13 .)
Triplen harmonics (order multiple of 3) are present only in three-phase, four-wire
systems, when single phase loads are connected between phase and neutral.
Utilities are mainly focusing on low harmonic orders (5, 7, 11, and 13).
Generally speaking, harmonic conditioning of the lowest orders (up to 13) is
sufcient. More comprehensive conditioning takes into account harmonic orders up
to 25.
Harmonic amplitudes normally decrease as the frequency increases. Sufciently
accurate measurements are obtained by measuring harmonics up to order 30.
Schneider Electric - Electrical installation guide 2013
M13
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
M - Harmonic management
5.1 Resonance
The simultaneous use of capacitive and inductive devices in distribution networks
may result in parallel or series resonance.
The origin of the resonance is the very high or very low impedance values at the
busbar level, at different frequencies. The variations in impedance modify the current
and voltage in the distribution network.
Here, only parallel resonance phenomena, the most common, will be discussed.
Consider the following simplied diagram (see Fig. M14) representing an installation
made up of:
b A supply transformer,
b Linear loads
b Non-linear loads drawing harmonic currents
b Power factor correction capacitors
For harmonic analysis, the equivalent diagram is shown on Figure M15 where:
L
S
= Supply inductance (upstream network + transformer + line)
C = Capacitance of the power factor correction capacitors
R = Resistance of the linear loads
I
h
= Harmonic current
By neglecting R, the impedance Z is calculated by a simplied formula:
Z
s
=
jL
1-LsC
2
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
The denition of THD
i
being:
1
I
I
THD
2
1
r.m.s.
i
=
it may be deduced that:
2
i 1 r.m.s.
THD 1 I I + = .
Figure M18 shows, as a function of the harmonic distortion:
b The increase in the r.m.s. current I
r.m.s.
for a load drawing a given fundamental
current
b The increase in Joule losses, not taking into account the skin effect. (The reference
point in the graph is 1 for I
r.m.s.
and Joules losses, the case when there are no
harmonics)
The harmonic currents cause an increase of the Joule losses in all conductors in
which they ow and additional temperature rise in transformers, switchgear, cables,
etc.
0 20 40 60 80 100 120
1
1.2
1.4
1.6
1.8
2
2.2
0.8
THD
(%)
Joules losses
Irms
Fig. M18 : Increase in rms current and Joule losses as a function of the THD
Losses in asynchronous machines
The harmonic voltages (order h) supplied to asynchronous machines cause the
ow of currents in the rotor with frequencies higher than 50 Hz that are the origin of
additional losses.
Orders of magnitude
b A virtually rectangular supply voltage causes a 20% increase in losses
b A supply voltage with harmonics u
5
= 8% (of U
1
, the fundamental voltage),
u
7
= 5%, u
11
= 3%, u
13
= 1%, i.e. total harmonic distortion THD
u
equal to 10%, results
in additional losses of 6%
Losses in transformers
Harmonic currents owing in transformers cause an increase in the copper losses
due to the Joule effect and increased iron losses due to eddy currents. The
harmonic voltages are responsible for iron losses due to hysteresis.
It is generally considered that losses in windings increase as the square of the THD
i
and that core losses increase linearly with the THD
u
.
In Utility distribution transformers, where distortion levels are limited, losses increase
between 10 and 15%.
Losses in capacitors
The harmonic voltages applied to capacitors cause the ow of currents proportional
to the frequency of the harmonics. These currents cause additional losses.
Schneider Electric - Electrical installation guide 2013
M15
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Example
A supply voltage has the following harmonics:
b Fundamental voltage U
1
,
b harmonic voltages u
5
= 8% (of U
1
),
b u
7
= 5%,
b u
11
= 3%,
b u
13
= 1%,
i.e. total harmonic distortion THD
u
equal to 10%. The amperage of the current is
multiplied by 1.19. Joule losses are multiplied by (1.19), i.e. 1.4.
5.3 Overload of equipment
Generators
Generators supplying non-linear loads must be derated due to the additional losses
caused by harmonic currents.
The level of derating is approximately 10% for a generator where the overall load
is made up of 30% of non-linear loads. It is therefore necessary to oversize the
generator, in order to supply the same active power to loads.
Uninterruptible power systems (UPS)
The current drawn by computer systems has a very high crest factor. A UPS sized
taking into account exclusively the r.m.s. current may not be capable of supplying the
necessary peak current and may be overloaded.
Transformers
b The curve presented below (see Fig. M19) shows the typical derating required for
a transformer supplying electronic loads
%
Electronic
load
0 20 40 60 80 100
10
20
0
kVA
(%)
30
40
50
60
70
80
90
100
Example: If the transformer supplies an overall load comprising 40% of electronic
loads, it must be derated by 40%.
b Standard UTE C15-112 provides a derating factor for transformers as a function of
the harmonic currents.
k
1
1 0.1 h
1.6
h 2
40
=
+
T
h
2
T
h
=
I
I
h
1
Typical values:
b Current with a rectangular waveform (1/h spectrum): k = 0.86
b Frequency-converter current (THD 50%): k = 0.80
Fig. M19 : Derating required for a transformer supplying electronic loads
5 Main effects of harmonics in
electrical installations
Schneider Electric - Electrical installation guide 2013
M - Harmonic management
M16
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Asynchronous machines
Standard IEC60034-1 ("Rotating electrical machines Rating and performance ")
denes a weighted harmonic factor (Harmonic voltage factor) for which the equation
and maximum value are provided below.
HVF
U
0.02
h
h 2
13
=
=
h
2
i
Example
A supply voltage has a fundamental voltage U
1
and harmonic voltages u
3
= 2% of
U
1
, u
5
= 3%, u
7
= 1%. The THD
u
is 3.7% and the HVF is 0.018. The HVF value is
very close to the maximum value above which the machine must be derated.
Practically speaking, asynchronous machines must be supplied with a voltage having
a THD
u
not exceeding 10%.
Capacitors
According to IEC 60831-1 standard ("Shunt power capacitors of the self-healing type
for a.c. systems having a rated voltage up to and including 1 000 V Part 1: General
Performance, testing and rating Safety requirements Guide for installation"), the
r.m.s. current owing in the capacitors must not exceed 1.3 times the rated current.
Using the example mentioned above, the fundamental voltage U
1
, harmonic voltages
u
5
= 8% (of U
1
), u
7
= 5%, u
11
= 3%, u
13
= 1%, i.e. total harmonic distortion THD
u
equal to 10%, the result is
I
r.m.s.
/I
1
= 1.19, at the rated voltage. For a voltage equal to 1.1 times the rated voltage,
the current limit
I
r.m.s.
/I
1
= 1.3 is reached and it is necessary to resize the capacitors.
Neutral conductors
Consider a system made up of a balanced three-phase source and three identical
single-phase loads connected between the phases and the neutral (see Fig. M20).
Figure M21 shows an example of the currents owing in the three phases and the
resulting current in the neutral conductor.
In this example, the current in the neutral conductor has a rms value that is higher
than the rms value of the current in a phase by a factor equal to the square root of 3.
The neutral conductor must therefore be sized accordingly.
The current in the neutral may therefore exceed the current in each phase
in installation such as those with a large number of single-phase devices (IT
equipment, uorescent lighting). This is the case in ofce buildings, computer
centers, Internet Data Centers, call centers, banks, shopping centers, retail lighting
I
s
I
r
I
t
I
n
Load
Load
Load
Fig. M20 : Flow of currents in the various conductors connected to a three-phase source
Schneider Electric - Electrical installation guide 2013
M17
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
20 40 0
In
t (ms)
t
(A)
It
Is
t
t
Ir
t
zones, etc.
This is not a general situation, due to the fact that power is being supplied
simultaneously to linear and/or three-phase loads (heating, ventilation, incandescent
lighting, etc.), which do not generate third order harmonic currents. However,
particular care must be taken when dimensioning the cross-sectional areas of neutral
conductors when designing new installations or when modifying them in the event of
a change in the loads being supplied with power.
A simplied approach can be used to estimate the loading of the neutral conductor.
For balanced loads, the current in the neutral I
N
is very close to 3 times the 3rd
harmonic current of the phase current (I
3
), i.e.: I
N
3.I
3
This can be expressed as: I
N
3. i
3
. I
1
For low distortion factor values, the r.m.s. value of the current is similar to the r.m.s.
value of the fundamental, therefore: I
N
3 . i
3
I
L
And: I
N
/I
L
3 . i
3
(%)
This equation simply links the overloading of the neutral (I
N
/I
L
) to the third harmonic
current ratio.
In particular, it shows that when this ratio reaches 33%, the current in the neutral
conductor is equal to the current in the phases. Whatever the distortion value, it has
been possible to use simulations to obtain a more precise law, which is illustrated in
Figure M22 next page.
The third harmonic ratio has an impact on the current in the neutral and therefore on
the capacity of all components in an installation:
b Distribution panels
b Protection and distribution devices
Fig. M21 : Example of the currents owing in the various conductors connected to a three-phase
load (In = Ir + Is + It)
5 Main effects of harmonics in
electrical installations
Schneider Electric - Electrical installation guide 2013
M - Harmonic management
M18
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. M22 : Loading of the neutral conductor based on the 3rd harmonic ratio
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
0 20 40 60 80 100
0
I
N
I
L
/
I
3
(%)
15 33
b Cables and trunking systems
According to the estimated third harmonic ratio, there are three possible scenarios:
ratio below 15%, between 15 and 33% or above 33%.
Third harmonic ratio below 15% (i
3
15%):
The neutral conductor is considered not to be carrying current. The cross-sectional
area of the phase conductors is determined solely by the current in the phases. The
cross-sectional area of the neutral conductor may be smaller than the cross-sectional
area of the phases if the cross sectional area is greater than 16 mm
2
(copper) or
25 mm
2
(aluminum).
Protection of the neutral is not obligatory, unless its cross-sectional area is smaller
than that of the phases.
Third harmonic ratio between 15 and 33% (15 < i
3
33%), or in the absence of
any information about harmonic ratios:
The neutral conductor is considered to be carrying current.
The operating current of the multi-pole trunking must be reduced by a factor
of 0.84 (or, conversely, select trunking with an operating current equal to the current
calculated, divided by 0.84).
The cross-sectional area of the neutral MUST be equal to the cross-sectional area of
the phases.
Protection of the neutral is not necessary.
Third harmonic ratio greater than 33% (i
3
> 33%)
This rare case represents a particularly high harmonic ratio, generating the
circulation of a current in the neutral, which is greater than the current in the phases.
Precautions therefore have to be taken when dimensioning the neutral conductor.
Generally, the operating current of the phase conductors must be reduced by a
factor of 0.84 (or, conversely, select trunking with an operating current equal to the
current calculated, divided by 0.84). In addition, the operating current of the neutral
conductor must be equal to 1.45 times the operating current of the phase conductors
(i.e. 1.45/0.84 times the phase current calculated, therefore approximately 1.73 times
the phase current calculated).
The recommended method is to use multi-pole trunking in which the cross-sectional
area of the neutral is equal to the cross-sectional area of the phases. The current in
the neutral conductor is therefore a key factor in determining the cross sectional area
of the conductors. Protection of the neutral is not necessary, although it should be
protected if there is any doubt in terms of the loading of the neutral conductor.
This approach is common in nal distribution, where multi-pole cables have identical
cross sectional areas for the phases and for neutral.
With busbar trunking systems, precise knowledge of the temperature rises caused by
harmonic currents enables a less conservative approach to be adopted. The rating of
a busbar trunking system can be selected directly as a function of the neutral current
calculated.
For more details, see chapter E and "Cahier Technique ECT212: The neutral: A live
and unique conductor"
5.4 Disturbances affecting sensitive loads
Schneider Electric - Electrical installation guide 2013
M19
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Effects of distortion in the supply voltage
Distortion of the supply voltage can disturb the operation of sensitive devices:
b Regulation devices (temperature)
b Computer hardware
b Control and monitoring devices (protection relays)
Distortion of telephone signals
Harmonics cause disturbances in control circuits (low current levels). The level of
distortion depends on the distance that the power and control cables run in parallel,
the distance between the cables and the frequency of the harmonics.
5.5 Economic impact
Energy losses
Harmonics cause additional losses (Joule effect) in conductors and equipment.
Higher subscription costs
The presence of harmonic currents can require a higher subscribed power level
and consequently higher costs. What is more, Utilities will be increasingly inclined to
charge customers for major sources of harmonics.
Oversizing of equipment
b Derating of power sources (generators, transformers and UPSs) means they must
be oversized
b Conductors must be sized taking into account the ow of harmonic currents. In
addition, due the skin effect, the resistance of these conductors increases with
frequency. To avoid excessive losses due to the Joule effect, it is necessary to
oversize conductors
b Flow of harmonics in the neutral conductor means that it must be oversized as well
Reduced service life of equipment
When the level of distortion THD
u
of the supply voltage reaches 10%, the duration of
service life of equipment is signicantly reduced. The reduction has been estimated
at:
b 32.5% for single-phase machines
b 18% for three-phase machines
b 5% for transformers
To maintain the service lives corresponding to the rated load, equipment must be
oversized.
Nuisance tripping and installation shutdown
Circuit-breakers in the installation are subjected to current peaks caused by
harmonics. These current peaks may cause nuisance tripping of old technology
units, with the resulting production losses, as well as the costs corresponding to the
time required to start the installation up again.
Examples
Given the economic consequences for the installations mentioned below, it was
necessary to install harmonic lters.
Computer centre for an insurance company
In this centre, nuisance tripping of a circuit-breaker was calculated to have cost
100 k per hour of down time.
Pharmaceutical laboratory
Harmonics caused the failure of a generator set and the interruption of a long
duration test on a new medication. The consequences were a loss estimated
at 17 M.
Metallurgy factory
A set of induction furnaces caused the overload and destruction of three
transformers ranging from 1500 to 2500 kVA over a single year. The cost of the
interruptions in production were estimated at 20 k per hour.
Factory producing garden furniture
The failure of variable-speed drives resulted in production shutdowns estimated
at 10 k per hour.
5 Main effects of harmonics in
electrical installations
Schneider Electric - Electrical installation guide 2013
M - Harmonic management
M20
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
6 Standards
Harmonic emissions are subject to various standards and regulations:
b Compatibility standards for distribution networks
b Emissions standards applying to the equipment causing harmonics
b Recommendations issued by Utilities and applicable to installations
In view of rapidly attenuating the effects of harmonics, a triple system of standards
and regulations is currently in force based on the documents listed below.
Standards governing compatibility between distribution networks and
products
These standards determine the necessary compatibility between distribution
networks and products:
b The harmonics caused by a device must not disturb the distribution network
beyond certain limits
b Each device must be capable of operating normally in the presence of
disturbances up to specic levels
b Standard IEC 61000-2-2 is applicable for public low-voltage power supply systems
b Standard IEC 61000-2-4 is applicable for LV and MV industrial installations
Standards governing the quality of distribution networks
b Standard EN 50160 stipulates the characteristics of electricity supplied by public
distribution networks
b Standard IEEE 519 presents a joint approach between Utilities and customers
to limit the impact of non-linear loads. What is more, Utilities encourage preventive
action in view of reducing the deterioration of power quality, temperature rise and the
reduction of power factor. They will be increasingly inclined to charge customers for
major sources of harmonics
Standards governing equipment
b Standard IEC 61000-3-2 for low-voltage equipment with rated current under 16 A
b Standard IEC 61000-3-12 for low-voltage equipment with rated current higher than
16 A and lower than 75 A
Maximum permissible harmonic levels
International studies have collected data resulting in an estimation of typical
harmonic contents often encountered in electrical distribution networks. Figure M23
presents the levels that, in the opinion of many Utilities, should not be exceeded.
M - Harmonic management
Fig. M23 : Maximum admissible harmonic voltages and distortion (%)
Odd harmonic orders Odd harmonic orders Even harmonic orders THD
u
non-multiples of 3 multiples of 3
Order h LV MV HV Order h LV MV HV Order h LV MV HV LV MV HV
5 6 5 2 3 5 4 2 2 2 1.8 1.4 8 6.5 3
7 5 4 2 9 1.5 1.2 1 4 1 1 0.8
11 3.5 3 1.5 15 0.4 0.3 0.3 6 0.5 0.5 0.4
13 3 2.5 1.5 21 0.3 0.2 0.2 8 0.5 0.5 0.4
17h49 2.27x17/h-0.27 1.9x17/h-0.2 1.2x17/h 21<h45 0.2 0.2 0.2 10h50 0.25x10/h+0.25 0.25x10/h+0.22 0.19x10/h+0.16
Schneider Electric - Electrical installation guide 2013
M21
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
7 Solutions to mitigate harmonics
M - Harmonic management
There are three different types of solutions to attenuate harmonics:
b Modications in the installation
b Special devices in the supply system
b Filtering
7.1 Basic solutions
To limit the propagation of harmonics in the distribution network, different solutions
are available and should be taken into account particularly when designing a new
installation.
Position the non-linear loads upstream in the system
Overall harmonic disturbances increase as the short-circuit power decreases.
All economic considerations aside, it is preferable to connect the non-linear loads as
far upstream as possible (see Fig. M24).
Group the non-linear loads
When preparing the single-line diagram, the non-linear devices should be separated
from the others (see Fig. M25). The two groups of devices should be supplied by
different sets of busbars.
Fig. M24 : Non-linear loads positioned as far upstream as possible (recommended layout)
Sensitive
loads
Z
2
Z
1
Non-linear
loads
Where impedance
Z
1
< Z
2
Create separate sources
In attempting to limit harmonics, an additional improvement can be obtained by
creating a source via a separate transformer as indicated in the Figure M26.
The disadvantage is the increase in the cost of the installation.
Fig. M25 : Grouping of non-linear loads and connection as far upstream as possible
(recommended layout)
Sensitive
loads
Line impedances
Non-linear
load 1
Non-linear
load 2
Yes
No
Fig. M26 : Supply of non-linear loads via a separate transformer
Non-linear
loads
Linear
loads
MV
network
Schneider Electric - Electrical installation guide 2013
M - Harmonic management
M22
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Transformers with special connections
Different transformer connections can eliminate certain harmonic orders, as
indicated in the examples below:
b A Dyd connection suppresses 5th and 7th harmonics (see Fig. M27)
b A Dy connection suppresses the 3rd harmonic
b A DZ 5 connection suppresses the 5th harmonic
Install reactors
When variable-speed drives are supplied, it is possible to smooth the current
by installing line reactors. By increasing the impedance of the supply circuit, the
harmonic current is limited.
Installation of harmonic suppression reactors on capacitor banks increases the
impedance of the reactor/capacitor combination for high-order harmonics.
This avoids resonance and protects the capacitors.
Select the suitable system earthing arrangement
TNC system
In the TNC system, a single conductor (PEN) provides protection in the event of an
earth fault and the ow of unbalance currents.
Under steady-state conditions, the harmonic currents ow in the PEN. Because
of the PEN impedance, this results in slight differences in potential (a few volts)
between devices that can cause electronic equipment to malfunction.
The TNC system must therefore be reserved for the supply of power circuits at the
head of the installation and must not be used to supply sensitive loads.
TNS system
This system is recommended if harmonics are present.
The neutral conductor and the protection conductor PE are completely separate and
the potential throughout the distribution network is therefore more uniform.
7.2 Harmonic ltering
In cases where the preventive action presented above is insufcient, it is necessary
to equip the installation with ltering systems.
There are three types of lters:
b Passive
b Active
b Hybrid
Passive lters
Typical applications
b Industrial installations with a set of non-linear loads representing more than
500 kVA (variable-speed drives, UPSs, rectiers, etc.)
b Installations requiring power-factor correction
b Installations where voltage distortion must be reduced to avoid disturbing sensitive
loads
b Installations where current distortion must be reduced to avoid overloads
Operating principle
An LC circuit, tuned to each harmonic order to be ltered, is installed in parallel with
the non-linear load (see Fig. M28). This bypass circuit absorbs the harmonics, thus
avoiding their ow in the distribution network.
Fig. M27 : A Dyd transformer blocks propagation of the 5
th
and 7
th
harmonics to the upstream
network
h11, h13
h5, h7, h11, h13
h5, h7, h11, h13
Schneider Electric - Electrical installation guide 2013
M23
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. M30 : Operating principle of a hybrid lter
7 Solutions to mitigate harmonics
Generally speaking, the passive lter is tuned to a harmonic order close to the order
to be eliminated. Several parallel-connected branches of lters can be used if a
signicant reduction in the distortion of a number of harmonic orders is required.
Active lters (active harmonic conditioner)
Typical applications
b Commercial installations with a set of non-linear loads representing less than
500 kVA (variable-speed drives, UPSs, ofce equipment, etc.)
b Installations where current distortion must be reduced to avoid overloads.
Operating principle
These systems, comprising power electronics and installed in series or parallel
with the non-linear load, compensate the harmonic current or voltage drawn by the
load. Figure M29 shows a parallel-connected active harmonic conditioner (AHC)
compensating the harmonic current (Ihar = -Iact).
The AHC injects in opposite phase the harmonics drawn by the non-linear load, such
that the line current Is remains sinusoidal.
Hybrid lters
Typical applications
b Industrial installations with a set of non-linear loads representing more than 500
kVA (variable-speed drives, UPSs, rectiers, etc.)
b Installations requiring power-factor correction
b Installations where voltage distortion must be reduced to avoid disturbing sensitive
loads
b Installations where current distortion must be reduced to avoid overloads
b Installations where strict limits on harmonic emissions must be met
Operating principle
Passive and active lters are combined in a single system to constitute a hybrid lter
(see Fig. M30). This new ltering solution offers the advantages of both types of
lters and covers a wide range of power and performance levels.
Non-linear
load
I har
Filter
Fig. M28 : Operating principle of a passive lter
Non-linear
load
Linear
load
AHC
Is
I har
Iact
Non-linear
load
Linear
load
AHC
Is
I har
Iact
Hybride filter
Fig. M29 : Operating principle of an active lter
Schneider Electric - Electrical installation guide 2013
M - Harmonic management
M24
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
7 Solutions to mitigate harmonics
Selection criteria
Passive lter
It offers both power-factor correction and high current-ltering capacity. Passive
lters also reduce the harmonic voltages in installations where the supply voltage is
disturbed. If the level of reactive power supplied is high, it is advised to turn off the
passive lter at times when the percent load is low.
Preliminary studies for a lter must take into account the possible presence of a
power factor correction capacitor bank which may have to be eliminated.
Active harmonic conditioners
They lter harmonics over a wide range of frequencies and can adapt to any type of
load. On the other hand, power ratings are limited.
Hybrid lters
They combine the performance of both active and passive lters.
7.3 The method
The best solution, in both technical and nancial terms, is based on the results of an
in-depth study.
Harmonic audit of MV and LV networks
By calling on an expert, you are guaranteed that the proposed solution will produce
effective results (e.g. a guaranteed maximum THD
u
).
A harmonic audit is carried out by an engineer specialised in the disturbances
affecting electrical distribution networks and equipped with powerful analysis and
simulation equipment and software.
The steps in an audit are the following:
b Measurement of disturbances affecting current and phase-to-phase and phase to
neutral voltages at the supply source, the disturbed outgoing circuits and the non-
linear loads
b Computer modelling of the phenomena to obtain a precise explanation of the
causes and determine the best solutions
b A complete audit report presenting:
v The current levels of disturbances
v The maximum permissible levels of disturbances (refer to IEC 61000, IEEE 519,
etc.)
b A proposal containing solutions with guaranteed levels of performance
b Finally, implementation of the selected solution, using the necessary means and
resources.
The entire audit process should be certied ISO 9002.
Fig. M31 : Example of MV passive lter equipment
Fig. M32 : Active Harmonic Conditionner (AccuSine range)
Fig. M33 : Example of hybrid lter equipment
Schneider Electric - Electrical installation guide 2013
N1
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapter N
Characteristics of particular
sources and loads
Contents
Protection of a LV generator set N2
and the downstream circuits
1.1 Generator protection N2
1.2 Downstream LV network protection N5
1.3 The monitoring functions N5
1.4 Generator Set parallel-connection N10
Uninterruptible Power Supply units (UPS) N11
2.1 Availability and quality of electrical power N11
2.2 Types of static UPSs N12
2.3 Batteries N15
2.4 System earthing arrangements for installations comprising UPSs N16
2.5 Choice of protection schemes N18
2.6 Installation, connection and sizing of cables N20
2.7 The UPSs and their environment N22
2.8 Complementary equipment N22
Protection of LV/LV transformers N24
3.1 Transformer-energizing inrush current N24
3.2 Protection for the supply circuit of a LV/LV transformer N24
3.3 Typical electrical characteristics of LV/LV 50 Hz transformers N25
3.4 Protection of LV/LV transformers, using Schneider Electric
circuit-breakers N25
Lighting circuits N27
4.1 The different lamp technologies N27
4.2 Electrical characteristics of lamps N29
4.3 Constraints related to lighting devices and recommendations N34
4.4 Lighting of public areas N42
Asynchronous motors N45
5.1 Motor control systems N45
5.2 Motor protection functions N46
5.3 Motor monitoring N49
5.4 Motor starter congurations N50
5.5 Protection coordination N51
5.6 Basic protection scheme: circuit-breaker + contactor +
thermal relay N51
5.7 Control and protection switching gear (CPS) N52
5.8 Intelligent Power and Motor Control Centre (iPMCC) N54
5.9 Communication N56
5
4
3
2
1
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N2
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Protection of a LV generator set
and the downstream circuits
Most industrial and large commercial electrical installations include certain important
loads for which a power supply must be maintained, in the event that the utility
electrical supply fails:
b Either, because safety systems are involved (emergency lighting, automatic re-
protection equipment, smoke dispersal fans, alarms and signalization, and so on) or
b Because it concerns priority circuits, such as certain equipment, the stoppage of
which would entail a loss of production, or the destruction of a machine tool, etc.
One of the current means of maintaining a supply to the so-called priority loads, in
the event that other sources fail, is to install a diesel generator set connected, via a
change-over switch, to an emergency-power standby switchboard, from which the
priority services are fed (see Fig. N1).
G
Change-over switch
Priority circuits Non-priority circuits
HV
LV
Fig N1 : Example of circuits supplied from a transformer or from an alternator
1.1 Generator protection
Figure N2 below shows the electrical sizing parameters of a Generator Set. Pn, Un
and In are, respectively, the power of the thermal motor, the rated voltage and the
rated current of the generator.
Fig N2 : Block diagram of a generator set
Thermal
motor
R
Un, In
Pn
S
T
N
Overload protection
The generator protection curve must be analysed (see Fig. N3).
Standards and requirements of applications can also stipulate specic overload
conditions. For example:
t (s)
1
0
0
3
2
1.1
7
10
12
100
1,000
Overloads
1.2 1.5 2 3 4 5
I
In
Fig N3 : Example of an overload curve t = f(I/In)
I/In t
1.1 > 1 h
1.5 30 s
The setting possibilities of the overload protection devices (or Long Time Delay) will
closely follow these requirements.
Note on overloads
b For economic reasons, the thermal motor of a replacement set may be strictly sized
for its nominal power. If there is an active power overload, the diesel motor will stall.
The active power balance of the priority loads must take this into account
b A production set must be able to withstand operating overloads:
v One hour overload
v One hour 10% overload every 12 hours (Prime Power)
Schneider Electric - Electrical installation guide 2013
N3
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Protection of a LV generator set
and the downstream circuits
Short-circuit current protection
Making the short-circuit current
The short-circuit current is the sum:
b Of an aperiodic current
b Of a damped sinusoidal current
The short-circuit current equation shows that it is composed of three successive
phases (see Fig. N4).
Fig N4 : Short-circuit current level during the 3 phases
I rms
0.3 In
3 In
In
Generator with compound
excitation or over-excitation
Generator with serial
excitation
t (s)
Fault appears
10 to 20 ms 0
0
0.1 to 0.3 s
1 - Subtransient conditions
2 - Transient conditions
3 - Steady state conditions
1 2 3
b Subtransient phase
When a short-circuit appears at the terminals of a generator, the current is rst made
at a relatively high value of around 6 to 12 In during the rst cycle (0 to 20 ms).
The amplitude of the short-circuit output current is dened by three parameters:
v The subtransient reactance of the generator
v The level of excitation prior to the time of the fault and
v The impedance of the faulty circuit.
The short-circuit impedance of the generator to be considered is the subtransient
reactance xd expressed in % by the manufacturer. The typical value is 10 to 15%.
We determine the subtransient short-circuit impedance of the generator:
=
= X d
U x d
S
n
(ohms)
where S Un n
2
100
3 I
b Transient phase
The transient phase is placed 100 to 500 ms after the time of the fault. Starting from
the value of the fault current of the subtransient period, the current drops to 1.5 to
2 times the current In.
The short-circuit impedance to be considered for this period is the transient
reactance xd expressed in % by the manufacturer. The typical value is 20 to 30%.
b Steady state phase
The steady state occurs after 500 ms.
When the fault persists, the output voltage collapses and the exciter regulation seeks
to raise this output voltage. The result is a stabilised sustained short-circuit current:
v If generator excitation does not increase during a short-circuit (no eld
overexcitation) but is maintained at the level preceding the fault, the current stabilises
at a value that is given by the synchronous reactance Xd of the generator. The typical
value of xd is greater than 200%. Consequently, the nal current will be less than the
full-load current of the generator, normally around 0.5 In.
v If the generator is equipped with maximum eld excitation (eld overriding) or with
compound excitation, the excitation surge voltage will cause the fault current to
increase for 10 seconds, normally to 2 to 3 times the full-load current of the generator.
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N4
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Calculating the short-circuit current
Manufacturers normally specify the impedance values and time constants required
for analysis of operation in transient or steady state conditions (see Fig. N5).
Fig N5 : Example of impedance table (in %)
(kVA) 75 200 400 800 1,600 2,500
xd 10.5 10.4 12.9 10.5 18.8 19.1
xd 21 15.6 19.4 18 33.8 30.2
xd 280 291 358 280 404 292
Resistances are always negligible compared with reactances. The parameters for the
short-circuit current study are:
b Value of the short-circuit current at generator terminals
Short-circuit current amplitude in transient conditions is:
I
I
sc3 =
n
X d
1
3
(Xd in ohms)
or
I sc3 =
In
x d
100 (xd in%)
Un is the generator phase-to-phase output voltage.
Note: This value can be compared with the short-circuit current at the terminals of a
transformer. Thus, for the same power, currents in event of a short-circuit close to a
generator will be 5 to 6 times weaker than those that may occur with a transformer
(main source).
This difference is accentuated still further by the fact that generator set power is
normally less than that of the transformer (see Fig. N6).
Fig N6 : Example of a priority services switchboard supplied (in an emergency) from a standby
generator set
GS
Priority circuits Non-priority circuits
MV
Source 1
Main/standby
NC NO
NC: Normally closed
NO: Normally open
NC
D1 D2
2,000 kVA
42 kA
500 kVA
2.5 kA
LV
When the LV network is supplied by the Main source 1 of 2,000 kVA, the short-circuit
current is 42 kA at the main LV board busbar. When the LV network is supplied by the
Replacement Source 2 of 500 kVA with transient reactance of 30%, the short-circuit
current is made at approx. 2.5 kA, i.e. at a value 16 times weaker than with the Main
source.
Schneider Electric - Electrical installation guide 2013
N5
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Protection of a LV generator set
and the downstream circuits
1.2 Downstream LV network protection
Priority circuit protection
Choice of breaking capacity
This must be systematically checked with the characteristics of the main source
(MV/LV transformer).
Setting of the Short Time Delay (STD) tripping current
b Subdistribution boards
The ratings of the protection devices for the subdistribution and nal distribution
circuits are always lower than the generator rated current. Consequently, except in
special cases, conditions are the same as with transformer supply.
b Main LV switchboard
v The sizing of the main feeder protection devices is normally similar to that of the
generator set. Setting of the STD must allow for the short-circuit characteristic of the
generator set (see Short-circuit current protection before)
v Discrimination of protection devices on the priority feeders must be provided
in generator set operation (it can even be compulsory for safety feeders). It is
necessary to check proper staggering of STD setting of the protection devices of
the main feeders with that of the subdistribution protection devices downstream
(normally set for distribution circuits at 10 In).
Note: When operating on the generator set, use of a low sensitivity Residual
Current Device enables management of the insulation fault and ensures very simple
discrimination.
Safety of people
In the IT (2
nd
fault) and TN grounding systems, protection of people against indirect
contacts is provided by the STD protection of circuit-breakers. Their operation on
a fault must be ensured, whether the installation is supplied by the main source
(Transformer) or by the replacement source (generator set).
Calculating the insulation fault current
Zero-sequence reactance formulated as a% of Uo by the manufacturer xo.
The typical value is 8%.
The phase-to-neutral single-phase short-circuit current is given by:
I f
X o
=
+
Un
X d
3
2
The insulation fault current in the TN system is slightly greater than the three
phase fault current. For example, in event of an insulation fault on the system in the
previous example, the insulation fault current is equal to 3 kA.
1.3 The monitoring functions
Due to the specic characteristics of the generator and its regulation, the proper
operating parameters of the generator set must be monitored when special loads are
implemented.
The behaviour of the generator is different from that of the transformer:
b The active power it supplies is optimised for a power factor = 0.8
b At less than power factor 0.8, the generator may, by increased excitation, supply
part of the reactive power
Capacitor bank
An off-load generator connected to a capacitor bank may self-excite, consequently
increasing its overvoltage.
The capacitor banks used for power factor regulation must therefore be disconnected.
This operation can be performed by sending the stopping setpoint to the regulator
(if it is connected to the system managing the source switchings) or by opening the
circuit-breaker supplying the capacitors.
If capacitors continue to be necessary, do not use regulation of the power factor relay
in this case (incorrect and over-slow setting).
Motor restart and re-acceleration
A generator can supply at most in transient period a current of between 3 and 5 times
its nominal current.
A motor absorbs roughly 6 In for 2 to 20 s during start-up.
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N6
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
If the sum of the motor power is high, simultaneous start-up of loads generates a
high pick-up current that can be damaging. A large voltage drop, due to the high
value of the generator transient and subtransient reactances will occur (20% to
30%), with a risk of:
b Non-starting of motors
b Temperature rise linked to the prolonged starting time due to the voltage drop
b Tripping of the thermal protection devices
Moreover, all the network and actuators are disturbed by the voltage drop.
Application (see Fig. N7)
A generator supplies a set of motors.
Generator characteristics: Pn = 130 kVA at a power factor of 0.8,
In = 150 A
xd = 20% (for example) hence Isc = 750 A.
b The Pmotors is 45 kW (45% of generator power)
Calculating voltage drop at start-up:
PMotors = 45 kW, Im = 81 A, hence a starting current Id = 480 A for 2 to 20 s.
Voltage drop on the busbar for simultaneous motor starting:
U
U
d n
sc n
=
I I
I I
100
in %
U = 55%
which is not tolerable for motors (failure to start).
b the Pmotors is 20 kW (20% of generator power)
Calculating voltage drop at start-up:
PMotors = 20 kW, Im = 35 A, hence a starting current Id = 210 A for 2 to 20 s.
Voltage drop on the busbar:
U
U
d n
sc n
=
I I
I I
100 in %
U = 10%
which is high but tolerable (depending on the type of loads).
Fig N7 : Restarting of priority motors (P > 1/3 Pn)
G
Resistive loads Motors
PLC
F N
Remote control 1
Remote control 2
F F F
Restarting tips
b If the Pmax of the largest motor >
1
3
Pn , a soft starter must be
installed on this motor
b If Pmotors >
1
3
Pn
, motor cascade restarting must be managed by a PLC
b If Pmotors <
1
3
Pn
, there are no restarting problems
Schneider Electric - Electrical installation guide 2013
N7
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Protection of a LV generator set
and the downstream circuits
Non-linear loads Example of a UPS
Non-linear loads
These are mainly:
b Saturated magnetic circuits
b Discharge lamps, uorescent lights
b Electronic converters
b Information Technology Equipment: PC, computers, etc.
These loads generate harmonic currents: supplied by a Generator Set, this can
create high voltage distortion due to the low short-circuit power of the generator.
Uninterruptible Power Supply (UPS) (see Fig. N8)
The combination of a UPS and generator set is the best solution for ensuring quality
power supply with long autonomy for the supply of sensitive loads.
It is also a non-linear load due to the input rectier. On source switching, the autonomy
of the UPS on battery must allow starting and connection of the Generator Set.
Fig N8 : Generator set- UPS combination for Quality energy
G
Sensitive feeders
Mains 2
feeder
Mains 1
feeder
Uninterruptible
power supply
Non-sensitive
load
Electrical utility
HV incomer
NC NO
By-pass
UPS power
UPS inrush power must allow for:
b Nominal power of the downstream loads. This is the sum of the apparent powers
Pa absorbed by each application. Furthermore, so as not to oversize the installation,
the overload capacities at UPS level must be considered (for example: 1.5 In for
1 minute and 1.25 In for 10 minutes)
b The power required to recharge the battery: This current is proportional to the
autonomy required for a given power. The sizing Sr of a UPS is given by:
Sr = 1.17 x Pn
Figure N9 next page denes the pick-up currents and protection devices for
supplying the rectier (Mains 1) and the standby mains (Mains 2).
