B-70 Vol 1. Final Report
B-70 Vol 1. Final Report
B-70 Vol 1. Final Report
document
is
submitted
in compliance
with
NAS9-12100
S D 72- SH-O003
B-70 AIRCRAFT STUDY
FINAL REPORT
Volume I
April
1972
L.Cf.
Taube
Study Manager
B-70
Aircraft
Study
04J_
Space
DivisionRockwell
North American
5
_
TABLE
OF
Space
Division Rockwell
North American
CONTENTS
PAGE
VOLUME
I
SECTION
SECTION
SECTION
SECTION
VOLUME
VOLUME
VOLUME
I
II
III
IV
DATA
WORK
COST
B-70
LOCATION
MATRIX
BREAKDOWN
STRUCTURE
DATA DEFINITIONS
PROGRAM
SUMMARY
COSTS
I-3
I-ii
1-21
1-29
II
WBS
WBS
1.0
2.0
WBS
WBS
3.0
4.0
WBS
WBS
5.0
6.0
WBS
WBS
7.0
8.0
WBS
9.0
AIR VEHICLE
PROGRAM
TECHNICAL
SUPPORT
MAJOR AIRFRAME
MATING
FLIGHT
TEST
FLIGHT
TEST GROUND
SUPPORT
SPARES
SPECIAL
TEST EQUIPMENT
TOOLING
OTHER PROGRAJM ELEMENTS
EQUIPMENT
II-i
II-127
II-237
II-251
11-487
11-581
11-603
II-611
II-675
III
WBS
WBS
i. i
I. 2
WBS
WBS
i. 3
i. 4
AIRFRAME
STRUCTURES
ENVIRONMENTAL
CONTROL
PROPULSION
SECONDARY
POWER
!II-i
AIR INDUCTION
SYSTEM
FLIGHT
CONTROL
PERSONNEL
ACCOMMODATIONAND
ALIGHTING
ANDARRESTING
MISSION
AND TRAFFIC
CONTROL
FLIGHT
INDICATION
TEST INSTRUMENTATION
iV-I
IV-123
IV-249
IV-369
IV-469
IV-537
IV-583
IV-647
111-325
111-469
111-627
IV
WBS
WBS
i. 5
1.6
WBS
WBS
i. 7
i. 8
WBS
WBS
WBS
WBS
i. 9
i. iO
I. Ii
i. 12
INSTALIATION_
CHECKOUT
ESCAPE
& PRE-FLIGHT
l-iii
SD72-SH-O003
Space Amencan
Division Rockwell
North
TABLE OF CONTENTS
VOLUME
I
SECTION
TITLE
PAGE
I-i
INTRODUCTION
I
DATA
LOCATION
II
WORK
BREAKDOWN
III
IV
MATRIX
1-3
I-ii
STRUCTURE
II-i
Level
4 Definitions
11-2
Government
11-3
WBS
1-12
Furnished
1-16
Equipment
1-19
Chart
DEFINITIONS
1-21
III-i
General
1-21
111-2
Subdivisions
III-3
Elements
ImI-4
Non-recurring/Recurring
COST
B-70
DATA
PROGRAM
of
SUMMARY
1-24
Cost
1-27
DATA
1-29
1-29
IV-I
Program
Abstract
IV-2
Program
History
IV-3
Master
IV-4
Hardware
lV-5
Program
IV-6
Subcontractor
IV-7
Unit
IV-8
1-22
of Work
of
Significant
Phasing/Flight
Test
Development
Summary
Cost
Cost
Cost
Events
Schedules
1-45
Summary
1-92
Data
1-92A
1-304
Summary
1-3o5
Analysis
State-of-the-Art
1-34
&
Percent
Developed
1-310
Summary
IV-9
Weight
1-312
Summary
P_
PAGE
II_.AN_
I-v
SD72-SH-O003
!_tOT t"It_ED
Space
Division Rockwell
Noah Amencan
II_fBODUCTION
In accordance
with the requirements
of Contract
NAS9-12100
dated July 15,
1971, North American
Rockwell
Corporation
submits
the Phase II Report
for
the B-T0 Aircraft
Study.
This report
consists
of four volumes
of B-T0 cost,
schedule
and technical
data, a management
summary
document,
and a magnetic
tape of the program
cost data constructed
to the NASA prescribed
format.
Previous
studies
have provided
the NASA with historical
data on the Apollo
CSM and the Saturn
S-II Programs.
Consistency
and commonality
of data
organization
and cost data definitions
have been maintained
as far as
possible
to provide
a c_mon
base for the correlation
and analysis
of the
data generated
by these three studies.
To
derive
the
maximum
benefit
from
the
learning
experienced
on the
previous
studies,
the members
of the B-70 Team were selected
primarily
from
the Apollo
CSM Study Team.
L. J. Taube was the Program
Manager,
and
J. E. Hauver
the Study Leader.
Responsible
for the collection
and analysis
of the technical
and schedule
data presented
in this report
were
V. T. Johnson
and O. DJuvstad,
respectively.
Cost data was the responsibility
of J. E. Nauver.
Supporting
the data collection
and analysis
tasks were many individuals
from
the NR Los Angeles
Division
(LAD).
This Division
was the prime B-70
contractor
and supplied
all the records
and reports
utilized
to develop
the
study data.
Key individuals
at the Los Angeles
Division
were:
W.A.
Spivak,
R. H. Kemp, B. G. Peterson,
W. A. Snyder,
R. C. Coakley,
R. D. Davlson,
and
F. W. Beers.
The
B-70
Aircraft
Study
was
conducted
in two
phases.
Submittal
of
the
Phase
Report
(SD71-189)
c_ September
24, 1971, concluded
the initial
phase of the
contract.
This report
contained
the results
of an in-house
investigation
to determine
the availability,
applicability
and extent
of B-70 historical
data to support
the study objectives.
This document
became
the Phase II
S_dy
Plan.
Phase
II objective
was to provide
the B-70 aircraft
data in accordance
with
the approved
Study Plan.
Several
minor modifications
to the original
plan
have been made as the result
of the Phase
II effort.
These modifications
have been reviewed
and approved
by the NASA Technical
Monitor.
This document
isthe
B-70 Aircraft
Study Final
Report.
i
Technical
and
schedule
data
cost
was
provided
the
data
preliminary
and
should
be
for
NASA
the
Structures
on January
replaced
with
the
6,
Subsystem
1972.
Final
This
Report
and
program
data
data.
I-1
SD72-SH-O003
was
level
considered
SpaceAmerican
DivisionRockwell
North
I-2
SD72-S_-OOO3
#_1_
SECTION
DATA
LOCATION
Space American
Division Rockwell
North
MATRIX
This section
of the Final Report
contains
the Data Location
Matrix
which
provides
a summary
of the major
cost, schedule
and technical
items provided
in the report.
The matrix
is organized
into two parts.
Part I contains
the location
of the major B-70 program
level data items and Part II
contains
the location
of the major data items contained
within
the
subsystems.
Data can be located
beginning
on the page and in the volume
indicated.
The volume
number
is designated
by an upper
case "Roman"
numeral
followed
by the page number.
Part
I B-70
Program
Summary
Data
Vol.
Program
Abstract
major program
Program
History
organized
schedule,
Master
all
the
- brief
narrative
overview
milestones
and contractual
of Significant
detail
summary
technical
and
Events
Development
- Chronologically
- Copies
of
issued
during
Program
by
Subdivision
Chart
1-102
1-102
1-105
Engineering
Engineering
Production
Production
Time-Phased
Time-Phased
Time-Phased
Time-Phased
Time-Phased
Time-Phased
Tooling
SDW Cum Chart
Tooling
SDW
Rate Chart
Test/QC
SDW Cum Chart
Test/QC
SDW Rate Chart
Other SDW CGm Chart
Other SDW Rate Chart
by WBS
Level
Total Dollar
Bar Chart
Time-Phased
WBS 1.0 Air
Time-Phased
WBS
2.0
1-93
1-96
i -98
of Work
Time-Phased
Time-Phased
Time-Phased
Time-Phased
Program
1-45
1-92A
Total Dollar
Bar Chart
Time-Phased
Stack
Chart
Total
1-34
1-92
Summary
Program
Summary
Cost Data
Total Program
by EOC/WBS
Summary
Chart
Total Program
by EOC Summary
Time-Phased
Engineering
Group Hours by WBS Item
Total
1-29
Phasing/Flight
Test Schedules
significant
master
schedules
program
performance
period.
Hardware
of the
history.
I-i13
I-i14
1-127
1-128
1-143
I -144
I -156
1-157
1-172
1-173
1-175
4 Items
Vehicle
Rate
Program
Technical
Rate Chart
Chart
Support
1-175
1-179
1-186
I-3
SD72-SH-O003
and
Page
_1=_
WBS
Time-Phased
Time-Phased
Time-Phased
Time-Phased
Time-Phased
WBS
WBS
WBS
WBS
3.O
4.0
5.0
6.0
WBS
7.0 Special
Rate Chart
Test
Equipment
Time-Phased
Time-Phased
WBS
8.0
Tooling
Rate
Chart
WBS
9.0
Other
i.O
Air
Total
Vehicle
Dollar
Time-Phased
Time-Phased
Ti_e-Phased
Time-Phased
Time-phased
Time-Phased
Time-Phased
Time-Phased
Time-Phased
Time-Phased
By
Bar
Space
Division Rockwell
North Amencan
Major Airframe
Mate Rate Chart
Flight
Test Rate Chart
Flight
Test GSE Rate Chart
Spares
Rate Chart
Level
Program
Elements
I-!93
1-196
1-203
1-208
1-211
1-214
Rate
Chart
1-219
5 Subsystem
Chart
1-226
WBS
WBS
WBS
WBS
WBS
WBS
1.0
I.i
1.2
1.3
1.4
1.5
Air Vehicle
Rate Chart
Airframe
Structure
Rate Chart
Environmental
Control
Rate Chart
Propulsion
Rate Chart
Secondary
Power Rate Chart
Air Induction
Rate Chart
1-231
1-236
1-243
1-248
1-255
1-262
WBS
WBS
WBS
WBS
1.6
1.7
1.8
1.9
Flight
Control
Rate Chart
1-269
Pers. Accomm.
& Escape
Rate Chart
1-274
Alighting
and Arresting
Rate Chart
1-281
Mission
_ Traffic
Control
Rate Chart
1-286
Time-Phased
WBS i.i0
Time-Phased
WBS i.ii
Time-Phased
WBS !.12
Subcontractor
Cost Summary
Unit Cost Analysis
Flight
Indication
Rate Chart
1-291
Test Instrumentation
Rate Chart
1-294
Subsystem
Install,
C/O and Preflight
1-299
1-304
1-305
State-of-the-Art
Developed
Weight
& Percent
Analysis
1-310
Summary
1-312
I-4
SD72-SH-O003
_i_)
(_I
t..) or'-I
!
H
H
I
H
m
H
Lr_
_--I
Space
Division Rockwell
North American
I
H
H
m
',D
.q'LP,
!
H
H
H
t"(3h
Oh
Cq
IIIIIIII
HHHHHHHH
HHHHHHHH
HHHHHHHH
r--I
m
H
m
H
H
H
m
H
b',--I
Um
00
0q
O
0J
u'h
l--I
m
H
H
H
m
H
H
m
O,J
0h
cq
I
H
H
H
cq
eq
LO,
I
H
H
H
CQ
p.-)
I
H
H
H
r.fq
I
m
i--I
E-_
_O_
O_
,,_
O-,, t._ Gh
.-1I
l
llllll
HnHHHH
m
H
HHHHHH
H
H
H
H
H
H
IIIIIIIIIII
HHHHHHHHHHH
HHHHHHHHHHH
HHHHHHHHHHH
H
H
H
n
n
H
H m
Hl--I
H m
,.tl
o
o
o
o
_3
f..-I
r-]
_
_
.M
_; _
o
,-4
r.D
-p
O
.p
r._
@
0
.r4
o._
'_ _.o_ _ _
CO
,H
o_
Cq
r_ r-40d
,.-7,44
.H
,-I
_ ,rt
h0
,---t
,,-t
<
_)
co)
oJ
T- 5
SD72-SH-O003
_4_k_
4_
_J
O
rj
(2tx
_
I
I-t
Space
DlvlslonRockwell
Nodh American
trx
_,D
!
O
cO
,--4
I
,--t
I
_0J
_o_
I
H
I-.-t
r-I
Ctl
_8
C',
0J
I.-t
I-..t
H
,-.i
3
CO
,
0 _
i
._
r_
CO
U_
l
I-4
_I .rl
'_0 .-_",..D
',,,0
r-l_._
I
CO
Oa
-..d"
".,D(_JO0
o"_..,..dLr_,
Lf",
IIIII
I
_' _H.
'
i,l,.
,-I
o
r_
m
m
_
0
._
N
0
o
_
O
_._
,,-t ,,-t
,-I
I>
,--I
r.Q
,-I
o
h
_-I
o
P-I
Iii
r.Q .4_
_'_
_ o
,-I r...)
I::h
l_.,-t
01_1
__
0 0 _
r..b _..9 0
._
._-_
_1
b_ _-I ..I.a
0
o
r.Q
4-_
I;::I
o
"r-6
SD72-SH-O003
O_
'.O
O
ao
rY_
Space
Division Rockwell
North American
oJ
I
t--t
I--t
r.Q
,-I
b-r-4
co
b--
k_
r-I
0
H
',.0
CO
_I
_
M
o
I
.,-I
t--t
E_ I::::I
"
}
i
0 _
!
.H
u'rJ
(Xl
r--t
oo
0d
I
H
_4a
o
t--I ._
_.,_
_'_ _
-._
o
b-M3
k_
ta_
kFx
Od
I
_@_o
__
_
_
IIIIII
_o_
_0
I
HHH
0d
L'-.-.1
IIII
I--t
IIII
_H
+_
d_
O
.M
'd
O
r-4
_0
h0
_
F-_ 4-_ 0
.._ .._
_
_
,_
o
o
c..)
oca
_,-t
._ _-_ o_
_o_ too
d)
o
o
r-I OJ o'3__
L_kO
"L.
A
_
r-'4 _-t
bD
._I
JddJd
ddd88
[....
H
4-_
<
gt
r.p
o_
CO
I-7
SD72-SH-O003
E-I
_
cO
,--4
RD
b_
o
o
oO
._.1"
",4D
_
H
H
H
HHHHH
HHHHH
o_
or}
O..I
,.-I
_
Od
c_
LP_
OJ
O
,--4
c'q
H
H
H
H
H
H
H
H
um
b..cxI
c,rb
0
oq
Space
DivisionRockwell
North American
or,, oj _ o
cO o,q.--.._"b-eq__
_.._._.._
I
HH
HH
oa
O
_
or}b-...
O o'2,
LP', LP,.
HH
HH
H
H
HH
HH
r./j
,--t
o",,
oJ
I
H
H
H
H
H
H
r_
c_
C)
o1-1 :
E_
@
m
I
r..O'
c_ J_
4 .....
o
o_
,---I .r-I ._
bo'h
C',J
I
H
u".,
0..1
i
um
u'.,
Od
i
_
b04
I
Om O oo
b.-- ,.-I c"rb
r'_,.z.-_
_ I
I
I--t
I--t
I..-I
I--t
I-.4
0
._
cO
O0
,-4
CO
I
I---t
I--I H
o
,,-..i
.._
.,.-I
4._
cJ
0
,-I
4-_
c_
.p4_
ra _a
,-.-I._
,-4
0
H
_'_
bD _
_
_
0
_0_
I.--I _)
Od
o
f::h
_0
4a 4-_ 0
r--I _
Lr',
.r-I
bll
0
i--t
,-4
1.,-I
.,--I
_l
-_
4._
_
0
-_
.,4
" r-.-t
r-0
0,10d
Ckl Od Cq
e-t
r-_
ddcdc cd
_
_
._1-
..._.1-
Od
c_
._.I-
0
k_
z-8
SD72-SH-O003
0
tr', t_r',
_4_
Space DivisionRockwell
NorthAmerican
4_
03
o
o
co
LF_
co
LO,
o
'-.0
I
,-_ ,-_
_0_0
I
H
H
H
m
H
H
H
H
H
H
H
H
H
m
IIIII
III
HHHHH
HHHHH
HHH
HHH
r_
,-I
,-4
r-t
.r-t
O "_
I
.r-I
V1
o
,.-t
e:l
0 _
oo
"_ _ _,,
c)
o,.c_
m _
H
m
E-I A_3_
+
,--t
_0
o _
p_
0,4
P_
,-I
r-_
.M
-_
_
.H
,--I
4_
__ _
__
__
P_
_
o
E_
._'_0
O _
0._
P_
_.o
O_
'..O ',.D
',.0 '.0
,,_
b-
cO.
O_-I
cOcO
od
cO
CO00
30
O
Cb,
T- 9
SD72-SH-O003
__
SECTION
II WORK
t-
_I
BREAKDOWN
Space
Division Rockwell
North American
STRUCTURE
The development
of a Work Breakdown
Structure
(WBS) was a prime
objective
of Phase
I.
The WBS had to be designed
to accommodate
cost, schedule and technical
data related
to the B-70 aircraft
subsystems
and provide
a
logical
grouping
of other program
elements
not directly
related
to the subsystems.
The Work Breakdown
Structure
developed
for this study is contained
in Exhibit
i, page
1-19
and
1-20.
To maintain
consistency
of
Saturn
S-If studies
and to place
levels
of the NASA WBS framework,
been made:
NASA
WBS
In all cases,
corresponding
Level
terminology
with the previous
Apollo
CSM and
the B-TO WBS levels
at the corresponding
the following
WBS level designations
have
Description
NR
WBS
Program
System
Subsystem
Major
Assembly
Minor
Assembly
Components
Piece
where WBS
description
levels
will
Parts
are discussed,
be used.
the
NASA
level
Level
number
and
by
a decimal
point.
For
X
example:
,
System
Subsystem
Minor
Assembly
Major
Assembly
1-11
SS72-SH-O003
_I_
following
paragraphs
contain
the
Space
Division Rockwell
North American
definition
of
each
level
each
4 WBS
item.
Individual
sections
of Volumes
II, III and IV will provide
a thorough
definition
of the level
5 items and discuss
the cost, schedule
and technical
data located
at each WBS level.
II-I
Level
1.0
4 Definitions
Air
Vehicle
This
WBS
(Volume
level
II,
item
Page
II-i
contains
)
all
costs
associated
with
the:
a)
engineering
vehicle
and
fications.
b)
design,
manufacture
simulators.
(WBS
c)
design,
develop,
manufacture,
procure
and ground
test all
air vehicle
#1 and 2 subsystems.
(WBS 1.1 through
1.11)
d)
partially
design,
develop,
manufacture,
test Air Vehicle
#3 subsystems
exclusive
Navigation
System.
(WBS 1.1 - 1.11)
e)
fabricate
subsystem
provisions,
systems
installation,
manufacturing
and flight
test checkout
and preflight
operations
(WBS 1.12) for Air Vehicles
#l and 2.
f)
modification
program
but
accidents.
g)
North
and test of
1.1 - 1.11)
and rework
as the
exclusive
of major
(WBS 1.1 - i.ii)
American
technical
Furnished
items.
Rockwell
all
models,
excluded
engineering
effort
fram
in-house
this
associated
mockups
procure
of the
and
and ground
Bomb and
result
of the flight
test
air vehicle
repair
due to
costs
integration
and installation
Equipment
(GFE).
See Page
Specifically
a)
and development
testing
required
to develop
subsystem
design
criteria
and performance
speci(WBS 1.O, 1.1 through
1.11).
WBS
item
with
associated
with
the
of Government
I-i6
for a list
of GFE
are:
the
Weapon
Systems
(WBS
2.z4).
b)
procurement
of Weapon
c)
program
management
d)
flight
test activities
and 2 (WBS 4.41).
System
activities
after
1-12
components
(WBS
(WBS
2.23).
first
flight
of
2.24).
Air
8D72-81-0003
Vehicle
#i
_I_
e)
Cost
(EOC)
tains
and
the
major airframe
mating
activities
including
and wing joining
problems
(WBS 3.0).
data
is presented
Subdivision
definitions
within
subsystems.
Data
a)
technical
description
b)
technical
drivers
c)
technical
characteristics
d)
Subsystem
state-of-the-art
e)
percent
f)
development
g)
schedule
h)
subcontractor
Volume
data.
Individual
contents.
2.0
Program
This
III
The
presented
WBS
the
tank
item
by
Element
III
of
this
sealing
of
Cost
volume
con-
is presented
to enable
the user to
cost data with other programs
and/or
include:
of
all
level
influencing
subsystem
5 and
subsystem
6 items
development
ratings
developed
compared
to
a production
article
summary
design/programmatic
cost
and IV
volumes
subsystems
Technical
WBS
this
of Work (SDW).
Section
of the EOC's and SDW's.
Schedule
and technical
data
evaluate,
analyze
and compare
the
nical
Space Amencan
Division Rockwell
North
element
impacts
summaries
and
discussion.
contain
all subsystem
cost, schedule
and techare arranged
by subsystem
WBS number
(level
5).
should
be
Support
consulted
(Volume
contains
five
for
II,
level
detail
Page
definitions
II-130
5 items
and
(2.20
through
2.24).
Design
This
Support
WBS
item
(Volume
II, Page
is utilized
II-166
to display,
)
as
information
only,
a matrix
of the Engineering
groups
and disciplines
designated
on the WBS as "Design
Support".
This matrix
provides
the user with the ability
to isolate
and remove
from 1.0
Air Vehicle
and subsystems
(WBS i.i through
i.ii) those
costs
associated
with
design
support.
1-13
SD72-SN-O003
#4_k_
2.21
Other
B&D
Testing
(Volume
II,
Page
Space American
Division Rockwell
Nodn
11-168
Program
Management
(Volume
II,
Control
of program
b)
operational,
analy s i s.
c)
support
d)
costs
costs
maintenance
personnel
tractors
of
to
engineering
final preparation
to the customer.
Engineering
groups
Control;
Operation
Page
11-174
required
and
technical
and
functional
associate
i.i through
activities.
for
the
fol-
accomplishments.
configuration
contractors
and
subcon-
representatives.
of reports
supporting
Planning;
and
data
for
presentation
Proposal
and Procurement
Control;
Design
Illustrations;
Mechanical
& Propulsion
Administration;
Operations
Administration;
Engineering
Administration;
R&D Programming;
Advanced
Projects
and B-70 Project
Group.
2.23
Logistics
This
a)
b)
c)
d)
e)
WBS
Support
item
labor
(Volume
contains
required
II,
the
Page
costs
to perform
II-184
associated
packaging
with
the:
studies
design
and development
of the maintenance
concept,
support
operation
analysis,
and maintenance
program
necessary
to sustain
the end product
development
of product
analysis
of product
test operations
analysis,
performance
performance
determination
and
tasks,
expressed
in terms
facilities
and personnel,
product.
reporting
data
system.
collected
delineation
of
from
individual
of methods,
equipment,
required
to maintain
the
1-14
SD72-SE-O003
end
#_
f)
2.24
field
Weapon
Space Amencan
Division Rockwell
North
service
System
(Volume
II,
Page
II-193
Major
Airframe
Mating
(Volume
II,
Page
11-237
Cost associated
with this WBS item contain
the manufacturing
and
flight
test support
personnel
involved
in joining
the major airframe
section
of Vehicles
#l and 2.
Problems
associated
with this effort,
primarily
on Ship #1, include
sealing
of the fuel tanks and joining
of
the wings.
Costs related
to these problems
are contained
in this item.
System
installation,
checkout
and preflight
activities
occurred
durin_
this period
and are excluded
from this item (See WBS 1.12).
Consult
Volume
II, Page
activities.
4.0
Flight
II-237
Test
for
a detail
Progra m
discussion
(Volume
II,
of
Page
the
major
II-25l
airframe
mating
Ground
This
development,
facturing
6.0
Spares
This
Support
Equipment
(Volume
II,
Page
11-487
flight
(Volume
WBS
item
test
II,
Ground
Page
includes
Support
11-581
the
Equipment.
cost
required
to
fabricate
and/or
pro-
1-15
S_2-S]_-O003
_I_
tract
as spares.
for Ship #3 but
ZO
- Special
Specifically
excluded
utilized
as spare parts
Test
Equipment
(Volume
are those
when ship
II,
Page
Space
Division Rockwell
North American
articles
fabrication
#3 was cancelled.
11-603
Included
ricate
and/or
Manufacturing,
8.0-
(Volume
Toolin_
II,
Page
11-611
)
to design,
fabby Engineering,
(Volume
This
item
II,
Page
includes
all
11-675
other
)
activities
and
tasks
not
associated
Government
Furnished
Listed
Equipment
in
below
Equipment
are
the Air
those
Vehicle
items
WBS Number
Propulsion
1.3.1
1.3.7.1
1.3.7.2
as
Government
Furnished
Document.
Description
Subsystem
YJ-93-GE
Engines
RPM Gages
EGT Gages
Secondary
Power
1.4.1.4.2
Subsystem
Pressure
Pressure
1.4.1.4.3
1.4.5.1.2
1.4.5.1.3
1.4.5.1.6
Personnel
identified
Specification
Accommodations
Gages
Sensors
Emergency
Generator
Voltage
Regulator
Battery
& Escape
17.1
17.2.1
17.2.2
17.2.5
17.2.8
17.2.9
Subsystem
Personnel
Equipment
Converters
Check Valves
Quick
Disgo_nects
Capsule
02
02 Pressure
Cylinder
Regulator
1-16
SD72-SH O00B
#I_
WBS Number
Description
1.7.2.12.1
Quantity Indicator
Mode Switch
Fire Extinguisher Cylinder
Relief Container
Survival Equipment
1.7.2._.2
1.7.3.2
1.7.3.3
1.7.4.5
Mission
and Traffic
1.9.1.1.1
1.9.1.1.2
1.9.1.1.3
1.9.1.1.6
Control
Subsystem
Receiver/Transmitter
Control Unit
Antenna Selector Unit
RF Transmission Line Switch
Communications
Control
Ground Intercom Control
1.9.1.2.2
1.9.1.2.3
1.9.2.1.1
1.9.2.1.2
1.9.2.1.3
1.9.2.1.5
1.9.2.2.1
1.9.2.2.2
1.9.2.2.3
1.9.2.2.6
1.9.3 .i
1.9.3.2
1.9.3.4
Flight
Indication
1.10.2.1
1.10.2.2
SpaceAmencan
DivisionRockwell
North
1.10.2.4
1.10.3.1.i
1.1o.3.1.3
1.1o.3.1.4
1.1o.3.6
1.1o.3.6.5
1.1o.3.7
1.1o.3.7.5
1.1o.3.9
1.1o.3.1o
Amplifier
Altitude/Vertical
Indicator
Amplifier
Standby Altimeter
Clock
1.1o.4
Flight
Director
1-17
sD72-smooo3
Speed
Indicator
Computer
kL
....f
o.
i I
I.I_IIL
4 lYlTEII
,.
_ I i lily
c _il,ll
i iili)ll
wv
_ ,++,+,+ _ t+ w,
i_t_
IP4tll
_L
T
I t_11
m m
iptit_
Tll
+.,++++++
co_)_h_
I_
Ill
v _ +.+,,_ I
_It,_,_
_"
f:
FRAME
FOLDOUT
_-
13
14
I_C(_#W_)
I_L_
AR
,;$
ST E M
_Pm SY_
.,$
__
j._
j-..,,..,I
_te w, wI
*LLC
" *1
Cf'T*.C_
,A
CJU'
'_"
_.am.,..ra
,<,N
oc m_,s
*_ vf
.A,
_f
5,,.,,,,_._25
.A
_w
i_.i
O.K..AC._I
a_..l
wm.,,,
a,_,w
_ ,O,_,U
_,TaO,a_k
J*
i
o.N*s
L ,w.i
a..,,_
_s
,IMS
_1o
r
v
_mtc_
_S_I
_u_fff
FOLDOUT
I
!i
',
FRAME
_3
i
AIR
V|HI_L|
II
,,
,,
Aim
INOUCT
II.JI_SY
K_d
_TT [ M
COktl_O_
_EMFL_HT
_mlL
t _utTr
tO_
t
,
_e_
_qT IM
,+
r_
q_l[w
?,
_v_
_, c *+I o_
m*A
+ ,,41
_t*+_ro.
m*IS
+fl
m
.
AgC_/AM
_mtlwc_
-11-11
$TATI_
e+ O+_lm'
q rl+m
tl
w_+
tltrs
cr
.+
FOUX)U'I:fRAME
,. I
,,
I
INI}
APIR
E _'l"lPWN_ St_IL_ V$
aL)GNT_;O
_P_O
_"
E M
C(_TRO(
SUI_
Y $ t IEIW
I_kT
,,
ION
_N $I" II U_
SUBSYSTEM
FLIGI-II
!
N
T A f ION
I F.,I'I
_I
iCwl
tlll
p- ,-_, ?
uv,
,*
imi(_oI_
II
o,, _i,
_IA
,J_,it,
,.--,,2
_lqOUNO
ti$
}'_l
I1.1'1_
; "
(.ME
I
_ti
_OLOOUT_
F_M_-__-
,o
FLIOHT
F_.IGH1
TI_T
II
_[_ST
I
_IN_L
(3_S AND
I_1_[ F L.I(_H T
_LLATIO_
_FLIG
4_
i I
f J I
AI_RAM_
MA T ;_G
GS_
B,_SLC
SSI
441
"_
A_
R4_
G_
MAIIMT
_q_E
,o
rEST
E(_-UIF_I
_tC=Ac EN T
IPARES
, i
i-I
.-.L
l
I_JIIPPt" E M! N T A'L
4mFG
DE VEt r_Mi
P_MDGRAMS
NT
I;I
COII4 TRACT
l_L
I!_(_ EOUtl =
ptj6L
_1_A T ll_q_ S
e_3
el
II
Ti AMINAT
)4._1
IIIC_
AAWa_./_q
_,_,
P_@E ll,....mMq' _
SD72-SH-03
NO_WIILL
I_._,_
tqLMED
IP_[:!
OIv,_ION
'
_I_
SECTION
III-i
III
COST
DATA
ORGANIZATION
AND
Space
Division Rockwell
North American
DEFINITION
General
The primary
objective
of the cost data contained
in this document
is to provide
the user with a time-phased
history
of the North American
Rockwell
recorded
costs
for each item of the Work Breakdown
Structure
where
cost data can be
obtained.
Complete
and for each level
Recorded
cost data has been generated
primarily
from the Los Angeles
Division
514 Cost Accumulation
Statements.
Financial
ledger
records,
manufacturing
and engineering
departmental
records,
and subcontractorcost
reports
have
been utilized
to provide
greater
visibility
in restructuring
the cost data
into the approved
study formats.
Methods
and procedures
for this restructuring were presented
in the Phase I Report
(SD71-189
dated September
24, 1971).
Minor
variations
to these procedures
have occurred
during
the conduct
of
Phase
II activities.
These
variations
have been reviewed
and approved
by the
NASA Technical
Monitor.
The cost data has been time-phased
to enable
the analysis
and correlation
of
this data to the schedule
milestone
and technical
data contained
in the report.
Time-phasing
has been on slx-month
centers
with March and September
selected
as the cut-off
months.
September
is the end of the MR fiscal
year and March
represents
the fiscal
year mid-point.
All tlme-phased
cost data is presented
in rate (decum)
form.
Costs reported
at September
are the cumulative
costs
from April
through
September.
Costs reported
at March are the cumulative
costs
from October
through
March.
March
of 1958
month
reflects
end of March.
is the initial
time period
of the study.
Data recorded
at this
NR expenditures
from contract
award
(December
1957) to the
Time-phased
cost detail
continues
until September
of 1966, which
encompasses
the point at which the program
objective
of sustained
Mach 3 flight
was achieved.
Preliminary
study and design
effort
prior to the contract
award
in December
1957 and the Air Force and NASA flight
research
programs
beginning
in late 1966 are excluded
from the time-phased
cost detail.
The Program
Abstract
beginning
on page 1-29 of this volume
should
be consulted
for details
of the pre-award
and post evaluation
time periods.
The cost
document
each WBS
all costs
utilized
Design/Engineering
Production
Tooling
and
STE
1-21
SD72-SH-O003
_i_
Space
Division Rockwell
North American
Te st/QC
Other
The
Elements
of
Cost
are:
Design/Engineering
Hours
Labor Dollars
Burden
Dollars
Shop
Support
Hours
Labor Dollars
Burden
Dollars
Production
Hours
Labor Dollars
Burden
Dollars
Tooling
and STE Hours
Labor Dollars
Burden
Dollars
Planning
Hours
Labor Dollars
Burden
Dollars
Test/QC
Hours
Labor Dollars
Burden
Dollars
Engineering
Material
Manufacturing
Material
Tooling
and STE Material
Subcontract
Material
Procurement
Cost
Other
Cost Dollars
Wind Tunnel
General
IDWA
111-2
The
and
Subdivision
Subdivisions
Administrative
Expense
of Work
of Work
are
designed
to present
the
cost
data
at
which
would
identify
its functional
relationship.
The assessment
cation
of costs to a particular
Subdivision
of Work were based on
definition
of the Elements
of Cost in relation
to the contractual
Work.
The definitions
of the Subdivisions
of Work
are:
1-22
SD72-SH-O003
a level
and identifithe accounting
Statements
of
#4L_
Space
North Amencan
Division Rockwell
,Design/Engineering
Costs
classified
in this
SDW
represent
the
effort
associated
with
the
study,
analysis,
design,
development,
evaluation
and redesign
of
specific
elements
of the WBS.
This includes
the preparation
of
specifications,
drawings,
parts
lists,
wiring
diagrams,
technical
coordination
between
engineering
and manufacturing,
vendor
coordination
data reduction,
report
preparation,
determination
of
specification
and
requirements
for reliability,
maintainability
and quality
control.
Production
Included
in this
SDW
are
the
costs
for
fabrication,
processing
and
sub-
assembly,
final assembly,
line inspection,
planning,
rework,
modification,
experimental
production
and installation
of parts and equipment
of all
hardware
items produced
under this contract
whether
deliverable
or not.
Specifically
excluded
is the production
of the test hardware
and the
models
and mockups
utilized
in the development
program.
Cost associated
with these
items is included
in the
Test/QC
SDW.
Included
in the
Production
SDW are those
costs associated
with the designation
and
implementation
process
meets
quality
level
manufacturing
Toolin_
This
and
SDW
of the necessary
controls
to ensure
that a manufacturing
prescribed
standards,
and the establishment
of acceptable
and statistical
methods
for determining
performance
of
processes.
STE
contains
cost
associated
with
the
planning,
design,
fabrication,
assembly,
inspection,
installation,
modification,
maintenance
and rework
of all tools,
dies, jigs,
fixtures,
guages,
handling
equipment,
work
platforms
and manufacturing
special
test equipment.
Included
are costs
for determining
tool requirements,
tool engineering,
maintaining
tool
records,
scheduling
and controlling
all tool orders,
programming
and
preparation
of tapes for numerically
controlled
machine
parts,
preparation
of templates
and patterns
and start-up
and closeout
costs
incurred
in the production
operations.
Test/QC
The
costs
displayed
in this
SDW
are
associated
with
the
performance
of
and integrated
systems
to
suitable
for their
intended
verify
use
they
(these
tests are conducted
on hardware
or final designs
that have been
produced,
inspected
and assembled
by established
methods);
(3) tests
performed
by two or more contractors
to substantiate
the feasibility,
development,
qualification,
or acceptance
of interface
and/or
interface
system
compatibility;
(4) test planning
and scheduling,
data reduction
and report
preparation;
(5) fabricating
all models,
mockups,
breadboards,
1-23
SD72-SH-O003
Space
Division Rockwell
North American
sinmlators,
etc., utilized
by Engineering
in the
The Shop Support
Element
of Cost within
this S_
production
effort.
development
program.
contains
all of this
Other
This
tion
111-3
The
SDW contains
costs.
All
Elements
Elements
of
subcontractor
in WBS 9.98.
termina-
of Cost
Cost
contained
in this
study
to
further
define
the
cost
data
those
used in a typical
accounting
system
and consist
of direct
and indirect
charges.
The direct
costs are those that can be readily
and practically
identified
to a particular
project
or task.
The indirect
costs are those
that cannot
be readily
identified
to a contract
and are therefore
pooled
and applied
as a rate to the direct
hours and/or
dollars.
These costs
consist
of indirect
labor
(Financial,
Purchasing,
Security,
Contracts
and
Pricing)
occupancy
costs,
depreciation
and similar
costs that are not
directly
utilized
associable
to
in this study
a contract.
The
are as follows:
Desi6-n/Engineerin
Direct
Labor
definition
Hours
and
of
all
Elements
of
Cost
Dollars
Burden
Hours
and
Dollars
support
personnel,
supplies,
and occupancy
costs.
Direct
Labor
Hours
and
depreciation,
rentals,
taxes,
Dollars
rework
and replacement,
and shift premiums
are
and packing
included.
and
crating.
1-24
SD72-SH-0003
Overtime
are
_i_
Shop
Support
Direct
Labor
Hours
and
are
Plannin_
Direct
Included
in
the
Planning
and
STE.
Toolin_
Costs
Dollars
types of
against
effort
described
in the
this EOC is in support
of models,
mockups,
simulators,
types.
Overtime
premiums
and shift
included.
Labor
this
EOC
effort
STE
Hours
are
in
Overtime
and
Space Amencan
Division Rockwell
North
all
to
EOC
hours
and
dollars
of Production,
and
Labor
this
Dollars
direct
support
premiums
Direct
identified
and
shift
Hours
Shop
premiums
and
inclnde
are
associates
Support,
with
Tooling,
included.
Dollars
the
direct
hours
and
dollars
associated
with the design,
fabrication
and assembly
of contract
supplemental
tooling,
special
test equipment,
dimensional
tooling
and
handling
Test/QC
equipment.
Direct
Labor
Hours
and
Dollars
and
Manufacturing
This
EOC
shift
premiums
are
included.
Burden
included
all
manufacturing
overhead
costs
which
cannot
be
readily
identified
with individual
projects,
systems,
or tasks.
The
burden
is distributed
over all direct
labor hours generated
by the
Production,
Shop Support,
Planning,
Tooling
and STE, and
Test/QC
Elements
of Cost.
Examples
of the types
of costs included
in this
burden
pool are: fringe
benefits
such as employee
vacations,
sick
leave,
holiday
pay, conventinns,
seminars,
retirement,
and savings
plans;
secretarial
personnel,
supplies,
depreciation,
rentals,
taxes,
insurance
and occupancy
costs.
En_ineerin_
Material
Included
in this
EOC
is the
cost
that
required
to
support
the
are
for
raw
research
materials
and
and
development
1-25
SD72-SH-0003
purchased
effort.
parts
_1_
Manufacturing
Material
Space
DivisionRockwell
North Amer_an
The cost of raw materials, purchased tooling and purchased parts, other
than subcontracted
items, that are required to support the tooling and
special test equipment effort are included in this element of cost.
Subcontracting
The costs associated with the major and minor subcontractor
effort and
various small miscellaneous
subcontractor effort are included in this
Element
tooling
of Cost.
Identification
of the supplier's engineering, production,
and testing effort is provided by the Subdivision of Work. All
supplier costs are associated to these SDW's utilizing the same definitions,
as far as possible, as the in-house costs.
See the previous section for
SDW definitions.
Materi_l
Procurement
Costs
This EOC includes all in-house material overhead costs for procurement,
receiving inspection, warehousing and in-plant handling of material and
subcontract purchases.
These costs are distributed over all direct
material and subcontract purchased dollars.
Other Costs
This EOC includes the costs accumulated for travel expense, subsistence,
and air fares of all direct classified personnel on this program; the cost
of automatic computation support (Data Processing), supplier's claims, and
payroll expense applicable to offsite effort.
General
and Administrative
Expense
The costs displayed under this EOC include the general and administrative
expenses which are incurred in the direction of the contract as a whole
as contrasted with the burden expenses of engineering, manufacturing
and
material.
This burden is applied as a percent of the total work-in-process
dollars (direct and indirect costs) generated by the contract.
Included
in the G&A pool are such items as: wages and salaries of personnel in those
departments whose effort is in support of all in-house contracts, supplies
and expenses, indirect employee benefits, proposal expense, welfare and
recreation expense, depreciation,
taxes, insurance, cafeteria and vending
operations, executive offices allocations including allowable research
costs, telephone and telegraph, and equipment rentals.
1-26
SD72-SH-O003
_I_
IDWA
(Interdivisional
Work
Space Amencan
Division Rockwell
North
Authorizations)
IDWA's
are issued
to the supporting
divisions
of North American
Rockwell
to capitalize
on their
many
and varied
talents
and skills.
This EOC
has been established
to collect
the recorded
costs of the tasks transferred
to these other divisions.
The
production,
tooling
and testing
support.
111-4
Non-Recurring/Recurring
1-27
SDV2-SH-O003
PRECEDING
SECTION
IV-I
Program
Abstract
The
Force
Air
BLANK
NOT
PROGRAM
SUMMARY
DATA
a requirement
for
PAGE
IV
established
FILME, _
a Mach
Space
Division Rockwell
North American
3 advanced
strategic
bomber
in early
1952.
This bomber
was to replace
the aging B-52.
The
program
was designated
WSIIO-A.
The Air Force,
NASA and several
Air Frame
contractors
had performed
conceptual
studies
of this weapon
system
for
several
years prior
to the publication
of the requirements.
In July,
1955, the Air Force
requested
competitive
bids for Weapon
System
IIO-A.
Study
contracts
were awarded
in November,
1955 to North
American
Aviation
and Boeing
Aircraft
Companies
for the preliminary
design
effort
of the Weapon
System.
Government
funded
value of these contracts
were approximately
$10million
each.
At the same time IBM was awarded
a similar
contract
for preliminary
design
of the Bombing/Navigation
System.
The Air Force
selected
North American
Aviation
as Weapon
System
Manager
in January
1958 and work began on Phase I of the Weapon
System
development.
This effort
included
development
engineering
and testing,
performance
specification
development,
selection
of major
subcontractors
and
a mockup
inspection
in March
1959.
The initial
program
called
for first
flight
by July 1962, and the first operational
wing (_5 A/V) by December
1965.
In January
1958, the Air Force accelerated
the program
with first
flight
by January
1962 and first operational
wing (65 A/V) by September
196_.
In October
1958, the Air Force
revised
this schedule
with a stretch
out after
first flight
and the first operational
wing (62 A/V) by
September
1965.
In October
1959, the Air Force again went to an austere
program
though
deletion
of high cost simulators,
design
simplifications,
soft tooling,
and discontinuance
of intensive
honeycomb
brazing
and welding
development
effort.
Under
this program,
the first operational
wing was
scheduled
for December
1965, with first flight
still planned
for January
1962.
By December
1959, basic solutions
to major technical
problems
had
been resolved
and engineering
drawings
were being prepared.
