Final Sad Project
Final Sad Project
TABLE OF CONTENTS
Chapter 1 Page#
1.0 Introduction 6
1.1 Scope 6
1.2 Objective 7
1.3 Preliminary investigation 7
1.4 Fact finding techniques 7
1.4.1 Interviews 7
1.4.2 Summary of Interviews 7
1.4.3 Surveys 8
1.4.4 Summary of Surveys 8
1.5 Problems of the current system 8
1.6 Proposed solutions to the problems 8
1.6 Benefits of the proposed system 9
1.7 Conclusion 10
Chapter 2 Page#
2.0 Feasibility 10
2.1 Technical Feasibility 11
2.1.1 Hardware 11
2.1.2 Software 11
2.1.3 Machines 11
1
System Analysis and Design Group Project
Chapter 3 Page#
3.0 Data Flow Diagrams 18
3.1 Context Diagram 18
3.1.1 Explanation of Context Diagram 19
3.2 Level 0 Diagram 21
3.2.1 Explanation of Level 0 20
3.3 Level 1 Diagram 22
3.3.1 Explanation of Level 1 22
3.4 Data Dictionary 23
3.4.1 Data Flows 24
3.4.3 Data Store 33
3.4.4 Processes 35
3.4.5 Entities 39
2
System Analysis and Design Group Project
Chapter 4 Page#
4.0 Sun Video Corporations Logo 41
4.1 Main Menu 42
4.2 Customer 43
4.3 Video Return 44
4.4 New Customer Registration 45
4.5 Customer Payment Details 45
4.6 Database Tables 46
4.6.1 Rent a Video Table 47
4.6.2 Payment Details Table 49
4.6.3 Customer Table 51
4.6.4 Video Returned Table 53
Chapter 5 Page#
5.0 Gantt Chart 57
5.1 Conclusion 58
5.2 Reference 59
5.3 Appendix 60
3
System Analysis and Design Group Project
ACKNOWLEDGEMENT
In the beginning we would like to thank our GOD, the most merciful and beneficent, for
giving us the strength to complete this project with full determination.
My special thanks to my course instructor, Mrs. Ambreen Ahmed, without her help and
guidance we would not have been able to complete the report up to the mark and as well
if it was not for her support in the field of Microsoft acsses i don’t think we would be
able to present the screen shots in a appropriate way.
4
System Analysis and Design Group Project
INTRODUCTION
This case study is about a video shop whose name us Sun Video Corporation. It has
expertise in video rental business. Their plan is to have a series of stores scattered
strategically around a metropolitan area. As being expertise in the video rental business
they offer great deal for their customer and provide a competitive edge for their
competitors. In this case we are required to do the work of the system analyst and go
through each process which the system analyst performs.
SCOPE
As all of you know that as the world is advancing the need for new system have increased
in every organization old systems are being replaced by new system, the reason behind
this is that the organization demands excellent quality work more profit to be earned in
short term and to gain more market share as quick as they can and to kick their
competitors out of the market. New system is:
• User Friendly
• More Efficient
• They provide you with the latest security (I.E Fire Wall)
• U can use internet proving you with the better speed and quality so you could
send and receive important e-mails
5
System Analysis and Design Group Project
As mentioned above that what the new system does, our prime target is to create a
new and reliable system for Sun Video Corporation as it is offering many facilities to
its customers and it is proving a competitive edge.
OBJECTIVE
My objective is to make useful and user friendly system, so that non technical person can
also under stand it. It is easy for the company to use the system, providing the system that
would be designed for the company will consists of high security software (zone alarm
version 9) so that no hacker can break inside the system and stole data and installing
latest version of antivirus (I.E McAfee version 8.0) so the system is virus free and the
data is secured
PRELIMINARY INVESTIGATION
After receiving the request from Sun Video Corporation regarding their system our team
started its work with the very basic step that was searching for the problem by the method
of fact and finding techniques and gather the information regarding the problem that
was faced by the Sun Video Corporation.
Interviews
6
System Analysis and Design Group Project
This was the basic step taken by our team this main reason for conducting interview was
that we would know that what are the problem that the company is currently facing and
how is it affecting their business? Although taking interview is not an easy task but we
manage to do it some how.
Conclusion
As a part of our first step we conducted this session and went to various people like the
managing director the company, the sales manager, the cashier and asked them about the
problem that they were facing, so that the information that they provide us would be later
used on.
Surveys
The second step that our group took was going on to surveys of different famous and
large video stores in order to see what is the main reason behind their success in the
market and what type of system are they currently using ad what are the benefits that they
are getting out of it?
Conclusion of Survey
Conducting survey was successes as it gave answer to most of are questions. Are prime
target was achieve we gathered all the relevant information and the irrelevant information
was discarded.
7
System Analysis and Design Group Project
1. All the personal records would have right of privacy, as passwords can be easily
generated with the help of password manager guide which is an 8 user guide, user
friendly software which tells the user how to create a password and to use it.
3. It can generate automatic backup of each customer records. Incase the original
one is deleted the system can provide the user with the back up.