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N8
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Generator Set/UPS combination
b Restarting the Rectier on a Generator Set
The UPS rectier can be equipped with a progressive starting of the charger to
prevent harmful pick-up currents when installation supply switches to the Generator
Set (see Fig. N10).
Fig N9 : Pick-up current for supplying the rectier and standby mains
Nominal power Current value (A)
Pn (kVA)
Mains 1 with 3Ph battery Mains 2 or 3Ph application
400 V - I1 400 V - Iu
40 86 60.5
60 123 91
80 158 121
100 198 151
120 240 182
160 317 243
200 395 304
250 493 360
300 590 456
400 793 608
500 990 760
600 1,180 912
800 1,648 1,215
Fig N10 : Progressive starting of a type 2 UPS rectier
20 ms
5 to 10 s
t (s)
Mains 1
GS starting
UPS charger
starting
b Harmonics and voltage distortion
Total voltage distortion is dened by:
(%) =
U
U
h
2
1
where Uh is the harmonic voltage of order h.
This value depends on:
v The harmonic currents generated by the rectier (proportional to the power Sr of
the rectier)
v The longitudinal subtransient reactance Xd of the generator
v The power Sg of the generator
We dene
= U Rcc X d
Sr
Sg
(%)
the generator relative short-circuit voltage, brought to
rectier power, i.e. t = f(URcc).
Schneider Electric - Electrical installation guide 2013
N9
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Protection of a LV generator set
and the downstream circuits
Note 1: As subtransient reactance is great, harmonic distortion is normally too high
compared with the tolerated value (7 to 8%) for reasonable economic sizing of the
generator: use of a suitable lter is an appropriate and cost-effective solution.
Note 2: Harmonic distortion is not harmful for the rectier but may be harmful for the
other loads supplied in parallel with the rectier.
Application
A chart is used to nd the distortion as a function of URcc (see Fig. N11).
Fig N11 : Chart for calculating harmonic distorsion
(%) (Voltage harmonic distortion)
U'Rcc = X''d
Sr
Sg
1 2 0
0
1
2
3
4
5
6
7
8
9
10
11
Without filter
With filter
(incorporated)
12
13
14
15
16
17
18
3 4 5 6 7 8 9 10 11 12
The chart gives:
b Either as a function of URcc
b Or URcc as a function of
From which generator set sizing, Sg, is determined.
Example: Generator sizing
b 300 kVA UPS without lter, subtransient reactance of 15%
The power Sr of the rectier is Sr = 1.17 x 300 kVA = 351 kVA
For a < 7%, the chart gives URcc = 4%, power Sg is:
Sg = 351
15
4
x 1,400 kVA
b 300 kVA UPS with lter, subtransient reactance of 15%
For = 5%, the calculation gives URcc = 12%, power Sg is:
Sg = 351
15
12
x 500 kVA
Note: With an upstream transformer of 630 kVA on the 300 kVA UPS without lter,
the 5% ratio would be obtained.
The result is that operation on generator set must be continually monitored for
harmonic currents.
If voltage harmonic distortion is too great, use of a lter on the network is the most
effective solution to bring it back to values that can be tolerated by sensitive loads.
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N10
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Protection of a LV generator set
and the downstream circuits
1.4 Generator Set parallel-connection
Parallel-connection of the generator set irrespective of the application type - Safety
source, Replacement source or Production source - requires ner management of
connection, i.e. additional monitoring functions.
Parallel operation
As generator sets generate energy in parallel on the same load, they must be
synchronised properly (voltage, frequency) and load distribution must be balanced
properly. This function is performed by the regulator of each Generator Set (thermal
and excitation regulation). The parameters (frequency, voltage) are monitored before
connection: if the values of these parameters are correct, connection can take place.
Insulation faults (see Fig. N12)
An insulation fault inside the metal casing of a generator set may seriously damage
the generator of this set if the latter resembles a phase-to-neutral short-circuit. The
fault must be detected and eliminated quickly, else the other generators will generate
energy in the fault and trip on overload: installation continuity of supply will no longer be
guaranteed. Ground Fault Protection (GFP) built into the generator circuit is used to:
b Quickly disconnect the faulty generator and preserve continuity of supply
b Act at the faulty generator control circuits to stop it and reduce the risk of damage
This GFP is of the Residual Sensing type and must be installed as close as
possible to the protection device as per a TN-C/TN-S
(1)
system at each generator set
with grounding of frames by a separate PE. This kind of protection is usually called
Restricted Earth Fault.
(1) The system is in TN-C for sets seen as the generator and
in TN-S for sets seen as loads
Fig N12 : Insulation fault inside a generator
Protected
area
Generator no. 1
Phases
N
PE
PEN PEN PE
PE
PE
Generator no. 2
Unprotected
area
RS RS
Generator Set operating as a load (see Fig. N13 and Fig. N14)
One of the parallel-connected generator sets may no longer operate as a generator
but as a motor (by loss of its excitation for example). This may generate overloading
of the other generator set(s) and thus place the electrical installation out of operation.
To check that the generator set really is supplying the installation with power
(operation as a generator), the proper ow direction of energy on the coupling busbar
must be checked using a specic reverse power check. Should a fault
occur, i.e. the set operates as a motor, this function will eliminate the faulty set.
Grounding parallel-connected Generator Sets
Grounding of connected generator sets may lead to circulation of earth fault currents
(triplen harmonics) by connection of neutrals for common grounding (grounding
system of the TN or TT type). Consequently, to prevent these currents from owing
between the generator sets, we recommend the installation of a decoupling
resistance in the grounding circuit.
G
MV incomer
LV
HV busbar
F F
G
MV incomer
LV
HV busbar
F F
Fig N13 : Energy transfer direction Generator Set as a
generator
Fig N14 : Energy transfer direction Generator Set as a load
Schneider Electric - Electrical installation guide 2013
N11
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Uninterruptible Power Supply
units (UPS)
2.1 Availability and quality of electrical power
The disturbances presented above may affect:
b Safety of human life
b Safety of property
b The economic viability of a company or production process
Disturbances must therefore be eliminated.
A number of technical solutions contribute to this goal, with varying degrees of
effectiveness. These solutions may be compared on the basis of two criteria:
b Availability of the power supplied
b Quality of the power supplied
The availability of electrical power can be thought of as the time per year that power
is present at the load terminals. Availability is mainly affected by power interruptions
due to utility outages or electrical faults.
A number of solutions exist to limit the risk:
b Division of the installation so as to use a number of different sources rather than
just one
b Subdivision of the installation into priority and non-priority circuits, where the
supply of power to priority circuits can be picked up if necessary by another available
source
b Load shedding, as required, so that a reduced available power rating can be used
to supply standby power
b Selection of a system earthing arrangement suited to service-continuity goals, e.g.
IT system
b Discrimination of protection devices (selective tripping) to limit the consequences
of a fault to a part of the installation
Note that the only way of ensuring availability of power with respect to utility outages
is to provide, in addition to the above measures, an autonomous alternate source, at
least for priority loads (see Fig. N15).
Fig. N15 : Availability of electrical power
Priority circuits Non-priority circuits
Alternate source 2.5 kA
G
This source takes over from the utility in the event of a problem, but two factors must
be taken into account:
b The transfer time (time required to take over from the utility) which must be
acceptable to the load
b The operating time during which it can supply the load
The quality of electrical power is determined by the elimination of the disturbances at
the load terminals.
An alternate source is a means to ensure the availability of power at the load
terminals, however, it does not guarantee, in many cases, the quality of the power
supplied with respect to the above disturbances.
N - Characteristics of particular sources and loads
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N12
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Today, many sensitive electronic applications require an electrical power supply
which is virtually free of these disturbances, to say nothing of outages, with
tolerances that are stricter than those of the utility.
This is the case, for example, for computer centers, telephone exchanges and many
industrial-process control and monitoring systems.
These applications require solutions that ensure both the availability and quality of
electrical power.
The UPS solution
The solution for sensitive applications is to provide a power interface between the
utility and the sensitive loads, providing voltage that is:
b Free of all disturbances present in utility power and in compliance with the strict
tolerances required by loads
b Available in the event of a utility outage, within specied tolerances
UPSs (Uninterruptible Power Supplies) satisfy these requirements in terms of power
availability and quality by:
b Supplying loads with voltage complying with strict tolerances, through use of an
inverter
b Providing an autonomous alternate source, through use of a battery
b Stepping in to replace utility power with no transfer time, i.e. without any interruption
in the supply of power to the load, through use of a static switch
These characteristics make UPSs the ideal power supply for all sensitive applications
because they ensure power quality and availability, whatever the state of utility power.
A UPS comprises the following main components:
b Rectier/charger, which produces DC power to charge a battery and supply an
inverter
b Inverter, which produces quality electrical power, i.e.
v Free of all utility-power disturbances, notably micro-outages
v Within tolerances compatible with the requirements of sensitive electronic devices
(e.g. for Galaxy, tolerances in amplitude 0.5% and frequency 1%, compared to
10% and 5% in utility power systems, which correspond to improvement factors
of 20 and 5, respectively)
b Battery, which provides sufcient backup time (8 minutes to 1 hour or more) to
ensure the safety of life and property by replacing the utility as required
b Static switch, a semi-conductor based device which transfers the load from the
inverter to the utility and back, without any interruption in the supply of power
2.2 Types of static UPSs
Types of static UPSs are dened by standard IEC 62040.
The standard distinguishes three operating modes:
b Passive standby (also called off-line)
b Line interactive
b Double conversion (also called on-line)
These denitions concern UPS operation with respect to the power source including
the distribution system upstream of the UPS.
Standard IEC 62040 denes the following terms:
b Primary power: power normally continuously available which is usually supplied by
an electrical utility company, but sometimes by the users own generation
b Standby power: power intended to replace the primary power in the event of
primary-power failure
b Bypass power: power supplied via the bypass
Practically speaking, a UPS is equipped with two AC inputs, which are called the
normal AC input and bypass AC input in this guide.
b The normal AC input, noted as mains input 1, is supplied by the primary power, i.e.
by a cable connected to a feeder on the upstream utility or private distribution system
b The bypass AC input, noted as mains input 2, is generally supplied by standby
power, i.e. by a cable connected to an upstream feeder other than the one supplying
the normal AC input, backed up by an alternate source (e.g. by an engine-generator
set or another UPS, etc.)
When standby power is not available, the bypass AC input is supplied with primary
power (second cable parallel to the one connected to the normal AC input).
The bypass AC input is used to supply the bypass line(s) of the UPS, if they
exist. Consequently, the bypass line(s) is supplied with primary or standby power,
depending on the availability of a standby-power source.
Schneider Electric - Electrical installation guide 2013
N13
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Uninterruptible Power Supply
units (UPS)
UPS operating in passive-standby (off-line) mode
Operating principle
The inverter is connected in parallel with the AC input in a standby (see Fig. N16).
b Normal mode
The load is supplied by utility power via a lter which eliminates certain disturbances
and provides some degree of voltage regulation (the standard speaks of additional
devicesto provide power conditioning). The inverter operates in passive standby
mode.
b Battery backup mode
When the AC input voltage is outside specied tolerances for the UPS or the utility
power fails, the inverter and the battery step in to ensure a continuous supply of
power to the load following a very short (<10 ms) transfer time.
The UPS continues to operate on battery power until the end of battery backup time
or the utility power returns to normal, which provokes transfer of the load back to the
AC input (normal mode).
Usage
This conguration is in fact a compromise between an acceptable level of protection
against disturbances and cost. It can be used only with low power ratings (< 2 kVA).
It operates without a real static switch, so a certain time is required to transfer the
load to the inverter. This time is acceptable for certain individual applications, but
incompatible with the performance required by more sophisticated, sensitive systems
(large computer centers, telephone exchanges, etc.).
What is more, the frequency is not regulated and there is no bypass.
Note: In normal mode, the power supplying the load does not ow through the
inverter, which explains why this type of UPS is sometimes called Off-line. This term
is misleading, however, because it also suggests not supplied by utility power, when
in fact the load is supplied by the utility via the AC input during normal operation. That
is why standard IEC 62040 recommends the term passive standby.
UPS operating in line-interactive mode
Operating principle
The inverter is connected in parallel with the AC input in a standby conguration,
but also charges the battery. It thus interacts (reversible operation) with the AC input
source (see Fig. N17).
b Normal mode
The load is supplied with conditioned power via a parallel connection of the AC input
and the inverter. The inverter operates to provide output-voltage conditioning and/or
charge the battery. The output frequency depends on the AC-input frequency.
b Battery backup mode
When the AC input voltage is outside specied tolerances for the UPS or the utility
power fails, the inverter and the battery step in to ensure a continuous supply of
power to the load following a transfer without interruption using a static switch which
also disconnects the AC input to prevent power from the inverter from owing upstream.
The UPS continues to operate on battery power until the end of battery backup time
or the utility power returns to normal, which provokes transfer of the load back to the
AC input (normal mode).
b Bypass mode
This type of UPS may be equipped with a bypass. If one of the UPS functions fails,
the load can be transferred to the bypass AC input (supplied with utility or standby
power, depending on the installation).
Usage
This conguration is not well suited to regulation of sensitive loads in the medium to
high-power range because frequency regulation is not possible.
For this reason, it is rarely used other than for low power ratings.
UPS operating in double-conversion (on-line) mode
Operating principle
The inverter is connected in series between the AC input and the application.
b Normal mode
During normal operation, all the power supplied to the load passes through the
rectier/charger and inverter which together perform a double conversion (AC-DC-
AC), hence the name.
b Battery backup mode
When the AC input voltage is outside specied tolerances for the UPS or the utility
power fails, the inverter and the battery step in to ensure a continuous supply of
power to the load following a transfer without interruption using a static switch.
The UPS continues to operate on battery power until the end of battery backup time
or utility power returns to normal, which provokes transfer of the load back to the
AC input (normal mode).
Normal mode
Battery
Charger
Inverter
AC input
Filter/
conditioner
Load Battery backup mode
Fig. N17 : UPS operating in line-interactive mode
Fig. N16 : UPS operating in passive standby mode
Normal mode
Battery
If only one AC input
Inverter
Normal
AC input
Bypass
AC input
Bypass
Static
switch
Load
Battery backup mode
Bypass mode
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N14
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
b Bypass mode
This type of UPS is generally equipped with a static bypass, sometimes referred to
as a static switch (see Fig. N18).
The load can be transferred without interruption to the bypass AC input (supplied
with utility or standby power, depending on the installation), in the event of the
following:
v UPS failure
v Load-current transients (inrush or fault currents)
v Load peaks
However, the presence of a bypass assumes that the input and output frequencies
are identical and if the voltage levels are not the same, a bypass transformer is
required.
For certain loads, the UPS must be synchronized with the bypass power to ensure
load-supply continuity. What is more, when the UPS is in bypass mode, a disturbance
on the AC input source may be transmitted directly to the load because the inverter
no longer steps in.
Note: Another bypass line, often called the maintenance bypass, is available for
maintenance purposes. It is closed by a manual switch.
Normal mode
Battery
If only one AC input
Inverter
Normal
AC input
Bypass
AC input
Static
switch
(static
bypass)
Manual
maintenance
bypass
Load
Battery backup mode
Bypass mode
Fig. N18 : UPS operating in double-conversion (on-line) mode
Usage
In this conguration, the time required to transfer the load to the inverter is negligible
due to the static switch.
Also, the output voltage and frequency do not depend on the input voltage and
frequency conditions. This means that the UPS, when designed for this purpose, can
operate as a frequency converter.
Practically speaking, this is the main conguration used for medium and high
power ratings (from 10 kVA upwards).The rest of this chapter will consider only this
conguration.
Note: This type of UPS is often called on-line, meaning that the load is continuously
supplied by the inverter, regardless of the conditions on the AC input source. This
term is misleading, however, because it also suggests supplied by utility power,
when in fact the load is supplied by power that has been reconstituted by the double-
conversion system. That is why standard IEC 62040 recommends the term double
conversion.
Schneider Electric - Electrical installation guide 2013
N15
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Uninterruptible Power Supply
units (UPS)
2.3 Batteries
Selection of battery type
A battery is made up of interconnected cells which may be vented or of the
recombination type.
There are two main families of batteries:
b Nickel-cadmium batteries
b Lead-acid batteries
b Vented cells (lead-antimony): They are equipped with ports to
v Release to the atmosphere the oxygen and hydrogen produced during the different
chemical reactions
v Top off the electrolyte by adding distilled or demineralized water
b Recombination cells (lead, pure lead, lead-tin batteries): The gas recombination
rate is at least 95% and they therefore do not require water to be added during
service life
By extension, reference will be made to vented or recombination batteries
(recombination batteries are also often called sealed batteries).
The main types of batteries used in conjunction with UPSs are:
b Sealed lead-acid batteries, used 95% of the time because they are easy to
maintain and do not require a special room
b Vented lead-acid batteries
b Vented nickel-cadmium batteries
The above three types of batteries may be proposed, depending on economic factors
and the operating requirements of the installation, with all the available service-life
durations.
Capacity levels and backup times may be adapted to suit the users needs.
The proposed batteries are also perfectly suited to UPS applications in that they are
the result of collaboration with leading battery manufacturers.
Selection of back up time
Selection depends on:
b The average duration of power-system failures
b Any available long-lasting standby power (engine-generator set, etc.)
b The type of application
The typical range generally proposed is:
b Standard backup times of 10, 15 or 30 minutes
b Custom backup times
The following general rules apply:
b Computer applications
Battery backup time must be sufcient to cover le-saving and system-shutdown
procedures required to ensure a controlled shutdown of the computer system.
Generally speaking, the computer department determines the necessary backup
time, depending on its specic requirements.
b Industrial processes
The backup time calculation should take into account the economic cost incurred by
an interruption in the process and the time required to restart.
Selection table
Figure N19 next page sums up the main characteristics of the various types of
batteries.
Increasingly, recombination batteries would seem to be the market choice for the
following reasons:
b No maintenance
b Easy implementation
b Installation in all types of rooms (computer rooms, technical rooms not specically
intended for batteries, etc.)
In certain cases, however, vented batteries are preferred, notably for:
b Long service life
b Long backup times
b High power ratings
Vented batteries must be installed in special rooms complying with precise
regulations and require appropriate maintenance.
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N16
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Installation methods
Depending on the UPS range, the battery capacity and backup time, the battery is:
b Sealed type and housed in the UPS cabinet
b Sealed type and housed in one to three cabinets
b Vented or sealed type and rack-mounted. In this case the installation method may be
v On shelves (see Fig. N20)
This installation method is possible for sealed batteries or maintenance-free vented
batteries which do not require topping up of their electrolyte.
v Tier mounting (see Fig. N21)
This installation method is suitable for all types of batteries and for vented batteries
in particular, as level checking and lling are made easy.
v In cabinets (see Fig. N22)
This installation method is suitable for sealed batteries. It is easy to implement and
offers maximum safety.
2.4 System earthing arrangements for installations
comprising UPSs
Application of protection systems, stipulated by the standards, in installations
comprising a UPS, requires a number of precautions for the following reasons:
b The UPS plays two roles
v A load for the upstream system
v A power source for downstream system
b When the battery is not installed in a cabinet, an insulation fault on the DC system
can lead to the ow of a residual DC component
This component can disturb the operation of certain protection devices, notably
RCDs used for the protection of persons.
Protection against direct contact (see Fig. N23)
All installations satisfy the applicable requirements because the equipment is housed
in cabinets providing a degree of protection IP 20. This is true even for the battery
when it is housed in a cabinet.
When batteries are not installed in a cabinet, i.e. generally in a special room, the
measures presented at the end of this chapter should be implemented.
Note: The TN system (version TN-S or TN-C) is the most commonly recommended
system for the supply of computer systems.
Fig. N19 : Main characteristics of the various types of batteries
Fig. N20 : Shelf mounting
Fig. N21 : Tier mounting
Fig. N22 : Cabinet mounting
Fig. N23 : Main characteristics of system earthing arrangements
Type of arrangement IT system TT system TN system
Operation b Signaling of rst insulation fault b Disconnection for rst b Disconnection for rst insulation fault
b Locating and elimination of rst fault insulation fault
b Disconnection for second insulation fault
Techniques for protection b Interconnection and earthing of b Earthing of conductive parts b Interconnection and earthing of
of persons conductive parts combined with use of RCDs conductive parts and neutral imperative
b Surveillance of rst fault using an b First insulation fault results in b First insulation fault results in
insulation monitoring device (IMD) interruption by detecting leakage interruption by detecting overcurrents
b Second fault results in circuit interruption currents (circuit-breaker or fuse)
(circuit-breaker or fuse)
Advantages and b Solution offering the best continuity of b Easiest solution in terms of design b Low-cost solution in terms of installation
disadvantages service (rst fault is signalled) and installation b Difcult design
b Requires competent surveillance b No insulation monitoring device (calculation of loop impedances)
personnel (location of rst fault) (IMD) required b Qualied operating personnel required
b However, each fault results in b Flow of high fault currents
interruption of the concerned circuit
Service life Compact Operating- Frequency Special Cost
temperature of room
tolerances maintenance
Sealed lead-acid 5 or 10 years + + Low No Low medium
Vented lead-acid 5 or 10 years + ++ Medium Yes Low
Nickel-cadmium 5 or 10 years ++ +++ High no High
Schneider Electric - Electrical installation guide 2013
N17
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Uninterruptible Power Supply
units (UPS)
Essential points to be checked for UPSs
Figure N24 shows all the essential points that must be interconnected as well as the
devices to be installed (transformers, RCDs, etc.) to ensure installation conformity
with safety standards.
Fig. N24 : The essential points that must be connected in system earthing arrangements
N
CB0
T0
IMD 1
IMD 2
Earth 2
Earth
3
Earth 1
CB1
CB3
T1
T2
CB2
Q1 Q4S
Q5N
Q3BP
T0 neutral
T1 neutral
T2 neutral
Bypass
neutral
UPS exposed
conductive
parts
UPS output
Downstream
neutral
Load
exposed
conductive
parts
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N18
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2.5 Choice of protection schemes
The circuit-breakers have a major role in an installation but their importance often
appears at the time of accidental events which are not frequent. The best sizing of
UPS and the best choice of conguration can be compromised by a wrong choice of
only one circuit-breaker.
Circuit-breaker selection
Figure N25 shows how to select the circuit-breakers.
Fig. N25 : Circuit-breakers are submitted to a variety of situations
CB1 CB2
CB3
CB3
CB2
10 1 0.1 100
0.1
0.01
0.001
1
10
100
Uc
GE
Ir
down-
stream
Select the breaking capacities of
CB1 and CB2 for the short-circuit
current of the most powerful source
(generally the transformer)
However, CB1 and CB2 must
trip on a short-circuit supplied
by the least powerful source
(generally the generator)
CB2 must protect the UPS static
switch if a short circuit occurs
downstream of the switch
The Im current of CB2 must be calculated for simultaneous
energizing of all the loads downstream of the UPS
If bypass power is not used to handle overloads, the UPS current must trip the CB3 circuit
breaker with the highest rating
The trip unit of CB3 muqt be set not to trip for the overcurrent when the load is energized
For distant short-circuits, the CB3 unit setting must not result in a dangerous touch voltage.
If necessary, install an RCD
The overload capacity of the static
switch is 10 to 12 In for 20 ms,
where In is the current flowing
through the UPS at full rated load
T
r
i
p
p
i
n
g
t
i
m
e
(
i
n
s
e
c
o
n
d
s
)
Energizing of
a transformer
Energizing of all
loads downstream
of UPS
I/In of upstream
circuit breaker
Im
upstream
Im
down-
stream
Ir
upstream
Ir
down-
stream
CB2 curve
CB3 curve
Generator
short-circuit
Thermal limit
of static power
Schneider Electric - Electrical installation guide 2013
N19
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Uninterruptible Power Supply
units (UPS)
Rating
The selected rating (rated current) for the circuit-breaker must be the one just above
the rated current of the protected downstream cable.
Breaking capacity
The breaking capacity must be selected just above the short-circuit current that can
occur at the point of installation.
Ir and Im thresholds
The table below indicates how to determine the Ir (overload ; thermal or longtime)
and Im (short-circuit ; magnetic or short time) thresholds to ensure discrimination,
depending on the upstream and downstream trip units.
Remark (see Fig. N26)
b Time discrimination must be implemented by qualied personnel because time
delays before tripping increase the thermal stress (I
2
t) downstream (cables, semi-
conductors, etc.). Caution is required if tripping of CB2 is delayed using the Im
threshold time delay
b Energy discrimination does not depend on the trip unit, only on the circuit-breaker
Fig. N26 : Ir and Im thresholds depending on the upstream and downstream trip units
Type of downstream Ir upstream / Im upstream / Im upstream /
circuit Ir downstream Im downstream Im downstream
ratio ratio ratio
Downstream trip unit All types Magnetic Electronic
Distribution > 1.6 >2 >1.5
Asynchronous motor >3 >2 >1.5
Special case of generator short-circuits
Figure N27 shows the reaction of a generator to a short-circuit.
To avoid any uncertainty concerning the type of excitation, we will trip at the rst
peak (3 to 5 In as per Xd) using the Im protection setting without a time delay.
Fig. N27 : Generator during short-circuit
Irms
t
3 In
In
0.3 In
Subtransient
conditions 10 to 20 ms
Transient conditions
100 to 300 ms
Generator with
over-excitation
Generator with
series excitation
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N20
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2.6 Installation, connection and sizing of cables
Ready-to-use UPS units
The low power UPSs, for micro computer systems for example, are compact ready-
to-use equipement. The internal wiring is built in the factory and adapted to the
characteristics of the devices.
Not ready-to-use UPS units
For the other UPSs, the wire connections to the power supply system, to the battery
and to the load are not included.
Wiring connections depend on the current level as indicated in Figure N28 below.
Fig.N28 : Current to be taken into account for the selection of the wire connections
SW
Static switch
Rectifier/
charger
Battery
capacity C10
Ib
Inverter
Load
Mains 1
Mains 2
Iu
I1
Iu
Calculation of currents I1, Iu
b The input current Iu from the power network is the load current
b The input current I1 of the charger/rectier depends on:
v The capacity of the battery (C10) and the charging mode (Ib)
v The characteristics of the charger
v The efciency of the inverter
b The current Ib is the current in the connection of the battery
These currents are given by the manufacturers.
Cable temperature rise and voltage drops
The cross section of cables depends on:
b Permissible temperature rise
b Permissible voltage drop
For a given load, each of these parameters results in a minimum permissible cross
section. The larger of the two must be used.
When routing cables, care must be taken to maintain the required distances between
control circuits and power circuits, to avoid any disturbances caused by HF currents.
Temperature rise
Permissible temperature rise in cables is limited by the withstand capacity of cable
insulation.
Temperature rise in cables depends on:
b The type of core (Cu or Al)
b The installation method
b The number of touching cables
Standards stipulate, for each type of cable, the maximum permissible current.
Voltage drops
The maximum permissible voltage drops are:
b 3% for AC circuits (50 or 60 Hz)
b 1% for DC circuits
Schneider Electric - Electrical installation guide 2013
N21
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Uninterruptible Power Supply
units (UPS)
Selection tables
Figure N29 indicates the voltage drop in percent for a circuit made up of 100 meters
of cable. To calculate the voltage drop in a circuit with a length L, multiply the value in
the table by L/100.
b Sph: Cross section of conductors
b I
n
: Rated current of protection devices on circuit
Three-phase circuit
If the voltage drop exceeds 3% (50-60 Hz), increase the cross section of conductors.
DC circuit
If the voltage drop exceeds 1%, increase the cross section of conductors.
a - Three-phase circuits (copper conductors)
50-60 Hz - 380 V / 400 V / 415 V three-phase, cos = 0.8, balanced system three-phase + N
In Sph (mN
2
)
(A) 10 16 25 35 50 70 95 120 150 185 240 300
10 0.9
15 1.2
20 1.6 1.1
25 2.0 1.3 0.9
32 2.6 1.7 1.1
40 3.3 2.1 1.4 1.0
50 4.1 2.6 1.7 1.3 1.0
63 5.1 3.3 2.2 1.6 1.2 0.9
70 5.7 3.7 2.4 1.7 1.3 1.0 0.8
80 6.5 4.2 2.7 2.1 1.5 1.2 0.9 0.7
100 8.2 5.3 3.4 2.6 2.0 2.0 1.1 0.9 0.8
125 6.6 4.3 3.2 2.4 2.4 1.4 1.1 1.0 0.8
160 5.5 4.3 3.2 3.2 1.8 1.5 1.2 1.1 0.9
200 5.3 3.9 3.9 2.2 1.8 1.6 1.3 1.2 0.9
250 4.9 4.9 2.8 2.3 1.9 1.7 1.4 1.2
320 3.5 2.9 2.5 2.1 1.9 1.5
400 4.4 3.6 3.1 2.7 2.3 1.9
500 4.5 3.9 3.4 2.9 2.4
600 4.9 4.2 3.6 3.0
800 5.3 4.4 3.8
1,000 6.5 4.7
For a three-phase 230 V circuit, multiply the result by e
For a single-phase 208/230 V circuit, multiply the result by 2
b - DC circuits (copper conductors)
In Sph (mN2)
(A) - - 25 35 50 70 95 120 150 185 240 300
100 5.1 3.6 2.6 1.9 1.3 1.0 0.8 0.7 0.5 0.4
125 4.5 3.2 2.3 1.6 1.3 1.0 0.8 0.6 0.5
160 4.0 2.9 2.2 1.6 1.2 1.1 0.6 0.7
200 3.6 2.7 2.2 1.6 1.3 1.0 0.8
250 3.3 2.7 2.2 1.7 1.3 1.0
320 3.4 2.7 2.1 1.6 1.3
400 3.4 2.8 2.1 1.6
500 3.4 2.6 2.1
600 4.3 3.3 2.7
800 4.2 3.4
1,000 5.3 4.2
1,250 5.3
Fig. N29 : Voltage drop in percent for [a] three-phase circuits and [b] DC circuits
Special case for neutral conductors
In three-phase systems, the third-order harmonics (and their multiples) of single-
phase loads add up in the neutral conductor (sum of the currents on the three
phases).
For this reason, the following rule may be applied:
neutral cross section = 1.5 x phase cross section
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N22
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Example
Consider a 70-meter 400 V three-phase circuit, with copper conductors and a rated
current of 600 A.
Standard IEC 60364 indicates, depending on the installation method and the load, a
minimum cross section.
We shall assume that the minimum cross section is 95 mm
2
.
It is rst necessary to check that the voltage drop does not exceed 3%.
The table for three-phase circuits on the previous page indicates, for a 600 A current
owing in a 300 mm
2
cable, a voltage drop of 3% for 100 meters of cable, i.e. for
70 meters:
3 x 70 = 2.1 %
100
Therefore less than 3%
A identical calculation can be run for a DC current of 1,000 A.
In a ten-meter cable, the voltage drop for 100 meters of 240 mN
2
cable is 5.3%, i.e.
for ten meters:
5.3 x 10 = 0.53 %
100
Therefore less than 3%
2.7 The UPSs and their environment
The UPSs can communicate with electrical and computing environment. They can
receive some data and provide information on their operation in order:
b To optimize the protection
For example, the UPS provides essential information on operating status to the
computer system (load on inverter, load on static bypass, load on battery, low battery
warning)
b To remotely control
The UPS provides measurement and operating status information to inform and
allow operators to take specic actions
b To manage the installation
The operator has a building and energy management system which allow to obtain
and save information from UPSs, to provide alarms and events and to take actions.
This evolution towards compatibilty between computer equipment and UPSs has the
effect to incorporate new built-in UPS functions.
2.8 Complementary equipment
Transformers
A two-winding transformer included on the upstream side of the static contactor of
circuit 2 allows:
b A change of voltage level when the power network voltage is different to that of the
load
b A change of system of earthing between the networks
Moreover, such a transformer :
b Reduces the short-circuit current level on the secondary, (i.e load) side compared
with that on the power network side
b Prevents third harmonic currents which may be present on the secondary side
from passing into the power-system network, providing that the primary winding is
connected in delta.
Anti-harmonic lter
The UPS system includes a battery charger which is controlled by thyristors or
transistors. The resulting regularly-chopped current cycles generate harmonic
components in the power-supply network.
These indesirable components are ltered at the input of the rectier and for most
cases this reduces the harmonic current level sufciently for all practical purposes.
Schneider Electric - Electrical installation guide 2013
N23
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Uninterruptible Power Supply
units (UPS)
In certain specic cases however, notably in very large installations, an additional
lter circuit may be necessary.
For example when :
b The power rating of the UPS system is large relative to the MV/LV transformer
suppllying it
b The LV busbars supply loads which are particularly sensitive to harmonics
b A diesel (or gas-turbine, etc,) driven alternator is provided as a standby power
supply
In such cases, the manufacturer of the UPS system should be consulted
Communication equipment
Communication with equipment associated with computer systems may entail the
need for suitable facilities within the UPS system. Such facilities may be incorporated
in an original design (see Fig. N30a ), or added to existing systems on request
(see Fig. N30b ).
Fig. N30b : UPS unit achieving disponibility and quality of computer system power supply Fig. N30a : Ready-to-use UPS unit (with DIN module)
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N24
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Protection of LV/LV transformers
These transformers are generally in the range of several hundreds of VA to some
hundreds of kVA and are frequently used for:
b Changing the low voltage level for:
v Auxiliary supplies to control and indication circuits
v Lighting circuits (230 V created when the primary system is 400 V 3-phase
3-wires)
b Changing the method of earthing for certain loads having a relatively high
capacitive current to earth (computer equipment) or resistive leakage current
(electric ovens, industrial-heating processes, mass-cooking installations, etc.)
LV/LV transformers are generally supplied with protective systems incorporated,
and the manufacturers must be consulted for details. Overcurrent protection must,
in any case, be provided on the primary side. The exploitation of these transformers
requires a knowledge of their particular function, together with a number of points
described below.
Note: In the particular cases of LV/LV safety isolating transformers at extra-low
voltage, an earthed metal screen between the primary and secondary windings
is frequently required, according to circumstances, as recommended in European
Standard EN 60742.
3.1 Transformer-energizing inrush current
At the moment of energizing a transformer, high values of transient current (which
includes a signicant DC component) occur, and must be taken into account when
considering protection schemes (see Fig. N31).
Fig N31 : Transformer-energizing inrush current
In
I
I 1
st
peak
10 to 25 In
t
RMS value of
the 1
st
peak
t
20
ms
5 s
Im
I
Ii Ir
Fig N32 : Tripping characteristic of a Compact NS type STR
(electronic)
Fig N33 : Tripping characteristic of a Acti 9 curve D
The magnitude of the current peak depends on:
b The value of voltage at the instant of energization
b The magnitude and polarity of the residual ux existing in the core of the
transformer
b Characteristics of the load connected to the transformer
The rst current peak can reach a value equal to 10 to 15 times the full-load r.m.s.
current, but for small transformers (< 50 kVA) may reach values of 20 to 25 times
the nominal full-load current. This transient current decreases rapidly, with a time
constant of the order of several ms to severals tens of ms.
3.2 Protection for the supply circuit of a
LV/LV transformer
The protective device on the supply circuit for a LV/LV transformer must avoid the
possibility of incorrect operation due to the magnetizing inrush current surge, noted
above.It is necessary to use therefore:
b Selective (i.e. slighly time-delayed) circuit-breakers of the type Compact NS STR
(see Fig. N32) or
b Circuit-breakers having a very high magnetic-trip setting, of the types Compact NS
or Acti 9 curve D (see Fig. N33)
RMS value of
the 1
st
peak
In 10In 14In
I
t
Schneider Electric - Electrical installation guide 2013
N25
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Protection of LV/LV transformers
Example
A 400 V 3-phase circuit is supplying a 125 kVA 400/230 V transformer (In = 180 A)
for which the rst inrush current peak can reach 12 In, i.e. 12 x 180 = 2,160 A.
This current peak corresponds to a rms value of 1,530 A.
A compact NS 250N circuit-breaker with Ir setting of 200 A and Im setting at 8 x Ir
would therefore be a suitable protective device.
A particular case: Overload protection installed at the secondary side of the
transformer (see Fig. N34)
An advantage of overload protection located on the secondary side is that the short-
circuit protection on the primary side can be set at a high value, or alternatively a
circuit-breaker type MA (magnetic only) can be used. The primary side short-circuit
protection setting must, however, be sufciently sensitive to ensure its operation in
the event of a short-circuit occuring on the secondary side of the transformer.
Note: The primary protection is sometimes provided by fuses, type aM. This practice
has two disadvantages:
b The fuses must be largely oversized (at least 4 times the nominal full-load rated
current of the transformer)
b In order to provide isolating facilities on the primary side, either a load-break switch
or a contactor must be associated with the fuses.
