Load (MW) Gen (MW) Norm Al N-1 VTC-NK (MW) Total Imp/E XP (MW) Remark

The document summarizes the results of a load flow analysis for the existing power system in 2012. It examines three scenarios - low, medium, and high load cases for different times of day and contingency conditions. The analysis found voltage drops and potential voltage collapses at several 115kV buses due to insufficient generation and transmission outages in the normal and N-1 contingency states across all load cases and time periods.
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views

Load (MW) Gen (MW) Norm Al N-1 VTC-NK (MW) Total Imp/E XP (MW) Remark

The document summarizes the results of a load flow analysis for the existing power system in 2012. It examines three scenarios - low, medium, and high load cases for different times of day and contingency conditions. The analysis found voltage drops and potential voltage collapses at several 115kV buses due to insufficient generation and transmission outages in the normal and N-1 contingency states across all load cases and time periods.
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

Report Load Flow Existing Case 2012

1. Low Case:

January-2012

Load

Gen

(MW) (MW)

Norm
al

N-1

VTCNK

(MW)

Total
Imp/E
xp

Remark

(MW)
- Normal Case: Kengkok 115kV Bus

Peak time_(19:00
- 22:00h)

520.7 392.5

-26.3

Voltage drop(108.8kV)
- Voltage Collapse at 115kV (PBI)

140.8 when T/L NN1 NLE Trip out

- Voltage Collapse at (SPO) when


T/L 1cct, MHA SPO Trip out

Day time_(8:00 18:00h)

451.0 367.1

0.5

-94.5 - Voltage collapse at 115kV (PBI,

NAHO, PSA & XNE) when T/L NLE

TKU Trip out.


Light time_(23:00
- 7:00h)

314.8 251.7

14.7

- Voltage collapse at 115kV (PBI,

-69.7 NAHO, PSA) when T/L NLE TKU


Trip out.

2. Medium Case:

April-2012

Peak time_(19:00

Load

Gen

(MW) (MW)
621.1 277.3

Norm
al

N-1

VTCNK

(MW)
X

Total
Imp/E
xp

Remark

(MW)
-

- Voltage collapse at 115kV (PBI,

167.3 353.6

- 22:00h)
Day time_(8:00 18:00h)
Light time_(23:00
- 7:00h)

550.9 271.1

415.0 191.5

23.6

-95.5

286.7
229.0

NAHO, PSA & XNE) when T/L NLE


TKU Trip out.
- Voltage collapse at 115kV
(PBI,NAHO,PSA & XNE) when T/L
NLE TKU Trip out.
- Voltage collapse at 115kV (PBI,
NAHO, PSA) when T/L NLE TKU
Trip out.

3. High Case:

October-2012

Load

Gen

(MW) (MW)

Norm
al

N-1

VTCNK

(MW)

Total
Imp/E

Remark

xp

(MW)
- Normal Case: Kengkok 115kV Bus
Voltage drop(109.2kV)

Peak time_(19:00
- 22:00h)

654.7 370.8

- Voltage collapse at 115kV (PBO,


KKO) when T/L 1cct,

TKE PBO

139.9 259.2 Trip out.

- Voltage collapse at 115kV (SPO)


when T/L 1cct, MHA SPO Trip
out.

Day time_(8:00 -

580.0 345.3

- Voltage collapse at 115kV (PBI,

121.1 243.3

18:00h)
Light time_(23:00
- 7:00h)
Remark:

428.9 284.2

O - 115 kV Bus Voltage Drop


X - System not Stable

- System Stable

-40.9

NAHO, PSA & XNE) when T/L NLE


TKU Trip out.
- Voltage Drop at 115kV (PBI) when

151.5 T/L NLE TKU Trip out.