0% found this document useful (0 votes)
73 views

Project/Company Logo Title of Itp: Date of Issue: This ITP Accompanies The Method Statement

This document appears to be an inspection test plan (ITP) that outlines acceptance criteria and responsibilities for inspections and tests during a construction or engineering project. It includes sections for the test or inspection description and frequency, acceptance criteria, responsibilities of parties like the subcontractor and client, references to related documents, and whether the verification record is deliverable. The purpose is to define quality control requirements and ensure inspections and tests meet specified standards at appropriate points during the project.

Uploaded by

engsam777
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views

Project/Company Logo Title of Itp: Date of Issue: This ITP Accompanies The Method Statement

This document appears to be an inspection test plan (ITP) that outlines acceptance criteria and responsibilities for inspections and tests during a construction or engineering project. It includes sections for the test or inspection description and frequency, acceptance criteria, responsibilities of parties like the subcontractor and client, references to related documents, and whether the verification record is deliverable. The purpose is to define quality control requirements and ensure inspections and tests meet specified standards at appropriate points during the project.

Uploaded by

engsam777
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

PROJECT/COMPANY LOGO

Date of issue: This ITP accompanies the Method Statement:

# IT

S/N

INSPECTION / ACTIVITY/ TEST DESCRIPTION

FREQUENCY OF TEST OR INSPECTION

Acceptance Criteria/ Tolerance / Parameters

REFERENCES - DOCUMENTS - METHOD STATEMENTS - DRAWINGS - SPECIFICATIONS - STANDARDS

Note: The "RESPONSIBILITIES" can be:

H: Hold Point (a point beyond which work may not procee W: Witness Point (it provides a party with the opportunity R: Review Point (the responsible entity should review the

TITLE OF ITP

# ITP DOCUMENT DERIAL NUMBER

VERIFICATION RECORD (e.g. Form, checksheet, etc)

Document specifying the requirement (e.g. standard, spec, contract etc)

RESPONSIBILITIES (H/W/R)
SubContractor (if applicable) Main Contractor QC Main Contractor Client Other

- STANDARDS

nd which work may not proceed without the authorisation of a designated authority) es a party with the opportunity to witness the inspection or test or aspect of the work, at their discretion) nsible entity should review the results of the test/inspection and act accordingly)

Is this Record deliverable (Y/N)

You might also like