Development
was well advanced
and considerable
development
hardware
was in existance.
In December
1959, the B-70 program
was redirected
from a 62 aircraft
program
with full qualification
to a single
air vehicle
(XB-70)
and minimum
effort
airworthiness
test program.
The IBM B_
System
effort
was transferred
to an Air Force
contract
and continued
at a reduced
rate.
The defensive
subsystems
terminated
Vought
was
On September
19, 1960,
with the Design,
Development,
and IIYB-70
aircraft.
This
needed
for
an operational
Control
work at
subsystem
contracts
Boeing,
Lockheed
and
were
Chance-
North American
Aviation
was advised
to proceed
Fabrication
and Test of one XB-70 prototype
would include
development
of all major
systems
Mash
3bomber.
1-29
SD72- SH- 0003
Space
Division Rockwell
North Amencan
Six months
later the program
was redirected
again to a prototype
development
program
consisting
of three aircraft.
The major
objectives
of
this program
were to design,
fabricate,
and demonstrate
the technical
feasibility
of a high altitude,
long range,
Mach 3 type vehicle
and to demonstrate
the
air
operation
vehicle.
of an integrated
prototype
bombing
Air Vehicle
Number
3 was cancelled
to
demonstrate
the
navigation
system
on
in March of 1964 and
operation
of
an
integrated
the 3rd
with
bombing
was rolled
out on
40,000
feet.
Air
of the program
for 33 minutes.
objectives
on
May 29,
Vehicle
May
19,
1966
when
it flew
in excess
of
Mach
The flight
test phase to demonstrate
the program
objectives
ended in
late July 1966.
At this point NAA entered
into two contracts
with the Air
Force
and NASA to use Air Vehicle
Number
i as a test bed.
Under these
contracts
NAA maintained
for the conduct
of these
the aircraft
and provided
modifications
as
test programs.
These tests Mere concluded
February
of 1969 when the remaining
and placed
in the museum
at Wright
B-70
Contract
North
Dayton,
Ohlo
Summar_
American
Aviation
bomber
under
Air Force
contract
were $246,550
Two additional
31801
covered
air vehicle
was flown to
Patterson
Air Force Base.
required
in
Contract
when the
Pre-Phase
the period
conducted
design
studies
on
a SAC
AF33(616)-2367.
Recorded
costs against
this
contract
was completed
in February
1956.
I contracts
from March
expenditures
charged
against
through
Weapon
System
llO-A
preliminary
were awarded
North American.
of 1956 through
June of 1957.
this contract
contract
award
were $7,465,066.
in December
1957
Air Force
contract
AF(33)600-36118.
$1,757,389
were
contract.
Prior
to the Weapon
System
llO-A contract
awarded
North American
$9,469,005
in study contracts.
AF33(600)Total
July 1957,
was covered
under
recorded
against
this
award the Air Force had
development.
Cumulative
recorded
costs,
exclusive
of
fee,
were
1-30
SD79- SH- 0003
$63,653,6o8.
#l_
Space
Division Rockwell
North American
was initiated
in July 1959 under a letter
Agreement
#2 to Contract
AF33(600)-38669.
continuation
of the development
activities
covered
by the definitive
contract.
The total program;was
redirected
on
December
2, 1959 to the fabrication
and flight
testing
of a single
XB-70
prototype.
This redirection
occurred
prior to the definitization
of
Supplemental
Agreement
#2.
The program,
as redirected,
was definitized
as Supplemental
Agreement
#2 in May of 1960 for a total estimated
cost and fixed fee of $180,193,324
covering
the development
and fabrication
effort
of a single
XB_70 prototype
through
June of 1961.
Total negotiated
price of parts
1 and 2 under
AF33(600)-38669
was $300,69_,152
exclusive
of changes.
Total recorded
costs
against
this contract
were $310,908,713
which excludes
fee
As
the
result
of
congressional
studies
during
mid_1960,
letter
contract
for the YB-70 weapon
system
development
program
was signed
in
September,
1960.
This contract
was designated
as AF33(600)-42058,
and
amounted
to a reinstatement
of a full weapon
system
development
program
The
contract
was to provide
for the fabrication
of Ii YB-70
systems
in addition
to the current
requirement
of i XB_70.
However,
before
this contract
could
be definitized,
it was redirected
on March 31, 1961 to a three ship XB=70
prototype
air vehicle
program.
AF33(600)_42058
was deflnitized
on December
]9, 1961 at a total
estimated
cost and fee of $&_9,350_125o
This price included
the funds
expended
for the YB-70
development
under the letter
contract
and the pro_
duction
and delivery
of three X_-70 configured
aircraft_
By May of 1963,
the total
estimated
cost for the delivery
of the three aircraft
had grown
$60h.2M,
exclusive
of spares
and grotund support
eqt_ipment
AF33(600)_42058
was
termination
of Air Vehicle
reduced
Recorded
reduced
#3 in
approximately
43 million
co_t_ cumulated
against
(exclusive
of
fee)
including
to a two prototyp_
XB-70
March,
1964._
The contract
dollars
ag a regult
of
this contract
amounted
ground
support
equipment
program
value
with
wan
to
th_
tb:,_ _ance]!a_.ion
t_ $612_i_521_!01_
and
spar_-_,
_The flight
test portion
of the XB_70 development
program
_a_ pL_._._red
under
a cost plus incentive
fee contract
negotiated
in mid l_h.
_q_n_
contract,
A m33(657)_12395,
had a target
cost of $36_839,88B,
target
fee of $?,758,561
with a 85/15 cost sharing
arrangement_
The performanc_
aspects
of t_e flight
test program
called
for the demonstration
of e,_.tained
X-31
sm'_-sx-ooo3
_i_
Space Arnencan
Division Rockwell
North
Mach
3 flight
capability
for 30 minutes
and 180 flight
hours over 22.5
aircraft
operational
months.
(Refer
to olume
II page 11-251
for details
of
this program).
Total
recorded
costs charged
to this contract
amounted
to
$36,078,605, exclusive
of fee.
(Total
flight
test costs reported
in this
study are $39,253,050
which
includes
support
effort
not associated
directly
with the flight
test contrast).
The B-70 aircraft
study includes
all costs generated
under
the Phase I
and Phase
II Air Force
contracts
and the basic flight
test contract,
AF33(657)12395.
Several
additional
research
contracts
were awarded
to North American
after
completion
of the basic flight
test contract.in
June 196_.
AF33(657)15871 was initiated
in mid-1966
with the first flight
under the contract
on
November
3, 1966.
A technical
discussion
of this program
is included
in Volume
II page 11-5. Total recorded
costs were $12,376,012.
A second
program,
NASa-If75,
sponsored
by the NASA for investigation
into the control
of structural
dynamics
was begun
in early 1967.
A technical
description
of this progx_m
is provided
in Volume
II page 11-5.
Total North American
expenditures
recorded
against
this contract
were $13,115,765.
1-32
SDT2-SH-O003
Space
Division Rockwell
North American
r.,.-.
ut_
-3.i
SDT2-SH-0003
#I_
IV-2
Program
October
of Significant
Space
DivisionRockwell
North American
Events 1954
Headquarters,
United States Air Force, published a General
Operational Requirement for an Intercontinental
Bombardment
Weapon System Piloted Bomber.
This bomber was to be partially
chemical fueled, was to replace the B-52, and was to be active
in the Strategic Air Command inventory in the general time
period of 1965 to 1975. The Air Force, NACA, and selected airframe contractors had studied this weapon system for at least
two years before publication of the formal requirement.
A
subsequent study requirement, issued by AKDC, identified the
project as "Weapon System IIOA" and established 1963 as the
target date for the first wing of 30 operational air veBicles.
1955
April
The IIOA Weapon System Project Office (WSPO) was formed as part
of the Bombardment Aircraft Division, Directorate of System
Management, Detachment No. i, Headquarters ARDC at Wright
Patterson Air Force Base.
The WSPO presented a series of
briefings to Headquarters AMC, Headquarters SAC, Headquarters
ARDC, USAF Air Staff, USAF Air Council, and the Department of
Defense outlining _ts proposed program for the WS IIOA development and delivery.
July
1956
Apri i
October
SD72-SN-OOO3
#I_
Space American
Division Rockwell
North
1957
July
Both contractors
submitted
study reports
based on the revised
technical
direction
outlining
their findings
and presented
briefings
to Headquarters
ARDC, AMC, SAC and USAF.
On August
30, 1957
Headquarters
USAF directed
the initiation
of a 45-day
competitive
design
period
to be culminated
with onsite
inspections
of the
contractors'
facilities
by a source
selection
board
evaluation
November
group.
The onsite
reviews
occurred
in October
and November
respectively.
at
The
AMC
review
team
captains
from
ARDC,
North
and
American
SAC
& Boeing
reported
their
findings
to the respective
commanders
at Wright
Patterson
Air
Force Base who in turn submitted
separate
sealed
recommendations
to
December
the
Secretary
On the 23rd,
been selected
of
the
Air
Headquarters
as Weapon
Council.
USAF
System
announced
that
llOA contractor
North American
and had been
had
awarded
a phase I contract.
Concurrently,
ARDC and AMC were
directed
to determine
the degree
to which
the program
could be
accelerated
in an effort
to equip the first SAC wing at the
earliest
possible
date.
1958
May
Pending
resolution
with the Air Force,
stopped.
Alternate
of air vehicle
configuration
considerations
all effort
on the full scale mockup
was
plans for static
and fatigue
testing
based
on revised
levels
funding
were
also
in preparation.
July
August
Contract
a total
AF33(600)-36599
for
price of $74,675,149,
January
1958
September
General
engine.
Electric
October
Air Force
additional
November
Hamilton
- February
selected
the name Valkyrie
in which more than 20,000
airmen
throughout
the
D.E.I.
and mockup
was definitized
and covered
the period
from
1959.
conducted
the
initial
run
on
a J-93
Directive,
wire 15780LA,
dated 10-17-58
air vehicle
to the program
for fatigue
Standard
Environmental
was
Control
selected
as
subcontractor
series
added one
testing.
for
System.
1-35
SD72-S_.OOOB
the
for
Deeelber
Space
Division Rockwell
North American
The second
_hase of the program,
system
and subsystem
developmerit, be_anwiththe
issuance
of Letter
Contract
AF33(600)-38669
which was subsequently
definitized
in April
1959 with a total
price
of $120.5
M.
1959
February
Mar c h
On ii March
1959, the B-70 Weapon
System
Development
Engineering
Inspection
(DEI) was completed
at the Los Angeles
Plant.
The
basic
objectives
of the DEI were to allow Air Force
representatives the following:
vehicle
mockup
was
completed
on
9 February
The opportunity
to review
in detail
the Weapon
System
contractors
interpretation
of and compliance
with
technical
requirements
called
for in the contract
performance
specifications.
le
The opportunity
mockup
articles
objectives
with
The
and
and
to evaluate
the plans and physical
to determine
accomplishment
of the
respect
to design
performance.
opportunity
to review
inspection
functions,
producibility.
all aspects
of maintenance
safety,
ease of operation,
During
the DEI, 761 Requests
for Alteration
were written,
of
which 381 were considered
category
i to be accomplished
as a
part of the current
contractual
requirements.
April
.June
Initial
acceptance
of the -70 configuration
was received
from
the Air Force
on 8 June.
The major
changes
imposed
by this
configuration
were:
(1) the forward
fuselage
was shortened
by
approximately
30 inches,
(2) the upper intermediate
fuselage
tank section
was refaired
to hold approximately
16,000
additional
pounds
of fuel, and (3) the engines
were moved forward
and the
aft
fuselage
shortened
by
approximately
five
inches.
1-36
a_72-sa-ooo3
#_
Space
Division Rockwell
North American
October
Major
cost reduction
exercises
were being conducted
in consideration of Fiscal
1960-1961
budgets,
As part of this study it was
planned
that the spare engine
requirements
would be reduced,
eliminate
the fatigue
article,
reduce
test air vehicles
from
12 to i0, and make the static
article
a flight
vehicle
to be
tested
at Wright
Patterson
rather
than Palmdale.
December
20,000
to 7,000.
196o
January
May
On the
of Air
July
The second
in support
The
DEI
the
August
ist of May,
Vehicle
No.
on commencing
"pre-award
negotwo wing panels
and three wing
leading
edge-elevons-seven
and a section
of the upper
fabrication
of
1 went in-work.
the
program
was
objectives:
i.
Review
current
status
and
to achieve
better
balance
2.
Devise
Fiscal
first
details
completed
in
upper
fuselage
support
on July
22nd
establish
changes
necessary
in scheduled
expenditures.
a plan of action
for a weapon
1961 funding
limitations.
system
within
the
information
and data generated
in support
of and during
this
proved
beneficial
in technical
and financial
planning
for
ll air vehicle
YB-70 program
subsequently
announced.
Initial
Air
Vehicle
No.
1 subassembly
began
on
5 August.
1-37
SD72-SN-O003
_M_
Space American
Division Rockwell
North
196o
September
General
Orders
were issued
on 21 September,
redirecting
the
XB-70 to Plan W-2TR authorizing
the manufacture
and flight
testing
of ii YB-70's
in addition
to the 1 XB-70.
December
A major program
milestone
was completed
by releasing
the last
of ii, 202 basic engineering
drawings
required
to build
the
first prototype
XB-70.
These drawings
represented
a total of
more than six million
engineering
manhours,
including
almost
lO, O00 hours
of wind tunnel
testing.
1961
February
Eleven
teams of representatives
from
functions
of NAA Los Angeles
Division
as a part of a concentrated
cost reduction
program.
Cost reviews
were conducted
at 19 subcontractor
plants
resulting
in the elimination
or postponement
of some tooling,
facility
items, aerospace ground
equipment
and spares
not immediately
needed,
simplified
design
and manufacturing
methods
and reduced
supplier
estimates.
March
From
the
President's
Budget
Message:
"The acquired
missile
capability
programmed
by this message
also makes unnecessary
and economically
unjustifiable
the
development
of the B-70 Mach 3 manned
bomber
as a full weapon
system
at this time.
The B-70 would not become
available
in
operatiomal
numbers
until well beyond
1965.
By that time we
expect
to have a large number
of intercontinental
ballistic
missiles,
fully tested
and in place,
as well as a substantial
manned
bomber
force mostly
equipped
with air to ground
missiles.
In view of the extremely
high cost of the B-T0 system,
its lesser
survivability
as a ground
base system
and its @reatervulnerability
in the air compared
to missiles,
its capabilities
as
a second
strike
system
do not appear
to have sufficient
advantages
over a much less expensive
missile,
or even a B-52 or
successor
bomber
equipped
with Skybolt,
to Justify
a request
in FY 1962 for $358 M.
We recognize,
however,
that there are
still uncertainties
with
respect
to the operational
characteristics
of our planned
missile
force.
We also recognize
that there are certain
advantages
inherent
in a controlled
force of manned
bombers.
To preserve
the option
of developing
this manned
bomber
weapon
system,
if we should
later determine
such a system
is required,
I recommend
that the B-T0 program
be carried
forward
essentially
to explore
the problem
of flying
at three times the speed of
sound
with
an
airframe
potentially
useful
as
a bomber,
1-38
s_Tz-sH-ooo3
with
the
#_
March
From
the
President's
Budget
Message
Space
Division Rockwell
North American
- Continued:
development
of a small number
of prototype
aircraft
and related
bomb-navigation
systems.
We should
also explore
the possibility
of developing
a manned
bomber
system
specifically
designed
to
operate
in an environment
in which both sides have large ICBM
forces.
Even on this more limited
basis,
the B-70 project
will cost
1.3 billion
before
it is completed
in 1967.
Approximately
$800 million
has already
been provided,
$220 million
is now
requested
for 1962 -- $138 million
less than the amount
included
in the January
budget
-- and the balance
will be required
in
subsequent
years.
The total development
program
which I am
recommending
will cost $1.4 billion
less than that previously
planned."
The
above
resulted
in Air
Force
direction
program
to a prototype
development
Manpower
was once more reduced
and
to keep costs as low as possible.
were terminated
and 21 others
were
to
reduce
the
B-70
consisting
of three aircraft.
a new austere
look was taken
Five major
subcontractors
instructed
to stop that
portion
of their work that would no longer
be required,
or were
otherwise
redirected.
In addition
to the major
subcontractors,
168 minor
subcontractors
were terminated
and 30 others
were
partially
terminated.
Intensive
internal
programs
were initiated
to achieve
the established
technological
goals at minimal
cost.
This was evidenced
by a substantial
reduction
in systems
testing
requirements,
Judicious
design
changes
and reduced
tooling
requirements.
May
A design
change
was made to eliminate
the auxiliary
door air
inlet system.
The function
of this system
was to furnish
an
additional
supply
of air to the engines
in order to increase
the air vehicle
performance
in all types of weather
conditions,
to allow heavier
payloads,
and allow takeoff
from shorter
runways.
This requirement
was not considered
mandatory
for a
development
vehicle
and effected
a significant
cost saving.
October
1-39
SD72-SH-O003
#_
December
Space
Division Rockwell
North American
A special
investigation
team was formed
to research
and develop
a new fuel tank sealing
process
to eliminate
leakage
problems
that were being
experienced.
Viton polymer
base sealant
was
developed
as was the use of the nickel
plating
in this
application.
1962
March
April
May
June
A management
decision
was made on 19 June to cancel
requirements
for the subcontracted
Air Induction
Control
System
Controllers.
This action
necessitated
removal
of some A/V installed
components
and release
of an alternate
design
in support
of a manual
system.
August
Lateral
instability
control
simulator.
5 dihedral
to the
lateral
bob-weight
assembly
(aft
to Palmdale
on
1 YJ-93 engine
on 6 April.
fuselage
18 March
was
section)
was
in support
of
delivered
at
Fiscal
Year
'62 funding
limitations,
assembly
in-work
dates were set over
was discovered
during
operation
of the flight
Subsequent
study led to the decision
to add
Air Vehicle
2 and 3 wings and to add a
assembly
to Air Vehicle
No. 1.
1963
January
and integrated
systems
operation,
and bombing
mode accuracies,
and
measurements
of
the identification
of fixes required
for a successful
XB-70 operation.
During
flight
program,
45 equipment
flights
were made totaling
185
flight
hours.
May
The
decision
system
system
was
made
to
not
install
the
air
of
induction
(AICS)
in Air Vehicle
No. 1 for first flight
was not required
at flight
speeds
below Mach
control
valves
were locked
and hydraulic
systems
hold the movable
portions
of the inlet in proper
this
control
as this
1.4.
The
were ported
to
fixed positions.
1-40
SD72-SH-O003
#_lb_
June
September
Space
Division Rockwell
North American
As a resultant
from the initial
integrated
propulsion
tests at
the Santa Susans
Test Facility,
a design
change
was issued
to
replace
all of the hardline
auxiliary
drive system bays hydraulic
mountings
to cushion
supports.
This action
eliminated
leakage
problems
associated
with vibrations
being
experienced.
Subsequent
to
a very
comprehensive
program
situation
analysis
conducted
with Brig. Gen. F.J. Ascani,
B-70 SPO, a series
of
meetings
were held over a two day period
with a Defemse
Advisory
Group.
Detailed
discussions
and committee
meetings
were conducted
in reviewing
the status
of the program,
projected
funding
and proposed
plans.
December
NAA received
a Contract
Change
from Wright
Patterson
AFB
(Systems
Engineering
Group)
to install
the SST instrumentation
on Air Vehicle
No. 2 rather
than Air Vehicle
No. 3 which had
been previously
programmed.
March
On 5 March,
Secretary
of Defense
McNamara
announced
that the
XB-70 program
was reduced
by the Government
from three aircraft
to two.
Stop work orders were issued
on all Air Vehicle
No. 3
effort.
At this point
in time, only 98 honeycomb
panels
of a
total requirement
of 1,286 had been delivered
in support
of
A/V #3 and minimal
subassembly
effort
had been accomplished
on
the Air Vehicle.
April
On 24
April,
the
electron
beam
lower moldline
was completed
Air Vehicle
No. 1 structure.
welding
and
sold
on the
off
left
which
hand
wing
completed
May
"Roll-out"
of the first XB-70
occurred
at 9:15 a.m. on llMay
1964.
The ceremony
was covered
by press,
radio,
television
and was attended
by:
Major
General
R. Ruegg and Brigadier
General
F.J. Ascanl,
heading
a group
of 50 B-70 SPO personnel;
Colonel
T. Bishop
and three officers
from SAC; Brigadier
General
A. Low, Mr. C. Covington
and two others
from the DOD;
four members
from the California
delegation
to the House
of
Representatives;
approximately
67 subcontractor
VIP's and
40NAA
executives.
September
On 21 September,
the initial
XB-70A
flight
was made from
Palmdale
to Edwards
Air Force Base with a duration
of 1 hour
and lO minutes.
Due to a failure
in the retraction
of the
main landing
gear, the planned
speed of Mach 1.1 was not
reached
and the maximum
speed was held to approximately
254 KIAS.
The air vehicle
was taken to approximately
16,000
feet where
low
speed maneuvers
were successfully
checked
out.
Although
both
1-41
SD72-SX-O003
#i_
Space
Division Rockwell
North Amencan
September
October
Flight
No. 4 completed
the planned
evaluation
for initial
flights,
in that a Mach number
of 1.42 and altitude
of 46,000
feet were accomplished.
The maximum
indicated
speed was
446 KIAS.
Subsequent
to this flight,
the No. 1 XB-7OA
went
into layup on 24 October
for a series
of proof loading
tests on
the movable
progression
surfaces
towards
out on landing,
the
times and proceeded
aimed at preparing
the Mach 2 and Mach
air
for
its
January
The Phase
II Proof Tests were completed
utilizing
Air Vehicle
No. 1 as the test article.
Various
structural
components
primarily
involved
in the propulsion
and flight
control
of the
air vehicle
were stratically
proof loaded
and operationally
tested
under simulated
flight
loads.
May
On
to
29May,
No. 2 XB-70A
rollout
pre-flight
operations.
was
conducted
and
transferred
Significant
inflight
structural
damage
was experienced
during
the 12th flight
of Air Vehicle
No. 1.
Sections
of wing apex
skin and leading
edge became
detached,
entered
the right hand
engine
air intake
duct, and resulted
in an emergency
landing
on the Edwards
Air Force Base lake bed with only 4 engines
in
operation.
July
On 17 July,
duration
of
feet
and
the No.2.XB-70A
made its initial
flight
for a
1 hour 13 minutes,
reached
an altitude
of 42,000
a speed
of Mach
1.41.
1966
January
Seven flights,
five with A/V No. 1 and two with A/V No. 2 were
accomplished
during
this
month
and 14:01
hours
were
logged.
The highlight
of the month's
activities
was the
successive
Math 3 flights
(#17 & #18) of A/V No. 2.
During
Fllght
No. 17,
A/V No. 2 attalnedMach
3 for the first time and repeated
the
performance
during
Flight
No. 18, nine days later.
For the
first time two flights
in one day were accomplished,
one with
each air vehicle
on 3 January.
On ii January
A/V No. 1
accomplished
Flight
No.
3:_0 hours,
two flights
with a turnaround
of less
30 on A/V No. 1 was conducted
on 6 Jan,
the longest
flight
in the program.
:.
r-42
S_72-SH-OOOB
than _ hours.
mad lasted
#4_
Space
Division Rockwell
North American
1966
May
The
XB-70's
flight
was
33 minutes
design
objective
of
sustained
2,000
demonstrated
19 May when Air Vehicle
above Mach No. 3.
Weighing
531,000
mile-per-hour
No. 2 cruised
pounds
at take-
in excess
of Mach
No.
2.0.
August
The initial
phase of the XB-70 flight
test program
was concluded
in the early portion
of this month.
The program
was conducted
under the provisions
of Contract
No. AF33(657)-12395,
which
began with first flight
on 21 September
1964 and ended with the
completion
of 22.5 aircraft
operation
months
on 6 August
1966.
The XB-70's
was clearly
conducted
at
During
this
received
to
test program.
design
objective
of Mach
3 flight
above 70,000
feet
demonstrated
during
the program
with lO flights
this speed between
14 October
1965 and 6 June 1966.
same month letter
Contract
AF33(657)-15871
was
conduct
support
for a USAF/NASA
Joint XB-70
flight
1967
January
A flight
research
program
sponsored
jointly
by NASA and USAF
for sonic boom measurements
was completed
in late January.
This
program
was initiated
in Nov 1966 with the primary
purpose
of
determining
the proper
method
of combining
the theoretical
sonic
boom
intensity
due to lift and due to volume
for the far field
case
April
second
flight
research
program
was
initiated
with
the
61st
flight
on Air Vehicle
No. 1.
This program
was an investigation
into the control
of structural
dynamics,
was sponsored
by NASA
and conducted
throughout
the remainder
of the program.
1-43
SD72-SH-O003
_4_
Space
Division Rockwell
North American
z969
February
On 4 February,
the XB-70
(Air
flight
from Edwards
Air Force
Force Base where the aircraft
Museum.
Vehicle
No. i) made
its final
Base to Wright
Patterson
Air
was placed
in the Air Force
I-4_
SDTZ-SH-OO03
#_
IV-3
Master
Phasin_/Fli_ht
Test
Space
Division Rockwell
North American
Schedules
MASTER
SCHEDULES
BACKGROUND From
the
Mach 3
schedule
separate
exercises,
time
of
B-70
contract
award
to
achievement
of
sustained
flight,
the
program
was
subjected
to almost
continuous
exercises.
During
the
period
of
1960
to
1965,
110
planning
and
scheduling
exercises
were
conducted.
prompted
primarily
by total
vehicle
requirements
funding,
1958
and
resulted
mid-1966.
in
seven
Interim
major
schedule
schedules
of
changes
lesser
These
and/or
between
early
change
magnitude
were
issued
to maintain
proper
utilization
of total
resources
between
the
points
of major
program
redirections.
Therefore,
although
over
140 individual
schedules
were
considered
during
the
B-70
program
(52
alone
prior
to start
of air
vehicle
manufacturing),
this
study
will
be restricted
to
the
following
inclusions:
1) The initial
contract
go-ahead
schedule,
2) the
schedule
applicable
during
the
March
1959
Weapons
System
Design
Engineering
Inspection
(DEI),
3)
the
schedule
under
which
air
vehicle
manufacturing
was initiated,
and
4) all
subsequent
master
schedules
which
were
agreed
upon
with
the
Air
Force
SPO as operational
As
and
the
reporting
program
baselines.
progressed,
pages
1-51
The following
the
through
1-91
clarification
aforementioned
schedules
) were
identified
is
provided.
by
(see
different
systems.
Shortly
after
receipt
of the
Weapons
System
ll0A
contract,
the
Air
Force
requested
that
NAA submit
an accelerated
schedule
with
alternate
plans.
This
initial
schedule
and plans
were
identified
as Plans
A, B, C, and D.
Subsequent
plans
maintained
this
alphabetical
identification
system
with
a numerical
suffix
as applicable
until
early
of identification
ignations
Therefore,
the
next
1961.
more
at
master
At that
would
be
meaningful
the
time
schedule
of
time
it
utilized
decided
make
the
that
a new system
schedule
des-
in respect
to time
of issuance.
program
redirection
in early
was
identified
as 61-4-1.
61
-4
1961,
- 1
|
(Year)
was
to
i
(Schedule
(Month)
No.)
I
1961
This
ist
April
system
prevailed
throughout
the
Issuance
remainder
of
in April
the
program.
1-45
SD72-SH-O003
#4_1=_
Space
DivisionRockwell
North Amencan
_J
NARRATIVE
Schedule
Date
of
SUMMARY
No.
and
Issuance
C-I
January
Chronology
The
1958
initial
support
B-70
of
flight
first
Strategic
in
R-2
This
This
1959
resulting
1965.
month
Air
Force
of
an
one
of
January
article.
and
by
design
the
August
release
in
the
over
multiple
tool.
optimum
one-shlp
to
Angeles
plant
be
and
flight
in
vehicle
for
out
This
to
December
1959
manufac-
led
to
flight
which
manufacturing
time
operations
of
Edwards
1962
to
also
personnel
this
the
provided
plan
fabricated/assembled
flown
release
2,
schedule
Under
test
months.
and
and
assembly
of
slipped
fatigue
design
first
of
Force
first
was
six
schedule
buildup
program.
was
the
design
This
Air
delivery
December
the
air
an
flight
100%
dated
to
stretch
one
Wing
and
the
W-15.
set
to
after
approximately
program
Air
first
LMSA-033,
allowing
first
100%
program
1962
delayed
Plan
vehicle
on
vehicles,
delivered
in
plan
1961
response
the
first
to
eleven-month
performed
prototype
of
sidered
Wing
in
maintained
1960.
accommodated
spans
air
test
December
on
out
in
the
issuance
65
static
for
issued
addition,
Wire
redirected
ture
of
based
In
was
This
schedule
in December
1959
was
stretch
flight
completion
W-15
and
Command
was
to
one
schedule
This
1960.
August
out
December
Air
schedule
directive
master
requirement
scheduled
plan
December
System
article
was
Change
AF33(600)-36599.
total
test
First
1964.
March
fatigue
Weapon
Contract
programmed
a
of
in
the
at
Air
for
support
prototype
the
Force
subsequent
testing.
1-46
SD72-SH-O003
be
con-
Los
Base
#i_
W-15D
Apri
Continued
1960
Year
schedule
'60-'61
issuance
one
W-27R
1960
Plan
even
the
and
operations.
and
the
systems
major
The
1962
maintained
was
for
article
mediately
1960
Revisions
from
a
to
the
the
reissuance
in
one
XB-70
YB-70
of
an
W-27R
and
In
YB-70
of
of
first
all
Mach
December
flight
a static
completion
number
im-
i.
Plan
resultant
November
to
ii
addition,
for
Force
operational
a YB-70
in
Air
turn
development,
date
Program
review
in
development
flight
YB-70
to
design,
for
1963.
and
response
the
scheduled
AF/NAA
major
installations
of
following
for
for
with
was
the
December
spans
first
June
in
dates
including
XB-70
maintained
flight
over
needed
bomber.
Fiscal
the
set
with
test
of
to
been
issued
aircraft,
plan
in-work
proceed
prototype
test
Revised
was
to
support
led
first
had
allowable
schedule
direction
scheduled
December
the
reducing
ramp
This
with
though
fabrication
W-27R
W-15D.
operations
in
considerations
program
assembly
This
September
of
vehicle
1962,
exercises
budget
Space
Division Rockwell
North American
1960
incorporate
required
the
following
changes:
i.
Add
four
months
testing
2.
Extend
3.
Set
to
static
over
points
4.
Set
over
air
6.
Set
over
and
incorporation
air
Planning
in
support
vehicle
major
testing
from
19
test
by
resolve
and
one
survey
to
21
and
months.
incorporate
acceptance
program.
and
vehicle
XB-70
of
first
this
of
month.
propulsion
points
assembly
Los
article.
airframe
'62
than
load
Dec.
coefficients
test
comp_tion
Add
Revised
influence
months.
number
5.
rather
of
static
static
four
YB-70
7.
the
one
resolve
month.
deliveries
(maintained
flight).
schedule
manufacturing
Angeles.
1-47
SD72-SII-O003
reflected
at
Palmdale
air
6 i-4-I
National
budget
direction
vehicle
to
plan
static
test
also
the
prototype
Bomb-Nay
sheet
increased
and
of
year
a
to
this
By
January
point
air
on
the
most
in
air
vehicles
was
issued.
program
on
was
the
vehicles
2,
to
be
in
effort
used
in
on
the
the
effort
air
vehicle
this
of
effort
the
next
to
period
total
plan
but
by
plan
of
this
schedule
element
of
of
resumed
master
which
was
delayed
6,
action
the
funding
was
program
this
completions
preparation
due
additional
1963;
h
with
each
for
to
requirements
and
informed
reached
all
during
3, and
respectively,
in
conjunction
allocations
had
programming
redirected
61-4-1
1,
months,
and
been
curtail
issued
February
to
this
experienced
preference
efficient
due
problems.
Subsequently,
schedule
based
in
were
of
significant
of
had
be
funding
to
available,
prototype
expected
Force
under
plans
that
three
date
November
would
necessary
and
flight
No.
manufacturing
the
was
Air
to
The
and
be
By
of
1963,
negotiated
The
could
and
achieve
evident
funds
internal
resources
was
of
vehicles
Multiple
to
first
reduction
panel
included.
No.
slip
were
for
thickness,
the
became
be
reduction
honeycomb
subsequent
intervals.
flight
it
cost
foil
from
to
changes
provisions
Multiple
were
first
of
where
core
Secretary
lack
2 was
include
were
honeycomb
Prototype
to
in
program
fewer
Prototype
limitations.
the
delay
survey
of
maintained
it
Force
of
change
schedule
funding
that
on
1962,
flight
Air
three-prototype
The
full
scale
and
possible
program
existing
- 1
where
1962
and
on
nine-month
same
I,
i.e.,
in
loads
system.
December
flights
July
exception
milling,
metal
first
air
the
required
prototype
In
and
Prototype
those
chem
resulted
program
to a
of 61-4-1.
configuration
as
basically
of
63-2
With
the
same
changes;
Plans
article
deleted.
panels,
Internal
limitations
reduce
the
and
issuance
Space
Division Rockwell
North American
listing
B-70
necessary
program.
1-48
SI)72-SH-O003
air
7,
and
was
9
issued
funding
Division
changes
1.
#_
63-2-14
As
the
result
plan
response
was
from
action
to
Customer
issued
that
all
on
the
completion
63-2-14,
Rev.
5-10-63
Subsequent
delays
in
Major
a
63-9-19
to
the
issuance
vehicle
with
air
were
issued
master
schedule.
to
the
air
By
this
#2
and
with
#3
would
and
resources
vehicle
months,
5
the
i,
in
and
the
sealing
at
of
and
time
problems
in
and
that
dihedral
it
major
on
SPO
vehicles
analysis
the
This
review
schedule
which
completions
by
had
structural
air
where
reviewed.
2,
this
resolved
Force
63-9-19
wing
revised
A situation
Air
the
and
the
made
accomplished.
of
schedules
planning.
customer
were
3.0,
necessitated
tanks
been
wing
schedule,
WBS
Special
magnitude
had
the
#i
#2,
63-2-14
with
#3
the
the
be
with
months
detail)
were
and
conducted
publication
air
in
to
vehicle
(see
fuel
changes
incorporating
status
On
joining
would
This
vehicle
basic
further
#1
time
$i
the
conjunction
#2
air
air
schedule.
vehicle
in
agreed
was
in
for
No
point
vehicle
over
to
completions
master
vehicles
requested
that
economy.
of
in
had
schedule
#3.
#1
Mating,
the
joining
change
-5
vehicle
in
setting
change
in
schedule
Force
a
program
approximately
air
dealing
been
in
no
of
Airframe
revision
air
64-3
of
air
Air
of
and
63-2-14
on
overall
month,
acceleration
The
review
63-2-1
the
1963.
resulted
one
Plan
reprogrammed
greatest
completion
with
direction,
be
reprogramming
departments
issued
8 March
effort
provide
an
functional
of
Space
Division Rockwell
North American
program
resulted
7,
set
6,
over
and
respectively.
March
1964,
Secretary
cancellation
time
of
the
air
operations
had
operations
were
mentioned
of
the
vehicle
been
#1
clearly
economics,
and
(1)
reflect
the
air
the
vehicle
air
air
#1
At
the
view
#2
schedule
of
'out-of-door'
the
actuals
and
vehicle
the
status
was
weld
air
aforeand
revised
to
(2)
revise
cancellation,
#2
point
final
remaining
vehicle
#3
announced
this
fuselage
In
master
vehicle
and
#3).
to
defined.
the
McNamara
(AV
wing
started
circumstances,
program
Defense
XB-70B
first
flight
dates.
64-11-1
Subject
as
of
another
plan
November
five
reflected
1964
and
shifted
on
air
air
vehicle
vehicle
#2
months.
1-49
SD72-SH-OO03
#1
out
;I
t_
_z
O_z
>
v
CO
Z
,q-
CO
.-_
..J
IJJ
LIJ
--1
-r
C_)
i./")
ILl
z
-
_
I--
"
I
>
nr
Q.
_-
co
L
0
W
"1"
t-,W
er
I-A
ix:
.J
Q.
.J
Q.
U.
'T
1-50
SD72-SH-O003
'
+I
o_
PO
II-51
,,.,-,
....
tT-)=)_jS_,_X)L'qtl
PAGE
BI_kNK
NOT
FILMEr,
1-53
SD72-SH-OO03
'
1
I
IiII
_--
L.
_'FRAML
_1.
BDT_-$H-O_03
i-_5,_6
J
I
'
i
].
I
+
ti
i,
.......
I .......
[.'i
i....
,
__
..!
_ro_
-"
if'
"i
+ sup,
"X
_I_
.-,__
v%
_i_
IF
I.....
"-'"-p,..r,,,
F,,,. f,,.
"
_
_
" IL,"
I
o_
LI
'1
-%
A
C_
X
_-
I'i2
! ',
"1
_o_
,-o _,-I
......
-_,_
, ..........
it
-?
C'I .
........
o .........................
__
' ........ t!
'.
J.
,,
_.._...... ..,.
I,I,,
,d
.... .:_,
'
:._
_L",
,,_,
%
"
,li
...
If
I
,
\ \_ _?_
_ -._-_,
I
_....
I
i
, _
'-
1-57
.................
SD72-SH-O003
I
i
i
_'OLDOUT
F/_ o _o -f YPE
,_0
F_L_ME oq--
(_,,_,':;,",'_
/_/,9_:,
,,,-_
4/F__.J
21 DECEMBER
1959
8D72-SH-0003
1-59,60
2_
z_
_'_
Z_
'3
I-
%
i
Z2_ _
I
I
___,_
131 ----1
N4
..J
li
m
w
i
,,.d
._
......
....
z_
Q
W
:z::t
,,,,_I
,_
_I
I.
_I
;_
_'
"_
_1
--i
_-,
I-
-'_I
I_I
N
_u
I!l
_Y
............
rYI
I_I
,%
Z-61
SD72-SI-I-0003
,i
.......
.'_
, ..................
i
_........
'
',
i ...........
l
:_
.......
"
_-_-'
_........
"-_
....
........
'
........
,.'--1--:-
: ""
,.:
1----. -_ .'....
'
_--_--';
..... _ ....
".
r"_
:!
. : .
L--_---_-._._..'_....i
i.......
, t
"
i .... ";"t-
. ;
._ ._ .-i .......
......
t
" ! ,
, .... ;----_ - '.--7 .....
"
r'-- .............................
'
p-..-:-_. I........
":
;
........
.....
"
_..w..._ ....
it-
'"
"
..........
!. _:".:!,_
_t_:.
i-_2,_:,
i .'--:_:._..-I:.....-.:_... :_:':
._.-. : -:---,""-.
,:. I :
"
_.!4,r'_
'
"
"
:i"
.....
":
"
,-i,:-!
:t_ ! _ :_._!
i
-
.IL
1.
'.
-!
-_,
.:
I-,
i ....
!i
.'
:I '
'---1
.:.
'
'
',....
|.
-'
I-::
i
" !"
I
.": ....
,;.
"-,
+
:""
:
..,_
__
;.-
l
_
I".
'......I[:; ....
"_ i....:--1-_
, _,-! i._
lit
"
.>
I I
i .._
!.
, L. '+ . l'
.,'
J_
'!: -+
l: ......l
i.
'
b ......... ---]--7.1-i-U.[-,-.TU}=-iT-:i..
It
I
": "::,f_
"
- i-_-i
",
...._--!
.I
1
'
.i"
;.
l ___
_.....
'
ti
;.
I1
+___'.__L_-i---i-
"
.!
'
"
" ........
_
....
li
.-- .l_
.l
I
.
I ,t
, ll
..-
'
-'-. .........
t'
I-.......
-i
. _
-J- ......
"
t ......
I
,_
I
!
. -
...... --
_--,-..... r_--_--
_-----r-.u.
_-:-.......................
;.If
.....'............
:,
t
I
._
",l
!"t
!
!
,
"
"
";I.
t]
:12o-. ,,,_-L;.L_]L
!:_;;
" ;'r'--'':
',,I
r-
7- -U:Tr:7;<.;:
J Ti--77:
L
I
b.....
i.....
i-
.-
_-
1'
-'
-:
,
-.+
7--
'--........ :--q,----'.:-i.-l'!.
.1
'
i'-'--1-.--"
"
..
_i'_-
, .,.;.F-'
.'. ......
.,I,
._$t_'lr-
..,
:
I....._TT-,..._I.
'l ....
,1.
l'ti
i"
""
"L'/
.....
'?'-
..I
:
,..
'," i_
"-;
., '---L
--_+
.........
1
i
":-_-.t
.....
....... _ ................
-!1#
t
__
"---'1"
'_:'..I..
_.:--,-i_-._i- _....!-_:1_
'.
1,
i
-I--Lt:-....
':" ' -
, i
i"
"_
r 4I
..
,. _.
:,
--
,.
,1_
" :
._........
i.--.t_-_,
....
_,
""
..
l
- .
.,
I, .....
......... __ __
I),
i t
I_.
'
_ _
t: ,-_ .......
1
% \
......
,"
"
_-'-"_I'-,, I_
i
'--""
.
....
_.._
.......
T,,
'<
l.
-i- 1
:--r--,-,-i::_-:1.....-l--....i .....--_--_-:-:-
:'_I-
..-
i."
1 :.:I,,
"1-
i_\l
_"--:--_.
_"
%1
t ._-::1::_-i': I-.-:::--!7:_! 11
i
"
:, ._ i TM .'q,
i:.
:.I
.......
5 _t
"
.............................
1-62
SD72-SH-0003
_i
II
'
P
"t
_''
'
"
.....
";
_ ......
'
;'
l
1-63
SD72-SH-O003
1-64
l
SD72-SH-O003
--
1-65
SD72-SH-O003
1-67
SD72-SH-O003
l)_']lN,,_l,
PAGE
oF _
QLk_r_
IS
IIII
--
mill
I I
1-69
ir
__
SD72-SH-O003
-,-
'
1-71
SDy2-SH-O003
l.,.
....
_ ,',,
NOT
FILMED
]l
PROGRAM
PI.AN
Ig_
IIHAMII
$@HOI___B
L .... .......
I-T3,7Z_
1-73
SD72-SH-O00)
,_ I_.u_
-
L_L_,_K
NOT
,
FILMED
I,
I ....
-i
....................
!. _.__1 :
.......
_I
,
....
",." !
-'.
..
1-75
SD72-SH-0003
.m,
law
i"
tm_
i
I:a
_.
,w
:lE
n
L
ai_
_l
tnnmlwmm,
u
am: I
:"
zl
J_
<
z_
t-
i i
_L
......
....
..
_2
_:__
" t
_"
I
R-
,L
-m
;/.
'
_
i i
iii
'
,i,,
"
I
I
_ ......
_l
N
{.
