Consolidated DWG List

1) The document is a consolidated drawing list for an NGL extraction unit with equipment layouts and piping and instrumentation diagrams. 2) It includes 7 area plot plans and lists over 50 equipment tags to be shown on the plans at a scale of 1:100. 3) The remarks section notes that some equipment like de-ethanizer area and column tray stations were not considered in the phase II plans.

Uploaded by

avaisharma
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
142 views10 pages

Consolidated DWG List

1) The document is a consolidated drawing list for an NGL extraction unit with equipment layouts and piping and instrumentation diagrams. 2) It includes 7 area plot plans and lists over 50 equipment tags to be shown on the plans at a scale of 1:100. 3) The remarks section notes that some equipment like de-ethanizer area and column tray stations were not considered in the phase II plans.

Uploaded by

avaisharma
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 10

CONSOLIDATED DWG LIST FOR NGL EXTRACTION UNIT PDVSA PIRITAL-I MAN HR ESTIMATION

SR. NO. 1 2 3 4 5 6 7 8 TYPE UNIT KEY PLAN AREA PLOT PLAN FOR NGL EXTRACTION UNIT NGL-1 NGL-2 NGL-3 NGL-4 NGL-5 NGL-6 NGL-7 SIZE A0 A0 A0 A0 A0 A0 A0 A0 SCALE 1:100 1:30 1:30 1:30 1:30 1:30 1:30 1:30 QTY 1 30 20 13 21 10

DATE PRD CHK APPROVED TOTAL QTY 1

PIPING GA

118

9 NGL MAIN RACK INTERCONNECTING DWG UG COMPOSITE DRAWING

NGL MAIN RACK AREA RACK INTERCONNECTING DRAWING NGL-1 NGL-2 NGL-3 NGL-4 NGL-5 NGL-6 NGL-7

A0

1:50 1:50

24 24 2 2 1 1 1 1 2 24

10 11 12 13 14 15 16 17

A0 A0 A0 A0 A0 A0 A0 A0

1:100 1:100 1:100 1:100 1:100 1:100 1:100

3/5/2014 PATG DHAA PITS REMARK

1 DRAWING CONSIDERD FOR TURBO EXPANDER RACK PROVISION AND TOTAL 4 TIER TAKEN IN TO CONSIDERATION 1 DRAWING CONSIDERD FOR TURBO EXPANDER RACK PROVISION AND TOTAL 4 TIER TAKEN IN TO CONSIDERATION

PHASE II

SR. NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

TYPE

UTILITY STATION (3 SERVICE)

SAMPLING WITH COOLER

SAMPLING WITHOUT COOLER

DESCRIPTION CHILLING AREA TURBO EXPANDER AREA ABSORBER AREA DE-METHANIZER AREA AIR COLLER AREA RACK AREA CHILLING AREA TURBO EXPANDER AREA ABSORBER DE-METHANIZER AIR COLLER CHILLING AREA TURBO EXPANDER AREA ABSORBER DE-METHANIZER AIR COOLER

QTY 3 3 1 2 1 9 0 0 0 0 0 0 0 0 0 0

TOTAL QTY

REMARK

19

COLUMN TRAY STATION NOT CONSIDERED COLUMN TRAY STATION NOT CONSIDERED CONSIDERED ONE FOR C3 PUMPS

NA

NA

ANALYZER SHELTER EQUIPMENT ON SKID CHILLING AREA TURBO EXPANDER AREA ABSORBER DE-METHANIZER AIR COOLER 1 2 1 1 1

NA NA

EMERGENCY SHOWER & EYEWASHER

DE-ETHANIZER AREA NOT CONSIDERED

Sr. No

EQUIPMENT LAYOUT

2 3

PLATE FIN HEAT EXCHANGERS GAS/GAS EXCHANGER GAS/GAS EXCHANGER GAS/LIQUID EXCHANGER DEMETHANIZER CONDENSER LOW TEMP SEPERATOR LOW TEMPERATURE SEPERATOR TURBO EXPANDER 1st LOW PRESSRUE EXPANDER / COMPRESSOR 1st LOW PRESSRUE EXPANDER / COMPRESSOR PACKAGE 2nd LOW PRESSRUE EXPANDER / COMPRESSOR 2nd LOW PRESSRUE EXPANDER / COMPRESSOR PACKAGE
ABSORBER TOWER

ABSORBER ABSORBER BOTTOM PUMP ABSORBER BOTTOM SPARE PUMP


5 DE-METHANIZER TOWER

DEMETHANIZER REFLUX PUMP DEMETHANIZER REFLUX SPARE PUMP DEMETHANIZER DEMETHANIZER REBOILER DEMETHANIZER BOTTOM PUMP DEMETHANIZER BOTTOM SPARE PUMP RECYCLE GAS EXCHANGER SIDE CHILLER
6 7 AIR COOLER

C3+ AIR COOLER


DE-ETHANIZER

C3+ BOTTOM PUMP C3+ BOTTOM SPARE PUMP DEETHANIZER OVHD CONDENSER DEETHANIZER OVHD CONDENSER DEETHANIZER OVHD CONDENSER DEETHANIZER OVHD CONDENSER DEETHANIZER BOTTOM REBOILER DEETHANIZER REFLUX PUMP DEETHANIZER REFLUX SPARE PUMP ETHANE PRODUCT PUMP AND SPARE

ETHANE PRODUCT PUMP AND SPARE DEETHANIZER DEETHANIZER OVHD ACCUMULATOR ETHANE PRODUCT BOOSTER PUMP ETHANE PRODUCT BOOSTER SPARE PUMP

EQUIPMENT LAYOUT LIST FOR NGL EXTRACTION UNIT PDVSA PIRITAL-I MAN HR ESTIMATION
EQUIPMENT TAG NO. AREA SIZE SCALE TYPE OF DWG. PLAN

A0 D2-22.0301 D2-22.0302 D2-22.0303 D2-22.0304 D8-22.0301 D4-22.0301 D10-22.0301 D4-22.0302 D10-22-0302 D8-22.0302 D3-22.0303 D3-22.0304 D3-22.0301 D3-22.0302 D8-22.0303 D2-22.0305 D3-22.0305 D3-22.0306 D2-22.0306 D2-22.1003 D2-22.0502 D3-22.0501 D3-22.0502 D2-22.1004 D2-22.1005 D2-22.1006 D2-22.1007 D2-22.0501 D3-22.0503 D3-22.0504 D3-22.0505 NGL-1

1:100

NGL-2

A0 A0

1:100 1:100

1 1

NGL-3

A0 NGL-4 A0

1:100

1:100

NGL-5

NGL-6

A0 A0

1:100 1:100

NGL-7

NGL-7

D3-22.0506 D8-22.0501 D8-22.0502 D3-22.0507 D3-22.0508

ION UNIT
TYPE OF DWG. SECTION

DATE PRD CHK APPROVED EXTRA DWG. QTY.

3/5/2014 PATG DHAA PITS REMARK

1 1

2 2

P&ID deleted P&ID deleted P&ID Not found Phase II 1 1 2


Phase II Phase II Phase II Phase II Phase II Phase II Phase II Phase II Phase II Phase II Phase II

Phase II Phase II Phase II Phase II Phase II