0% found this document useful (0 votes)
75 views

Project Diary II

This document contains details of a mechanical engineering project being undertaken by a team of students, including their batch number, team members, project title, names of the guide and coordinator, and a section for weekly reports on the status and work completed, individual contributions, proposed future work, and signatures of the students and guide.

Uploaded by

Sasi Kumar
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views

Project Diary II

This document contains details of a mechanical engineering project being undertaken by a team of students, including their batch number, team members, project title, names of the guide and coordinator, and a section for weekly reports on the status and work completed, individual contributions, proposed future work, and signatures of the students and guide.

Uploaded by

Sasi Kumar
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

K.S.

RANGASAMY COLLEGE OF TECHNOLOGY


THIRUCHENGODE- 637 215

DEPARTMENT OF

MECHANICAL ENGINEERING

PROJECT PHASE II IV BE MECHANICAL

PROJECT DIARY

PROJECT DETAILS

BATCH NUMBER:

TEAM MEMBERS:

S.NO

ROLL NO

REG. NO

1
2
3
4

PROJECT TITLE:

NAME OF THE GUIDE:

GUIDE SIGNATURE:

PROJECT COORDINATOR SIGNATURE:

HOD/MECH

WEEKLY REPORT

NAME

Date from
No

to

Week

Work status/work done in the previous week:

Contribution by the individual


1.
2
3
4
Work proposed for next week:

Guide remark (compulsory)

Student signature

Guide signature

1.
2.
3.
4.
Project coordinator
signature

You might also like