,(
,m
2
ii
,_i ""
'
.IK
-- .,,,-_
411
,4b
llln-++
I
z+
ii
>
;E BLANK
NOT
F1T._ED,
i
I
I
I
1-77,7_
1-79
SD72-SH-0003
m
a
to
l"ll _
+
!
,i
..-Im
IIi
il
11
i:i
mr
_L
I"
o
$I"
t" n
I
T _
t-
k
i
Ig -
-'7
/
l
:2
__[
2.
Y
,.
_im.m
g
I
L
q
i
i -
t.
1
24
ii
;_$;_,A
i__j
<
-4
.J
I
E
f...
F.,
'"
[,,.
-1
!-81, _2
SD72-SH-O003
'==I
i,
m
-=_
|
I
I
I
|
I
I
I
I
I
I
I
I
I
I
I
I
I
-- --
'
1-83
SD72-SH-O003
Z-84
SDy2-SH-O003
l_
:::
!::
i,
I!T
i!i!
;:r[
::'
t;l
:::
:it
':
i_i
..............
u:
:]I
:_l
!7i'!1_i:!;_:
;Iii_;_
'_
il i!t
r,i
_.':.::
,,
f'.'
:.:;i.'
I: ",:/ii
i:!t'{:l
ill: !;!
iii' :!" :.
i;
.;2:
"
,,I
:,'
: .'!
,,. iii
ii_
'S
-Tr
;r;
'_
"I
It;
!.;2
....2 _ _
::
....
;"
;:,
::!
i:!:_ .....
,]]i!_
]:
"'"
ii i!i
i!i
ii
:'.
i:
"
::_i ;il
:_
I!
i!::11,4
',!':!!i]i
i_!:
,.
.......
_-'!],ii!i
i!!i
!P
?!
':I
iil
_il
::ii
i;
_ i
!:t
;,
.:_
ililt
_t!i t:i
'
;_'i
iii
!H!!i!_
,}_I -
" II m: !U
"
lii.....
I!i' t:_
l_F rt:1
111J
{! _!iiili
:t: !ii
,I
t;;_ 1:!
tt
"=_ m:
' _I'T,'I
ll; _[_ t!l,,
' D:41t_:
....If"
%2
il .igii_
_.r_
' _
i[i
.... i:i; Ii1[
. .!!i
if :;_i!i!i
'"
.
ttit
,lii 1i}!
........ _:!,:_ t
[!:
g
I:
t,I.
_ :,Ii!!2t*;:'_:
:ii
t:l
iil ii!pi
I
PJI
......
;I_
t;l;
:If
-!!!
HH li
ii hii ih iiii :Li
::2[ ;JU .......
4i
,_ 0 t:,]i I:;I;;
!t.
INI
:HI
]!
_[!
:tI
,,,i:.
,i_
- ,,
_li; !iii
;._Hluttq
_I_
;IUt:l
_;1
-:?,:
'
,_,.!i
_',
i_
l"i:_
[_.
:lll 111":
iii] m:
]il
;It
tl;_H
!]
U.I
oq,
i_: iitl
"+++
m,
i
i,i._
.I:!]l!
iF,!
qi
2;t_|l:ll
::_ ii!
;2 ......
"
---
.'_u._
;-_iu!_!;_.
ii!-:h
,.
I;Y
if!! >;
2'I
_:t
.....
T-85
=:tz"
5_ "a
sDy2-SH-O003
<<
<]
1-86
SD72-SH-0003
:i.
:t_
._'
II
:1
I
:I
1
'P
i'
, [.
t
L
!
.
I!:
_t
i
t
, 1
::
:i
ii
rT
II
I:
_r
t_
ii
]:
:f
,!
i
!i
ii
:I
ii
il
.1
.r
i
l'
2
N.,;
_.i
'%
2;
!i
4"
'.='
tl
i
II
li
o_Z_
"o
0
"1
X-
tl
i
:.!
!
_t
:!
;!!
i]
i
4
2.
:
i
44
it'!
INTERNAL
NpRTH
LETTER
A_tERICAN
AVIATION,
TO
'_ose
._mReSS
DATE
IMC.
Z4.sted
31 _
19611_
FROM
V.
_DxES
D/:*,9_.- U.D
_O_
R.
Bradley
_..
Ore,me.
i_v.: & Ae_skm@
SU_EC?
:_'
I XB-70A
Revislcm
ScheduleSchedule
Plan 64-3-5
Please
revise
in-house
operating
plans
_.
to reflect
t_e following
"=
_:
'_
sch?dUler objectives :
"'
, ,A/V
A/V No. i
"Shop Completion
First Flight
7 May 1964
27 June 1964
15 october 196_
15 December 1964
w. R. m-a_ey
Chief
(7
_'_
._-7
9 _ogram Ana_sls
_RB:ip
cc:
'
"
W. Spiv_k,
W.
W.
j.
E.
D/190;
O. Barton,
D/177
PPS); D.
Peitz_e,
D/163;
SD7?-SH-O003
t$_St
[,erw
|.@$
D/098;
Scott,
D/168;
F. ttargrove,
D/163;
R. Odom, D/163;
H. Bone,
D/198;
Emsley, D/198; H. Wilkerson, D/186; K. Kleinwachter, D/192; R. Scholl, D/61;
Boyer, D/lhl PMD; W. yoakley, D/93 PMD; C. Sell, D/93; R. Gottschalk, D/052;
Hanlon, D/168; K. Bengtson, D/060.
1-88
OIIU
C. _,
y_
I
f
k
I
i.
K
i
A
I
\
l
_--<>
k_
I
A
!
A
m
_>_
<>
k
I
0
i
1-90
SD72-SH-O003
._.._:!.-_.-I
.
, :,
i :: +%'
i_],___-_<_.++=:
+i-_1+_
:
_:: _--_.-I--!
--_._-++--"
,,-,:
.........
I--
"
F-
I_ .... +
+1..:t
- '
"
'.....
.+--t---:2_
"
"
] ....
'
+ '
_'_'3
-i- +::-::
. V
'
,-'
_.
+ _.
I
t+
.I
I
t':
,_._,,,1;
_
:'
"
.i
:i
t
t
l-L"
'
.....
-:.,
.........
_Lw,_
"
t<, t,<
'
_tN
........!.... = ....
,-,
'
r.Lih,[ _m..--+-:q
,, t,":,4i
-t
; ..._
: "i
"
[ I"%,
"
_ ................
.
.
'
.....
i "
,.
\%
'
+
,q
'_
'
:i
"+
:+: ::-+.+_+:::
::.[:
-+
'
+ +
_. ..... ;..... F,
: I ..i'__
,
i............
"_
! ' L+m
'
,,I
._,_ _.
_,_,R
i ,_ 7..I
'
,;+
' _
t+
,.
,.
'..
'
I....' : '_.
..............
......
._,.t
_ _...,
I,.
. _ _._,.-l,_
,"2 P,,,I I
, ' i +_ _
_-_-_
+...._ -:-_ -""'
k\\\\l/
+ -
+`;:
: _ ....: '
:, ...I
....
+ .
r_
l,,.
b,.\\\"q
+ k\\\\'l
,t
.!-_\\"\'_
'L
I .......
i..........
.J.......
--
'
.......................
O+
_
1-91
BD72-SH-O003
_,--_ I Iz z
Uu-
_'
_ u__
o__
Z_
iI
jl
--I
II
,--,
01
I_ I
I
I
_r-
0"-I
I
i
'I
II
I'I
I
I
_F
!
L)
I
>-
_i--
.e._Zo
>
j
i
--
Z_,,,
I_,
..I
c_ 8___0
o ,,,zi
oO,-v;_.
i.-.
__
z
0
I
Z
0
U
_
<
_
-U
_
_
Z
0
_
_
Z
Z
Z
--
__
z0
"
_-
>
.<
U
I"I--
0
--
Z
Z
I
I'--
.1.-
0
m
,.,,,,,I
._.:_
I-92
SD72-SH-O003
#4j_l=_
IV-5
PROGRAM
This section
the following
SUMMARY
COST
Space Amencan
Division Rockwell
North
DATA
provides
a summary
of the
cost related
summaries:
B-70
program
cost
data.
Title
Program
by
includes
Page
Total Program
by
Time-Phased
Total
Engineering
Hours
Total Program
by
Total Program
by
Air Vehicle
(WBS
Total
It
EOC/WBS
Program
by EOC
- Group Matrix
SDW
WBS Level 4
1.0) by Subsystem
1-93
1-96
1-98
I- 102
1-175
1-226
EOC/WBS
This summary
presents
the Work Breakdown
Structure
level 4 (system)
and
level
5 (subsystem)
items by Element
of Cost_
A sub-total
of the subsystems
has been provided
along with a program
total.
The data is not time-phased
and Subdivision
of Work detail
is not included.
Time-Phased
Total
Program
by EOC
This summary
contains
a time-phased
data is not provided
by Subdivision
time-phased
EOC detail
is available
individual
WBS items.
En_ineerin_
Hours
Grou_
schedule
for each Element
of Cost.
of Work or WBS item.
SDW and WBS
within
volumes
ii, III and IV under
The
the
Matrix
This matrix
contains
the direct
labor hours charged
by each B-70 Engineering
Group
against
a particular
WBS level 4 or level 5 item.
This matrix
allows
the
WBS
analyst
element
Total
Pro6ram
to identify
in volumes
by
and rearrange
II, III and IV
the engineering
hours
if desired.
contains
its own engineering
hours
Each
matrix.
SDW
This sections
presents
the total program
by Subdivision
of Work.
The data is
presented
in graphic
form with the corresponding
computer
outputs
which provided
EOC detail
included
behind
the charts.
Charts
and computer
outputs
are in the
cost breakdown
and time-phased
formats.
Total
Program
by WBS
Level
This section
provides
the level 4 WBS items by Element
of Cost.
The data
presented
in graphic
Form with the corresponding
computer
outputs
included
behind
the charts.
Charts
and computer
outputs
are in the cost breakdown
time-phased
formats.
Air
Vehicle
(WBS
1.0)
by
is
and
Subsystem
This section
oresents
the Air Vehicle
data by each Subsystem
within
the Air
Vehicle.
Data is in cost breakdown
and time-phased
formats.
Charts
and the
corresponding
computer
outputs,
(which provide
Element
of Cost detail)
are
included.
I-9_
SD72-SH-O003
t]
E.
=;
=.
,-.._ -
0
[-.
:_
N_"
___
:"
r.-
o-
.......
.,
o,=
;.
=_
_
o_
,_
uo
-.=....
SD72-SH-O003
_6.
ur_
t',O'I'
ql,
e-"_ ,,,o
_"_
<_
_D
QO
O',
_D
_o0
.-2
_aD
m
F-,
_..2
..4"
_"
..2
..2
p,.,
g_
;
ca_
,4
N"
Q0
,,J
,-_
_O
<
F4
,4
O
F_
o
"_"
I""
,_"
O
O
_<_
,_"
_p
un
e-a
_o
.,
,_"
_o
_,
N"
_l
_o
p-
r_
.-: ._-
_.;
N
_N
O_
o_
u_
e_
<
u_
p-
_f
Q
1-94
SD?2-SH-0003
,7,
N
O'e,_
N
__
O1"-
N
N
O",_
gO
I_
0,1
_N
=-
v_..i
.9,0
gd
O
oO
O
u_
oz
L)
v
U3
un
00
N=
o_o_
_'_
i.n
N
7=
N
N
o0
L_
0
,=-
a:
0
,,,e
v
<
ho9
f_
O"
oo
0
[-,
N
00
oo
A
N
O
o
,,..
I
N
O',
O
_-
_0
0",
d_g
_a-
ch
N
r_l
_g
I%1 i_
0
N
,c
O
N
00
_D
,4
t",,_O
O
_O
N
A
O
*,-4
p.-,_
N
u_
0
N
I"'.
,,',4
_O
nn
v
O
O
L
t_t.n
u3
m"
nn
O
't:l
i=
0
"0
=1
14
kl
r.3
<
o=.
.=
o
o
o
_
_
,,
= =-.__
==o
,=z<
;
It)
1-95
SD72-SH-O003
L_
1S
F.
..:
.i
="
-"
_"
_h_NN_wN_
..2
-:
_Oh_hh_
....
......
I-96
......
.....
SD72-SH-O003
J
II
J_
0
e_
Q
p,
,a
_ __
"_
"_
__
_r
r,-
f_
N
d
N
e_
e_
_2
1-97
SD72-SH-O003
_J
1-98
SD72-SH-O003
1-99
...................
SD72-SH.O003
._. I-i00
....
SD72-SH-O003
_.g
k
o-,-4
I)
l-lOl
SD72-SH-O003
.,.-I
_0
ao
B_
X_
NOI,Lal_:IOl:ld
ONI_NION_
,, i
......
8
(Imozr_)
1,
_
_V"_
I-i02
SD72-SH-O003
HOIS_
rt'_lR T H
SPAC
AMFRICAN
OlVl
SION
mE]CKWFLL
_)_TA
PPEPARED
UNDER
,NASA
C[)NTR
NAS9-121C0
ACT
CORP.
APRIL
CCST
8-7n
1972
BREAKOCW_S
AIRCRAFT
STUCY
SUMMARY
DESIGN
TCOLING
IENGR
PRCO
HOURS
flCLLARS
!][S 1 Gt_/ENG
LA?,Om
ENGR
I_,_EF }_I NC
^I
8URI)EN
23302117
4.,3P2
&I
4,690
653686
AT
SUPP!]q
L&bCR
854936_
3777186
403677
8527100
59992930
3.
35234
146
AT
LAHCK
37
$
$
__,4[q
264101
3391957
3.444
3.&41
AT
469495
$
3.772
4644393
MATFP,. I_L
IC3_739
264B7513
Iq02o9105
27567941
13269196
3336112
TUNNEL
TAL
GCN
ADMIN
&
2161_125
3593151_3
5438265
IDWA
TQTAL
q588qB
419716263
7614013
27S421
113450752
2041696
896190
19q2386
364754091t
Z-zo3
451322836
12_015q
94019941
1615357
3910650
2399256(]
COST
197537_
27715a1_
400409H
COST
SU_-TF,
120791
_15C30
3034_1
25616633
qTq49124
39C5661
F _,
3_579
17823682
MATL
T
MP
('TH
93<}2967
_9536493
2008372
31
45227_04
TF_OL IKG/STE
,_INC
25C7741
573C94
2133167
M_TERI^L
(]NTR_C
2120487_
7725192
10935t
AT
7n33432
236401
99c)_19
BURDEN
SUBC
65713
70
STE
TE ST I CC
MFG
204499_
133_4209R
ING
_NG_'
8_539
306613
665C36
ANC
L _. L_CR
_O
lOC
flOURS
OQLLARb
3594515
3.2Z4
AT
LAi_CR
PLA,_N
HOURS
OOLLARS
185795(]I
LA_CR
TK](JL I _(,
TEST
STE
115437100
P"_ODUCTICN
SHCP
HOURS
DCLLARS
AND
115492648
q3545948
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP,
APRIL
UNCER
NAS9-I2100
B-70
COST
BREAKOGWI_S
AIRCRAFT
STUI3Y
SUMMARY
ETHER
COST
H_URS
DCLLARS
OESIGK/ENGINEERING
LABOR
AT
$
ENGR
_UROFN
PRQDUCT
ION
LABCR
AT
SHOP
SUPPORT
LA6CR
AT
TqOLI_G
AN_
LAbCn
AT
PLANN
ING
LASER
AT
TEST/CC
LABOR
AT
MFG
BURDEN
ENGR
MATERIAL
MFG
MATERIAL
TOOLII_GISTE
SUBCONTRACT
MPC
WIND
TUNNEL
OTHER
CF)ST
SUB-TCTAL
GEN
&
IDWA
ADMIN
TQTAL
COST
4oS07
_T
4690
24C,q0340
12781t 1594
12?_50561
3.772
1857960t
599C2030
7934231
24964749
7725192
2641Ct
3L
16(22992
5520R20
3'536603
1d876579
149544912
3,224
$
3.14h
STE
$
_.419
$
?Jo 444
3.641
AT
TOTAL
H_URS
DOLLARS
5118952
19956849
45227604
2561 b6 3{
316682261
225032s_5
4004098
29173555
5118952
q91621741
MATL
109695
15819226
279032
52286471036344171
10
IO72
-I
0
O_
<
I-
f,,
,,_
3E
lU
<
II
II
U
I
I,.
I_
tM
<=_
!
7O
Iit
II
,<
<
IN
II
<
li
O
a.
8
(8110ITIIM)
1-1o5
_IqO(l
SD72-SH-O003
E
UII.
d_
I
iiJ
a
a
Ill
z
,ql
6
0
,9I
o
0
E
G.
NURTH
AMEP,
SPACE
DIVISICN
ICAN
RCCKWEI.
OATA
PREPAPED
UNBER
NASA
CONTRACT
NAS9-12100
CORP.
APRIL
TIME
PHASED
B-70
AIRCRAFT
I_72
EXPENO.
STUCY
SUMMARY
MAN-
L^_F!R
LAhflR
BLIR DEN
LABF)R
L A B,_}R +
HURDEN
EN G _
MATL
DCLLARS
DOLL
4.465
1089626
1072274
216190C
1C4319q
4.298
4483783
3q75189
8458_72
10568.5
I_P2544
3.g64
71483q_
6169968
1331_364
396374
15450.C
271906
3.q19
I0655_7C
g282446
19_44116
314'_75
IP4_.C
32C5729
4._33
12q27347
lOd
MC)N TH S
HOUR
1453.5
24401
621C.5
R AT E
rJ-I
_o
0-2
5_
Q-3
_-4
Q-I
59
0-2
5')
cJ-3
59
q-4
59
q-I
6_
Q-2
6n
O-_
60
227R8.C
2_2_627
3.qJ6
14954C71
130_600
0-4
O-I
oC
61
45078.5
769_217
3. 766
28_73091
24361
_-2
61
45108.5
_178aq5
3.61E
2_5_7123
3964_.5
6766510
3.054
35033.5
5885_33
28q78.5
ARS
l(_ 182
238C652
28_5
129T04
c,
1462342
28.042671
1076249
53_34791
27800
30447C76
60034199
3187634
2472619i
25977575
5C763772
1153250
3. 772
2220191C
24782
46984430
15_3_23
4(,45478
4.047
20C12314
22134239
42146553
1560594
33422,5
5_1477
3.7R5
21253975
23_09683
45063658
2779207
29_61.5
5113475
4.104
20985437
26902_18
47888C55
598/_
4.
]2502324
15850?o7
28352691
579250
4.293
1169_054
13843724
24941778
830247
700
Q-3
61
O-4
61
O-I
62
0-2
o_
Q-3
o2
Q-4
62
0-1
63
_-2
63
_-3
63
0-4
03
(O-I
64
_-2
64
Q-3
e4
17160.5
3(.,2C,249
0-4
-1
64
_5
1401C.5
2525121
0-2
65
Q-3
65
6751.0
11342_I
5.339
60564_C
6736281
12792
0-4
'3-1
6_
66
5238.0
997827
5.266
4780726
6355540
11136266
_-2
66
'
I40
I-i07
520
76 1
6105_I
389490
o6
83
NDFTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
RCCKWELL
CORP.
1972
APRIL
UNDER
NASg-12100
TIME
B-TC
PHASED
EXPEI_D,
A IP,CRAFT
STUCY
SUMMARY
HANMON IHS
Q-3
66
{J-4 66
Q-I
h7
Q-2
67
Q-3
67
T_T AI_
463C.5
3_C8_C.5
LAIIGR
HOURS
77@212
6546"/_5
LABCR
R AT E
BURBEN
DCLLARS
4125_7g
5.301
c]
2575AL_03
I-i08
522C5mI
270995
57
LABt_R
FIURDEN
_345970
528457476
ENGR
MATt
_159_6
1995684
_}
NOPTH
SPACE
AMER ICAN
DIVISION
RCCKWF.
LL
DATA
FREPAREC
IINEER
NASA
CONTRACT
NASg-12100
CgRP.
Iq72
APRIL
TIME
PHASED
B-70
AIRCRAFT
EXPEND.
STUBY
SUMMARY
MFG
TCCL/STE
MATL
TOTAL
MATL
CUBE
_ IN:T)
MATERIAL
TUNNEL
l 77
17036P
3267
MPC
OTll
FP
C_)ST
122_1.
3-2
_J-3
5 I
0-4
5R
C-I
59
0-2
5_
Q-3
5q
:3-4
5?
(2-I
6q
60
CO-2
-43P
-20
583528
225I.o.
01,]704
_67657
22351368
4csoo38q
49%71_5_
1388679
605Qb7
13446_0
418_408
43q55142
27572R1
33:!_115
230874_
27724692
?q745350
191C66d
4630_9
1_129_2
352732_
32&2170S
399540C2
15_3_28
29':523
2(_054_
1 1CC5192
38q324P
57839151
2712655
237221
2_37
303671_a9
41362325
I_.34 _27
20/559
2_05_72
256A3_4
35121629
1560821
177914
272c6_
_9.1314707
312_240_
I_37490
14_254
1934463
1921366?
1377510
118797
1267565
17518693
2217114
366_053
1324915
LO,4.?n
0-3
(Q-4
O)
4-I
61
61
1C2;_31S
C'-3
61
4713q24
r)-4
61
_-I
62
&?
498622')
4q15
Q-2
_-3
62
55769_3
22_7R55
Q-1
63
772_16q
6e, l C31
0-2
63
Q-3
&3
772711_
?44638
7862
($-I
64
64C73_7
476551
lr336412
0-2
64
F_-x
64
27135(:5
125q9_
0-4
64
870_C2
IC03e_!
Q-2
79 706
Z1955014
R96c4
q_5
831<_811
8190545
3q8
615612
C-4
704
C-4
@-I
65
25C?_
6_$54
I
-I
I_76071
563170
1729798
30R
1486635
_08288
1357564
1928_2
1021.828
o5
Q-3
O- 4
o5
G-1
66
_-2
66
11203_0
-16B3
764
323_124
65
1Gc3354
3791
z-lo9
11740
4C0400
"_5
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION"
PREPARED
CONTRACT
ROCKWELL
CCRP,
APRIL
1972
UNDER
NAS9-12100
TIME
9-70
PHASED
AIRCRAFT
EXPEKO.
STbSY
SUMMARY
MFG
_ATL
0-3
Q-6
_-1
(J-2
0-3
66
66
67
_7
67
TOTAL
1222B_5
,_52276Cg
TOOLISTE
_ATL
SUBC
3552_
25e16633
/]F!4FR
CO S T
TOTAL
MATER IAL
632R
1774325
-'_106 82 261
I -llO
6P, 74_3367
225,_3265
400409
3775H7
29173555
N_IRTH
AMERICAN
SPACE
DIVISION
RCCKWELL
DATA
PREPAREG
UNDER
Na. SA
CNNTRACT
NASg-12100
CCRP.
APRIL
TIM_
PHASED
B-70
AIRCRAFT
EXPEND.
STbDY
SUMMARY
SUB
TOTAL
OIC
0-1
5_
0-2
59
Q-3
5_
Q-%
5_
O-I
59
Q-2
59
C-3
59
_-4
59
Q-I
60
0-2
6O
Q-4
6O
Q-I
61
Q-2
bl
_-_
61
Q-4
61
(_-I
62
Q-2
62
Q-._
52
0-4
6_
Q-I
65
0-2
63
0-3
63
0-4
63
0-I
_4
t_-2
_,'_
C,-3
64
Q-4
64
Q-I
69
Q-2
_5
0-3
65
0-4
65
_-I
66
0-2
66
192_7_
H_OI6
TCTAL
TOTAL
G
_; A
TDW_
234790_
CCST
2347S69
176_7425
1 7667405
147_6]
-_7_63705
20405_7
7_34444C
2_6_60
73166412
13337C6
_216071
619147,50
1240256
2927Cl1
_7769692
1q12414
4372691
104054797
24214
884@
13335
37786g19
73353298
74513453
63251
3145996
1P3732001
23q1716
5913127
132'336644
30134_I
_6cl_5_
1664747
2q24005
101502111
29C759=
_6574471
146_C22
2619C66
90649559
2C82)17
774Cq166
1342569
249645S
_1248194
13863_5
_7C342_0
1167491
3C68103
71269
L3_75_5
69281427
15_(790e
4_03875
75646210
192_4_l
_5274140
7_3726
1561617
37619483
ln2182g
28402R48
7697_O
4727
29173365
3239124
IFC70447
485297
6749
IH562493
13343323
35_383
41214C
I-Iii
13099712
314
090
1972
NURTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONT_ ACT
CGRP.
RCCKWELL
UNCER
N^ $9-1P
APRIL
I OC
TIME
PHASED
AIRCRAFT
EXPFN_.
STUOY
SUMMARY
SUH
TOTAL
_-3
0-4
q-t
G-2
_)-3
66
66
_r
67
6t
T(IT AL
38191_
33L7/653
11611470
S_1621741
TOTAL
CCST
IDv!A
11961
1681_)226
1-112
Z79)_21_31C_6344[77
171
1972
.-_
_-_3
,-4
s_-s_-ooo_
I-i14
SD72-SH-0003
(gEOITIIM)
S_FIO(I
NORTH
AMERICAN
SPAC E DIVISION
DATA
PREPARED
NASA
CONTRACT
RCCKWELL
CORP.
UNDER
NASg-12100
TIME
B-70
SUBD
CF
WORK
Q-[
q-2
q-3
Q-4
Q-[
{;-2
Q-3
q-4
Q-I
Q-2
q-3
Q-4
Q-1
Q-2
q-3
Q-4
Q-[
Q-2
q-3
Q-4
Q-[
Q-2
q-3
q-4
Q-[
Q-2
Q-3
Q-4
(3-I(3-2
Q-3
(3-4
PHASED
AIRCRAFT
EXPEND.
STUDY
DESIGN/ENGINEERING
DESIGN/ENGINEERING
ON-SITE
MANMONTHS
LABOR
LABOR
HOURS
LABOR
RATE
LABOR
OCLLARS
BURDEN
DOLLARS
984908
982469
LABOR
BURDEN
58
58
58
58
1285.5
215935
4.561
5655,5
916586
4,383
4017197
3589981
7607178
59
59
59
59
60
60
60
60
61
61
61
61
62
62
62
62
63
63
63
63
64
64
64
64
65
65
65
65
7238.5
[235367
4.321
5337750
4270928
9608678
107580
1893478
4.211
7973824
6820192
14794016
10866.0
1883428
4.545
8559249
7115705
15674954
10275.5
1726243
4.712
813368C
6376365
14510045
15C975
2576625
4.745
|2226134
8808626
21034760
9738,5
1765899
4.931
8707812
8120279
16828091
8929.0
1523905
5.205
7932400
6q86598
14918998
8274.0
[390048
5.|53
7163597
7042561
14206158
7804.0
1331920
5.692
758[180
74384L5
15019595
8645.0
1452358
5.238
7607383
75499[2
L5157295
7687.5
1311994
5.493
7206255
8027653
15233908
4727.0
831q95
5.679
4724618
5433207
[el57825
7469.0
1294692
4.88[
6320033
7684626
14004659
5.647
3852977
4405374
8258351
4061.5
L972
APRIL
682359
1-115
1967377
+
$
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCK_ELL
APRIL
CORP.
UNDER
NASg-IZIOO
TXME
B-70
SUBD
CF
NORK
Q-I
Q-2
C)-3
66
66
66
TOTAL
PHASED
EXPEND.
AIRCRAFT
STUDY
DESIGN/ENGINEERING
DESIGN/ENGINEERING
ON-SITE
MANMONTHS
LABOR
LABOR
HOURS
LABOR
RATE
LABOR
DCLLARS
BURCEN
OOLL _RS
LABOF,
BURDEN
$
3
3972.0
688475
5.673
3905465
4987468
889291
3457.5
580810
5.516
3202658
6002
7206997
135761.5
1972
23302117
lI543710C
3_,9
109662698
22507q7q8
r_,
1-116
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPAREO
NASA CONTRACT
RCCKWELL
CORP.
APRIL
UNOER
NAS9-L2100
PHASED
AIRCRAFT
SUBD
CF
WORK
q-t
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-[
g-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
0-2
0-3
0-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
G-I
Q-2
(]-3
Q-4
58
58
58
58
59
5g
59
59
60
6O
60
60
61
61
61
6t
62
62
62
62
63
63
63
63
64
64
64
64
65
65
65
65
EXPEt_D.
STUDY
SHOP
SUPPORT
OESIGNIENGIhEER[NG
ON-SITE
MANMON THS
1972
LABOR
LABOR
HOURS
LABOR
R ATE
LABOR
DGI_LARS
BURDEN
DOLLARS
LABOR
BURDEN
58.5
9825
3.068
30143
26769
56912
29.0
4170
3.165
13198
12690
25888
60882
83454
144336
130.5
22163
2. 747
333.0
58681
2.883
169151
237428
406579
- 102.5
- 17730
2.
883
-51116
-30519
-81635
193.5
32623
2.
908
94879
120_,04
215283
194,0
33148
2.855
94636
I17149
211785
2.
2410S
40719
6,_824
46.5
8455
90.0
15375
4.602
70755
60851
131606
901.0
151348
4.434
671148
673703
134485
966,0
164787
4.543
748672
806804
1555476
38|.5
64077
4.706
301516
336805
638321
58,5
9955
3.289
3273e
54389
87127
45.0
7890
3.528
27838
55148
82986
3,694
379449
571615
951064
3. 760
196010
327981
523991
5925
[02730
310,5
52136
851
I-I17
+
$
NORTH AMERICAN
SPACE
DIVISION
DATA PREPARED
NASA
CONTRACT
RCCKWELL
CORP.
APRIL
UNDER
NASq-I2|O0
TIME
B-70
SUBD
CF
WORK
66
66
66
TOTAL
PHASED
EXPEND.
AIRCRAFT
STUDY
SHOP
SUPPORT
DESIGN/ENGINEERING
ON-SITE
Q-I
Q-2
Q-3
LABOR
MANMONTHS
LABOR
HOURS
LABOR
RATE
LABOR
DOLLARS
BURDEN
DOLL _RS
_26,0
73717
3.697
272566
537856
810422
426.G
7L686
5.397
386900
611747
99_647
5075.5
I972
865036
352367C
I- 118
_6_6993
LABOR
RUROEN
8166463
+
$
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA CONTRACT
ROCKWELL
CORP.
APRIL.
UNDER
NASg-12100
TIME
B-70
SUBO
OF
WORK
TESTIQC
DESIGN/ENGINEERING
ON-SITE
MANMONTHS
Q-I
Q-2
Q-3
CI-4
Q-I
Q-2
Q-3
G-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
{}-2
Q-3
Q-4
Q-I
Q-2
(Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
(}-4
PHASED
EXPEND.
AIRCRAFT
STUCY
LABOR
LABOR
HOURS
LABOR
RATE
LABOR
DOLLARS
BURCEN
DOLLARS
LABOR
BURDEN
58
58
I. 5
314
3,029
951
951
58
5B
1,5
162
2,790
652
452
-28
2. I07
-5g
-5q
5q
5g
59
59
13,5
2331
3, 155
7354
7356
60
60
15o0
2624
3. 558
9337
q337
60
60
13,5
2353
3.380
7954
7954
61
61
I0.5
177l
3.023
5353
535?
61
61
3.0
489
3, 2b8
1598
1598
62
62
62
62
I. 5
231
4. 541
104g
1049
4343
4343
7.5
1378
3.
152
63
63
26.0
6056
3. 492
63
63
12,0
1993
3.380
6736
6736
64
64
12,0
2061
3,656
?536
7534
64
64
21.0
3685
3,744
13796
13796
-65
65
65
65
11 l.O
19309
4. 305
83 ll 8
83118
II 1.0
18728
4, 400
8240
I-i19
14163
14163
I_240 3
t972
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APR|L
UNDER
NASg-12IOO
TiME
B-70
SUBD
CF
WORK
PHASED
AIRCRAFT
EXPEND,
STUDY
TESIIQC
OESIGNIENGINEERING
ON-SITE
LABOR
MANMONTHS
LABOR
HOURS
LABOR
RATE
LABOR
DOLLARS
BURDEN
DOLLARS
LABOR
BURDEN
Q-I
Q-2
66
6b
153,0
26497
4,755
125g98
125998
Q-3
66
127,5
21397
4,5.53
97415
97_15
TOTAL
639,0
197Z
IC9351
4_g495
T-120
409495
NORTH
AMERICAN
SPACE
DIVISION
DATA PREPARED
NASA CONTRACT
R(]CKWELL
C(]RP,
APRIL
UNDER
NAS9-12100
TIME
8-70
SUBD
OF
WORK
MANMONTHS
Q-[
Q-2
Q-3
Q-4
Q-1
Q-2
Q-3
0-4
Q-I
Q-2
Q-3
0-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-L
Q-2
Q-3
Q-4
Q-E
Q-2
Q-3
Q-4
Q-[
Q-2
Q-3
Q-4
Q-t
Q-2
58
58
58
58
5q
59
50
59
60
60
60
60
61
61
61
61
62
62
62
62
63
65
63
63
64
64
64
64
65
65
65
65
66
66
1972
PHASEO
EXPEND.
AIRCRAFT
ST_CY
DESIGN/ENGINEERING
LABOR
HOURS
LABOR
RATE
LA80R
OCLLARS
BURDEN
DOLLARS
LABOR
BURDEN
ENGR
MATL
1345.5
226074
4.494
1016002
1009238
2025240
2773
5482,0
920918
4.377
4030847
3602671
7o33518
6062
7369.0
1257502
4,293
5398573
4354382
9752955
22452
11104.5
1054490
4.170
815032g
7057620
152C7949
31805
10776.5
1868322
4.55(;
8517470
7085186
15602656
lq?O
10482.5
17_121_
4.677
82365L3
6496769
14733282
27562
15302.0
2611544
4.720
12326123
8925775
2125|898
20317
9788.0
1774843
4.921
873351E
8160998
16894513
33856
9020.5
1539511
5. 199
8004204
7047449
15051653
7165
9162.5
1542774
5.081
783q088
7716264
15555352
52861
8794.0
1500763
5.560
8344015
824521g
16589234
82054
9038,5
1518428
5,213
7q15635
7886717
15802352
112498
7758.0
1324010
5.473
7246527
8082042
1532856g
86821
5.65C
4766252
5488355
10254607
145181
4, 788
678260C
8256241
1503884
4793,0
84357C
8172.5
1416731
260374
4483.0
753223
5,485
41313q0
4733355
8864745
3q7176
4551,0
788689
5.457
4304009
5525324
g829333
352596
1-121
NORTHAMERICANROCKWELLCORP.
SPACE
DATA
NASA
DIVISION
PREPARED
CONTRACT
APRIL
UNCER
NASq-12100
TIME
B-7O
SUBD
OF
WORK
MANMONTHS
Iq72
PHASED
AIRCRAFT
EXPENO.
STUDY
DESIGN/ENGINEERING
LABOR
HOURS
401I.O
673893
14145E.0
24276504
LABOR
RATE
LABOR
DOLLARS
BURDEN
DOLLARS
5,471
3686q73
_b14086
I19430065
ll_2BTEgl
LABOR
BURDEN
830LOSq
23371775b
ENGR
M&TL
_89694
2133167
1-122
NORTH
AMERICAN
SPACE
DIVISION
OATA
PREPAREO
NASA
CONTRACT
ROCKWELL
APRIL
CORP,
UNDER
NAS9-12100
TIME
B-70
SUBD
CF
WORK
MFG
MATL
58
58
58
58
59
59
59
59
60
60
60
60
6[
61
61
61
62
62
62
62
63
63
63
63
64
64
64
64
65
65
65
65
66
66
1972
PHASED
AIRCRAFT
EXPEND,
STUDY
DESIGN/ENGINEERING
$UBC
T757025
TOTAL
MATERIAL
MPC
2773
150
7763087
WIND
TUNNEL
OTHER
COST
TOTAL
O/C
$
5327
5327
69t22
122097
122097
18307]04
18329756
487295
600394
600394
17724348
17756153
487258
1009592
1009592
12966858
12968778
769666
2175747
2175747
8542875
8570437
510488
1609170
160917C
e721717
6742034
194377
2479273
2_79273
6786998
6820854
197306
2347828
2347828
5989869
5997034
190957
2641236
264|236
5818544
5871405
188930
237480
_E15350
4697404
204112
1758544
1758544
920200
1032698
-703353
-703353
1"/76056
1862877
1033774
L033774
12390
157571
56665
1006084
1006084
9590
269964
81155
397176
71018
352 596
7309C
40647
253168
1-123
829953
149685
561259
2374803
829953
1
1496851
561259
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPAREC
CONTRACT
ROCKWELL
CF
WORK
NFG
MATL
Q-3
PHASED
AIRCRAFT
EXPEND.
STUCY
DESIGN/ENGINEERING
SUBC
66
TOTAL
1972
UNDER
NASq-12100
TIME
B-70
SUBD
APRIL
CORP.
TOTAL
MATER IAL
489696
979_9124
1000822ql
MPC
30257
3905661
T724
TOTAL
OIC
$
WIND
TUNNEL
261546
21610125
261546
21610125
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP.
UNDER
NAS9-12100
TIME
B-70
SUBD
CF
WORK
SUB
TOTAL
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
O-I
Q-2
Q-3
Q-4
Q-t
Q-2
Q-3
0-4
Q-I
0-2
Q-3
Q-4
Q-I
0-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
58
58
58
58
59
59
59
59
60
60
60
60
61
61
61
6t
62
62
APRIL
PHASED
AIRCRAFT
EXPEND.
STUDY
DESIGN/ENGINEERING
G & A
TOTAL
COSI
IOWA
20334(0
_2033490
15587824
15587824
2q170400
29170400
34460_52
34460952
31516847
527806
32044653
25423377
484389
25907?66
30667562
569855
31237437
26260501
487998
2674849_
2388088C
40083g
2428171g
62
62
63
63
63
63
23_904_0
402676
24393166
232_q294
388710
23638004
16172344
270403
16442747
J54
64
18478388
391266
18869654
64
64
65
65
65
65
B6
66
I1474927
244163
1171909C
162
427406
1664731_
10829790
288938
11118728
10816278
280278
11096556
19_13
1-125
1972
,J
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPAREO
NASA
CONTRACT
ROCKWELL
CORP.
UNOER
NAS9-12|00
TIME
B-70
SUBO
OF
WORK
SUB
TOTAL
0-3
66
TOTAL
9082556
359315833
APR[L
PHASEO
EXPENO.
AIRCRAFT
STUOY
DESIGN/ENGINEERING
G _, A
273538
5438265
TOTAL
COST
IOWA
9356094
36675_t098
z-126
1o.72
o
<
<
6
o
0,
:E
,<
r_
o
0
a.
m
-i
I
j,
EW"
SD72-SH-O003
_,
_0
0_._
_-_
_0
_t_-_-ooo_
(BIIOI'rIIM)_V'lqO(I
NORIH
ANERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
RCCKWELL
UNCER
NASq-12100
lIME
8-70
SUBD
OF
WORK
5FI
Q-I
Q-2
58
58
Q-3
58
Q-4
59
Q-[
Q-2
59
59
Q-3
(Q-4 59
60
Q-I
Q-2
60
:-3
60
6O
Q-4
61
g-I
61
Q-2
61
0-3
0-4
6I
O-I
62
IQ-2 62
62
Q-3
Q-4
62
63
Q-I
63
Q-2
Q-3 63
(_-4 63
66
Q-l
64
Q-2
(}-3 66
64
Q-4
65
Q-I
65
Q-2
65
Q-3
65
0-4
PHASED
AIRCRAFT
EXPEND,
STUCY
DESIGN/ENGINEERING
PRODUCTION
ON-SITE
MANNONTHS
LABOR
LABOR
HOURS
LABOR
R AT E
8
LABOR
DOLLARS
BURCFN
O(]LL ARS
37
4.625
+
$
LABOR
BURDEN
7_
36
191.0
135L8
5.414
73189
972l
82910
97.5
16629
5,456
90721
145._9
10526C
174.0
3056q
5.273
161199
34809
195999
11.822
5,,498
6499?
16644
985
3.308
3258
2051
5809
3, 711
9748
1.0923
20671
3,667
3590
2866
6456
67,5
6,0
15.0
6.0
2627
979
Rt641
180.0
30659
5.079
155718
150624
3C6342
478.5
80495
4,, q25
396463
405719
802242
394.5
67287
5.128
345043
362402
707445
-4C.5
-6783
8.401
-56_85
292q9b
236011
29 1.0
49692
6. 907
243820
299746
543566
1244487
1488317
2732804
302897
380119
683016
515569
263676
779225
135[.5
[972
APRIL
C(]RP,
237795
340.5
59132
279.0
46918
5.233
5. 122
10.988
T-]_29
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
RCCKWELL
CORP.
APRIL
UNI]ER
NASg-X2[O0
TIME
8-70
SUBD
OF
WORK
DES IGN/ENGI
PROCUCTION
ON-SITE
MANMONTHS
Q-I
(_-2
Q-3
66
66
66
TOTAL
NEER
PHASEO
EXPENO.
AIRCRAFT
STUDY
ING
LABQR
LABOR
HOURS
LABOR
RATE
LABOR
OOLLARS
30,,0
523g
3.531
18498
1916';
37667
36.0
6115
3,644
2228_
22 778
45064
.3787.5
653686
3594515
_-13o
BURCEN
DGLLARS
3777186
LABOR
BUP lIEN $
737170I
lq72
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARE{)
NASA CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NASg-12100
TIME
B-70
SUBD
_F
WORK
Q-3
0-4
Q-I
0-2
0-3
0-4
Q-1
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-1
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
_-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
0-3
5g
59
60
60
60
60
61
61
61
bl
62
62
62
62
63
53
63
63
64
64
64
64
,65
65
65
65
66
66
66
TOTAL
PHASED
EXPENO.
AIRCRAFT
STUDY
PROCUCTION
PRODUCTION
ON-SITE
MANMONTHS
LABOR
HOURS
LABOR
LABfJR
RATE
LABOR
DOLLARS
576.C
IC1470
3,689
374296
685.5
118765
3. 707
440321
110112
BUROEN
Ol]LL ARS
LA E}OR
BURDEN
28794
467115
124644
234756
375ql
2.q2q
3450.0
588807
3.144
1851083
2222707
4073790
10242.0
1857107
3,152
5852799
7451964
13304763
16177.5
2760855
3.C73
8483947
11377959
19861906
16185.0
2719064
3. 183
8653756
12084445
20738201
14658,0
250154q
3.
266
817062C
Iil77352
1q347972
1618g.0
2719690
2.857
7769055
12422441
20191496
15653.5
2671497
3.576
9554346
15508666
25163012
1373648
3.
4616476
7482151
12098627
2957137
6682385
7630522
2378
361
4863.0
842863
3.508
1230.0
206550
4.