3.3 Typical electrical characteristics of LV/LV 50 Hz
transformers
400/230 V
125 kVA
3 x 70 mm
2
NS250N
Trip unit
STR 22E
Fig N34 : Example
3.4 Protection of LV/LV transformers, using
Schneider Electric circuit-breakers
Acti 9 circuit-breaker
3-phase
kVA rating 5 6.3 8 10 12.5 16 20 25 31.5 40 50 63 80 100 125 160 200 250 315 400 500 630 800
No-load 100 110 130 150 160 170 270 310 350 350 410 460 520 570 680 680 790 950 1160 1240 1485 1855 2160
losses (W)
Full-load 250 320 390 500 600 840 800 1180 1240 1530 1650 2150 2540 3700 3700 5900 5900 6500 7400 9300 9400 11400 13400
losses (W)
Short-circuit 4.5 4.5 4.5 5.5 5.5 5.5 5.5 5.5 5 5 4.5 5 5 5.5 4.5 5.5 5 5 4.5 6 6 5.5 5.5
voltage (%)
1-phase
kVA rating 8 10 12.5 16 20 25 31.5 40 50 63 80 100 125 160
No-load losses (W) 105 115 120 140 150 175 200 215 265 305 450 450 525 635
Full-load losses (W) 400 530 635 730 865 1065 1200 1400 1900 2000 2450 3950 3950 4335
Short-circuit voltage (%) 5 5 5 4.5 4.5 4.5 4 4 5 5 4.5 5.5 5 5
Transformer power rating (kVA) Cricuit breaker Size
230/240 V 1-ph 230/240 V 3-ph 400/415 V 3-ph curve D or K (A)
400/415 V 1-ph
0.05 0.09 0.16 iC60, NG125 0.5
0.11 0.18 0.32 iC60, NG125 1
0.21 0.36 0.63 iC60, NG125 2
0.33 0.58 1.0 iC60, NG125 3
0.67 1.2 2.0 iC60, NG125 6
1.1 1.8 3.2 iC60, C120, NG125 10
1.7 2.9 5.0 iC60, C120, NG125 16
2.1 3.6 6.3 iC60, C120, NG125 20
2.7 4.6 8.0 iC60, C120, NG125 25
3.3 5.8 10 iC60, C120, NG125 32
4.2 7.2 13 iC60, C120, NG125 40
5.3 9.2 16 iC60, C120, NG125 50
6.7 12 20 iC60, C120, NG125 63
8.3 14 25 C120, NG125 80
11 18 32 C120, NG125 100
13 23 40 C120, NG125 125
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N26
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Compact NS100NS250 circuit-breakers with TM-D trip unit
Compact NS100NS1600 and Masterpact circuit-breakers with STR or
Micrologic trip unit
Transformer power rating (kVA) Circuit-breaker Trip unit
230/240 V 1-ph 230/240 V 3-ph 400/415 V 3-ph
400/415 V 1-ph
3 56 912 NS100N/H/L TN16D
5 89 1416 NS100N/H/L TM05D
79 1316 2228 NS100N/H/L TN40D
1215 2025 3544 NS100N/H/L TN63D
1619 2632 4556 NS100N/H/L TN80D
1823 3240 5569 NS160N/H/L TN100D
2329 4050 6987 NS160N/H/L TN125D
2937 5164 89111 NS250N/H/L TN160D
3746 6480 111139 NS250N/H/L TN200D
Transformer power rating (kVA) Circuit-breaker Trip unit Setting
230/240 V 1-ph 230/240 V 3-ph 400/415 V 3-ph Ir max
400/415 V 1-ph
47 613 1122 NS100N/H/L STR22SE 40 0.8
919 1630 2756 NS100N/H/L STR22SE 100 0.8
1530 550 4490 NS160N/H/L STR22SE 160 0.8
2346 4080 70139 NS250N/H/L STR22SE 250 0.8
3765 64112 111195 NS400N/H STR23SE / 53UE 400 0.7
3755 6495 111166 NS400L STR23SE / 53UE 400 0.6
5883 100144 175250 NS630N/H/L STR23SE / 53UE 630 0.6
58150 100250 175436 NS800N/H - NT08H1 Micrologic 5.0/6.0/7.0 1
74184 107319 222554 NS800N/H - NT08H1 - NW08N1/H1 Micrologic 5.0/6.0/7.0 1
90230 159398 277693 NS1000N/H - NT10H1 - NW10N1/H1 Micrologic 5.0/6.0/7.0 1
115288 200498 346866 NS1250N/H - NT12H1 - NW12N1/H1 Micrologic 5.0/6.0/7.0 1
147368 256640 4431,108 NS1600N/H - NT16H1 - NW16N1/H1 Micrologic 5.0/6.0/7.0 1
184460 320800 5541,385 NW20N1/H1 Micrologic 5.0/6.0/7.0 1
230575 4001,000 6901,730 NW25N2/H3 Micrologic 5.0/6.0/7.0 1
294736 5101,280 8862,217 NW32N2/H3 Micrologic 5.0/6.0/7.0 1
Schneider Electric - Electrical installation guide 2013
N27
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Lighting circuits
A source of comfort and productivity, lighting represents 15% of the quantity of
electricity consumed in industry and 40% in buildings. The quality of lighting (light
stability and continuity of service) depends on the quality of the electrical energy
thus consumed. The supply of electrical power to lighting networks has therefore
assumed great importance.
To help with their design and simplify the selection of appropriate protection devices,
an analysis of the different lamp technologies is presented. The distinctive features
of lighting circuits and their impact on control and protection devices are discussed.
Recommendations relative to the difculties of lighting circuit implementation are given.
4.1 The different lamp technologies
Articial luminous radiation can be produced from electrical energy according to two
principles: incandescence and electroluminescence.
Incandescence is the production of light via temperature elevation. The most
common example is a lament heated to white state by the circulation of an electrical
current. The energy supplied is transformed into heat by the Joule effect and into
luminous ux.
Luminescence is the phenomenon of emission by a material of visible or almost
visible luminous radiation. A gas (or vapors) subjected to an electrical discharge
emits luminous radiation (Electroluminescence of gases).
Since this gas does not conduct at normal temperature and pressure, the discharge
is produced by generating charged particles which permit ionization of the gas. The
nature, pressure and temperature of the gas determine the light spectrum.
Photoluminescence is the luminescence of a material exposed to visible or almost
visible radiation (ultraviolet, infrared).
When the substance absorbs ultraviolet radiation and emits visible radiation which
stops a short time after energization, this is uorescence.
Incandescent lamps
Incandescent lamps are historically the oldest and the most often found in common
use.
They are based on the principle of a lament rendered incandescent in a vacuum or
neutral atmosphere which prevents combustion.
A distinction is made between:
b Standard bulbs
These contain a tungsten lament and are lled with an inert gas (nitrogen and
argon or krypton).
b Halogen bulbs
These also contain a tungsten lament, but are lled with a halogen compound
and an inert gas (krypton or xenon). This halogen compound is responsible for the
phenomenon of lament regeneration, which increases the service life of the lamps
and avoids them blackening. It also enables a higher lament temperature and
therefore greater luminosity in smaller-size bulbs.
The main disadvantage of incandescent lamps is their signicant heat dissipation,
resulting in poor luminous efciency.
Fluorescent lamps
This family covers uorescent tubes and compact uorescent lamps. Their
technology is usually known as low-pressure mercury.
In uorescent tubes, an electrical discharge causes electrons to collide with
ions of mercury vapor, resulting in ultraviolet radiation due to energization of the
mercury atoms. The uorescent material, which covers the inside of the tubes, then
transforms this radiation into visible light.
Fluorescent tubes dissipate less heat and have a longer service life than
incandescent lamps, but they do need an ignition device called a starter and a
device to limit the current in the arc after ignition. This device called ballast is
usually a choke placed in series with the arc.
Compact uorescent lamps are based on the same principle as a uorescent tube.
The starter and ballast functions are provided by an electronic circuit (integrated in
the lamp) which enables the use of smaller tubes folded back on themselves.
Compact uorescent lamps (see Fig. N35) were developed to replace incandescent
lamps: They offer signicant energy savings (15 W against 75 W for the same level of
brightness) and an increased service life.
Lamps known as induction type or without electrodes operate on the principle of
ionization of the gas present in the tube by a very high frequency electromagnetic
eld (up to 1 GHz). Their service life can be as long as 100,000 hrs.
Fig. N35 : Compact uorescent lamps [a] standard,
[b] induction
a -
b -
N - Characteristics of particular sources and loads
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N28
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Discharge lamps (see Fig. N36)
The light is produced by an electrical discharge created between two electrodes within
a gas in a quartz bulb. All these lamps therefore require a ballast to limit the current in
the arc. A number of technologies have been developed for different applications.
Low-pressure sodium vapor lamps have the best light output, however the color
rendering is very poor since they only have a monochromatic orange radiation.
High-pressure sodium vapor lamps produce a white light with an orange tinge.
In high-pressure mercury vapor lamps, the discharge is produced in a quartz or
ceramic bulb at high pressure. These lamps are called uorescent mercury discharge
lamps. They produce a characteristically bluish white light.
Metal halide lamps are the latest technology. They produce a color with a broad color
spectrum. The use of a ceramic tube offers better luminous efciency and better color
stability.
Light Emitting Diodes (LED)
The principle of light emitting diodes is the emission of light by a semi-conductor
as an electrical current passes through it. LEDs are commonly found in numerous
applications, but the recent development of white or blue diodes with a high light
output opens new perspectives, especially for signaling (trafc lights, exit signs or
emergency lighting).
LEDs are low-voltage and low-current devices, thus suitable for battery-supply.
A converter is required for a line power supply.
The advantage of LEDs is their low energy consumption. As a result, they operate
at a very low temperature, giving them a very long service life. Conversely, a simple
diode has a weak light intensity. A high-power lighting installation therefore requires
connection of a large number of units in series and parallel.
Fig. N36 : Discharge lamps
Technology Application Advantages Disadvantages
Standard - Domestic use - Direct connection without - Low luminous efciency and
incandescent - Localized decorative intermediate switchgear high electricity consumption
lighting - Reasonable purchase price - Signicant heat dissipation
- Compact size - Short service life
- Instantaneous lighting
- Good color rendering
Halogen - Spot lighting - Direct connection - Average luminous efciency
incandescent - Intense lighting - Instantaneous efciency
- Excellent color rendering
Fluorescent tube - Shops, ofces, workshops - High luminous efciency - Low light intensity of single unit
- Outdoors - Average color rendering - Sensitive to extreme temperatures
Compact - Domestic use - Good luminous efciency - High initial investment
uorescent lamp - Ofces - Good color rendering compared to incandescent lamps
- Replacement of
incandescent lamps
HP mercury vapor - Workshops, halls, hangars - Good luminous efciency - Lighting and relighting time
- Factory oors - Acceptable color rendering of a few minutes
- Compact size
- Long service life
High-pressure - Outdoors - Very good luminous efciency - Lighting and relighting time
sodium - Large halls of a few minutes
Low-pressure - Outdoors - Good visibility in foggy weather - Long lighting time (5 min.)
sodium - Emergency lighting - Economical to use - Mediocre color rendering
Metal halide - Large areas - Good luminous efciency - Lighting and relighting time
- Halls with high ceilings - Good color rendering of a few minutes
- Long service life
LED - Signaling (3-color trafc - Insensitive to the number of - Limited number of colors
lights, exit signs and switching operations - Low brightness of single unit
emergency lighting) - Low energy consumption
- Low temperature
Technology Power (watt) Efciency (lumen/watt) Service life (hours)
Standard incandescent 3 1,000 10 15 1,000 2,000
Halogen incandescent 5 500 15 25 2,000 4,000
Fluorescent tube 4 56 50 100 7,500 24,000
Compact uorescent lamp 5 40 50 80 10,000 20,000
HP mercury vapor 40 1,000 25 55 16,000 24,000
High-pressure sodium 35 1,000 40 140 16,000 24,000
Low-pressure sodium 35 180 100 185 14,000 18,000
Metal halide 30 2,000 50 115 6,000 20,000
LED 0.05 0.1 10 30 40,000 100,000
Fig. N37 : Usage and technical characteristics of lighting devices
Schneider Electric - Electrical installation guide 2013
N29
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Lighting circuits
4.2 Electrical characteristics of lamps
Incandescent lamps with direct power supply
Due to the very high temperature of the lament during operation (up to 2,500 C),
its resistance varies greatly depending on whether the lamp is on or off. As the cold
resistance is low, a current peak occurs on ignition that can reach 10 to 15 times the
nominal current for a few milliseconds or even several milliseconds.
This constraint affects both ordinary lamps and halogen lamps: it imposes a
reduction in the maximum number of lamps that can be powered by devices such as
remote-control switches, modular contactors and relays for busbar trunking.
Extra Low Voltage (ELV) halogen lamps
b Some low-power halogen lamps are supplied with ELV 12 or 24 V, via a
transformer or an electronic converter. With a transformer, the magnetization
phenomenon combines with the lament resistance variation phenomenon at
switch-on. The inrush current can reach 50 to 75 times the nominal current for a few
milliseconds. The use of dimmer switches placed upstream signicantly reduces this
constraint.
b Electronic converters, with the same power rating, are more expensive than
solutions with a transformer. This commercial handicap is compensated by a greater
ease of installation since their low heat dissipation means they can be xed on a
ammable support. Moreover, they usually have built-in thermal protection.
New ELV halogen lamps are now available with a transformer integrated in their
base. They can be supplied directly from the LV line supply and can replace normal
lamps without any special adaptation.
Dimming for incandescent lamps
This can be obtained by varying the voltage applied to the lampere
This voltage variation is usually performed by a device such as a Triac dimmer
switch, by varying its ring angle in the line voltage period. The wave form of the
voltage applied to the lamp is illustrated in Figure N38a. This technique known
as cut-on control is suitable for supplying power to resistive or inductive circuits.
Another technique suitable for supplying power to capacitive circuits has been
developed with MOS or IGBT electronic components. This techniques varies the
voltage by blocking the current before the end of the half-period (see Fig. N38b) and
is known as cut-off control.
Switching on the lamp gradually can also reduce, or even eliminate, the current peak
on ignition.
As the lamp current is distorted by the electronic switching, harmonic currents
are produced. The 3
rd
harmonic order is predominant, and the percentage of 3
rd
harmonic current related to the maximum fundamental current (at maximum power)
is represented on Figure N39.
Note that in practice, the power applied to the lamp by a dimmer switch can only vary
in the range between 15 and 85% of the maximum power of the lampere
300
200
100
0
0
t (s)
t (s)
0.01 0.02
-100
-200
-300
300
a]
b]
200
100
0
0 0.01 0.02
-100
-200
-300
Fig. N38 : Shape of the voltage supplied by a light dimmer at
50% of maximum voltage with the following techniques:
a] cut-on control
b] cut-off control
0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0
50.0
45.0
40.0
35.0
30.0
25.0
20.0
15.0
10.0
5.0
0
i3 (%)
Power (%)
Fig. N39 : Percentage of 3
rd
harmonic current as a function of the power applied to an
incandescent lamp using an electronic dimmer switch
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N30
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
According to IEC standard 61000-3-2 setting harmonic emission limits for electric or
electronic systems with current y 16 A, the following arrangements apply:
b Independent dimmers for incandescent lamps with a rated power less than or
equal to 1 kW have no limits applied
b Otherwise, or for incandescent lighting equipment with built-in dimmer or dimmer
built in an enclosure, the maximum permissible 3
rd
harmonic current is equal to
2.30 A
Fluorescent lamps with magnetic ballast
Fluorescent tubes and discharge lamps require the intensity of the arc to be limited,
and this function is fullled by a choke (or magnetic ballast) placed in series with the
bulb itself (see Fig. N40).
This arrangement is most commonly used in domestic applications with a limited
number of tubes. No particular constraint applies to the switches.
Dimmer switches are not compatible with magnetic ballasts: the cancellation of the
voltage for a fraction of the period interrupts the discharge and totally extinguishes
the lampere
The starter has a dual function: preheating the tube electrodes, and then generating
an overvoltage to ignite the tube. This overvoltage is generated by the opening of a
contact (controlled by a thermal switch) which interrupts the current circulating in the
magnetic ballast.
During operation of the starter (approx. 1 s), the current drawn by the luminaire is
approximately twice the nominal current.
Since the current drawn by the tube and ballast assembly is essentially inductive, the
power factor is very low (on average between 0.4 and 0.5). In installations consisting
of a large number of tubes, it is necessary to provide compensation to improve the
power factor.
For large lighting installations, centralized compensation with capacitor banks is a
possible solution, but more often this compensation is included at the level of each
luminaire in a variety of different layouts (see Fig. N41).
Fig. N40 : Magnetic ballasts
a
a] b] c]
C
Ballast
Lamp
Ballast
Lamp
C
a
Ballast
Lamp C a
Ballast
Lamp
Fig. N41 : The various compensation layouts: a] parallel; b] series; c] dual series also called
duo and their elds of application
The compensation capacitors are therefore sized so that the global power factor is
greater than 0.85. In the most common case of parallel compensation, its capacity
is on average 1 F for 10 W of active power, for any type of lampere However, this
compensation is incompatible with dimmer switches.
Constraints affecting compensation
The layout for parallel compensation creates constraints on ignition of the lampere
Since the capacitor is initially discharged, switch-on produces an overcurrent.
An overvoltage also appears, due to the oscillations in the circuit made up of the
capacitor and the power supply inductance.
The following example can be used to determine the orders of magnitude.
Compensation layout Application Comments
Without compensation Domestic Single connection
Parallel [a] Ofces, workshops,
superstores
Risk of overcurrents for control devices
Series [b] Choose capacitors with high
operating voltage (450 to 480 V)
Duo [c] Avoids icker
Schneider Electric - Electrical installation guide 2013
N31
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Lighting circuits
Assuming an assembly of 50 uorescent tubes of 36 W each:
b Total active power: 1,800 W
b Apparent power: 2 kVA
b Total rms current: 9 A
b Peak current: 13 A
With:
b A total capacity: C = 175 F
b A line inductance (corresponding to a short-circuit current of 5 kA): L = 150 H
The maximum peak current at switch-on equals:
I c V
C
L
= = =
max
-6
-6
x 10
x 10
A 230 2
175
150
350
The theoretical peak current at switch-on can therefore reach 27 times the peak
current during normal operation.
The shape of the voltage and current at ignition is given in Figure N42 for switch
closing at the line supply voltage peak.
There is therefore a risk of contact welding in electromechanical control devices
(remote-control switch, contactor, circuit-breaker) or destruction of solid state
switches with semi-conductors.
Fig. N42 : Power supply voltage at switch-on and inrush current
600
400
200
0
-200
-400
-600
0
(V)
t (s)
0.02 0.04 0.06
300
200
100
0
-100
-200
-300
0
(A)
t (s)
0.02 0.04 0.06
In reality, the constraints are usually less severe, due to the impedance of the cables.
Ignition of uorescent tubes in groups implies one specic constraint. When a group
of tubes is already switched on, the compensation capacitors in these tubes which
are already energized participate in the inrush current at the moment of ignition of
a second group of tubes: they amplify the current peak in the control switch at the
moment of ignition of the second group.
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N32
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
The table in Figure N43, resulting from measurements, species the magnitude of
the rst current peak, for different values of prospective short-circuit current Isc. It is
seen that the current peak can be multiplied by 2 or 3, depending on the number of
tubes already in use at the moment of connection of the last group of tubes.
Fig. N43 : Magnitude of the current peak in the control switch of the moment of ignition of a
second group of tubes
Number of tubes Number of tubes Inrush current peak (A)
already in use connected Isc = 1,500 A Isc = 3,000 A Isc = 6,000 A
0 14 233 250 320
14 14 558 556 575
28 14 608 607 624
42 14 618 616 632
Nonetheless, sequential ignition of each group of tubes is recommended so as to
reduce the current peak in the main switch.
The most recent magnetic ballasts are known as low-loss. The magnetic circuit has
been optimized, but the operating principle remains the same. This new generation
of ballasts is coming into widespread use, under the inuence of new regulations
(European Directive, Energy Policy Act - USA).
In these conditions, the use of electronic ballasts is likely to increase, to the
detriment of magnetic ballasts.
Fluorescent lamps with electronic ballast
Electronic ballasts are used as a replacement for magnetic ballasts to supply power
to uorescent tubes (including compact uorescent lamps) and discharge lamps.
They also provide the starter function and do not need any compensation capacity.
The principle of the electronic ballast (see Fig. N44) consists of supplying the lamp
arc via an electronic device that generates a rectangular form AC voltage with a
frequency between 20 and 60 kHz.
Supplying the arc with a high-frequency voltage can totally eliminate the icker
phenomenon and strobe effects. The electronic ballast is totally silent.
During the preheating period of a discharge lamp, this ballast supplies the lamp with
increasing voltage, imposing an almost constant current. In steady state, it regulates
the voltage applied to the lamp independently of any uctuations in the line voltage.
Since the arc is supplied in optimum voltage conditions, this results in energy
savings of 5 to 10% and increased lamp service life. Moreover, the efciency of the
electronic ballast can exceed 93%, whereas the average efciency of a magnetic
device is only 85%.
The power factor is high (> 0.9).
The electronic ballast is also used to provide the light dimming function. Varying the
frequency in fact varies the current magnitude in the arc and hence the luminous
intensity.
Inrush current
The main constraint that electronic ballasts bring to line supplies is the high
inrush current on switch-on linked to the initial load of the smoothing capacitors
(see Fig. N45).
Fig. N44 : Electronic ballast
Fig. N45 : Orders of magnitude of the inrush current maximum values, depending on the
technologies used
Technology Max. inrush current Duration
Rectier with PFC 30 to 100 In y 1 ms
Rectier with choke 10 to 30 In y 5 ms
Magnetic ballast y 13 In 5 to 10 ms
Schneider Electric - Electrical installation guide 2013
N33
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Lighting circuits
In reality, due to the wiring impedances, the inrush currents for an assembly of lamps
is much lower than these values, in the order of 5 to 10 In for less than 5 ms.
Unlike magnetic ballasts, this inrush current is not accompanied by an overvoltage.
Harmonic currents
For ballasts associated with high-power discharge lamps, the current drawn from
the line supply has a low total harmonic distortion (< 20% in general and < 10% for
the most sophisticated devices). Conversely, devices associated with low-power
lamps, in particular compact uorescent lamps, draw a very distorted current
(see Fig. N46). The total harmonic distortion can be as high as 150%. In these
conditions, the rms current drawn from the line supply equals 1.8 times the current
corresponding to the lamp active power, which corresponds to a power factor of 0.55.
Fig. N46 : Shape of the current drawn by a compact uorescent lamp
0.6
0.4
0.2
0
-0.2
-0.4
-0.6
0
(A)
t (s)
0.02
In order to balance the load between the different phases, lighting circuits are usually
connected between phases and neutral in a balanced way. In these conditions,
the high level of third harmonic and harmonics that are multiple of 3 can cause an
overload of the neutral conductor. The least favorable situation leads to a neutral
current which may reach 3 times the current in each phase.
Harmonic emission limits for electric or electronic systems are set by IEC standard
61000-3-2. For simplication, the limits for lighting equipment are given here only for
harmonic orders 3 and 5 which are the most relevant (see Fig. N47).
Fig. N47 : Maximum permissible harmonic current
Harmonic Active input Active input power y 25W
order power > 25W one of the 2 sets of limits apply:
% of fundamental % of fundamental Harmonic current relative
current current to active power
3 30 86 3.4 mA/W
5 10 61 1.9 mA/W
Leakage currents
Electronic ballasts usually have capacitors placed between the power supply
conductors and the earth. These interference-suppressing capacitors are responsible
for the circulation of a permanent leakage current in the order of 0.5 to 1 mA per
ballast. This therefore results in a limit being placed on the number of ballasts that
can be supplied by a Residual Current Differential Safety Device (RCD).
At switch-on, the initial load of these capacitors can also cause the circulation of a
current peak whose magnitude can reach several amps for 10 s. This current peak
may cause unwanted tripping of unsuitable devices.
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N34
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
High-frequency emissions
Electronic ballasts are responsible for high-frequency conducted and radiated
emissions.
The very steep rising edges applied to the ballast output conductors cause current
pulses circulating in the stray capacities to earth. As a result, stray currents circulate
in the earth conductor and the power supply conductors. Due to the high frequency
of these currents, there is also electromagnetic radiation. To limit these HF emissions,
the lamp should be placed in the immediate proximity of the ballast, thus reducing
the length of the most strongly radiating conductors.
The different power supply modes (see Fig. N48)
Technology Power supply mode Other device
Standard incandescent Direct power supply Dimmer switch
Halogen incandescent
ELV halogen incandescent Transformer Electronic converter
Fluorescent tube Magnetic ballast and starter Electronic ballast
Electronic dimmer +
ballast
Compact uorescent lamp Built-in electronic ballast
Mercury vapor Magnetic ballast Electronic ballast
High-pressure sodium
Low-pressure sodium
Metal halide
Fig. N48 : Different power supply modes
4.3 Constraints related to lighting devices and
recommendations
The current actually drawn by luminaires
The risk
This characteristic is the rst one that should be dened when creating an
installation, otherwise it is highly probable that overload protection devices will trip
and users may often nd themselves in the dark.
It is evident that their determination should take into account the consumption of
all components, especially for uorescent lighting installations, since the power
consumed by the ballasts has to be added to that of the tubes and bulbs.
The solution
For incandescent lighting, it should be remembered that the line voltage can be more
than 10% of its nominal value, which would then cause an increase in the current
drawn.
For uorescent lighting, unless otherwise specied, the power of the magnetic
ballasts can be assessed at 25% of that of the bulbs. For electronic ballasts, this
power is lower, in the order of 5 to 10%.
The thresholds for the overcurrent protection devices should therefore be calculated
as a function of the total power and the power factor, calculated for each circuit.
Overcurrents at switch-on
The risk
The devices used for control and protection of lighting circuits are those such as
relays, triac, remote-control switches, contactors or circuit-breakers.
The main constraint applied to these devices is the current peak on energization.
This current peak depends on the technology of the lamps used, but also on the
installation characteristics (supply transformer power, length of cables, number of
lamps) and the moment of energization in the line voltage period. A high current
peak, however eeting, can cause the contacts on an electromechanical control
device to weld together or the destruction of a solid state device with semi-
conductors.
Schneider Electric - Electrical installation guide 2013
N35
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Lighting circuits
Two solutions
Because of the inrush current, the majority of ordinary relays are incompatible with
lighting device power supply. The following recommendations are therefore usually
made:
b Limit the number of lamps to be connected to a single device so that their total
power is less than the maximum permissible power for the device
b Check with the manufacturers what operating limits they suggest for the devices.
This precaution is particularly important when replacing incandescent lamps with
compact uorescent lamps
By way of example, the table in Figure N49 indicates the maximum number of
compensated uorescent tubes that can be controlled by different devices with
16 A rating. Note that the number of controlled tubes is well below the number
corresponding to the maximum power for the devices.
Fig. N49 : The number of controlled tubes is well below the number corresponding to the
maximum power for the devices
Tube unit power Number of tubes Maximum number of tubes that can be
requirement corresponding controlled by
(W) to the power Contactors Remote Circuit-
16 A x 230 V GC16 A control breakers
CT16 A switches C60-16 A
TL16 A
18 204 15 50 112
36 102 15 25 56
58 63 10 16 34
But a technique exists to limit the current peak on energization of circuits with
capacitive behavior (magnetic ballasts with parallel compensation and electronic
ballasts). It consists of ensuring that activation occurs at the moment when the line
voltage passes through zero. Only solid state switches with semi-conductors offer
this possibility (see Fig. N50a). This technique has proved to be particularly useful
when designing new lighting circuits.
More recently, hybrid technology devices have been developed that combine a solid
state switch (activation on voltage passage through zero) and an electromechanical
contactor short-circuiting the solid state switch (reduction of losses in the semi-
conductors) (see Fig. N50b).
Fig. N50 : Standard CT+ contactor [a], CT+ contactor with manual override, pushbutton for
selection of operating mode and indicator lamp showing the active operating mode [b], and TL +
remote-control switch [c] (Schneider-Electric brand)
a b c
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N36
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Choice of relay rating according to lamp type
b Figure 51 below shows the maximum number of light ttings for each relay,
according to the type, power and conguration of a given lamp. As an indication, the
total acceptable power is also mentioned.
b These values are given for a 230 V circuit with 2 active conductors (single-phase
phase/neutral or two-phase phase/phase). For 110 V circuits, divide the values in the
table by 2.
b To obtain the equivalent values for the whole of a 230 V three-phase circuit,
multiply the number of lamps and the total acceptable power:
v by 3 (1.73) for circuits without neutral;
v by 3 for circuits with neutral.
Note: The power ratings of the lamps most commonly used are shown in bold.
Modular contactors and impulse relays do
not use the same technologies. Their rating is
determined according to different standards.
For example, for a given rating, an impulse
relay is more efcient than a modular
contactor for the control of light ttings with
a strong inrush current, or with a low power
factor (non-compensated inductive circuit).
Type
of lamp
Unit power
and capacitance of power factor
correction capacitor
Maximum number of light ttings for a single-phase circuit
and maximum power output per circuit
TL impulse relay CT contactor
16 A 32 A 16 A 25 A 40 A 63 A
Basic incandescent lamps
LV halogen lamps
Replacement mercury vapour lamps (without ballast)
40 W 40 1500 W
to
1600 W
106 4000 W
to
4200 W
38 1550 W
to
2000 W
57 2300 W
to
2850 W
115 4600 W
to
5250 W
172 6900 W
to
7500 W
60 W 25 66 30 45 85 125
75 W 20 53 25 38 70 100
100 W 16 42 19 28 50 73
150 W 10 28 12 18 35 50
200 W 8 21 10 14 26 37
300 W 5 1500 W 13 4000 W 7 2100 W 10 3000 W 18 5500 W
to
6000 W
25 7500 W
to
8000 W
500 W 3 8 4 6 10 15
1000 W 1 4 2 3 6 8
1500 W 1 2 1 2 4 5
ELV 12 or 24 V halogen lamps
With ferromagnetic transformer 20 W 70 1350 W
to
1450 W
180 3600 W
to
3750 W
15 300 W
to
600 W
23 450 W
to
900 W
42 850 W
to
1950 W
63 1250 W
to
2850 W
50 W 28 74 10 15 27 42
75 W 19 50 8 12 23 35
100 W 14 37 6 8 18 27
With electronic transformer 20 W 60 1200 W
to
1400 W
160 3200 W
to
3350 W
62 1250 W
to
1600 W
90 1850 W
to
2250 W
182 3650 W
to
4200 W
275 5500 W
to
6000 W
50 W 25 65 25 39 76 114
75 W 18 44 20 28 53 78
100 W 14 33 16 22 42 60
Fluorescent tubes with starter and ferromagnetic ballast
1 tube
without compensation (1)
15 W 83 1250 W
to
1300 W
213 3200 W
to
3350 W
22 330 W
to
850 W
30 450 W
to
1200 W
70 1050 W
to
2400 W
100 1500 W
to
3850 W
18 W 70 186 22 30 70 100
20 W 62 160 22 30 70 100
36 W 35 93 20 28 60 90
40 W 31 81 20 28 60 90
58 W 21 55 13 17 35 56
65 W 20 50 13 17 35 56
80 W 16 41 10 15 30 48
115 W 11 29 7 10 20 32
1 tube
with parallel compensation (2)
15 W 5 F 60 900 W 160 2400 W 15 200 W
to
800 W
20 300 W
to
1200 W
40 600 W
to
2400 W
60 900 W
to
3500 W
18 W 5 F 50 133 15 20 40 60
20 W 5 F 45 120 15 20 40 60
36 W 5 F 25 66 15 20 40 60
40 W 5 F 22 60 15 20 40 60
58 W 7 F 16 42 10 15 30 43
65 W 7 F 13 37 10 15 30 43
80 W 7 F 11 30 10 15 30 43
115 W 16 F 7 20 5 7 14 20
2 or 4 tubes
with series compensation
2 x 18 W 56 2000 W 148 5300 W 30 1100 W
to
1500 W
46 1650 W
to
2400 W
80 2900 W
to
3800 W
123 4450 W
to
5900 W
4 x 18 W 28 74 16 24 44 68
2 x 36 W 28 74 16 24 44 68
2 x 58 W 17 45 10 16 27 42
2 x 65 W 15 40 10 16 27 42
2 x 80 W 12 33 9 13 22 34
2 x 115 W 8 23 6 10 16 25
Fluorescent tubes with electronic ballast
1 or 2 tubes 18 W 80 1450 W
to
1550 W
212 3800 W
to
4000 W
74 1300 W
to
1400 W
111 2000 W
to
2200 W
222 4000 W
to
4400 W
333 6000 W
to
6600 W
36 W 40 106 38 58 117 176
58 W 26 69 25 37 74 111
2 x 18 W 40 106 36 55 111 166
2 x 36 W 20 53 20 30 60 90
2 x 58 W 13 34 12 19 38 57
Fig. N51 : Maximum number of light ttings for each relay, according to the type, power and conguration of a given lamp (Continued on opposite page)
Schneider Electric - Electrical installation guide 2013
N37
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Lighting circuits
Type
of lamp
Unit power
and capacitance of power factor
correction capacitor
Maximum number of light ttings for a single-phase circuit
and maximum power output per circuit
TL impulse relay CT contactor
16 A 32 A 16 A 25 A 40 A 63 A
Compact uorescent lamps
With external electronic ballast 5 W 240 1200 W
to
1450 W
630 3150 W
to
3800 W
210 1050 W
to
1300 W
330 1650 W
to
2000 W
670 3350 W
to
4000 W
not tested
7 W 171 457 150 222 478
9 W 138 366 122 194 383
11 W 118 318 104 163 327
18 W 77 202 66 105 216
26 W 55 146 50 76 153
With integral electronic ballast
(replacement for incandescent
lamps)
5 W 170 850 W
to
1050 W
390 1950 W
to
2400 W
160 800 W
to
900 W
230 1150 W
to
1300 W
470 2350 W
to
2600 W
710 3550 W
to
3950 W
7 W 121 285 114 164 335 514
9 W 100 233 94 133 266 411
11 W 86 200 78 109 222 340
18 W 55 127 48 69 138 213
26 W 40 92 34 50 100 151
High-pressure mercury vapour lamps with ferromagnetic ballast without ignitor
Replacement high-pressure sodium vapour lamps with ferromagnetic ballast with integral ignitor (3)
Without compensation (1) 50 W not tested,
infrequent use
15 750 W
to
1000 W
20 1000 W
to
1600 W
34 1700 W
to
2800 W
53 2650 W
to
4200 W
80 W 10 15 27 40
125 / 110 W (3) 8 10 20 28
250 / 220 W (3) 4 6 10 15
400 / 350 W (3) 2 4 6 10
700 W 1 2 4 6
With parallel compensation (2) 50 W 7 F 10 500 W
to
1400 W
15 750 W
to
1600 W
28 1400 W
to
3500 W
43 2150 W
to
5000 W
80 W 8 F 9 13 25 38
125 / 110 W (3) 10 F 9 10 20 30
250 / 220 W (3) 18 F 4 6 11 17
400 / 350 W (3) 25 F 3 4 8 12
700 W 40 F 2 2 5 7
1000 W 60 F 0 1 3 5
Low-pressure sodium vapour lamps with ferromagnetic ballast with external ignitor
Without compensation (1) 35 W not tested,
infrequent use
5 270 W
to
360 W
9 320 W
to
720 W
14 500 W
to
1100 W
24 850 W
to
1800 W
55 W 5 9 14 24
90 W 3 6 9 19
135 W 2 4 6 10
180 W 2 4 6 10
With parallel compensation (2) 35 W 20 F 38 1350 W 102 3600 W 3 100 W
to
180 W
5 175 W
to
360 W
10 350 W
to
720 W
15 550 W
to
1100 W
55 W 20 F 24 63 3 5 10 15
90 W 26 F 15 40 2 4 8 11
135 W 40 F 10 26 1 2 5 7
180 W 45 F 7 18 1 2 4 6
High-pressure sodium vapour lamps
Metal-iodide lamps
With ferromagnetic ballast with
external ignitor, without
compensation (1)
35 W not tested,
infrequent use
16 600 W 24 850 W
to
1200 W
42 1450 W
to
2000 W
64 2250 W
to
3200 W
70 W 8 12 20 32
150 W 4 7 13 18
250 W 2 4 8 11
400 W 1 3 5 8
1000 W 0 1 2 3
With ferromagnetic ballast with
external ignitor and parallel
compensation (2)
35 W 6 F 34 1200 W
to
1350 W
88 3100 W
to
3400 W
12 450 W
to
1000 W
18 650 W
to
2000 W
31 1100 W
to
4000 W
50 1750 W
to
6000 W
70 W 12 F 17 45 6 9 16 25
150 W 20 F 8 22 4 6 10 15
250 W 32 F 5 13 3 4 7 10
400 W 45 F 3 8 2 3 5 7
1000 W 60 F 1 3 1 2 3 5
2000 W 85 F 0 1 0 1 2 3
With electronic ballast 35 W 38 1350 W
to
2200 W
87 3100 W
to
5000 W
24 850 W
to
1350 W
38 1350 W
to
2200 W
68 2400 W
to
4000 W
102 3600 W
to
6000 W
70 W 29 77 18 29 51 76
150 W 14 33 9 14 26 40
(1) Circuits with non-compensated ferromagnetic ballasts consume twice as much current for a given lamp power output. This explains the small number of lamps in this
conguration.
(2) The total capacitance of the power factor correction capacitors in parallel in a circuit limits the number of lamps that can be controlled by a contactor. The total
downstream capacitance of a modular contactor of rating 16, 25, 40 or 63 A should not exceed 75, 100, 200 or 300 F respectively. Allow for these limits to calculate the
maximum acceptable number of lamps if the capacitance values are different from those in the table.
