0% found this document useful (0 votes)
43 views

Method Statement Example: Operation: Excavate To Reduced Levels (0.500m Deep)

The document provides details of an excavation operation including: 1) Bulldozers will excavate material to reduced levels of 0.5m deep prior to spoil heaps located adjacent to access roads. 2) Dump trucks fitted with buckets will be used to transport excavated material to spoil heaps. 3) Lorries will use existing roads for access for loading. The operation will require 6 machine days to complete the 5,000 cubic meters of excavation work.

Uploaded by

Gerald Maginga
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views

Method Statement Example: Operation: Excavate To Reduced Levels (0.500m Deep)

The document provides details of an excavation operation including: 1) Bulldozers will excavate material to reduced levels of 0.5m deep prior to spoil heaps located adjacent to access roads. 2) Dump trucks fitted with buckets will be used to transport excavated material to spoil heaps. 3) Lorries will use existing roads for access for loading. The operation will require 6 machine days to complete the 5,000 cubic meters of excavation work.

Uploaded by

Gerald Maginga
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Method Statement Example

Operation: Excavate to reduced levels (0.500m deep) CONTRACT: KIAGATA I!!GATE TEN"ER NO: #00$%0# Operation Operation Qty Method Sequence of No. Operation & Excavate to #00 x &50 x 0.5 ' !evel /r-d # "$ )ulldo*ers to reduced excavate a+d pus, to 2e &5000m( levels esta2l-s,ed t,e mater-al -+to (0.500m pr-or to spo-l ,eaps deep) excavat-o+ ad.ace+t to t,e access roads. # "ra/l-+es 0-tted 1-t, #m( 2uc3ets to 2e located o+ top o0 eac, spo-l ,eap. !orr-es to use ex-st-+/ roads 0or access 0or load-+/

Plant and Output Labour # "$ "o*ers &#0m(%, per mac,-+e '# x &#0 ' #40 m(%, & )a+3s ma+

Duration &5000%#40 ' $#.5 ,ours t,ere0ore 0or 6 1or3-+/ ,ours per da7 ' 6 mac,-+e da7s &5000%&50 ' &00 ,ours t,ere0ore 0or 6 1or3-+/ ,ours per da7 ' &# mac,-+e da7s

# "ra/ l-+es 4 lorr-es per mac,-+e

55 m(%, ' 55 x # ' &50 m(%,

Dragline exca ator

Operation of Dragline exca ator I+ a t7p-cal c7cle o0 excavat-o+8 t,e 2uc3et -s pos-t-o+ed a2ove t,e mater-al to 2e excavated. T,e 2uc3et -s t,e+ lo1ered a+d t,e dra/rope -s t,e+ dra1+ so t,at t,e 2uc3et -s dra//ed alo+/ t,e sur0ace o0 t,e mater-al. T,e 2uc3et -s t,e+ l-0ted 27 us-+/ t,e ,o-st rope. A s1-+/ operat-o+ -s t,e+ per0ormed to move t,e 2uc3et to t,e place 1,ere t,e mater-al -s to 2e dumped. T,e dra/rope -s t,e+ released caus-+/ t,e 2uc3et to t-lt ma3-+/ t,e mater-al -+ t,e 2uc3et to 0all do1+. T,-s -s called a dump operat-o+. O erhead! T,e -+d-rect costs -+curred -+ ru++-+/ 2us-+ess. T,ese -+clude re+t a+d rates8 mar3et-+/ a+d pu2l-c-t78 adm-+-strat-ve a+d 0-+a+c-al costs Mar"up A ra-se -+ t,e pr-ce o0 a+ -tem 0or sale O# a+ amou+t added to a cost pr-ce -+ calculat-+/ a sell-+/ pr-ce8 espec-all7 a+ amou+t t,at ta3es -+to accou+t over,ead a+d pro0-t. Pre$tender %hec"li!t No. &cti ity & "ec-s-o+ to te+der # Arc,-tect%e+/-+eer v-s-ted ( 9ater-als sc,edules prepared 4 E+:u-r-es se+t out 5 ;-te v-s-t report $ ;tateme+t o0 co+struct-o+ met,od 5 Est-mate sta/e & 2u-ld up 6 <-+al :uotat-o+s rece-ved = Est-mate sta/e # 2u-ld up &0 >re?te+der pro/ramme && >rel-m-+ar-es assesme+t &# Est-mate complete &( Est-mate c,ec3ed &4 <-+al summar-es &5 Te+der ad.ud-cat-o+ &$ >r-ce mar3up a/reed &5 Te+der su2m-tted Date #eq. Date #ec. #e!pon!ibility