This template must always be used with care and only by a competent person. It contains many prompts and information to cover a range of common issues; but must not be relied upon in its own right to address all possible scenarios. It is the responsibility of the Appointed Person at all times to ensure any Lifting Plan, particularly the Risk Assessment and Method Statement fully meets the requirements of the planned lifting operation.
2. Basic Information
Customer Site Customer Details Contact Contact Number Date of Lifting Operation Load Weight of load Load Information Load dimensions Lifting point Maximum radius of lift Maximum height of lift Lorry Loader make Lorry Loader Information Lorry Loader model Stabilizer configuration Maximum stabilizer load Access to lift area Ground conditions Site Conditions Voids underground Underground services Public interface Overhead lines
3. Identification of Hazards
a. People in area struck by: Lorry loader boom Lorry loader chassis Moving load Ground unable to support lorry loader Lorry loader overloaded
Lorry loader failure Load collides with structure Load collides with other cranes, excavators etc Load/lorry loader boom comes within arcing distance of overhead lines Persons hand crushed/trapped by load Load may fall on person Loose parts on load may fall Person falling from height when attaching or removing slings from load High wind causes load to collide with fixed object Lorry loader becomes unstable
c. Movement of load:
d. Suspended load :
4. Risk Assessment
Operation/Issue Hazard
Struck by: Lorry loader boom Lorry loader chassis Moving load Ground unable to support lorry loader Med
Risk
Residual Risk
People in area
High
Low
Low
Ensure weight of load is known and accurate High Lorry Loader operator to have valid ALLMI/CPCS card Ensure lorry loader has been adequately maintained and has current report of thorough examination. Tag line to be attached to load to control rotation Establish effective exclusion zone in conjunction with Principal Contractor Establish presence or otherwise of overhead lines. High If present arrange for isolation or position lorry loader boom/load outside minimum safe approach distance Low Low
Lorry loader failure Load collides with structure Load collides with other cranes, excavators etc Load/lorry loader boom comes within arcing distance of overhead lines
Med
Low
Med
Low
HIgh
Low
Movement of load
Operation/Issue
Hazard
Persons hand crushed/trapped by load
Risk
Residual Risk
Med
All slinging to be completed by Slinger/Signaller with valid ALLMI/CPCS card Ensure lorry loader has been adequately maintained, has current report of thorough examination and that pre-use checks are carried out.
Low
Ensure lifting accessories with adequate capacity have been selected, that they are adequately maintained, have current report of thorough examination and that pre-use checks are carried out. Inspect load for lose objects prior to lift and secure/remove loose items. All personnel to wear hard hats. Delivery vehicle to be provided with ladder for access/egress. Sling to be pre attached to lifting points on cage roof.
Low
High
Low
Person falling from height when attaching or removing slings from load Working at Height High
Access to cage roof to attach sling master link to lorry loader hook via hoist cage internal access ladder and trap door. Slinger signaller to stand on ladder with upper half of body through trap door to attach/remove master link.
Low
High wind causes load to collide with fixed object Environmental conditions Lorry loader becomes unstable
High
Wind speed to be checked with hand held anemometer by Crane Supervisor before lift starts. Lift to be aborted if wind speed exceeds 20mph.
Low
High
Low
5. Category of Lift Load Complexity Environmental Complexity Lift Category 6. Lifting Team Role Appointed Person Crane Supervisor Lorry Loader Name ALLMI/CPCS Card No. Mobile Phone
Operator Slinger/signaller
7. Equipment Equipment
Lorry Loader Rated Capacity kg @ m radius and m height Lifting Accessories .
Specification
Maintenance Records
Current and with vehicle Current and with vehicle
TE Report
Current and with vehicle Current and with vehicle
Current and with vehicle Stabilizer Spreaders 2-way radios with spare batteries PPE Cones/Barriers Anemometer Tagline Short Access Ladder mm diameter Polypropylene Rope Pre use check Current and with vehicle N/A
N/A N/A
8. Procedure
a. Appointed person must ensure that Principal Contractor and Crane Supervisor
are in possession of latest revision of Method Statement. If Appointed Person is not attending site for the lifting operation he must brief the Crane Supervisor;
b. Arrive on site and liaise with Principal Contractor; c. Inspect lifting area to ensure that nothing has changed since last site visit; check
wind speed.
d. Crane Supervisor to brief Lifting Team if Appointed Person is not on site, on
contents of Method Statement. Crane Supervisor, Operator and Slinger/Signaller to sign Method Statement to acknowledge receipt and understanding of briefing;
e. Establish exclusion zone in conjunction with Principal Contractor to exclude both
and radius;
Distribution
10. Signatures
Appointed Person
I have prepared this method statement and authorise the Lifting Team to proceed with the lifting operation in compliance with this document. Any changes to the specified procedure must be approved by me before the lifting operation begins I have been briefed on this Method Statement by the Appointed Person. I have checked that the lifting plan reflects the situation on site and the details are correct. I have briefed the contents of the Method Statement to the other members of the Lifting Team I have been briefed on and understand the Method Statement for this lifting operation. I have been briefed on and understand the Method Statement for this lifting operation. I confirm that I have been briefed on and understand the Method Statement for this lifting operation. I also confirm that the ground on which the Lorry Loader will stand can accept the stabilizer loads provided to me by Company Name.
Crane Supervisor