201.0
268.5
108407.0
(;77
842175
1536020
34838
2. C48
71348
7q6503
867851
45212
3.41g
577621
732180
15455q
5qg0203C
18579501
T-131
+
$
3742q6
223.5
7804.5
1972
87571652
147473682
195
NORTH
AMERICAN
SPACE
DIVISION
OATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNCER
NASg-12[O0
TIME
B-70
SUBD
CF
WORK
64
64
65
65
65
TOTAL
PHASED
AIRCRAFT
EXPEND,
STUDY
SHOP
SUPPORT
PRODUCTION
ON-SITE
g-3
Q-4
Q-I
q-2
0-3
LABOR
MANMONTHS
LABOR
HOURS
LABOR
RATE
261.0
45842
3.628
I14.0
19861
3.52e
LABOR
DCLLARS
BURCEN
OCLLARS
166336
233354
70C65
95 548
-819
375.0
1972
b5703
23040!
1-132
328083
LABOR
BURDFN
399690
165613
-B19
564484
+
$
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
CORP,
ROCKWELL
APRIL
UNCER
NAsg-1210O
TIME
B-70
SUBO
CF
WORK
q-3
Q-6
q-I
Q-2
Q-3
Q-6
q-!
q-2
Q-3
0-4
Q-I
0-2
Q-3
Q-4
Q-I
Q-2
q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
O-2
G-3
Q-6
Q-I
Q-2
0-3
Q-6
Q-I
Q-2
58
58
59
59
59
59
60
60
60
60
61
61
61
61
62
62
62
62
63
63
63
63
.64
64
64
66
65
65
65
65
66
66
PHASED
AIRCRAFT
EXPEND.
STUDY
PLANNING
PRODUCTION
ON-SITE
MANMONTHS
LABOR
LABOR
HOURS
LABOR
DOLLARS
LABOR
RATE
BURCEN
DOLLARS
LABOg
BUR DEN
5711
5711
2.96(]
28324
28324
6994(]
69940
12.0
1905
2.998
55.5
9569
133.5
23401
2.989
270.0
46837
3. 160
14799C
544.5
91472
3.050
278949
483
278949
165672
3.C22
500012
74950
574962
877.5
15917C
2.916
464167
78444
542611
853.5
145699
2,977
433695
80306
516001
790.5
13277q
2.
393483
8735[
480834
56
963
3.786
212
207
419
577.5
97031
6.q37
673144
475960
1149104
487.5
83307
3.102
258399
407389
665788
138.0
24312
3. 303
80295
12L360
201641
66,0
11438
3.11e
35645
5410_
8q769
4370
3.
13583
20687
34270
166G
3.348
9.0
108
4888
1-133
7926
+
$
198_,7 _
969.0
25.5
I,O72
12814
NORTH
AMERICAN
SPACE
DIVIS[ON
DATA
PREPARED
NASA
CONTRACT
RGCKWELL
CORP.
APRIL
UNDER
NASq-121OO
TIME
B-70
SUBD
OF
WORK
Q-3
66
TOTAL
6.0
5815.5
PHASED
EXPEhD.
AIRCRAFT
STUDY
PLANNING
PRODUCTION
ON-SITE
MANMONTHS
1972
LABOR
LABOR
HOURS
I0_I
LABOR
RATE
3.3B1
999319
LABOR
DCLLARS
BURCEN
DOLLARS
352C
5091
339lq57
1-134
1_14244
LABOR
BURDEN
Bblt
4806201
+
$
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NASg-12100
TIME
B-70
SUBD
CF
WORK
58
58
5'9
59
59
59
60
60
60
60
61
61
61
61
62
62
62
62
63
63
63
63
,66
64
64
66
65
65
65
65
66
66
PHASED
EXPEND.
AIRCRAFT
STUEY
TEST/QC
PRODUCTION
ON-S
Q-3
Q-4
Q-I
(3-2
Q-3
(}-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
(}-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
(3-2
0-3
Q-4
Q-I
Q-2
[TE
LABOR
LABOR
RATE
LABOR
DOLLARS
MANMONTHS
LABOR
HOURS
6.0
931
4.g08
656q
4569
6.0
898
4.257
3823
3823
BURDEN
DOLLARS
LABOR
BURDEN
25.5
6471
4. 665
20855
20855
54.0
9426
6, 992
47058
47058
22.5
389 [
3. 664
14255
16255
258.C
43990
3.
144
138307
138307
753,0
136554
3.
152
430433
430433
1564.5
267073
3.236
866169
864
1891.5
317877
3.405
108238D
1082380
1798.5
3C7065
3.600
1105326
1105326
2212.5
371608
4.214
1566032
2415.0
412102
3.595
1481396
53338
1534734
1473,0
2592q0
3.696
95846C
77076
1035536
153497
4.055
62246g
25418
647887
14999
433802
885.0
1972
541.5
90941
4.
605
4_S803
44 1.0
76420
4.
942
377682
1-135
211683
169
1777715
377682
*
$
NORTHAMERICAN
SPACE
DATA
NASA
DIVISION
PREPAREC
CONTRACT
ROCKWELL
APRIL
CORP,
UNDER
NASq-12100
TIME
B-70
SUBD
OF
WORK
PHASED
AIRCRAFT
LABOR
MANMONTHS
LABOR
HOURS
LABOR
RATE
307.5
51707
4969
16655.0
EXPEhO.
STUDY
TEST/QC
PRODUCTION
ON-SITE
TOTAL
1972
2507761
BUREN
DOLLARS
1-136
256950
25695(:
9392967
LABOR
_URDEN
382514
9775681
+
$
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NAS9-12IO0
TIME
8-70
SUBO
CF
WORK
MANMONIHS
58
58
58
58
59
59
59
59
60
60
60
60
61
61
61
61
62
62
62
62
63
63
63
63
64
64
64
64
65
65
65
65
66
66
PHASE[}
EXPEND.
AIRCRAFT
STUDY
PRODUCTION
LABOR
HOURS
LABOR
RATE
8
t6354
5.
159.0
27096
909.C
L04
BUR CEN
DOLL ARS
"_ LABOR
DOLLARS
4,625
99.0
LABOR
BURDEN
36
37
+
$
73
83469
972L
93190
4.535
122868
14539
137407
159911
3, g16
626290
34800
661090
IC77,C
186850
3.748
700366
43921
744287
796,5
133939
3,036
406574
126695
533269
_692.0
800896
3.
120
2499150
2308580
_807730
134
6750989
7533274
14284263
11878.5
2153810
3.
18775,5
3204286
3. lO1
19345.5
3250215
3.239
10526082
16851.0
2875952
3.345
18938.5
3181546
3.
18847,,0
3216598
3587
[1537961
II028.0
1940887
3,641
7066054
9402244
16468298
6268.5
1086791
3.670
3988213
5237574
9225787
2076,0
348779
5.133
1790110
1834563
3624673
117957
4005
472416
823598
1296014
681.0
1972
128
1-137
9_3752
l 1608889
2 1546418
12577575
23103657
9621201
1 1539961
2116L162
9951246
1340308O
2 3354326
16369
139
27907100
ENGR
MATL
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NAS9-12|00
TIME
8-70
SUBO
OF
WORK
MANMONTHS
618.0
TOTAL
133040.C
PRODUCT
PHASED
EXPEND.
AIRCRAFT
STUDY
ION
LABOR
HOURS
104075
22805950
LABOR
RATE
4.202
LABOR
DOLLARS
BUROEN
DOLLARS
437315
605_90
76517870
_-138
%1LJ
X972
ct3473679
LABOR
BURDEN
1042805
16900154g
ENGR
MATL
NORTHAMERICANROCKWELL
SPACE
DATA
NASA
DIVISION
PREPARED
CONTRACT
CORP.
OF
WORK
MFG
MATL
58
58
58
58
59
59
59
59
60
60
60
60
61
61
61
61
62
62
62
62
63
63
63
63
64
64
64
64
65
65
65
65
66
66
1972
UNDER
NAS9-12100
TIME
B-TO
SUBD
APRIL
PHASED
AIRCRAFT
EXPEND,,
STUCY
PRODUCTION
SUBC
433520
TOTAL
MATER IAL
433520
MPC
3846
OTHER
COST
SUB
TOTAL
5641
5714
112960
643516
4029 162
G &
3605554
3605554
95601
190600
31120511
31120511
850134
269832
32901567
26106017
26107002
1549061
17912
28418262
541775
16577782
16616910
988720
2352.8
18162427
360026
1028879
2C718972
21747851
680216
28145
27263942
564889
4713g24
24061973
28775897
[087445
23430
44171035
899225
6986229
21395753
26381982
1072774
6125
49007299
869965
5576903
16058125
21635028
8 120
4569601
7726164
15617765
23343929
-77
45929333
816456
66893
38459180
690205
985
39128
969206
1424319
796676
7727118
6345602
14072720
g6524
6407347
8015425
14422772
1783781
88340
44201993
104293"/
68173
20463664
468592
q12259
273995
20144
10432185
2916
1120300
1120300
199863
8265
4953101
1093_54
1093354
226761
6816
2622945
2713606
8708C2
170650
41457
2884256
1-139
1029285
74
135327
78995
NORTH
AMER [CAN
RCCKWELL
SPACE
DIVISION
DATA
PREPARED
UNDER
NASA
CONTRACT
NASg-12IO0
TIME
B-70
SUBD
CF
WORK
MFG
MAIL
45227604
PHASED
AIRCRAFT
1972.
EXPEND.
STUCY
PRODUCTION
SUBC
1222865
TOTAL
APRIL
CORP.
TOTAL
MATERIAL
75206
1222865
Iq0269106
MPC
lS269106
2_5496710
1-]_40
CTHER
COST
14051
958808
SUB
TOTAL
235492?
41971626]
G &
70923
76 t40
I 3
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA CONTRACT
RC_CKWELL
UNDER
NASg-12I.O0
TIME
B-70
SUBO
OF
WORK
[DWA
Q-[
Q-2
q-3
Q-4
Q-I
Q-2
{}-3
Q-
Q-[
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-
Q-[
Q-2
Q-3
Q-6
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-[
Q-2
Q-3
Q-4
Q-I
Q-2
58
58
58
58
59
59
59
59
60
60
60
60
61
61
61
6t
62
62
62
62
63
63
63
63
66
64
64
64
65
65
65
65
66
b6
PRODUCTION
TOTAL
COST
5716
_63516
I1167
6040309
4243
329CSBlO
6600
28966637
59151
18561604
2512356
30361189
3923566
68993826
2924005
52801269
2610066
69102753
2696659
49242268
30_8199
62217584
6803875
50035153
1561_17
22493873
6727
6749
APRIL
CORP.
IC728586
5095177
27C1940
PHASED
EXPEfiD.
AIRCRAFT
STUOY
1972
NORTH
AMERICAN
SPACE
OIV|S[ON
DATA
PREPAREO
NASA
CONTRACT
ROCKWELL
CGRP,
UNCER
NASg-|2100
TINE
B-TO
SUBD
CF
WORK
IOWA
APRIL
PHASEO
EXPENOo
AIRCRAFT
STUCY
PROCUCTION
TOTAL
COST
242585C
TOTAL
23992560
_15 I32283b
_-142
1972
II
!
IK
8
1-143
SD72-SH-O003
(SJOITIIM)
_IVTIO(I
I- T
=olb
,,,_3
0 p.,, W_
QI_ .M
0
ol-
w
a_ o
,._, w
w _
_a__z
_- a. P
_ww
go
O_
UL
!"
---_,
......
1
0
($KOIqqI_)
I-i$_
S_lqOd
,I
0
SD72-SH_O003
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARE0
NASA
CONTRACT
ROCKWELL
CORP,
APRIL
UNOER
NASg-12100
TIME
B-70
SUBD
CF
WORK
Q-[
Q-2
Q-3
Q-4
Q-I
Q-2
0-3
Q-4
Q-I
Q-2
0-3
Q-4
q-I
Q-2
0-3
q-4
Q-!
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
{)-3
Q-4
Q-I
Q-2
{}-3
Q-4
PHASEO
AIRCRAFT
EXPEhD.
STUOY
DES IGN/ENGI
NEER ING
TOOLING
AND
STE
ON-SITE
MANMONTHS
lq72
LABOR
LABOR
HOURS
LABOR
RATE
LABOR
DOLLARS
BUR CFN
DOLLARS
LABOR
BURDEN
SB
58
1,5
152
4,704
715
690
1405
58
58
I, 5
308
3. 078
948
I 168
2116
5. 333
16
13
59
5q
2':::;
59
59
I (]o5
I898
3o (]65
_818
6683
12501
60
60
18,0
3217
2.84
9141
12 I15
21256
60
60
27,0
4588
2,917
13 38 1
17398
30779
61
61
82.5
13982
2, 797
3g I02
52 142
91244
61
61
I03,5
18729
3,162
59221
78409
137630
62
62
105,0
17939
3.913
70191
82749
152940
524_2
85515
62
62
5q, 5
qqSO
3,32C
3303
63
63
31.5
5271
4, 34g
22923
28541
51464
.63
63
40,5
6727
4, 236
28493
34829
63322
64
64
23.5
3977
4o 070
16 lB6
26637
42823
1115
3.
887
4334
5527
9861
736
2065
2684
474q
13.'58
2275
64
64
6.0
65
65
3,0
436
4.
6.5
65
1,5
213
4,305
z-145
q17
NORTH
ANERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NASq-12|OO
TIME
B-TO
SURO
CF
WORK
Q-I
Q-2
0-3
66
66
66
TOTAL
PHASED
EXPEhD.
AIRCRAFT
STUDY
OES IGN/ENG
INEER ING
TOOLING
AND STE
ON-SITE
MANNON THS
1972
LABOR
LABOR
HOURS
LABOR
RATE
3.79_
515.C
LABOR
DOLLARS
BURCEN
DOLLARS
252
403677
1-146
LABOR
_URDEN
381
710290
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NAS9-12|O0
TIME
B-TO
SUBD
(IF WORK
TOOLING
TOOLING
AND
AND
ON-SITE
MANMONTHS
0-1
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
(}-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
0-3
Q-4
{)-1
Q-2
Q-3
0-4
1972
PHASED
AIRCRAFT
EXPEND,
STUCY
STE
STE
LABOR
LABOR
HOURS
LABOR
RATE
LABOR
DOLLARS
BUR CEN
DOLLARS
LABOR
BURDEN
58
58
58.5
9756
3, 818
37248
25807
63055
58
58
31.5
5241
6,
32232
9793
42025
59
59
121.5
20749
4.487
93095
58510
59
59
651.5
79393
3.728
295989
237541
150
151605
533530
60
60
2152.5
373166
3.639
1283247
1114261
2397528
bO
60
2875.5
483006
3.371
1628632
1421C88
3049520
61
61
9241.0
1577087
3. 543
5587276
4589745
1C177019
61
61
14640.0
2654808
3,326
8823996
8794005
17617999
62
62
5676.0
(J68596
3.328
3223286
3528233
675].519
62
62
2458.5
613106
3.298
1362316
1720672
3082988
63
63
1795.5
306391
3.371
1032982
1169126
2202t08
63
63
141E.0
238243
3.551
846104
1099|35
1945239
64
64
2253.0
384607
3.959
1638411
3160904
64
64
937.5
164933
2.636
434710
673266
IIC7976
65
65
228.0
39636
4.433
175713
188582
364295
65
65
38.0
6626
30627
33292
63919
4.
768
1-147
1522693
+
$
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
APRIL
CORP.
UNDER
NASg-12|OO
TIME
fl-70
SUBD
CF
WORK
TOOLING
TOOLING
AND
AND
ON-SITE
MANMONTHS
44376,5
PHASED
EXPEND.
AIRCRAFT
STUOY
STE
STE
LABOR
LABOR
RATE
LABOR
HOURS
0-I
66
(_-2 66
Q-3
66
TOTAL
1972
.750
48
8,042
LABOR
DOLLARS
T-]_48
+
$
LABOR
BURDEN
42
3
386
26410131
7725lq2
BURDEN
DOLLARS
45
386
26301
529
5271L660
NORTH AMERICAN
SPACE
DIVISION
DATA PREPARED
NASA CONTRACT
RCCKWELL
CORP.
APRIL
UNDER
NASq-1..2100
TIME
8-70
SUBD
CF
WORK
PLANNING
TOOLING
AND
LABOR
HOURS
8
Q-3
60
Q-4
60
Q-I
6l
Q-2
61
Q-3
61
Q-4
61
Q-I
62
Q-2
62
0-3
62
Q-4
62
Q-I
63
Q-2
63
Q-3
63
Q-4
63
Q- 1 64
Q-2
64
0-3
64
O-4
64
0-I
65
O-2
65
0-3
65
0-4
65
Q-I
66
0-2
66
O-3
66
2238.0
TOTAL
3372.0
717.0
343.5
PHASED
EXPENI_,
AIRCRAFT
STUDY
STE
LABOR
ON-SITE
MANHCNTHS
122282
62214
7
375960
LABOR
RATE
LABOR
DOLLARS
2.625
BUROFN
DOLLARS
LABOR
BUR DEN
+
$
21
21
3.174
388072
49103
437175
3.069
190907
26371
217278
.142
3.679
-I
138326C
-I
64739
14479gq
36.G
6047
2.555
1544e
16558
32006
10.5
1967
7.195
14152
13469
27621
19.5
3351
3.297
11047
6.0
1123
4. 185
4700
9138
20185
6016
10716
3
1.5
1972
132
3.530
573094
466
2008072
1-149
590
185984
1056
2194056
NORTHAMERICAN
SPACE
DATA
NASA
DIVISION
PREPARED
CONTRACT
RCCKWELL
CORP.
UNDER
NAS9-L2[O0
TIME
B-70
SUBD
CF
WORK
TEST/QC
TOOLING
AND
ON-SITE
MANMONTHS
Q-!
Q-2
(}-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
0-3
Q-4
Q-I
Q-2
{}-3
Q-4
Q-I
Q-2
Q-3
Q-4
58
58
58
58
59
59
59
59
60
60
60
60
61
61
61
6X
62
62
62
62
63
63
63
63
64
64
64
64
65
65
65
65
1972
APRIL
PHASED
AIRCRAFT
EXPEND.
STUDY
STE
LABOR
LABOR
HOURS
LABOR
RATE
1
LABOR
BURDFN
LABOR
DOLLARS
2,000
+
$
2
4q
5.46g
268
268
80
3.038
243
243
1526
3.08C
_70C
4700
8100
3.259
26399
26399
93.0
15527
3.394
52706
52706
232.5
39652
3.31B
13158_
13[583
510.0
92533
3.580
331313
331313
229.5
39190
3.136
122905
122905
115.5
19304
3.210
61970
61970
6g.O
II864
3.364
39911
39911
285.0
47905
3.509
168106
168106
97.5
16652
3.679
6126G
61260
30395
30395
9.0
46.5
51.0
8849
3.435
10.5
1892
3.64C
54
1.29_
1-15o
688_
70
6886
70
NORTHAMERICAN
SPACE
DATA
NASA
DIVISION
PREPARED
CONTRACT
R(]CKWELL
CORP.
APRIL
UNDER
NASg-12100
TIME
B-70
SUBD
CF
WORK
TEST/QC
TOOLING
AND
ON-SITE
PHASED
AIRCRAFT
EXPEND.
STUDY
STE
LABOR
MANMONTHS
LABOR
HOURS
1.5
303
1750.5
1q72
LABOR
RATE
.
LABOR
DOLLARS
73
303481
LABOR
BURDEN
22
1038739
1-15i
BURDEN
DOLLARS
$
22
103873q
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP,
APRIL
UNOER
NASg-|2LO0
TIME
B-70
SUBD
Q-[
Q-2
Q-3
Q-4
Q-1
Q-2
Q-3
Q-4
Q-[
Q-2
0-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-1
Q-2
(}-3
Q-4
Q-1
Q-2
Q-3
Q-4
Q-1
Q-2
Q-3
Q-4
Q-I
Q-2
OF
WORK
1972
TOOLING
ANO
PHASED
AIRCRAFT
EXPEND,
STUCY
STE
LAB{JR
RATE
LABCR
DCLLARS
BURDEN
DOLLARS
37965
26497
64462
5,975
33448
10961
44409
20832
4.481
93354
58523
151877
471.0
82817
3. 701
306507
244224
550731
89694
60
60
2217.0
384483
3.430
1318787
I126396
2445183
604007
60
60
2995.5
503129
3.368
1694540
1438486
3133026
905281
61
61
I0273.0
1753003
3.506
6146031
4600_90
IC_37021
3523326
61
61
15597.0
2828284
3.325
9405435
8Bq87F15
18304220
II005192
62
62
6010.5
1(]25732
3. 331
3416381
3610982
7027_J63
4915358
62
62
2633,5
442360
3. 294
1457319
1773154
3230473
2207855
63
63
1896.0
323526
3.387
1095816
1197667
2293483
691031
63
63
3981.5
668835
3.627
2425963
1198703
3624666
844638
64
64
2410.0
411283
3.928
1615387
1681(:06
3296993
476551
64
6k
1005.0
176864
2.734
483591
692262
1175853
125098
65
65
261.0
4.319
195711
200404
396115
65
65
45.5
36314
40666
76980
MANMONTHS
LABOR
HOURS
58
58
60.0
9909
3.83
58
58
33.0
5598
59
59
121.5
5o
59
66
66
1.5
45313
7814
31C
4. 647
81
1-152
25
42
LABOR
BURDEN
67
TOOL/S
TE
MATL
458
-438
-2C
100368
-1083
3791
_.i
NORTH
AMERICAN
SPACE
DIVISION
DATA PREPARED
NASA
CONTRACT
ROCKWELl..
CORP.
APRIL
UNDER
NAS9-12100
TIME
B-70
SUBD
CF
WORK
TOOLING
AND
PHASED
EXPENO.
AIRCRAFT
STUDY
STE
MANMONTHS
LABOR
HOURS
LABOR
RATE
LABOR
DOLLARS
BUROEN
OOLLARS
1.5
214
_. 584
981
842
50014.0
1972
8690306
29763555
1-153
26891190
LABCR
BURDEN
1823
566547_5
+
$
TOOLISTE
MATL
35524
25616633
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CDRP
APR[L
UNDER
NASg-12IO0
TIME
8-70
SURO
OF
WORK
SUBC
Q-I
Q-2
Q-3
Q-4
Q-I
(}-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
G-2
0-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
0-3
Q-4
Q-I
0-2
58
58
58
58
59
59
59
59
60
60
60
60
61
61
61
bl
62
62
62
62
63
63
63
63
64
64
64
64
65
65
65
65
66
66
1972
TOOLING
ANU
TOTAL
MATERIAL
PHASED
EXPEND.
AIRCRAFT
STUOY
STE
OTHEP
COST
MPC
SUB
TOTAL
TOTAL
COST
458
25
64945
64945
-438
-24
43947
43947
42156
42136
1116
712227
801921
195 129
27056
195129
6411
1386LL9
19797
5954923
123308
60762_I
i 6(_356
6919407
1386119
2649331
3253338
236605
2441985
3347266
263_28
583t
6750051
4960522
e48385C
439839
43741
19804451
37LOgl
20175542
8019616
IGC24808
1159702
160627
38649357
695654
39345011
2889461
7804819
479159
48035
15359376
248094
15607470
3760321
6058176
300466
-24940
9564175
1008179
1699210
110294
557934
14C2572
100588
-5776
441443
_17994
111423
698
67C59
192157
67393
8590
176C7
117975
35764
2110
-1083
-193
704
76408
786
TOTe
5714
3791
625
i-_54
142832
9707007
4103612
68402
4172014
5122050
85L52
5207202
433339[
92 106
4_25497
1443g93
30724
1474717
14727
566691
551964
2040
171
78448
5885
NORTHAMERICAN
SPACE
DATA
NASA
DIVISION
PREPARED
CONTRACT
RCCKWELL
CORP.
UNDER
NASg-12IO0
TIME
B-70
SUBD
CF
WORK
SUBC
TOOLING
AND
TOTAL
MATERIAL
3_524
27567841
1972
APRIL
5318_,74
PHASED
AIRCRAFT
EXPEhD.
STUDY
SIE
MPC
2185
333b112
1-155
OTHER
COST
1615
275_21
SUB
TOTAL
41147
113_50752
&
123g
20418q6
TOTAL
COST
42386
115492648
i-,,,
<
w
,,,p
<
<
I
L
I
_
,,
_o
1,
,-4
,-4
SD72-SH-O003
I-]_5(D
(S_OITIIM)
S_FIO(I
II
L
i_ ,,,
I
0
0,1
I
_
,-4
0
,-4
SD72-SH-O003
_-_57
(sHom_m)
s_-noa
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
APR| L
CORP.
UNDER
NASq-[2[O0
TIME
e-70
SUBD
CF
WORK
58
58
58
58
5'9
59
59
59
6O
6O
60
6O
61
61
61
61
62
62
62
62
63
63
63
63
64
64
64
64
65
65
65
65
EXPEND,
STUDY
DESIGN/ENGINEERING
TESTIQC
ON-SITE
q-I
Q-2
Q-3
Q-4
q-I
q-2
q-3
q-4
Q-[
Q-2
Q-3
Q-4
q-!
q-2
q-3
Q-4
Q-I
Q-2
q-3
Q-4
q-[
Q-2
q-3
Q-4
Q-I
{]-2
q-3
q-4
Q-I
Q-2
q-3
Q-4
PHASED
AIRCRAFT
LABOR
LABOR
DOLLARS
BURDEN
DCLLARS
MANMONTHS
LABOR
HOURS
LABOR
BATE
48.0
8007
4.442
]557C
190.5
32064
4.157
133284
125443
25R727
286.0
48836
4.175
203866
167509
371375
213.0
37359
4.110
153546
134425
287971
456.0
78933
4.496
35_871
276037
630908
925163
1934661
364_0
LABOR
BURDEN
72000
1480.5
248799
4.057
1009498
1884.0
321571
3.735
1201110
1028847
2?29957
1570.C
284691
4.309
1226625
12923_2
2518957
2C43.5
348748
4.262
1486241
1504085
2990326
1782.0
29g414
4.325
1326C71
2621068
610.0
IC4120
4, 7B9
498661
58018!
107_842
476.5
7968B
4.6q5
374175
401509
775684
344.5
58844
4.776
281035
356698
637533
179.5
31619
4.358
137803
187259
325062
240,0
4165q
2.292
95479
109208
204(=81'
I15.5
19359
3.025
58554
70624
z]58
1294991
129178
+
$
1972
NORTH AMERICAN
SPACE
DIVISION
DATA
PREPAREi_
NASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NAS9-12100
TIME
B-T0
SUBD
CF
WORK
Q-1
Q-2
Q-3
66
66
66
TOTAL
7.5
[TE
LABOR
LABOR
HCIUR S
1267
20
11925.0
PHASED
EXPENO.
AIRCRAFT
STUDY
OESIGN/ENGINEERING
TEST/QC
ON-S
MANMONIHS
1Q72
LABOR
RATE
3.161
LABOR
OCLLARS
BURDEN
DOLLARS
3980
5409
3.550
2044998
71
i 854q366
1-159
70
8527100
+
$
LABOR
BURDEN
9389
I41
I 7076466
NORTH
AMERICAN
SPACE
OIV[SION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
APRIL
CORP.
UNDER
NASg-12100
TIME
B-70
SUBO
(_F WORK
PHASED
AIRCRAFT
EXPEND.
STUCY
PRODUCTION
TESTIQC
ON-SITE
MANMONTHS
197Z
LABOR
HOURS
LABOR
LABOR
RATE
t-16o
LABOR
DOLLARS
BURDEN
DOLL aKS
LABDR
BURDEN
+
$
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APRI L
UNDER
NAS9-|2100
TIME
B-70
SUBD
CF
WORK
SHOP
SUPPORT
TESTIQC
ON-SITE
MANMON IHS
Q-I
Q-2
Q-3
Q-4
q-I
Q-2
q-3
Q-4
Q-[
Q-2
q-3
q-4
Q-I
Q-2
Q-3
q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
LABOR
LABOR
HOURS
58
58
58
58
21
397.0
PHASED
EXPEND.
AIRCRAFT
STUCY
66656
LABOR
RATE
LABOR
OCLLARS
BURDEN
DOLLARS
52
2.476
2.957
197080
LABOR
BURDEN
73
*
$
226393
125
423473
59
59
2587,0
441466
2.959
1306251
1575015
2881266
59
59
2638.5
464428
2.921
1356656
1817377
3L74033
60
60
3722.0
64508l
2.962
1911002
2347642
4258644
60
DO
6371.5
1070362
3.036
3249243
4101487
7350730
61
61
1X591,0
1978151
3.063
6060056
7407508
61
61
5618,0
1018680
3,043
3099410
4561687
7661097
62
62
3604.0
615077
1774784
2206170
3980954
62
62
63
63
1973.5
331530
3.089
1024035
1"_89456
2413491
784.0
133707
3.196
427292
571231
998523
63
63
771.5
129709
3.443
446626
9[7209
64
64
541.0
92301
2.879
265716
409934
64
64
131.5
23199
1.460
33882
768_7
110719
65
65
-55.5
-9613
2.071
19919
39506
59425
32970
56757
89727
65
65
1_,5
3234
2.885
10.
195
Z-161
13467564
1363835
675652
1972
NORTH
AMER|CAN
ROCKWELL
SPACE
D[VI' S[ON
0ATA
PREPAREO
UNDER
NASA
CONTRJCT
NASg-12].O0
CORP.
APRKL
TIME
B-70
SUB{)
GF
WORK
Q-1
Q-2
Q-3
6b
66
66
TOTAL
-3.0
LABOR
LABOR
HOUR S
-4q5
-2
40691,5
PHASED
EXPEND,
AIRCRAFT
STUDY
SHOP
SUPPORT
TEST/QC
ON-SITE
MANM(]N T H S
]-972
LABOR
RATE
IB8
LABOR
DOLLARS
-93
2,500
1-16s
1184
-5
2120_B78
1003492
BURDEN
DOLLARS
LABOR
BURDEN
I09 1
57
27705523
52
48910401
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPAREC
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NASg-LZ[O0
TIME
8-70
SUBD
CF
WORK
O-I
Q-2
Q-3
O-_
Q-1
0-2
O-3
63
63
63
63
64
64
64
Q-I
65
Q-2
65
Q-3
65
(_-4 65
Q-I
66
TOTAL
LABOR
LABOR
HOURS
-51
160.0
26947
LABOR
RATE
3.
353
3.973
8.5
145 1
3.
B.5
16_(_
3.0
I. 5
747
LABOR
DOLLARS
-17
BUR CEN
DOLLARS
1
-20
2465
107071
LABOR
BURDEN
+
$
- 19 1
109536
543 7
3399
8836
3. 738
5617
3_I0
8827
548
3. 880
2126
219
3.881
85(_
3.813
61
16
181.5
PHASED
EXPEND.
AIRCRAFT
STUDY
PLANNING
TEST/tiC
ON-SITE
MANMONTHS
1972
30579
120791
1-163
7gl
2g17
316
l I06
23
86
10384
131175
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA CONTRACT
ROCKWELL
CDRP.
APRIL
UNDER
NASq-12100
TIME
8-70
SUBD
CF
WORK
58
58
Q-3
Q-4
G-I
Q-2
58
58
59
59
0-3
Q-4
_-I
Q-2
O-3
0-4
59
59
60
60
60
60
Q-1
O-2
O-3
Q-4
Q-I
0-2
0-3
0-4
O-I
0-2
61
61
61
61
62
62
62
62
63
63
Q-3
Q-4
Q-I
0-2
0-3
Q-4
q-I
Q-2
O-3
Q-4
63
63
64
64
64
64
65
65
65
65
PHASED
EXPEND.
AIRCRAFT
STUCY
TESTIQC
TESTIQC
ON-SITE
Q-I
Q-2
LABOR
MANMONTHS
LABOR
HOURS
LABOR
RATE
LABOR
OGLLARS
g.O
1609
3.515
5655
7812
3.006
23484
23484
46.0
BURCEN
DOLLARS
LABOR
BURDEN
20081
3.105
62342
62342
242.5
42040
2._7C
124851
124851
661.5
111179
3.217
357703
357703
228052
3.248
740621
74062
652.0
118187
3.14C
37114(;
37114q
194.5
33156
3.22g
107058
107058
116.5
19540
3.091
6038_
60389
43.5
7461
3.418
2550C
25500
58.0
9824
3.385
3325_
33259
52.5
8988
3.713
33372
33372
15.0
2661
3.504
9325
21.0
3692
3.794
14006
I0.0
1653
3. 806
1-164
6292
+
$
5655
114.0
1336.5
1972
932_
14006
6292
NORTHAMERICAN
SPACE
DATA
NASA
DIVISION
PREPARED
CONTRACT
R(]CKWELL
CORP.
APRI L
UNDER
NASg-12100
TIME
B-70
SUBD
OF
WORK
LABOR
LABOR
HOURS
66
66
66
TOTAL
3572.5
EXPEND,
STUDY
TESTIQC
TESTIQC
ON-SITE
Q-I
0-2
Q-3
PHASED
AIRCRAFT
LABOR
RATE
83
3,g52
12
3.667
616030
LABOR
DOLLARS
LABUR
BURDEN
+
$
328
-40
288
44
46
90
1975378
T-165
8URCEN
DCLLARS
197_31_4
lq72
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
RCCKWELL
CORP.
APR ! L
UNDER
NASg-12100
TIME
B-70
SUBO
CF
WORK
MANMONTHS
q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
q-I
Q-2
Q-3
Q-4
q-I
Q-2
0-3
Q-4
q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-[
q-2
Q-3
Q-4
Q-I
Q-2
58
58
58
58
59
59
59
59
60
60
60
60
61
61
61
61
62
62
62
62
63
63
63
63
64
64
64
64
65
65
65
65
66
66
1972
PHASED
EXPEhD.
AIRCRAFT
STUCY
TEST/(_C
LABOR
HOURS
LABOR
RATE
LABOR
DOLLARS
BURCEN
DOLLARS
36503
LABOR
BURDEN
*
$
ENCR
MATL
48.0
8028
4.437
35622
506.5
I00329
3.349
336019
351836
687855
123642
2q19.0
498114
3,,079
1533601
1742524
3276125
373922
2965.5
521868
3.013
1572544
1951802
3524346
283170
4420.5
766054
3. 121
2390724
2623679
5014403
1460422
1430340
3.228
4616444
5026650
q643094
I048687
2527774
3.166
800L787
8436355
16438142
2759769
1421558
3.304
4697184
5854C19
10551203
3153778
8513.5
14811.5
7840.0
72125
32
5842,,0
99698l
3. 378
3368083
3710255
7078338
1146094
3872.0
650484
3.658
2379421
2715527
5094948
1530962
1437.5
245237
3.879
951282
1151392
2102674
1478450
1464.0
246168
3.904
961131
1321
2282314
2666709
161584
3.624
585562
769831
1355393
511562
334.5
58928
3.164
186427
267506
453933
434069
208.5
36286
3.625
13[530
14Q505
281035
575873
146.5
24465
4.033
98666
127697
226363
213405
946.5
4.5
871
4.
gOg
!-166
4276
183
6 576
10852
36894
NORTH AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRJCT
ROCKWELL
CORP.
APRIL
UNDER
NASg-X2100
TIME
8-70
SUBD
OF
WORK
MANMONTHS
Q-3
Q-4
Q-I
Q-2
Q-3
LABOR
HOURS
3O
563705
PHASED
AIRCRAFT
EXPEND,
STUDY
TFSTIC)C
66
66
67
67
67
TOTAL
I972
LABOR
RATE
3. 667
q6g5Ogg
LABOR
DCLLARS
110
31850413
Z-:L67
BURDEN
OOLLaRS
173
36243013
+
S
LABOR
BURDEN
283
680q3426
ENGR
MATL
2622
1782"_682
NORTH
AMERICAN
SPACE
DIVISION
DATA PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NAS9-12100
TIME
B-70
SUBD
OF
WORK
SUBC
Q-I
Q-2
Q-3
Q-4
Q-L
Q-2
Q-3
Q-4
Q-1
Q-2
Q-3
0-4
Q-1
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
0-1
Q-2
Q-3
Q-4
Q-[
Q-2
q-3
Q-4
Q-1
Q-2
58
58
58
58
59
59
59
59
60
60
60
60
61
61
61
61
62
62
62
62
63
63
63
63
64
64
64
64
65
65
65
65
66
66
1972
PHASEO
AIRCRAFT
EXPEND.
STUDY
TEST/QC
TOTAL
MATERIAL
MPC
32
WINO
TUNNEL
OTHER
CCST
170368
12q3
TOTAL
01C
$
SUB
[OTAL
171661
243820
123642
6762
583528
-9669
573859
1392118
373g22
31600
610704
76663
687367
4369014
292473
24231
695957
58795
754752
4595802
166202
162662_
201949
338115
77173
415288
7258266
162C50
1210737
147532
603C89
62100
465189
11466552
2204_8
298026?
239396
296523
12891
309414
1996T219
63814
3217592
268202
237221
58866
296C87
16333086
32400
1178494
91437
20755_
74612
282171
863044G
26054
1557016
122219
177914
359722
537636
731181g
73413
1551863
148765
148254
169674
317928
4121230
38968
2705677
264036
118797
311123
42q920
5681945
103488
615050
68742
-28601
-28400
2010785
434069
15792C
-23441
-23442
1022480
575873
172256
9303
213405
36896
1
-1
1
38076
7651
i-]_68
1174C
6129
bl3O
1035294
2453
2453
480297
11916
67313
176
NORTH
AMERICAN
SPACE
OIVISEON
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNCFR
NASq-]2|O0
TIME
B-T0
SUBO
CF
WORK
SUBC
Q-3
Q-_
Q-1
Q-2
0-]
TOTAL
8q61_0
PHASED
EXPENOo
AIRCRAFT
STUCY
TEST/QC
TOTAL
MATERIAL
26242
66
66
b7
67
67
1972
1_719872
MPC
1612
1992386
1-169
WINO
TUNNEL
(_THER
CCST
4328
4328
40040q8
TOTAL
O/C
$
12 I0 159
52l_257
SUB
TOTAL
32#b5
q40199_I
NORTH
AMERICAN
SPACE
DIVISION
OATA PREPARED
NASA
CONTRACT
RI_CKHELL
APRIL
CORP.
UNDER
NAS9-12100
TIME
B-70
SUBD
GF
WORK
G & A
0-1
Q-2
Q-3
Q-1
Q-2
Q-3
0-1
Q-2
Q-3
Q-4
Q-I
0-2
Q-3
Q-4
Q-I
Q-2
Q-3
G-4
Q-I
G-2
G-3
Q-4
0-1
Q-2
Q-3
0-4
Q-I
Q-2
Q-3
Q-4
G-I
Q-2
58
58
58
58
5q
5q
5q
59
60
60
60
60
61
61
61
61
62
62
62
62
63
63
63
63
64
64
64
64
65
65
65
65
66
66
PHASEO
EXPEND.
AIRCRAFT
STUCY
TEST/QC
IOWA
TOTAL
COST
243820
[392118
12067
4381081
4605
46O040"/
143472
6935
7408671
224344
37147
l 1728043
405343
1860333
222328g5
302929
1989563
L6625576
14_747
8775187
122637
?434456
68g06
41gOl_6
gSO01
5776946
427fl5
2053570
21755
1044235
27621
I0_2gl5
12813
493LIG
2026
69339
T_-__70
1972
NORTH
AMERICAN
SPACE
DIVISION
DATA PREPARED
NASA
CONTRACT
RC_CKWELL
CCIRP.
APRIL
UNOER
NAS9-121OO
TIME
B-70
SUBD
CF
WORK
G E. A
Q-3
Q-6
Q-I
Q-2
Q-3
6b
66
67
67
67
TOTAL
TEST/QC
IDWA
qTB
1615357
PHASEO
EXPEND.
AIRCRAFT
STUOY
TOTAL
CGST
33663
3910650
99545968
T-171-
1q72
!
u
zO
O_
L
!
|
Q
Lu
-r
.g
!
i
.g
me
!
0
I,,
co
1-172
(SIOITIIM)
_ _'lqO(I
SD72-SH-0003
ii'
u_
1-173
u_
(SI[0ITIIM)
_FFIOG
SD72-SH.-O003
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA CONTRACT
ROCKWELL
CORP.
aPRIL
UNDER
NAsg-12|OO
TIME
B-70
SU60
Q-I
q-2
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
60
60
60
60
61
61
61
6l
b2
Q-2
62
Q-3
Q-4
Q-I
q-2
(_-3
Q-4
Q-I
0-2
0-3
Q-4
Q-I
q-2
Q-3
62
62
63
63
63
63
64
64
64
64
65
65
65
g-4
65
Q-I
Q-2
Q-3
6.6
66
66
TOTAL
CF
WORK
OTHER
COST
GT_ER
COST
SUB
TOTAL
18116
18116
I12353
664C;8
318G24
PHASED
EXPEI_O.
AIRCRAFT
STUDY
345
TOTAL
COST
18461
I12353
2141
1L4494
66498
1236
67734
318024
5q10
323q34
35@64
35864
602
3b_66
Ilq76
llg7b
201
12177
5_97
5697
g5
15g8e81
1598681
5792
26730
16254li
2 568"/C
25687C
5466
26233_
8_9076
869076
18492
887568
[ 634Cj2
163492
4362
167854
1730851
1730851
4617g
1777C3C
-168921
- 168921
-5087
-174008
100375
100375
5118952
5118952
I03398
I oq 69 5
5228647
302
I-i?4
1072
g_'I_
__
W-_IOObI,__I_O
o.
Ox
Dirioo_
g_IVc[S
000000000
{O
.._
,-I
E
D_Ir.I._f_I
_k'V_IHIV _OI'_W [
t'_
O
,IkIOddrlB
'IV'3
II_L_.",I.I.
Plb}IDO_I,:I
C_
_{"I_IIi_A
HIV
,--4
i
!
8
l",-
-.1
.. ......
I,,
(guoI_m)
_,rr_o_
ii
i iii ii
I
.
,-4
SD72-_H-O003
1-175
NORTH
SPACE
OATA
N_SA
AMERICAN
DIVISION
PREPARED
CONTRACT
KCKWELL
CORP.
APRIL
1977
UNOER
NAS-I210C
B-70
COST
BREAKDOWNS
AII_CRAFT
SIUOY
_UMNAPY
4-SYST
EP
1
I_CURS
001 t_ARS
OI:!SIGN/ENG
IN2ER
LABGR
AT _
t:NGS,
mJRDEN
_' [-'qUCT
18313241
90_15322
91_r_5778
I NG
z,,qOS
AT
$
AGNIN
TJTAL
C,'}ST
228885
108996g_
_72223_
16032843
I(!N
7282C51
221"_0c'4
$
;_,.
