JH Step 1 Audit Sheet
JH Step 1 Audit Sheet
JH Step 1 Audit Sheet
DEPT:
S.No
1 2 3
Passing %
90 80 80
L1
Obtained % L2 L3
REMARKS
1
1.1 1.2
2 3
3.1 3.2 3.3 3.4 3.5
50 50
4
4.1 4.2 4.3 4.4 4.5
Wire/cable/electrical
Any loose wires/cables Loose wire/cable more than required length Without glands (Where Applicable) Wires/cables tied without clamps Panels/covers not fully sealed/closed. Any item arround machine without allocated place 10 10 10 10 10
50
5
5.1
20
20
6
6.1 6.2 6.3 6.4
60
15 15 15 15
Safety gaurds not available Safety guard provided but may cause accident Floor around m/c with pits & projections Sllipery areas around machine
7
7.1 7.2 7.3 7.4
20
8
8.1 8.2 8.3
If the personnel associated with the m/c (claener/operator/ supervisor/manager) clear about TPM.
What is Autonomous Maintenance? What is 1st step of Autonomous Maintenance? What are the defects and type of defects? 20 20 20
60
9
9.1 9.2 9.3 9.4 9.5 9.6 9.7 9.8
60
400
ISPAT INDUSTRIES