1) Second Medium Term Plan 2013 - 2017
1) Second Medium Term Plan 2013 - 2017
1) Second Medium Term Plan 2013 - 2017
REPUBLIC OF KENYA
TRANSFORMING KENYA: PATHWAY TO DEVOLUTION, SOCIO-ECONOMIC DEVELOPMENT, EQUITY AND NATIONAL UNITY
The Presidency Ministry of Devolution and Planning Treasury Building P.O. Box 30005 - 00100 Nairobi, Kenya Tel. 254-20-252299 E-mail: [email protected] Website: www.devolutionplanning.go.ke
English
O God of all creation Bless this our land and nation Justice be our shield and defender May we dwell in unity Peace and liberty Plenty be found within our borders
Amkeni ndugu zetu Tufanye sote bidii Nasi tujitoe kwa nguvu Nchi yetu ya Kenya Tunayoipenda Tuwe tayari kuilinda
Let one and all arise With hearts both strong and true Service be our earnest endeavour And our homeland of Kenya Heritage of splendour Firm may we stand to defend
Natujenge taifa letu Ee, ndio wajibu wetu Kenya istahili heshima Tuungane mikono Pamoja kazini Kila siku tuwe na shukrani
Let all with one accord In common bond united Build this our nation together And the glory of Kenya The fruit of our labour Fill every heart with thanksgiving
VISION 2030
Foreword
Under Kenya Vision 2030, Kenya aims to be a middle-income rapidly industrializing country by 2030, offering all its citizens a high quality of life. Its first Medium Term Plan was implemented between 2008 and 2012. This Second Medium Term Plan outlines the policies, programmes and projects which the Jubilee Coalition Government intends to implement during the five year period starting 2013 to 2017 in order to deliver accelerated and inclusive economic growth, higher living standards, better education and health care, increased job creation especially for youth, commercialized agriculture providing higher rural incomes and affordable food, improved manufacturing sector and more diversified exports. All this is necessary in order to address the acute challenges of poverty, joblessness, and inequality and to facilitate faster realisation of Kenya Vision 2030.The Plan was prepared through an inclusive and wide-ranging consultative process which conforms to the requirements of the Constitution of Kenya on public participation in public policy-making. Its implementation framework has also taken cognizance of the two-tier level of government, national and county, and new governance structures mandated by the constitution in the form of commissions and independent offices. In line with the priorities outlined in the Jubilee Coalition Manifesto Agenda for Kenya 2013-17 and Beyond the plan aims at accelerating economic growth putting the economy on a higher, inclusive and sustainable growth trajectory leading to a double digit GDP growth rate within the five year period. To realize these goals and secure our countrys prosperity, the government will in the course of this plan period implement measures to strengthen our economic competitiveness through accelerated governance and public sector reforms and by increasing government spending on expansion, and modernisation of our railways, roads, ports, airports, energy, water and the ICT and telecommunications infrastructure. To further enhance efficiency and competitiveness of our economy, the government will devote more investment to infrastructure and to the key sectors of the economy that will drive growth particularly through public private partnerships arrangements. The Jubilee government was elected into office on a platform that prioritises job creation and increasing youth employment over the plan period and expanding Kenyas area under irrigation in order to increase agricultural productivity and food security. The policy mechanisms for realizing these objectives are contained in this medium term plan. A commercialized agriculture with high value addition remains our key priority. At the same time, the government will establish disease free zones in our livestock-producing areas, working in cooperation with the county governments concerned, to support higher productivity and processing of animal products for domestic consumption and exports. Similar efforts will be made to increase value addition and employment in fisheries and in the exploitation of our rich marine resource. In order to meet the goals of job creation, value-addition in agriculture, fisheries and livestock, and export diversification, the government will, therefore, establish special economic zones in partnership with private investors to support increased manufacturing and exports with high value added. To meet the demand for skilled jobs in these and other sectors, priority will also be accorded to programmes targeting training and apprenticeships to meet the demand for human resource skills required by the transformation of the Kenya economy which is central to this medium-term plan. As the education and training sections of this plan demonstrate, this will be accomplished through a variety of programmes under the social pillar. The government will also strengthen youth employment and entrepreneurship through credit, financial assistance and training. This will enable recipients to acquire skills and engage in productive employment on their own or as suppliers to the larger enterprises in the public or private sectors. This medium term plan includes two key national initiatives that were not featured in its predecessor. Under the economic pillar, the development of oil and other mineral resources, is now included among the priority sectors. This follows the discovery of oil in commercial quantities in Kenya, in addition to substantial deposits of coal, iron ore, rare earth minerals and other minerals. Exploitation of these resources will be done in ways that benefit the people of Kenya most with priority on local communities and counties concerned. Mineral exports are also expected to help close the balance of trade, and to raise government revenue. Under the Foundations of National Transformation this Plan has added building National Values and Ethics as an additional initiative in the foundation of our national development.