4. It would be sending automatic notifications to the user who have rented videos for
$50.
8
System Analysis and Design Group Project
5. It will contain software which will the user on which shelf on what location is the
particular video which the customer s looking for this will provide them with time
flexibility and the customer would also be satisfied with this service.
6. Introducing this software would facilitate new customer enrolling and renting
movies from Sunny Videos that will make them enjoy high profit.
CONCULSION
After performing the necessary steps it was founded that sunny videos manual way of
working was more time consuming and it was not efficient to work with this system
as no privacy right were available. Being the system analyst it was decided that it is
necessary to introduce a new system for Sunny Video which is know as Sunny rental
Video
FEASIBILITY
Feasibility report means to identify the problem and summarizing the complete
objectives. It also creates broad data for the management team that would decide by
looking at the objects whether to move on the new phase or not. There are 4 types of
feasibility report which are mentioned below:
1. Technical
2. Operational
3. Economical
4. Schedule
9
System Analysis and Design Group Project
Under this process the (IT) company determines weather the company has technological
resources to compose or purchase the system. Thus we figured the technical feasibility
report; we came to know the system which is proposed to the Sun Cooperation can be
operated easily. The system replace the manually work and transform all the manually
data in to computerize form .which would augment productivity. Training sessions are
required for the employees to educate them to excel to the newly proposed system and to
further understand and use the built in software that are inside the system to prevent their
company from suffering great losses.
Operational feasibility
Operational feasibility helps to crack business problems and provide opportunities to
business .Our system would help users to use the system effortlessly, thus eliminating the
paper work. Through data entry the system would cradle all the records of the customers
and hence the transactions made by sun video can be seen through any interface of sun
video. Through this all the customers record would be maintain properly without fuss. It
would show all the records of payment received, due dates, and pending payments. This
10
System Analysis and Design Group Project
system would be user- friendly which would enable employees to learn and operate the
system fester achieving productive results.
Pieces framework
Pieces stands for Performance, Information, Economy, Control, Efficiency, Services
Pieces has merely 6 points.
Performance
The currant system is not that fast and efficient which waste sundry time in paper work
even after that the transactions of the customers are not recorded properly thus arising
conflicts between management and employees and customers .Thus performance is
effected, through new system the whole thing would be computerized and the task would
be done rapidly hence augmenting performance levels.
Information
The system will have its own data base through it the company can look and see all the
transactions of the customers thus having information about all it customers .
Economy
The system would be computerized, user friendly thus it would enhance productivity,
thus making the project economically strong. Perishing manually work thus codifying
and organizing the data of the customers properly. It would reduce the more workers, thus
cutting down the expanses and saving more money.
Control
Top management would have charge to control the system, thus it would decrease
pilfering , providing security . Thus every employee would have limited excess.
Efficiency
The system would be computerizes all over thus it would coup with all sinecures like data
entry, customer information, billing information resulting efficiency among employees
eventually satisfying customers .
Services
11
System Analysis and Design Group Project
Our company would provide augment product or system thus in future if the sun
cooperation needs to have new tools we would provide them. Thus upgrading the system.
Schedule Feasibility.
Is that feasibility under which our company will meet its deadlines, and task to gratify
them? Under it we have set targets to finish what activity on which time.
12
System Analysis and Design Group Project
• All the diagrams e.g. pert chart, data flow, level zero diagrams would be done in
5days
Economical Feasibility
Under this feasibility we analysis weather benefits in making the new system are
more then the development cost. Is it profitable to take the task and make it? Will it
going to provide any benefits to the organization.
COST-BENEFIT ANALYSIS
13
System Analysis and Design Group Project
• PAYBACK ANALYSIS
It is the process in which the organization identifies the time period in which the
system would pay back for itself.
The costs in the development of this project and the profits attained are shown below:
Cumulative Cumulative
Year Cost cost Benefits benefits
0 50,000 50,000 2,500 2,500
1 20,000 70,000 10,000 12,500
2 18,000 98,000 20,000 32,500
3 14,000 112,000 25,000 57,500
4 17,000 129,000 35,000 92,500
5 19,000 148,000 50,000 142,500
6 21,000 169,000 52,000 194,500
7 23,500 192,500 55,000 249,500
8 25,000 217,500 60,000 309,500
9 25,000 242,500 62,000 371,500
10 27,000 269,500 65,000 436,500
14
System Analysis and Design Group Project
15
System Analysis and Design Group Project
450000
400000
350000
300000
Year
250000 Cost
200000 Cumulative cost
Benefits
150000 Cumulative benefits
100000
50000
0
1 2 3 4 5 6 7 8 9 10 11
This graph was made on Microsoft Excel which helped in analyzing By the looking at the
above payback analysis graph it could be easily concluded that the system would payback
for itself in the 6th year after its development.
16
System Analysis and Design Group Project
ROI= 0.61
EXPLAINATION OF ROI
According to the workings of the ROI the organization is getting 61% return on its
investment.
CONCLUSION
After performing different steps of feasibility it was concluded that our software is
feasible and easy to use for the company. Now we decided to move on to the design
phase.
