CCNA 4 Chapter 7 V4.0

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

1

A network engineer has decided to pilot test a portion of a new network design
rather than rely on
a prototype for proof-of-concept. What are two advantages of pilot testing a
design concept?(Choose two.)

The test network experiences real-world network traffic.

Users within the enterprise are not affected by the test.

Network response can be tested in unplanned and unpredictable situations.

Unlikely failure conditions can be conveniently tested.

Network response can be tested in a highly controlled simulated environment.

2
While preparing a network test plan document, a network designer records all
initial and modified
device configurations. Which section of the document typically contains this
information?

Appendix

Test Procedures

Test Description

Actual Results and Conclusions

Anticipated Results and Success Criteria

3
Refer to the exhibit. A network designer creates a test plan that includes the
specification shown.
In which section of the test plan would this specification be found?

Test Description

Test Procedures

Design and Topology Diagram

Cisco-Training.net
Actual Results and Conclusions

Anticipated Results and Success Criteria

4
What OSI model Layer 2 security measure can a network engineer implement
when prototyping
network security?

a firewall at the network edge

port security at the access design layer

port security at the distribution design layer

IP access control lists at the access design layer

5
How do designers decide which network functions need to be included in the
prototype test?

They select the functions that align with the business goals.

They select the functions that occur at the network core.

They select the functions that do not exist in the existing network.

They select the functions from a list of generic network operations.

6
Refer to the exhibit. During prototype testing of the Cisco network shown,
connectivity must be
verified. Assuming all connections are working and CDP is enabled on all
devices and interfaces,
on which device was the command issued?

R1

S1

R3

Cisco-Training.net
S2

R5

S3

7
Refer to the exhibit. During prototyping, Layer 2 functionality is being tested.
Based on the output
shown, which two pieces of information can be determined? (Choose two.)

Switch1 is the root bridge.

Interface Fa0/2 on Switch1 has no role in the operation of spanning tree.

Interface Fa0/2 on Switch1 is the alternate port used to reach the root bridge.

Based on the entries in the "Role" column, it can be concluded that RSTP has
been implemented.

Interface Fa0/1 on Switch1 is the forwarding port selected for the entire
spanning-tree
topology.

8
What Rapid Spanning Tree Protocol (RSTP) state is given to the forwarding port
elected for every
switched Ethernet LAN segment?

root

backup

alternate

designated

9
Refer to the exhibit. During prototype testing, verification of VLAN
connectivity is being
performed. Based on the information shown, what command produced the
output?
Cisco-Training.net
show spanning-tree

show interfaces trunk

show cdp neighbors

show interfaces

show ip interface brief

10
Switch port Fa0/24 was previously configured as a trunk, but now it is to be
used to connect a
host to the network. How should the network administrator reconfigure switch
port Fa0/24?

Use the switchport mode access command from interface configuration mode.

Enter the switchport nonegotiate command from interface configuration mode.

Administratively shut down and re-enable the interface to return it to the default.

Enter the no switchport mode trunk command in interface configuration mode.

Use the switchport access vlan vlan number command from interface
configuration mode
to remove the port from the trunk and add it to a specific VLAN.

11
Refer to the exhibit. The redundant paths are of equal bandwidth and EIGRP is
the routing
protocol in use. Which statement describes the data flow from Server to PC2?

EIGRP load balances across the R3 to R1 and R3 to R2 links.

EIGRP load balances across the R1 to Switch3 and R2 to Switch3 paths.

EIGRP load balances across the Switch1 to Switch3 and Switch1 to Switch2
paths.

EIGRP does not load balance in this topology.

Cisco-Training.net
12
A network designer needs to determine if a proposed IP addressing scheme
allows efficient route
summarization and provides the appropriate amount of scalability to a design.
What is useful for
validating a proposed hierarchical IP addressing scheme?

NBAR

a pilot network

a route summary

a network simulator

a physical topology ma

13
In the router command encapsulation dot1q 10, what does the number 10
represent?

the metric used for a particular route

the number of the VLAN associated with the encapsulated subinterface

the priority number given to the device for the election process

the number that must match the Fast Ethernet subinterface number

the number used to program the router for unequal cost path load balancing

14
Refer to the exhibit. The users on the 192.168.10.192 network are not allowed
Internet access.
The network design calls for an extended ACL to be developed and tested.
Where should the
ACL be placed for the least effect on other network traffic?

inbound on Fa0/0 of R3

outbound on Fa0/0 of R3

Cisco-Training.net
inbound on Fa0/1 of R3

outbound on Fa0/1 of R3

inbound on Fa0/1 of R2

outbound on S0/0 of R2

15
Refer to the exhibit. What two measures can be taken to address the areas of
weakness circled
in the network design? (Choose two.)

Provide redundant connections to all end users.

Add another core switch to increase redundancy.

Add a switch in the server block connecting the server farm to each core switch.

Add an additional switch to the DMZ and direct links from the new switch to the
core switches.

Provide a redundant firewall router connecting to a second ISP, the core


switches, and the DMZ.

16
Why is it important to record baseline measurements of a prototype network?

Test results show security weaknesses after the baseline tests are run.

The baseline is the point at which the network is operating at its fullest potential.

Baseline measurements define a point at which network traffic has exceeded the
designed capabilities of the network.

Test results are compared to the baseline to see how the test conditions increase
processor use or decrease available bandwidth.

17
Refer to the exhibit. A network administrator has been given the task of creating
a design for a
temporary classroom building that is to be set up outside an overcrowded
Cisco-Training.net
school. In testing the
prototype, it is found that the student PC cannot ping the teacher PC. All the
switch interfaces are
active and connected properly, as is interface Fa0/0 of the router. Given that
only the commands
shown have been added to the router configuration, what is the source of the
problem?

The IP settings on the student PC are incorrect.

The default gateway on the teacher PC is misconfigured.

The router Fa0/0 interface has not been configured as a VLAN trunk.

The Fa0/0 physical interface has not been configured with an IP address and
subnet mask.

The administrator forgot to configure a routing protocol to allow the ping


packets to reach
the teacher PC subnet.

18
Refer to the exhibit. Why are interfaces Fa0/11, Fa0/23, and Fa0/24 not shown
in this switch output?

Interfaces Fa0/11, Fa0/23, and Fa0/24 are trunks.

Interfaces Fa0/11, Fa0/23, and Fa0/24 are shutdown.

Interfaces Fa0/11, Fa0/23, and Fa0/24 are blocking.

Interfaces Fa0/11, Fa0/23, and Fa0/24 failed diagnostics

19
Refer to the exhibit. A network technician is performing an initial installation of
a new switch in the
east wing. The technician removes the switch from the box, makes the
connections to the
network, and adds the configuration shown. The technician notifies the network
administrator that
the switch has been installed. When the network administrator at the home office
attempts to
telnet to the switch from host 192.168.0.1, the connection fails. What action
Cisco-Training.net
should the network
technician take?

Add an enable password to the switch.

Add a default gateway to the switch configuration.

Configure the switch with an IP access list to permit the host connection.

Enable the physical interfaces of the switch with the no shutdown command.

20
Refer to the exhibit. After all the interfaces have stabilized, what is the
spanning-tree state of all
the enabled interfaces of SW11?

discarding

forwarding

learning

listening

Cisco-Training.net

You might also like