VISION 2030
ii
FOREWORD
The government is acutely aware of the need for proactive work to enhance national unity in line with the values and principles of the constitution of Kenya. Achieving our development goals will depend on a strong Kenyan identity and values that give priority to our national good above all else. Implementing devolution is a theme that runs through this medium term plan. The Plans Political Pillar outlines measures to support devolution and the legislation that will be enacted to implement it as required by the constitution. The government is committed to supporting devolution with financial and human resources and in building capacity within county governments. The Plan is also committed to the continued implementation of the Judicial Transformation Framework, and to widen access to justice for all Kenyans. The government believes that justice and observation of human rights are integral parts of improving governance and the rule of law. Over the five year plan period, the government will therefore expand, equip and modernize the security agencies to ensure that every Kenyan is assured of his or her safety and that of their property. Improved security will also contribute to a better environment for doing business in Kenya, bring in more international tourists, and investment into our country. The pay and conditions of service for security personnel will be improved and measures will be put in place to support community policing and invest in CCTV and other technology to improve security. I therefore call upon all Kenyans to commit themselves to the pursuit of national unity, and to play their part in the implementation of this plan, so that we move forward to the future as a united and prosperous nation. The government on its part is committed to coordinating all the branches of the national government, in the implementation of this plan. I call upon our county governments, our development partners, and the private sector to join us as we seek to ensure that the objectives of this plan to improve the livelihoods of all Kenyans are fully realized.
H.E. Hon. Uhuru Kenyatta, C.G.H., President and Commander-In-Chief of the Defence Forces of the Republic of Kenya
iii
VISION 2030
Preface
The theme of the Second Medium Term Plan of Kenya Vision 2030 is Transforming Kenya: Pathway To Devolution, Socio-Economic Development, Equity And National Unity The Plan covers the period 2013-2017 which coincides with the term of the Jubilee Government and hence its emphasis on the full implementation of devolution in the context of a rapidly growing economy, promoting equity, inclusiveness, and employment to meet the needs of our youth. These goals were part of the Jubilee Coalition campaign platform and are in line with the long-term objectives of Vision 2030, and the Kenya Constitution. This medium term plan sets out the programmes, financing framework and the timelines that will guide the implementation of the promises made to the people of Kenya in the manifesto. Since its promulgation in 2010, the Kenya constitution has altered our governance framework fundamentally by creating a two-tier government one at national and the other in our 47 counties. Within counties, municipalities and urban areas which are a key part of our national development programme will be managed by independent boards responsible to county authorities. The distribution of functions of counties is outlined in the Fourth Schedule of the Constitution. These include development responsibilities that are central to this medium term plan among them agriculture, county hospitals and public health, early child education, cooperatives, trade, county roads, fisheries and livestock. Harmonizing this MTP with County Integrated Development Plans and Urban Plans will ensure faster delivery of the promises by the government as a whole. The constitution has also created a number of commissions and independent offices whose functions will have a strong bearing on the implementation of the MTPs policies, programmes and projects. The Second MTP takes all these changes into account and aims at coordinated action between the two levels of government in the interest of a growing economy to meet the many needs of the people of Kenya. The Ministry of Devolution and Planning under the Presidency has under this plan, outlined an implementation framework through which it will work closely with the National Treasury and other government ministries, the county governments, constitutional commissions and independent offices to ensure that projects and programmes contained in this Plan are completed with efficiency and on time. In consultation with the Transition Authority, this ministry has published County Profiles containing the latest data on the geographic, resources, economic and