(3) High-pressure mercury vapour lamps without ignitor, of power 125, 250 and 400 W, are gradually being replaced by high-pressure sodium vapour lamps with integral
ignitor, and respective power of 110, 220 and 350 W.
Fig. N51 : Maximum number of light ttings for each relay, according to the type, power and conguration of a given lamp (Concluded)
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N38
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Protection of lamp circuits: Maximum number of lamps and MCB rating versus
lamp type, unit power and MCB tripping curve
During start up of discharge lamps (with their ballast), the inrush current drawn by
each lamp may be in the order of:
b 25 x circuit start current for the rst 3 ms
b 7 x circuit start current for the following 2 s
For uorescent lamps with High Frequency Electronic control ballast, the protective
device ratings must cope with 25 x inrush for 250 to 350 s.
However due to the circuit resistance the total inrush current seen by the MCB is
lower than the summation of all individual lamp inrush current if directly connected to
the MCB.
The tables below (see Fig. N52 to NXX) take into account:
b Circuits cables have a length of 20 meters from distribution board to the rst lamp
and 7 meters between each additional ttings.
b MCB rating is given to protect the lamp circuit in accordance with the cable cross
section, and without unwanted tripping upon lamp starting.
b MCB tripping curve (C = instantaneous trip setting 5 to 10 In, D = instantaneous
trip setting 10 to 14 In).
Fig. N52 : Fluorescent tubes with electronic ballast - Vac = 230 V
Lamp
power (W)
Number of lamps per circuit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
MCB rating C & D tripping curve
14/18 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
14 x2 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
14 x3 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10
14 x4 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10
18 x2 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
18 x4 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 10
21/24 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
21/24 x2 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
28 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
28 x2 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10
35/36/39 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
35/36 x2 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10
38/39 x2 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 10 10
40/42 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
40/42 x2 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 10 10 16
49/50 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
49/50 x2 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 16 16 16 16
54/55 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10
54/55 x2 6 6 6 6 6 6 6 6 10 10 10 10 10 10 16 16 16 16 16 16
60 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10
Lamp
power (W)
Number of lamps per circuit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
MCB rating C & D tripping curve
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
9 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
11 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
13 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
14 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
15 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
16 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
17 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
18 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
20 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
21 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
23 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
25 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 10
Fig. N53 : Compact uorescent lamps - Vac = 230 V
Schneider Electric - Electrical installation guide 2013
N39
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Lighting circuits
Fig. N54 : High pressure mercury vapour (with ferromagnetic ballast and PF correction) - Vac = 230 V
Lamp
power (W)
Number of lamps per circuit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
MCB rating C tripping curve
50 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10
80 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 10 16 16 16
125 6 6 6 10 10 10 10 10 10 10 10 16 16 16 16 16 16 16 20 20
250 6 10 10 16 16 16 16 16 16 20 20 25 25 25 32 32 32 32 40 40
400 6 16 20 25 25 32 32 32 32 32 32 40 40 40 50 50 50 50 63 63
1000 16 32 40 50 50 50 50 63 63 - - - - - - - - - - -
MCB rating D tripping curve
50 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10
80 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 10 16 16 16
125 6 6 6 6 6 6 10 10 10 10 10 16 16 16 16 16 16 16 20 20
250 6 6 10 10 10 10 16 16 16 20 20 25 25 25 32 32 32 32 40 40
400 6 10 16 16 20 20 25 25 25 32 32 40 40 40 50 50 50 50 63 63
1000 10 20 25 32 40 40 50 63 63 - - - - - - - - - - -
Fig. N55 : Low pressure sodium (with PF correction) - Vac = 230 V
Lamp
power (W)
Number of lamps per circuit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
MCB rating C tripping curve
Ferromagnetic ballast
18 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
26 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
35/36 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
55 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 10
91 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 10 16 16 16 16
131 6 6 6 10 10 10 10 10 10 10 10 10 16 16 16 16 16 16 16 20
135 6 6 6 10 10 10 10 10 10 10 10 16 16 16 16 16 16 20 20 20
180 6 6 10 10 10 10 10 10 16 16 16 16 20 20 20 20 25 25 25 25
Electronic ballast
36 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
55 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
66 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10
91 6 6 6 6 6 10 10 10 10 10 10 10 10 10 10 10 16 16 16 16
MCB rating D tripping curve
Ferromagnetic ballast
18 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
26 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
35/36 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
55 6 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10
91 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 16 16 16 16
131 6 6 6 6 6 6 6 10 10 10 10 10 16 16 16 16 16 16 16 20
135 6 6 6 6 6 6 10 10 10 10 10 16 16 16 16 16 16 20 20 20
180 6 6 6 6 10 10 10 10 16 16 16 16 20 20 20 20 25 25 25 25
Electronic ballast
36 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
55 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
66 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10
91 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 10 16 16 16 16
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N40
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. N56 : High pressure sodium (with PF correction) - Vac = 230 V
Lamp
power (W)
Number of lamps per circuit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
MCB rating C tripping curve
Ferromagnetic ballast
50 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10
70 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 10 16 16 16
100 6 6 6 6 6 6 6 6 10 10 10 10 10 16 16 16 16 16 16 16
150 6 6 10 10 10 10 10 10 6 16 16 16 16 16 16 20 20 20 25 25
250 6 10 16 16 16 20 20 20 20 20 20 25 25 25 32 32 32 32 40 40
400 10 16 20 25 32 32 32 32 32 32 32 40 40 40 50 50 50 50 63 63
1000 16 32 40 50 50 50 50 63 63 - - - - - - - - - - -
Electronic ballast
35 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
50 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 10
100 6 6 6 6 6 6 6 6 10 10 10 10 10 10 16 16 16 16 16 16
MCB rating D tripping curve
Ferromagnetic ballast
50 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10
70 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 10 16 16 16
100 6 6 6 6 6 6 6 6 10 10 10 10 10 16 16 16 16 16 16 16
150 6 6 6 6 6 10 10 10 10 16 16 16 16 16 16 20 20 20 25 25
250 6 6 10 10 16 16 16 16 16 20 20 25 25 25 32 32 32 32 40 40
400 6 10 16 16 20 20 25 25 25 32 32 40 40 40 50 50 50 50 63 63
1000 10 20 32 32 40 40 50 63 63 - - - - - - - - - - -
Electronic ballast
35 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
50 6 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 10
100 6 6 6 6 6 6 6 6 10 10 10 10 10 10 16 16 16 16 16 16
Fig. N57 : Metal halide (with PF correction) - Vac = 230 V
Lamp
power (W)
Number of lamps per circuit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
MCB rating C tripping curve
Ferromagnetic ballast
35 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
70 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 10 16 16 16
150 6 6 10 10 10 10 10 10 10 16 16 16 16 16 16 20 20 20 25 25
250 6 10 16 16 16 20 20 20 20 20 20 25 25 25 32 32 32 32 40 40
400 6 16 20 25 25 32 32 32 32 32 32 40 40 40 50 50 50 50 63 63
1000 16 32 40 50 50 50 50 63 63 63 63 63 63 63 63 63 63 63 63 63
1800/2000 25 50 63 63 63 - - - - - - - - - - - - - - -
Electronic ballast
35 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
70 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 10 10
150 6 6 6 10 10 10 10 10 10 10 16 16 16 16 16 16 16 20 20 20
MCB rating D tripping curve
Ferromagnetic ballast
35 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
70 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 16 16 16
150 6 6 6 6 6 10 10 10 10 16 16 16 16 16 16 20 20 20 25 25
250 6 6 10 10 16 16 16 16 16 20 20 25 25 25 32 32 32 32 40 40
400 6 10 16 16 20 20 25 25 25 32 32 40 40 40 50 50 50 50 63 63
1000 16 20 32 32 40 50 50 63 63 - - - - - - - - - - -
1800 16 32 40 50 63 63 - - - - - - - - - - - - - -
2000 20 32 40 50 63 - - - - - - - - - - - - - - -
Electronic ballast
35 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
70 6 6 6 6 6 6 6 6 6 6 6 6 10 10 10 10 10 10 10 10
150 6 6 6 6 6 6 6 10 10 10 16 16 16 16 16 16 16 20 20 20
Fig. N58 : Metal halide (with ferromagnetic ballast and PF correction) - Vac = 400 V
Lamp
power (W)
Number of lamps per circuit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
MCB rating C tripping curve
1800 16 32 40 50 50 50 50 63 63 - - - - - - - - - - -
2000 16 32 40 50 50 50 50 63 63 - - - - - - - - - - -
MCB rating D tripping curve
1800 16 20 32 32 32 32 50 63 63 - - - - - - - - - - -
2000 16 25 32 32 32 32 50 63 - - - - - - - - - - - -
Schneider Electric - Electrical installation guide 2013
N41
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Overload of the neutral conductor
The risk
In an installation including, for example, numerous uorescent tubes with electronic
ballasts supplied between phases and neutral, a high percentage of 3
rd
harmonic
current can cause an overload of the neutral conductor. Figure N59 below gives an
overview of typical H3 level created by lighting.
Fig. N59 : Overview of typical H3 level created by lighting
The solution
Firstly, the use of a neutral conductor with a small cross-section (half) should be
prohibited, as requested by Installation standard IEC 60364, section 52353.
As far as overcurrent protection devices are concerned, it is necessary to provide
4-pole circuit-breakers with protected neutral (except with the TN-C system for which
the PEN, a combined neutral and protection conductor, should not be cut).
This type of device can also be used for the breaking of all poles necessary to supply
luminaires at the phase-to-phase voltage in the event of a fault.
A breaking device should therefore interrupt the phase and Neutral circuit
simultaneously.
Leakage currents to earth
The risk
At switch-on, the earth capacitances of the electronic ballasts are responsible for
residual current peaks that are likely to cause unintentional tripping of protection
devices.
Two solutions
The use of Residual Current Devices providing immunity against this type of impulse
current is recommended, even essential, when equipping an existing installation
(see Fig. N60).
For a new installation, it is sensible to provide solid state or hybrid control devices
(contactors and remote-control switches) that reduce these impulse currents
(activation on voltage passage through zero).
Overvoltages
The risk
As illustrated in earlier sections, switching on a lighting circuit causes a transient state
which is manifested by a signicant overcurrent. This overcurrent is accompanied by a
strong voltage uctuation applied to the load terminals connected to the same circuit.
These voltage uctuations can be detrimental to correct operation of sensitive loads
(micro-computers, temperature controllers, etc.)
The Solution
It is advisable to separate the power supply for these sensitive loads from the lighting
circuit power supply.
Sensitivity of lighting devices to line voltage disturbances
Short interruptions
b The risk
Discharge lamps require a relighting time of a few minutes after their power supply
has been switched off.
b The solution
Partial lighting with instantaneous relighting (incandescent lamps or uorescent
tubes, or hot restrike discharge lamps) should be provided if safety requirements so
dictate. Its power supply circuit is, depending on current regulations, usually distinct
from the main lighting circuit.
Lamp type Typical power Setting mode Typical H3 level
Incandescend lamp 100 W Light dimmer 5 to 45 %
with dimmer
ELV halogen lamp 25 W Electronic ELV 5 %
transformer
Fluorescent tube 100 W Magnetic ballast 10 %
< 25 W Electronic ballast 85 %
> 25 W + PFC 30 %
Discharge lamp 100 W Magnetic ballast 10 %
Electrical ballast 30 %
4 Lighting circuits
Fig. N60 : s.i. residual current devices with immunity against
impulse currents (Schneider-Electric brand)
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N42
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Voltage uctuations
b The risk
The majority of lighting devices (with the exception of lamps supplied by electronic
ballasts) are sensitive to rapid uctuations in the supply voltage. These uctuations
cause a icker phenomenon which is unpleasant for users and may even cause
signicant problems. These problems depend on both the frequency of variations
and their magnitude.
Standard IEC 61000-2-2 (compatibility levels for low-frequency conducted
disturbances) species the maximum permissible magnitude of voltage variations as
a function of the number of variations per second or per minute.
These voltage uctuations are caused mainly by high-power uctuating loads (arc
furnaces, welding machines, starting motors).
b The solution
Special methods can be used to reduce voltage uctuations. Nonetheless, it is
advisable, wherever possible, to supply lighting circuits via a separate line supply.
The use of electronic ballasts is recommended for demanding applications
(hospitals, clean rooms, inspection rooms, computer rooms, etc).
Developments in control and protection equipment
The use of light dimmers is more and more common. The constraints on ignition are
therefore reduced and derating of control and protection equipment is less important.
New protection devices adapted to the constraints on lighting circuits are being
introduced, for example Schneider Electric brand circuit-breakers and modular
residual current circuit-breakers with special immunity, such as s.i. type ID switches
and Vigi circuit-breakers. As control and protection equipment evolves, some now
offer remote control, 24-hour management, lighting control, reduced consumption,
etc.
4.4 Lighting of public areas
Normal lighting
Regulations governing the minimum requirements for buildings receiving the public in
most European countries are as follows:
b Installations which illuminates areas accessible to the public must be controlled
and protected independently from installations providing illumination to other areas
b Loss of supply on a nal lighting circuit (i.e. fuse blown or CB tripped) must not
result in total loss of illumination in an area which is capable of accommodating more
than 50 persons
b Protection by Residual Current Devices (RCD) must be divided amongst several
devices (i.e. more than on device must be used)
Emergency lighting and other systems
When we refer to emergency lighting, we mean the auxiliary lighting that is triggered
when the standard lighting fails.
Emergency lighting is subdivided as follows (EN-1838):
Safety lighting
It originates from the emergency lighting and is intended to provide lighting for people to
evacuate an area safely or for those who try to nish a potentially dangerous operation before
leaving the area. It is intended to illuminate the means of evacuation and ensure continuous
visibility and ready usage in safety when standard or emergency lighting is needed.
Safety lighting may be further subdivided as follows:
Anti-panic lighting in extended areas
It originates from the safety lighting, and is
intended to avoid panic and to provide the
necessary lighting to allow people to reach
a possible escape route area.
Safety lighting for escape routes
It originates from the safety lighting, and is
intended to ensure that the escape means
can be clearly identi ed and used safely
when the area is busy.
Emergency lighting and safety signs for escape routes
The emergency lighting and safety signs for escape routes are very important for all
those who design emergency systems. Their suitable choice helps improve safety
levels and allows emergency situations to be handled better.
Schneider Electric - Electrical installation guide 2013
N43
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Lighting circuits
Standard EN 1838 ("Lighting applications. Emergency lighting") gives some
fundamental concepts concerning what is meant by emergency lighting for escape
routes:
"The intention behind lighting escape routes is to allow safe exit by the occupants,
providing them with suf cient visibility and directions on the escape route "
The concept referred to above is very simple:
The safety signs and escape route lighting must be two separate things.
Functions and operation of the luminaires
The manufacturing speci cations are covered by standard EN 60598-2-22,
"Particular Requirements - Luminaires for Emergency Lighting", which must be read
with EN 60598-1, "Luminaires Part 1: General Requirements and Tests".
Duration
A basic requirement is to determine the duration required for the emergency lighting.
Generally it is 1 hour but some countries may have different duration requirements
according to statutory technical standards.
Operation
We should clarify the different types of emergency luminaires:
b Non-maintained luminaires
v The lamp will only switch on if there is a fault in the standard lighting
v The lamp will be powered by the battery during failure
v The battery will be automatically recharged when the mains power supply is
restored
b Maintained luminaires
v The lamp can be switched on in continuous mode
v A power supply unit is required with the mains, especially for powering the lamp,
which can be disconnected when the area is not busy
v The lamp will be powered by the battery during failure.
Design
The integration of emergency lighting with standard lighting must comply strictly with
electrical system standards in the design of a building or particular place.
All regulations and laws must be complied with in order to design a system which is
up to standard (see Fig. N61).
Fig. N61 : The main functions of an emergency lighting system
European standards
The design of emergency lighting systems is regulated by a number of legislative
provisions that are updated and implemented from time to time by new
documentation published on request by the authorities that deal with European and
international technical standards and regulations.
Each country has its own laws and regulations, in addition to technical standards
The main functions of an emergency lighting system
when standard lighting fails are the following:
b Clearly show the escape
route using clear signs.
b Provide sufcient emergency
lighting along the escape paths
so that people can safely nd
their ways to the exits.
b Ensure that alarms and
the re safety equipment
present along the way out
are easily identiable.
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N44
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Lighting circuits
which govern different sectors. Basically they describe the places that must be
provided with emergency lighting as well as its technical speci cations. The
designer's job is to ensure that the design project complies with these standards.
EN 1838
A very important document on a European level regarding emergency lighting is the
Standard EN 1838, "Lighting applications. Emergency lighting".
This standard presents speci c requirements and constraints regarding the
operation and the function of emergency lighting systems.
CEN and CENELEC standards
With the CEN (Comit Europen de Normalisation) and CENELEC standards
(Comit Europen de Normalisation Electrotechnique), we are in a standardised
environment of particular interest to the technician and the designer. A number
of sections deal with emergencies. An initial distinction should be made between
luminaire standards and installation standards.
EN 60598-2-22 and EN-60598-1
Emergency lighting luminaires are subject to European standard EN 60598-2-
22, "Particular Requirements - Luminaires for Emergency Lighting", which is an
integrative text (of speci cations and analysis) of the Standard EN-60598-1,
Luminaires "Part 1: General Requirements and Tests".
Schneider Electric - Electrical installation guide 2013
N45
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
The asynchronous (i.e. induction) motor is
robust and reliable, and very widely used.
95% of motors installed around the world are
asynchronous. The protection of these motors
is consequently a matter of great importance
in numerous applications.
5 Asynchronous motors
Asynchronous motors are used in a wide variety of applications. Here are some
examples of driven machines:
v centrifugal pumps,
v fans and blowers,
v compressors,
v crushers,
v conveyors,
v lifts and cranes,
v
The consequence of a motor failure due to an incorrect protection or inability of
control circuit to operate can include the following:
b For persons:
v Asphyxiation due to the blockage of motor ventilation
v Electrocution due to insulation failure in the motor
v Accident due to non stopping of the motor following a control circuit failure
b For the driven machine and the process:,
v Shaft couplings, axles, driving belts, damaged due to a stalled rotor
v Lost production
v Delayed manufacturing
b For the motor itself:
v Motor windings burnt out due to stalled rotor
v Cost of repair
v Cost of replacement
Therefore, safety of persons and goods, as well as reliability and availability levels,
are highly dependant on the selection of protective equipment.
In economic terms, the overall cost of failure must be considered. This cost
is increasing with the size of the motor and with the difculties of access and
replacement. Loss of production is a further and evidently important factor.
Specic features of motor performance inuence the power supply circuits required
for satisfactory operation
A motor power-supply circuit presents certain constraints not normally encountered
in other (common) distribution circuits. These are owing to the particular
characteristics of motors directly connected to the line, such as:
b High start-up current (see Fig. N62) which is mostly reactive, and can therefore be
the cause of important voltage drop
b Number and frequency of start-up operations are generally high
b The high start-up current means that motor overload protective devices must have
operating characteristics which avoid tripping during the starting period.
5.1 Motor control systems
Different kinds of motor control solution are compared in the following tables.
Fig. N62 : Direct on-line starting current characteristics of an
induction motor
I" = 8 to 12 In
Id = 5 to 8 In
In = rated current of the motor
In Is I"
I
20 to
30 ms
td
1 to 10s
t
I
s
/ I
n
T
s
/ T
n
Speed control Torque control
Direct on line 5-10 5-10 No No
Star Delta 2-3 1-2 No No
Auto-transformer 2-3 1-2 No No
Soft starter 3-5 1.5-2.5 No Yes
Variable speed drive 1.5 1.5-2 Yes Yes
Fig. N63a : Comparison of different motor control solutions
Pros Cons
Direct on line Reduced cost high starting
torque
High in-rush current
Star Delta Reduced in-rush current Reduced starting torque
Auto-tranformer Reduced in-rush current High weight
Soft starter Reduced in-rush current
controlled start and stop
Reduced starting torque
Variable speed drive Controlled speed Energy saving
at reduced speed
Higher cost
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N46
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
5.2 Motor protection functions
These are the arrangements implemented in order to avoid operation of motors in
abnormal conditions which could result in negative events such as: overheating,
premature ageing, destruction of electrical windings, damage to coupling or gear
box,
Four levels of protection schemes are commonly proposed: "Conventional",
"Advanced", "Advanced Plus", and "High Performance", which can be adopted
depending on the sophistication and power of the driven machine.
v "Conventional" protection functions apply for every type of motor or application,
v "Advanced" protection functions apply to more sophisticated machines requesting
special attention,
v "Advanced Plus", and "High performance" protection functions are justied for
high power motors, high demanding applications, or motors in critical process or
whenever ground current must be measured with high accuracy (~ 0,01A).
As shown in the following gure: High performance protections are not based only
on current but also on voltage
Protection
Conventional Advanced Advanced Plus
High
Performance
Short-circuit / Instantaneous overcurrent
Thermal overload
Phase current imbalance
Phase current loss
Over-current (instantaneous and temporised)
Ground current / Instantaneous earth fault
Long start (stall) / Incomplete sequence
Jam (locked rotor)
Under-current
Phase current reversal
Motor temperature (by sensors)
Rapid cycle lock-out / Locking out
Load shedding
Notching or jogging / Number of starts
Phase voltage imbalance
Phase voltage loss
Phase voltage reversal
Under-voltage
Over-voltage
Under-power
Over-power
Under power factor
Over power factor
Motor reclosing
Fig. N64 : Classication of protection functions
Schneider Electric - Electrical installation guide 2013
N47
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
Here is a list of motor protection functions and the result of activation.
Short-circuit: disconnection in case of a short-circuit at the motor terminals or inside
the motor windings.
Thermal overload: disconnection of motor in case of sustained operation with
a torque exceeding the nominal value. Overload is detected by measurement of
excessive stator current or by using PTC probes.
Phase current imbalance: disconnection of the motor in case of high current
imbalance, responsible for increased power losses and overheating.
Phase current loss: disconnection of the motor if one phase current is zero, as this is
revealing of cable or connection breaking.
Over-current: alarm or disconnection of the motor in case of high phase current,
revealing a shaft over-torque.
Ground fault: disconnection in case of a fault between a motor terminal and ground.
Even if the fault current is limited, a fast action could avoid a complete destruction of
the motor. It can be measured with the sum of the 3 phases if the accuracy required is
not high (~ 30%). If high accuracy is required then it must be measured with a ground
CT (0.01A accuracy).
Long start (stall): disconnection in case of a starting time longer than normal (due to
mechanical problem or voltage sag) in order to avoid overheating of the motor.
Jam: disconnection in order to avoid overheating and mechanical stress if motor is
blocked while running because of congestion.
Undercurrent: alarm or disconnection of the motor in case a low current value is
detected, revealing a no-load condition (e.g.: pump drain, cavitation, broken shaft, )
Phase current reversal: disconnection when a wrong phase current sequence is
detected
Motor temperature (by sensors): alarm or disconnection in case of high temperature
detected by probes.
Rapid cycle lock-out: prevent connection and avoid overheating due to too frequent
start-up.
Load shedding: disconnection of the motor when a voltage drop is detected, in order
to reduce the supply load and return to normal voltage.
Phase voltage imbalance: disconnection of the motor in case of high voltage
imbalance, responsible for increased power losses and overheating.
Phase voltage loss: disconnection of motor if one phase of the supply voltage is
missing. This is necessary in order to avoid a single-phase running of a three-phase
motor, which results in a reduced torque, increased stator current, and inability to start.
Phase voltage reversal: prevent the connection and avoid the reverse rotation of the
motor in case of a wrong cabling of phases to the motor terminals, which could happen
during maintenance for example.
Under-voltage: prevent the connection of the motor or disconnection of the motor, as
a reduced voltage could not ensure a correct operation of the motor.
Over-voltage: prevent the connection of the motor or disconnection of the motor, as
an increased voltage could not ensure a correct operation of the motor.
Under-power: alarm or disconnection of the motor in case of power lower than
normal, as this situation is revealing a pump drain (risk of destruction of the pump) or
broken shaft.
Over-power: alarm or disconnection of the motor in case of power higher than normal,
as this situation is revealing a machine overload.
Under power factor: can be used for detection of low power with motors having a
high no-load current.
Over power factor: can be used for detection of end of the starting phase.
5 Asynchronous motors
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N48
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
The consequence of abnormal overheating is a reduced isolation capacity of
the materials, thus leading to a signicant shortening of the motor lifetime. This
is illustrated on Figure N65, and justies the importance of overload or over-
temperature protection.
Overload relays (thermal or electronic) protect motors against overloads, but they
must allow the temporary overload caused by starting, and must not trip unless the
starting time is abnormally long.
Depending on the application, the motor starting time can vary from a few seconds
(for no-load starting, low resistive torque, etc.) to several tens of seconds (for a high
resistive torque, high inertia of the driven load, etc.). It is therefore necessary to t
relays appropriate to the starting time.
To meet this requirement, IEC Standard 60947-4-1 denes several classes of
overload relays, each characterized by its tripping curve (see Fig. N65a ).
The relay rating is to be chosen according to the nominal motor current and the
calculated starting time.
Trip class 10 is adapted to normal duty motors.
Trip class 20 is recommended for heavy duty motors
Trip class 30 is necessary for very long motor starting.
e
Fig. N65 : Reduced motor lifetime as a consequence of overheating
100%
50%
25%
12,5%
Lifetime
Overheating
0 = 25C
=
In
10 K
=
1,05 In
20 K
=
1,09 In
30 K
=
1,14 In
Fig. N65a : Tripping curves of overload relays
30
Class 30
Class 20
Class 10
1,05 1,50 7,2
1,20
20
10
t (S)
I/I
r
Schneider Electric - Electrical installation guide 2013
N49
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
5.3 Motor monitoring
The objective of implementing measurement devices is to ensure a continuous
supervision of operating conditions of motors. The collected data can be used with
great benet for improving Energy Efciency, extending lifetime of motors, or for
programming maintenance operations.
Four levels of sophistication for monitoring scheme are commonly proposed:
"Conventional", "Advanced", "Advanced Plus", and "High Performance", which
can be made accessible, depending on the sophistication and power of the driven
machine and the criticality of the process.
Here is a list of the most useful variables to be monitored, and the benet provided
by the measurement.
Currents: they are directly responsible for the conductors heating and thus for a
possible time life reduction. These are the most important variables to monitor. The
current measurement also gives a direct indication on the motor load and stress
applied to the driven machine.
Average current: to know the average load of the motor, whether the motor is well
adapted to the driven machine or not.
Phase current imbalance: as imbalance is responsible for additional losses in the
motor, phase current imbalance is an important variable to monitor.
Thermal capacity level: knowledge of the remaining overload capability and safety
margin.
Motor temperature (by sensors): knowledge of the real thermal operating
conditions, taking account of motor load, ambient temperature, ventilation efciency.
Phase to phase voltage: too high or too low phase voltages are responsible of
increased motor current for a given load. Voltage monitoring is thus indicating
whether the motor is operating in normal conditions or not.
Phase voltage imbalance: as imbalance is responsible for additional losses in the
motor, phase voltage imbalance is an important variable to monitor.
Active power: indication of the load level applied to the motor.
Reactive power: indication of the reactive power that could be necessary to
compensate by implementation of capacitors.
Power factor: indication of load level of the motor. If Power Factor is > 1: submit your
candidacy for the Physics Nobel Prize.
Active energy: possibility to relate the consumed energy to the operating time or the
quantity of goods produced by driven machine.
Reactive energy: possibility to determine the necessity of implementation of
capacitors in order to avoid payment of penalties to the Utility.
5 Asynchronous motors
Measurement Conventional Advanced Advanced Plus
High
Performance
Line currents
Ground current
Average current
Phase current imbalance
Thermal capacity level
Motor temperature (by sensors)
Frequency
Phase to phase voltage
Phase voltage imbalance
Average voltage
Active power
Reactive power
Power factor
Active energy
Reactive energy
Fig. N65b : Classication of monitoring functions
Fig. N65c : Example of intelligent motor management system
with Advanced Plus and "High performance" protection and
monitoring functions (TeSys T Schneider Electric)
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N50
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
Different utilization categories have been dened for contactors in IEC 60947-4-1.
The selection relative to asynchronous motor control is given in Figure N68.
5.4 Motor starter congurations
Different congurations of switchgear and control-gear are commonly proposed.
Some examples are shown on Figure N66.
The different applicable standards are listed on Figure N67.
M
Isolator-fuse:
b short-circuit protection,
b isolation for maintenance.
Contactor:
b on-off switching.
Overload relay:
b overload protection.
Motor
M
Magnetic circuit-breaker:
b isolation for maintenance,
b short-cicuit protection.
Variable speed drive :
b progressive starting,
b variable speed control,
b motor protection,
b overload protection.
Motor
Contactor :
b on-off switching,
b disconnection in case of fault.
M
Thermal-magnetic circuit-breaker:
b isolation for maintenance,
b short-circuit protection,
b overload protection.
Contactor:
b on-off switching
Motor
Fig. N66 : The various functions and their combinations forming a motor starter
Standard Title
IEC 60947-1 Low-voltage switchgear and controlgear General rules
IEC 60947-4-1 Contactors and motor-starters Electromechanical contactors and motor-
starters
IEC 60947-4-2 Contactors and motor-starters AC semiconductor motor controllers
and starters
IEC 60947-6-2 Multiple function equipment Control and protective switching devices
(or equipment) (CPS)
IEC 61800 Adjustable speed electrical power drive systems
Fig. N67 : Applicable standards
Category Typical applications
AC-1 Non-inductive or slightly inductive loads, resistance furnaces
AC-2 Slip-ring motors: starting, switching off
AC-3 Squirrel-cage motors: starting, switching off motors during running
AC-4 Squirrel-cage motors: starting, plugging
(1)
, inching
(2)
Fig. N68 : Different categories of AC contactors used for asynchronous motor control
1) By plugging is understood stopping or reversing the motor rapidly by reversing motor primary connections
while the motor is running.
2) By inching (jogging) is understood energizing a motor once or repeatedly for short periods to obtain small
movements of the driven mechanism
Schneider Electric - Electrical installation guide 2013
N51
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
5.5 Protection coordination
Type 1 and Type 2 coordination are dened in IEC 60947-4-1.
Total coordination is offered by some manufacturers.
5 Asynchronous motors
Coordination Consequence of a short circuit Application eld
Type 1 The contactor or starter shall cause no danger to
persons and installation and may not be suitable for
further service without repair and replacement of
parts.
General purpose application.
Basic machines.
Type 2 The contactor or starter shall cause no danger to
persons or installation and shall be suitable for
further use. The risk of contact welding is recognized,
in which case the manufacturer shall indicate the
measures to be taken as regards the maintenance of
the equipment.
Process with availability constraints, e.g.: continuous
process, critical industrial machines.
Continuity of service (total
coordination)
No damage or maladjustment is permissible.
Must be able to restart immediately after fault is
corrected No special precaution is required.
Fig. N69 : Level of acceptable destruction according to the coordination types
Among the many possible methods of
protecting a motor, the association of a
circuit breaker + contactor + thermal relay (1)
provides many advantages
(1) The combination of a contactor with a thermal relay is
commonly referred to as a discontactor.
(2) In the majority of cases, short circuit faults occur at the
motor, so that the current is limited by the cable and the wiring
of starter and are called impedant short-circuits.
5.6 Basic protection scheme: circuit-breaker +
contactor + thermal relay
The combination of these devices facilitates installation work, as well as operation
and maintenance, by:
b The reduction of the maintenance work load: the circuit-breaker avoids the need to
replace blown fuses and the necessity of maintaining a stock (of different sizes and
types)
b Better continuity performance: the installation can be re-energized immediately
following the elimination of a fault and after checking of the starter
b Additional complementary devices sometimes required on a motor circuit are
easily accommodated
b Tripping of all three phases is assured (thereby avoiding the possibility of single
phasing)
b Full load current switching possibility (by circuit-breaker) in the event of contactor
failure, e.g. contact welding
b Interlocking
b Diverse remote indications
b Better protection for the starter in case of over-current and in particular for
impedant short-circuit (2) corresponding to currents up to about 30 times In of motor
(see Fig. N67)
b Possibility of adding RCD:
v Prevention of risk of re (sensitivity 500 mA)
v Protection against destruction of the motor (short-circuit of laminations) by the
early detection of earth fault currents (sensitivity 300 mA to 30 A).
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N52
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
The combination of a circuit-breaker + contactor + thermal relay for the control and
protection of motor circuits is eminently appropriate when:
b The maintenance service for an installation is reduced, which is generally the case
in tertiary and small and medium sized industrial sites
b The job specication calls for complementary functions
b There is an operational requirement for a load breaking facility in the event of need
of maintenance.
5.7 Control and protection switching gear (CPS)
CPS or starter-controllers are designed to full control and protection functions
simultaneously (overload and short-circuit). In addition, they are designed to carry
out control operations in the event of short-circuit.
They can also assure additional functions such as insulation, thereby totally fullling
the function of motor starter unit. They comply with standard IEC 60947-6-2,
which notably denes the assigned values and utilisation categories of a CPS, as
do standards IEC 60947-1 and 60947-4-1.The functions performed by a CPS are
combined and coordinated in such a way as to allow for uptime at all currents up
to the Ics working short circuit breaking capacity of the CPS. The CPS may or may
not consist of one device, but its characteristics are assigned as for a single device.
Furthermore, the guarantee of total coordination of all the functions ensures the
user has a simple choice with optimal protection which is easy to implement.
Although presented as a single unit, a CPS can offer identical or greater modularity
than the three product motor starter unit solution. This is the case with the
Schneider Electric TeSys U starter-controller (see Figure N71).
Fig. N70 : Tripping characteristics of a circuit-breaker + contactor + thermal relay
t
In Is
Limit of thermal relay constraint
Operating curve of the
MA type circuit breaker
I
Circuit
breaker
Magnetic
relay
Contactor
Thermal
relay
Cable
Motor
End of
start-up
period
1 to
10 s
20 to
30 ms
I" magn.
Cable thermal withstand limit
Operating curve
of thermal relay
1.05 to 1.20 In
Short circuit current breaking capacity
of the association (CB + contactor)
Short circuit current breaking capacity
of the CB
Schneider Electric - Electrical installation guide 2013
N53
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
5 Asynchronous motors
Fig. N71 : Example of a CPS modularity (TeSys U starter controller by Schneider Electric)
Additional functionalities can also be installed with regard to:
b Power: reversing block, current limiter,
b Control:
v Function modules, alarms, motor load monitoring, automatic resetting, etc,
v Communication options such as Modbus-RTU (a.k.a. SL),, Probus-DP,
DeviceNet, CAN-Open, AS-I, etc,
v Auxiliary contact modules.
Fig. N72 : TeSys U Communication functions
Available functions Standard Advanced Multi-function
Starter status (ready, running, with default)
Start and Stop controls
Thermal alarm
Remote resetting by bus
Indication of motor load
Defaults differentiation
Alarms (overcurrents)
Parameter setting and protection function reference
Log le function
Monitoring function
Information conveyed by bus and functions performed
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N54
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
5.8 Intelligent Power and Motor Control Centre
(iPMCC)
iPMCC is a system integrating intelligent Motor Protection Relays (IMPR) in a
highly dependable Power and Motor Control Centre switchboard. Connectivity to the
supervision and control system is provided through an industrial communications
network.
This solution is particularly used in large industrial sites and infrastructures, with
continuous or hybrid process, and whenever continuity of service is a priority.
intelligent Motor Protection Relay (IMPR)
IMPR is the key component of an iPMCC. It is a microprocessor controlled device.
Motor monitoring and protection is performed based on measurements from sensors,
such as current transformers, voltage transformers (embedded or external), thermal
sensor, earth leakage detector, From these measurements and the settings, it
determines fault conditions or potential risks for motors and operators.
According to the motor protection model, an IMPR has the capability to detect
many kinds of faults. It is a great improvement compared to thermal relay protection.
Moreover, many complementary functions can be implemented by an IMPR:
monitoring, alarming, fault recording, statistics, communications, etc
Fig. N73: Example of motor control and protection architecture
1 2
4
3
5
6
7
Motor Control Centre
A Motor Control Centre (MCC) is an electrical switchboard which groups all motor
starters of a process, in order to build a centralised installation. Motor starters
management centralisation is requested in many industries and infrastructures, in
order to facilitate operation and maintenance. Withdrawable MCC functional units
(FU), a.k.a. drawers, are used in critical applications, as they are more convenient
to manage in case of fault. The faulty motor starter can be replaced quickly, without
shutting down the whole switchboard.
Fixed or disconnectable FUs can be used in less critical applications.
MCC-type ASSEMBLIES must be full-compliant to IEC 61439-1 and 61439-
2 standards to guarantee availability, safety and reliability of the application. In
an iPMCC conguration, design verication, especially temperature rise test, is
essential because the IMPR (electronic device) is sensitive to heat. Furthermore,
MCC should provide a dependable and reliable communication bus connection
An MCC is different from a universal cabinet in the way that a universal cabinet can
only be used to accommodate a group of few motor starters. It has lower electrical
characteristics requirements, and it does not provide the separation between motor
starters in different functional units. Therefore, in an universal cabinet complete
shutdown will be necessary before maintenance operations or any reconguration of
the starters.
1: Tesys T motor protection relay with native communications capability. The
protections are based on current and temperature.