I_6
ST.F
$
3.41_
$
$
3.444
_. _'41
AT $
3.772
4- SY ST t:,_;
2
HQUKS
DOLLAPS
2ZN&TZ
')
_6856
340_551
2eE546[
34_1 ] C)l
IQ113402
1739':6b
37075_2'_
4-SYSTEF
4- SY$tF_
3
HOURS
00LLGPS
4
H3t!RS
DI_LL A P '.-:
24(" 192
2279153
122629
c,
1276576
12_21(t
15219(;35
;_9, _,14<j
11{:
,'
_(_
3,;15o
121q_21
40 _4-{
23445G
101
77
4 J6
15,73
5452
532495
29"_
374099
1745335
4051234
'_ 1027
331fl1
32559d1
1577,'71
14491B
5_ 7S
MATt
1944q213_
1420_425
400439S
lglB7326
122190126
450066|
65,_ 0_397 4_
149724524
276590
,_5P94('
12E'227Q
3237099
Ie15951
102_.4 R9
e95713551
1-176
Ib13_3_,!34
_s4,_E _42
39253q5C
OF Poo
UAUrr'V'
NE}PTH
AMERICA_
SP_LE
DIVISICN
D&TA
PREPARFC
N_S_
CONTRACT
RIICKWELL
CORP,
APRIL
1_72
UNDER
NAS9-12100
B-7O
COST
8REAKDCW_S
AIRCRAFT
STUDY
SUMMAP, Y
4-SYSTFM
4-SYSTFM
5
H_URS
OCI. LARS
Df-S I GKIENG
I NEE_RI NG
LA L_CR
AT
$
4.932
,--_G_ _?URDEN
.aT $
P.eOL,UCT ION
LA v,CR
hi
SHt)P SUPP,O_T
L&_CR
AT
TO[_LI_G
AN[;
L#t_,-V, AT
Pl_ _t_ N ING
L,k3 CP
AT
T[$T/(.C
L_,_CR
aT
MrG
BURF)EN
I'564512
7334702
8076691
4.6_D
L_4559
7e67oa
293765
13_2kL;
3.224
_
-:.14_
SI_
*
3.413
5
3.444
_.641
AT ._
3.772
T,)IAL
HOURS
DCLLARS
4782'_39
16gla4d
24736
32
HOUKS
OOL L/kR3
234_7
93_5
l 1P 14
7856
2U_)51
19767
70567
_440'_3_
24444
75O67
49983
Io_30 _
335C_52
22_122
157844_
1296!)
535781?
Z75_26
42432c
ADMIN
22603550
COST
I-i77
HI!)UIIS
DOLLAR:,
856C0
29413',
386569
74C96<;4
25Z8357C
572696
209682_
301419
1031553
2521220_
qJl
262_
qOq_43
8o23t'.:>
247308,q
61915
176305_8
37967g
1801.3227
2190524
26 Ii} 3,*
348211
221797,30
LM
S
735465
230"_Bq6
5_6617
Sb_-TETAL
_
4-SYSI
7
215320
77_818
E_(;F_ MATER
I_l_
_FG
PAT _DIAL
TJP.L II_GISTE
t_ATL
SdBCI2_TRACT
M:_C
WIND
TUNNEL
uTVibi_
COST
S\-N
4-SYSTEM
6
81399231
2367101
44q.
2411557
56
147102
82870Z62
NDRTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP,
APRIL
UNDFR
NASS-IZIOP
B-?O
COST
_REAKL)CWNS
AIRCRAFT
STUDY
SUMMARY
4-SYST
Ei4
_
HGURS
OCLLARS
nES I GN/ENG
I NEERI NG
LABCR
AT
$
4 _-}G2
ERGI_
BURDEN
AT $
PRUDUCT
IGN
L 6 ;$C R
lIT
SHC, P SUPPCRT
LASCR
AT
T_)ULING
AND
LAgCq
._T
PLAM_
ING
LAECP
_,T
TFSTICC
L_,G CR
AT
MFG B bl_O Ei_l
I_NGP MATFPIAL
:4FC. NATEPI_L
ldULIKGISIE
SUBCONTPAC
T
MPC
WINL}
TUNNEL
qTHL9
COST
4. _ '-;
0
677170
26089340
$26_, ! 9_
12v_3_,75q4
3 .170 :_L)a 122350661
3.777
84772
1697C-'5.1
281412.
5C9020.$,_
738;)
7934231
22 _2l
24_64749
1_" )267
77251S2
351143
264 l:_i _i
960
1602992
3 )75
552C,32
_'
1__562
35366C3
43557
1287657g
67g7_)8
14q544912
_,. "7.
74
$
S. 14e,
STF
_
._.41
$
3.A_4
5._41
AT
I4255a;
65232
2S914_
MATL
5c_54"
74'_5158
15742651
SUG-TCTAL
GEK
&
IOWA
ADMIN
TtITAL
COST
TC T AL
HOURS
OCLLARS
298172
1995(aB
49
452276C4
256166
___
316Dti22oi
2250 32(55
4,),439d
29173555
(991621741
16R1'_22(>
279032
I0
16C408231C36344177
-_78
1972
0
I
L
_
(_oPTI_)
_I_l'Iog
-.
_
I-]-79
o
sD72-SH-0003
ROCKWELL
_I[IRTH AMERICAN
SPACE
DIVISION
OATA
PREPARED
_ASA
CONTRACT
CORP.
APRIL
1972
UNDER
NAS9-12100
TI ME
8-7O
PHASED
AIkCRAFT
EXPEND.
STUDY
4- S YSTEM
I
AIR
VEIl ICLE
LABOR
RATE
M_NMONTHS
LABOR
HOURS
833.5
14087h
4.498
633697
756519
4.301
3254152
28581e
138139l
3.908
5400427
4699639
10l
11588.5
2039976
3.912
79804_, 8
7237688
15218170
9702203
8425148
18127401
1460731
_J-t
J-2
5_
53
9-3
5,q
4504.
)-I
2-2
qq
5o
8094.5
LABER
DGLLARS
BUROfN
OOL L ARS
62 IC)20
5
LABOR
+
8ORD EN
EN g,(
MATL
1255611
0112417
0 0066
2_347
12T533
378864
_-3
_,9
0-4
59
_-I
,)-2
-_
D-4
63
ao
oO
_,0
13044.5
2365214
4.102
16257.5
3C_,,6_=46
3. 943
1209 1192
10519910
226 [ 0202
1068555
5-I
(,[
31444.
53_7312
_.77T
20272040
1773850_
38C I 1 [44
2757';54
;_-3
_-4
61
61
27613.0
5018:o_,_
3.707
18603600
19g83809
38b87409
3170
0-1
,_-2
62
62
30989.5
5289113
3.64_
19275406
20424239
396996#+5
i122L59
0-3
Q-4
_-1
,)-2
h_
6P
o_
6_
27315.C
45_293
3.768
17378_59
19335663
36714021
150")279
22305.5
3_07c7_
4.0R4
15547700
17171454
32719154
1434773
(,_-3
Q-4
63
_3
25203.5
4233t55
_.722
15758865
19110234
34869099
2667529
J-I
_-2
9-3
FO-4
0-1
0-2
44
64
4_
64
h5
65
24_54.
4/56438
4.011
1692104(2
22251963
3<)17 _003
5C72
232 (,653
4.201
9786975
12369579
22156554
495889
6514.C
ll?_8335
4.098
4624293
5697795
10322088
616224
_-3
0-4
(,5
65
1746.5
293896
5.877
1727265
1612773
3340938
226751
._-I
66
L3238.0
37.5
6965
5.168
I-i8o
35995
52276
88271
307531
_30
54848
90
WORTH
SPACE
DATA
NASA
AMERICAN
DIVISI(JN
PREPARED
CNNTRACT
ROCKWELL
CORP.
APRIL
UNDER
NAS9-12100
TI I_E PHASED
B-70
A[RCRAET
4- SYSTEM
AIR
VEHICLE
) - 2
_-3
_o
_-4
{,6
0-I
07
J-2
67
)-3
o7
TO TAL
EXPEND,
STUDY
MA N,41iNTH S
L ABF)k
HOUR S
-1.5
-276
267742.5
1972
LAB CR
kATE
3.28.3
4597C452
LABCR
DOLLARS
BURDEN
DOLLARS
-986
-829
178993390
1-181
190109180
ENGR
MATL
- 1735
369102570
29951
l 7(:}39068
NORTH
SPACE
DATA
'_ASA
AMERICAN
DIVISION
PREPARED
CLINTRACI
ROCKWELL
CORP.
APRIL
1972
UNDER
NAS9-12100
PHASED
EXPEND.
AIRCRAFT
STUDY
4-SYSTEM
AIR
1
VEHICLE
F'FC,
MATL
9-I
5_
Q-3
3-4
a-1
CJ-?
0-3
9-4
0-1
SH
5_
5:J
5q
5')
_9
60
_-2
,J- 3
;J-4
_-L
_-2
:)-3
_-4
Q-L
9-2
0-3
9-4
Q-L
_-2
U-3
Q-4
_-I
:_-2
Q-3
9-4
_Q-I
'J-2
9-3
9-4
J-I
60
60
60
oL
o[
hi
61
t,2
,%?
6,2
62
63
03
,%3
_3
64
64
64
b4
65
6_
65
6,5
66
SUB{]
MFC
WIND
TUNNEL
OTHER
CUST
127
17036_
10939
8031
583528
20 7890
125be,6
6 I0704
74 3098
T{]TAL
MATERIAL
2347
l 1907L
3_31218
246604
391@0R2
TOTAL
O/C
__07
181
791418
1353802
22077595
22385126
629551
695957
1268555
Iee4512
2235e322
23_17453
L518_.61
338115
2169302
25G7417
15_09
1 7805774
1888')938
1199030
403089
1617664
2020753
L 0(11899
22966514
20726367
296523
2384Z00
2680723
4707321
29259957
._713J008
1503312
237221
1866953
21041
4903221
2 5qeSCJlq
3L994299
1300120
207559
2_22574
2530
5L19756
21324489
2?954024
1200133
177914
23OO733
2478647
5_00375
14438909
21674057
1325907
148254
172
1869607
118797
-!.42029
zOO
975245
6559067
_:R36c3_1
16063557
1128736
57C6444
7491653
13705377
1691259
2336'_
6,%'
508486
440,_ 81
5227
2_;0099
68654
3082948
1193364
h67632
o0115
I-L82
1112254
1
-I
358819
119
113
12468
1174O
1443
74
133
- 232 32
951347
951348
8Y 1332
871331
625325
625326
250132
250132
17808
29608
'W!)RTH A_ERICAN
ROCKkELL
SPAC_
O IVI sI.qN
.L)ATA PREPARED
UNDER
_ASA
CONTR'-C]
NASC)-I210"_
APR IL
CORP.
PHASED
AIRCRAFT
1972
EXPEND.
STUDY
z.-SYSTFM
1
AIR
VEHILLE
MFG
!_ATL
9-2
SGBC
IETAL
R[ At
MFC
WIND
TLJNNFL
-72
-?
4_28
OTHFR
COST
CC,
- 30(] 2 _
")-4
n-I
9-2
d-3
mATE
4328
h6
o7
67
67
l_)lat
37015,23
]_92135
2&_bfi6_26
14208425
1-183
43C4098
19 Ib'1326
2319L424
_ORTH AMERICANROCgWELLCORP.
SPACEDIVISION
OATA PREPAPEOUNDE_
"_ASA
CONTRACT
APRIL
NAS9-12IO0
PHASED
EX PFNO.
AI PCRAFT
STUCY
4-SYSTEM
AIR
I
VEHICLF
S UB
IOIAL
58
5F_
58
5_
59
b9
59
b9
O0
60
b (',
6O
61
401973E5
F, A
TOTAL
COST
IDeA
14393Sd
1439398
715867C
7158470
154_.961_,
_848
40206213
I_33S
46799819
447lg92_
_12C4_
9629@
4572
683g!_+TV
136_+5'37
6L
793285G3
15A651
62
62
62
_2
63
b3
63
63
6.4
64
64
75624197
66
___
L5512P, 30
61555_
65
6S
65
45cJ7C9
Z32_4
B865
437269L
74132727
5_t3L27
86R08199
13C5193
2924005
79753395
083_o825
|15qC73
2010066
72L1
575_88|5
1011.12
244459
61096466
52038160
91 _757
306HIQg
.$60231
<_
5966
55520987
L2A_IL4
480387_
61592976
27223087
612412
L56L6L7
29397116
124qc_bs7
3_ L49__
_.727
11 ,3740
b74q
."+3 76 c; I S
L904h2
12845817
450 3404
196197
571+5
Z-Z84
16
1972
WORTH
SPACE
DATA
,_ASA
AMERICAN
ROCKmELL
D [VI F;[[IN
PREPAREi)
UNDER
CONTRACT
NASq-I2100
CORP.
APRIL
TIME
B-T0
4-SYSIEM
AIR
TFITAL
EXPEND.
STUDY
I
VEHICtE
S UB
TO TAL
Q-3
66
0-4. 66
C_-1 67
T_-? 67
PHASED
AIRCRAFT
2514
656C0q2_5
& A
IO_A
2589
75
L L4OILO6
T tiT AL
COST
27903210
bO53L3561
"T-].85
1972
:E
at
;!
1
(_IOITIIM)
SD72-SH-0003
_I%_'IOKI
_-_86
NORTH
SPACt
DATA
NASA
AMERICAN
D [VISION
PREPARED
CONTRACT
ROCKWELL
CORP.
APRIL
UNDE_
NASq-L21OO
PHASED
AIRCRAFT
4-SYSTEM
OKPGRA_
2
IECHNICAL
MAN_O_THS
Q-2
0-}
D-2
D-3
D-4
2-2
,_'-3
_-4
Q-L
Q-3
_-4
J-I
_-2
_-3
_,-4
Q-B
_-2
_-3
2-L
,)-3
D-4
_)-I
58
qq
_
5_
5_
50
59
5_
60
60
60
O0
61
61
_I
61
02
62
52
_2
_3
_3
63
63
o4
64
64
64
65
65
65
_55
66
1Q72
EXPEND.
SIUDY
SUPPORT
LA_ER
RATE
4oi,0
77220
4.506
347920
_51010
IC53.0
L7691_
4.275
756308
693720
1450028
1354.5
2316h_
4.2_3
980633
@16158
1796791
2073.0
36530
4.010
[463_)95
95164l
2415336
1795.5
3] 12_8
4.083
1271181
77[979
20431o0
L35799
,. 5 _:i
6229_2
6753]'0
1.298352
-2[
32 550_
4._71
1455"+75
1059510
2514985
20L15
947.0
[717_1
4.8c_0
839995
813250
1653245
[194I
72C.0
123C49
5.163
635293
546363
1182150
20703
llZ,.O
11 _95'0
5.061
607111
583492
I[90603
-1084
785.5
134121
5.3_5
722262
709300
I_3
8_8.0
144220
5.701
822192
767960
1590152
726.C
12 _769
5._,11
69z,43 I
720093
1414524
-8
3_0.0
633_8
5. qlH
374917
404470
7793_7
642
175.5
36434
6.266
1907U$
200557
397260
L5139
6.113
92545
99030
1915_5
5.778
40253
51953
92206
808.S
lqOF_. 0
90.0
40.
6966
L Ai3[_R
DCLLARS
Z-_87
F_JRD EN
DOI LARS
LA_DR
BURDEN
t
$
EN GR
_4AIL
L All,3_
HOURS
6q 8930
[622
458
2166
513
2191
-2462
6109
-2R1
B8
_IORI'H
AMERICAN
SPACE
DIVISION
ROCKWELL
DATA
PREPARFD
UNDER
NAS_
CONTRACT
NASO--12100
6- SYSTEM
PROGRAM
2
TECHNICAL
MAN-
HOURS
26.5
TUT_L
1489(..
_41.2
5
TI _E
PHASED
B-7C
AIRCRAFI
1972
EXPEND.
STUDY
SUPPORT
L hFIOR
MONTHS
APRIL
CORP.
256C60_
LABCR
RATE
LABCR
DOLLARS
6.057
BURDEN
DOLLARS
EN G_
MATL
26723
11944619
1-188
61070
NDRTH
SPACE
DATA
"_ASA
AMERICAN
ROCKWELL
D [VI SI_3N
PREPAREO
UNDER
CONTRACT
NAS9-12100
CORP.
APRIL
PHASED
AIRCRAFT
4- SYSTEM
PEC'GRAN
2
TFCHNICAL
MFG
MA TL
_-I
L)-2
5_
58
bP
58
59
5q
9- 4
J-I
_-?
:J-3
_-4
59
)-I
60
3-2
69
,]-4 ,%q
1972
EX PENI].
STUDY
SUPPORT
TOCL/STF
MA TL
SUBC
TOT AL
_ATER! AL
MPC
45_
25
8071474
8073640
7[699
18423796
18424.309
488568
27488794
27490985
751086
19532086
19529624
I158583
_q16_18
99[8897
9655195
OTHER
COST
SUB
TJIAL
[322
700735
i 749B
G612865
124559
20U34227
*_5035
30722442
76573
228C7C_40
588487
5 3870
L 1859_05
968 OOC)C
27_d15
87526
125__1416
967644,4
_089
2784u0
46716
I I_o7_01
4338564
435_267
139518
19136
57C00(7
4338555
433
i. 37677
69301
5735052
6875/98
6881907
292624
5t)143
866229O
1025743
1025462
13454
2662107
28"4759
2844751
2 1542
4671447
1826
782089
2468
399842
1498
1_3073
]-?
Ol
3- 4
3-I
._-2
J-3
_-4
_)-I
_-2
42
62
62
02
_3
c_3
63
6_3
_-4
64
_-2
64
o4
_-3
_-4
64
O- i 65
_-2_ 65
J-3
3-4
_5
6@
_-I
LSO
7471
__3029
300630
642
f18
234
26
71
1-189
92277
N_RTH
AMERICAN
SPACE
DIV]SION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NASg-I2LO0
TI MF
B-70
4- SYSTEM
PROGRAM
2
TECHNICAL
MFG
MA TL
!972
PHASED
EXPEND,
AIRCRAFT
STUDY
SUPPORT
TQOLISTE
MA T L
SUBC
TOTAL
MATER| AL
MPC
OTHER
COST
SUB
K] T AL
59_32
TF)TAL
_5575
12Zl90126
12225t,
z-igo
7/L
4609461
149724524
_JRTH AMERICANROCK_ELLCO_,P,
SPACEDIVISION
r)&TA
_IASA
PR_PAI_ED
CONTraCT
APR[L
UNDER
NASg--IZIO0
TI lYE PHASED
B-70
AIRCRAFT
4- SYSTEM
PROGRAM
2
"TECHNICAL
SUPPORT
TCJTA L
C{]ST
_-I
58
70C735
_-3
_-4
Q-I
9-2
,'_-3
D-4
J-I
9- 2
,)-3
58
58_
5q
s9
59
5g
oO
60
60
q6]. 2865
9-[
bl
9-2
61
_-3
_I
_-4
61
_-1
6?
_-2
o2
]-3
62
9-4
02
J-I
_3
_-2
63
"_-3
63
_-4
63
,_-1
6_
]-2
_4
0-3
64
_0-4 64
_j-I 65
_)-2
_5
_-3
b5
_-4
65
_-I
5_
20%54227
3072 2442
2324-2.500
4345_9
22q9<_
12085567
233430
12 ]'_/4 t.45
21o_2(]
11884421
956
"(6
o62o2
144832
57'}5753
5831314
880712g
4451C
2706617
qq39q
4-t'7 C846
I_642
79 _7"_I
lnb67
41 0599
5152
2779
19827b
05056
z-ig]_
EXPEND,
STUDY
19 72
'_DRTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP,
UNDER
NASq-12100
TI _F
B-IO
4-SYSTEM
PROGRAM
2
TECHNICAL
&
ITgO
TCITAL
I6ZB4_O
APRIL
PHASED
EXPEND.
A[i_CI_AFT STUDY
SUPPORT
TCTAL
CGSI
61222
151:15 BC04
]--192
1072
SD72-SH-O003
(_oz"_m) _,_o=
,N3RTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NAS9-I2[O0
TI ME
B-70
4-SYSTEM
MAJOR
3
AIRFRAME
MANMCNTH S
_-I
.,)-?
9-3
_/-4
Q-I
]-2
_-3
D-4
2-I
5R
58
58
58
59
69
,)0
SQ
oO
._-3
_-4
_-I
j-2
J-3
_-4
_-I
_-2
j-3
_-4
_)-I
_-2
_-3
_-4
J-I
3-2
;0-3
_-4
_-I
_-2
_-3
bJ
50
61
61
61
51
62
b2
o2
62
53
63
63
53
64
6a
64
(',4
65
r_5
65
ICTAt
1972
PHASED
AIRCRAFT
EX PENG.
STUDY
MATING
LABOR
H OUR S
LABGR
RA TE
LABUR
BURO I_N
&
373.5
o3801
4.025
25O853
264990
988.5
166218
3.959
658005
116163
1374228
23066
223C71
3.738
833843
94 142c_
117S272
29683
217712
3.595
782834
97T517
1760351
29433
730.5
12 _b88
3. 976
4957O9
059132
1154841
24572
_40.0
14
3.277
484702
6:)9038
112 3740
23011
1306.
1297.0
/893
52 I_43
878g
2 (9.0
4_190
3.468
167122
218776
385898
10296
177.0
29720
3.526
104790
131337
235827
8292
5092.
1021359
3783918
T- 19 _
4548082
833
200U
156042
_FJRTHAMERICANW,OCK_,C-LL
CORP.
APRIL
SPACE
D l.V[ S[AN
DATA
PREPARED
UNDER
NASA
CONTRACI
NAS9-12IO0
PHASED
EXPEND,
AIRCRAET
STUDY
',-SYSTE_
UAJOI<
3
AIPFRAHE
MATI_;G
TOTAL
COST
5306$?
IJq72o4
I_0495_
17897_4
1170413
I147_l
396194
242LI_
TnTSL
84_0_2
1-195
1972
l-
,!
-m
I-
-i
o
O
l--
ac_
J
i
|
x
D-
n_
. ..4
On.
_'
--
t
|
,_Ww_
_o=_
w_a
|
u
Z__w
I-ww
LC-_
ZO
O_
Un.
-|
IX
I
ul
-t
W
0
0
_c
ck
1
u_
e-I
(gUOZ_'_)
;
0
e,4
_i_'r_0_
u'%
i -i_6
W]R FH AMERICAN
SPACE
DIVISION
DATA
PREPAREC
NASA
CONTRACT
ROCKWELL
CORP
UNDER
NASq-L2100
TI ME
B-70
4- SYSIEM
FLIGHT
_-I
3-3
D-4
J-I
_-2
"_-3
;_- 4
Q-I
;_-?
9-3
3-4
_-I
_-3
_-4
0-I
,_-2
9-3
3-4
_-I
Q-2
;)-3
k)-4
Q-I
,9-2
_-3
D-4
_)-1
Q-3
9-4
0-1
1972
APRIL
PHAS EO
AIRCRAFT
EXPEND.
STUDY
4
TEST
MANMONTHS
LABOR
HOURS
LABOR
RATE
7.5
1359
4, 574
6216
61fl4
1 2400
36.0
6104
4.2?0
26065
23802
49867
39. Q
6549
4.213
27589
2242
59
34.5
60_5
4. 188
25231
21935
47L66
60
60
bO
50
6 I
61
61
6l
62
62
62
62
63
63
63
63
64
64
64
64
65
65
65
65
66
27.0
4788
4.556
2L815
17784
39599
9.0
1479
4. 760
7949
5409
12458
34.5
5837
4.853
28327
19500
47827
7801
4.862
3"/931
35314
7 3245
56
97801
91410
18q211
6l 91
5_
50
58
58
59
59
43.
L AB(_R
DOLLARS
BURDEN
DOLLARS
LABOR
BURD EN
+
$
EN G_
MATL
5 O0 I0
117.0
2C2_2
4,8_4
174.(3
2g216
4.806
140408
[4403fl
284446
48918
217.5
37020
4.911
L81815
L94634
376449
55015
195.0
32665
4.32__
141163
169922
311085
46802
154.5
263/,0
4.641
122253
153855
216108
55071
100877
4.6(:}8
473964
626565
1100329
60861
3334.5
578o12
5.100
2950829
3607756
6559585
192131
3741.0
628395
5.4_8
3411014
3891131
730 2145
322275
4668.0
80qC83
5.469
4424696
5725441
573.
T-]_97
10150137
318035
_I{JRTH AMERICAN
SPACE
DIVISION
F)ATA PREPARED
_ASA
CONTRACT
ROCKkELL
CORP.
1972
APRIL
UNDER
NASg-12100
PHASED
EXPEND,
AIRCRAFT
STUDY
4- SYSTE _
FL[GHT
4
T.cST
Mh Nr._ONlt!S
TL)TAL
t A F_G:,t
H ObRS
3950.5
663563
I 7356.0
2 965'_45
LAB CR
PATh
5.48, ,
LAeCR
OCLLAP_S
BURDEN
UbL L AI_S
4512_3B
192702_g
i-!98
LABOR
BURDEN
8154171
35036238
+
$
472756
1577071
WORTH
SPACE
DATA
_ASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP,
APRIL
UNDER
NASg-12100
TI ME
B-7C
4- SYSTEM
FL IGHT
0-I
D-2
5-3
_-4
_-I
L)-2
_-3
g-4
_- t
:5-3
_-4
_-J
3- ;'
3-3
0-4
Q-[
3-2
PHASE{)
AIRCRAFT
EXPEND.
STUDY
4
TEST
MFG
MATL
D-]
_-2
_-3
1972
TOTAL
MATERIAL
MPC
WIND
TUNNEL
OTHER
COS T
T OT AL
O/C
$
5R
5_
58
5R
5q
5g
5_
5g
_0
6O
50
50
SUB
T3TAL
12400
49867
50010
47166
39599
12458
47827
61
ol
ol
62
62
62
63
_3
63
_,-4 63
64
3-I
64
_-3
64
_4
Q-I
65
3-2
65
_-3
65
Q-4
65
66
Q-i
56
-65
73306
61gi
4R8
34
34
1959Z4
'.8918
3855
15
15
337234
S5915
5507
4 4862
4419
55071
5871
4378
-4g
-40
71
360317
337050
6C816
22125
56366
263C2
21 8433
65333
16742.7
107427
70 L0778
81566
_03821
72039
290613
290413
8068418
-2658
31 5577
65_50
476643
676643
I 1O07807
1-199
5 4366
12376[b
,,_j"
_ORTH
SPACE
F)ATA
NASA
AMERICAN
DIVISIUN
PREPA_Frl
CONTIKACT
ROCKWELL
CORP,
APRIL
UNOER.
NASg--I2LO0
PHAS EO
AIRCRAFT
4- SYSTE _
FLIGHT
EXPEND.
STUDY
4
TEST
MFO
MAIL
TO TA L
1972
TOTAL
_ATEI_IAL
39568
512324
1449"13
17719S44
MFC
31507
276509
l- 200
WI NO
TUNNEL
OTHfR
CQST
21_449
I202278
TOTAL
DIC
$
2 [ 3449
120 2278
SUB
TOTAL
NCJRTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NAS9-12100
TI I_E PHASED
B-70
AIRCRAFT
4- SYSTEM
FL IGHT
4
TEST
& A
TCIAL
C_ST
59
58
12400
S8
58
59
5g
4867
59
5O
60
60
60
60
6[
ol
61
4 71hh
5C010
7 56
4 C354
2 37
12695
847
4 8,tb7#
1358
T4664
62
62
62
62
_288
199212
566C
342894
63
03
63
03
e_4
_,4
64
64
65
65
05
65
66
7320
445191
6024
$66341
7172
344222
26334
1203950
137C47
7197825
215478
8283896
286046
11203853
1-201
EXPEND.
STUDY
1972
NORTHAMERICANROCKWELL
CORP.
SPACEDIVISIUN
OATA
NASA
PREPARED
CONTRACT
APRIL
UNDER
NAS9-12100
PHASED
AIRCRAFT
t,_SYSTE_
FLIGHI
4
TEST
2683A5
IOT_L
1015951
[CTAL
CC;ST
q[lq835
_925305@
1-202
EXPEN().
STUDY
1972
SD72-SH-0003
(__)
__
_-_o_
W[}RTH
AMERICAN
SPACE
DIVISION
PATA
PREPARED
_SA
COrqlRACT
ROCK,wELL
APRIL
CORP.
UNDER
NAS9-12IO0
TI ME PHASED
B-70
AIRCRAFT
4- SYSTEM
GROUND
5
SUPPORT
MANMONTHS
,9-I
@-2
9-3
_-4
5-I
_-3
_-4
_-2
Q-4
9-I
3-2
9-3
_-I
3-3
_-4
Q-I
3-3
D-4
;)-I
_-2
T_-4
9-I
3-2
Q-3
D-4
0-I
58
58
58
59
%9
50
59
60
60
60
60
61
61
61
61
62
62
62
62
63
(,3
63
63
64
(_4
64
04
65
65
65
65
66
1972
E(_UIPMENT
LAB[IR
HCURS
43.5
EXPEND.
STUDY
7440
LA6CR
kATE
LA_CR
OLLLARS
bJRDEN
DOLLARS
LABOR
BURDEN
+
$
E_ GR
MATL
4,360
32509
33840
49675
_.167
207000
196733
403733
648.0
IIC51e_
3,738
418013
385a28
804501
372.5
153664
3.881
596373
5602Z_
77_95
4.466
3478_q
292504
640353
4 _8;'9
5o/26
224667
162053
380720
4.611
559910
411157
971067
-12
4.952
418813
394710
813523
441
295.5
448.
261.0
711.C
121425
66349
115_614
5
16997
%253
1150
5
46e.5
34572
056.5
IIZ044
4.773
534772
502786
1037558
-4
958.5
[61CIZ
4.209
677715
736860
1414575
975
981,0
107581
Z_.323
724510
802664
1527174
53198
854.5
143_07
4.595
650774
746242
1407016
4_239
779.0
132q55
4.630
615545
72q511
1345056
29934
07628
4.86_
474488
562780
1037268
_555,0
3672.0
6,96.5
28.5
636573
_3437
514_
3.9(.,9
2526447
4,808
401149
5,426
27914
z-2ok
3311591
538397
-23803
7881
5838038
11502
039546
47154
4311
2493
_LIRTH
AMERICAN
SPACE
DIVISION
OATA
PREPARED
NASA
CONTRACT
ROCKWELL
APR IL
CDRP.
UNDER
NASg-I2LO0
PHASED
AIRCRAFT
_- SYSTEM
GROUND
5
SUPPDRT
MA NMON TH S
I24.5
TO TAL
L2852.5
1972
EXPEND.
STUDY
6_UIPMENT
t AE_OR
H OURS
LAB CR
gATh
21257
5.363
LABUR
BURDEN
114006
956 S L L4
L2t C45L
Z-205
173327
105L7621
287333
20080735
+
$
EN G_
MATL
_J
WQRTH AMERICAN
SPACE
DIVISION
DATa,
PREPARELI
_ASA
CONTRACT
RF)CK_ELL
CORP.
UNDER
NASg-12100
TI VF
8-70
4- SYSIE'_
GROUND
5
SUPPOnT
NFG
MATt
9-1
_q
5_
3-2
58
3-3
]-4
58
59
,l-I
3-2
5q
J- 3 59
_9
3-4
oO
3-2
60
60
_,1
J-I
L)-2
61
Ol
_-4
61
62
_-t
3-2
b?
62
J-3
_)-4
62
63
D-t
e3
_-2
_,3
9-3
i)-4
(>4
J-I
_4
3-2
3 - 3 _>4
66
7-4
65
L)-I
_-?
bS
65
_-,_
6_
6h
i)-I
PHASED
AIRCRAFT
EXPEND,
STUDY
EQUIPM_NI
I _TAL
MATEKIAL
F]TH kR
CiJST
_PC
SU 8
TCTAL
66_4g
5
10523
1972
APRIL
TC]TAL
COST
66349
403738
403735
_22:377
_22877
I 6997
137_
5253
445
4629
lIE e,941
t 150
L 50
93_6
65/019
3025
3_9
1166941
12404
7426
?50
663423
39717O
-tL
-L
7379
97_433
18182
99o615
441
37
4277
818278
15206
833484
1 C519
829
3063
1351969
I 7657
1069626,
160760
16 7735
13216
7687
1(,03213
26g10
1630123
32804_
_8121+0
37562
6417
1952389
32627
1985016
446157
48 _396
462 05
6715
1951332
32626
1983958
2752 55
395L69
]2529
4632
1687406
35904
1723310
[10990
II 881I
43052
3114
1202305
25583
/227888
74T58
86260
25954
21
5950273
158753
6109026
49653
96807
[7434
[57
IObBq_4
28119
[082063
45444
47937
C)904
43
1873
6406_
I-S06
6219
_I_.|RTH
AMERICANROCK_,ELLCORP.
SPACEDIVISION
i)ATA PREPAREDUNDER
_ASA CONTRACTNASg--12100
APRIL
1972
TI ME PHASEDEXPEND.
8-7O A[RCRAFTSTUOY
4- SYSTFM
GROUND
5
SUPPOR
MFG
MA TL
?O_6t
Td T ,'_
L
1578449
T EQUIPMENT
TOTAL
MA TS Kl AL
74772
1802571
M PC
474L
235426
1-207
OIHER
C 0S T
79
60604
SUB
T lITAL
&
L LO 50
424320
TOTAL
COST
377975
226C365o
|
!
SD72-SH-O003
_I:JRTII AMERICAN
SPACE
DIVISIUN
DATA
P_EPAREF)
_ASA
CONTRACT
ROCKWELl
CORP.
APRIL
1972
UNDER
NAS9-12100
PHASED
AIRCRAFT
4- SYSTEM
SPARES
EXPEND,
STUDY
MANMONTHS
LABqR
HOURS
LAt5GR
RAT_
21.0
3517
3.442
2 c_o45
3.381
19_19
3.9z,
LABCR
OCLLARS
BUI_DEN
DOLLARS
LABOR
BURO EN
5 c:
5_
a-3
3-4
5o
59
lo_.C
_-1
_-2
60
60
l, ib.
9-3
_-4
60
60
_-I
;_-2
_I
oI
204.0
34119
4.275
_-3
3-4
/_1
_1
130.5
23755
3.,547
.-1
_-2
h2
62
462.0
78918
3.005
241102
)-3
_-4
,_2
62
1825.5
306484
3.045
933136
"J-I
_)-2
A3
63
1105.5
I_8784
3.077
580910
/744_5
J-3
i_-4
_3
63
725.5
121916
3.373
41 t201
560770
_7
_-I
:J-2
6+
-_'+
544.5
92902
3.278
304558
454970
758628
557
,_-3
'_-4
64
_4
414.C
7276t4
3.477
253037
35919I
6].2228
79
_-I
65
i)-2 _,5
577.5
9q95_
3.557
355509
498110
853619
D-3
")-q
65
65
405.C
07866
3.512
238319
358326
596645
259
2_-1
_)-2
_,
b6
391.5
67866
2._31
192124
462237
054361
277
_-3
_)-4
66
6&
43_. 5
73454
3.591
203786
387518
651304
I(]TAL
34.5
7561.0
5679
12481.51
4.45q
25643
100239
118019
2l 8258
78591
86395
164896
25322
22893
482[5
EN GR
MATL
_-1
TJ-2
13538
12105
148427
8_639
4224915
Z-209
138345
28?272
119167
205806
372
295548
536650
253
1175192
5824284
2108328
7021.
1355375
2304
1971
10049199
1.02
1670
1.2960
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
APRIL
CORP.
UNDER
NAS9--12100
TI ME
B-70
4- SYSTEM
SPARES
59
59
59
59
60
60
60
60
61
61
61
61
62
6?
67
62
63
63
63
63
64
_4
64
64
65
65
65
65
_6
66
66
a6
TOTAL
PHASED
EXPEND.
AIRCRAFT
STUDY
MFG
MATL
3-1
,_-2
Q-3
_-4
_-I
Q-2
Q-3
3-4
_-I
_-2
_-?
_-4
Q-I
3-2
_-3
Q-4
_-i
_-2
0-3
C)-4
_-I
3-2
g-3
3-4
_-L
3-2
_-3
_-4
"
L
3-2
O-3
:_-_
1972
TOTAL
MATERIAL
MPC
OTt4ER
COST
SUB
TOT AL
&
TOTAL
COST
25543
25643
218258
218258
23887L
7C_05
295892.
1597741
l 1",,0C04b
166710
3176
16O886
377
48592
92_
49518
3247
290519
5399
295918
31
1369
207578
3857
211435
55 7q
0426
6 L9460
372
70552
1814
23316
157604
1 o397
629057
25758
2453294
4 tL78
2494472
39228
3152252
52705
3204957
7L5023
7L 51 85
70440
30632
1788234
29899
1818133
422_70
42342?
45137
30335
1257527
26757
1286284
265679
265758
96082
36385
1011053
2 1513
1032566
2612
2629152
78643
32718
1227912
32761
1260673
54 _9479
97848
38157
1281129
34180
1315309
53790
1970388
59342
2029730
47975
Llt999
5 7584
1969583
548220
56
1045141
1045418
LL42459
IL42459
6357812
637C772
216819
70261
862366
1-210
348211
17630548
379674
180
10222
1-211
SD72-SH-O003
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
APRIL
CORP,
UNDE_
NASg-12100
T] ME
B-70
4- SYSTEM
SPFCIAL
7
TEST
MANMONTHS
;_-3
_-4,00
_-1
_-2
_-3
_-4
')-I
_-2
_-3
"_-4
_-[
_-2
_-3
_-6
_--I
_)-2
_Q-3
,_-4
_-I
)-2
_-3
_)-4
C.)-I
3-2
_-3
1972
PHASEC
AIRCRAFT
EXPEND,
STUDY
EQHIPMENI
LABOR
HOURS
LABCR
RATE
LABCR
DOLLARS
+
$
1007
1.5
149
2.q53
61
61
61
61
62
62
52
',2
63
63
63
03
64
64
66
64
65
65
65
65
66
66
66
7.S
1344
3.501
4706
4801
28.5
5235
4.039
21142
20140
4 1282
30.0
4960
3.373
16731
17524
34255
70.5
1 1959
3.09_
_6997
44749
8 1746
40.5
7046
3.331
2_464
26225
49689
3.510
415948
4.94[
488q0
45712
291536
TOTAL
58.
118501
5
9894
567
LABOR
BURD EN
60
705.0
440
BURDEN
DULL ARS
371913
787861
94602
421285
38707
3.352
129749
lIP.5
2C399
3.762
76766
P.3004
159750
51.728
12570
14634
27204
263
34
1282.5
218669
3.704
129
787512
1-212
252
921057
1486
21
9507
220.5
1.5
TDOL/STE
MATL
5420
57699
3717
18632
436382
50461
942
16600
5467
381
170 8569
5q6617
'_dRTtl AMERICANROCKWELL
CORP.
SPACEDIVISION
DATA PREPAREOUNDER
_ASA CBNTRACTNASg-12IO0
APRIL
4- SYSTEM
SPECIAL
EQUIPMENT
MPC
SUB
TtqI_L
195
2688
51
2739
9530
L77
q7C7
2
458
4547
2_3
IF_,5
42984
b37_
3a3
4905
9-15
4 71651
&
A191.5
T OTAL
CCST
870
48036
96501
1620
98121
S5/56
1439
87195
"t CI 5o
l[13
71329
21lS_
1288415
126722/
I 5C'43I
32nl
153612
422510
8991
43L56[
181055
4831
185886
33646
898
34544
It
392
$81
TO FA L
2367101
44456
241[557
-r-23_3
1972
ID,
i-ww
_c2E
_oiv
LJL
|
I
I1
c_
Lu
Z
6
:1
_c
NORTH
t_MFRICAN
SPACE
DIVISION
r)ATA
PR6PARED
NASA
CONTRACT
ROCKWELL
APRIL
CORP.
UNDEP
NAS9-12IO0
TI ME
B-70
MANMONTHS
%_
s ,q
_
5_
59
_9
59
5q
_0
60
oO
50
5[
PHASED
EXPEND,
A[ RCRAFT
STUDY
4- SYSTEM
TtJilL[NG
]-1
_-2
,,)-3
")-4
;_- 1
_-2
J- 3
;)-4
:J- 1
Q-2
Ig 72
6('.
LAt_OR
HOURS
0
33. C
LABOR
KATE
IABCP
DCLLARS
bURDEN
DCLL ARS
qcJOQ
3.831
3 79o5
26497
5598
5.975
33668
1096
9 _354
59523
LABOR
BURDEN
64462
[
44409
121.5
2C_32
4.48[
471 .0
d2_12
3.701
306496
244211
550707
I5 1_77
2209._
3d2_54
3.430
1313292
1121764
2435076
2_47.9
47_274
3.371
1612353
135804z+
2970397
173 Z'_82
3.50'3
6086,R75
46B2369
10719244
280G91
3.322
9333609
_d29240
18162909
3.33u
3376q50
35683q7
6945356
lO16q.
+
$
J- 2
9-4
(_I
_1
;,2
15496.5
5941.5
1014120
"J-2
__'_
_-t
;_-3
}-t
_-?
_-1
_-2
:d-4
Q-1
02
6P
63
2554.5
42 _'933
;3.302
1416218
1721145
3137563
1834.0
31 33q4
3.3_q
lObZtT[
11596_6
2221857
63
b3
_,4
3206.q
5q,q_o_
3.654
1968571
786202
2754773
2257.0
38_09
3.900
1500621
156684b
3067467
751.5
132523
2.531
335449
379405
714854
135.0
23548
4.852
114246
110891
225137
(-4
64
65
65
65
65
66
43.5
1.5
751L
310
3.126,
.
23476
81
25
z-2z5
25735
42
4q211
67
EN GR
MAIL
WORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NASg-121OO
PHAS EC
AIRCRAFT
4- SYSTEM
TOOL ING
1,5
48137.5
EXPEND.
STUDY
MANMON TH S
TaTAL
I972
LABOR
tlOURS
1fl0
1_36c310
LAB OR
RATE
BJRDEN
DOLLARS
4.733
59O
852
28616030
1-216
25600778
LABOR
BURD EN
+
$
1442
542 [ 6809
EN GR
MATL
_I3RTHAMERICANROCKWELL
CORP,
SPACEDIVISION
OAlA
!qASA
PREPARED
CONTRACT
APRIL
UNDER
NAS9-12100
TI ME
B-70
4- SYSTE:_
TCDL ING
58
58
58
58
59
5-I
_-2
59
,D-3 50
59
_-4
,_-1 60
60
3-2
5C
_-3
"J-4
6O
D-I
61
6t
9-2
_-3
61
_-4
61
62
_-2
62
62
3-3
_-4
62
6]
_-[
53
Q-2
_-3
63
63
54
_-I
_-2
G4
64
_-3
6&
_-4
65
Q-I
_-2
_5
65
_-3
Q-4
65
66
_-I
PHASED
AIRCRAFT
EXPEND,
STUDY
TOOL/STE
MATt
,9-1
Q-2
J-3
1972
458
-438
TOTAL
_ATERIAL
- 20
89694
&
T_TAL
CO ST
64945
64945
-2-%
4394?
