Valve Sequence Chart 487
Valve Sequence Chart 487
Valve Sequence Chart 487
DATE
AMMENDMENT
TITLE DATASHEET FOR VALVE SEQUENCE CHART FOR OPERATION AND CONTROL PHILOSOPHY
APPROVED
RSA
Total Pgs 3
APRV
NSULT SDN.BHD.
C/MHI/TTSB ONSORTIUM
Total Pgs 3
LIT 01/LT 02
MGFV01 A/B
MGFV02 A/B
MGFV04 A/B
MGFV05 A/B
MGFV06 A/B
SACV01 A/B
SACV02 A/B
SACV03 A/B
SACV04 A/B
SACV06 A/B
SACV08 A/B
SACV09 A/B
SACV07 A/B
SACV05 A/B
SACV10 A/B
ACFV01 A/B
ACFV02 A/B
ACFV03 A/B
ACFV04 A/B
ACFV05 A/B
ACFV06 A/B
AMT1V06
AMT1V02
AMT1V01
TAG NO.
MGFV03 A/B
P3- A/B
P2- A/B M
I 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 II 2.0 2.1 II 2.2 2.3 III 3.0 3.1 3.2 3.3 3.4 3.4 IV V
I
SERVICE MGF FILLING MGF PRE-SERVICE RINSE MGF SER. / ACF FILL MGF SER. / ACF PRE-SER. RINSE MGF SER. / ACF SER. SAC FILL SAC PRE-SER. RINSE SAC SER. REGENERATION (MGF) BACK WASH RINSE (see note 1)
V X X X X X
V X
CV
LS - 01
I A
X X X X X X X X X X X X X X < 90 % X X X X X X X
B1-A/B
P1-A/B
LS-02
10 MIN 5 MIN X
X X X
REGENERATION (SAC ) BACKWASH (see note 3) MIDDLE COL . FLUSH ACID PRE-INJECTION INJECTION FAST RINSE FINAL RINSE (see note 1) 5 MIN 5 MIN 5 MIN 30 MIN 97 MIN 10 MIN X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X CV = CONTROL VALVE M = MOTOR S = SOLENOID VALVE H = HIGH L = LOW < H X X X X >L =H =H X X X >L >L >L >L >L >L X X X X X X
NOTE : 1. DURING FINAL RINSE STEP THE AIR RELEASE VALVE ALONG WITH THE SERVICE INLET VALVE SHALL REMAIN OPEN FOR FIRST 30 SEC. AND THEN RINSE OUTLETVALVE SHALL OPEN AND AIR RELEASE SHALL GET CLOSED. 2.IF LEVEL IN FILTER WATER STORAGE TANK IS HIGH STOP THE MGF,ACF. 3.BACKWASH AFTER EVERY 7 REGENERATIONS OF SAC, AT THE SAME TIME DOUBLE SEQUENCE OF ACID REGENERATION. 3. ADDITIONAL FACILITIES LIKE HOLD , RESET , & ADVANCE ARE PROVIDED FOR OPERATORS INTERVENTION. ION EXCHANGE ( I) LIMITED
DOCUMENT NO : A4-EE220487-08-20 CLIENT DOC NO : SHEET : 1 OF1
LEVEL SWITCH (FWSTA/B) ( HIGH - LOW) < H < H >L >L >L >L
LEVEL TRANSMITTER
DEGASSER BLOWER
BACKWASH OUTLET
BACKWASH OUTLET
BACKWASH OUTLET
No. OF STREAMS IN OPERATION - 2. 1 WORKING AND 1 STANDBY, IF REQUIRED DOUBLE PRODUCTION FACILITY IS GIVEN IN OPERATION
DEGASSER
DRIVES
EJECTOR SUCTION
DOWNFLOW INLET
BACKWASH INLET
BACKWASH INLET
BACKWASH INLET
SERVICE OUTLET
SERVICE OUTLET
SERVICE OUTLET
DESCRIPTION
SERVICE INLET
SERVICE INLET
SERVICE INLET
POWER WATER
RINSE OUTLET
RINSE OUTLET
RINSE OUTLET
AIR RELEASE
AIR RELEASE
ACID INLET
ACID INLET
LEVEL SWITCH
UNIT
UNIT
LEVEL TRANSMITTER LEVEL TRANSMITTER DEGASSER WATER TANKS LEVEL TRANSMITTER DM WATER STORAGE TANK
DRIVES
SBAV01 A/B
SBAV02 A/B
SBAV03 A/B
SBAV04 A/B
SBAV06 A/B
SBAV08 A/B
SBAV09 A/B
SBAV07 A/B
SBAV05 A/B
SBAV10 A/B
LIT 01/02
CDT1V05
CDT1V02
CDT1V01
CDT1V04
TAG NO.