2: Tesys T extension module integrating voltage measurement and protections.
4: Tesys Ts emdedded CT can measure the earth leakage current of 20%-500% of
FLC (full load current). External CT can be used to get a better accuracy (0.02-10A).
5, 6, 7: Different kinds of Human Machine Interfaces (1-to-1, 1-to-8, and 1-to-Many).
Schneider Electric - Electrical installation guide 2013
N55
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
5 Asynchronous motors
LTME
LTMR
3M drawer
6M drawer
Fig. N74 : Example of iPMCC: Okken switchboard and drawers by Schneider Electric
Compared to traditional solutions, an iPMCC offers great advantages in both the
project design and execution stage as well as at the operations stage.
Value proposition for contractors during the project stage:
b It improves project efciency
v Reduction of engineering work, as starters are more standardised over a wider
range of ratings,
v Reduction of on-site wiring time thanks to the use of eld buses,
v Reduction of set-up time thanks to remote parametrization of control motor
devices.
b It reduces commissioning time by
v Allowing a better understanding of the process reactions thanks to detailed
diagnostics and statistics,
v Allowing faster error xing and bug tracking,
v Helping to x process start-up problems,
v Allowing time reduction thanks to pre-validated solutions (reference architectures).
Value proposition for end users during the operation stage:
b Improved Continuity of Service
v Increase process availability by better PROTECTING the motors & the loads,
- Using more accurate sensors,
- Using more accurate motor protection models.
b Reduced untimely DOWNTIME
v Alarms often give time to x the problem before tripping occurs,
v Trip conditions are detailed to help corrective operations,
v Statistics can be used for continuous improvement,
v Recording all protection parameters changes.
b Reduced Operational Costs
v Reduced ENERGY costs,
- Reduced energy consumption,
- Optimised energy consumption, benchmarking, costs allocation.
b Reduced MAINTENANCE costs
v Less downtime,
v Faster problem xing,
v Less spare parts stock,
v Preventive maintenance strategy.
b Reduced EVOLUTION costs and time
v Simplied engineering,
v No wiring required,
v Simplied set-up,
v Easier process tuning and commissioning.
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N56
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
A complete iPMCC concentrates the knowledge and experience of electrical
distribution, motor protection and control, automation and installation. This is why
only a few leading companies in electrical distribution and automation can propose
this kind of solution.
5.9 Communication
Lots of data are managed in an iPMCC application. An iPMCC application is typically
made of 50 to 1000 motor starters. In order to supervise the system, it is necessary
to send the motorss information such as motor status, current value, alarm, etc. The
traditional wire-to-wire connection is not an efcient and cost-effective way when
there is a lot of data to be transmitted. Today, communications via a network is the
preferred way.
The communications need the support of a common language, which is the
communications protocol. The following chart shows the protocols most commonly
used in different levels of industrial communications networks. At the moment, the
most popular device bus protocols are Ethernet TCP/IP, Modbus-RTU, Probus-DP
and DeviceNet.
Information network
A
S
I
M
o
d
b
u
s
-
R
T
U
C
A
N
o
p
e
n
D
e
v
i
c
e
N
e
t
P
r
o
f
i
b
u
s
-
D
P
E
t
h
e
r
n
e
t
Control network
Device bus
Sensor bus
P
r
o
f
i
b
u
s
-
P
A
Fig. N75 : Different communication protocols
Modbus
Modbus is a message handling structure introduced by Modicon in 1979. Modbus
is an application level protocol based on the OSI model. It is independent of the
physical layer.
MODBUS APPLICATION LAYER
Modbus on TCP
TCP
IP
Modbus+ / HDLC
Other
Fig. N76 : Modbus architecture
Schneider Electric - Electrical installation guide 2013
N57
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
Modbus-RTU (a.k.a SL - Serial Line)
Modbus can be implemented on RS232, RS442 or RS485 links as well as other
media like Ethernet. Modbus RS485 has been the most common protocol in the
world. It supports communications speed up to 115kbps, but most devices support
only communication up to 19.2 kbps.
Modbus RS485 is a low cost communication implementation, and it has the largest
installation base and supplier network. The weak point of Modbus is the transmission
speed (since it is limited by serial line speeds) and the relatively small number of
devices that can be connected to one network. However, Modbus-RTU is still an
economical and reasonable choice to the majority of motor protection systems.
Modbus is based on a Master/Slave concept. One device is the master and sends
requests to read or write data to each slave in turn. Slaves answer to requests from
the Master. Even though you can have many devices connected to one serial line
only one device can talk at a time.
Master
1 to 247 slaves
Communication may
only be initialized by
the Master
Request
Response
Fig. N77 : Modbus-RTU architecture
Initiate request
Perform the action initiate the response
Receive the response
Function code
Function code
Data request
Data response
Client Server
Fig. N77a : Modbus/TCP architecture
Modbus/TCP
Modbus/TCP is an excellent choice for large sites applications. Modbus/TCP uses
the standard 100 Mbps Ethernet media in physical layers to carry the Modbus
message handling structure. It offers very fast speed and big number of devices in
one network; it is easier to integrate MCC into the Local Area Network (LAN) of a
company, so it is the choice of more and more customers.
Unlike Modbus-RTU, Modbus/TCP works on a Client/Server concept:
b A client initiates the requests and a server answers,
b Any device can be a client or a server,
b Many devices are both client and server at the same time,
b A network can consist of many clients.
5 Asynchronous motors
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N58
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
Many clients can send requests at the same time and many servers can answer at
the same time:
b A client can talk to multiple servers at the same time,
b A server can answer to multiple clients at the same time,
b Ethernet switches take care of packet delivery to all a devices at the same time.
Fig. N78 : Typical communications architecture
Differences between Modbus/TCP and Modbus-RTU:
b Devices can be a client and a server at the same time.
b Everyone can talk at the same time: multiple devices can initiate communications,
not just one. Increases system response time by parallel communications.
b Multiple requests can be sent from one device to another without waiting for the
rst request to be answered. A new piece of data is added to the Modbus frame
called the Modbus Transaction identier to allow a response to be matched to a
specic request.
b The Transmission speed is much increased:10Mb, 100Mb, 1Gb etc.
b The transmission media is much more exible and costs are lower: bre, radio etc.
b The number of nodes on a single network is almost unlimited: maximum
recommended is around 200, but routers can be used to join several networks.
b Gateways/Proxies allow transparent communications between Ethernet Modbus/
TCP and Modbus-RTU devices.
Modbus I/O Scanning
Modbus I/O Scanning is a feature in Schneider Electric Programmable Logic
Controllers (PLC) which allows simple Modbus transactions with a simple setup
screen. It is only requested to set the address, poll time and data to read and/or
write.
After conguration the communications system manages automatically all Modbus
exchanges with scanned devices.
Schneider Electric - Electrical installation guide 2013
N59
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
Probus
Probus (PROcess Filed BUS) is a protocol introduced by a eldbus working group
in 1987. It is supported by PI (Probus & Pronet International).
Probus-DP is the version of Probus used at device level. It has been a
successful protocol in the last decades, especially in Europe. Probus-DP. It
supports communications up to 12 Mbps it, but actually 1.5 Mbps is the most
practical maximum value in applications. In order to achieve a transmission speed
up to 12 Mbps it requires additional constraints such as the suppression of bus
derivations.
The network topology is a bus. The number of devices in a bus is limited. The use
of specic repeaters may be required in order to achieve the theoretical maximum
number.
DeviceNet
DeviceNet is a protocol based on CAN, which is a protocol widely used in the
automotive industry. ODVA (Open DeviceNet Vendor Association) takes now the
responsibility to promote and provide technical support to DeviceNet specication.
ODVA is an international association comprised of members from the world's
leading automation companies. Collectively, ODVA and its members support network
technologies using the Common Industrial Protocol (CIP). These currently include
DeviceNet, EtherNet/IP, CompoNet and the major extensions to CIP CIP
Safety, CIP Sync, and CIP Motion. ODVA manages the development of these
open technologies and assists manufacturers and users of CIP Networks through
tools, training and marketing activities.
The network topology is a bus. The number of devices in a bus is limited.
DeviceNet provides communication with 3 possible speeds: 125, 250 or 500 kbps,
which depends on the bus length and cable as well as product consumption. The
maximum number of devices is 64, including master devices. The bus length is
limited to 100m at 500 kbps.
Fig. N79 : I/O Scanning architecture
I/O scanner manager
I/O scanning
Read and write MODBUS
Scanned
devices
I/O data
Gateway
Device application
Sends
request
Sends response
IN
5 Asynchronous motors
Schneider Electric - Electrical installation guide 2013
N - Characteristics of particular sources and loads
N60
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
t
o
u
s
d
r
o
i
t
s
r
s
e
r
v
s
Modbus RTU Probus-DP DeviceNet Ethernet Modbus TCP/IP
Speed up to 115 Kbps 9.6 Kbps to 12 Mbps 125, 250 or 500 kbps 10 / 100 Mbps / 1 Gbps
Max. distance without
repeaters
1300 m 100 m at 12 Mbps
1.2 km at 10 kbps
100 m at 500 kbps
500 m at 125 kbps
Twisted pair: 100 m
Optical bre:
. 2000 m (multi-mode)
. >2 km (mono-mode)
Max. number of devices 32 without repeater:
1 master and 247 slaves
126: mono or multi-masters, 122
slaves max with 3 repeaters
64: 1 master and 63 slaves 128 with I/O scanning; no limit
with others
Max. distance with repeaters Depends on the type of
repeater
400 to 4800 m according to
speed
Depends on the type of
repeater
10 km optical bre
Fig. N80 : Comparison of communications protocols
Synthetic view
The following table shows a short (non-exhaustive) comparison of these protocols:
5 Asynchronous motors
Schneider Electric - Electrical installation guide 2013
P1
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapitre P
Photovoltaic installations
Contents
Benets of photovoltaic energy P2
1.1 Practical benets P2
1.2 Environmental benets P2
Background and technology P3
2.1 The photovoltaic effect P3
2.2 Photovoltaic modules P4
2.3 Inverters P6
2.4 Connections P7
2.5 Battery chargers P7
2.6 Off grid or grid connected P8
PV System and Installation Rules P10
3.1 How to ensure safety during normal operation? P10
3.2 Protection against overvoltage: Surge protection P13
3.3 How to ensure safety during maintenance or emergency P15
3.4 How to ensure safety during all the life cycle of the installation P17
PV installation architectures P18
4.1 Common characteristics of PV architectures P18
4.2 Architectures for installations connected to the grid P19
4.3 Sizing P21
4.4 Installation type P22
4.5 Electrical equipments selection P23
Monitoring P31
5.1 Types of monitoring systems P31
5.2 Monitoring systems P31
5.3 Sensors P33
5.4 Security of the installation P33
1
2
3
5
4
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P2
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Benets of photovoltaic energy
1.1 Practical benets
This technology enables to produce electricity directly from the sun light, which is a
source of renewable energy. There are two ways for this:
b Solar Thermal Energy is captured through an exchange between a circulating uid
exposed to the sun and a load circuit (accumulation tank or heat pump).
b Solar photovoltaic Energy is produced using the principle of the photovoltaic cell
discovered by Edmond Becquerel in 1839.
It is particularly benecial to use solar radiation reaching the Earth since:
b This radiation remains stable (to within 10%) on average from one year to the next;
b At ground level, it supplies an average of 1000 Wh/m per day although this
depends on the following principal criteria:
v The latitude
v The angle of the surface and the direction faced
v The degree of pollution
v The time of year
v The thickness of the cloud layer
v The time of day
v The shade
The global horizontal irradiation, which is the amount of energy received yearly on a
plane varies from 700 kWh/m per year in the North of Europe to 2500 kWh/m per
year in African desert areas.
1.2 Environmental benets
Using solar energy allows to reduce the consumption of fossil fuels which are the
likely cause of global warming and atmospheric pollution.
It contributes to sustainable development and is also in accordance with the policies
of the European Union, which passed a decree in March 2007 setting the following
targets to be met by 2020:
b Reduction of greenhouse emissions by 20%
b Reduction of energy consumption by 20%
b 20% renewable energy as a proportion of total energy consumption
Schneider Electric - Electrical installation guide 2013
P3
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
P - Photovoltaic installations
2 Background and technology
2.1 The photovoltaic effect
This is the ability to transform solar energy into electricity and is achieved by using
photovoltaic (PV) cells.
A PV cell (see Fig. P1) is capable of generating voltage of between 0.5 V and 2 V
depending on the materials used and a current directly dependent on the surface
area (5 or 6 inch cells).
Its characteristics are shown in a current/voltage graph as shown in Figure 2.
Fig. P1 : Photovoltaic cell manufactured in a silicon plate
(source: Photowatt)
The photovoltaic effect is dependent on two physical values (see Fig. P3)
irradiance and temperature:
b As irradiance E (Wm) increases, so do the current and power produced by the cell
b As the temperature (T) of the cell increases, the output voltage decreases
signicantly, the current increases only slightly, so overall the output power
decreases. In order to compare the performance of different cells, the standard has
set out Standard Test Conditions (STC) for irradiance of 1000 W/m at 25C.
Fig. P2 : Typical characteristic of a photovoltaic cell
0
2
4
0,0 0,2 0,4 0,6 0,8 Volts
Amperes
To make it easier to use energy generated by photovoltaic cells, manufacturers offer
serial and/or parallel combinations grouped into panels or modules.
Voltage
Current
1000 Wm
2
800 Wm
2
600 Wm
2
400 Wm
2
200 Wm
2
MPP
MPP
An increase in solar radiation
increases the power generated by the cell
MPP : Maximum Power Point
Voltage
Current
75 C
An increase in temperature
decreases the power generated by the cell
50 C
25 C
0 C
Fig. P3 : Irradiance and temperature inuence the photovoltaic effect
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P4
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2.2 Photovoltaic modules
These combinations of cells (see Fig. P4) enable the voltage and current to be
increased. To optimise the characteristics of the modules, these are made up of cells
with similar electrical characteristics.
Each module providing a voltage of several tens of volts is classied by its power
level measured in Watt peak (Wp). This relates to the power produced by a surface
area of one m exposed to irradiation of 1000 W/m at 25C. However, identical
modules may produce different levels of power. Currently, the IEC standard species
a power variation of is 3% (see table in Figure P5). Modules with typical power of
160 Wp include all modules with power of between 155 Wp (160 -3%) and 165 Wp
(160 +3%).
It is therefore necessary to compare their efciency which is calculated by dividing
their power (W/m) by 1000 W/m.
For example, for a module of 160 Wp with a surface area of 1.338m (*), the peak
power is 160/1.338 which gives 120 Wp/m.
Therefore the efciency of this module is: 120/1000 = 12%.
Nota: Manufacturers may have different production tolerance limits according to local
standards or habits (example: JISC8918 species 10%), so it is recommended to
always check product catalogues for actual tolerance values.
Fig. P4 : PW1400 photovoltaic module dimensions:
1237 x 1082 x 45 mm (source: Photowatt)
(*) The dimensions of these modules (L x W x D) in mm are:
1237 x 1082 x 38.
Encapsulation Glass/Tedlar
Cell size 125.50 x 125.5 mm
Number of cells 72
Voltage 24 V
Number of bypass diodes 4 bypass diodes
Typical power 150 Wp 160 Wp 170 Wp
Minimum power 145 Wp 155 Wp 165 Wp
Voltage at typical power 33.8 V 34.1 V 34.7 V
Current at typical power 4.45 A 4.7 A 4.9 A
Short circuit current 4.65 A 4.8 A 5.0 A
Open wire voltage 43 V 43.2 V 43.4 V
Maximum circuit voltage 1 000 V CC
Temperature coefcient o = (dl/l)/dt # + 0.032 %/C
| = dV/dt # - 158 mV/C
P/P = - 0.43 %/C
Power specications at 1000 W/m: 25C: AM 1.5
Fig. P5 : Electrical characteristics of a PW1400 module (source: Photowatt)
However when photovoltaic cells are connected in series, a destructive phenomenon
known as the hot spot may occur if one of the cells is partially shaded. This cell
will operate as a receiver and the current passing through it may destroy it. To avoid
this risk, manufacturers include bypass diodes which bypass damaged cells. Bypass
diodes are usually tted in the junction box behind the module and enable 18 to 22
cells to be shunted depending on the manufacturer.
These modules are then connected in series to achieve the level of voltage required,
forming chains of modules or strings. Then the strings are arranged in parallel to
achieve the required level of power, thus forming a PV array.
Since there are increasing numbers of PV module manufacturers throughout
the world, it is important to consider the various options carefully when choosing
equipment. Installers should also:
b Ensure the compatibility of the electrical characteristics with the rest of the
installation (inverter input voltage).
b Ensure that they are compliant with the standards.
b Select suppliers likely to be in business in the long-term to ensure that faulty
modules can be replaced as these must be identical to those already installed.
This nal point is important as installers are responsible for the warranty granted to
their clients.
A faulty module within a string must be
replaced by an identical module and therefore
it is important to choose a supplier which is
likely to be in business in the long-term.
Schneider Electric - Electrical installation guide 2013
P5
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Different technologies are currently being used to manufacture photovoltaic
generators. These are divided into two categories - crystalline modules and thin lm
modules.
Crystalline silicon modules
There are two main categories of crystalline silicon modules mono-crystalline
modules and multi-crystalline modules.
Mono-crystalline modules are currently best in terms of performance, with efciency
of 16 18%. They are also more expensive.
The efciency of multi-crystalline modules is between 12 and 14%. They are more
commonly used, especially in the residential and service sectors.
These modules have a service life of more than 20 years. They lose some of their
power over time (< 1% per year) but continue to produce electricity. Depending on
the look required, bi-glass modules are available with two plates of glass which
make the module semi-transparent, or Tedlar or Teon glass modules which are less
expensive but completely opaque.
Thin lm modules
Extensive research is currently being carried out on thin lm modules and current
efciency levels of 6 to 8% should increase in coming years. They are cheap and
suitable for large areas provided that the surface is not a valuable part of the facility.
This category of thin lm modules includes a number of technologies of which there
are 3 main types:
b a-Si thin lm or amorphous silicon
b CdTe (cadmium telluride)
b CIS (copper indium selenide)
It should be noted that at present we do not yet have 20 years experience of this
type of technology and thus still do not know how these modules will age.
In their technical specications, reputable manufacturers indicate initial and stabilised
values.
The table in Figure P6 provides a comparative overview of all these technologies.
Fig. P6 : Comparison of technologies used in photovoltaic generators
Technologies sc-Si
mono-crystalline
mc-Si
multi-crystalline
a-Si
Thin lm
CdTe
Thin lm
CIS
Thin lm
STC module efciency
Maximum 20.4 % 16 % 10 % 14.4 % 15.5 %
Average 16 % 15 % 6 % 11 % 11 %
Relative cost ($/Wp) 0.8 to 1 0.8 to 1 0.75 0.65 0.85
Temperature coefcient at
the power peak (%/C)
-0.3 / -0.5 -0.3 / -0.5 -0.2 -0.2 -0.3
2 Background and technology
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P6
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2.3 Inverters
These devices which convert direct current into alternating current are special
inverters for photovoltaic power supply (see Fig. P7a). Different types of photovoltaic
inverters or PV inverters are available. They full three main functions:
b Inverter function: Converts direct current into alternating current in the form
required (sinusoidal, square, etc.)
b MPPT function: Calculates the operating point on the photovoltaic surface or array
which produces the most power in terms of voltage and current - also known as the
Maximum Power Point Tracker (see Fig. P7b).
b Automatic disconnection from the network function: Automatically commands the
inverter to switch off and the system to disconnect from the network in the absence
of voltage on the electrical network. This protects the inverter and any maintenance
staff who may be working on the network.
Therefore, in the event of a network failure, the inverter no longer supplies energy
to the network and energy produced by the photovoltaic modules is wasted. Grid
interactive systems are nevertheless available which function in back-up mode.
Batteries need to be installed for these systems as well as an additional control
panel to ensure that the network is disconnected before supplying their own energy.
b Different models
Some multi-MPPT inverters have a double (or triple, quadruple, etc.) MPPT
function. This function enables PV supply to be optimised when the array includes
strings facing in different directions. There is however a risk of total loss of supply if
one inverter is faulty.
Nevertheless, it is possible to install one less powerful inverter per string, which is a
more expensive solution but increases the overall reliability of the system.
Multi-string inverters are also available. These inverters are not necessarily multi-
MPPT as described above. The name simply indicates that several strings can be
connected to the inverter and that they are paralleled inside the inverter.
0,00
0 3 6 9 12 15 18 21 24 27 30 33 36
Vmpp Voc
P (V)
39 42 45
1,00
2,00
3,00
4,00
5,00 Isc
Isc : Modules short circuit current
Voc : Modules open wire voltage
Impp
6,00 180,00
Maximum
power point
160,00
140,00
120,00
100,00
80,00
60,00
40,00
20,00
0,00
I (A)
Fig. P7b : Operating point of a photovoltaic array which produces the most power, also known as
the Maximum Power Point Tracker
Fig. P7a : Conext Core XC inverter specially designed for
photovoltaic power supply (Source: Schneider Electric)
European efciency
In order to compare the various appliances, a level of efciency has been determined
based on different operating points, simulating the average daily performance of an
inverter. This European efciency is calculated using the following formula:
0.03 x (q 5%) + 0.06 x (q 10%) + 0.13 x (q 20%) + 0.1 x (q 30%) + 0.48 x (q 50%) +
0.2 x (q 100%)
Schneider Electric - Electrical installation guide 2013
P7
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
IP and operating temperature
Ingress protection and temperature parameters are important when choosing an
inverter.
Almost all manufacturers of inverters offer IP65 inverters which can be installed
outdoors. However, this does not mean that they should be installed in full sunlight
as most inverters operate in degraded mode in temperatures over 40C (50C for
Xantrex inverters manufactured by Schneider Electric) and thus output power is
reduced.
Installing inverters outdoors in full sunlight also incurs the risk of premature aging
of some of the inverters components such as the chemical condensers. This
considerably reduces the inverters service life from 10 years to as few as 5 years!
2.4 Connections
Photovoltaic installations require special cables and connectors. Since modules are
installed outdoors they are subjected to climatic constraints associated with high
voltages caused by the installation of modules in series.
Besides being ingress protected, the equipment used must also be resistant to UV
rays and ozone. It must furthermore display a high level of mechanical resistance
and a high level of resistance to extreme variations in temperature.
Cables
The voltage drop between the PV array and the inverter must be calculated and this
must not exceed 3% for nominal current (UTE recommendation: 1%).
The DC cables used should be double-insulated single wire cables and since these
are not standardised, cables indicated by the manufacturer as being specically for
PV should be used.
Connectors
In general, photovoltaic modules are supplied with two cables equipped with one
male and one female connector. Using these cables, it is possible to connect two
modules installed side by side, thus creating a series without any difculties. The
male connector connects to the female connector of the following module and so on
until the required level of direct current is attained.
These special connectors including the Multi-Contact MC3 or MC4 with locking
systems offer protection if touched while they are disconnected. This protection
is necessary since as soon as a photovoltaic module is exposed to irradiation, it
supplies voltage. If the cables connecting the modules are handled (to alter or extend
them) they must either rst be disconnected or the DC isolator for the DC circuit must
be activated at the input to the connection box.
It is also possible to use different connectors available on the market. These should
be chosen carefully for their quality, contact and male-female mating to avoid any
poor contact which may lead to overheating and destruction
2.5 Battery chargers
In remote locations, batteries need to be charged to supply energy after sunset.
There are two types of chargers:
b Current chargers the voltage of the PV array must be the same as the charge
voltage of the battery and is regulated in terms of current.
b MPPT chargers these chargers operate at the maximum power point. They
manage the charge of the battery, limit the current and voltage, and control oating.
This type of charger is more expensive than the type mentioned above but allows
an optimal number of PV modules to be installed and reduces the overall cost of the
installation.
We strongly advise against installing an
inverter in a place exposed to the sun as this
will considerably reduce its service life.
2 Background and technology
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P8
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2.6 Off grid or grid connected
2.6.1 Off grid installation
Historically, these were the rst places in which photovoltaic systems were used,
supplying telecommunication relay stations or remote settlements which were difcult
to access and could not be connected to the network.
They remain one of the only means of supplying electricity to 2 billion people who
currently do not have access to it.
In order to size these installations correctly, it is rst necessary to identify the load
curve required and the number of days where the installation will not be exposed to
sunlight in order to identify how much energy needs to be stored in the batteries. This
information is used to determine the size and type of batteries required.
Then, the surface area of the photovoltaic sensors must be calculated to ensure that
the batteries can be recharged in the worst case scenario (shortest day of the year).
Specic issues
This method entails over-sizing the system to ensure continuity once or twice a year.
As a result, this type of installation is very expensive!
It should be noted that according to the EPIA (European Photovoltaic Industry
Association) this type of installation will account for 20% of the photovoltaic market in
2012 and 40% in 2030.
Storage
Storage is crucial to this type of installation. Several types of batteries are available:
b Lead batteries
These batteries operate in cycles (charge/discharge). Open batteries are
recommended to prevent inating which may occur due to excessively rapid charging
and large emissions of hydrogen.
Their purchase price is certainly their main advantage although they have short
service lives. This is inuenced by the depth of discharging but they last no more
than 2 or 3 years at a discharging rate of 50% and above. Furthermore, deep
discharging may kill the battery. Therefore, when operating such equipment at a
remote site, the batteries should be changed on a regular basis to maintain their
charging performance.
b Ni-Cd or Nickel Cadmium batteries
These batteries have the advantage of being much less sensitive to extreme
temperature conditions and deep charging or discharging. They have a much longer
service life (5 to 8 years) but are more expensive to purchase. However, the cost
of the Wh stored over the service life of the installation is lower than that of lead
batteries.
b Li-ion batteries
These are the batteries of the future for these types of operations. They are
insensitive to deep discharging and have a service life of up to 20 years. At present,
they are prohibitively expensive but prices are set to fall by 2012 with the start of
mass production. They will therefore become the most economic variety for this type
of usage.
Schneider Electric - Electrical installation guide 2013
P9
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2.6.2 Grid Connected installation
Owners of power generation systems connected to the grid have 2 options:
b Sell all the power they produce (option known as total sale). For this option, a
separate connection must be established to the network, apart from the connection
for consumption. This also requires an administrative declaration.
b Use the power they produce locally as required and only sell the excess (option
known as sale of excess) which has two benets:
v The difference in the rates payable by the producer (purchase) and the consumer
(sale)
v It is not necessary to establish a new connection which may be expensive and
requires an administrative declaration.
Since different rates are charged, a protability analysis should be carried out to
choose the best option.
Installations connected to the grid 3 important points
The following points are important to note with regard to installations connected to
the network:
b In contrast to independent installations, no correlation is required between
consumption for the building and output.
For the total sale option, the two elements are completely independent.
For the sale of excess option, the network will compensate when production does
not cover consumption.
b The network must be present in order to supply and sell energy. Furthermore,
energy distributors require automatic disconnection systems to be in place in
case of incidents on the network. When activated, these stop supply and therefore
sales. Reconnection occurs automatically when the network returns to its nominal
operating conditions.
b As a general rule, no provision is made for local storage using batteries or other
means. This is true for mainland France where there is a high quality network with
the capacity to absorb all the energy produced.
However, the system does have one fault. If the network fails, owners of installations
who are also generally consumers are left with a power generation facility which
they cannot use (see previous point). In countries or towns with frequent network
incidents, systems are being developed which include batteries.
2 Background and technology
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P10
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 PV System and Installation
Rules
IEC standard 60364 Part 712 sets out rules for ensuring that solar photovoltaic
power systems are safe and supplies a number of the denitions used in this pages
3.1 How to ensure safety during normal operation?
Two particular characteristics of PV generators are their DC voltage levels and the
fact they cannot be shut off as long as PV modules are exposed to the sun. The
short-circuit current produced by the PV module is too low to trigger the power
supplys automatic disconnect. The most frequently used protective measures do
not therefore apply to PV systems. However, as PV modules are installed outdoors
they are exposed to the elements. And since they can be installed on roofs, critical
attention should be paid to the risk of re and the protection of re ghters and
emergency services staff.
3.1.1 Protecting people against electric shock
IEC 60364-712 stipulates that PV systems whose maximum UOC MAX is higher
than 120V DC should use double or reinforced insulation as a protection against
electric shock.
Switchgear, such as fuses or circuit-breakers on the DC side, do not afford protection
against electric shock as there is no automatic disconnect of the power supply.
Overcurrent protection, when used, protects PV cells against reverse current and
cables against overload.
3.1.2 Risk of re: protection against thermal effects
Generally speaking there are three situations that can lead to abnormally high
temperatures and the risk of re in a PV system: insulation fault, a reverse current in
a PV module, and overloading cables or equipment.
Insulation fault detection
Double or reinforced insulation is a protective measure against electric shock but
it does not exclude all risk of insulation fault. (The assumption here is that the
likelihood of an insulation fault and of someone touching an energised part of the
installation at the same is very low. Insulation faults in themselves do happen more
frequently, however.) DC insulation fault could be more dangerous as arc has less
chance to extinguish by itself as it does in AC.
The PV generator should be checked to ensure it is insulated from earth.
b When there is no galvanic insulation between the AC side and the DC side:
v It is impossible to earth one pole.
v AC protection can be used to detect insulation faults.
b When the AC side and DC side are galvanically separated:
v An overcurrent protective device (which also detects insulation faults) should be
used to trip the grounded conductor in the event of a fault, if the PV cell technology
(e.g. thin lms of amorphous silicon) requires one of the
conductors to be directly grounded.
v An insulation monitoring device should be used if the PV cell technology requires
one of the conductors to be resistance-grounded.
v An insulation monitoring device should also be used when PV cell technology
does not require either conductor to be earthed.
Insulation monitoring device shall be selected taking into consideration both U
OC MAX
and the capacitance between poles and earth causes leakage current. In addition
cables and inverter capacitance should be also considered. An Insulation monitoring
device able to handle capacitance up to 500F is suitable for PV system.
Paragraph 412.1.1 of IEC 60364 states:
Double or reinforced insulation is a protective
measure in which
b basic protection is provided by basic
insulation, and fault protection is provided by
supplementary insulation, or
b basic and fault protection is provided by
reinforced insulation between live parts and
accessible parts.
NB: This protective measure is intended to
prevent the appearance of dangerous voltage
on the accessible parts of electrical equipment
through a fault in the basic insulation.
When an insulation fault is detected whatever
the solution is, inverter is stopped and
disconnected from AC side, but the fault is still
present on DC side and voltage between poles
is open circuit voltage of PV generator as long
as sun is shining.
This situation cannot be tolerated over a
long period and the fault has to be found and
cleared. If not, a second fault may develop on
the other pole, causing the current to circulate
in the earthing conductors and metal parts
of the PV installation with no guarantee that
protective devices will operate properly. See
Overcurrent protection.
Schneider Electric - Electrical installation guide 2013
P11
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 PV System and Installation
Rules
Maximum power
developed with a
single inverter
Surface necessary
to develop such a
Power
Lowest capacitance
measurement
Highest capacitance
measurement
Maximum measured
capacitance by m
Frameless glass-
glass module with
aluminium frame on
an assembly stand
(open air)
Plant 1: 1 MW 8000 m Sunny afternoon:
5 F
Rainy morning:
10 F
1,25 nF / m
Plant 2: 750 kW 5000 m Sunny afternoon:
2 F
Rainy morning:
4 F
0,8 nF / m
In-roof glass-
glass module with
aluminium frame
Plant 1: 100 kW 800 m Sunny afternoon:
2 F
Rainy morning:
4 F
5 nF / m
Plant 2: 50 kW 400 m Sunny afternoon:
0,5 F
Rainy morning:
1 F
2,5 nF / m
Thin-lm PV module
on exible substrate
Plant 1: 100 kW 800 m Sunny afternoon:
30 F
Rainy morning:
50 F
62,5 nF / m
Plant 2: 50 kW 400 m Sunny afternoon:
15 F
Rainy morning:
25 F
62,5 nF / m
Maximum power usually
developed with a single
inverter
Surface necessary to
develop such a Power
Usual capacitance by m
2
Usual capacitance between
lines and earth for a single
IT system
Frameless glass-glass
module with aluminium
frame on an assembly stand
(open air)
1 MW 8000 m
2
1 nF / m
2
8 F
In-roof glass-glass module
with aluminium frame
100 kW 800 m
2
5 nF / m
2
4 F
Thin-lm PV module on
exible substrate
100 kW 800 m
2
50 nF / m
2
40 F
Some measurements made in European plants are giving the following gures:
Fig. P8 : Example of leakage capacitance in various PV systems
Fig. P9 : Reverse current
The literature provided by manufacturers of photovoltaic modules yield the following
gures:
=
~
Inverter
3.1.3 Protection of PV modules against reverse current
A short circuit in a PV module, faulty wiring, or a related fault may cause reverse
current in PV strings. This occurs if the open-circuit voltage of one string is
signicantly different from the open voltage of parallel strings connected to the same
inverter. The current ows from the healthy strings to the faulty one instead of owing
to the inverter and supplying power to the AC network. Reverse current can lead
to dangerous temperature rises and res in the PV module. PV module withstand
capability should therefore be tested in accordance with IEC 61730-2 standard and
the PV module manufacturer shall provide the maximum reverse current value (IRM)
Reverse current into the faulty string = total current of the
remaining strings
String overcurrent protection is to be used if the total number of strings that could
feed one faulty string is high enough to supply a dangerous reverse current:
1.35 I
RM
< (Ns -1) I
SC MAX
where:
b I
RM
is the maximum reverse current characteristic of PV cells dened in IEC 61730
b Ns is the total number of strings
There is no risk of reverse current when there
is only one string. When there are two strings
with same number of PV modules connected
in parallel, the reverse current will be always
lower than the maximum reverse current. So,
when the PV generator is made of one or
two strings only there is no need for reverse
current protection.
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P12
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3.1.4 Protection against overcurrent
As in any installation, there should be protection against thermal effect of overcurrent
causing any danger.
Short-circuit current depends on solar irradiance, but it may be lower than the trip
value of overcurrent protection. Although this is not an issue for cables as the current
is within current-carrying capacity, the inverter will detect a voltage drop and stop
producing power. It is therefore recommended that the maximum trip current should
be signicantly lower than I
STC MAX
.
String protection
Where string overcurrent protection is required, each PV string shall be protected
with an overcurrent protection device.
The nominal overcurrent protection (Fuse or Circuit breaker) rating of the string
overcurrent protection device shall be greater than 1,25 times the string short circuit
current I
sc stc_string.
Array protection
The nominal rated trip current (ITRIP) of overcurrent protection devices for PV arrays
(Fuses or Circuit breaker) shall be greater than 1,25 times the array short-circuit
current I
sc stc_aray
The selection of overcurrent protection rating shall be done in order to avoid
unexpected trip in normal operation taking into account temperature. A protection
rating higher than 1.4 times the protected string or array short-circuit current I
sc_stc
. is
usually recommended.
3.1.5 Circuit breakers or Fuses
Circuit breakers or fuses can be used to provide overcurrent protection.
Fuses, usually on the fuse holder or directly connected to bars or cables, do not
provide a load-break switch function. So when fuses are used, load-break switches
should also be used to disconnect fuses from the inverter in order to allow cartridge
replacement. So an array box with fuses on fuse holders as string protection, for
example, should also incorporate a main switch.
Circuit breakers offer netuned adjustment and greater accuracy than fuses in order
to allow the use of cables, especially for sub-array cables, that are smaller than fuses
Double earth faults
PV systems are either insulated from the earth or one pole is earthed through an
overcurrent protection. In both set-ups, therefore, there can be a ground fault in
which current leaks to the ground. If this fault is not cleared, it may spread to the
healthy pole and give rise to a hazardous situation where re could break out. Even
though double insulation makes such an eventuality unlikely, it deserves full attention.
IEC 60364-712:
712.433.1 Overload protection may be omitted
to PV string and PV array cables when the
continuous current-carrying capacity of the
cable is equal to or greater than 1,25 times
ISC STC at any location.
712.433.2 Overload protection may be omitted
to the PV main cable if the continuous current-
carrying capacity is equal to or greater than
1,25 times ISC STC of the PV generator.
Fig. P10 : String overcurrent protection "OCP"
For the two following reasons the double fault situation shall be absolutely
avoided: Insulation monitoring devices or overcurrent protection in earthed
system shall detect rst fault and staff shall look after the rst fault and clear it
with no delay.
b The fault level could be low (e.g. two insulation faults or a low short-circuit
capability of the generator in weak sunlight) and below the tripping value of
overcurrent protection (circuit breaker or fuses). However, a DC arc fault does not
spend itself, even when the current is low. It could be a serious hazard, particularly
for PV modules on buildings.
=
~
Inverter
S
w
i
t
c
h
O
C
P
O
C
P
O
C
P
O
C
P
Schneider Electric - Electrical installation guide 2013
P13
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
b Circuit breakers and switches used in PV systems are designed to break the rated
current or fault current with all poles at open-circuit maximum
voltage (UOC MAX). To break the current when UOC MAX is equal to 1000V, for
instance, four poles in series (two poles in series for each polarity) are required. In
double ground fault situations, the circuit breaker or switches must break the current
at full voltage with only two poles in series. Such switchgear is not designed for that
purpose and could sustain irremediable damage if used to break the current in a
double ground fault situation.
