0% found this document useful (0 votes)
22 views

Project Type Roadmap

This document outlines a project roadmap for improving an existing process. It determines that the process has not been formalized and requires redesign rather than corrective improvements. The project will follow the DMADV process model and aims to reduce lead times, cycle times or waste using a DMAIC Lean methodology.

Uploaded by

jesus784
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views

Project Type Roadmap

This document outlines a project roadmap for improving an existing process. It determines that the process has not been formalized and requires redesign rather than corrective improvements. The project will follow the DMADV process model and aims to reduce lead times, cycle times or waste using a DMAIC Lean methodology.

Uploaded by

jesus784
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Type Roadmap

"tart

Existing Process or Product?

No

DMADV

Yes

Has process been formalized?

No

Yes
Is output correctable via improvements or redesign necessary?

Redesign

Correctable

No

DMAIC Variation

Not Si Sigma

No

utput !easurable?

Yes

Is metric leadtime, cycletime, anything addressing the 7 wastes?

Yes

DMAIC Lean

You might also like