I 1.0 1.1 1.2 1.3 1.4 II 2.0 2.1 2.2 2.3 2.4 2.5 III 3.0 V
I
V X X X
V X
A A
A M
M X X
> 10% X X < 1.2 < 1.2 > 10% > 10% < 90%
X X
REGENERATION (SBA) SBA BACKWASH (SEE NOTE 3) MIDDLE COL . FLUSH CAUSTIC PRE-INJECTION CAUSTIC - INJECTION CAUSTIC FAST RINSE SBA FINAL RINSE (see note 1) 5 MIN 5 MIN 5 MIN 30 MIN 60 MIN 10 MIN X X X X X X X X X X X X X X X X > 10% > 10% > 10% > 10% > 10% > 10% X X M = MOTOR S = SOLENOID VALVE H = HIGH L = LOW MID - MEDIUM > MID =H X X > 10% > 10% > 10% X X X X =H >L X X X X X X X X X X X X X X X X X X X
CDT -1 ( CAUSTIC FILLING ) CDT -1 ( WATER FILLING ) ON/OFF VALVE = INTERLOCK = ALARAM CV = CONTROL VALVE
NOTE :
1. DURING SBA FINAL RINSE STEP THE AIR RELEASE VALVE ALONG WITH THE SERVICE INLET VALVE SHALL REMAIN OPEN FOR FIRST 30 SEC. AND THEN RINSE OUTLETVALVE SHALL OPEN AND AIR RELEASE SHALL GET CLOSED.
3. BACKWASH AFTER EVERY 7 REGENERATIONS OF SAC, AT THE SAME TIME DOUBLE SEQUENCE OF CAUSTIC REGENERATION. 4. THE LEVEL INSTRUMENT IN DM WATER TANK IS IN CLIENT SCOPE, CLIENT WILL GIVE THE HIGH AND LOW LEVEL SIGNAL FOR OPERATION OF DM PLANT. ION EXCHANGE ( I) LIMITED DOCUMENT NO : A4-EE220487-08-20 CLIENT DOC NO :
P7- A/B M
B1-A/B
CIT-01
LIT 00
LS-04
AG-1
REGENERATION PUMPS
DEGASSER BLOWER
BACKWASH OUTLET
DOWNFLOW INLET
BACKWASH INLET
CDT-1 AGITATOR
CAUSTIC OUTLET
SERVICE OUTLET
DESCRIPTION
CAUSTIC INLET
CAUSTIC INLET
SERVICE INLET
POWER WATER
RINSE OUTLET
WATER INLET
AIR RELEASE
SHEET
: 2 OF 3
UNIT
SBA
ACID MEASURING TANK AMT-2 LEVEL TRANSMITTER DEGASSER WATER TANK LEVEL TRANSMITTER DM WATER STORAGE TANK
CAUSTIC MEASURING TANK CDT-2 DEGASSED WATER PUMPS LEVEL SWITCH ( HIGH - MEDIUM -LOW)
DRIVES
BACKWASH OUTLET
EJECTOR SUCTION
EJECTOR SUCTION
pH TRANSMITTER
BACKWASH INLET
TOTALISED FLOW
MBV010 A/B
MBV01 A/B
MBV02 A/B
MBV03 A/B
MBV04 A/B
MBV05 A/B
MBV06 A/B
MBV07 A/B
MBV09 A/B
MBV08 A/B
MBV12 A/B
MBV11 A/B
TAG NO.
AMT2V07
AMT2V02
AMT2V01
CDT2V08
CDT2V03
CDT2V01
CDT2V02
B2- A/B M
P3- A/B
P6- A/B
AIT-01
AIT-01
CIT 02
FIT-01
LIT 01
LIT 02
V 106
LS-02
LS-04
I 1.0 1.1 1.2 II 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 III 3.0 3.1 MB FILLING
SERVICE
V X X X
V X
IA
M X X X
> 10% < 90% X < 0.2 < 0.2 > 10% < 90% > 10% < 90%
MB PRE-SERVICE RINSE MB SERVICE REGENERATION (LBA) MIDDLE COL . FLUSH MB BACK WASH ACID - CAUSTIC PRE-INJECTION ACID - CAUSTIC - INJECTION SLOW RINSE DRAIN DOWN AIR - MIX FORCE SETTLE MB FINAL RINSE ( see note - 1 ) AMT -2 ( ACID FILLING ) CDT -2 ( CAUSTIC FILLING ) CDT -2 ( WATER FILLING )
X X X
X X X
X X
X X X X X
X X X X X X X X
X X X
V
I
CV = CONTROL VALVE
M = MOTOR
S = SOLENOID VALVE
H = HIGH
L = LOW
ME = MEDIUM
NOTE :
1. DURING MB FINAL RINSE STEP THE AIR RELEASE VALVE ALONG WITH THE SERVICE INLET VALVE SHALL REMAIN OPEN FOR FIRST 30 SEC. AND THEN RINSE OUTLETVALVE SHALL OPEN AND AIR RELEASE SHALL GET CLOSED.
3. THE LEVEL INSTRUMENT IN DM WATER TANK IS IN CLIENT SCOPE, CLIENT WILL GIVE THE HIGH AND LOW LEVEL SIGNAL FOR OPERATION OF DM PLANT ION EXCHANGE ( I) LIMITED DOCUMENT NO : A4-EE220487-08-20 CLIENT DOC NO : SHEET : 3 OF 3
212552444.xls.ms_office
AG-2 M X X X
SBA
CDT-2 AGITATOR
SERVICE OUTLET
DESCRIPTION
CAUSTIC INLET
CAUSTIC INLET
SERVICE INLET
pH ISOLATION
POWER WATER
POWER WATER
RINSE OUTLET
WATER INLET
MB BLOWER
ACID INLET
ACID INLET
AIR INLET