0% found this document useful (0 votes)
58 views2 pages

Drill Ass555555

This document contains an assignment for an engineering course on drilling engineering. It includes two questions: 1) Solve three problems from the textbook using equation and nomograph methods, and discuss any issues with the nomograph approach. 2) Design a well trajectory plan with two non-vertical sections to reach a target, using average bedding dip data and build/drop rates from a sample well, and plot the planned trajectory on a geological cross-section image. The plan is due in one week.

Uploaded by

Sadek BP
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views2 pages

Drill Ass555555

This document contains an assignment for an engineering course on drilling engineering. It includes two questions: 1) Solve three problems from the textbook using equation and nomograph methods, and discuss any issues with the nomograph approach. 2) Design a well trajectory plan with two non-vertical sections to reach a target, using average bedding dip data and build/drop rates from a sample well, and plot the planned trajectory on a geological cross-section image. The plan is due in one week.

Uploaded by

Sadek BP
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

ENGI 8692 Drilling Engineering for Petroleum Exploration and Production ENGI 9118 Advanced Drilling Engineering Faculty

of Engineering, Memorial University of Newfoundland Winter, 2012 Assignment # 5 Feb. 27, 2012 1. Do problems 8.26, 8.27 and 8.33 from the text using both the equations and the nomograph methods. Are there any potential problems with using the nomograph method for these problems? (10 marks) 2. Do question 8.87 in the text using the following well trajectory guidelines: (20 marks) a. Well plan should have 2 nonvertical hold sections to reach target. . b. Inclination of hold sections should intersect average dip of bedding at approximately right angles. c. Use tabulated data for Well A as guides for kick off and build/drop rates. d. Plan, analyze and plot the proposed well trajectory using the Average Angle Method, superimposed onto a scanned image of the geological section. e. Ignore the part about designing the BHA.
Due in 1 week.

You might also like