ProcessValidation SOP
ProcessValidation SOP
[Document Number]
[Document Filename]
OTHER
STAMP HERE
Revision
Level
DRAFT
1.00
Revision
Date
DD/MM/Y
Y
DD/MM/Y
Y
DCO/ECO
Number
YY-00000
Description of Revision
Draft
Revision
Author
Author Name
YY-00000
Initial Release
Author Name
[Company Name]
[Company Group, Division, Location]
Process Validation
[Document Number]
Rev x.xx
DD/MM/YY
Table of Contents
Table of Contents....................................................................................................................................................1
1.0 Purpose..............................................................................................................................................................2
2.0 Scope..................................................................................................................................................................2
3.0 Definitions.........................................................................................................................................................2
3.1 Process Validation..................................................................................................................................2
3.2 Prospective Validation............................................................................................................................2
3.3 Retrospective Validation.........................................................................................................................2
3.4 Revalidation............................................................................................................................................2
4.0 Responsibilities..................................................................................................................................................2
4.1 Design Engineering................................................................................................................................2
4.2 Manufacturing Engineering...................................................................................................................2
4.3 Program/Project Management................................................................................................................2
4.4 Product Development Team...................................................................................................................2
4.5 Quality Assurance...................................................................................................................................2
5.0 References..........................................................................................................................................................2
6.0 Procedure...........................................................................................................................................................3
6.1 When Process Validation is Required....................................................................................................3
6.2 When Process Validation is Recommended...........................................................................................3
6.3 Retrospective Validation.........................................................................................................................3
6.4 Prospective Validation............................................................................................................................3
6.5 Elements of the Process Validation........................................................................................................3
6.6 Revalidation............................................................................................................................................4
7.0 Documentation..................................................................................................................................................4
[Document Filename]
Page 1 of 4
[Company Name]
[Company Group, Division, Location]
Process Validation
[Document Number]
Rev x.xx
DD/MM/YY
1.0
Purpose
This procedure defines process validation methods for manufacturing processes.
2.0
Scope
This procedure applies to manufacturing processes at all facilities of [Company Name].
3.0
Definitions
4.0
5.0
3.1
Process Validation
Establishment by objective evidence that a process consistently produces a result meeting
predetermined specification.
3.2
Prospective Validation
Validation conducted prior to introduction of a new product or process.
3.3
Retrospective Validation
Validation conducted on an existing process using accumulated data.
3.4
Revalidation
Validation for a process that has been previously validated.
Responsibilities
4.1
Design Engineering
Responsible for the design and design support for the product being manufactured. Design
Engineering also writes the product design documentation.
4.2
Manufacturing Engineering
Responsible for design and support of manufacturing processes. Manufacturing Engineering also
writes the manufacturing process documentation. Manufacturing Engineering is responsible for
initiation of the process validation activities, validation protocol, performance of the validation
tests, and writing reports.
4.3
Program/Project Management
Responsible for coordinating process validation reviews and approvals, obtaining the proper
approval signatures, and filing of process validation records. Program/Project Management also
forms the Product Development Team.
4.4
4.5
Quality Assurance
Responsible for monitoring the effectiveness of this procedure consistent with recognized
standards.
References
Production Equipment
Product Program Management Cycle
Useful Technical References
[Document Filename]
Page 2 of 4
[Company Name]
[Company Group, Division, Location]
Process Validation
[Document Number]
Rev x.xx
DD/MM/YY
FDA, CDRH, Quality System Manual, Section 4: Process Validation, 1997 FDA, CDRH, Guideline on
General Principles of Process Validation, 1997 Kane, V. (1986). Process Capability Indices. J. Quality
Technology (18-1) 41.
6.0
Procedure
6.1
6.2
Yearly if under continuous operation during or after the Pre-Production phase of the
program management cycle.
A manufacturing process produces excessive defects.
Evaluation or troubleshooting of a pass/fail process.
Customer complaints or a quality investigation identify the manufacturing process as a
possible cause for defects.
6.3
Retrospective Validation
Retrospective validation is used when historical data is available for existing manufacturing
processes. Types of useful data include design drawings and specifications, operating procedures
and work instructions, manufacturing instructions, inspection reports, production logs,
production test data, material review reports, service records, customer complaints, and audit
reports. Retrospective validation may not be feasible if accumulated data is incomplete or
inadequate.
6.4
Prospective Validation
Prospective validation is used when insufficient data is available for a manufacturing process, in
situations such as installation of new equipment, qualification of new process performance, or
processes which are not routinely monitored.
6.5
[Document Filename]
Page 3 of 4
[Company Name]
[Company Group, Division, Location]
Process Validation
[Document Number]
Rev x.xx
DD/MM/YY
Process parameters; to be controlled and monitored and methods for controlling and
monitoring.
Any subjective criteria used for evaluation.
Definition of what constitutes nonconformance for measurable and subjective criteria.
Information about sample size, length, and duration of the study.
Any special controls or conditions placed on preceding processes during the validation.
Statistical methods used for data analysis.
Criteria for a successful validation.
Measurement results, observations, conclusions, and recommendations.
6.6
Revalidation
Revalidation of a manufacturing process that had been previously evaluated need not include all
of the elements listed above. The revalidation report should include:
7.0
Documentation
Records of validation activities should be issued as Technical Reports and retained in the Design
History File. Reviews shall be held and review records should include dates and signatures of the
individuals who review and approve the validation.
For a validated process used in manufacturing, a qualified operator must perform the process.
Records containing manufacturing data should be retained in the appropriate Device History Record.
[Document Filename]
Page 4 of 4