Time Sheet & Expense Sheet Format
Time Sheet & Expense Sheet Format
1. DATES SHOULD BE IN DD-MM-YY FORMAT ONLY. 2. IF MORE THAN ONE ACTIVITY IS DONE ON A SINGLE DAY PUT THE ACTIVITY IN THE NEXT LINE WITH SAME DATE. 3. "FILE NO", "MANDAY NATURE" AND "REPORT TYPE" SHOULD BE SELECTED FROM THE DROP-DOWN LIST. 4. IF MANDAY NATURE ARE "NOT BILLABE"/"HOLIDAY"/"LEAVE" PLEASE LEAVE THE FILE NO CELL BLANK. 5. AFTER FILLING THE TIME SHEET PLEASE FILTER THE BLANK CELLS FROM " DATE" COLUMN 6. FILTER THE SHEET WITH RESPECT TO FILE NOS. AND PRINT IT. 7. SIGN THE PRINTED COPIES AND SENT IT TO RESPECTIVE PROJECT MANAGERS AND GET APPROVAL FOR CONSIDERING THE MANDAYS. 8. PLEASE FORWARD THE SOFT COPY (EXCEL SHEET) TO "[email protected]"FOR PROCESSING YOUR REMUNARATION. 9. PLEASE REFER THE BELOW GIVEN TABLE FOR PROJECT AND ITS RESPECTIVE FILE NO AND PROJECT MANAGER.
SL. N. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 CLIENT ONGC, 11 High Mumbai ONGC, 11 High Mumbai ONGC, 11 High Mumbai ONGC, 11 High Mumbai ONGC, 11 High Mumbai ONGC, 11 High Mumbai ONGC, 11 High Mumbai ONGC, 11 High Mumbai ONGC, 11 High Mumbai ONGC, 11 High Mumbai GSPC ONGC, 11 High Mumbai SWIBER Valentine Maritime Ltd. SUPREME OFFSHORE GRSE ONGC, 11 High Mumbai ONGC, Delhi HCC ADANI GAS ADANI GAS ADANI GAS ADANI GAS HCC LARSEN AND TOUBRO LTD. ADANI GAS Saipem India Projects ADANI GAS MNW-NF Bridge ICP Process Platform MHN-Pipeline Modification MHN-PGC B-193 (5 WHP) OSV-TPI D1 - DP MHNRD PLP B-193 Process Platform B-SERIES & N 15 N 16 WHP DEEN DAYAL FIELD DEVELOPMENT - OGT PROJECT WIN REWAMP B-193 Pipeline B-Series and N-15 N-16 Pipeline Project, TPI B-Series and N-15 N-16 Pipeline Project, TPI TPI for Manufacturing and Supply of Materials & Equipments CLUSTER-7 WELL PLATFORM PROJECT TPI "Construction of ETP and ETPs cum WIPs at Assam Asset" Potline fabrication-Aditya Aluminium Smelter Project CGD Pipeline laying - Ahmedabad CGD Pipeline laying - Faridabad CGD Pipeline laying - Khurja CGD Pipeline laying - Drs Chandlodia Annual Contract for TPI 'MHNRD PLP - Plus Tech CGD Pipeline laying - Lucknow Subcontracted Items CGD Pipeline laying - Vadodara PROJECT FILE NO 15301 2012/MUI/22 2012/MUI/23 2012/MUI/24 2012/MUI/25 2012/MUI/26 2012/MUI/27 2012/MUI/28 2012/MUI/29 2012/MUI/30 2012/MUI/31 2012/MUI/32 2012/MUI/33 2012/MUI/34 2012/MUI/35 2012/MUI/36 2012/MUI/37 2012/MUI/38 2012/XII/3 2012/XII/4 2012/XII/5 2012/XII/6 2012/XII/7 2012/XII/8 2012/XII/9 2012/XII/12 2012/XIQ/110 2012/XII/14
MANDAY NATURE: ONSHORE INDIA: INSPECTION/CERTIFICATION/DOC. REVIEW AT VENDOR SITE PERFORMED WITHIN INDIA OFFSHORE INDIA: INSPECTION/CERTIFICATION/SAFETY AUDIT/DOC. REVIEW PERFORMED IN OFFSHORE ONSHORE ABROAD: INSPECTION/CERTIFICATION/DOC. REVIEW AT VENDOR SITE PERFORMED OUTSIDE INDIA BASE SUPPORT: DOCUMENT REVIEW AT OFFICE OR MEETING WITH CLIENT WITH IN INDIA NOT BILLABLE: DAYS JOB NOT ASSIGNED HOLIDAY: HOLIDAYS DECLARED BY RINA LEAVE: APPROVED LEAVES COMPENSATORY LEAVE: APPROVED COMPENSATORY LEAVES NOTE: PLEASE MAKE SURE THAT REPORT REFERENCE NO. IS MENTIONED AGAINST ANY CLAIMED MANDAY NATURE
RI/F/06 REV: 02
LOCATION
WORKING HOURS
MANDAY NATURE
REPORT TYPE
FILE NO
15-01-2014
15-01-2014
TOTAL HOURS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PAGE 2OF 5
RI/F/06 REV: 02
LOCATION
WORKING HOURS
MANDAY NATURE
REPORT TYPE
FILE NO
15-01-2014
APPROVED BY
(SIGNATURE )
TOTAL HOURS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PAGE 3OF 5
RI/F/07 REV:01
EXPENSE SHEET
EMPLOYEE NAME: MONTH & YEAR: ADVANCE AMOUNT RECVD. TOTAL EXPENSES INCURED BALANCE ADVANCE AMOUNT VOUCHER NO. INR INR LODGING EXP. FOOD & REFRESHMENT 3110 -3110 DAILY ALLOWANCES. POSTAGE AND COURIER PRINTING AND STATIONERY INTERNET EXP. S SANTHOSH JAN-2014 CURRENCY INR INR INR 3110
FILE NO
1 2 3
APPROVED BY
(SIGNATURE )
TOTAL IN INR
DATE (dd-mm-yy)
CURRENCY
TRAVEL EXP
RI/F/07 REV:01
(SIGNATURE )
TOTAL IN INR