43947
-20
8 _o94
SUB
TOTAL
25
',58
-438
OTHER
CCST
MPC
-1
75q7
64 L I
15 1856
151856
554409
6 54409
3135624
597,,3
3195367
5785
3950880
75276
4026156
43741
14544988
270289
14815277
923306
159465
30173[49
560707
30733856
4801&44
378369
48035
12173404
204329
12377733
2253[)43
2253_]43
177538
-24940
5543204
9 3043
5636247
_72399
672399
65053
2960534
49500
3010034
406708
406708
3c2528
31.95__33
53424
3248657
395234
395234
42132
5702
3508535
74654
3583189
115946
II 5946
42182
3603
876585
}.8652
895237
83678
83678
25027
2110
335952
8963
344915
-65
- 6550
-I'[68
603(_02
603_02
861_21
8b1421
3487324
34_7374
2 94679
I 092 7409
4 t301644
10927409
379l
50
3791
79373
17573
[13277
625
"5776
704
786
4219
4644
1-217
1127
43324
139
4783
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
Cf)RP.
APRIL
UNDER
NASg-12[O0
TI I_E PHASED
B-70
AIRCRAFT
4- SYSTEM
TOOL ING
T_T^L
EXPEND.
SI"UDY
TOOLI_TE
MATL
TOTAL
MATERIAL
MPC
35524
3 5524
2l H5
24 130867
1972
2473
CL_7
OTHER
COST
"r-2L8
&
llT_
26[038
2l 90524
SUB
T OT AL
i471025
40330
62870262
(_morFzzx) mr_zo_
SD72-SH-O003
NORTHAMERICANROCKWELL
CORP.
SPACE
DATA
NASA
DIVISION
PREPARED
CUNTRACT
APRIL
UNDER
NASAL2100
TI ME
B-70
4- SYSTEM
OTHER
9
PROGRAM
MANMONTHS
9-1
58
58
9-3
58
3-4
58
3-I
59
5q
3-2
V9
_-4
59
"_-I 60
bO
_-2
9-3
60
60
3-4
61
5-I
61
3-2
'_)
- 9 61
3-4
61
62
9-I
3-2
62
6,2
3-3
Q-4
02
63
O-1
63
3-P
63
9-3
Q-4
53
64
Q-t
64
3-2
6_+
3-3
64
3-4
65
J-t
65
_-2
65
65
5-4
6)6
_-!
1q72
EXPEND.
STUDY
ELEMENTS
LABOR
HOURS
43.5
PHASED
AIRCRAFT
7215
LABOR
RATE
LA8CR
_CL LAF,S
BURDEN
DOLLARS
LABOR
BURDEN
4.341
31319
32923
64142
E_G_
_ATL
288.0
_8384
4.274
200810
191708
398518
285.C
48574
4.4_9
215615
173Sbi
389476
238.5
41933
4.368
183148
154711
337859
252 0
43741
4.401
192506
163538
356044
2923
577.5
96772
3.824
370066
345254
715320
7710
102096
4.082
4[673|
957014
773745
2029
310.5
56190
4.320
245334
251446
496780
4494
354.0
6C267
&.839
291280
265818
557098
9957
430.0
73763
4.798
353902
325018
678920
18214
394.5
6 7385
4. 981
335649
354312
68 996[
8205
379.5
_J693
&.596
292427
318923
61 [350
23690
363.0
616S0
4.578
282390
321436
603826
5549
2IO.C
36652
5.158
I_9043
218003
407046
13898
lOW.5
I gC77
4.831
92159
108244
200403
[4626
48.0
8074
5.0 17
45352
65218
110570
14142
56.C
I[494
5,196
59719
871q4
146913
13797
597.
1-220
_ICIRTHAMERICANROCKWELLCORP,
SPACE
DATA
WASA
DIVISION
PREPARED
CONTRACT
APRIL
UNDER
NASO-12100
TI ME
B-70
4- SYSTEM
OTHEk
g
PRI3GRAM
MA NMONTHS
93.0
TOTAL
5(348.5
1972
PHASED
AIRCRAFT
EXPEND,
STUDY
ELFMENTS
L ABfIR
H()URS
LABCR
RATE
15583
b.065
8631[P
LABCR
DCLLARS
78956
3882k.06
1-221
BURDEN
DOLLARS
115078
3849599
LABOR
BURDEN
+
$
19 40 34
7732005
9318
142558
NDRTHAMERICANROCKWELL
SPACE
DATA
NASA
DIVISION
PREPARED
CONTRACT
APRIL
CORP.
UNDER
NAS9-12100
TI ME
8-70
4-SYSTEM
OTHER
9
PROGRAM
MFG
MA TL
Q-I
3-2
3-3
_-I
3-2
3-3
_-4
_-I
3-2
Q-3
Q-4
3-1
Q-3
Q-4
Q-I
Q-2
Q-3
_-4
0-I
3-2
0-3
D-4
Q-2
0-3
_-4
O-t
Q-2
Q-3
3-4
,9-I
1972
PHASED
AIRCRAFT
EXPEND.
STUDY
ELEMENTS
TOOL/STE
MATL
SUBC
IOTAL
MATERIAL
MPC
OTHER
COST
SUB
TOTAL
64142
58
58
398518
58
59
59
59
6O
6O
6O
6O
61
61
61
61
62
62
62
.(,3
63
63
63
%4
64
64
64
65
65
65
65
66
389476
337859
585
3913
405
514
34117
394588
23519
42374
73603
9679
13226L
9 30863
222 CO
35_83
60212
5088
104455
943500
58C8
r2363
82665
6986
829995
14[6426
[933
56015
61.905
4877
406604
1.030484
1516
41C95
60825
4793
35 I127
1095665
8205
6871
2778
22
808
110607
809581
32115
3163
136461l
30866
39193
4178
346006
993203
8210
22130
8043
957876
1395095
1.4916
4463
19 [759
14142
2523
2658063
13797
2861
-148015
1548
290
1-222
201 i. 239
411.54[
2785298
15556
WORTH
SPACE
DATA
slASA
AMERICAN
DIVISIUN
PREPARED
CONTRACT
ROCKWELL
CORP.
APRIL
tINDER
NAS9-1.2IO0
TI ME
B-70
4- SYSTEM
i)THER
9
PRt)GRAM
MFG
MATL
PHASED
AIRCRAFT
EXPEND.
STUDY
ELEMENTS
TDDL/SIE
MATL
SUBC
TOT AL
NATERI AL
9318
IOTAL
652
32
1972
4969
289149
1-223
:_9
MPC
OTHER
COST
573
l 15692
58549
7455158
SU_
Tq TAL
_ORTHAMERICANROCKWELL
CORP.
SPACEDIVISION
OATA PREPAREDUNDER
NASA CONTRACT
NASr-12100
TI ME
B-70
4- SYSTE M
DTHER
9
PROGRAM
G
3-1
3-2
0-3
3-4
3-I
3-2
3-3
.)-4
_-I
58
58
59
S8
59
59
$9
5Q
60
Q-3
_-4
9-1
L)-2
0-3
_-4
3-1
9-2
Q-3
3-4
3-L
_-2
_}-3
_-4
_-L
_-2
_-3
3-4
3-I
3-2
_-3
3-4
3-1
60
60
61
61
61
61
62
62
62
62
63
63
63
63
64
64
64
64
65
65
65
65
66
APRIL
PHASED
AIRCRAFT
ELEMENTS
TOTAL
COST
64142
3c_8518
38(_470
33 785q
7516
40_104
17735
_4 _598
17533
961033
26323
1442740
172 98
1 04 ?782
18391
1114056
13537
823118
33630
2044869
21135
1014_38
2g68_
1424783
10979
422520
74311
285q699
469
1625
1-22k
EXPEND.
STUDY
1972
'WDRTH
AMERICAN
ROCKWELL
SPACE
D IVI SIC)N
DATA
PREPARED
UNDER
WASA CONTRACT
NASq-12100
TIME
B-70
4- SYSTEm
OTHER
g
PRUGRAM
ELEMENTS
_ A
TCTAL
CGSI
Q627
TUTAL
298172
APRIL
CORP,
PHASED
EXPEND.
AIRCRAFT
STUDY
32 $244
160_CB23
1-225
1_972
&llOI'hI-I_WI
JOI&IFTIV_SIII
Lna_fE_
W_LBXS_Ig
,,m
i :i0o
ii!
liOI&&W_BII
_IOI_VDIGJlI
&S_
_liOI'IJ
I[
,-4
'I0_03
E
,-4
EOIB'II_O_d
_qOIH_A
, ,I
_
(SWOITIIM)
s_y'rI(xI
_IV
o
1-226
sD72-s_-ooo5
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPAREI]
CONTRACT
ROCKWELL
CORP.
1972
UNDER
NASg-12100
B-70
k-SYSTEM
AIR
APRIL
COST
BREAKD_WI_S
AIRCRAFT
STUDY
I
VEHICLE
5-SUBSYS
HCURS
DOLLARS
DES[ GN/ENGINEERING
LABCR
AT $
4.921
ENGR
BURDEN
AT $
P!_ODUCT ION
LABCR
AT $
SHGP
SUPPL, R T
LABCR
AT $
PLANN
ING
LABOR
AT
$
TEST/QC
L_BOR
AT $
MFG BURDEN
FNC,q MATER I AL
MFG
MATERIAL
SUBC ONTRAC
T
MPC
WIND
TUNNEL
OTHER
COST
SUB-TOTAL
GEN &
IOWA
ADMIN
TUTAL
COST
4.463
3.222
3.C36
5.417
3.531
AT $
3.918
1826579
8505232
7019655
5-SUBSYS
5-SUBSYS
@
Hr)URS
DOLLARS
83025_31
40769287
36746727
119047!39
3,_337731
508479
6386037
1488671
13183710
716232
24,4273<_
5411
19507,%5
17456
6:_171767
196643
r'_ 74073403
916_66
106624
2267739
23188681
303828
23492509
1-227
5-SUBSYS
02
OI
HCURS
DOLLARS
985802
4912662
4335751
I11236
3Z0730
8'931
27132
418,__ C9
r3
H_U.RS
OOLLARS
17610?4
8489644
7185436
4,42874,
1393646
27838
B79ii
171782_
11693669
272274,91
[03499447
8205547
276092G
122959_3
167696
815440
13552727
582839
11598442
608353
1978G5
338342?
3781,98412
24515351
6505097
21332575
406036084
39 I060
249064,11
3528011
563172
"35843291
<)
NORTHAMERICANROCKWELLCORP.
SPACEDIVISION
DATA PREPARED
UNDER
NASA CONTRACTNASg-12100
APRIL
1972
COST BREAKDOWNS
B-70 AIRCRAFTSTUDY
4-SYSTEM
AIR
1
VEHICLE
5-SUBSYS
5-SUBSYS
04
DESI GN/ENG
INEERI NG
LABOR
AT $
4o921
ENGR
BURDEN
AT $
PRODUCT
ION
LABOR
AT
SHOP
SUPPORT
LABOR
_T
PLANN ING
LABOR
AT
TESTICC
LABOR
AT
MFG
BURDEN
3.222
3,036
3417
3.531
AT
4.463
HOURS
OOLLARS
HL_UR S
90LLARS
1950276
9832_80
9231077
630695
3110162
2700615
1130155
5567013
5118121
339739
1041422
151065
470196
573357
1712747
19595
63051
1354238
3.918
29005372
1369_96
SUB-TOT&L
53033324
ADMIN
TOTAL
COST
5-SUBSYS
06
HOURS
DOLLARS
ENGR
MATERIAL
MFG
MATERIAL
SUBC 0 NTRAC T
MPC
WIND
TUNNEL
OTHER
COST
GEN &
IOWA
5-SUBSYS
05
$05279
330209
921444
429186
54383954
1-228
10036
31264
62q614
G-I
HOUI_ S
DOLLARS
526124
2580264
2375291
51,]049
1610q46
34093
110134
2232702
21266
65983
1932S6_%
546220
1173454
966093
0301831
412883
124317_
3261 13
7425036
427124
1153331
146407
257964
69926
18772082
288326
19060408
24024295
41C733
24435028
10901110
200741
14557C,4
12557555
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
R_CKWELL
CORP.
APRIL
I972
UNDER
NASg-12100
COST
BREAKDOWNS
B-70
AIRCRAFT
STUDY
4-SYSIEM
AIR
I
VEHICLE
5-SUBSYS
5-SUBSYS
O8
DESI G_,/ENGINEERI
LABCR
AT $
ENGR
RURDEN
PRODUCT
ICN
LABCR
AT
SHOP
SUPPORT
LABOR
AT
PLANN
ING
LABOR
AT
TEST/QC
L A L_CR
AT
_FG
L_tJRDEN
NG
4.'_21
AT $
_.222
3,,036
3.417
3.531
AT $
4.463
HCURS
DOLLARS
HOURS
DOLLAR%
Igq30q
998488
874_75
21330H
99525c_
908594
301
1273
11602
3.qlg
8199
14352749
704276
3UB-TCTAL
16969303
ADMIN
TUTAL
COST
5-SUBSYS
I0
HOURS
OQLLARS
61
2g8913
17259?_ 16
1-229
11
HOURS
O_LLAKS
530886
2686991
?647685
13732_
449311
174639
591227
2650
gZSG
_NGR
MATERIAL
MFG
MATERIAL
SUBCL) NTRACT
MPC
WINr) TUNNF L
OTHER
COST
GEN
&
IOWA
5-SUBSYS
09
771
26 17
67_8 6(;
19251
6697 :'_
1435666
98457
15053 70
8553_
747683
3097830
13640B
9157
37153
16
5545.0,
3770766
104605
48942
3234233
58329
3292562
87790_
15809,_
8937176
NORTHAMERICAN
SPACE
DATA
NASA
RCCKWELL
DIVISION
PREPARED
CONTRACT
CORP.
APRIL
UNDER
NAS9-12100
COST
BREAKDCW
_S
B-70
AIRCRAFT
STUDY
_r-SYSIEM
AIR
VEHICLE
5-SUBSYS
12
HOURS
DCLLARS
DES[ GNIENG
INEERI NG
LASCR
AT
$
4.q21
ENGR
BURDEN
AT $
PRUDUCT
ION
LABOR
AT
SHOP
SUPP[J RT
LABCR
AT
PLANN ING
LABCR
AT
TEST/QC
LABGR
AT
MFG
BURDEN
3,222
3._]36
:_.417
3.531
AT $
4.463
316507
1837324L
1967049
_0415322
i_52451
81cq57?B
3.91_
459f_814
1663284_
14796_35
5_583_77
65703
7282051
Z36401
2210644_
280324
996850
963d21
3406551
587203
2685461
2135631
94BLLgL
2727798!
1081134_2
ENGR
MATERIAL
MFG
MATERIAL
SUBCONTRACT
MPC
WIND
TUNNEL
OTHER
COST
9848L32
131_030
ADMIN
TOTAL
COST
1793906%
37C75623
194492135
14208425
19187326
SUB-TGTAL
GEM
&
IDWA
TCTAL
HOURS
DOLLARS
55496
)37
I155919
4685745
61338601
1-23o
65bGO9245
II4CIIO(_
279032
I_
6953L3_61
19 72
_,
"
/!
-_
I,-
l-
ow
_ww
(sloths)
_'r_
I-P31
SD72-SH-O003
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NAS9-12100
TI ME
B-TO
4- SYSI'EM
5- SUB SYSIEM
O-I
O-?
,)-4
Q-I
_-3
Q-4
Q-1
Q-2
Q-3
Q-4
Q-1
0-2
0-3
3-4
Q-I
Q-2
0-3
Q-4
Q-I
9-2
Q-3
Q-4
O-[
Q-2
0-3
0-4
Q-[
Q-2
CQ-3
Q-4
Q-1
PHASED
AIRCRAFT
EXPEND.
STUDY
1
0
MANMONTHS
LABOR
HOURS
LABOR
RATE
172.5
29031
4.478
710.5
119551
4.2
2482.0
423635
1626.0
60
60
60
60
58
5B
58
58
59
59
59
59
1972
LABOR
DOLLARS
BURDEN
DOLLARS
LABOR
8URD EN
+
$
EN GR
MATL
130006
129008
259014
511882
464963
976845
3.342
1415716
1491139
290 6855
21217b
286500
3.776
I081827
1120502
220 2329
40038
1408.5
24&031
4.074
994277
921451
[91 5728
31188
926.5
155642
4.784
74_600
559594
130 4194
61
61
1393.0
237954
_.595
811378
1904822
61
61
02
62
62
62
1007.5
182719
4. 742
86651O
815387
168 1897
6021
756.C
128982
4.746
612204
591336
120 3540
94482
477.5
8C082
4.804
384701
408438
579. C
98955
4. 963
491066
530825
102 189 l
28002
679901
1266931
56537
6,3
63
63
63
64
64
64
64
65
65
65
65
66
82
1093444
733.C
123029
4.771
58'7030
I126.5
192332
4. 598
884399
1121463
79 3139
200 5862
43.0
7584
6.272
47570
148.0
2 5621
5.535
141817
14.5
2476
5.676
13558
9020
22578
13.5
2345
4.585
10752
15459
26211
1-232
52255
163974
99825
305791
580
4033
2349
I7393
175904
153134
75480
14477
4120
-I
NORTHAMERICANROCKWELL
CORP
SPACE
DATA
NASA
DIVISION
PREPARED
CONIRACT
APRIL
UNDER
NASg-12100
PHASED
AIRCRAFT
4- SYSTEM
5- SUB SYSTEM
MA NMONTHS
LgT2
EXPEND,
STUDY
l
0
L ABOR
HOURS
LABOR
RATE
LABCR
DOLLARS
BURDEN
DOLL ARS
LABOR
BU R D EN
EN GR
MATL
951
TOTAL
I:_617.5
234C469
I001 1359
1-233
98_.6093
19897452
916866
NDRTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP.
APR [L
UNDER
NAsg-12[O0
TI ME
B-70
6- S YSTEM
5- SUBSYSTEM
58
58
Q-3
{}-4
Q-1
Q-2
Q-3
0-4
Q-I
Q-2
Q-3
Q-4
Q-1
Q-3
Q-4
Q-I
Q-2
Q-3
Q-4
Q-I
_-2
Q-3
9-4
Q-1
Q-2
Q-3
Q-4
O-I
EXPEND.
SIUDY
[
0
MPC
Q-I
Q-2
Q-3
Q-
Q-!
PHASED
AIRCRAFT
0 THER
COST
31
SUB
TOTAL
& A
TOT AL
COS T
25O625
259625
(:;81099
981099
58
58
221
50
59
17966
39369
31 76368
3176368
59
59
3389
96374
2362130
2342130
60
60
4203
124088
2075207
39539
2116766
60
60
308
19C853
1497704
28536
1526260
335660
2259323
61985
2301308
202'_28
1_91353
35L67
1926500
382729
1688192
28336
1716528
61
61
61
61
62
62
1668
507
7661
62
62
63
63
13853
313290
1290186
21756
1317962
2758
185384
1238035
20700
1258735
63
63
5570
1209837
20229
1230066
2330013
69578
2379591
-Iiq201
66
b4
16322
154695
66
64
27463
153568
356336
7582
363918
05
65
4330
145615
470213
7209
477422
65
65
66
735
1
5E246
85679
2286
87965
4161
30372
915
31287
r-234
1972
_DRTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NASq-[2IO0
TI ME
B-70
4-SYSTEM
5- SUB SYSTEM
EXPEND.
STUDY
t
0
MPC
l_J
TH E P,
COST
106624
S UB
TOTAL
&
2267
?39
2318_681
3O
I009
b8
TOTAL
PHASED
AIRCRAFT
303828
TUT AL
COS T
103q
23492509
1972
(_oiT_)
_o_
1-236
SD72-SH-O003
NORTHAMERICANROCKWELLCORP.
SPACEOIVISION
DATA PREPAREDUNDER
_IASACONTRACTNASq-12IO0
APRIL
1972
T] ME PHASEDEXPEND,
B-70 AIRCRAFTSTUDY
4-SYSTEM
5- SUBSYSTEM
AIRFRAME
I
01
STRUCTURES
SUF;SY STE M
MANMON THS
LABOR
HOURS
LABOR
RA TE
337.0
56836
BURDEN
DOLLARS
4,549
257642
248744
332138
q.402
1462076
1209014
267 1090
79363
2810.5
47gd43
4.270
2048848
1551497
3600345
41984
5q
59
5773.0
1015872
3.886
3947471
3444770
7392241
211323
60
60
7275.5
1261100
4.041
5095626
4343517
9439143
1273622
3.75l
742 5705
6722864
14148569
451281
12936317
11791734
24728051
2128782
2265467
58
58
58
58
59
5q
1979
. 5
LABOR
BURD EN
+
$
EN GR
MATL
1ABCR
OCLLARS
506386
1303
bO
60
61
11785.0
197_889
2C917,C
35o c.787
61
61
62
62
62
62
19627.0
355_162
3.516
12513B42
13989888
2650
19086.5
325?208
3.4_I
11207662
12396070
236C 3732
356931
14766.C
248C613
3.698
0174404
10505554
1967q958
582184
53
63
63
63
64
64
64
64
65
65
65
65
12838.0
2191265
3.922
8593979
18319273
980165
14471.0
2430993
3.4oI
8414289
10617834
i9032123
2410084
168C7.C
2868154
3.883
14967877
26 I0 4036
6394.5
1125747
4.0_,5
4576150
5871821
6,025
2276582
2836878
530681
588384
3264.
565655
51 6. C
8_787
"3.624
6. I 15
11136159
T-237
972 5294
37 30
10447971
L12614
76866
511 3460
483180
1119065
179805
WORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONIRACT
ROCKWELL
MANMONTHS
Q-I
0-2
Q-3
_-4
Q-I
0-2
Q-3
66
,,6
66
66
67
67
67
TOTAL
-[.5
158644.0
L9?2
UNDER
NAS9-12[O0
TI ME
B-70
_-SYSTEM
5- SUB SYSTEM
AIRFRAME
APRIL
CORP,,,
I
OI
STRUCTURES
PHASED
EXPEND,
AIRCRAFT
STUDY
SUSSYSTEM
LABOR
HOURS
LABOR
RATE
LABCR
DOLLARS
BURDEN
DOLLARS
LABOR
BURDEN
+
$
EN GR
MATL
107
83,673
8953
9464
18417
3_4Y3
-332
3.497
-II61
-I074
-2235
26242
2 726C624
101605225
]-238
II0820i30
212425355
l169366g
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PRFPARED
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NAS9-12100
PHASED
AIRCRAFT
4- SYSTEM
5- SUBSYSTEM
AIRFRAME
I
01
STRUCTURES
MFG
_A TL
Q-I
Q-2
7_-3
Q-4
0-I
Q-2
3-3
C/-4
Q-I
J-2
Q-3
,9-4
,9-I
0-2
68
5_
_0
58
59
59
59
S9
60
60
oO
60
61
,51
0-4
Q-I
h2
9-2
62
;)-3 62
62
3-[
63
0-2
83
CO-3 6"3
0-4
03
64
64
2-2
_Q-3 04
_j-_ 64
0-I
65
65
_-2
65
_-3
05
Q-4
1972
EXPEND,
STUDY
S UB SY S TE M
SUBC
TOTAL
MATEkl
AL
71
1303
79363
24._ 2862
MPC
4340
WINDTUNNEL
OTHER
COS[
T[I T AL
O/C
$
153331
6924
160255
472658
10 3301
575959
433600
369551
803151
252484h
69350
18548944
I 8760267
524984
494129
770276
1264405
400
105_35275
118C9297
792629
155533
878175
103_708
15609
('72e157
7193047
46 0489
237825
1347120
1584943
8623315
1175399o
511441
163088
1709808
1872890
1110881
137586
1106353
1243939
IC01899
4392657
I914996_
25 P080c)2
37_9452
151o4432
Lq270815
805386
143216
148 4430
1627646
10612
14661082
656618
147669
1602566
1750235
117121
1102170
1219291
-199710
-110612
34661
76
222
433305_
4311210
9624433
706537
43412C6
3585784
IC337074
780443
441937C
344CC25
797250
1236831
98501
171772
25CC99
58654
89098
95 5604
719909
7 19909
1501796
558856
646400
646400
650395
196422
454097
454097
18 1638
181638
62728
351577
1-239
_ORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
APR IL
CORP.
UNDER
NASg-12100
TI ME
B-70
4- SYS TEM
5- SUBSY STEM
AIRFRAME
I
Ol
STRUCTURES
MFG
MA TL
3-1
_-2
Q-3
_-4
Q-1
_-2
_)-3
SUBC
66
66
66
66
67
67
67
T_]TAL
272274_;
1972
1. I0 3499441
PHASED
AIRCRAFT
EXPEND,
STUDY
SUB SY STE M
TOTAL
MATERI
AL
MPC
WIND
TUNNEL
34473
7150
11740
26242
IOL2
4328
[42420607
1-240
u205547
27bog20
OTHER
COST
TOTAL
O/C
$
12975
24715
4329
12295983
15056903
'_ORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
,WASA CONTRACT
ROCKWELL
APR IL
CORP.
UNDER
NAS9-12100
T[ ME
B-70
4-SYSTEM
5- SUB SY STEM
AIRFRAME
I
Ol
STRUCTURES
SUB
TOTAL
}-2
_-3
_-4
Q-I
0-2
Q-4
Q-I
_-2
.}-3
_-4
Q-L
Q-2
Q-3
2-4
Q-I
Q-2
_-3
Q-4
Q-I
Q-2
_-3
_-4
Q-I
Q-7
D-3
3-4
Q-I
_-2
Q-3
Q-4
58
58
5_
58
59
59
59
59
60
60
60
60
61
61
bl
61
62
62
62
62
63
63
53
63
64
54
64
64
55
(5
65
65
PHASED
EXPEND.
AIRCRAFT
STUDY
SUB SYSTE
8 A
TUTAL
COST
IOWA
668015
668015
3330752
3330752
6997692
279418O7
2321_
7020906
8848
27950745
2_462766
23074777
3 14_54
13335
23387048
50C464
"41128
38866390
784744
2590967
42242101
54666642
IC76719
4214571
5995
2392
8640
7932
45307579
7g8010
2924005
4902 9594
36747893
6?8689
2610066
39986048
29869534
544386
2496459
32910379
30030028
53_261
2489662
_3067951
35752058
801243
2536545"
39089846
13215023
310503
1380891
149064[7
h414374
17150C8
}.84383
48587
I197
6599954
1687
1765282
1-241
1972
NORTH
SPACE
DATA
_IASA
AMERICAN
DIVISION
PREPARED
CONTRACI
ROCKWELL
CORP.
APRIL
UNDER
NASC]F-12100
II ME
8-70
4- SYSTEM
5- SUBSYSTEM
AIRFRAME
1
Ol
SIRUC
S UB
TOTAL
_-1
Q-2
Q-3
0-4
_-I
0-2
Q-3
66
66
66
66
67
67
67
TOTAL
84755
29q47
378tO84L2
1972
IURE S
_ A
PHASED
AIRCRAFI
SUBSYSTE
IDWA
IOIAL
COST
87307
2552
<)02
6595Cq7
EXPEND.
STUDY
30849
21332575
1-242
4 C6036084
._...J
a
w
z
o
I
.<
0
0
J
(_oz'n_)_v'nc_
1-243
SD72-SH-O003
_ORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
UNDER
NASg-
CORP.
APRIL
12100
IT ME
B-70
4-SYSTEM
I
S-SUBSYSTEM
02
ENVIRONMENTAL
1972
COhTROL
PHASED
AIRCRAFT
EXPEND,
STUDY
SUBSYSTEM
MA NMONTHS
Q-I
Q-2
Q-3
O-I
_-2
9-3
Q-4
Q-I
_-2
Q-3
Q-4
O-[
O-2
Q-3
J-4
0-I
Q-2
0-3
_-4
Q-I
_-2
Q-3
Q-4
0-1
Q-2
_-3
3-4
0-2
Q-3
Q-4
58
58
58
58
59
Sg
59
59
60
60
60
bO
61
61
6 1
61
62
62
62
62
63
63
63
63
64
O4
64
64
h5
65
65
h5
L ABEIR
HOURS
LAB CR
RATE
LABCR
DI]LLARS
BURDEN
DOLLARS
LABOR
BU R 0 EN
+
$
ENGR
MATL
39.0
6674
4.607
30745
30350
262.5
44173
4.419
195218
173722
368940
415.C
IC883
4.261
302024
2_5269
54 7293
9315
730.5
128753
4.177
537859
461180
999039
2464
502.5
87101
4.701
409434
328L83
737617
522.0
87653
4.671
409433
325423
734856
1211
1348.5
23C256
3.852
886946
749223
1636169
78532
423.0
76752
5.394
413998
396477
810475
11483
397.5
67990
5.602
380913
309468
690381
4877
436.5
73'_12
5.378
394784
371888
766672
6394
384.0
65502
5.6L7
36 7909
355399
723308
364
425.0
713LL
5.179
369296
413550
782852
2569
363
6210L
5.620
349001
382355
731356
9380
142.5
2 5013
6.057
151516
156302
30 78 18
36.C
E20I
7.306
45307
40772
86079
I2.0
2020
7.261
14667
13245
27912
.G
I-2[#4
6 1095
189
- 46
40460
498
APRIL
'_ORIH AMERICANROCKWELL
CORP.
SPACEDIVISION
DATA
NASA
PREPARED
CONTRACT
UNDER
NASC>'-IZIOO
IT ME
B-70
4-SYSTEM
t
S- SUBSYSTEM
02
ENVIRONMENTAL
MANMONTHS
1972
CONTROL
L ABOR
HOURS
1,5
_74
644 1.0
I IO 5969
PHASED
AIRCRAFT
EXPEND.
STUDY
SUBSYSTEM
LABOR
RATE
LABCR
DOLLARS
1274
7.322
5260324
T-245
BURDEN
DOLLARS
1148
4753960
LABOR
BURDEN
+
$
ENGR
MATL
2422
10014284
167696
_JORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
_qASA CONTRACT
ROCKWELL
CORP,
APRIL
tiNDER
NASg-L2100
TI ME
B-70
4-SYSTEM
5- SUB SYSTEM
ENVI RONMEN
SUBC
_-1
Q-2
:_-3
3-4
_-I
_-2
Q-4
0-1
_,)-2
0-3
,Q-4
CO-1
_-2
_-4
',}-1
Q-2
;)-4
C_-2
0-5
;)-4
;_-1
;)-2
0-3
3-4
0-1
0-2
,_- 3
0-4
58
58
58
58
59
59
59
59
60
60
r_O
60
51
61
1
02
TAL
CONI'ROL
TOTAL
MATERIAL
PHASFD
AIRCRAFT
33536
11752C6
1177670
16q3830
1693784
L350953
EXPEND.
STUDY
SUBSYSTEM
OTHER
COST
MPC
189
24221
1972
LO
1431
32320
SUB
TOTAL
&
TOTAL
COST
61095
61095
1729
370868
370868
4132
586392
586392
24125
2233154
2233154
1 00488
1 5084
2546073
48528
2595501
1352170
_G3L5
1_184
2180525
41545
2222070
30C764C
308_172
92807
16360
4831508
89784
4921292
2313336
2324619
67248
17179
]219721
59831
3279552
1315705
1320582
421_8
17752
2070913
34760
2105673
13157C6
1322100
42281
18233
2149286
36075
2185361
507497
507861
Z[593
26709
1279471
21393
1300864
290117
2g2686
9576
18726
II03840
18456
I122296
558516
567896
77704
14239
1391195
29601
1420796
4C460
14719
8325
371322
7901
379229
1420
88146
2352
90498
568
28480
760
29240
61
62
62
62
63
63
63
63
64
64
64
64
65
65
65
65
_98
149
1-246
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP.
UNDER
NASg--I2100
TI ME
B-70
4-SYSTEM
l
5-SUBSYSTEM
02
ENVIRONMENTAL
SIIBC
CONTROL
TCTAL
MATERIAL
PHASED
EXPEND,
AIRCRAFT
STUDY
SUBSYSTEM
MPC
OTHER
COST
40
I3552727
1972
APRIL
1 3/20423
582839
197_05
Z-247
SUB
TOTAL
2462
2451535[
TOTAL
COST
74
2536
39 1060
24906411
all
II
M
W
I,
H
!
ill
Iit
!
I
1
,-4
1-248
(moI_)
_o_,
SD72-SH-O003
NDRTH
SPACE
DATA
WASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP,
APRIL
UNDER
NAS9-12100
TI ME
B-70
4- SYSTEM
5- SUBSY SIEM
PROPULSION
1972
PHASED
AIRCRAFT
EXPEND.
STUDY
I
03
SUBSYSTEM
M_N'_ON TH S
L A_(]R
HOURS
LABOR
RATE
LABOR
DCLLARS
BURDEN
DOLL AkS
LABOR
BURDEN
EN OR
MATL
_-1
2-2
_-3
5R
59
58
130.5
21984
4.135
90903
93025
512.5
86098
4.058
349399
331937
68 1336
_-1
_-2
Q-3
_-4
_-L
_-2
9-3
_-4
_}-L
J-2
_-3
_-4
Q-I
_-2
_-3
0-4
Q-I
0-2
Q-3
_-4
0-I
_-2
r,_-3
_-4
_-I
3-2
Q-3
0-4
59
59
59
59
60
60
60
60
61
ol
_1
61
62
62
62
62
63
63
63
63
(,4
64
64
64
65
65
65
65
679.0
II
4.064
4?0290
399248
869538
56808
968.5
17C459
4.061
692192
613550
1305742
3485
886.C
153783
4.379
673434
549087
L22 2521
7588
1109.5
201213
4.233
851780
702363
1554143
1732.5
295957
4.195
1241582
982830
2224412
103154
1180.5
214102
4.253
910573
870467
178 L040
105298
1548.C
264318
3.936
1040331
988914
2029245
1154.5
193926
4.433
859737
794445
1654182
1061.5
180912
4.834
874471
851616
1726087
66819
1030.0
172979
5.488
949311
635808
1585119
28415
445.0
760[1
5.936
451181
475185
926366
47125
361.0
63449
5.q95
380368
495729
876097
88.0
15179
6.572
99?52
90694
190446
31.0
5[32
6.501
33363
26319
59682
5733
1-249
183928
263
4451
56067
90877
112780
114109
16402
1637
NORTHAMERICAN
SPACE
DIVISION
DATA PREPARED
NASA
CONTRACT
ROCKWELL
CO_P.
A PR IL
UNDER
NASg-12IO0
TI ME
B-70
4-SYSTEM
5- SUBSYSTEM
PROPULSION
O-I
0-2
0-3
TOTAL
PHASED
AIRCRAFT
EXPEND.
STUDY
I
03
SUBSYSTEM
MANMON THS
LABOR
H OURS
LABCR
RATE
LABER
DGLLARS
BURDEN
OOt L ARS
3.0
48R
5.09b
2487
1987
66
66
66
13
13011.0
1972
3.615
41
2231736
qgT120L
1-250
LABOR
BURDEN
4474
EN GR
_IATL
LOB
93
46
89C3250
+
$
18874451
8 1544_
NORTHAMERICAN
SPACE
DATA
NASA
DIVISION
PREPARED
CONTRACT
ROCKWELL
APRIL
CORP.
UNDER
NAS9-[2100
PHASED
AIRCRAFT
TI ME
8-70
6- SYSTEM
5- SUB SYSTEM
PROPULSION
MFG
MATt
rj-i
Q-2
_J-3
O-I
3-2
:J-3
3-4
_-1
0-2
Q-3
Q-I
3-2
_-3
O-q
q-i
_d-2
Q-3
0-4
_J-[
Q-2
C_-$
,'J-I
_-2
3-3
3-4
Q-l
9-2
Q-3
;)-4
58
58
_;8
58
59
5g
59
59
60
hO
60
60
61
61
61
61
62
62
62
62
63
63
63
63
64
54
_4
64
65
65
55
65
1g72
EXPEND.
STUDY
I
03
SU8 SYSTEM
SUSC
TOTAL
MATERIAL
MPC
263
14
4451
264
276031
332899
12133
276032
270517
7836
g41736
949322
568h8
OTHFR
COST
SUB
T OT AL
G&
184205
97635
3268
15
362862
II06062
237>'6
78 3466
1539385
19 5 5957
3336773
63538
5126760
97680
3290232
3346209
202592
1368404
1671558
47916
268897
6C 1 2783
74570
1376768
14820b0
48335
496262
380
5703
70721
I497549
1588626
54778
368723
6021172
6?696
131C99(_
1483776
52q12
1"/3535
336
56463
1046121
48165
317624
3137997
52666
i47 7902
26711
97g302
75037
14 635 T
5207
1 03652
-215876
3905
I g3682
25121
38352
118 3321
25178
I I _+l09
41513
36468
1060
22686
187
16402
4905
5979
217732
5809
1637
292
2392
6_003
1707
1-25&
_IORTHAMEK[CANROCKWELL
SPACE
DATA
_ASA
OIVISIUN
PREPARED
CONTRACT
APRIL
CORP.
UNDER
NASg-IZIO0
PHASED
AIRCRAFT
4-SYSTFM
5- SUB SYSTFM
PROPULSION
MFG
MA TL
_-L
_)-2
Q-3
EXPEND.
STUDY
l
03
SUBSYSTEM
SUBC
TOTAL
MATERI
AL
06
66
66
TOTAL
L97Z
MPC
L08
22
OTHER
COST
LTL
SUB
T OT AL
12413888
r-252
608353
3383427
35280L19
L4_,
4775
'93
11 5_ _462
&
563
l 72
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPAREO
CONTRACT
ROCKWELL
CORP.
UNDER
NASg--12[O0
fI ME
B-70
4- SYSTEM
5- SUB SYSTFM
PROPULSION
APRIL
PHASED
AIRCRAFT
[
03
SUBSYSIEM
TOTA L
COST
0-I
Q-2
0-3
Q-4
,.9-I
Q-2
C)-3
_Q-4
O-I
i)-2
._-3
2-4
0-1
3-2
_-3
_-4
_-1
3-2
0-3
_-4
_-1.
_}-2
3-3
_-4
_-I
_-2
O-3
F_-4
9-1
_-2
rd-3
_-4
58
58
58
58
59
59
59
59
60
60
60
60
61
61
6I
61
62
62
_2
62
63
63
63
63
64
64
64
64
65
65
65
65
184205
78346o
1539385
I955957
3398311
522444C
4087353
3876424
408866?
3420368
3tq0463
1502613
1208499
1688873
22__541
65710
1-253
EXPEND.
STUDY
1972
NORTH
AMERICAN
SPACE
DIVISION
DATA PREPAREO
NASA
CONTRACT
ROCKWFLL
CORP.
UNDER
NAS9-L2LO0
TTME
B-70
4- S YSTEM
5- SUB SYSTEM
PROPULSION
APRIL
PHASEO
EXPENOo
AIRCRAFT
STUDY
I
03
SUBSYSTEM
TO TA L
C{JST
Q-I
Q-2
0-3
66
66
66
TOTAL
49lq
96
3584329L
1-254
).972
0
_,
I-
>
Z
.4
"_
_,
<
i...
r,,, W_
t,L
I'-- Ul D _
U_
I,-
_'
o..,
_aa_
X_
_'--
Q_ Q_
J v_ IX
,be
|
!
II
,'_0
_o
u_
olD.
10t
!
lU
a
r_
.<
tU
;!
<
<
1-255
(_I01_)
_[_1"I(XI
'
SDT2-SH-O003
._ORTHAMERICANROCKWELL
SPACE
DATA
NASA
DIVISION
PREPARED
CONTRACT
CORP,
UNDEK
NASg"-I2tO0
TI ME
B-70
4-SYSTEM
5- SUB SY STEM
SECONDARY
MANMONTHS
Q-2
O-i
J-2
_-3
3-4
Q-I
Q-2
q-3
Q-4
0-I
0-2
Q-3
Q-4
0-I
Q-2
Q-3
0-4
J-I
_-2
Q-3
Q-4
_-l
Q-2
q-3
_-4
Q-I
_-2
Q-3
Q-4
58
58
58
58
59
59
Sq
59
60
6O
60
6O
61
61
61
61
62
(,2
_2
62
63
63
63
63
6"+
64
64
64
65
55
65
65
30.0
1972
APRIL
1
04
POWER
PHASE{3
AIRCRAFT
EXPEKD.
STUDY
SUBSYSTEM
LABOR
HOURS
5L_79
LAB (JR
RATE
5, 168
LABCR
F)CLLARS
BURDEN
DOLLARS
LABOR
BURDEN
26246
23108
49354
+
$
EN GR
MATL
179
249.0
4[834
4o357
182271
I62631
344902
27548
47U,5
8C363
4032
324034
278S20
602654
2131(,
829.5
145918
3.808
568836
531170
II00006
II720
1004,5
174075
4042
703659
#)54466
1558125
16855
[197.0
20[d99
4.141
832728
728358
156 1086
72454
1492o5
254745
4,369
1112956
805215
1978171
$2089
I144.5
207003
4,524
939108
921010
1860118
104467
160_.0
2743,_8
6,670
1281293
1216095
2497388
122708
1411.5
236065
4824
1143026
1175060
2318986
II1426
1147.5
196088
5,500
1078405
1045993
2124458
24719
116(9.0
19638h
5.410
1062473
1111254
2173727
70705
072.0
165763
5.545
91 8804
1023157
194 1961
41318
505.5
89023
5.833
519298
586155
1105453
45723
I_6.0
28761
6,055
1/4141
187008
361149
25354
63,0
10764
6055
65175
69562
134737
9990
1-256
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP.
A PR IL
UNDER
NASq-I2100
PHASED
AIRCRAFT
4-SYSTEM
5- SU8 SYSTEM
SECONDARY
1
04
POWER
MANMON TH S
3.0
13463.0
[q/2
EXPEND,
STUDY
SUBSYSTEM
L AB OR
HOURS
LABOR
RATE
LABCR
DCLLARS
BURDEN
DOLLARS
796
6.080
4840
5553
2309610
10q37353
Z-257
10585315
LABOR
BURD EN
I03c;3
21522668
EN GI_
MATL
708
805279
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
APRIL
CORP.
UNDER
NAS9-12100
PHASEO
AIRCRAFT
4-SYSTEM
5-SUBSYSTEM
SECONDARY
SUBC
Q-I
Q-2
Q-3
_-4
58
5a
58
58
59
J-2
59
59
59
60
Q-I
60
Q-2
69
Q-3
Q-4
60
61
61
Q-2
61
Q-3
J-4
oL
62
7-1
62
3-2
Q-3 62
62
_-4
63
_-I
63
0-2
63
Q-3
63
0-4
64
Q-I
3-? 64
9-3
64
64
3-4
65
0-I
65
g-2
65
Q-3
65
3-4
1972
I
04
POWER
SUB SYSIE
TOTAL
MATERIAL
EXPEND.