17
System Analysis and Design Group Project
Data flow is known as a geographical figure of the data. DFD denotes the process which
takes place in a system .it even shows how data evolve around through an information
system.
CONTEXT DIAGRAM
18
System Analysis and Design Group Project
The diagram says that the customers would interact with the system and it would show
his/her id, it would include whose payments are outstanding, whose payment are done,
whose videos are due. The new customer has to fill the form to avail membership for the
sun video. System would generate reports and management would be accountable to see
the report of the whole report... The accounts department would send cash which would
received by customers.
19
System Analysis and Design Group Project
This diagram was made by using viso .In this case the when the customer will give there
id, the system would show customer payments, dues, etc. Accounts deportment sends
cash. Customer record shows rental information to compose a report. Which would give
to the management of the sun video. This system have information when the video is
rented then its receipt is made and passed to the customers. Payment which are which are
received from the accounts department is updated in customers records. If the customers
comes to the bonus level those customers’ details are forwarded to the accounts
department which generates motley or yearly schemes or bonus letters for those desire
customers.
20
System Analysis and Design Group Project
21
System Analysis and Design Group Project
In level 1 Data Flow Diagram, Customer Rental Record which is a data store sends
customer’s yearly details to the Create Yearly Bonus Letter. It advances to Free Coupons
Process which generates free coupons for the customer and both the items bonus letter
and free coupon goes to Create Customer Certificate. These three items that are coupons,
letter and certificate are sent directly to the customer.
22
System Analysis and Design Group Project
DATA DICTONARY
23
System Analysis and Design Group Project
Data Flows
Source : customer
24
System Analysis and Design Group Project
Name : customer/Video ID
25
System Analysis and Design Group Project
Source : customer
Name : payment/dues
26
System Analysis and Design Group Project
Source : customer
Name : receipt
Destination : customer
27
System Analysis and Design Group Project
Name : cash
28
System Analysis and Design Group Project
Source : accounts
29
System Analysis and Design Group Project
Name : report
30
System Analysis and Design Group Project
Destination : management
Destination : customer
31
System Analysis and Design Group Project
Destination : customer
Data Store
32
System Analysis and Design Group Project
33
System Analysis and Design Group Project
34
System Analysis and Design Group Project
Processes
35
System Analysis and Design Group Project
36
System Analysis and Design Group Project
Process Specification: takes in payment info and sends the receipt generated to
the customer
37
System Analysis and Design Group Project
Process Specification: takes in info about customer and videos and send the
info to the management.
Entities
38
System Analysis and Design Group Project
Name : Customer
Description : manages all the finance of the organization and the system
Name : management
39
System Analysis and Design Group Project
Screen Shots
40
System Analysis and Design Group Project
Our logo
This logo was designed with the help of adobe photo shop to provide a good
look for the system
41
System Analysis and Design Group Project
Main Screen:
42
System Analysis and Design Group Project
This form shows the video id and the customer id that what particular movie has been
issued by a particular customer
43
System Analysis and Design Group Project
This form tells that whether the VCD that was issued by the customer has been returned
on the due date or not if not how much fine he has to pay for getting delayed.
44
System Analysis and Design Group Project
This tell the customer that the movie they are looking for in what category is it available
for (e.g in DVD or VCD)
45
System Analysis and Design Group Project
46
System Analysis and Design Group Project
This is a plain form for a new customer to get enroll for the membership and start using
sun videos services.
Table:
47
System Analysis and Design Group Project
48
System Analysis and Design Group Project
This table shows the amount of customer that have been enrolled to use the services of
Sun Videos
49
System Analysis and Design Group Project
Bonus Table:
This table tells about how many customers have been enrolled in the bonus scheme
introduced by sun videos corporation.
50
System Analysis and Design Group Project
Rent a Video:
51
System Analysis and Design Group Project
This table shows that how man customer have taken the videos on rent.
Payment Mode
52
System Analysis and Design Group Project
This table shows that the fine that a particular customer has to pay when he extends his
return date and the video is over due
Reports
Customer:
53
System Analysis and Design Group Project
Video Rental:
Video Returned:
54
System Analysis and Design Group Project
This shows how many movies have been returned by the customer plus it is
also showing the fine that if a customer gets late how much does he has to pay
Gantt Chart
55
System Analysis and Design Group Project
This chart is made before starting the actual work. This helps us to plan each and every
thing and go about it according to time and days
Conclusion
56
System Analysis and Design Group Project
After putting hard effort on the designated proposal assigned by the Sun Videos
corporation it gives me and my group the honor that the making of the new system
was a complete success which in future will them to solve their problem, as new
hard ware and software are being installed in the system and it is user friendly nd is
easy for the management to understand .
REFERENCES
57
System Analysis and Design Group Project
Reference By Book:
Kendall.J,(1999), System Analysis and Design, 4th edition, Prentice Hall
International,
Cashman.T, (2001), System Analysis and Design, Course Technology.
APPENDIX
58
System Analysis and Design Group Project
TASK SHEET
59