The ideal solution is prevent double ground faults arising. Insulation monitoring
devices or overcurrent protection in grounded systems detect the rst fault. However,
although the insulation fault monitoring system usually stops the inverter, the fault is
still present. Staff must locate and clear it without delay. In large generators with sub-
arrays protected by circuit breakers, it is highly advisable to disconnect each array
when that rst fault has been detected but not cleared within the next few hours.
3.1.6 Switchgears and enclosure selection
Double insulation
Enclosures on the DC side shall provide double insulation.
Thermal issues
The thermal behaviour of switchgear and enclosures warrants careful monitoring.
PV generator boxes and array boxes are usually installed outdoors and exposed to
the elements. In the event of high ambient temperatures, high IP levels could reduce
air ow and thermal power dissipation. In addition, the way switchgear devices
achieve high voltage operation i.e. through the use of poles in series increases
their temperature. Special attention should therefore be paid to the temperature of
switchgear inside outdoor enclosures on the DC side.
Cable protection should comply with requirements of IEC 60364. Part 712 of the
standard stipulates that all enclosures on the DC side should meet the requirements
of IEC 61439. This standard covers low voltage switchgear and control gear
assemblies and sets out requirements that guarantee the risk of temperature rises
has been factored into the safe design of DC boxes (generator and array boxes).
Pollution degree of switchgear and enclosure selection
In addition to the standard criteria for selecting enclosures in PV systems with UOC
MAX of 1000V, some equipment may show IEC 606947 - 1 Pollution Degree 2 rather
than Pollution Degree 3.
If the switchgear is Pollution Degree 2, the IP level of the enclosure according
to IEC 60529 shall be at least IP5x.
3.2 Protection against overvoltage: Surge protection
Overvoltage may occur in electrical installations for various reasons. This may be
caused by:
The distribution network as a result of lightning or any work carried out
Lightning bolts (nearby/on buildings and PV installations, or on lightning conductors)
Variations in the electrical eld due to lightning.
Like all outdoor structures, photovoltaic installations are exposed to the risk of
lightning which varies from region to region. Preventive and arrest systems and
devices should be in place.
3.2.1 Protection by equipotential bonding:
The rst safeguard to put in place is a medium (conductor) that ensures equipotential
bonding between all the conductive parts of a PV installation. The aim is to bond all
grounded conductors and metal parts and so create equal potential at all points in
the installed system.
3.2.2 Protection by surge protection devices (SPD):
SPD are particularly important to protect sensitive electrical equipments like AC/DC
Inverter , monitoring devices and PV modules but also other sensitive equipments
powered by the 230VAC electrical distribution network. The following method of risk
assessment is based on the evaluation of the critical length L
crit
and its comparison
with L the cumulative length of the d.c. lines.
3 PV System and Installation
Rules
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P14
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
b L is the sum of :
v the sum of distances between the inverter(s) and the junction box(es), taking
into account that the lengths of cable located in the same conduit are counted only
once, and
v the sum of distances between the junction box and the connection points of
the photovoltaic modules forming the string, taking into account that the lengths of
cable located in the same conduit are counted only once.
b Ng: arc lightning density(nb of stike/km/year)
=
~
L
DC
L
AC
AC Box Generator Box Array box Main LV switch
board
SPD
1
SPD
2
SPD
3
SPD
4
SPD Protection
Location PV Modules or Array boxe Inverter DC side Inverter AC side Main board
L
DC
L
AC
Ligthning rod
Criteria <10m >10m <10m >10m Yes No
Type of SPD No need SPD 1
Type 2 *
SPD 2
Type 2*
No need SPD 3
Type 2
SPD 4
Type 1
SPD 4
Type 2 if Ng>2,5
& overhead line
* Type 1 if separation distance according to EN 62305 is not kept
Installation of SPD
The number and location of SPD on the DC side depends on the length of the cables
between the solar panels and inverter (if this length is>10 metres a second SDP
is necessary and located in the box close to the solar panel, the rst one is located in
the inverter area.
To be efcient, SPD connections cables to L+, L- network and also between
earth terminal block of SPD and ground busbar must be as short as possible
(d1+d2<50cm)
Fig. P12 : Type of SPD according to location
Type of installation Individual residential
premises
Terrestrial production plant Service/Industrial/Agricultural
Buildings
L
crit
(in m) 115/Ng 200/Ng 450/Ng
L > L
crit
Surge protective device(s) compulsory on DC side
(2)
L < L
crit
Surge protective device(s) not compulsory on DC side
(1)
Fig. P11 : Critical length L
crit
calculation
Surge Protection Device is required if L < L
crit
L
crit
depends on the type of PV installation, and is calculated according to the
following table :
Schneider Electric - Electrical installation guide 2013
P15
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
d1 + d2 < 50 cm
d1 + d3 < 50 cm
d2 + d3 < 50 cm
Generator
Conversion
N
L
d2
d1
d3
PRD-DC
1
Generator
Conversion
N
L
d2
d1
d3
PRD-DC
1
d2
d1
d3
PRD-DC
1
> 4 mm
2
3.3 How to ensure safety during maintenance or
emergency
To ensure staff safety during maintenance and emergencies disconnect devices
should be appropriately located and enclosures installation should be failsafe.
3.3.1 Isolation switching and control
b The switch disconnectors on the AC side and DC side of the inverter shall be
installed for inverter service and maintenance.
b As many switch disconnectors should be installed as are needed to allow operation
on the PV generator, particularly to replace fuses in the array boxes and generator
junction boxes.
b For PV systems inside buildings, a remotely-controlled switch disconnector should
be mounted as closely as possible to the PV modules or to the point of entry of DC
cables in the event of an emergency.
=
~
AC Box Generator Box Array box Main LV switch
board
Fig. P15 : Switch disconnector location
Fig. P14 : Switch disconnector Compact NSX 200A with
heatsink and interphase barrier
Note: Switches used in PV systems are
designed to break the rated current of all poles
at U
ocmax
. To break the current when U
ocmax
is equal to 1000V, for instance, four poles in
series (two poles in series for each polarity)
are required. In double ground fault situations,
the circuit breaker or switches must break the
current at full voltage with only two poles in
series. Such switchgear is not designed for
that purpose and could sustain irremediable
damage if used to break the current in a
double ground fault situation. For this reason
double ground faults must be avoided at
all costs. Insulation monitoring devices or
overcurrent protection in grounded system
detect the rst fault. Staff shall locate it and
clear it without delay.
3 PV System and Installation
Rules
Fig. P13 : SPD installation
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P16
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3.3.2 Selecting and installing enclosures
Enclosures for different PV generator boxes and switch boards on the DC side need
to ensure double isolation, equipment protection against such outdoor hazards as
temperatures, the rain, vandalism, and shock.
Enclosure and their auxiliary equipment must ensure temperature and humidity
control to allow equipment to operate smoothly. It is, however, difcult to propose
a generic solution. Each installation needs to be analysed in order to optimize the
sizing of its enclosures and auxiliary equipment.
Thermostat O
Heating resistance
Hygrostat
Thermostat F
Cold Heat
Humidity
Thermal risks and heating / cooling solution shall be studied
Fans IP55
Heating resistance
Fig. P16 : Temperature and moisture control
Schneider Electric - Electrical installation guide 2013
P17
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3.4 How to ensure safety during all the life cycle of
the installation
IEC60364-6 requires initial and periodic verications of electrical installations.
Specicities of photovoltaic installation (outdoor, high DC voltage, unsupervised
installation) make periodic checking very important.
If usually the efciency of all the system is checked in order to ensure the maximum
production, we recommend to perform periodic maintenance of equipment.
PV system operating conditions involve various environmental stresses: wide
temperature variations, humidity, and electrical stresses. In order to ensure
performances of equipment during all the life cycle of installation particular attention
shall be paid to the following:
b Enclosure integrity (Double isolation IP level)
b Switchgears operating condition and integrity
v to evaluate if any overheating has occurred
v to examine switchgears for the presence of dust, moisture
b Visual check of electrical connections
b Functional test of equipment and auxiliaries
b Insulation monitoring device test
b Insulation resistance test
3 PV System and Installation
Rules
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P18
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
P - Photovoltaic installations
4 PV installation architectures
4.1 Common characteristics of PV architectures
A PV array is made up of a number of modules in series or parallel, corresponding
to the input characteristics of the inverter. However, since these modules are
interconnected, the array is very sensitive to shade or differences in terms of the
direction faced.
By following a few simple cabling rules, supply can be optimised and any operating
problems may be avoided.
Position of the panels
If, when installing a PV array on a roof, panels need to face in different directions, it is
essential to assemble at least one string per direction and ensure each string is facing
in just one direction to ensure optimised supply. Each string must be connected to a
specic inverter (or to inputs of a multi-MPPT inverter - see Section 3).
If this instruction is not observed, the array will not be damaged but supply will be
reduced, thus increasing the time needed for a return on investment.
Shade
Besides the risk of destruction of shaded modules within a PV array due to the hot
spot phenomenon as described in Paragraph 2.2 for which manufacturers have
devised solutions, research conducted by the Institut National des Energies Solaires
(INES Frances national institute for solar energy) suggests that shading of 10% of
the surface area of a string may cause more than a 30% reduction in output!
It is therefore important to eliminate direct shading. However, in many cases this is
difcult (trees, chimney, neighbouring wall, pylon, etc.).
If a PV array includes several strings:
b If possible, shaded modules should be included in a single string
b Otherwise, a technology should be chosen which responds better to diffuse light
than direct light
Eliminating loops
When connecting components, the rst precaution to take is to avoid loops in the
cabling within strings.
Even though direct lightning strikes on arrays are relatively rare, currents induced
by lightning are much more common and these currents are particularly destructive
where there are large areas of looping. Figure P17 shows how to improve an array
including a large loop.
Fig. P17 : Avoiding loops when cabling strings
Charge Charge
=
~
=
~
Schneider Electric - Electrical installation guide 2013
P19
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 PV installation architectures
4.2 Architectures for installations connected to the
grid
General Rules
Where photovoltaic installations are connected to the grid and energy is sold, it is
necessary to optimise efciency and reduce installation costs. With this in mind,
a relatively high DC operating voltage of between 200 and 500 V is often used for
residential applications, with up to 1000 V being used for applications requiring a
higher level of power.
All the modules in a PV array should be identical (same brand and same type) and
selected to supply the same level of power. For example, the modules should all be
180 W, even though there exists other power levels in the same PV modules product
range (170 W, 180 W and 190 W).
In practice, the protection units (DC and AC units) should be positioned close to the
inverters for ease of maintenance.
PV array with a single string of modules
This is the simplest conguration (see Fig. P18). It is used for small PV arrays with
peak power of up to 3 kWp depending on the modules deployed. In most cases, it is
used for residential PV operations.
Modules are connected in series, supplying direct current of between 200 and 500
VDC in this instance. Optimal efciency is obtained from the inverter within this
voltage range.
A single DC line is fed through to the inverter. The PV array can be isolated from the
inverter by means of a load break switch near the inverter.
PV array with several module strings in parallel
This conguration (see Fig. P19), mainly deployed on buildings or in small PV power
plants on the ground, is used for PV installations of up to thirty strings in parallel with
power output of some 100 kWp. This limit is imposed for technological and nancial
reasons. If exceeded, the required width of the main DC cable would be impractical.
Direct current can be determined based on the number of modules in series per
string and in this instance is between 300 and 600 VDC. By paralleling identical
strings, the power required for the installation can be attained. The strings are
paralleled in a PV array box. This box includes the safety devices required for
paralleling the strings and appliances used to measure the strings current. A single
DC cable connects these boxes to the inverter. The PV array can be isolated from
the inverter by means a load break switch near the inverter.
=
~
Meters Inverter DC unit AC unit PV
kWh kWh
Fig. P18 : Diagram showing a single-string photovoltaic array
Meters PV array box Inverter PV
Network
kWh kWh
Supply point
=
~
DC
enclosure
AC
enclosure
Fig. P19 : Diagram showing a multi-string photovoltaic array with one inverter
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P20
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
PV array with several strings divided into several groups
When power levels exceed 50 or 100 kW, photovoltaic arrays are split into subgroups
(see Fig. P21) to make it easier to connect the various components. Strings are
paralleled on two levels.
b Strings in each subgroup are paralleled in subgroup PV array boxes. These boxes
are tted with safety devices, the necessary measuring equipment and monitoring
devices.
b The outputs of these boxes are paralleled in a PV array box near the inverter.
This box is also tted with the required safety devices as well as the measuring and
monitoring equipment necessary for paralleling the subgroups.
The array can be isolated from the inverter using a load block switch which may or
may not be tted in the PV array box. The arrays direct current is approximately
1000 VDC.
=
~
=
~
=
~
PV array box
Inverter
PV
DC enclosure AC enclosure
Fig. P20 : Diagram showing a multi-string photovoltaic array with several single-phase inverters
connected in a three-phase arrangement
As a variation on this diagram, several single-phase inverters can be installed in a
three-phase arrangement (see Fig. P20).
=
~
PV array box
Inverter
PV
DC enclosure AC enclosure
Fig. P20 : Diagram showing a photovoltaic array consisting of several groups
Schneider Electric - Electrical installation guide 2013
P21
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 PV installation architectures
4.3 Sizing
Calculating a photovoltaic array
It is absolutely essential to take account of location (geographic location, latitude,
altitude, shade, etc.) and installation factors (direction faced, angle, etc.).
Firstly, the approximate power output may be calculated based on the available
surface area:
10 m = 1 kWp
7140 m (=football ground) = 700 kWp
The PV array should always be arranged around the inverter. The calculations
involved should compare the characteristics of the modules and those of the inverter
with a view to identifying the optimal conguration.
b String composition:
NB: Number of modules x Voc (at t min) < inverter Vmax
The no load voltage of the string (Voc x number of modules in series) at the
minimum temperature of the installation location must be lower than the inverters
maximum input voltage.
=> This must be strictly observed. Otherwise the inverter may be destroyed.
Apart from the aforementioned rule for preventing destruction of the inverter
Number of modules x Voc (at t min) < inverter Vmax two other limits must be
observed:
v Number of modules x Vmpp (at t max) > inverter Vmin
The operating voltage (Vm x number of modules in series at all temperatures at the
installation location) should fall within the inverters MPPT voltage range. Otherwise,
the inverter will stall and energy supply will cease.
v Isc strings < inverter I max
The total Isc current for strings in parallel must be lower than the maximum input
current for the inverter. Otherwise, the inverter limits the supply of energy delivered to
the network.
Inverter specications
b In Europe, the power level of the inverter must be between 0.8 and 1 times the
power of the array:
0.8 < Pinverter / Parray < 1
v Below this (under 0.8 Parray), the inverter limits power signicantly. The energy
sold to the network will thus be inferior to that which the panels are capable of
supplying and therefore it will take longer to secure a return on investment.
v Above this (over Parray), the inverter is too large for the power level of the array.
Again, it will take longer to secure a return on investment.
b Single-phase or three-phase
A decision should be made over these two options in consultation with the local
energy distributor based on the devices available in manufacturers product ranges,
often within the following limits:
v Inverter Pn < 10 kW => single phase inverter
v 10 kW < Pn < 100 kW => either three-phase inverter(s) or single-phase inverters
split between the three phases and neutral. The management of unbalances
between phases needs to be checked in this instance.
v Pn > 100 kW => three-phase inverter(s)
b Conguration software
Manufacturers of inverters help design ofces and installers to size strings for
residential and service sector installations based on the equipment available by
supplying sizing software.
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P22
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4.4 Installation type
The installation type is a factor which should not be neglected since, in countries
including France, the purchase price for power supplied is dependent on this. Along
with shading, it should be taken into account when choosing a module.
There are three installation types building integrated, partially integrated and
ground-based:
b Building Integrated PhotoVoltaic (BIPV)
This installation type fulls a dual role (energy supply and roof waterproong,
shading, etc.).
b Partially integrated
This is the simplest assembly to install and, most importantly, does not alter the
water resistance of a roof. However, its major drawback is that, in France, operators
cannot charge the highest rate for it. This installation type is most commonly used in
Germany and Switzerland.
b Ground-based
This installation type is used for power supply plants covering large areas
(photovoltaic farms). Again, in France it is not eligible for the highest purchase price.
Schneider Electric - Electrical installation guide 2013
P23
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 PV installation architectures
SPD
2
SPD
3
E1 E2 E3
Outdoor Indoor
Q2
Q1
Q3
=
~
Inverter with or without
galvanic isolation
T
o
g
r
i
d
c
o
n
n
e
c
t
i
o
n
Fig. P22 : Grid connected <= 10kW
Needs String junction box PV main switch Inverter AC box (230V P/N)
Switchgears and control
Isolation (d) (a) (d)
Switching
(Making & breaking rated
current)
DC21B
(d)
DC21B
(a) (d)
Control (b) (d) (e) (d)
Over-current protection (c) (f)
Protection against
Insulation fault
(h) (h)
RCD type B or A SI
Surge protection type 2 type 1 or 2
Enclosure Outdoor
Double insulation
Indoor
Double insulation
Standard AC requirement +
grid code requirement
Metering Inverter relevant parameters Energy
b a PV array main switch could be included in the inverter. This solution makes inverter service or replacement more difcult.
b b Remote switching for emergency services located as closely as possible to the PV modules or to the point of entry of DC cables in the building.
b c No protection is required when the number of string does not exceed 2.
b d Service and emergency switching
b e Inverter shall include a protection for anti-islanding (in accordance with VDE 0126 for example)
b f Overload and short-circuit protection B curve recommended.
b g This SPD could be unnecessary if there is another SPD in the AC installation at a distance of less than 10 metres.
b h If the inverter provides no galvanic separation a RCD protection is necessary on AC side. IEC 60364-712 species RCD type B Some local regulations require
RCD type A SI
4.5 Electrical equipments selection
4.5.1 Grid connected PV system <= 10kW (Residential)
One single phase inverter
Typically, a 5kW grid-connected single-phase inverter. with UOC MAX s 600V. One
or two strings Isctc < 25A, IAC < 32A. In this design there is no string protection.
A PV main switch is necessary. When the inverter is indoors, an additional remote-
controlled switch at the DC cable entry point is recommended for emergencies
services.
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P24
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4.5.2 10 to 100kW grid connected PV system (Small building)
One three phase multi input inverter without array box
Typically, 10kW to 36kW grid-connected inverters, UOC MAX probably higher than
600V (i.e. 800V or 1000V), Isctc < 125A, Iac < 63A. In this range of power, inverters
usually have between 2 and 4 maximum power point tracking (MPPT) inputs, so the
number of strings in the same DC sub-network is equal to one or two. There is no
need for string protection. A PV main switch for each MPPT input is necessary. When
an inverter is indoors, additional remote-controlled switches at DC cable entry point
are recommended for emergencies services.
SPD
11
SPD
12
E1
Indoor
Indoor / Outdoor
T
o
g
r
i
d
c
o
n
n
e
c
t
i
o
n
Inverter with or without
galvanic isolation
SPD
3
E3
Q3
SPD
21
SPD
22
=
~
E2
Q21
Q22
Q11
Q12
Fig. P23 : 10-100kW single multi MPPT inverter
b a PV array main switch could be included in the inverter. This solution makes inverter service or replacement difcult.
b b Remote switching for emergency services located as closely as possible to the PV modules or to the point of entry of DC cables in the building.
b c No protection is required when the number of string does not exceed 2.
b d Service and emergency switching
b e Inverter shall include a protection for anti-islanding (in accordance with VDE 0126 for example)
b f Overload and short-circuit protection (B curve recommended).
b g If there is no SPD in the inverter or if the distance between DC box and inverter exceeds 10m a SPD is necessary in this box.
b h
v If the inverter provides no galvanic separation a RCD protection is necessary on AC side. IEC 60364-712 species RCD type B Some local regulations require
RCD type A SI
v If the inverter provides at least simple separation
- Without functional earthing: insulation monitoring is necessary, it's usually done by the inverter in this range of power.
- With functional earthing: the earthing shall be done with a DC MCB breaker (C60PV 4P series 2 10A) or a fuse.
Needs String junction box PV array main switch Inverter AC box (400V)
Switchgears and control
Isolation (d) (a) (d)
Switching
(Making & breaking rated
current)
DC21B
(d)
DC21B
(a) (d)
Control (b) (d) (e) (d)
Over-current protection (c) (f)
Protection against
Insulation fault
(h) (h)
RCD type B or A SI
Surge protection type 2 type 1 or 2
Enclosure Outdoor IP5x
Double insulation
Indoor IP5x
Double insulation
Standard AC requirement +
grid code requirement
Metering Energy
Schneider Electric - Electrical installation guide 2013
P25
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 PV installation architectures
Fig. P24 : 10-100kW single MPPT inverter
b a PV array main switch could be included in the inverter. This solution makes inverter service or replacement difcult.
b b Remote switching for emergency services located as closely as possible to the PV modules or to the point of entry of DC cables in the building. The main switch
in array box can be equipped with tripping coil and motor mechanism for remote reclosing for that purpose.
b d Service and emergency switching
b e Inverter shall include a protection for anti-islanding (in accordance with VDE 0126 for example)
b f Overload and short-circuit protection (B curve recommended).
b g If there is no SPD in the inverter or if the distance between DC box and inverter exceeds 10m a SPD is necessary in this box.
b h
v If the inverter provides no galvanic separation a RCD protection is necessary on AC side. IEC 60364-712 species RCD type B Some local regulations require
RCD type A SI
v If the inverter provides at least simple separation
- Without functional earthing: insulation monitoring is necessary
- With functional earthing: the earthing shall be done with a DC MCB breaker (C60PV 4P series 2 10A) or a fuse.
One three phases inverter with One Array box
Typically, 30kW to 60kW grid-connected inverters. UOC max is generally higher than
600V (up to 1000V), Isctc does not exceed 200A, I AC does not exceed 100A. This
design has more than 2 strings. Reverse current protection is therefore necessary. A
main PV switch is required. When an inverter is inside, additional remote-controlled
switch at DC cable entry point is recommended for emergencies.
Outdoor
Indoor
T
o
g
r
i
d
c
o
n
n
e
c
t
i
o
n
Inverter with or without
galvanic isolation
SPD
3
E3
Q3
=
~
SPD
2
E2
Q0
Q0
E1
Q2
Q0
Q0
Q1
SPD
1
Needs String / Array junction box PV array main switch Inverter AC box (400V)
Switchgears and control
Isolation (d) (a) (d)
Switching
(Making & breaking rated
current)
DC21B
(d)
DC21B
(a) (d)
Control (b) (d) (e) (d)
Over-current protection (c) (f)
Protection against
Insulation fault
(h) (h)
RCD type B or A SI
Surge protection type 2 type 1 or 2
Enclosure Outdoor IP5x
Double insulation
Indoor IP5x
Double insulation
Standard AC requirement +
grid code requirement
Metering P,Q, PF, Energy
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P26
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Multi single phase inverters design
Typically, 6x5 to 20x5kW grid-connected inverters. The design used for residential
building can be duplicated as often as necessary. In that case, the DC system is very
simple and the AC system is very similar to usual AC systems.
Q4
SPD
3
Indoor
Outdoor
Q3
Q3
=
~
E1
SPD
1
=
~
E1
Q1
SPD
1
Q3
Q3
=
~
E1
Q1
SPD
1
=
~
E1
Q1
SPD
1
Q3
Q3
=
~
E1
Q1
SPD
1
=
~
E1
Q1
SPD
1
E3
Q1
b h If the inverter provides no galvanic separation a RCD protection is necessary on AC side. IEC 60364-712 species RCD type B Some local regulations require
RCD type A SI
Fig. P25 : 10-100kW multi single MPPT inverter
Needs PV array main switch Inverter AC box (400V)
Switchgears and control See 5kW design (h) (d)
Surge protection type 2 type 1 or 2
Enclosure Outdoor IP5x
Double insulation
Standard AC requirement +
grid code requirement
Metering Energy P,Q, PF, Energy, unbalance
Schneider Electric - Electrical installation guide 2013
P27
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 PV installation architectures
Fig. P26 : 10-100kW single MPPT inverter with 2 arrays
Three phases inverter with two Array boxes (Na <=2)
Typically, 60kW to 100kW grid-connected inverters with 2 arrays. Array cable
protection is not necessary for 2 or 3 arrays.
The I
sctc
array s o 200A, I
sctc
s o 400A, and I
max
AC s o 200A. A PV main switch
is required close to the inverter. Remotely operated switches in array boxes allow
disconnects to be located close to the PV modules in the event of emergencies.
Outdoor
Indoor
T
o
g
r
i
d
c
o
n
n
e
c
t
i
o
n
Inverter with or without
galvanic isolation
SPD
3
E3
Q3
=
~
SPD
2
E2
SPD
1
Q1
Q0
Q0
Q2
Outdoor
E1
SPD
1
Q1
Q0
Q0
E1
b a PV array main switch could be included in the inverter. This solution makes inverter service or replacement difcult.
b b If switching for emergency services is required, the main switch in array box can be equipped with tripping coil and motor mechanism for remote reclosing.
b c No protection is required when the number of arrays <= 3 (No cable sizing benet)
b d Service and emergency switching
b e Inverter shall include a protection for anti-islanding (in accordance with VDE 0126 for example)
b f Overload and short-circuit protection.
b g If there is no SPD in the inverter or if the distance between DC box and inverter exceeds 10m a SPD is necessary in this box.
b h
v If the inverter provides no galvanic separation a RCD protection is necessary on AC side. IEC 60364-712 species RCD type B Some local regulations require
RCD type A SI
v If the inverter provides at least simple separation
- Without functional earthing: insulation monitoring is necessary
- With functional earthing: the earthing shall be done with a DC MCB breaker (C60PV 4P series 2 10A) or a fuse.
Needs String / Array junction box PV array main switch Inverter AC box (400V)
Switchgears and control
Isolation (d) (a) (d)
Switching
(Making & breaking rated
current)
DC21B
(d)
DC21B
(a) (d)
Control (b) (d) (e) (d)
Over-current protection (c) (f)
Protection against
Insulation fault
(h) (h)
RCD type B or A SI
Surge protection type 2 type 1 or 2
Enclosure Outdoor IP5x
Double insulation
Indoor IP5x
Double insulation
Standard AC requirement +
grid code requirement
Metering P,Q, PF, Energy
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P28
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4.5.4 150kW to 500kW Grid connected PV system (Large
building and farm)
Three phases inverter with more than two Array boxes
Typically, 150kW to 500kW single inverter. This design is very similar to the
previous one except that it has more arrays, which requires array cable protection.
I
stc
<= 400A, IAC <= 600A.
Outdoor
Indoor
T
o
L
V
/
M
V
t
r
a
n
s
f
o
r
m
e
r
Inverter without
galvanic isolation
SPD
3
E3
Q3
=
~
SPD
1
E2
SPD
0
Q0
Q0
Q21
Q2
Q2
Q1
E1
SPD
0
Q0
Q0
Q1
E1
Q2
Needs String Array junction box Generator junction box Inverter AC box 400V or other
voltage (Transfoless inveter)
Switchgears and control
Isolation (a) (d)
Switching
(Making & breaking
rated current)
DC22A
DC22A
(a) (d)
Control (b) (a) (d)
Over-current protection (c ) (f)
Protection against
Insulation fault
(h) (h)
Surge protection (g) type 2 type 1 or 2
Enclosure Outdoor IP5x
Double insulation
Indoor
Double insulation
Standard AC requirement +
grid code requirement
Metering Energy P,Q, PF, Energy, Alarm, THD,
individual harmonics
Fig. P27 : 150-500kW single MPPT inverter with N arrays > 2
b a PV array main switch could be included in the inverter. This solution makes inverter service or replacement more difcult.
b b If switching for emergency services is required, the main switch in array box can be equipped with tripping coil and motor mechanism for remote reclosing.
b c Array cable protection is recommended to prevent cable overszing. To ensure fast trip of protections 6 to 8 arrays are recommended.
b e Inverter shall include a protection for anti-islanding (in accordance with VDE 0126 for example)
b f Overload and short-circuit protection.
b g If there is no SPD in the inverter or if the distance between DC box and inverter exceeds 10m a SPD is necessary in this box.
b h Galvanic insulation is provided by LV/MV transformer,
v PV system without functional earthing: insulation monitoring is necessary: IMD - IM20 and accessory IMD-IM20-1700
v PV system With functional earthing: the earthing shall be done with a DC MCB breaker (C60PV 4P series 2 10A) or a fuse.
Schneider Electric - Electrical installation guide 2013
P29
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 PV installation architectures
Fig. P28 : 150-500kW multi 3-phases inverters
Multi three phases inverters design without array box
Typically 10x20 to 20x30kW grid connected inverters
Uoc max <=1000V one or two string per inverter. IAC max 50A for one
inverter.
Q6
SPD
3
Indoor
Q5
=
~
Q5
=
~
Q5
=
~
Q5
=
~
Q5
=
~
Q5
=
~
Q5
=
~
Q5
E1 SPD
11
Q11
Q12
SPD
12
E1 SPD
11
Q11
Q12
SPD
12
=
~
E3
Needs String junction box AC Combiner Box
Switchgears and control
See 10 to 36kW design
Surge protection type 2 type 1 or 2
Enclosure Outdoor IP5x
Double insulation
Standard AC requirement +
grid code requirement
Metering Energy P,Q, PF, Energy, Alarm,
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P30
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Multi MW Grid connected PV system (Large building and farm)
Typically 500kW -630kW inverters with LV/MV transformers and MV substation.
Outdoor
E4
E5
SPD
2
SPD
1
=
~
E2
SPD
0
Q0
Q0
Q1
E1
SPD
0
Q0
Q0
Q1
E1
Indoor 2nd inverter similar scheme
Q5
SPD
3
E3
Q2
Q2
Q3
b
Q4
Fig. P29 : 500-630kW inverters with LV/MV transformers
b a PV array main switch is usually included in the inverter panel.
b b If switching for emergency services is required, the main switch in array box can be equipped with tripping coil and motor mechanism for remote reclosing.
b c Array cable protection is recommended to prevent cable overszing. To ensure fast trip of protections 6 to 8 arrays are recommended.
b f Overload and short-circuit protection.
b g If there is no SPD in the inverter or if the between DC box and inverter >10m a SPD is necessary in this box.
b h Galvanic insulation is provided by LV/MV transformer,
v PV system without functional earthing: insulation monitoring is necessary: IMD - IM20 and accessory IMD-IM20-1700
v PV system With functional earthing: the earthing shall be done with a DC MCB breaker (C60PV 4P series 2 10A) or a fuse.
4 PV installation architectures
Needs String Array junction box Generator junction box Inverter AC box 400V or other
voltage (Transfoless inveter)
Switchgears and control
Isolation (a) See next page
Switching
(Making & breaking
rated current)
DC22A
(a) See next page
Control (b) See next page
Over-current protection (c ) See next page (f)
Protection against
Insulation fault
See next page
Surge protection (g) type 2 (g) type 1 or 2
Enclosure Outdoor IP5x
Double insulation
Indoor
Double insulation (i)
Metering Energy P,Q, PF, Energy, Alarm, Power
quality
Schneider Electric - Electrical installation guide 2013
P31
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5 Monitoring
Since the protability of photovoltaic installations depends mainly on operational
uptime, it is essential to ensure that they are permanently up and running. The best
way of ensuring this is to install a monitoring system covering key equipments of the
installation. This system should notify all faults immediately, be capable of detecting
drifts in output, and possibly control equipment remotely.
5.1 Types of monitoring systems
Several types of monitoring systems are available for installations, depending mainly
of the size of the installation.
Systems for Residential up to commercial, 1 to 1000 kWp, are able to monitor the
inverters status, measurements and alarms - and key electrical values related to
the output of the installation.
These systems are based on a data -logger, mostly equipped with a RS232/485
serial port to communicate with the inverters, using Modbus or a proprietary protocol.
Data acquisition is based on low speed polling rate, every 10 minutes in average.
Data may be stored locally in the data-logger, for free, but for a short period of time,
or pushed to an external server which store the data over the years and deliver a
front end, providing an annual service fee. In that case, the communication with the
distant server can be or via GPRS, or via Ethernet
The data-logger can also be equipped with auxiliary inputs, such as analogue inputs
to monitor temperature or irradiance sensors, digital input to monitor the status of an
equipment and/or pulse input to connect with an energy meter equipped with digital
output.
Systems for large commercial up to Utility scale power plant, from 500 kWp upwards,
are able to monitor the complete installation, from the string input to the point of
connection to the grid.
These systems are based on a SCADA (Supervision Control And Data Acquisition)
system, which enable multi site monitoring, DC & AC measurements, remote control
of motorized equipments, smart alarming, generation of reports, performance
indication and other capabilities such as in-depth analysis.
These systems also include other equipment to run the site more efciently, such
as weather station ( temperatures, wind rain gauge ), irradiance sensors, a plant
controller - device which communicate with the grid operator, to adapt the production
of the site to the grid variation ( Voltage, Power Factor ) and specic meters such
as revenue grade meters, close the popint of connection
These scada systems can be local and/or remote, with redundancy capabilities and
high performance for data processing.
This type of installation is mostly served by a Service contract for Operations
& Maintenance and in many cases, with performance objectives which can be
production, performance ratio or availability.
5.2 Monitoring systems
These systems may be autonomous or include remote monitoring, accessible from
the "cloud".
Schneider Electric - Electrical installation guide 2013
P - Photovoltaic installations
P32
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. P30 : Example of an autonomous monitoring system mostly used in residential to
commercial PV installations
Large
screen
display
Data logger
SMS
SMTP FTP
@mail Files
GSM
GPRS
Inverter 1
Sensors
Inverter 2 Inverter 3
=
~
=
~
=
~
Once the data is collected locally, the system sends output data and alerts as soon
as they are generated to a remote monitoring system capable of managing stand-by
periods for maintenance work. This enables the installation to be monitored closely,
which is essential where operators of photovoltaic installations are not necessarily
the site occupants.
Fig. P31 : Example of a system for remote monitoring mostly used in utility scale power plants
Site 2 Site 2
On-site server
Site 1
TCP/IP Ethernet network
RS485 - TCP/IP
SCADA
Ethernet TCP/IP network
Inverter 1
Inverter 2 Inverter 3
Router
=
~
=
~
=
~
Large screen
display and
control in a
control room
Sensors
Equipment status,
measurements
Remote
Operation & Maintenance
Remote monitoring system
5 Monitoring
Schneider Electric - Electrical installation guide 2013
P33
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5.3 Sensors
Sensors provide data to the monitoring systems and include:
b A sensor for measuring instantaneous luminous ux such as a pyranometer (heat
ow sensor used to measure the quantity of solar energy in natural light (W/m), see
Fig. P32). This is the standard reference for the installation. It may be used to identify
shifts over time and is recommended to all suppliers wishing to conduct comparative
analyses and compile statistics for their installations.
b A temperature sensor this is an important factor for photovoltaic power supply
(see Paragraph 2.1). This sensor either serves as an external probe or is attached to
the back of a module.
b A kilowatt hour meter
When selling power, only the kilowatt hour meter operated by the energy distributor
purchasing the electricity may be used as a reference.
The other meters tted within an installation (in the inverter or next to the ofcial
meter) are only indicators with their own specic levels of accuracy. Variations of
more than 10% may occur between the values given by an installations devices and
that given by the ofcial meter. However, these variations are not only due to different
levels of accuracy. They are also caused by energy lost in the cables and safety
devices downstream from the inverter.
It is therefore important to use cables of minimal length and clearly identify:
v The location where the installation will be connected to the network
v The locations where the energy distributors meters will be connected
5.4 Security of the installation
Since modules are expensive and in some cases openly accessible, sites need to be
monitored by security cameras.
NB although this type of surveillance is authorised for private sites, lming of public
highways is prohibited.
Fig. P32 : Pyranometer Kipp & Zonen 2
5 Monitoring
Schneider Electric - Electrical installation guide 2013
Schneider Electric - Electrical installation guide 2013
Q1
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapter Q
Residential and other special
locations
Contents
Residential and similar premises Q2
1.1 General Q2
1.2 Distribution boards components Q2
1.3 Protection of people Q4
1.4 Circuits Q6
1.5 Protection against overvoltages and lightning Q7
Bathrooms and showers Q8
2.1 Classication of zones Q8
2.2 Equipotential bonding Q11
2.3 Requirements prescribed for each zone Q11
Recommendations applicable to special installations Q12
and locations 3
2
1
Schneider Electric - Electrical installation guide 2013
Q - Residential and other special locations
Q2
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.1 General
Related standards
Most countries have national regulations and-or standards governing the rules
to be strictly observed in the design and realization of electrical installations for
residential and similar premises. The relevant international standard is the publication
IEC 60364.
The power network
The vast majority of power distribution utilities connect the low voltage neutral point
of their MV/LV distribution transformers to earth.
The protection of persons against electric shock therefore depends, in such case, on
the principle discussed in chapter F. The measures required depend on whether the
TT, TN or IT scheme of earthing is adopted.
RCDs are essential for TT and IT earthed installations. For TN installations, high
speed overcurrent devices or RCDs may provide protection against direct contact
of the electrical circuits. To extend the protection to exible leads beyond the xed
socket outlets and to ensure protection against res of electrical origin RCDs shall
be installed.