STUDY
M PC
OTHER
COSI
I0
179
SUB
T (ITAL
&
|46619
2582
933
_95016
119071
14(]387
4961
94
748096
238142
255862
8007
35
1363910
3881141
3097996
232483
8570
5497174
2545564
2618C18
1 6O561
8872
4348537
4430743
4522832
134717
11992
6647712
2058135
2162602
67794
7917
40 9843
3400708
3523416
II7750
26852
6165406
10 3486
3424537
3535963
117518
71482
6043949
10 1447
5303653
532_372
227647
54282
7734759
129325
2C94079
2164784
742 62
69807
4482580
74947
1390528
1431846
1 953 TB
6/080
3636265
77372
16633
10622
1178431
25074
10358
2 5354
_gg(]
75 84
-5_31
388256
1783
-233l
144179
T-258
IDWA
49543
119071
45723
104738
8 2969
127238
1
80309
3847
6655
199305
22322O
_ORTH
SPACE
DATA
_ASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
UNDER
NASg-I2100
TI _E
B-70
4- SYSTEM
5- SUBSYSTEM
SECONDARY
SUBC
"J-]
66
TLITAL
I
04
POWER
PHASEC
EXPEND,
AIRCRAFT
STUDY
SLBSYSTE_
TOTAL
MATERIAL
708
29005312
APR IL
CORP.
29810651
M PC
OTHER
COST
146
-Ib7
13 69T 96
_-259
330209
SUB
TOTAL
ltOBO
53033324
_
334
92
1444
1972
_IORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP,
UNDER
NAS9-12100
TIME
B-70
4- SYSTEM
5- SUB SYSTEM
SECONDARY
APRIL
I
04
POWER
PHASED
AIRCRAFT
SUBSYSTEM
TO TAL
C{]ST
_)-}.
0-2
3-3
Q-4
O-I
Q-2
Q-3
Q-4
Q-I
_-2
0-3
0-4
_)-1
9-2
0-3
Q-4
0-I
O-2
Q-3
_-4
O-I
O-2
_-3
0-4
_-I
_-2
0-3
_-4
0-1
Q-2
C_-3
_-4
58
58
58
58
59
59
59
59
60
60
bO
60
61
61
61
bt
62
62
62
62
63
03
63
63,
64
64
64
64
65
65
65
65
49543
495016
7480S6
1363910
5601912
4_.381
E1
6074255
4401966
6268892
6145396
7864084
4557527
3713637
12035C5
398614
148026
1-260
EXPEND,
STUDY
1972
NORTHAMERICANROCKWELL
CORP.
SPACEDIVISION
DATA
'4ASA
PREPARED
CONTRACT
UNDFR
NAS9-12100
IT ME
B-70
4-SYSTEM
5- SUB SYSTE'_
SECONDARY
APRIL
I
04
PO WIER
PHASED
AIRCRAFT
SUBSYSTEM
TO TA L
COST
114J. 4
5438"_q54
1-26_
EXPEND.
STUDY
1972
"1-262
(gllOrI'Illl) I1_I'IolI
sD72-s_{-ooo3
_ORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
APRIL
CORP.
U_!DER
NASg-/2100
PHASED
AIRCRAFT
4- SYSTEM
I
5- SUB SYSTEM
05
AIR
INDUCTION
_-1
_-2
_-3
,3-4
3-I
_-2
_-3
3-4
0-I
_-2
Q-3
_-4
_-I
L)-2
_-3
_-4
Q-I
Q-Z
_-3
0-4
0-1
_-2
_-3
]-4
O-I
9-3
_-4
_-[
Q-2
0-3
_-4
58
58
58
58
5q
5m
5q
59
60
6O
60
60
6 [
61
6 [
61
62
b2
62
62
63
63
63
63
64
64
64
64
65
65
65
6S
[972
SUbSYSTE
EXPEND.
STUDY
MANMONTHS
LABOR
[[CURS
LABCR
RATE
LABCR
DOLLARS
BURDEN
DOLLARS
45.0
7716
4.399
33942
35107
LABOR
+
8URD EN $
EN GR
MATt
69049
33021
4.184
[381 12
12932
253.5
43 194
4. 177
180418
1477d0
328198
204.0
35902
4. 142
14870l
128917
277618
477.0
82696
4.4t_6
370956
302023
672979
506.5
85199
4.468
3806_0
303934
684574
13102
520.5
8@768
4. 572
405861
295175
70 1036
52777
7 C2bO
4. 532
31 8404
299649
618053
103089
4.382
482249
455475
937724
164090
387.
645.0
[ 1 CC62
267493
196.5
428
18q
448.5
75"384
4. 624
34 8589
350603
699192
72663
328.5
56C03
4.920
275547
282788
558335
72039
298.5
49921
4.391
219194
265346
48 4540
26249
135.0
22904
5.555
127222
141272
268494
22396
[18.5
2C676
5.563
115029
128229
243258
22310
-2174
45.0
7756
6.502
50895
49146
100041
13.5
2 _.15
6.798
[5738
15097
30835
T-263
-870
.j"
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
_IASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NASg-12100
TI t_E PHASEO
B-70
AIRCRAFT
4- SYSTEM
5- SUB SYSTEM
A IR INDUC
MANMONTHS
1
05
I'ION
EXPEND.
STUDY
SUB SYS IE M
LABOR
HOURS
lq
4624.5
1972
LABGE
DGLLARS
3.421
7q 1796
65
3611622
1-264
BURDEN
DCLLARS
367
3330220
LABOR
RURD EN
+
$
432
694185[
EN G_<
MATL
-62
546226
,_ORTHAMERICANROCKWELL
CORP
SPACEDIVISION
DATA PREPARED
UNDER
NASA
CONTRACT
4- SYSIEM
I
5- SUB SYSTEM
05
AIR
INDUCTION
Q-I
Q-2
_-3
T_-4
Q-I
9-2
_-4
Q-I
Q-2
Q-3
Q-4
Q-I
Q-2
Q-3
_-4
Q-L
Q-2
0-3
9-4
Q-I
;,)-2
Q-3
Q-4
Q-I
Q-2
Q-3
3-4
O-I
Q-2
0-3
Q-4
58
58
58
58
59
5'::)
59
_9
60
6O
60
6O
61
61
61
62
62
52
62
63
63
63
63
64
64
64
64
65
65
65
.65
PHASED
AIRCRAFT
EXPEND.
STUDY
SUBSYSTEM
MATE
TOTAL
RIAL
MPC
OTHER
COST
WIND
TUNNEL
I 7037
791 78
1126915
1972
NAsg-12100
Tl _E
8-70
SUBC
APRIL
79606
112(-_15
T OT AL
O/C
$
SUB
TOTAL
L 7037
86086
110870
110870
378363
177 tO4
l 7 7104
587042
307gi
20182_
20 18 28
1637152
21.34
821044
821233
48734
182582
182582
1725528
287575
300677
18784
165266
16 5266
1169301
32304
133435
133435
1901463
LO 4209
1734444
98IOl1
1034688
8753G5
$78304
33788
99635
4574
1730799
1894889
67937
64343
39674
LO 40 17
3004567
17308C0
1803463
60682
30245
92708
122953
2686290
1063630
1135669
52260
31133
39551
1785815
283684
30933
11701
29699
32099C
343386
46470
22310
[_I16
-2174
-650
-87e
-155
T-265
8418
180649
1016522
210348
24
25
658375
-I
23
22
273706
30
31
97248
12
12
29822
_IDRTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
4- SYSTEM
I
S-SUBSYSTEM
05
AIR
INDUCTION
PHASED
AIRCRAFT
EXPEND.
STUDY
SUBSYSTEM
TOTAl_
MATERIAL
-62
930183l
Ig72
UNDER
NASg--121OO
TI ME
B-70
SUBC
APRIL
CORP,
984805?
M PC
WIND
TUNNEL
-13
412883
1-266
TOTAL
OIC.
OTHER
COST
L243178
32bi13
SUB
TUTAL
l
1509291
358
18772082
_IORTH AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
APRIL
CORP.
UNDER
NASq-].2].O0
PHASED
AIRCRAFT
4-SYSTEM
I
5- SUBSYSTEM
05
AIR
INDUCTION
G
58
5R
58
58
50
59
Q-2
59
J-3
Q-4
5g
60
Q-2
60
60
60
6l
Q-t
Q-2_ 61
61
Q-3
g-4
61
3-]. 62
3-2
62
52
_-3
62
Q-4
63
O-t
63
Q-2
63
Q-4
63
64
Q-]
64
3-2
64
0-3
0-4
64
65
3-I
65
Q-2
65
Q-3
65
J-4
&
SUBSYSTEM
TOTAL
COST
86086
Q-i
0-2
Q-3
Q-4
378365
587042
1 63 7152
32877
1758405
22279
1191580
35335
1936798
32231
I 760e75
50432
3054999
45088
2731378
29858
tSl
16991
1033513
14010
5673
672_385
5824
279530
2595
99843
7_5
3C617
1-267
EXPEND,
STUDY
1972
NORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NASCy-I21OO
TIPE
B-70
4- SYSTEM
1
5- SUBSYSTEM
OS
AIR
INDUCTION
PHASED
AIRCRAFT
SUBSYSTEM
TCTAL
COST
G_A
II
288326
369
[ _f_6 (2408
1-268
EXPEND,
STUDY
[972
1-269
(a_o_)
_v'r_o_
SD72-SH-O003
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NAS9-12100
T[ ME
B-7O
4- SYSTEM
I
5- SUB SYSTEM
06
FLIGHT
CONTROL
MANMONTHS
Q-I
58
58
Q-2
Q-3
58
_8
0-4
Q-l
59
59
_-2
0-3
59
_-4
59
O-I
60
Q-2
60
0-3
60
Q-4
60
Q-I
61
0-2
61
3-3
6L
0-4
61
Q-I
62
3-2
62
0-3
62
_-4
b2
Q-I
63
0-2
63
0-3
63
C}-4 63
Q-[
64
_-2
64
Q-3
h4
L)-4 04
Q-[
66
3-2
65
Q-3
05
O5
_-4
40.5
1972
PHASED
AIRCRAFI
EXPEND,
STUDY
SIJBSYSTEM
LABOR
HOURS
_891
LABOR
RATE
4.800
LABCR
DCLLARS
BURDEN
DOLLARS
3 3076
31352
LABOR
BURDEN
+
$
EN GR
MATL
6 4428
199.0
33513
4.461
149485
131925
281410
234.0
40016
4.508
180378
137559
317937
1138
11846I
3.940
466791
428382
895093
16426
1050.0
182252
3.897
710249
6_6243
1396492
21870
1126.5
185204
3.971
75L354
672054
1423408
217747
L649.5
281714
3.830
1079025
941779
2020804
70878
1267.5
22 gg08
3.844
883713
953187
1836900
397370
1028.0
175540
4.351
763726
733366
1497092
76206
967.5
162631
4.200
682995
739003
142 1998
128842
673.0
196
487.5
83393
5.624
469039
488292
957331
149916
515,5
86500
4.975
430371
502154
932525
18233
376.5
64366
5.158
331992
383792
715784
32953
333.0
58614
5.42|
317744
367219
084963
330i9
I00.5
17389
5.729
99624
110231
209855
6057
6. 954
37018
41097
78115
2422
31. S
5323
1-270
_JRTH AMERICANROCKWELLCORP.
SPACE
DATA
NASA
DIVISICN
PREPARED
CONTRACT
APRIL
UNDER
NAS9-12100
II ME
B-70
4- SYSTEM
1
5- SUB SYSTEM
06
FL IGHT
CONTROL
MANMDN T H S
PHASED
AIRCRAFT
EXPEND,.
STUDY
SUBSYSTEM
LABOR
HCUkS
1890
10.5
]. OOQD.
1972
LABCR
RATE
1.753
1737606
LAECR
DCLLARS
BURDEN
DOLLARS
3314
3268
7389894
T,-27
7350823
LABOR
BURDEN
6582
L_7607L7
+
$
ENGR
MATL
17b
I173454
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPAREO
CONTRACT
ROCKWELL
CORP.
UNDER
NAS9--12100
Tl ME
B-70
4- SYSTEM
X
5- SUB SYSTEM
06
FLIGHT
CONTROL
SURC
Q-I
Q-2
Q-3
0-4
Q-t
0-2
{Q-3
Q-t
0-2
Q-3
Q-4
0-I
Q-2
Q-3
_-4
Q-I
Q-2
Q-3
3-4
O-I
_-2
Q-3
Q-4
0-1
Q-2
Q-3
Q-4
Q-I
Q-2
0-3
Q-4
58
58
58
58
5q
5q
5g
59
60
60
60
60
6I
6I
61
61
62
62
62
62
63
63
63
63
64
o4
64
64
65
65
65
65
1972
APRIL
PHASED
AIRCRAFT
EXPEND,
STUDY
SUBSYSTEM
TOTAL
MATERIAL
OTHER
COST
MPC
3443
I q6
L[3_
SUB
TOTAL
&
TOTAL
COST
67871
67871
It
4476
286093
286093
96
5137
324308
324308
1094733
1625C0
178926
5831
t4883
1094733
162500
184376
12516
23083
1616467
30798
1647265
61956C
83 7307
65392
25159
2351266
4 4800
2396066
1602525
[673403
51902
19307
3765916
69982
3835898
1061735
145910b
03995
26111
3386111
62924
3449035
1153889
123C095
42671
14453
2784317
46734
2831051
1153889
1282731
46805
2083
2772365
46534
2818899
gslooc
110C916
55148
24414
2137809
39088
2176897
127402
t45635
5888
23928
1107976
18528
1126504
430036
462989
62571
17117
1258461
26777
k285238
i2012
14034
744028
15832
7 59860
33019
0057
1812
14761
232485
6202
238687
2422
432
5905
86874
2317
89191
1-272
slLIRTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APRIL
L97_
UNDER
NASq--I2100
TI I_E PHASED
EXPEND.
B-70
AI RC RAF I" STUDY
4-SYSTEM
L
5- SUB SYSTEM
06
FL IGHT
CONTROL
SUBC
7425036
SLBSYSTEM
MATE
TOTAL
RI &L
MPC
UTHER
COST
L75
36
422
8598_90
427124
257964
T-273
SUB
TOT AL
72]5
24D24295
F. A
TDTAL
CI]ST
217
7432
410733
24435021_
!
II
|
!
|
|
!
1
0
0
_-_7_
(_oz'rm_)
m_w_c_
s_7_-sH-ooo3
NORTH
SPACE
DATA
WASA
AMERICAN
DIVISION
PREPARED
CONTP, ACT
ROCKWELL
APR IL
CORP.
UNDER
NASg-12LO0
TI ME
8-70
4- SYSTEM
5- SUB SYSTEM
PERSONNEL
L
07
ACCOMM
MANMONTHS
_Q-L
3-2
J-3
Q-I
Q-2
3-4
Q-L
Q-2
CQ-_
_-4
_-I
3-2
_-3
Q-4
3-t
Q-_
_-4
Q-t
_-Z
3-3
]-4
0-I
3-2
Q-3
58
58
5 p,
58
59
59
5q
59
60
60
60
60
61
61
6l
61
#,2
62
62
62
63
63
63
63
#,4
64
64
64
65
_-I
'.,I-265
65
6_
3-4
1621
O
PHASED
AIRCRAFT
EXPEND,
STUDY
SUBSYSTEM
ANt) ESCAPE
LABOR
HOURS
0,0
tgb.
1972
LABOR
RATE
LABCR
DOLLARS
4. 716
7644
BURDEN
BOLL AR,S
7367
LABOR
bURDEN
I 50 It
ENGR
MATL
22
32707
t.689
120658
L23721
244379
Llb60
463.5
7245
3.433
2-/2063
279704
551767
34014
4C6,0
7L688
3,6q3
264736
267826
532562
14983
L20213
3.833
460762
407603
868345
109266
4.174
367688
309477
677165
25231.0
693.0
52Z,.5
843091
1503.C
256658
3.5L6
902405
944320
1846725
174874
814.5
t41746
3.9L3
578184
641896
1220080
147286
727.5
123(::)26
4,564
565612
580941
1146553
120874
394.5
66107
4.145
274025
3091'98
583223
154.5
26432
5.862
154944
140537
295481
100.C
169Gt
6.216
105050
117266
222316
91.0
15324
6.798
104176
103046
207222
7132
106924
13576
45.0
7850
6, (96
53346
53578
12.0
1954
8.88L
t 7354
1450
8. 725
7983
6.0
gl 5
1-275
66_19
3 1855
14672
76200
2817
844
1(15
66
NDRTHAMERICANROCKWELLCORP.
SPACE
DATA
NASA
DIVISION
PREPARED
CONTRACT
MANMONTHS
l
07
ACCOMM
AND
LABOR
HOURS
61.
6139.0
Ig72
UNDER
NASg-L2[O0
TI ME
B-70
4- SYSTEM
5- SUB SYSTEM
PERSONNE
APRIL
[057439
ESCAPE
PHASED
AIRCRAFT
EXPEND.
STUDY
SUBSYSTEM
LAB GR
RATE
LABOR
DCLLARS
9.557
583
4257193
1-276
BURDEN
DOLLARS
490
4308[60
L ABOR
8URO EN
EN GK
MAFL
!.O73
8565353
4
966093
NF_RIFH AMERICAN
DATA
NASA
PREPARED
CI-]NI'RACT
RL-tCKkEtL
APRIL
CORP,,
UNDER
NASg-l.2100
TI ME
B-70
4 -:-SYSTEM
1
5-- SUB SYSTEM
07
PKRS(}NNEil.. ACCOMM
SUBC
Q-t
Q-3
Q-4
Q-L
Q--.2
0-3
Q-I
:_-2
Q-3
_)-I
g-2
Q-3
Q-4
O-t
0-2
J-3
".)-4
0-1
0-2
0-3
0-4
O-]
O-2
O- 3
Q-4
5,_
58
5 F]
58
5O
5O
S9
5q
60
60
60
60
61
61
_I
AND
TCTAL
MATERIAL
PHASED
AIRCRAFT
E SCAPE
EXPEND,
STUDY
SUBSYSTEM
MPC
OTHER
COST
308
22
IOWA
L5342
256677
34014
2881
588662
1 4983
1269
548814
1176246
22411
7528
1143147
22212
25940
18811
2456013
59026
720307
197410
13736
6066
1437292
39952
712714
1418832
23815
163279
272545
24054
I 1302
I63280
4[5590
42864
_89063
56453"/'
24
SUB
TOTAL
638
_.1660
50!
1972
62
62
,52
62
63
[ 30;374
251248
13748
7283
140375
21 6575
10460
7680
93036
95853
63
63
6_
b4
64
04
65
_- 2 65
C)- _, 65
65
;)-4
23200
24044
4227
828
7132
|. 3516
_60
4939
817938
137 30
-2249
393312
6575
-L986
245202
4099
1002
216116
4598
1002
12644l
2690
1.65
49
9226
41295
II01
66
12
3690
18440
492
_-277
22683
NDRTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
SUBC
1
07
ACCOMM
AND
TOTAL
MATERIAL
ESCAPE
PHASED
AIRCRAFT
211S424
EXPEND.
STUDY
SUBSYSTEM
MPC
4
I t5_3_1
1972
UNDER
NASg-12100
TIME
B-70
4- SYSTEM
5- SUB SYSTEM
PERSONNEL
APR]L
CORP,
l
146407
OTHER
COST
263
69926
1-278
SUB
TOT AL
1341
1090[tlO
IOWA
40
200741
1_55704
_ORTH AMERICANROCKWELL
SPACE
DATA
NASA
DIVISION
PREPARED
CONTRACT
APRIL
CORP,
UNDER
NASg-12100
T! ME
B-70
4- SYSTEM
'S-SUBSYSTEM
PER S{)NNEL
I
07
ACC (]MM
AND
E SC A PE
PHASED
AIRCRAFT
SUBSYSTEM
I0 IAL
COST
9-I
Q-2
2-3
,9-I
a-2
O-3
3-4
9-3
C_-4
5:_
58
5R
58
59
59
5':)
5q
_0
_,0
_0
6O
61
Q
a
0"!.
I
A?
15342
256677
588662_
548814
11986_,7
1 /880_2
.) ?' 3";34_
6.<
Q-.2 63
,Q.3
63
_J-i b _
_Jo-2 f,%
6_((--4
9-4
Q-'l 6_i
0--2 6_
Q..:_ 8 5
0-
0 t ,'1(:
]29
1}l
4_'3 q6
1 8_ _ 2
I.-279
EXPEND.
STUDY
1972
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NASq-I21UO
TI ME
B-70
4- SYSTEM
5- SUB SYSTEM
PERSONNEL
1972_
1
07
ACC OMM
AND
E SCAPE
PHASED
AIRCRAFT
EXPEND.
STUDY
SUBSYSTEM
TO TAL
CO ST
_J
1-280
!
-I
I
!
0
_-_s_
(_ormz_) _n_
sD_s-smooo)
NORTH
SPACE
OATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
APRIL
EORP.
UNDER
NAS9--12100
TIME
B-70
4- SYSTEM
5- SUB SYSTEM
ALIGHTINC,
MAt_MONTHS
9-I
Q-2
_-3
3-4
0-I
0-2
9-3
9-4
Q-I
9-2
@-3
3-4
0-1
7-2
0-3
_-4
Q-I
3-2
Q-3
3-4
O-I
$)-2
0-3
_-4
_-[
,_-2
0-3
3-4
Q-I
9-2
_)-3
9-4
58
_B
58
S8
59
59
54
59
60
60
60
60
6]
61
61
61
62
62
62
62
63
63
63
63
64
64
64
b4
65
65
65
65
I
08
AND
AR RE ST I NG
L A;_{IR
HOURS
9_
40.5
1972
6108
PHASED
AIRCRAFT
SUBSYSTE
EXPEND.
STUDY
IV
LABOR
PATE
LA_CR
DOLLARS
a.674
444
BURDEN
DOLLARS
432
LABOR
BURDEN
+
$
EN G_
MATL
876
4.628
31044
26269
57313
82.5
14042
4.518
63440
48277
I 11717
70.5
12504
4.346
54342
44877
99219
I18.5
2C473
4.443
90953
78219
[69172
127.5
21535
4.655
100245
80196
180441
178.5
3C78q
4.930
[51800
102837
108.0
1_7t4
4.853
95959
89a17
18 5776
t025
I05.C
17842
5.247
93609
622o0
17 5869
6479
114.0
1q045
4.929
93872
945_4
188466
2301
12540
6.056
75936
74853
150789
73.5
254637
-1588
20
665
46.5
7687
5.140
39514
39713
79227
-702
37.5
6300
5.921
37304
39629
76933
-110
48.0
8359
5.895
49277
53670
10 2947
-111
16.5
2124
6.860
18688
18118
36806
154
10.5
1844
6.843
12618
12219
24837
62
._../
1-282
NORTH
AMERICAN
SP _%CE DIVISION
DATA
PREPARED
_ASA
CONTRACT
ROCKWELL
APRIL
CORP.
UNDER
NAS'::)--IZIO0
TIME
B-70
4- SYSTEM
5- SLIB SYSTEM
ALIGHTING
MA_IMONIHS
I177.5
1972
1.
08
AND
ARRESTING
PHASED
EXPEND.
AIRCRAFT
STUDY
SUBS YSTE
tABOR
H U URS
LABER
RATE
-I
4. OOO
LABCR
OCLLARS
202260
-4
100O041
1-283
BURDEN
DOLL ARS
-3
885977
LAB(IR
8URD EN
EN G&
MATL
-7
18(_5018
8199
NORTH
SPACE
DATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP.
UNDER
NAS9--12100
TIME
B-70
4- SYSTEM
5- SUB SYSTEM
ALIGHTING
SU8C
Q-I
0-2
O-3
_-4
Q-3
_-4
0-I
0-3
_-4
0-I
_-2
9-3
D-4
Q-I
Q-2
,_-3
,_-4
Q-I
Q-2
Q-3
Q-4
Q-I
0-2
0-3
_-4
Q-I
2-2
0-3
58
58
58
58
59
5(9
59
60
60
60
60
61
61
61
61
62
62
bZ
62
63
63
63
63
64
64
64
64
65
65
65
65
1972
APRIL
I
08
AND
ARRE
ST[ NG
TOTAL
MATERIAL
PHASED
AIRCRAFT
EXPEND.
STUDY
SUBSYSTE_
OTHER
CCST
MPC
SUB
TOTAL
876
TOTAL
COST
876
57313
57313
213688
21 3688
5665
331070
331070
713689
213889
5837
318745
318745
2602603
2602603
15441I
2926186
55753
2(981939
1771323
176_735
I04887
2055065
3C_155
2094218
1584016
1584C36
45384
1884057
35012
1919069
2024063
2025088
58077
18
2268959
42163
2311122
1575463
1581942
50580
1808394
30353
1838747
1575464
|577705
50205
181644_
30488
1846931
1229581
123C246
52279
1433314
23964
145_'278
357658
356956
L1424
27
447634
7485
455119
120520[
1205091
1447535
30700
1478235
102797
2188
104985
-III
165509
-40
154
46
37067
987
_7994
62
II
24911
665
25576
1-284
NORTH
SPACE
OATA
WASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CURP.
UNDER
NASO--12100
TIME
B-70
4- SYSTEM
5- SUBSYSIFM
ALIGHTING
SU_C
I
OB
AND
AR RE STI NG
MATE
TRTAL
RIAL
PHASED
EXPEND,
AIRCRAFT
STUDY
SLBSYSTEM
MPC
4
1435274q
I_72
APRIL
14_6C04B
I
704276
SUB
T OT AL
OTHER
COST
1-285
TO T AL
CD S I"
-I
-I
I
61
169O0303
29891B
172
_g216
i
W "
"1
1-286
(_OITIIM)
_%_FIO(I "
SD72-SH-0003
NORTH
SPACE
DATA
NASA
AMERICAN
ROCKWELL
D IVISII)N
PREPARED
UNDER
CONTRACT
NASg-12100
CORP.
APRIL
TI ME
B-70
4-SYSTEM
5- SUBSYSTEM
MISSION
1972
PHASED
EXPEND,
AT RCRAFI
STUDY
I
09
AND
TRAFFIC
MANMONTHS
LABOR
HOURS
CONTREL
SUBSYSTEM
LABCR
RATE
LABCR
DGLLARS
BURDEN
DOLLARS
LABOR
+
8URD EN $
ENGR
MATL
9-I
_-2
58
58
15.0
2605
4.382
11415
11852
0-3
9-4
58
58
100.5
1_840
4.236
71331
66060
137391
0-I
:)-2
59
s9
136.S
23503
4.033
9_777
81447
176224
1623
_-3
;)-4
50
59
187.5
32844
3.892
127839
247400
1092
D-I
9-2
60
60
122.5
21219
4.542
96380
79010
175390
193
Q-3
_-4
_-1
,_-2
60
60
61
61
102.C
1714_
4.453
76340
63550
139899
3538
I_7.5
31783
4.204
I066_8
240240
37272
,-3
Q-4
61
61
102.5
18608
4.603
85648
90932
176580
8813
_-i
_-2
Q-3
J-4
0-1
_-2
62
02
62
62
6_
63
97.5
[6619
5.051
83945
75616
159561
2234
97.5
16302
5.203
84821
82473
167294
243
61.5
1C453
5.727
59867
56822
116689
0-3
0-4
_-1
_-2
63
63
64
64
53.5
SOb2
5.176
46904
51601
9_505
3509
39.5
6841
8.165
55858
42484
98342
4565
_-3
_-4
0-I
_-2
0-3
9-4
64
(,4
65
65
65
65
3[.5
5552
1.598
8872
36642
45514
6450
133602
119561
2 3267
93
26193
4.5
707
7.755
5483
4851
10334
1848
1.5
307
8.225
2525
2214
4739
739
'WORTH AMERICAN
SPACE
DIVISION
DATA PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APR IL
UNDER
NASB.-12100
II PE
B-70
4-SYSTEM
5- SUB SYSTEM
MISSION
1
09
AND
TRAFFIC
MA NMONTHS
LAB OR
HO_RS
-69
1341.0
1972
CONIRCL
PHASED
AIRCRAFT
EXPEND.
STUDY
SUBSYSTEM
LABOR
kATE
LABCR
DCLLARS
3.tO1
-27b
230,302
1045340
C c9
1-288
BURI)EN
DOLL ARS
-299
97].454
LABOR
BURDEN
-575
20[b7q4
+
$
EN GR
ATL
52
0d457
,WORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
UNDER
NAS9-12100
TI ME
B-70
4- SYS TEM
_- SUE SYSTEM
MISSION
I
(],9
AN{) TRAFFIC
SUBC
58
5Q
58
9 - 4 S8
J-I
_q
Q-2
59
_)-3 59
q9
CQ-I GO
4-2
60
0-3
60
60
3-4
Q-I
6I
61
_J- 3 _,I
_-4
01
O-I
62
_2
62
62
3-4
_-I
63
_-2
0-3
63
_3
0-4
0-1
h4
b4
)-2
"0-3 O4
(-,4
_-4
_J-I 65
_5
_-2
3-3
65
65
L972
APRIL
C[]NTRCL
TOTAL
MA TE RI AL
PIIASED
AIRCRAFT
EXPEND.
STUDY
SUBSYSIEP
MPC
{JTHER
COST
3-I
3-2
264
0]_
SUB
TOTAL
23531
16
TCJT AL
COST
23531
137505
137505
24354
25977
782
202988
202983
24354
25446
76b
273614
2736t4
7] I05-3
71 IZSI
42210
2q38
931789
17755
3065 48
.]L C086
18651
1222
469858
8953
418811
357964
39523h
13404
28R, 5
651765
12112
663817
1007
210559
5027
275586
162030
2119
164749
269
167825
2811
t 70642
422
145884
2_39
148323
81CC_2
8(;05
_067
2234
llO
243
26193
S9
19
2580
9 4q 544
350g
346
36
102396
1712
104108
450b
4d7
[9
103413
286
103699
6450
2347
17
t 548
553
139
132
1-289
54328
12737
5611
1156
55484
340
13077
150
5761
NORTHAMERICAN
SPACE
DATA
NASA
DIVISION
PREPARED
CONTRACT
ROCKWELL
APRIL
CORP,,
UNDER
NAS9-12100
TI ME
B-70
4-SYSTEM
5- SUB SYSTEM
MISSION
l
09
aND
TRAFFIC
SUBC
CONTROL
TGTAL
MATERIAL
52
t50537C
1972
1603827
PHASED
AIRCRAFT
EXPEND,
STUDY
SUbSYSTeM
MPC
OTHER
COST
II
SUB
TOTAL
-512
85538
9L57
m-'#9o
371531_
C
-16
55450
TOTAL
COST
-528
3770766
--U=
o._
-I
>
<
.I
u.
0
I,,,_
I,-
o?<_0
0 _
r" UJv_
--_-JZ
I,- Z
z'_
_mm
!
ZO
On,
!"
!
6
i
<
i-291
(S_OITIIM)
_ _rFIO_
,_
SD72-SH-O003
_IORTH
AMERICAN
SPACE
DIVISION
DATA
PREPARED
NASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NASe-X2100
TIMF
b-70
4- SYSTEM
I
5- SUB SYSTEM
lO
FLIGHT
|NDICATION
MANMON TH S
O-I
0-2
59
b9
;,)-4
_-I
0-2
,_-3
_-4
9-I
J-2
0-3
_-4
0-1
0-2
0-3
Q-_
0-I
0-2
Q-3
0-4
_-I
_-2
0-3
59
60
60
60
60
61
61
61
61
62_
62
62
62
63
63
63
63
64
64
64
1972
PHASED
AIRCRAFT
EXPEND,
STUDY
SUBSYSTEM
LABOR
H OURS
LABGR
RATE
LABCR
DCLLARS
BURDEN
DOLLAPS
LABOR
BURDEN
+
$
SUt_C
311813
311813
84385_
744582
020333
265431
TOTAL
30q7830
1-292
_L)RTH
AMERICAN
SPACE
DIVISION
DATA
PREPAREO
NASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NASg-12100
PHASED
EXPEND.
AIRCRAFT
STUDY
4-SYSTEM
]
5- SUB SYSTEM
10
FL IGHT
INDICATION
MPC
Q-[
_-2
_-3
Q-4
0-1
Q-2
Q-3
_J-4
Q- l
Q-2
_-4
_-1
Q-2
Q-3
_-4
Q-I
3-2
_-3
Q-4
0-1
L}-2
_-3
SUBSYSTEm
SUB
TOTAL
G &
T (],T AL
COST
59
qq
8267
32 C080
320080
59
59
60
,0
bO
60
41
61
61
6[
62
62
62
62
63
63
_3
63
_4
64
64
85 lq
3201;32
320332
TOTAL
50065
893923
2[686
915609
/-,14177
788759
19712
80847[
17772
638105
[1.857
649962
76C3
136403
273C3_
32_4233
_074
58329
278108
3292562
1-29-%
[972
!
|
i
0
_-_9_
(s,,0_)
m_'v'n_
s97_-sH-ooo3
NORTH
SPACE
IJATA
NASA
AMERICAN
DIVISION
PREPARED
CONTRACI
ROCKWELL
APRIL
CORP.
UNDER
NAS9-12100
TI ME
8-70
4- SYSTEM
I
S- SUBSYSIEM
11
TEST
INS TI_UMENTA
MA NM()NTH S
2-I
0-2
J-I
"_-2
Q-3
2-4
(Q-I
q-?
3-3
_-4
Q-2
Q-3
;)-4
Q-I
")-2
Q-3
_-4
_-i
Q-2
Q-3
9-4
0-I
2-2
0-3
_-4
"3-2
0-3
D-4
5,_
58
5_
58
59
5+
59
5g
60
60
60
gO
61
61
61
61
62
62
62
62
63
63
63
63
64
64
04
64
65
65
6,5
1972
IT ON
PHAS EU
AIRCRAFT
EXPEND,
STUDY
SUBSYSTEM
BUR DEN
DOLLARS
LABOR
8URO EN
+
$
L AL_OR
HOURS
LABOR
RATE
LABCR
DGLLARS
L5.0
253,3
4.573
I L597
11539
2 i_136
58.5
99"36
4.289
42616
38702
8 131B
cN GR
MATL
56.0
I 1299
4.2 37
47870
38638
8650_
106.5
18638
4.266
79515
68101
147616
96. C
I _520
5.3 06
87(,55
71524
159179
73.5
12321
5.246
64632
51196
11 5828
229.5
3 c,C_O
4.545
177022
130279
307901
2183
289.5
52609
4.756
250193
227760
477953
20011
615_5
105C67
4.300
451789
445578
8_7_67
82401
793.5
1332_T
4.291
571893
_22736
1194629
810.0
|38C16
4.541
626715
674455
130
649.5
I0_071
4.284
467256
638Y42
1105998
6510
111288
3.789
421621
475575
89 T 196
76773
I98,0
350_0
5.923
207494
242620
450114
70007
26_.0
46155
4.2_3
195360
24[992
43 1358
70263
IIB.5
2Cli
86855
89234
17 b089
28780
4.317
65
1-295
1170
78
24084_9.
83O 74
5[086
_ORTH AMERICANROCKWELL
COKP.
SPACEDIVISION
DATA PREPAREDUNDER
NASA
CONTRACT
4- SYSrEM
l
5- SUBSYSTEM
11
TEST
INS TRUMF
,_-1
0-2
0-3
60
66
66
TOTAL
6,0
NTA IT(IN
L A!_OR
HOURS
1CH3
43
50'+4.5
1972
NASO-t2100
IT ME
B-70
MANMONTHS
APRIL
8_2C9b
PHASED
EXPEND.
AIRCRAFT
STUDY
SUBSYSTEM
1ABCR
RATE
LABCR
DOLLARS
3.32 B
3604
4,837
208
_794501
1-296
BURDEN
DOLLARS
1448 1.
[99
408335E
LABOR
BURDEN
*
$
t 80@5
40-(
7877852.
ENGR
MATL
L?4ZT
2758
747683
NORTHAMEglCAN ROCKkELLCORP.
SPACFDIVISION
OATA PREPAREDUNDER
WASACONTRACTNAS9-12100
TI ME
B-70
4-SYSTEM
1
5- SUB SYSTFM
II
TEST
IN S TR UME NTA 11LIN
M@'C
C,;-I
_-2
0-3
_-4
_-1
0-2
I)THER
C(_ST
58
58
58
58
50
50
W-3
59
_-4
5_
C)-I 60
9-2
&O
'_-3
60
,%-4 60
_)-I -,1
"J-2
6L
%-3
61
U-4
61
0-I
62
')-2
62
a-3
_2
_-4
62
J-I
63
0-2
6_
_-3
63
_-4
63
_-1
6 L,
_-2
64
_-3
64
'_-4 6',
J-I
65
Q-2
65
D-3
65
_-4
65
10
184
APRIL
PHASED
AIRCRAFI
EXPEND.
STUDY
SUBSYSTEM
SUB
TLITAI.
T OT AL
COST
23136
23136
61318
81318
86508
86508
147610
147616
159179
3033
162212
115916
2708
118124
310200
5766
316034
9295
509489
1692
538
500194
0532
616
q86910
10565
1003481
132
1454581
24415
1478996
1B cJ6695
23353
L420048
1203687
21130
1284817
18975
61P. 2
426q
5032
101511
8184
-51.092
25469
2fa72
921001
19599
940660
54H462
11611
560133
21010
25
528050
14105
542761
5134
I0
210013
5603
215616
T-297
1972
_ORTH
SPACE
DATA
N&SA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP,
APRIL
UNDER
NAS9-IZIO0
TI ME
B-70
4- SYSTEM
I
5- SUB SYSTEM
II
TEST
INSTRUMENTATION
3-2
0-3
66
t_6
T[JTAL
FlTHE R
COST
4029
t04605
48942
EXPEND,
STUDY
SUBSYSTEM
MPC
1_',9
PHASED
AIRCRAFT
S UB
TOTAL
&
41542
/251
3334
I00
8779082
158094
1-298
T Of AL
COS f
42793
3434
8937176
1972
!
|
1
, j
_
1-299
(gEOITIIM)
,
_
S_nTIO(I
SD72-SH-O003
_ORTH
SPACE
DATA
SlASA
AMERICAN
DIVISION
PREPARED
CONTRACT
ROCKWELL
CORP.
APRIL
UNDER
NASg--L2LO0
TI ME
B-70
4- SYSTEM
5-SUBSYSTEM
SUBSYSIEW
I
12
INSTALLATION
MA NMt}N TH S
3-I
59
6)-2 68
58
3-3
5_
0-4
O-I
5 (}
:5- 2
Q-3
59
5O
0-4
60
Q-I
60
_-2
Q-3
O0
Q-4
O0
Q-I
bl
Q-2
61
3-4
5I
62
Q-I
0-2
62
h2
Q-3
_-4
62
_-I
63
.)-2 63
63
3-3
')-4 63
64
Q-I
_-2
64
0-3
64
64
3-4
O-I
65
6_
65
0-3
3-4
65
AND
L ABOR
FLOURS
8
PHASED
EXPEND.
AIRCRAFT
STUOY
CHECKCUT
LABOR
RA TE
LABCR
DOLLARS
4.625
LABOR
BURD EN
37
1.5
135
4.215
13.5
2437
4.2 59
LC. 5
L 751
5.047
36
73
569
461
1 0379
8932
19311
8838
3812
12710
[65.0
2 7154
3. I I I
292.5
49321
3.032
151080
1321.5
239425
3.122
747468
4377.0
7472LL
3.094
2312073
2549
6253.5
IC5C539
3.204
3365511
3830771
72462_2
4380.0
747519
3.317
24797,%2
2944580
5424342
5"/12.0
95(;815
3.197
3068177
4037059
7105236
3310.5
505054
3.722
2103323
3095128
5199451
501T.5
882g56
3.B06
3360311
4325359
76815070
2365.5
41C233
3.655
1499284
1959630
3438914
15589b
5.819
907084
739093
164677"/
q28.5
Z-300
86038
103,0
[
170C_6
687339
120
8 6039
168176
143 480./
4861195
1972
NORTH
A_ERICAN
SPACE
DIVISION
L')ATA PREPARED
_ASA
CONTRACT
ROCKWELL
CORP.
APRIL
UNL)ER
NAsg-12100
TI ME
B-70
_--SYSTEM
5- SUB SYSTEM
SUP, SY_TE
I
12
_,i INSIAL|.AFI
M.ANMCINTI4 S
_-I
0-2
:J-3
66
(-,6
66
Tf)TAL
0i_ ANI]
L AH UP,
H OUR S
g2
3414q.0
5840566
PHASED
AIRCRAFT
EXPEND.
STUDY
CHFCKCUf
LAH OR.
RATE
LABCR
DCLLARS
403
4.380
201003_7
1-301
BdROEN
D{]L L ARS
361
24230438
764
44330775
1972
NORTHAMERICAN
SPACE
DATA
_ASA
DIVISION
PREPARED
CONTRACT
ROCKWELl.
CORP.
APRIL
UNDER
NAS9-12100
PHASED
AIRCRAFT
4- SYSTEM
5- SUe SYSTEM
SUBSYSTEM
MFG
MATL
1
12
INSTALLATI_3N
TOTAL
MATERIAL
AND
EXPEND.
STUDY
CHECKCUT
Sdt3
TOT.aL
MPC
Q-2
C)-4
Q-I
9-2
Q-3
Q-4
0-1
0-2
Q-3
'_-4
0-2
Q-3
D-6
O- l
Q-2
0-3
3-4
0-I
3-2
_J-3
Q-4
Q-I
3-2
Q-3
Q-4
58
58
59
_9
59
59
60
e3
&O
60
61
61
61
62
62
_2
62
63
6_
63
63
_4
64
04
_4
65
65
65
65
&
IOWA
TDTAL
COST
?3
58
_-3
T)-4
1972
73
1039
1030
193/1
19311
12710
314664
51 _66_
12952
242
1 14002
86039
2131
168176
191#6
8b2112
I0_9434
26589
177 6060
_,7176
7626t6
2585852
6105879
102487
6208366
25832
I153769
1153759
90917
165358C
1653580
130302
9030164
151571
9181735
1467317
I_67317
144531
7036190
I17645
?153835
2217861
221
218459
954L556
169208
578537
10289301
1286514
1286574
137149
662
189172
2267333
9079676
11U0129
110C129
000227
9186026
199305
Ib0726
956605?
40,9925
409925
122609
397 1448
106052
3530
4081030
2691Q_'
269109
5062
202148B
7861
48009
1-302
3174
1963895
52531
NORTHAMERICANROCKWELL
CORP.
SPACE
r_ATA
NASA
DIVISION
PREPARED
CONTRACT
APRIL
tO72
UNOER
NAS9-121.00
TI _'E PHASED
EXPEND.
B-70
AIRCRAFT
STUDY
4- SYSTEM
_- SUB SYSTEM
SUBSYSTEM
MFG
MATL
522]'
_0-2
I
1.2
INSTALLATION
AND
CHECKCUT
TOTAL
MATERIAL
MPC
SUB
TOTAL
5227
I084
7075
_, A
IOWA
TO T _L
COST
7288
213
6o
-30023
TOTAL
9848132
-3CC23
c#84 8132
-1d46
1318030
-31869
55496937
1-303
-960
I155919
-32829
4685745
61338601
_-6
WBS
i.i
ITEM
ENGR
STRUCTURE
SUBCONTRACTOR
PROD
COST
Space Amer,can
Division Rockwell
North
SUMMARY
TOOLING
TEST
TOTAL
24,811,212
54,120,504
24,510,375
2,203,729
3,784,068
4,153,083
11,260,835
21,622,566
8,263,855
STAB.
2,134,321
3,815,870
4,571,880
10,522,071
FUS.
8,920,832
1,592,796
2,082,211
12,595,839
23,305,204
5,439,346
29,036,045
57,356
103,499,447
i.i.i
HORIZ.
1.1.2
WING
1.1.3
VERT
1.1.5
INTER
1.1.7
HONEYCOMB
1.2
ECLS
i0,795,669
2,507,225
249,833
13,552,727
1.3
PROP
6,000,500
5,418,673
179,269
11,598,442
1.4
SEC
PWR
5,829,793
22,969,171
206,408
29,005,372
1.5
AIR
INDUCT
7,041,484
1,993,435
31,404
1.6
FLT
CONTROL
2,188,837
4,768,647
467,552
1.7
PA
& ESCAPE
186,772
848,947
58,354
1.8
ALIGHT
1.9
MISSION
i.i0
FLT
INDIC.
i.ii
TEST
INST
2.24
WEAPON
STAB.
291,495
&
TOTAL
ARS
1,933,284
TRAF
996,565
SYST
10,567,577
10,140,880
57,356
1,094,438
36,323,328
85,854,040
97,949,124
190,269,106
59,258
1,851,888
1,153,331
14,352,749
382,356
1,505,370
161,712
3,097,830
12,758
27,567,841
9,301,831
7,425,036
126,/+/+9
1,841,680
235,508
41,204,612
1221190,126
896,190
i-3o4
sm7e-s_-ooo3
316,682,261
_I_
IV-71
Unit
Cost
Analysis
The Unit
Cost
of
labor
and material
all
production
the
B-70
costs
costs
Air
Vehicle
experienced
accumulated
was
developed
on Vehicles
1,
under
the
Elements
WBS
item
of
Cost
used
to
accumulate
from
the
actual
2,
and
3.
It
following
Subsystem
Cost (ioi through
I.ii)
Subsystem
lnstallation,
Checkout,
Major Airframe
Mating
(3.0)
The
Space American
Division Rockwell
North
the
and
WBS items:
Preflight
total
production
contains
(i.12)
Production
cost
for
each
Spares,
and
were:
Production,
Labor and Burden
Shop Support,
Labor and Burden
Planning,
Labor and Burden
Quality
Control,
Labor
and Burden
Manufacturing
Material
Major
Subcontract
Cost
Material
Procurement
Cost
Other Production
Cost
II_A
General
Administration
The initial
Engineering,
Flight
Operations
cost
As
a result
2 and
still
no
of
the
3, much of
in process
appreciable
Tooling,
Special
Test Equipment,
such as training
are not included.
major
differences
Sustaining
in
configuration
between
effort
associated
with
contract
termination.
Engineering
or
Tooling
GSE,
Air
Air Vehicle
Therefore,
Vehicles
3 was
there was
effort.
Subsystem
costs were allocated
to Air Vehicles
i, 2, and
production
labor hours for the Structures
Subsystem,
and
data for the balance
of the subsystems.
An average
unit
3 by use of
Subcontractor
cost method
for
no
those
subsystems
in
which
the
subcontractor
provided
In-house
Assembly,
Installation,
and Major Airframe
Mating
to Vehicles
I, 2, and 3 by use of the in-house
production,
installation
labor hours charged
to each vehicle.
unit
cost
in-house
cost
was used
data.
The production
costs associated
with those
subsystems
which were not used in
the three
B-70 Air Vehicles,
such as the Boeing
Wing,
and the Hamilton
Standard
Air Induction
Control
Subsystems,
were not included
in the Vehicle
Unit
Costs.
1-305
SDT2-SH-OO03
#I_
Exhibit
2, page
1-308,
shows
a summary
of equivalent
was developed
subsystem
from the
of the
actual
unit
Space Amencan
DivisiOnRockwell
North
cost
equivalent
units
completed
cost of the three vehicles
units completed
program
closeout
of the
at contract
combined.
at the time
records.
of program
An analysis
of the Stm_ary
Data shows that the large improvement
in the
Structures
cost for Air Vehicle
3 over Air Vehicle
2 was due primarily
to
the great
strides
made in honeycomb
panel fabrication.
For example,
the
production
hours required
to fabricate
5200 gross
square
feet of honeycomb
panels
for Air Vehicle
3, required
less than 50 percent
of the hours required
for Air Vehicle
2:
quality
rejection
cost was
Air
Air
Vehicle
Vehicle
i
2
Air
Vehicle
control
study
259 hours
176.5 hours
8h hours
also
shows
per
per
per
that
square
square
square
Air
foot
foot
foot
Vehicle
3 had
12 percent
of
the
An average
unit
Instrumentation
Subsystems,
which were purchased
for Air Vehicles
I and 2 on the same contract,
and the Personnel
Accomodation
and Escape,
Alighting
and Arresting,
and
Flight
Indication
Subsystems
which were purchased
for the three vehicles
on
the same contract.
An analysis
of the subcontract's
cost shows that much
of the material
procurement
and fabrication
effort
for the multiple
unit
orders
were performed
concurrently.
Therefore,
an average
unit cost was
computed
for these
subsystems
by dividing
the total production
labor and
material
cost by the number
of equivalent
units completed.
An analysis
of
the Flight
Control
Subsystem
indicated
that Air Vehicle
i was charged
with
92 percent
of the total material
cost for the three vehicles.
Therefore,
the subsystem
unit cost for each of the three vehicles
was adjusted
to contain
an
equal
amount
of
the
The Mission
and Traffic
Furnished
Equipment
and
total
material
cost
Control
Subsystem
is therefore
not
based
hardware
included
upon
percent
completion.
was primarily
in the Vehicle
Government
Unit Cost.
1-306
SDT_-SH-O003
#I_
Space
DivisionRockwell
North American
to be refurbished
at a cost of $4.8M
Exhibit 3, page 1-309_ shows the cum average unit cost of the 62 vehicles
as proposed_
The vehicle costs shown do not include the Bomb/Nay or
Defensive S_systemso
Initial Engineering, Tooling, and Special Test
Equipment, a,_ well as C_E are not included.
The results of the study shows an RS-70 First Unit Cost for the 62 vehicle
proposal of $157M, as compared with the B-T0 Actual First Unit Cost of
$163M and an Average Unit Cost for the three Air Vehicles of $123.8_.
In comparing the First Unit Costs of the RS_70 with the XB-70, it should
be noted that the XB-70 includes the program inefficiencies,
cost penalties
resulting from program stop orders and redirections; while the cost of the
RS-70, which was generated from the 62 vehicle proposal, does not include
these costs_
A technical analysis of the _70
and XB-70 was performed to develop the
state-of-the-art
comparison between the two vehicles, and the relative
effort required to complete the XB-70 in relation to the RS-70.
The
results of this study shows that the RS-70, without the Bom/Nav, and
Defensive Subsystems, would have required 1.78 times the effort required for
the XB-70 program.
The details of this study as well as an explanation of
the application of the subsystem factors is contained in Volume I
Section iV-8_ page 1-310.
I-3o7
SD72-SH-O003
#4_
Space
Division Rockwell
North American
/}
Or3
_n
8
t.D
,-I
0
t'-!
EXHIBIT
sD72-s_-ooo3
1-308
NORTH
AMERICAN
ROCKWF2_
BASED
CORPORATION
Ol
,eEBRUJ Y
P,]
,95
ZOO0
800
6OO
_o0
8o
6o
2O
10
6
NUMBER
1o
OF
20
_0
60
80
ZOO
UNITS
EXHIBIT
I-3O9
SD72-SH-O003
_A_
Section
The
IV-8:
State-Of-The-Art
state-of-the-art
ratings
and
and
Percent
percent
Developed
developed
Space American
Division Rockwell
North
Summary
statuses
for
the
air
vehicle
and each subsystem
are presented
by Exhibit
4, page I-Bll.
Each of the subsystem
values
depicted
by the summary
table were brought
forward
from the Development
Data Summary
of that subsystem.
The air
vehicle
values
shown were derived
by applying
weight
factors
to each subsystem
value to reflect
the contributing
scope of effort.
The
state-of-the-art
ratings
assigned
to each
subsystem
were
established
by comparing
the B-70 configuration
requirements
to existing
capabilities
in January,
1958.
All of the subsystem
percentages
were determined
by
comparing
the XB-70
program
level of effort
achieved
to that scheduled
for
the RS-70
program.
For the "out-the-door"
development
stage,
the status
levels
reflect
air vehicle
No. 1 installations,
except
for the Air Induction
Subsystem
(AIS) which
compares
the NR subsystem
installed
in air vehicle
No. 2.
As discussed
in the AIS Development
Data Summary,
the AIS installed
in air vehicle
No. 2 was more representative
of the XB-70 effort
expended.
There
are no percentage
values
presented
for Mission
and Traffic
Control
since
the XB-70
too insignificant
The
"Program
subsystem
was
to assess.
Confidence
essentially
Level"
all
percentages
GFP
indicate
with
the
the
effort
status
expended
level
achieved
(1)
(2)
(3)
All
effort
expended
prior
to
1960
was
for
the
Essentially
all expenditures
associated
with
were not in support
of the XB-7ODevelopment
Essentially
all expenditures
modifications
to XB-70
air
XB-70
Development
Program.
(4)
The effort
applicable
(5)
Air vehicle
sharing
spares
provisioning
associated
vehicle
No.
RS-70
program.
the YB-70
Program.
program
(NA-274)
expended
by several
subcontractors
to the XB-70 Development
Program.
should
be considered
required
to support
and Manufacturing
for cost
given to the
was
not
i00
percent
in determining
FTOSE
a flight
test program.
1-31o
SDT2-SB-O003
and
o_.o_oo_,-_,,_
o0 o_ o_ _o
o_ o_0
[-_ 0
, o.,_:
o_
f-_
-.4"
Cq
8_
0
o-_e4
0 e,_ 0 _,,O'.r',*.r_o
cO ['--oOtO
[',-_0_0
OZ
0-,
_0 o
-.%
I ,,00,-t
,,DO(X)
8_
0
_o
_o_
_04,,0_0
'oo Lr% _,,t'__O-,tCO
,,-t t,rx H
r.3
H
_1 (--_ 0-,
I DO
,-I0 I _
I
...._ooo
o 0",
u.%oo
cc_ I 0",
u'_O_D
["- ,,O _0
_O C_
0 ["
r..I
oO
r.n
o_
0
[-=1
ol
m_
il
o_
_OZ
o
1-311
SD72-SH-O003
EXHIBIT
0J_
IV-9
The
the
Weight
Space
Division Rockwell
Nort#l American
Summary
B-70 Weight
weight
data
Summary
included
table presented
in this section
essentially
in the subsystem
technical
characteristics
recaps
charts.
The values
displayed
were calculated
by the Engineering
Weights
group in
direct
support
of the study and were derived
from NR Weight
Reports
generated
during
the B-70 program.
The weight
summary
table presents
the
detail
weights
of the B-70 at three
specific
development
stages:
(1) The
RS-70
in October
1959;
(2) the XB-70 No. 1 in July 1964; and (3) the XB-70
No. 2 in June 1966.
The weights
shown for air vehicles
No. 1 and No. 2 are
based
while
on weight
the RS-70
reports
values
generated
are based
subsequent
to
on an estimated
actual
pre-flight
weight
report.
weighings
The values
shown in the weight
summary
table were calculated
essentially
down to the major assembly
level
(level 6) of the WBS.
However,
it was
necessary
to deviate
from the WBS in some areas due to the B-70 weight
report
formats
having
a different
weight
breakdown
structure.
An example
of the weight
breakdown
structure
used during
the B-70 program
is also
presented
in this section.
The example
presents
the weights
for air vehicle
No. 2 in June 1966 and covers
weight
empty
summary,
flight
test instrumentation,
ballast
installations,
aft CG loading.
useful
load,
most
forward
CG
loading,
z-312
SD72-SH-0003
and
most
_1
B-70
WBS
1.0
Air
WEIGHT
SUMMARY
Gross Weight
(Dry)
Gross Weight
(Wet)
Taxi Weight
Landing
Weight
1.2
Structure
Horiz.
Stab. & Flaps
Wing
Vertical
Stabilizer
Forward
Fuselage
(to
i.i.5
Interm.
Fuselage
(FS 856-2029)
Aft Fuselage
(FS
Misc.
Items,
& Fairing
Engine
Mounts
Environmental
1.2.1
1.2.2
1.2.3
2029
Doors,
&
Control
FS
856)
Aft)
Fire
Shroud
(Wet)
Remote
(Wet)
Cooling
1.3.3
(l)
Useful
Engines
Engine
Engine
40,699
7,412
64,992
11,166
62,626
10,768
2,109
1,328
1,927
2,367
2,087
2,372
611
(37,630)
30,018
270
179
Installation
Compart.
Cooling
2,441
2,336
75
75
(1)
(1)
5,682
4,076
324
(i)
(1)
930
575
Total
(ll,39_)
(ll,306)
(1)
(l)
89
Anti-icing
1.3.1
1.3.2
3,285
31,133
3,965
9,186
(1) 1,515
Ammonia
Supply
System
Ammonia
(Normal)
Ammonia
(Emergency)
Propulsion
3,244
27,399
3,965
9,143
2,069
13
7O
Fluid (Glycol)
1.3
(125,422)
2,240
25,494
2,250
7,490
(4,770)
Total
Water
Supply
System
(Wet)
Water-(Normal
Cooling)
Water
(Emerg.
Cooling)
Equip.
--0--
Paint
1.2.9
253,601
542,029
542,029
296,292
(124,203)
(89,022)
Total
I.i.i
1.1.2
1.1.3
1.1.4
Weights
Lbs
--0-
i0,000
Airframe
#l
250,817
519,878
542,029
296,292
207,571
554,609
562,609
282,661
Payload
1.1.6
xB-7o A/V #2
Weights
IxB-7o
LbsA/V
Vehicle
Design
Design
Maximum
Maximum
i.i
TABLE
Rs-7o
Weights
Lbs
Item
Space Amencan
Division Rockwell
North
200
(l)
34o
(1)
1,190
98
1,168
5,696
,076
324
924
2oo
340
1,178
98
1,154
(39,166)
(39,189)
31,041
301
31,098
312
Load
1-313
SD72-SH-O03
_4_
WBS
1.3
RS-70
Weights
Lbs
Item
Space
Division Rockwell
North American
XB-70 A/V
Weights
Lbs
#i
XB-70 A/V #_
Weights
Lbs
(Continued)
-
Drain
Fuel
& Vents
Pressure
Nitrogen
1.3.5
& Inerting
LN 2
Fuel System
Volume
Type Fuel
Weight
Engine
1.3.7
Engine
Indicating
Starting
Subsystem
1.3.8
Fire
Thrust
Secondary
1.4.1
Supply
6.55
ib/gal
288
Total
1.4.2
Accessory
Drive
System
1.4.3
Emergency
Starting
1.4.4
Constant
Number
Ipll
6.7
System
(HYDR)
Supply
Electrical
Speed
700
43,646
4,434
gal
JP-6
ib/gal
(2)
(3)
581
(41
(5
Including
Lube
Design
Mission
581
202
194
205
197
(3)
(3)
8
1,367
(Cartridge)
8
(12,594)
(11,273)
6,455
70
190
(4)
7,145
Fluid
70
gal
1,5o4
190
(4)
gal
1,510
152
242
Drive
Supply
1,995
3,072
904
& Nitrogen
(2)
294
94
185
15
(12,132)
#i
ib/gal
863
324
8,618
Brake
(903 AV
4,303
45,971
gal
JP-6
6.55
#2
Useful
IncludingLoadWindmilling
Flight
Test Equipment
(1)
795
3O9
Fluid
Power
87
716
700
i,iii
397
Detection
Subsyst.
Extinguishing
- Wet
Extinguishing-Portable
Power
(1)
3,854
51,797
gal
JP-6
Control
Hydraulic
Power
Fluid
- Type
Capacity
1.4.5
73o
Protection
Fire
Fire
Fire
87
716
489
(l)
(G-Load)
1.3.6
1.4
(Dry',
AV
#2)
System
1-314
SD72-SH-O003
372
#3
3,567
WBS
1.5
Air
Induction
1.5.1
1.6
1.5.2
1.5.3
1.5.4
1.5.5
-
Subsystem
Controls
& Displays
Boundary
Layer
Control
Cooling
& Control
Package
Cooling
Nitrogen
U.L.
Fod Screens
Flight
1.6.2
1.6.3
1.9
XB-70A/V#I
Weights
Lbs
504
Accomo
Total
& Arresting
1.8.1
1.8.2
Main
Nose
1.8o3
1.8.4
Mission
Landing
Gear
Total
& Traffic
Gear
(5)
Weight
Integrated
Power
Racks & Supports
not
included
in
3,971
1,o5o
(7,705)
4,502
2,842
37O
359
361
2,281
136
85o
(17,oo8)
45o
(1,830)
1,256
iiO
464
(19,772)
14,209
1,978
516
2,769
(1,o96)
(1,310)
(1,857)
1,256
109
492
(20,173)
14,649
1,988
512
3,024
(1,144)
632
146
3O4
3o8
i00
352
3O9
i00
384
383
308
49
65
Supply
llO
Subsystem
915
3,471
7O9
4,433
2,818
( 3,267)
1.9.1
Communication
Equip
1.9.2
Navigational
Aids Equip.
1.9.3.2
IFF
1.9.4
Portable
Tape Recorder
-
1,411
3,709
7OO
3,938
4,236
3,145
1,715
Total
3,124
(7,610)
13,049
1,794
Control
3,055
34
Personnel
Equip.
Liquid
Oxygen
Subsystem
Crew Station
Accom.
Alighting
3,462
Three
(5)
(7,751)
& Escape
#2
(15,686)
3,372
Three
1,648
Total
XB-70
A/V
Weight s
Lbs
(16,185)
5,486
Three
Primary
Flight
Controls
Secondary
Flight
Controls
Flight
Augment.
Control
Subsystem
(FACS)
Personnel
1.7.1
1.7.2
1.7.3
1.8
Control
RS-70
Weights
Lbs
(7,638)
Total
Inlet Subsystem
Engines
Per Inlet
By-Pass
Section
Air Induction
Control
1.6.1
1.7
Item
Space
Division Rockwell
North American
Wto
- Unuseable
Load
I-3_5
SD72-SH-O003
_1_)
WBS
i.i0
Flight
1.10.1
1.10.2
1.10.3
-
Indication
Weapon
Test Equip.
Total
Platform
&
Total
Special
Cooling
NOTES:
661)
169
337
155
(16,263)
3,900
lO,161
SST
lO0)
i00
RS-70
Design
Gross
including
military
Mod
of SST
3,900
11,989
511
1,152
1,430
1,050
1,050
(12,179)
(11,287)
3O
30
107
71
(Design)
(Alternate)
Structural
(18,369)
(6)
Instrum.
of
665)
155
Reduction
Weight
XB-70 AV #2
Weights
Lbs
341
Repairs
(6)
#i
169
315
168
543
2,848
6,216
525
Auxiliary
Gear (Tiedown
& Jack
Ftgs.)
Miscellaneous
Instruments
Cost
AV
Weights
Lbs
(10,615)
& Releases
Items
Ballast
Ballast
XB-70
Instrumentation
Weight
Empty
Alternate
Load
Struct.
Mod. for
Misc.
Subsyst.
Auxiliary
Gyro Platform
Flight
Instruments
Control
Air Data Subsyst.
Offense
Electronics
Defense
Electronics
I.Ii
RS-70
Weights
Lbs
Item
Space
Division Rockwell
North American
not
included
in
Weight
(wet) reflects
total
subsystems
and miscellaneous
i0,000
2,078
9,072
2,078
3,047
14,717
7,877
7,000
subsystem
vehicle
items.
total.
weight
flight
test conditions.
more than the Gross
for the flight
test
1-316
SD72-SH-0003
,,
NORTH
.........
AMEHICAN
AVIATION,
INC.
PAtE
CH|tKtO
tTi
28 _y
196_
,,,,
WEIOHT _
.oo,_ .oXB-?OA
HCP.'I_ONTAL
ITEM
o, 72
_-6_-_62
,]_1_
|,w
DAT'Bf,
k5
NO*
WllGl_r
LBS.
ARM
C. G.
V,T.RTICAL
MOMENT
ARM
C.
G.'
MOMENT
ii
Basic 8tx_c%ure
Inner
Panel
Folding Tip
Seeondaz._ St ruc%_re
Elevens
TOT_,
(2818,)
WI_G GRODP
8o88
1011
'1841
1895
2105
(55101h75)
38076235
170252h0
198k
200582_
I 22_6
31033
(5636200
200
_o!86oo
200
200
2OO
16176o0
202200
3682OO
k1348_
- 124 i8f
' 6 o6 )0
TAIL GROUP
Basic
Structure
Horizontal Stabilizer
Vertical Stabilizer
Secondary
St ruc%ur_
Flaps
TOTAL
- TAIL GROUP
(9824777)
2588 i
(63'q)
3759
3c3
6o0
581
, 2211
167o
638
_50
150362_
83n149
506O10
38e8oo
275
25h
266
275
10703587
(3.666_L86)
711700
#54786
8O598
165000
1912084
BODY _OqP
Basic Structure
Secondary Structure
Windshield
Rsdame Fairing
Control Tunnel"
Aspirator
Doors & Operating Mechanism
Main Landing Gear
Nose Landing Gear
Banb
Escape Hatches
Oumpartment
Entrance
Drag Chute
Ensine
Non Structural Panels
Nose Ramp & Controls
Fairing & Flllete
Miscellaneous
TOTAL - F_ODYGROUP
153&
638
420
394
26&
303
501
19_7
2235
11o5
281
907
1765
1223
!5_9
6o9
39
6o
16o
991
515
5_5
_79
_75
211_
( 152) '
59
1977
397
1048
1019
1329
1823
11597
839oZ
1-317
115609910
(2068898)
190
251372
11088o
586911
11.19735
(6489535
267
217
221
1950325
343663
1_0_943
313635
21255
28740
332000
209497_
135
1166_3
130613
191o5oh
1627343
lO6
1_31935o.
(42_641)
170346
911hO
66963
96192
(656210)
ih9175
29786
120
lo884o
292
177828
251
21_9
219
132
197
258
177
let
12"t_53hh6
SD72-SH-'O003
9789
i&940
350_0
130812
11623
I02k26
185496
19O553
|1
j ......
NOIITH
AME_CAN
AVIATION,
INC.
,,...o.
o,
.,..,..,_
Bib
_-65-463
,
..,
WIIORT _
e8 Nay lC_5
,,=,,_ ,,.
m|
in
XB-70A
iii
HORIZONTAL
WKIQll4"T
ITEN
LINI.
ARM
IIi
C.
G.
MOMENT
VI[R'nCAL.
ARM
C.
O.
MOMIrJ4'r
,,
Oe&r
Running Gear
hnainS
Wheels
Drag Braces
TOTAL - ALIGRTI_
10690896
95200
671738
7953330
3482976
1348162
3728557
(2610)
797
1151
(2973831*)
917347
865.
1145
9901,25
15o
17g
1182
1163
1773o0
202362
62_
1100
6_50o
56
391
4695
20_
802
2303
Bogie Beam
Fuselage Supports
Controls
Nose Gear
Running
Gear
Strut
(Including
Drag Brace
Fuselage
Supports
Controls
1704
1700
1718
1694
1704
1681
1619
Oil)
GEAR OR(KIP
19175 '
37
(13o478_)
23213_
28
158
1568
61778
107
37
153
.502365
75628
1227O6
134
3086o2
37
88
112
154
130
(230625)
29289
76120
1710o
26796
81120
30944693
1535410
Ol:g)UP
SUFY__CE cOWrROI8
.--
|,
(157)
Cockpit
Controls
Control
Sticks
Rudder
Pedals
123
3_
Fold
Stabiliser
Stabilizer
Flip
TOTAL - 8URFACI
279930
217
u89
173594
245
Controls
(570e610)
455155
215
53075
21_
2138
748
1812
1050960
2o7
a_87
5783077
200
5542OO
965
ho8358o
59840
_1
221
kA.o
2k9o50
2hl
Io6oho
71
42103
281
10951
I,O8
7
317
7685 1
"T-ql_,
(611895)
8O
58o
152
11
COWl'ROt8 (m(K_
_6655
35770
1910
1247
(895)
Controls
29151
8126
781,75
11770
383910
17680
12006O
55
Controls
Vertical
Stabilizer
Mechanical
Tr_
_raultc
Feel
Bungees
Supports
1302
1_6
27"0.
Korizontal
237
239
215
365
Controls
48339
13124
( 5352 )
(2990)
Rlevon
Controls
Mechanical
Electrical
_draultc
& Pneumatic
Bob Weights
& 1_msees
Supports
Wing
393
386
(361)
F1 ight
Au_entation
Equipment
Inmtallation
(37277)
(61463)
1737
1901
2161,
1877
1829
(1760779)
265024
2O911
(183oo_)
207
217
882912
_1
13139
579793
218
207
lhO52596
31_64
2387
8__3o8
1526
65619
15947_
NORTH
AMERICAN
AVIATION,
INC.
,,,.,
_W
CNI_CIIIQ
.,.,
..,,..
live
,1 5
e8
,,o. _7
WZIO_
EMPTY
,... NA-65-562
.o_,..o.
HORIX_NTAL,
W|IGHT
LI_.
ITEM
ARM
o, 72
XB-70A
)--
C. O.
ii
c. G.
v-ancAt,
MOMI[NT
ARM
MOMENT
i
1
ENGINE
SECTION
Engine
Mounts
Engine
Shrouds
Remove/
Ra/ls
& Seals
TOTAL
- ENGINE
SECTION
TOTAL - STRUCTURAL
PROPULSION
Engine
F_I
GROUPS
Gear
Drain,
Boxes
i66o
& DrtTes
Vent
(i6i2i)
312
3i24
76n2
391,1
889
3_
179
& Cooling
'.
61i52
24375
3116b0
397167
27536352
Controls
8yltem
..
iz
2o34
199o
1342
1626
12.81
1428
2078
332_
(25o7432i)
634608
62i6760
10255564
6408066
1138809
h8552
3 96a
166
5162434
139
23o7_0
166
i9_
165
15o
2oo
165
i43
109
1,11_
Z56
ihi6
581
1514
879634
179
314
1To2
534428
i'm
1673
177o
1593
19o6
1733
i883
911
1712
692
280
58a
567
Loop
2OO6
6596o979
(7863379)
135Olii
122_8a+0
h_6oho
11o9292
982611
9471_9
652276
186608
601956
362496
807
Boost
and Transfer
Pumps
Filling
System
Distribution
System
Transfer
System
Vent
System
Pressurization
System
Drain System
Eleetrleal
Comtrolm
Cooling
21_I
31099
System
Tank Sealant
Bterting
156
,195
168
249993583
Induetlon
System
Inlet
Guide & Fairing
By Pass & Controls
Variable
Geometry
Inlet
Control
Package
Master
Controls
FOD Screens
Engine
838096
268875
3990105
5o97o76
2372
7nstallation
Engine
2138
2151
2151
GROUP
Aeeessoz"y'
Air
392
125
1855
(2T_,.2687)
51792
599808
1260930
591150
177800
561o
25597
(lOO2O95)
2oo
161400
i68
116256
56o00
8_3q0
i0_895
117702
_334_
200
185
23_.
28_.
178
199
22O
19402
82386
56320
103999
_-
TOTAL
- PROPULSION
GRO%TP
5kTOl
T-ql
(3 ,
I03642701
9265963
&WLa'rzoN,
NORTIJ _
INC.
E_
IBm_mr
n,.65. 62
m_,
i i
..,
_8 _
1965
_TJUI_ E
m%_L
toO.
X_'70A
1 1' M
mm_rr.
HoRrLONTAL
ARM
C.G.
MOMI_IT
VERTICAL.
ARM
C.
G.
MOMENT
ZQU'JI:R41T OROUPS
I
Iulu_bmnt8
ni t
337
_w,
8_7
l(11cel_o_
'X'O'2 -
TOTAL-
:OISTRm4n"M3
2_1966
111o_17
1_73go:
_86
231
209
196
?78_7
177023
19992
Z%_2
11.99773
Oroup
_draulie
Utility
?_ma_
z881
3799
FrDRAULIC OROUP
TOTAL-
Electrical
Group
AC-Power
Supply
Power Conversion
Distribution
& Control
maCT_ICAL
Device8
O_OUP
1837
lS69
5292397
7100331
6680
3.2392728
z88
z53
z178
1.55_1.
2_3133
21.8292o
1096_
z5821*5
132
111.0
831
377
685
161
161
1o751*8o
I_6
208
21_
_v8_8
5262_
_66ov_
217
238
28641*
89726
351.9891.
3ZZ8
463841
611639
68_891,
Group
Eleetronieo
Intercom
i00
5O5
636
5oi
lO_
519
1_
169
5zo
6Z8
_9
238
2O5
50100 239
5_1.95 21.3
251
973_
223
1o9681 _9
3Z
383
5_
521.
17280
2O0692
233
85
- AN/AIC-18
' 1_7665
5 6o
551,51,
17_,25
23900
25515
1.3172
31,565
387O].
7008
97282
System
Flight
Director
Equil_ent
Racks
Cc_puter
11.3_
_F_niahtnga
& Equipment
0roup
Aeecmodations
for
Personnel
Mlacellaneou_
Equil_ent
Furnishings
Emergency
Equll_ent
TOTAL-
ru_us_
GROUP
1365
96
3@
zZT.
_38
398
1.1o
1397
219
25_
790753
3_3o22
597870 252
38208 2U6
151290 249
317119 198
31.3980
23616
91881
1.4946
a __
2o57
1-320
5oh1.23
NORTH
HECKEIB
AMERICAM
AVIATION,
INC.
pace
WEIS_m D(FIT
SUMMART
"_
uo.,L.o. XB-70A
Conditionin_
HoRrZONTAL
wIiOl_r
LB.
IT[M
ARM
(2o_5)
228
131
53
956
179
85
29
38_
(69o)
559
69
62
Freon System
Equipment & Supports
Plumbing
Controls
Glycol System
Waterwall & Supports
Drag Chute Compt. Insulation
Etc.
Equipment, Fluid
Controls
(1178)
87_
(12_)
53
224
27
1105
& Supports
47
- AIR CONDITIONING
ARTI-ICING
789
73h
775
7o6
673
552
400
662
V[M_CAL
ARM
C. O.
MOMENT
1o55
99
(1425252)
179892
96154
41075
674936
2h9
eSz
27O
264
(528075)
56779
36811
14310
252384
120467
258
46182
250
21250
230
244
6670
93696
46920
11600
254208
(613461)
8'/7
836
1o57
lTOl
2O75
1751
1462
490243
5768_
65534
(20283_7)
1486674
109975
392224
39474
(172625)
251
725
974
765-
801125
140256
35955
1725o
15o66
156
211
185
(192963)
136344
11183
41440
148
3996
(3157071
245
236
234
(1289683)
1112
1177
1173160
116523
I_030o
25o
243
(977336)
(1154)
C. G.
MOMRNT
& Anti-Icin_
270725
33984
10998
(264662]
229
233
2_1595
23067
&
6363
30
413
TOTAL - AUXILIARTGEAROROUP
443
1-321
i_74032
6334079
1617
2o81
_851o
168
5oho
859453
214
88382
_7963
21491
J[
D.141
or
_9
aT*
28 )_F 1965
Air
NO.
26579677
L
SD79-_w
nnO3
93_22
4450135
NORTH
N
AMERI_ulr
AVIATIo_Hr,
INC.
,,..L
BTt
50
o, 72
VER_CAL
C.
j.
CNIF.JII
o,.,
t'i't
28 _7'
1965
W|IGJ4T
Will.
ITEM
HORIZONTAL
C. O.
ARM
MOMENT
ARM
G.
MOMENT
RECAPITULATION:
151_17
2_9993583
27536352
GROUP
5_7oI
1036_2701
9265963
GROUPS
211,91
TOTAL - STRUCTURAL
GROUPS
TOTAL
- "PROTON
TOTAL
- EQUIPMENT
FLIGRT
TEST IRSTR.
TOTAL
- WEIGHT
Horizontal
Vel-f;1esl
CG -
CO
633
230876
BfPT_
1670.6 - 1386
9_2
3o._ ,,_c
200.0
18.5 Inehe
181.5
I E322
4h5o135
619"D-oo
3900
(Wt. Empty)
UE_COUI_TABLE
26579677
7O95O5
1670.6 385703556
blow
SD72-SH-O003
772_0
181
- Iih573
181.5
h191o077
Mlmpam
_,
CI_KI_
liYo
NORTH
.U_RZGAN
AVlJVI'IGN,
INC.
,,,,o.
E_
28 _
.,,
1965
FLIGHT
TEST
_ATION
WEIGHT
LBII.
|TIM
51
ARM
C.
72
,o.NA-65-462
,_.,L.o.
HORIZONTAL
o,
G.
X_-70A
VERTlCAL
MOMENT
C.
ARM
G.
MOMENT
FLIGHT
TEST
INSTRUMENTATION
|I
9o4
19
14
194
5812
663
300
Fire Extinguisher
Installation
Capsule
Recovery
Beacon
Instl.
.Capsule _r_ncy
Chute ReleaJe
Crew Suit Cooling
Instl.
Electrical
Control
Package
Package
Support
& Wire Ladder
Recording
Equipment
Miscellaneous
Parameters
8389
266
616
511
TOTAL FLIGHT
TEST
FLIGHT
TEST EMPTY
INSTRUMERTATION
WEIGHT
19o3
171o312
428
444
8132
6216
458
88852
1451
8_33212
1461
469
1566
1704
1428
1883
968643
140700
13137174
453264
879648
962213
154
,2bo
139216
456o
272
3808
249
145
48306
8_274o
176
116688
240
720OO
212
1778468
26
6916
20t_
195
12566t_
99645
17688
26798366
323803.l
Plus:
LW 2 for
Package
TOTAL
Cooling
FLIGHT
TEST
Flight
Test
lO5O
15o5
18738
INSTRUMERTATION
145
+1580250
+ 15225o
28378616
3390261
" Less:
-
*Instrumentation
Weight
TOTAL
Specification
39oo
1589
-619Tioo
198
IRSTRUMERTATXON
- ALT
LOAD
i_838
Pounds
8peclfication
of
instrumentation
Weight
A detailed
Page
37
i eight is i eluded
,n the Mode
instrumen
ation _ ight in
is treate, as Alternte
Load
Empty.
AI:
weight breakdown
of
Test In trumen_,tion
FIIl at
of this report.
is
sh_n
_m_
1-323
SD72
D-
84MO
772200
1618o61
_e.181516
*NOTE:
3900
Empty
on
;e
NOW'I! _CAN
AVIATION,
INC.
,.....
4UlPCMIT
_2 o, 72
_-65-_52
NQ.
_%-_,
ii
BALLAST
I_TALSATION
MOOll.
I'IORIZONTAL
C. G.
WlleN'r
Lml.
ITEM
ARM
MOM
IL'INT
NO.
_B"
70A
VERTICAL
ARM
C.
G.
MOMENT
DESIGN
i
(1o21)
NOSE C(lqPAI_4EI_
Ballast
_,
Shelf
Center
Shelf
Aft Shelf
Supports
ELECTRONIC
Ballast
Walkway
Bay No.
Bay No.
Bay No.
Bay No.
Bay No.
102
293
308
318
,EQUII_
(29)
(80)
(76)
(76)
EQUIPMENT
'(225)
7].672
67097
69946
(2047139)
623
655
686
127092
370075
1062614
234
TI2
11o2888
147_
1472
737
773
lo8_86_
1137856
228
228
228
47736
12882o
353172
353172
335616
335616
(227)
_930o7
(707)i 1533317
228
228
22789O6
6735216
BAY
Ballast
Bay wo. 1
627
655
(22)
(51)
2o78
12078
TOTAL - BALLAST
Installed aa alternate
Air Vehicle
685938
64k52o
229
228
250526
22_,352
474878
133o458
275378_
806567h
Z-324
D-M@
23052
BALLAST
ELECTRONIC
NOTE:
_5o6
226
229
:(227)
(6_187o6)
10000
- DESIGN BAILAST
_TmmAs
(3o3)
23868
91416
lO472o
(231767)
204
565
X5_9
15_9
2168
Supports
TOTAL
234
312
3ko
(8979)
BAY
Step
i
2
3
4
5
(316510)
:: the
SD72-BH-O003
NOS_m/I _CAN
AVIATION,
INC.
,,,,
-o.
53
72
:..:.,.,
..,
M,_
.,,._,
o_r,_
LOAn
.:._
HORIZONTAl
O.
.o
XB-70A
VERTICAL
C.
G.
WIIQMI"
ITEM
USUal,
C.
.o. #a-65-_62
ARM
MOMENT
ARM
MOMINT
LOAD
NOR-EXPENDABLE ITEMB
Crew
Pilot
215
Co-Pilot
215
8urrlval
Unusable
2701
432
EXFERDAI_E
Emergency
Water
/weonia
TOTAL
No.
310
8979
7oO
87_
(29107_)
_91.6
25669
35036
29322
3282o
72378
22598
29305
Oil
- AICS
Coolant
Cooling
Coolant
181
15128
_8618o
78192
227
(2278906',
231767
(228)
267
1869oo
3152806
13023323
1.53951.60
32573961
535700h_
5377651*8
6052161_3
1i8193274
1.2800612
6O66135O
'58257705
1O966821*
1269
2529
1834
1902
1633
189_
2070
219
221
5621511
1.2956
158
152
32876
1.8366_0
13679hk2
189
202
212
26k
550
206_
167 7
1_6
hO76
2O0
729
679
246
250
32k
729
679
236196
23086O
46728
8o3oo
10O2696
5o0o0
21.6
795o1*
85OOO
25o
62754739
311153
& 4 have
6212660
596o2933
,-
i, 2
244
4671*92889)
i010
ITEM5
LOAD
IIII
Tank=
1021
(6735216)
316510
6_18706
611800
21._+
18o
53750
53750
ITEMS
EXPENDABLE
TOTAL USEFul
4578195
89_944
14325
ITEM8
26288
(1oooo)
Electronic
Bay
Nitrogen
- Fuel Tank Inerting
and Pressurizing
_)N-EXPERDABLE
250
250
_2h
1695
2067
62
Gear
Fuel
Unusable
Engine
Fluids
Ballast
and Supports
Nose Section
TOTAL
1*x6
_16
been
off-lo
ded.
See
_age
25
for
tot_l
capaci'
ie=.
lq_llil
NORTH _EMZFJCAN
ITe
:Tarw_
....,
28 Nay
m_
1965
AVIATION,
w7_
roma_
INC.
ca
m,
HORIZONTAL
WI[IIIHT
C.O.
VI[RTICAL
C.
G.
ITEM
I Jill.
ARM
MOM
IL'NT
ARM
MOM
Ir,NT
230876
311153
Empty
385703556
_8555 7718
:16o7.4
5A2oe9
cG - .16o7._ - 13_.
_rizont_
41910077
6275_739
_871_6127k
.oh66_816
193.1
23.
9a2
Vertical
MOMERT
CG z 200-193.1
CEAIKIE-GEAR
TAKXOFI m
GROSS
DOWN
= 6.9 7nche
,,
KtE_l%_l_9_
16o8.9
798331
+I_7O7_6
8720596o5
195.8
.o6135572
cG = 16o8.9 - 1_
9_2
Ho_,omt_
5_9
UP
F_
TO UP
WEIGhT-GEAR
,,
below
200 - 195.8
- 23.
= _
MAC
lel
below
] _P
MDsT FORWARD CG
Takeoff
Gross
Partial
Welght-ee=
Fuel
6.55
at
(-213_)
- ?2378 1633
l'b/gal
Taak Wo. 6
.Taak
Tame
Tank
Tank
Tank
Tank
Cooling
m,.
No.
No.
11'o.
No.
No.
1,
- 29322
- 25669
- 31820
- 22598
- i_665
- 17oIk
5
7
8
1
Water
01_661_16
871_6127_
51_L_Ya9
Down
-35_9oo8
1834
1269
1902
189_
2075
1007
.11819327_
53776548
32573961
6o5216ho
k28oo612
30h19875
17133098
729
1159110
1590
._o_7_9)
.13679kk2
. _632876
, 5621511
_8366_O
189
158
219
152
202
199
233
_56_796
2918335
396_262
2_6
39111<)
!--
_i0_T
FORWARD
CG
- GEAR
CG
= 200
- 195.9
lu_ber
18,
shown
on
change
from
Yertlcal
Landing
326973
DOWN
the
Gear
= 4.
Gross
Up
to
Inc_ea
ei,,i_t v
below
CO
l_._oling Gear
1-326
z57_.I
51_673_56
195.
6_o558_
t at the
e_ ! of
Se
59 , _lu_
th
_i:_
D_!_
Page
L _v..
SD7 o ou
nnn_
_uence
moment
NORTHx, EI_F.RICAN
PI_PAI_D
AVIATION,
M08T MT
MfCKID
INC.
UTa
II
Ca
,,,_l,_
PREDICTED
o,,,,, 28
EMPTY
WE_GRT-FIRST
i Ul
HORIZONTAL
WEIGHT
I.lll,
ITEM
FLIGHT
ARM
,.,., ...
55
.,,.o,..o.
NA-65-1.62
-o=,+.o.
XB-70A
C.G.
MOMENT
VERTICAl
ARM
:,
72
C,
G,
MOMENT
i i
MOST AFT CG
Takeoff
Gross Weight-Gear
5b,2o29
Down
_0466_8i6
871261271*
Less:
2452o1
Rorizont_
296828
t,
CG : 1626.1
-59601933
-472531645
1626.1
398729629
183.8
45062883
-_
25.5% MAC
i_86
9_z
Vertical
_'_ICT%_D
FLIGHT
CG = 200 - 183.8
_+_'_[_:_IG_=T FLI_ST
385703556
230876
_i910077
Plus:
EMPTY WEIGHT -
1617503
8_8308
317
352
21,3995
FIRST FLIGHT
T-qP7
1.62503
572o00
405270319
_D72-SH-O003
I++279235
P
J