1.2 Distribution boards components (see Fig. Q1)
Distribution boards (generally only one in residential premises) usually include
the meter(s) and in some cases (notably where the supply utilities impose a TT
earthing system and/or tariff conditions which limit the maximum permitted current
consumption) an incoming supply differential circuit-breaker which includes an
overcurrent trip. This circuit-breaker is freely accessible to the consumer.
1 Residential and similar premises
The quality of electrical equipment used in
residential premises is commonly ensured by a
mark of conformity situated on the front of each
item
The power distribution utility connects the LV
neutral point to its MV/LV distribution tranformer
to earth.
All LV installations must be protected by RCDs.
All exposed conductive parts must be bonded
together and connected to the earth.
Electrical installations for residential premises
need a high standard of safety and reliability
Fig. Q1 : Presentation of realizable functions on a consumer unit
Distribution board
Combi surge arrester
Remote control switch
TL 16 A
Programmable thermostat
THP
Load shedding switch
CDSt
Programmable time switch
IHP
Contactors, off-peak
or manual control CT
Differential
MCB
Differential load
switch
Incoming-supply
circuit breaker
Enclosure
Remote control
Energy management
Service connection
Lightning protection
Overcurrent
protection
and isolation
Protection against
direct and indirect
contact,
and protection
against fire
MCB phase and neutral
Schneider Electric - Electrical installation guide 2013
Q3
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
On installations which are TN earthed, the supply utilities usually protect the
installation simply by means of sealed fuse cut-outs immediately upstream of the
meter(s) (see Fig. Q2). The consumer has no access to these fuses.
1 Residential and similar premises
If, in a TT scheme, the value of 80 for the
resistance of the electrode can not be met then,
30 mA RCDs must be installed to take over the
function of the earth leakage protection of the
incoming supply circuit-breaker
The incoming supply circuit-breaker (see Fig. Q3)
The consumer is allowed to operate this CB if necessary (e.g to reclose it if the
current consumption has exceeded the authorized limit; to open it in case of
emergency or for isolation purposes).
The rated residual current of the incoming circuit-breaker in the earth leakage
protection shall be 300 mA.
If the installation is TT, the earth electrode resistance shall be less than
R
50 V
300 mA
166 . In practice, the earth electrode resistance of a new installation
shall be less than 80
(
R
2
)
.
The control and distribution board (consumer unit) (see Fig. Q4)
This board comprises:
b A control panel for mounting (where appropriate) the incoming supply circuit-
breaker and other control auxiliaries, as required
b A distribution panel for housing 1, 2 or 3 rows (of 24 Acti 9 units) or similar MCBs
or fuse units, etc.
b Installation accessories for xing conductors, and rails for mounting MCBs, fuses
bases, etc, neutral busbar and earthing bar, and so on
b Service cable ducts or conduits, surface mounted or in cable chases embedded in
the wall
Note: to facilitate future modications to the installation, it is recommended to keep
all relevant documents (photos, diagrams, characteristics, etc.) in a suitable location
close to the distribution board.
The board should be installed at a height such that the operating handles,
indicating dials (of meters) etc., are between 1 metre and 1.80 metres from the oor
(1.30 metres in situations where handicapped or elderly people are concerned).
Lightning arresters
The installation of lightning arresters at the service position of a LV installation is
strongly recommended for installations which include sensitive (e.g electronic)
equipment.
These devices must automatically disconnect themselves from the installation in
case of failure or be protected by a MCB. In the case of residential installations, the
use of a 300 mA differential incoming supply circuit-breaker type S (i.e slightly time-
delayed) will provide effective earth leakage protection, while, at the same time, will
not trip unnecessarily each time a lightning arrester discharges the current (of an
overvoltage-surge) to earth.
Resistance value of the earth electrode
In the case where the resistance to earth exceeds 80 , one or several 30 mA RCDs
should be used in place of the earth leakage protection of the incoming supply
circuit-breaker.
Circuit breaker
depending on
earthing system
Fuse or
Distribution
board
Meter
Fig. Q2 : Components of a control and distribution board
Fig. Q3 : Incoming-supply circuit-breaker
Fig. Q4 : Control and distribution board
Schneider Electric - Electrical installation guide 2013
Q - Residential and other special locations
Q4
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.3 Protection of people
On TT earthed systems, the protection of persons is ensured by the following
measures:
b Protection against indirect contact hazards by RCDs (see Fig. Q5) of medium
sensitivity (300 mA) at the origin of the installation (incorporated in the incoming
supply circuit-breaker or, on the incoming feed to the distribution board). This
measure is associated with a consumer installed earth electrode to which must be
connected the protective earth conductor (PE) from the exposed conductive parts of
all class I insulated appliances and equipment, as well as those from the earthing
pins of all socket outlets
b When the CB at the origin of an installation has no RCD protection, the protection
of persons shall be ensured by class II level of insulation on all circuits upstream
of the rst RCDs. In the case where the distribution board is metallic, care shall be
taken that all live parts are double insulated (supplementary clearances or insulation,
use of covers, etc.) and wiring reliably xed
b Obligatory protection by 30 mA sensitive RCDs of socket outlet circuits, and
circuits feeding bathroom, laundry rooms, and so on (for details of this latter
obligation, refer to clause 3 of this chapter)
Where utility power supply systems and
consumers installations form a TT earthed
system, the governing standards impose the use
of RCDs to ensure the protection of persons
300 mA
30 mA 30 mA
Bathroom and/or
shower room
Socket-outlets
circuit
Diverse
circuits
Fig. Q5 : Installation with incoming-supply circuit-breaker having instantaneous differential
protection
Incoming supply circuit-breaker with instantaneous differential
relay
In this case:
b An insulation fault to earth could result in a shutdown of the entire installation
b Where a lightning arrester is installed, its operation (i.e. discharging a voltage
surge to earth) could appear to an RCD as an earth fault, with a consequent
shutdown of the installation
Recommendation of suitable Schneider Electric components
b Incoming supply circuit-breaker with 300 mA differential and
b High sensitivity 30 mA RCD (for example differential circuit-breaker 1P + N type
Declic Vigi) on the circuits supplying socket outlets
b High sensitivity 30 mA RCD (for example differential load switch type IDclic) on
circuits to bathrooms, shower rooms, laundry rooms, etc. (lighting, heating, socket
outlets)
Incoming supply circuit-breaker with type S time delayed
differential relay
This type of CB affords protection against fault to earth, but by virtue of a short time
delay, provides a measure of discrimination with downstream instantaneous RCDs.
Tripping of the incoming supply CB and its consequences (on deep freezers, for
example) is thereby made less probable in the event of lightning, or other causes of
voltage surges. The discharge of voltage surge current to earth, through the surge
arrester, will leave the type S circuit-breaker unaffected.
Schneider Electric - Electrical installation guide 2013
Q5
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Residential and similar premises
Recommendation of suitable Schneider Electric components (see Fig. Q6)
b Incoming supply circuit-breaker with 300 mA differential type S and
b High sensitivity 30 mA RCD (for example differential circuit-breaker 1P + N type
Declic Vigi) on the circuits supplying washing machines and dish-washing machine
b High sensitivity 30 mA RCD (for example differential load switch type IDclic) on
circuits to bathrooms, shower rooms, laundry rooms, etc. (lighting, heating, socket
outlets)
300 mA - type S
30 mA
Bathroom and/or
shower room
Socket-
outlet
circuit
Diverse
circuits
30 mA 30 mA
High-risk location
(laundry room)
Fig. Q6 : Installation with incoming-supply circuit-breaker having short time delay differential
protection, type S
Incoming supply circuit-breaker without differential protection
In this case the protection of persons must be ensured by:
b Class II level of insulation up to the downstream terminals of the RCDs
b All outgoing circuits from the distribution board must be protected by 30 mA or
300 mA RCDs according to the type of circuit concerned as discussed in chapter F.
Where a voltage surge arrester is installed upstream of the distribution board
(to protect sensitive electronic equipment such as microprocessors, video-
cassette recorders, TV sets, electronic cash registers, etc.) it is imperative that the
device automatically disconnects itself from the installation following a rare (but
always possible) failure. Some devices employ replaceable fusing elements; the
recommended method however as shown in Figure Q7, is to use a circuit-breaker.
Recommendation of suitable Schneider Electric components
Figure P7 refers:
1. Incoming-supply circuit-breaker without differential protection
2. Automatic disconnection device (if a lightning arrester is installed)
3. 30 mA RCD (for example differential circuit-breaker 1P + N type Declic Vigi) on
each circuit supplying one or more socket-outlets
4. 30 mA RCD (for example differential load swith type IDclic) on circuits to
bathrooms and shower rooms (lighting, heating and socket-outlets) or a 30 mA
differential circuit-breaker per circuit
5. 300 mA RCD (for example differential load swith) on all the other circuits
Bathroom and/or
shower room
Socket-outlet
circuit
300 mA 30 mA 30 mA 30 mA
High-risk circuit
(dish-washing
machine)
Diverse
circuits
2
5 3 4
1
Fig. Q7 : Installation with incoming-supply circuit-breaker
having no differential protection
Schneider Electric - Electrical installation guide 2013
Q - Residential and other special locations
Q6
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1.4 Circuits
Subdivision
National standards commonly recommend the subdivision of circuits according to the
number of utilization categories in the installation concerned (see Fig. Q8):
b At least 1 circuit for lighting. Each circuit supplying a maximum of 8 lighting points
b At least 1 circuit for socket-outlets rated 10/16 A, each circuit supplying a maximum
of 8 sockets. These sockets may be single or double units (a double unit is made up
of two 10/16 A sockets mounted on a common base in an embedded box, identical
to that of a single unit
b 1 circuit for each appliance such as water heater, washing machine, dish-washing
machine, cooker, refrigerator, etc. Recommended numbers of 10/16 A (or similar)
socket-outlets and xed lighting points, according to the use for which the various
rooms of a dwelling are intended, are indicated in Figure Q9
The distribution and division of circuits provides
comfort and facilitates rapid location of fault
Cooking
apparatus
Washing
machine
Lighting Heating Socket-
outlets
Fig. Q8 : Circuit division according to utilization Fig Q9 : Recommended minimum number of lighting and power points in residential premises
Protective conductors
IEC and most national standards require that each circuit includes a protective
conductor. This practice is strongly recommended where class I insulated appliances
and equipment are installed, which is the general case.
The protective conductors must connect the earthing-pin contact in each socket-
outlet, and the earthing terminal in class I equipment, to the main earthing terminal
at the origin of the installation.
Furthermore, 10/16 A (or similarly sized) socket-outlets must be provided with
shuttered contact orices.
Cross-sectional-area (c.s.a.) of conductors (see Fig. Q10)
The c.s.a. of conductors and the rated current of the associated protective device
depend on the current magnitude of the circuit, the ambient temperature, the kind of
installation, and the inuence of neighbouring circuits (refer to chapter G)
Moreover, the conductors for the phase wires, the neutral and the protective
conductors of a given circuit must all be of equal c.s.a. (assuming the same material
for the conductors concerned, i.e. all copper or all aluminium).
The inclusion of a protective conductor in all
circuits is required by IEC and most national
standards
Fig. Q10 : Circuit-breaker 1 phase + N - 2 x 9 mm spaces
Room function Minimum number Minimum number
of xed lighting points of 10/16 A socket-outlets
Living room 1 5
Bedroom, lounge, 1 3
bureau, dining room
Kitchen 2 4
(1)
Bathroom, shower room 2 1 or 2
Entrance hall, box room 1 1
WC, storage space 1 -
Laundry room - 1
(1) Of which 2 above the working surface and 1 for a specialized circuit: in addition
an independent socket-outlet of 16 A or 20 A for a cooker and a junction box or
socket-outlet for a 32 A specialized circuit
Schneider Electric - Electrical installation guide 2013
Q7
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Figure Q11 indicates the c.s.a. required for commonly-used appliances
Protective devices 1 phase + N in 2 x 9 mm spaces comply with requirements for
isolation, and for marking of circuit current rating and conductor sizes.
1.5 Protection against overvoltages and lightning
The choice of surge arrester is described in chapter J
Installation rules
Three principal rules must be respected:
1 - It is imperative that the three lengths of cable used for the installation of the surge
arrester each be less than 50 cm i.e.:
b the live conductors connected to the isolating switch
b from the isolating switch to the surge arrester
b from the surge arrester to the main distribution board (MDB) earth bar (not
to be confused with the main protective-earth (PE) conductor or the main earth
terminal for the installation.The MDB earth bar must evidently be located in the
same cabinet as the surge arrester.
2 - It is necessary to use an isolating switch of a type recommended by the
manufacturer of the surge arrester.
3 - In the interest of a good continuity of supply it is recommended that the
circuit-breaker be of the time-delayed or selective type.
Type of circuit c. s. a. of the Maximum power Protective device
single-phase 230 V conductors
1 ph + N or 1 ph + N + PE
Fixed lighting 1.5 mm
2
2,300 W Circuit-breaker 16 A
(2.5 mm
2
) Fuse 10 A
10/16 A 2.5 mm
2
4,600 W Circuit-breaker 25 A
(4 mm
2
) Fuse 20 A
Individual-load circuits
Water heater 2.5 mm
2
4,600 W Circuit-breaker 25 A
(4 mm
2
) Fuse 20 A
Dish-washing machine 2.5 mm
2
4,600 W Circuit-breaker 25 A
(4 mm
2
) Fuse 20 A
Clothes-washing machine 2.5 mm
2
4,600 W Circuit-breaker 25 A
(4 mm
2
) Fuse 20 A
Cooker or hotplate
(1)
6 mm
2
7,300 W Circuit-breaker 40 A
(10 mm
2
) Fuse 32 A
Electric space heater 1.5 mm
2
2,300 W Circuit-breaker 16 A
(2.5 mm
2
) Fuse 10 A
(1) In a 230/400 V 3-phase circuit, the c. s. a. is 4 mm
2
for copper or 6 mm
2
for aluminium, and protection is provided by a 32 A
circuit-breaker or by 25 A fuses.
Fig. Q11 : C. s. a. of conductors and current rating of the protective devices in residential installations (the c. s. a. of aluminium conductors are shown in brackets)
1 Residential and similar premises
Schneider Electric - Electrical installation guide 2013
Q - Residential and other special locations
Q8
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Bathrooms and showers rooms are areas of high risk, because of the very low
resistance of the human body when wet or immersed in water.
Precaution to be taken are therefore correspondingly rigorous, and the regulations
are more severe than those for most other locations.
The relevant standard is IEC 60364-7-701.
Precautions to observe are based on three aspects:
b The denition of zones, numbered 0,1, 2, 3 in which the placement (or exclusion)
of any electrical device is strictly limited or forbidden and, where permitted, the
electrical and mechanical protection is prescribed
b The establishment of an equipotential bond between all exposed and extraneous
metal parts in the zones concerned
b The strict adherence to the requirements prescribed for each particular zones, as
tabled in clause 3
2.1 Classication of zones
Sub-clause 701.32 of IEC 60364-7-701 denes the zones 0, 1, 2, 3 as shown in the
following diagrams (see Fig. Q12 below to Fig Q18 opposite and next pages):
2 Bathrooms and showers
Fig. Q12 : Zones 0, 1, 2 and 3 in proximity to a bath-tub
Zone 1*
(*) Zone 1 is above the bath as shown in the vertical cross-section
Zone 0
Zone 2 Zone 3
0.60 m 2.40 m
Zone 1*
Zone 2 Zone 3
0.60 m
2.40 m
Zone 0
Zone 0
Zone 1
Zone 3 Zone 2
0.60 m
2.25 m
Zone 1
2.40 m
Schneider Electric - Electrical installation guide 2013
Q9
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Bathrooms and showers
Zone 2
Zone 3
Zone 3
0.60 m
2.25 m
Zone 2
2.40 m
Zone 0
Zone 1
Zone 0
Zone 1
Zone 2
0.60 m
2.40 m
Zone 1 Zone 3
2.40 m 0.60 m
Zone 1
Zone 0
Fig. Q13 : Zones 0, 1, 2 and 3 in proximity of a shower with basin
(1) When the shower head is at the end of a flexible tube, the vertical central axis of
a zone passes through the fixed end of the flexible tube
Zone 2
2.25 m
Zone 1
Zone 3
2.40 m
0.60 m
Zone 1
Zone
2
Zone 3 Zone 3
Zone 2
Zone 1
2.40 m
0.60 m
0.60 m
0.60 m
Fixed shower
head (1)
Fixed shower
head (1)
Fig. Q14 : Zones 0, 1, 2 and 3 in proximity of a shower without basin
Prefabricated
shower
cabinet
0.60 m
0.60 m
Fig. Q15 : No switch or socket-outlet is permitted within 60 cm of the door opening of a shower
cabinet
Schneider Electric - Electrical installation guide 2013
Q - Residential and other special locations
Q10
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. QP16 : Individual showers with dressing cubicles
Zone 3
AD 3
BB 2
BC 3
AD 3
BB 2
BC 3
Shower cabinets (zone 1)
Dressing cubicles (zone 2)
Classes
of external
influences
WC
Classes
of external
influences
AD 3
BB 2
BC 3
AD 3
BB 3
BC 3
AD 7
BB 3
BC 3
Zone 2
AD 3
BB 2
BC 3
WC
Classes
of external
influences
AD 7
BB 3
BC 3
Classes
of external
influences
h < 1.10m
1.10m < h < 2.25m
AD 3
BB 3
BC 3
Zone 1
Dressing cubicles
AD 5
h < 1.10m
1.10m < h < 2.25m
AD 3
BB 3
BC 3
AD 5
Fig. Q17 : Individual showers with separate individual dressing cubicles
Fig. Q18 : Communal showers and common dressing room
Zone 2
AD 7
BB 3
BC 3
Classes
of external
influences
AD 3
BB 2
BC 3
Classes
of external
influences
Zone 2
Dressing room
Zone 1
h < 1.10m
1.10m < h < 2.25m
AD 3
BB 3
BC 3
AD 5
h < 1.10m
1.10m < h < 2.25m
AD 3
BB 3
BC 3
AD 5
Note: Classes of external inuences (see Fig.Q46).
Schneider Electric - Electrical installation guide 2013
Q11
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Bathrooms and showers
2.2 Equipotential bonding (see Fig. Q19)
Metallic pipes
h i 2 m
Radiator
Metal
door-frame
Metal bath Equipotential conductors
for a bathroom
Lighting
Gaz
Water-drainage
piping
Socket-outlet
To the earth
electrode
Fig. Q19 : Supplementary equipotential bonding in a bathroom
2.3 Requirements prescribed for each zone
The table of clause 3 describes the application of the principles mentioned in the
foregoing text and in other similar or related cases
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Q - Residential and other special locations
Q12
3 Recommendations applicable to
special installations and locations
Fig. Q20 : Main requirements prescribed in many national and international standards (continued on opposite page)
Figure Q20 below summarizes the main requirements prescribed in many national
and international standards.
Note: Section in brackets refer to sections of IEC 60364-7
Locations Protection principles IP Wiring Switchgear Socket-outlets Installation
level and cables materials
Domestic dwellings b TT or TN-S systems 20 Switch operating handles Protection by
and other habitations b Differential protection and similar devices on 30 mA RCDs
v 300 mA if the earth electrode distribution panels,
resistance is y 80 ohms instantaneous to be mounted
or short time delay (type S) between 1 metre and
v 30 mA if the earth electrode 1.80 metre above the oor
resistance is u 500 ohms
b surge arrester at the origin of the
installation if
v supply is from overhead line with bare
conductors, and if
v the keraunic level > 25
b a protective earth (PE) conductor
on all circuits
Bathrooms or shower Supplementary equipotential bonding
rooms (section 701) in zones 0, 1, 2 and 3
Zone 0 SELV 12 V only 27 Class II Special appliances
limited to
strict minimum
Zone 1 SELV 12 V 25 Class II Special aplliances
limited to Water heater
strict minimum
Zone 2 SELV 12 V or 30 mA RCD 24 Class II Special appliances
limited to Water heater
strict minimum Class II luminaires
Zone 3 21 Only socket-outlets protected by :
b 30 mA RCD or
b Electrical separation or
b SELV 50 V
Swimming baths Supplementary equipotential bonding
(section 702) in zones 0, 1, and 2
Zone 0 SELV 12 V 28 Class II Special appliances
limited to
strict minimum
Zone 1 25 Class II Special appliances
limited to
strict minimum
Zone 2 22 Only socket-outlets protected by :
(indoor) b 30 mA RCD or
24 b electrical separation or
(outdoor) b SELV 50 V
Saunas 24 Class II Adapted to temperature
(section 703)
Work sites Conventional voltage limit UL 44 Mechanically Protection by
(section 704) reduced to 25 V protected 30 mA RCDs
Agricultural and Conventional voltage limit UL 35 Protection by
horticultural reduced to 25 V 30 mA RCDs
establishments Protection against re risks
(section 705) by 500 mA RCDs
Restricted conductive 2x Protection of:
locations (section 706) b Portable tools by:
v SELV or
v Electrical separation
b Hand-held lamps
v By SELV
b Fixed equipement by
v SELV
v Electrical separation
v 30 mA RCDs
v Special supplementary
equipotential bonding
Schneider Electric - Electrical installation guide 2013
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Q13
3 Recommendations applicable to
special installations and locations
Locations Protection principles IP Wiring Switchgear Socket-outlets Installation
level and cables materials
Fountains Protection by 30 mA RCDs and
(section 702) equipotential bonding of all exposed
and extraneous conductive parts
Data processing TN-S system recommended
(section 707) TT system if leakage current is limited.
Protective conductor 10 mm
2
minimum
in aluminium. Smaller sizes (in copper)
must be doubled.
Caravan park 55 Flexible cable of Socket-outlets
(section 708) 25 metres shall be placed
length at a height of
0.80 m to 1.50 m
from the ground.
Protection of
circuits by
30 mA RCDs
(one per 6
socket-outlets)
Marinas and pleasure The cable length for connection to Protection of
craft (section 709) pleasure craft must not exceeded 25 m circuits by
30 mA RCDs
(one per 6
socket-outlets)
Medical locations IT medical system equipotential Only magnetic Protection of circuits
Group 2 : Operating grouding, limited to one operating protection for the by thermal-magnetic
theatres and similar theatre and not exceeding 10 kVA primary of LV/LV protection only. One
(section 710) transformer. Monitoring to three per circuit.
of secondary loads
and transformer
temperature
Medical locations TT or TNS Protection by
Group 1 : 30 mA RCDs
Hospitalization and
similar (section 710)
Exhibitions, shows and TT or TN-S systems 4x Protection by
stands (section 711) 30 mA RCDs
Balneotherapy Individual: see section 701
(cure-centre baths) (volumes 0 and 1)
Collective: see section 702
(volumes 0 and 1)
Motor-fuel lling Explosion risks in security zones Limited to the
stations necessary minimum
Motor vehicules Protection by RCDs or by
electrical separation
External lighting 23 Protection by
installations 30 mA RCDs
(section 714)
Mobile or transportable The use of TN-C system is not 30 mA RCDs
units (section 717) permitted inside any unit must be used for
all socket-outlets
supplying
equipment
outside the unit
Fig. Q20 : Main requirements prescribed in many national and international standards (concluded)
Schneider Electric - Electrical installation guide 2013
Schneider Electric - Electrical installation guide 2013
R1
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Chapter R
EMC guidelines
Contents
Electrical distribution R2
Earthing principles and structures R3
Implementation R5
3.1 Equipotential bonding inside and outside buildings R5
3.2 Improving equipotential conditions R5
3.3 Separating cables R7
3.4 Raised oor R7
3.5 Cable running R8
3.6 Busway R11
3.7 Implementation of shielded cables R11
3.8 Communication networks R13
3.9 Implementation of surge arresters R15
3.10 Cabinet cabling R17
3.11 Standards R20
Coupling mechanisms and counter-measures R22
4.1 General R22
4.2 Common-mode impedance coupling R23
4.3 Capacitive coupling R24
4.4 Inductive coupling R25
4.5 Radiated coupling R26
Wiring recommendations R28
5.1 Signal classes R28
5.2 Wiring recommendations R28
1
2
3
4
5
Schneider Electric - Electrical installation guide 2013
R - EMC guidelines
R2
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
1 Electrical distribution
The system earthing arrangement must be properly selected to ensure the
safety of life and property. The behaviour of the different systems with respect
to EMC considerations must be taken into account. Figure R1 below presents a
summary of their main characteristics.
European standards (see EN 50174-2, EN 50310 and HD 60364-4-444) recommend
the TN-S eathing system which causes the fewest EMC problems for installations
comprising information-technology equipment (including telecom equipment).
When an installation includes high-power equipment (motors, air-conditioning, lifts,
power electronics, etc.), it is advised to install one or more transformers specically
for these systems. Electrical distribution must be organised in a star system and all
outgoing circuits must exit the main low-voltage switchboard (MLVS).
Electronic systems (control/monitoring, regulation, measurement instruments, etc.)
must be supplied by a dedicated transformer in a TN-S system.
Figure R2 below illustrates these recommendations.
Disturbing
devices
Sensitive
devices
Transformer
Not recommended Preferable Excellent
Disturbing
devices
Sensitive
devices
Disturbing
devices
L
i
g
h
t
i
n
g
A
i
r
c
o
n
d
i
t
i
o
n
i
n
g
Sensitive
devices
Fig. R2 : Recommendations of separated distributions
TT TN-S IT TN-C
Safety of persons Correct Correct
Use of residual current Continuity of the PE conductor must be ensured throughout the installation
devices (circuit breaker)
is mandatory
Safety of property Correct Poor Correct Poor
Medium ground-fault High ground-fault Low ground-fault current High ground-fault current
current current (about 1 kA) for rst fault (about 1 kA)
(< about ten amps) (< about ten mA),
but high for second fault
Availability of energy Correct Correct Excellent Correct
EMC performance Correct Excellent Poor (to be avoided) Poor
- Risk of overvoltages - Good equipotential - Risk of overvoltages (not recommended)
- Equipotential situation - Common-mode lters - Neutral and PE are
problems - Need to manage and surge arrestors combined
- Need to manage devices with high must handle the phase- - 50/60 Hz and
devices with high leakage currents to-phase voltages harmonics currents
leakage currents - High ground-fault - RCDs subject to circulate in the earthing
currents (transient nuisance tripping if and grounding structures
disturbances) common-mode - High ground-fault
capacitors are present currents
- Equivalent to (transient disturbances)
TN system for second
fault
Fig. R1 : Main characteristics of the different earthing sytems
Schneider Electric - Electrical installation guide 2013
R3
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
2 Earthing principles and
structures
This section deals with the earthing and equipotential bonding of information-technology
devices and other similar devices requiring interconnections for signalling purposes.
Earthing networks are designed to full a number of functions. They can be
independent or operate together to provide one or more of the following:
b Safety of persons with respect to electrical hazards
b Protection of equipment with respect to electrical hazards
b A reference value for reliable, high-quality signals
b Satisfactory EMC performance
The system earthing arrangement is generally designed and installed in view of
obtaining a low impedance capable of diverting fault currents and HF currents away
from electronic devices and systems. There are different types of system earthing
arrangements and some require that specic conditions be met. These conditions
are not always met in typical installations. The recommendations presented in this
section are intended for such installations.
For professional and industrial installations, a common bonding network (CBN) may
be useful to ensure better EMC performance with respect to the following points:
b Digital systems and new technologies
b Compliance with the EMC essential requirements of Directive 2004/108/EC
(emission and immunity)
b The wide number of electrical applications
b A high level of system safety and security, as well as reliability and/or availability
For residential premises, however, where the use of electrical devices is limited, an
isolated bonding network (IBN) or, even better, a mesh IBN may be a solution.
It is now recognised that independent, dedicated earth electrodes, each serving a
separate earthing network, are a solution that is not acceptable in terms of EMC,
but also represent a serious safety hazard. In certain countries, the national building
codes forbid such systems.
Use of a separate clean earthing network for electronics and a dirty earthing
network for energy is not recommended in view of obtaining correct EMC, even
when a single electrode is used (see Fig. R3 and Fig. R4). In the event of a lightning
strike, a fault current or HF disturbances as well as transient currents will ow in the
installation. Consequently, transient voltages will be created and result in failures or
damage to the installation. If installation and maintenance are carried out properly,
this approach may be dependable (at power frequencies), but it is generally not
suitable for EMC purposes and is not recommended for general use.
"Clean"
earthing network
Electrical
earthing network
lightning rods
Separate earth electrodes
"Clean"
earthing network
Electrical
earthing network
lightning rods
Single earth electrode
R - EMC guidelines
Fig. R3 : Independent earth electrodes, a solution generally not acceptable for safety and EMC
reasons
Fig. R4 : Installation with a single earth electrode
Schneider Electric - Electrical installation guide 2013
R - EMC guidelines
R4
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
The recommended conguration for the earthing network and electrodes is two or
three dimensional (see Fig. R5). This approach is advised for general use, both
in terms of safety and EMC. This recommendation does not exclude other special
congurations that, when correctly maintained, are also suitable.
Fig. R6 : Each level has a mesh and the meshes are
interconnected at several points between levels. Certain
ground-oor meshes are reinforced to meet the needs of
certain areas
2 Earthing principles and
structures
Equipotential bonding required for
multi-level buildings
"Electrical" and "communication"
earthing as needed
lightning rods
Multiple interconnected earth electrodes
In a typical installation for a multi-level building, each level should have its
own earthing network (generally a mesh) and all the networks must be both
interconnected and connected to the earth electrode. At least two connections are
required (built in redundancy) to ensure that, if one conductor breaks, no section of
the earthing network is isolated.
Practically speaking, more than two connections are made to obtain better symmetry
in current ow, thus reducing differences in voltage and the overall impedance
between the various levels in the building.
The many parallel paths have different resonance frequencies. If one path has a high
impedance, it is most probably shunted by another path with a different resonance
frequency. On the whole, over a wide frequency spectrum (dozens of Hz and MHz), a
large number of paths results in a low-impedance system (see Fig. R6).
Each room in the building should have earthing-network conductors for equipotential
bonding of devices and systems, cableways, trunking systems and structures. This
system can be reinforced by connecting metal pipes, gutters, supports, frames, etc.
In certain special cases, such as control rooms or computers installed on false oors,
ground reference plane or earthing strips in areas for electronic systems can be used
to improve earthing of sensitive devices and protection interconnection cables.
Fig. R5 : Installation with multiple earth electrodes
Schneider Electric - Electrical installation guide 2013
R5
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
R - EMC guidelines
3 Implementation
3.1 Equipotential bonding inside and outside
buildings
The fundamental goals of earthing and bonding are the following:
b Safety
By limiting the touch voltage and the return path of fault currents
b EMC
By avoiding differences in potential and providing a screening effect.
Stray currents are inevitably propagated in an earthing network. It is impossible to
eliminate all the sources of disturbances for a site. Earth loops are also inevitable.
When a magnetic eld affects a site, e.g. the eld created by lightning, differences in
potential are created in the loops formed by the various conductors and the currents
owing in the earthing system. Consequently, the earthing network is directly
affected by any counter-measures taken outside the building.
As long as the currents ow in the earthing system and not in the electronic circuits,
they do no damage. However, when earthing networks are not equipotential, e.g.
when they are star connected to the earth electrode, the HF stray currents will ow
wherever they can, including in control wires. Equipment can be disturbed, damaged
or even destroyed.
The only inexpensive means to divide the currents in an earthing system and
maintain satisfactory equipotential characteristics is to interconnect the earthing
networks. This contributes to better equipotential bonding within the earthing
system, but does not remove the need for protective conductors. To meet legal
requirements in terms of the safety of persons, sufciently sized and identied
protective conductors must remain in place between each piece of equipment and
the earthing terminal. What is more, with the possible exception of a building with a
steel structure, a large number of conductors for the ligthning rods or the lightning-
protection network must be directly connected to the earth electrode.
The fundamental difference between a protective conductor (PE) and a ligthning
rod down-conductor is that the rst conducts internal currents to the neutral of the
MV/LV transformer whereas the second carries external current (from outside the
installation) to the earth electrode.
In a building, it is advised to connect an earthing network to all accessible conducting
structures, namely metal beams and door frames, pipes, etc. It is generally sufcient
to connect metal trunking, cable trays and lintels, pipes, ventilation ducts, etc. at
as many points as possible. In places where there is a large amount of equipment
and the size of the mesh in the bonding network is greater than four metres, an
equipotential conductor should be added. The size and type of conductor are not of
critical importance.
It is imperative to interconnect the earthing networks of buildings that have shared
cable connections. Interconnection of the earthing networks must take place via a
number of conductors and all the internal metal structures of the buildings or linking
the buildings (on the condition that they are not interrupted).
In a given building, the various earthing networks (electronics, computing, telecom,
etc.) must be interconnected to form a single equipotential bonding network.
This earthing-network must be as meshed as possible. If the earthing network is
equipotential, the differences in potential between communicating devices will be low
and a large number of EMC problems disappear. Differences in potential are also
reduced in the event of insulation faults or lightning strikes.
If equipotential conditions between buildings cannot be achieved or if the distance
between buildings is greater than ten metres, it is highly recommended to use
optical bre for communication links and galvanic insulators for measurement and
communication systems.
These measures are mandatory if the electrical supply system uses the IT or
TN-C system.
3.2 Improving equipotential conditions
Bonding networks
Even though the ideal bonding network would be made of sheet metal or a ne
mesh, experience has shown that for most disturbances, a three-metre mesh size is
sufcient to create a mesh bonding network.
Examples of different bonding networks are shown in Figure R7 next page. The
minimum recommended structure comprises a conductor (e.g. copper cable or strip)
surrounding the room.
Schneider Electric - Electrical installation guide 2013
R - EMC guidelines
R6
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. R7 : Examples of bonding networks
Trunk
IBN
IBN
BN: Bonding network
CBN: Common bonding network
IBN: Isolated bonding network
CBN
Star (IBN)
PE
Mesh IBN
Mesh BN
Mesh BN
Local mesh Local mesh
IBN
Tree structure
The length of connections between a structural element and the bonding network
does not exceed 50 centimetres and an additional connection should be installed
in parallel at a certain distance from the rst. The inductance of the connection
between the earthing bar of the electrical enclosure for a set of equipment and the
bonding network (see below) should be less than one Henry (0.5 H, if possible).
For example, it is possible to use a single 50 cm conductor or two parallel conductors
one meter long, installed at a minimum distance from one another (at least 50 cm) to
reduce the mutual inductance between the two conductors.
Where possible, connection to the bonding network should be at an intersection to
divide the HF currents by four without lengthening the connection. The prole of the
bonding conductors is not important, but a at prole is preferable. The conductor
should also be as short as possible.
Parallel earthing conductor (PEC)
The purpose of a parallel earthing conductor is to reduce the common-mode current
owing in the conductors that also carry the differential-mode signal (the common-
mode impedance and the surface area of the loop are reduced).
The parallel earthing conductor must be designed to handle high currents when it
is used for protection against lightning or for the return of high fault currents. When
cable shielding is used as a parallel earthing conductor, it cannot handle such high
currents and the solution is to run the cable along metal structural elements or
cableways which then act as other parallel earthing conductors for the entire cable.
Another possibility is to run the shielded cable next to a large parallel earthing
conductor with both the shielded cable and the parallel earthing conductor connected
at each end to the local earthing terminal of the equipment or the device.
For very long distances, additional connections to the network are advised for
the parallel earthing conductor, at irregular distances between the devices. These
additional connections form a shorter return path for the disturbing currents owing
through the parallel earthing conductor. For U-shaped trays, shielding and tubes, the
additional connections should be external to maintain the separation with the interior
(screening effect).
Bonding conductors
Bonding conductors may be metal strips, at braids or round conductors. For high-
frequency systems, metal strips and at braids are preferable (skin effect) because a
round conductor has a higher impedance than a at conductor with the same cross
section. Where possible, the length to width ratio should not exceed 5.
Schneider Electric - Electrical installation guide 2013
R7
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Implementation
3.3 Separating cables
The physical separation of high and low-current cables is very important for EMC,
particularly if low-current cables are not shielded or the shielding is not connected
to the exposed conductive parts (ECPs). The sensitivity of electronic equipment is in
large part determined by the accompanying cable system.
If there is no separation (different types of cables in separate cableways, minimum
distance between high and low-current cables, types of cableways, etc.),
electromagnetic coupling is at its maximum. Under these conditions, electronic
equipment is sensitive to EMC disturbances owing in the affected cables.
Use of busbar trunking systems such as Canalis or busbar ducts for high power
ratings is strongly advised. The levels of radiated magnetic elds using these types of
trunking systems is 10 to 20 times lower than standard cables or conductors.
The recommendations in the Cable running and Wiring recommendations
sections should be taken into account.
3.4 Raised oors
The inclusion of the oors in the mesh contributes to equipotentiality of the area and
consequently to the distribution and dilution of disturbing LF currents.
The screening effect of a raised oor is directly related to its equipotentiality. If the
contact between the oor tiles is poor (rubber antistatic joints, for example) or if
the contact between the support brackets is faulty (pollution, corrosion, dust, etc.
or if there are no support brackets), it is necessary to add an equipotential mesh.
In this case, it is sufcient to ensure effective electrical connections between the
metal pedestals. Small spring clips are available on the market to connect the metal
pedestals to the equipotential mesh. Ideally, each pedestal should be connected, but
it is often sufcient to connect every other pedestals in each direction. A mesh 1.5 to
2 metres in size is suitable in most cases. The recommended cross-sectional area of
the copper is 10 mm
2
or more. In general, a at braid is used. To reduce the effects of
corrosion, it is advised to use tin-plated copper (see Fig. R8).
Perforated oor tiles act like normal oor tiles when they have a cellular steel
structure.
Preventive maintenance is required for the oor tiles approximately every ve years
(depending on the type of tile plate and the environment, including humidity, dust
and corrosion). Rubber or polymer antistatic joints must be maintained, similar to the
bearing surfaces of the oor tiles (cleaning with a suitable product).
Raised floor
u 10 mm
2
Metal pedestals
Spring clips
Fig. R8 : Raised oor implementation
Schneider Electric - Electrical installation guide 2013
R - EMC guidelines
R8
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. R10 : Installation of different types of cables
Lower OK Better
NO!
Area protected against external EM field
YES!
3.5 Cable running
Selection of materials and their shape depends on the following criteria:
b Severity of the EM environment along cableways (proximity of sources of
conducted or radiated EM disturbances)
b Authorised level of conducted and radiated emissions
b Type of cables (shielded?, twisted?, optical bre?)
b EMI withstand capacity of the equipment connected to the wiring system
b Other environmental constraints (chemical, mechanical, climatic, re, etc.)
b Future extensions planned for the wiring system
Non-metal cableways are suitable in the following cases:
b A continuous, low-level EM environment
b A wiring system with a low emission level
b Situations where metal cableways should be avoided (chemical environment)
b Systems using optical bres
For metal cableways, it is the shape (at, U-shape, tube, etc.) rather than the cross-
sectional area that determines the characteristic impedance. Closed shapes are
better than open shapes because they reduce common-mode coupling. Cableways
often have slots for cable straps. The smaller the better. The types of slots causing
the fewest problems are those cut parallel and at some distance from the cables.
Slots cut perpendicular to the cables are not recommended (see Fig. R9).
In certain cases, a poor cableway in EMI terms may be suitable if the
EM environment is low, if shielded cables or optical bres are employed, or separate
cableways are used for the different types of cables (power, data processing, etc.).
It is a good idea to reserve space inside the cableway for a given quantity of
additional cables. The height of the cables must be lower than the partitions of the
cableway as shown below. Covers also improve the EMC performance of cableways.
In U-shaped cableways, the magnetic eld decreases in the two corners.
That explains why deep cableways are preferable (see Fig. R10).
Different types of cables (power and low-level cables) should not be installed in the
same bundle or in the same cableway. Cableways should never be lled to more than
half capacity.
Fig. R9 : CEM performance of various types of metal cableways
Schneider Electric - Electrical installation guide 2013
R9
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Implementation
Forbidden Correct Ideal
Power cables
Auxiliary circuits (relay contacts)
Control (digital)
Measurements (analogue)
Note: All metal parts must be electrically interconnected
Fig. R11 : Recommendation to install groups of cables in metal cableways
Recommended
Acceptable
Not recommended
Fig. R12 : Recommendation to install cables in steel beams
It is recommended to electromagnetically separate groups from one another, either
using shielding or by installing the cables in different cableways. The quality of the
shielding determines the distance between groups. If there is no shielding, sufcient
distances must be maintained (see Fig. R11).
The distance between power and control cables must be at least 5 times the radius
of the larger power cable.
Metal building components can be used for EMC purposes. Steel beams (L, H, U
or T shaped) often form an uninterrupted earthed structure with large transversal
sections and surfaces with numerous intermediate earthing connections. Cables
should if possible be run along such beams. Inside corners are better than the
outside surfaces (see Fig. R12).
Both ends of metal cableways must always be connected to local earth network.
For very long cableways, additional connections to the earthing system are
recommended between connected devices. Where possible, the distance between
these earthing connections should be irregular (for symmetrical wiring systems) to
avoid resonance at identical frequencies. All connections to the earthing system
should be short.
Metal and non-metal cableways are available. Metal solutions offer better
EMC characteristics. A cableway (cable trays, conduits, cable brackets, etc.) must
offer a continuous, conducting metal structure from beginning to end.
An aluminium cableway has a lower DC resistance than a steel cableway of the
same size, but the transfer impedance (Zt) of steel drops at a lower frequency,
particularly when the steel has a high relative permeability
r
. Care must be taken
when different types of metal are used because direct electrical connection is not
authorised in certain cases to avoid corrosion. That could be a disadvantage in terms
of EMC.
When devices connected to the wiring system using unshielded cables are not
affected by low-frequency disturbances, the EMC of non-metal cableways can be
improved by adding a parallel earthing conductor (PEC) inside the cableway. Both
ends must be connected to the local earthing system. Connections should be made
to a metal part with low impedance (e.g. a large metal panel of the device case).
The PEC should be designed to handle high fault and common-mode currents.
Schneider Electric - Electrical installation guide 2013
R - EMC guidelines
R10
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. R13 : Metal cableways assembly
NO!
NOT RECOMMENDED
YES!
Mediocre OK Better
Fig. R14 : Recommendation for metal cableways assembly to pass through a wall
Implementation
When a metal cableway is made up of a number of short sections, care is required to
ensure continuity by correctly bonding the different parts. The parts should preferably
be welded along all edges. Riveted, bolted or screwed connections are authorised as
long as the contact surfaces conduct current (no paint or insulating coatings) and are
protected against corrosion. Tightening torques must be observed to ensure correct
pressure for the electrical contact between two parts.
When a particular shape of cableway is selected, it should be used for the entire
length. All interconnections must have a low impedance. A single wire connection
between two parts of the cableway produces a high local impedance that cancels its
EMC performance.
Starting at a few MHz, a ten-centimetre connection between two parts of the cableway
reduces the attenuation factor by more than a factor of ten (see Fig. R13).
Each time modications or extensions are made, it is very important to make sure
they are carried out according to EMC rules (e.g. never replace a metal cableway by
a plastic version!).
Covers for metal cableways must meet the same requirements as those applying to
the cableways themselves. A cover should have a large number of contacts along the
entire length. If that is not possible, it must be connected to the cableway at least at
the two ends using short connections (e.g. braided or meshed connections).
When cableways must be interrupted to pass through a wall (e.g. rewalls), low-
impedance connections must be used between the two parts (see Fig. R14).
Schneider Electric - Electrical installation guide 2013
R11
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3.6 Busway
Busways reduce the risk of exposure to electromagnetic elds.
According to the WHO (World Health Organisation), exposure to electromagnetic
elds can be a health hazard starting at levels as low as 0.2 micro-Teslas and could
represent a long-term risk of cancer. Some countries have created standards that
stipulate limits (e.g. 0.2 T at 1 metre in Sweden).
All electrical conductors generate magnetic elds proportional to the distance
between them. The design of busbar trunking with tightly spaced conductors in a
metal enclosure helps to considerably reduce radiated electromagnetic elds.
The electromagnetic eld characteristics of busbar trunking are welldened
and measurements show that they are far below potentially dangerous levels
(see Fig. R14b).
In specic cases, where particularly low values are required (computer rooms,
medical rooms, some ofces), it is important to minimize the magnetic induction
generated by power cables.
Magnetic induction is:
b proportional to the current
b proportional to the distance between the conductors
b inversely proportional to the square of the distance with respect to the busbar.
Busbar with a steel casing provides a good screening effect compared to power
cables: magnetic eld reduced from 2 to 30 times, depending on the Canalis model.
This is particularly low because of the short distance between the bars and the
additional attenuation provided by the steel casing.
3 Implementation
Fig. R14a : Power cables and metallic busways magnetic eld
radiations
100
0.1
1.0
10
100
1000
1000 10000
Distance from the center of the Busbar (mm)
KTA10 (1000 A)
KTA16 (1600 A)
KTA20 (2000 A)
KTA40 (4000 A)
B
(
T
)
Fig. R14b : Canalis busbar trunking system data
3.7 Implementation of shielded cables
When the decision is made to use shielded cables, it is also necessary to determine
how the shielding will be bonded (type of earthing, connector, cable entry, etc.),
otherwise the benets are considerably reduced. To be effective, the shielding should
be bonded over 360. Figure R15 below show different ways of earthing the cable
shielding.
For computer equipment and digital links, the shielding should be connected at each
end of the cable.
Connection of the shielding is very important for EMC and the following points should
be noted.
Schneider Electric - Electrical installation guide 2013
R - EMC guidelines
R12
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Fig. R15 : Implementation of shielded cables
Cable
insulated
coat
Cable
insulated
coat
Cable
insulated
coat
Screen
Screen
Screen
EMC clamp
width
Added
insulated
coat
If the shielded cable connects equipment located in the same equipotential bonding
area, the shielding must be connected to the exposed conductive parts (ECP) at
both ends. If the connected equipment is not in the same equipotential bonding area,
there are a number of possibilities.
b Connection of only one end to the ECPs is dangerous. If an insulation fault occurs,
the voltage in the shielding can be fatal for an operator or destroy equipment. In
addition, at high frequencies, the shielding is not effective.
b Connection of both ends to the ECPs can be dangerous if an insulation fault
occurs. A high current ows in the shielding and can damage it. To limit this problem,
a parallel earthing conductor (PEC) must be run next to the shielded cable. The size
of the PEC depends on the short-circuit current in the given part of the installation.
It is clear that if the installation has a well meshed earthing network, this problem
does not arise.
The following gure shows how to prepare the screen when EMC clamps are used.
Fig. R16 : recommended screen preparation
Not acceptable
Bonding bar
connected
to the chassis
Equipotential metal panel
Poorly connected shielding = reduced effectiveness
Collar, clamp, etc.
Collar, clamp, etc.
Cable gland = circumferential contact to
equipotential metal panel
Acceptable
Correct
All bonding connections must be made to bare metal
Ideal
Bonding wire
(pigtail)
Schneider Electric - Electrical installation guide 2013
R13
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Implementation
3.8 Communication networks
It is highly recommended to follow the European Standards EN 50173 series to
perform Information Technology cablings.
To ensure a reliable data transmission, the quality of the whole link shall be
homogeneous. That means the category of the different cables shall be the same,
the connecting interfaces shall be adapted to the cables.
Cables and connections of different categories may be mixed within a channel
however the resultant performance will be determined by the category of the lowest
performing component.
The shield continuity of the whole link (patch cords, Terminal Outlets, horizontal
cable) shall be ensured and controlled by tests.
The Terminal Outlets (TO) could be used to earth the screen terminations in the
cabinet. The choice of these TO is very important.
Communication networks are mostly extensive. They interconnect equipment located
in different areas where the feeding power supplies could have different earthing
systems.
If these different areas are not well equipotential, harsh transient currents could
appear (lightning, main power fault, etc.) causing high voltage potential differences
between interconnected equipment.
Communication interfaces (board, module, etc.) could be disturbed or damaged by
this common mode over voltages.
The use of TN-S earthing system and well equipotential installation minimize this
issue.
In any case, the use of Surge Protective Device (SPD) installed in Common Mode
and/or Differential Mode is recommended.
Equipment 1
Patch cord
TO
Equipment 2
Patch cord
TO
A
p
p
a
r
a
t
u
s
A
p
p
a
r
a
t
u
s
Main link
Dirturbing
currents
Equipment 1
Patch cord
TO
Equipment 2
Patch cord
TO
A
p
p
a
r
a
t
u
s
A
p
p
a
r
a
t
u
s
Main link
Dirturbing
currents
Fig. R17 : How to reduce disturbing currents loop
Schneider Electric - Electrical installation guide 2013
R - EMC guidelines
R14
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
If the different areas/zones are not equipotential, if the power supply earthing system
is TN-C or IT, or if there is a doubt and the previous 2 points, optical ber links are
highly recommended.
To avoid electrical safety issue, the optical ber link should not have any metallic
parts.
Protection against coils disturbances
AC and mostly DC Coils (relay, contactor, actuator, etc.) are very disturbing sources.
To minimize these High Frequency disturbances the following solutions could be
implemented. (In grey, the preferred choice).
To be efcient, the TVS shall be installed closely to the coil.
Arcing voltage
Un
Coil
Relay
x
Arcing voltage
Un
x
TVS
Coil
Relay
Fig. R18 : TVS reduces the arcing voltage
Symbol Transient Voltage
Suppression type
For
AC
For
DC
Overvoltage
limitation
Contact fall time
R-C network Y Y 2 to 3 . Un 1 to 2 times the
standard time
Metal Oxide Varistor Y Y < 3 . Un 1.1 to 1.5 times the
standard time
Transient Voltage
Suppression Diode
Bidirectional
Y Y < 2. Un 1.1 to 1.5 times the
standard time
Transient Voltage
Suppression Diode
Directional
N Y Un + 0.7 V 3 to 10 times the
standard time
Free wheeling diode N Y Un + 0.7 V 3 to 10 times the
standard time
Resistor Y Y < 4 . Un 1.5 to 2.5 times the
standard time
Fig. R19 : TVS table information
Schneider Electric - Electrical installation guide 2013
R15
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Imax: 65kA (8/20)
In: 20kA (8/20)
Up: 1,5kV
Uc: 340Va
d
1
d
2
d
3
d
1
+
d
2
+
d
3
y
5
0
c
m
disconnector
S
P
D
d
1
d
3
d
1
+
d
2
+
d
3
3
5
c
m
S
P
D
Q
uick P
R
D
U equipment
disconnection
circuit-breaker
load to be
protected
U2
Up
U1
surge arrester
L3
L2
L1
L = L1 + L2 + L3 < 50 cm
3.9 Implementation of surge arresters
Connections
They must be as short as possible. In fact, one of the essential characteristics
for equipment protection is the maximum level of voltage that the equipment can
withstand at its terminals. A surge arrester with a protection level suitable for the
equipment to be protected should be chosen (see Fig. 20). The total length of the
connections is L = L1 + L2 + L3. It represents an impedance of roughly 1 H/m for
high frequency currents.
Application of the rule U = L
di
dt
with an 8/20 s wave and a current of 8 kA leads to a voltage of 1,000 V peak per
metre of cable.
U = 1.10
-6
x 8.10
3
= 1,000 V
8.10
-6
This gives U equipment = Up + U1 + U2.
If L1 + L2 + L3 = 50 cm, this will result in a voltage surge of 500 V for a current of
8 kA.
Wiring rules
b Rule 1
The rst rule to be respected is not to exceed a distance of 50 cm when connecting
the surge arrester to its disconnection circuit-breaker. The surge arrester connections
are shown in Figure R21.
Fig. R20 : Surge arrester connection: L < 50 cm
Fig. R21 : SPD with separate or integrated disconnector
3 Implementation
Schneider Electric - Electrical installation guide 2013
R - EMC guidelines
R16
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
b Rule 2
The outgoing feeders of the protected conductors must be connected right at the
terminals of the surge arrester and disconnection circuit-breaker (see Fig. R22).
Intermediate
earth
terminal
L N
Main earth
terminal
Intermediate
earth terminal
L N
Main earth
terminal
protected
outgoing
feeders
Large
frame
loop
surface
Clean cables polluted by
neighbouring polluted cables
Clean cable paths separated
from polluted cable paths
Small
frame
loop
surface
YES YES NO NO
Fig. R23 : Example of wiring precautions to be taken in a box (rules 2, 3, 4, 5)
b Rule 3
The phase, neutral and PE incoming wires must be tightly coupled to reduce the loop
surfaces (see Fig. R23).
Fig. R22 : Connections are right at the SPD's terminals
Quick PRD
Protected feeders Power supply
L < 35 cm
b Rule 4
The surge arrester's incoming wires must be moved away from the outgoing wires to
avoid mixing the polluted cables with the protected cables (see Fig. R19).
b Rule 5
The cables must be attened against the metallic frames of the box in order to
minimise the frame loops and thus benet from a disturbance screening effect.
If the box is made of plastic and the loads particularly sensitive, it must be replaced
by a metal box.
Schneider Electric - Electrical installation guide 2013
R17
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3 Implementation
In all cases, you must check that the metallic frames of the boxes or cabinets are
frame grounded by very short connections.
Finally, if screened cables are used, extra lengths which serve no purpose
("pigtails"), must be cut off as they reduce screening effectiveness.
3.10 Cabinet cabling (Fig. R24)
Each cabinet must be equipped with an earthing bar or a ground reference metal
sheet. All shielded cables and external protection circuits must be connected to this
point. Anyone of the cabinet metal sheets or the DIN rail can be used as the ground
reference.
Plastic cabinets are not recommended. In this case, the DIN rail must be used as
ground reference.
Cabinet cabling recommendations
Each cabinet, cubicle or enclosure shall be tted, as a minimum, with an earthing bar
and a reference metallic plate or grid (grounding plate). All the metallic parts (frames,
panels, roof, door, etc.) shall be interconnected together with adapted features.
The use of specic washer is recommended. Some examples of preferred ones are
shown below:
Fig. R24 : Grounding and bonding examples
Potential
Reference Plate
Fig. R25 : Preferred washers examples
Schneider Electric - Electrical installation guide 2013
R - EMC guidelines
R18
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
All the cables shall be laid on the grounded/earthed metallic structures.
All EMC components (e.g. EMI lter, EMC clamps) shall be xed directly on the
metallic plates without any insulating coating (e.g. free of paint or varnish).
Fig. R26 : Some examples of washers, bolt and lugs mounting.
Fig. R27 : Earthing and bonding examples
Painted
sheet metal
paint
paint
L
o
n
g
P
E
L < 10 cm
PE EMC
HF
HF
Ensure metal-to-metal
contact
L
F - H
F
Schneider Electric - Electrical installation guide 2013
R19
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Screened cables coming or going out from the cubicle shall be bonded to the
earthing bar or grounding plate if these cables are coming from long distance and/or
from non equipotential zones.
The goal is to divert the disturbing currents at the cabinet entrance and not inside the
cabinet.
Non metallic cabinet are not recommended for EMC purposes.
To protect electronics equipment against low frequency magnetic eld, it is
recommended to use (galvanized) steel cabinets.
Non magnetic metals (e.g. aluminum, stainless steel) are more efcient for high
frequencies environment.
Power and low level apparatus shall be physically separated and cables segregation
and distances between power and sensitive cables shall also be respected as shown
on the gures below.
P
a
r
t
i
t
i
o
n
p
a
n
e
l
LOW level Power
To power components Mains Actuators Probes
Detectors
Fig. R28 : Correct EMC design inside a same cabinet
3 Implementation
Schneider Electric - Electrical installation guide 2013
R - EMC guidelines
R20
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
3.11 Standards
It is absolutely essential to specify the standards and recommendations that must be
taken into account for installations.
Below are several documents that may be used:
b EN 50174-1 Information technology - Cabling installation.
Part 1: Specication and quality assurance
b EN 50174-2 Information technology - Cabling installation.
Part 2: Installation planning and practices inside buildings
b EN 50310 Application of equipotential bonding and earthing in buildings
with information technology equipment.
b EN 50173 Information Technology - Generic cabling systems
b HD 60364-4-444 Low-voltage electrical installations
Part 4-444: Protection for safety - Protection against voltage
disturbances and electromagnetic disturbances
Electrostatic discharge protection
Normally, the use of specic tools or packages is required to handle or carry
electronics boards or components (CPU, memory, analog, PCMCIA modules, etc.)
which are sensitive to Electrostatic discharge (ESD).
Our products comply with standard ESD tests but ESD conditions are in some cases
over the specs.
ESD threat could cause semiconductors aging and failures. Without any care, the
semiconductor devices could be damaged or burned without users noticing.
Solution
The use of specic anti ESD wrist strap is highly recommended. This wrist strap
shall be installed inside each cabinet and correctly connected to the earthed cabinet
metallic frame.
Provide a procedure which depicts the good conditions of use.
An example is shown below.
Fig. R29 : Correct EMC design inside two separate cabinets
LOW level
Power
Metal cable trough
Schneider Electric - Electrical installation guide 2013
R21
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
ESD Wrist Strap
Static is produced by the contact and separation of materials: Shoes and oors,
clothes and the human body, parts being moved on or from surfaces. The generated
charge will reside on the body until it is discharged - the familiar "zap" that all of
us have experienced. It's the "zap" that does the damage. If we can prevent any
static charge from building up on the body, then there is essentially nothing to be
discharged. A properly grounded wrist strap effectively prevents any static charge
from building up. Any static charge that would tend to be created is instantly
"drained" by the wirst strap. The wrist strap maintains the potential equilibrium that is
accomplished the hard way with the "zap".
Fig. R30 : ESD wrist strap examples
3 Implementation
Schneider Electric - Electrical installation guide 2013
R - EMC guidelines
R22
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Coupling mechanisms and
counter-measures
4.1 General
An EM interference phenomenon may be summed up in Figure R31 below.
Walkie-talkie TV set
Radiated waves
Coupling Source Victim
Means by which
disturbances are
transmitted
Origin of
emitted disturbances
Example:
Equipment likely
to be disturbed
The different sources of disturbances are:
b Radio-frequency emissions
v Wireless communication systems (radio, TV, CB, radio telephones, remote controls)
v Radar
b Electrical equipment
v High-power industrial equipment (induction furnaces, welding machines, stator
control systems)
v Ofce equipment (computers and electronic circuits, photocopy machines, large
monitors)
v Discharge lamps (neon, uorescent, ash, etc.)
v Electromechanical components (relays, contactors, solenoids, current interruption
devices)
b Power systems
v Power transmission and distribution systems
v Electrical transportation systems
b Lightning
b Electrostatic discharges (ESD)
b Electromagnetic nuclear pulses (EMNP)
The potential victims are:
b Radio and television receivers, radar, wireless communication systems
b Analogue systems (sensors, measurement acquisition, ampliers, monitors)
b Digital systems (computers, computer communications, peripheral equipment)
The different types of coupling are:
b Common-mode impedance (galvanic) coupling
b Capacitive coupling
b Inductive coupling
b Radiated coupling (cable to cable, eld to cable, antenna to antenna)
Fig. R31 : EM interference phenomenon
Schneider Electric - Electrical installation guide 2013
R23
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4.2 Common-mode impedance coupling
Denition
Two or more devices are interconnected by the power supply and communication
cables (see Fig. R32). When external currents (lightning, fault currents, disturbances)
ow via these common-mode impedances, an undesirable voltage appears between
points A and B which are supposed to be equipotential. This stray voltage can
disturb low-level or fast electronic circuits.
All cables, including the protective conductors, have an impedance, particularly at
high frequencies.
Fig. R32 : Denition of common-mode impedance coupling
Examples (see Fig. R33)
b Devices linked by a common reference conductor (e.g. PEN, PE) affected by fast
or intense (di/dt) current variations (fault current, lightning strike, short-circuit, load
changes, chopping circuits, harmonic currents, power factor correction capacitor
banks, etc.)
b A common return path for a number of electrical sources
Stray
overvoltage
Device 1
Z2
Z1
Z sign.
I2
I1
Device 2
Signal line
ECPs ECPs
The exposed conductive parts (ECP) of devices 1 and 2 are connected to a common
earthing terminal via connections with impedances Z1 and Z2.
The stray overvoltage ows to the earth via Z1. The potential of device 1 increases
to Z1 I1. The difference in potential with device 2 (initial potential = 0) results in the
appearance of current I2.
Z Zsign Z
Z
Zsign Z
1 1 2 2
2
1
1
2
I I
I
I
= + ( ) =
+ ( )
Current I2, present on the signal line, disturbs device 2.
Device 1 Device 2
Signal cable
Disturbed
cable
Fault
currents
Lightning
strike
Disturbing
current
Difference in
potential
ZMC
Fig. R33 : Example of common-mode impedance coupling
4 Coupling mechanisms and
counter-measures
Schneider Electric - Electrical installation guide 2013
R - EMC guidelines
R24
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Counter-measures (see Fig. R34)
If they cannot be eliminated, common-mode impedances must at least be as low as
possible. To reduce the effects of common-mode impedances, it is necessary to:
b Reduce impedances:
v Mesh the common references,
v Use short cables or at braids which, for equal sizes, have a lower impedance than
round cables,
v Install functional equipotential bonding between devices.
b Reduce the level of the disturbing currents by adding common-mode ltering and
differential-mode inductors
If the impedance of the parallel earthing conductor PEC (Z sup) is very low
compared to Z sign, most of the disturbing current ows via the PEC, i.e. not
via the signal line as in the previous case.
The difference in potential between devices 1 and 2 becomes very low and the
disturbance acceptable.
Stray
overvoltage
Device 1
Z2
Z1
Z sign.
Z sup.
I2
I1
Device 2
PEC
Fig. R34 : Counter-measures of common-mode impedance coupling
4.3 Capacitive coupling
Denition
The level of disturbance depends on the voltage variations (dv/dt) and the value of
the coupling capacitance between the disturber and the victim.
Capacitive coupling increases with:
b The frequency
b The proximity of the disturber to the victim and the length of the parallel cables
b The height of the cables with respect to a ground referencing plane
b The input impedance of the victim circuit (circuits with a high input impedance are
more vulnerable)
b The insulation of the victim cable (
r
of the cable insulation), particularly for tightly
coupled pairs
Figure R35 shows the results of capacitive coupling (cross-talk) between two cables.
Examples (see Fig. R36 opposite page)
b Nearby cables subjected to rapid voltage variations (dv/dt)
b Start-up of uorescent lamps
b High-voltage switch-mode power supplies (photocopy machines, etc.)
b Coupling capacitance between the primary and secondary windings of
transformers
b Cross-talk between cables
t
t
U
Vsource
Vvictim
Fig. R35 : Typical result of capacitive coupling (capacitive
cross-talk)
Schneider Electric - Electrical installation guide 2013
R25
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Counter-measures (see Fig. R37)
b Limit the length of parallel runs of disturbers and victims to the strict minimum
b Increase the distance between the disturber and the victim
b For two-wire connections, run the two wires as close together as possible
b Position a PEC bonded at both ends and between the disturber and the victim
b Use two or four-wire cables rather than individual conductors
b Use symmetrical transmission systems on correctly implemented, symmetrical
wiring systems
b Shield the disturbing cables, the victim cables or both (the shielding must be
bonded)
b Reduce the dv/dt of the disturber by increasing the signal rise time where possible
4.4 Inductive coupling
Denition
The disturber and the victim are coupled by a magnetic eld. The level of disturbance
depends on the current variations (di/dt) and the mutual coupling inductance.
Inductive coupling increases with:
b The frequency
b The proximity of the disturber to the victim and the length of the parallel cables,
b The height of the cables with respect to a ground referencing plane,
b The load impedance of the disturbing circuit.
Examples (see Fig. R38 next page)
b Nearby cables subjected to rapid current variations (di/dt)
b Short-circuits
b Fault currents
b Lightning strikes
b Stator control systems
b Welding machines
b Inductors
Source
Differential mode Common mode
Victim
Source Victim
Vs
DM
Vs DM: Source of the disturbing voltage (differential mode)
Iv DM: Disturbing current on victim side (differential mode)
Vs CM: Source of the disturbing voltage (common mode)
Iv CM: Disturbing current on victim side (common mode)
Iv
DM
Vs
CM
Iv
CM
Fig. R36 : Example of capacitive coupling
Fig. R37 : Cable shielding with perforations reduces capacitive
coupling
Metal shielding
Source
C
Victim
4 Coupling mechanisms and
counter-measures
Schneider Electric - Electrical installation guide 2013
R - EMC guidelines
R26
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
Counter-measures
b Limit the length of parallel runs of disturbers and victims to the strict minimum
b Increase the distance between the disturber and the victim
b For two-wire connections, run the two wires as close together as possible
b Use multi-core or touching single-core cables, preferably in a triangular layout
b Position a PEC bonded at both ends and between the disturber and the victim
b Use symmetrical transmission systems on correctly implemented, symmetrical
wiring systems
b Shield the disturbing cables, the victim cables or both (the shielding must be
bonded)
b Reduce the dv/dt of the disturber by increasing the signal rise time where possible
(series-connected resistors or PTC resistors on the disturbing cable, ferrite rings on
the disturbing and/or victim cable)
4.5 Radiated coupling
Denition
The disturber and the victim are coupled by a medium (e.g. air). The level of
disturbance depends on the power of the radiating source and the effectiveness
of the emitting and receiving antenna. An electromagnetic eld comprises both an
electrical eld and a magnetic eld. The two elds are correlated. It is possible to
analyse separately the electrical and magnetic components.
The electrical eld (E eld) and the magnetic eld (H eld) are coupled in wiring
systems via the wires and loops (see Fig. R39).
H
Victim loop
Victim pair
i
Differential mode Common mode
H
Disturbing
cable
Disturbing
cable
Victim loop
i
Fig. R38 : Example of inductive coupling
E field
i
Field-to-cable coupling Field-to-loop coupling
H field
V
Fig. R39 : Denition of radiated coupling
Schneider Electric - Electrical installation guide 2013
R27
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
4 Coupling mechanisms and
counter-measures
When a cable is subjected to a variable electrical eld, a current is generated in the
cable. This phenomenon is called eld-to-cable coupling.
Similarly, when a variable magnetic eld ows through a loop, it creates a counter
electromotive force that produces a voltage between the two ends of the loop. This
phenomenon is called eld-to-loop coupling.
Examples (see Fig. R40)
b Radio-transmission equipment (walkie-talkies, radio and TV transmitters, mobile
services)
b Radar
b Automobile ignition systems
b Arc-welding machines
b Induction furnaces
b Power switching systems
b Electrostatic discharges (ESD)
b Lighting
EM field
i
Example of field-to-cable coupling Example of field-to-loop coupling
Device 1 Device 2
Signal
cable
h
Area of the
earth loop h
E field
Device
Ground reference plane
Fig. R40 : Examples of radiated coupling
Counter-measures
To minimise the effects of radiated coupling, the measures below are required.
For eld-to-cable coupling
b Reduce the antenna effect of the victim by reducing the height (h) of the cable with
respect to the ground referencing plane
b Place the cable in an uninterrupted, bonded metal cableway (tube, trunking, cable
tray)
b Use shielded cables that are correctly installed and bonded
b Add PECs
b Place lters or ferrite rings on the victim cable
For eld-to-loop coupling
b Reduce the surface of the victim loop by reducing the height (h) and the length
of the cable. Use the solutions for eld-to-cable coupling. Use the Faraday cage
principle.
Radiated coupling can be eliminated using the Faraday cage principle. A possible
solution is a shielded cable with both ends of the shielding connected to the metal
case of the device. The exposed conductive parts must be bonded to enhance
effectiveness at high frequencies.
Radiated coupling decreases with the distance and when symmetrical transmission
links are used.
Schneider Electric - Electrical installation guide 2013
R - EMC guidelines
R28
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5 Wiring recommendations
5.1 Signal classes (see Fig. R41)
Device
1 - Power connections
(supply + PE)
2 - Relay
connections
4 - Analogue link
(sensor)
3 - Digital link
(bus)
Digital connection
Two distinct pairs
Poorly implemented
ribbon cable
Correctly implemented
ribbon cable
Bonding wires
Analogue pair
NO! YES!
Standard cable
Fig. R41 : Internal signals can be grouped in four classes
Four classes of internal signals are:
b Class 1
Mains power lines, power circuits with a high di/dt, switch-mode converters, power-
regulation control devices.
This class is not very sensitive, but disturbs the other classes (particularly in
common mode).
b Class 2
Relay contacts.
This class is not very sensitive, but disturbs the other classes (switching, arcs when
contacts open).
b Class 3
Digital circuits (HF switching).
This class is sensitive to pulses, but also disturbs the following class.
b Class 4
Analogue input/output circuits (low-level measurements, active sensor supply
circuits). This class is sensitive.
It is a good idea to use conductors with a specic colour for each class to
facilitate identication and separate the classes. This is useful during design and
troubleshooting.
5.2 Wiring recommendations
Cables carrying different types of signals must be physically separated
(see Fig. R42 above)
Disturbing cables (classes 1 and 2) must be placed at some distance from the
sensitive cables (classes 3 and 4) (see Fig. R32 and Fig. R43)
In general, a 10 cm separation between cables laid at on sheet metal is sufcient
(for both common and differential modes). If there is enough space, a distance of
30 cm is preferable. If cables must be crossed, this should be done at right angles to
avoid cross-talk (even if they touch). There are no distance requirements if the cables
are separated by a metal partition that is equipotential with respect to the ECPs.
However, the height of the partition must be greater than the diameter of the cables.
NO! YES!
Unshielded cables of
different groups
Risk of cross-talk in common mode if e < 3 h
Disturbing
cable
Sensitive
cable
Shielded cables of
different groups
Ground
reference
plane
h
e
NO! YES!
Cross incompatible
cables at right angles
Disturbing
cable
Sensitive
cable
30 cm u 1 m
Fig. R42 : Wiring recommendations for cables carrying different
types of signals
Fig. R43 : Use of cables and ribbon cable
Schneider Electric - Electrical installation guide 2013
R29
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
A cable should carry the signals of a single group (see Fig. R44)
If it is necessary to use a cable to carry the signals of different groups, internal
shielding is necessary to limit cross-talk (differential mode). The shielding, preferably
braided, must be bonded at each end for groups 1, 2 and 3.
It is advised to overshield disturbing and sensitive cables (see Fig. R45)
The overshielding acts as a HF protection (common and differential modes) if it
is bonded at each end using a circumferential connector, a collar or a clampere
However, a simple bonding wire is not sufcient.
Fig. R44 : Incompatible signals = different cables
Avoid using a single connector for different groups (see Fig. R46)
Except where necessary for groups 1 and 2 (differential mode). If a single connector
is used for both analogue and digital signals, the two groups must be separated by at
least one set of contacts connected to 0 V used as a barrier.
All free conductors (reserve) must always be bonded at each end
(see Fig. R47)
For group 4, these connections are not advised for lines with very low voltage
and frequency levels (risk of creating signal noise, by magnetic induction, at the
transmission frequencies).
Fig. R46 : Segregation applies to connectors as well! Fig. R47 : Free wires must be equipotentially bonded
5 Wiring recommendations
Electronic
control
device
NO!
Electro-
mechanical
device
Shielded pair
Sensor
Unshielded cable for stator control
Electronic
control
device
YES!
Electro-
mechanical
device
Shielded pair + overshielding
Bonded using a clamp
Sensor
Shielded cable for stator control
Fig. R45 : Shielding and overshielding for disturbing and/or sensitive cables
NO! YES!
Electronic
system
Equipotential sheet metal panel
Wires not
equipotentially
bonded
Equipotential sheet metal panel
Electronic
system
Digital connections
Analogue connections
Power connections
Shielding
Power +
analogue
Power +
relay contacts
Digital +
relay contacts
Digital +
analogue
Relay I/O connections
NO! YES!
Digital connections
Analogue connections
NO! YES!
Schneider Electric - Electrical installation guide 2013
R - EMC guidelines
R30
S
c
h
n
e
i
d
e
r
E
l
e
c
t
r
i
c
-
a
l
l
r
i
g
h
t
s
r
e
s
e
r
v
e
d
5 Wiring recommendations
The two conductors must be installed as close together as possible
(see Fig. R48)
This is particularly important for low-level sensors. Even for relay signals with a
common, the active conductors should be accompanied by at least one common
conductor per bundle. For analogue and digital signals, twisted pairs are a minimum
requirement. A twisted pair (differential mode) guarantees that the two wires remain
together along their entire length.
NO! YES!
PCB with
relay contact
I/Os
Power supply
Area of
loop too large
- +
PCB with
relay contact
I/Os
Power supply
- +
Fig. R48 : The two wires of a pair must always be run close together
Group-1 cables do not need to be shielded if they are ltered
But they should be made of twisted pairs to ensure compliance with the previous
section.
Cables must always be positioned along their entire length against the bonded
metal parts of devices (see Fig. R49)
For example: Covers, metal trunking, structure, etc. In order to take advantage of the
dependable, inexpensive and signicant reduction effect (common mode) and anti-
cross-talk effect (differential mode).
NO! YES!
Chassis 1
All metal parts (frame, structure, enclosures, etc.) are equipotential
Chassis 2
Chassis 3
Power
supply
I/O interface
Chassis 1
Chassis 2
Chassis 3
Power
supply
I/O interface
Fig. R49 : Run wires along their entire length against the bonded metal parts
The use of correctly bonded metal trunking considerably improves
internal EMC (see Fig. R50)
Power or disturbing cables
Relay cables
Measurement or sensitive cables
Metal tray
NO! YES!
Fig. R50 : Cable distribution in cable trays
Schneider Electric - Electrical installation guide 2013
Schneider Electric - Electrical installation guide 2013
Schneider Electric - Electrical installation guide 2013
Electrical
installation guide
2013
According to
IEC international
standards
06/2013
EIGED306001EN
ART.822690
Make the most of your energy
35, rue Joseph Monier
CS30323
F-92506 Rueil-Malmaison Cedex
RCS Nanterre 954 503 439
Capital social 896 313 776
www.schneider-electric.com
As standards, specications and designs change from time to time, please ask for conrmation
of the information given in this pubication.
Schneider Electric Industries SAS
E
l
e
c
t
r
i
c
a
l
i
n
s
t
a
l
l
a
t
i
o
n
g
u
i
d
e
A
c
c
o
r
d
i
n
g
t
o
I
E
C
i
n
t
e
r
n
a
t
i
o
n
a
l
s
t
a
n
d
a
r
d
s
2
0
1
3
This document has been
printed on ecological paper