social data of the counties. These documents provide basic information to county governments in preparing their County Integrated Development Plans (CIDPs) as required under the Constitution and under the Public Finance Management Act (2012). Under the law, county budgeting is to be guided by the CIDPs. My Ministry has in addition prepared guidelines on the preparation of County Integrated Development Plans to help the counties meet that objective. To strengthen county planning, Ministry of Devolution and Planning will also provide financial and human resources to county governments to enable them build the capacity to ensure that County Integrated Development Plans are used to guide the county Medium Term Expenditure Framework and annual budgets. In line with the MTP, government ministries are expected to prepare five-year strategic plans to guide budgeting and plan implementation in their areas of responsibility. The Performance Contracts of the MDAs will also be tied to delivering the Plans outputs and targets within the specified timelines. In this manner the government expects to produce harmony and coordination between national and county government planning and between ministries at national level. Such coordination is expected to minimize resource wastage and build in more efficiency in the achievement of Vision 2030 objectives under our new governance framework. To understand how far we have gone towards effective plan implementation at all these levels, the Ministry of Devolution and Planning has put in place a monitoring and evaluation framework to guide policy reform and formulation of corrective action where necessary. An effective national monitoring and evaluation system will monitor and report progress in the implementation of the second MTP at national and county level in line with the promises contained in the Jubilee Manifesto. The Bill for this purpose will be submitted to Parliament for enactment into law. The legislation will support implementation of a computerized National Integrated Monitoring and Evaluation System (NIMES) at
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
iv
PREFACE
national, county and ward level; establish M&E structures at all these levels; and ensure conformity with the best reporting standards to ensure consistency of indicators and the formatting of reports nationally. In addition, the Ministry of Devolution and Planning will also prepare regular reports on progress made under second MTP which will be submitted to National and County Government Coordinating Summit. These reports will also be made publicly available on the Ministrys website, so that stakeholders and the public can access information on implementation of projects of interest to them. We expect this to promote both efficiency and accountability in our planning and implementation process. The Ministry will continue to publish Annual Progress Reports (APRs) on implementation of the Second MTP of Vision 2030 and to make them widely available to all stakeholders. We expect information generated by these documents to be useful to national stakeholders, the private sector, and international development partners. Our experience in the past has shown the need to link national policies, planning and budgeting more tightly. The Ministry of Devolution and Planning will therefore work closely with the National Treasury to ensure that the MTEF and subsequent annual budgets are aligned with the Second Medium Term Plan 2013-17 to ensure successful implementation of the Plan and the governments priorities. Finally, to the people of Kenya what will matter most is the delivery of services promised to them by the government at both levels that will be facilitated by the MTP, the MTEF and the annual budgets. The second MTP will be successful if that objective is met in a way that demonstrates improvement in the quality of life for Kenyans. The preparation of the second MTP 2013-17 commenced in August 2012. Since then, many people have been involved in the Plans preparation. I will like to thank the many Kenyans who took part in identifying development priorities in our county consultation forums and the business, professionals and stakeholder forums. Their inputs have been of immense value in the preparation of this document. I would also like to thank officials in the Ministry of Devolution and Planning and in all the other government ministries who helped in putting this document together, and ensuring the consistency between its many objectives. I am sure the people of Kenya will join me in thanking them for their efforts, as we move forward to realizing our common objectives under Vision 2030.
VISION 2030
Table of Contents
Foreword Preface List of Acronyms Executive Summary Chapter 1: 1.0 1.1 1.2 1.3 1.4 1.5 1.6 Chapter 2: 2.0 2.1 2.2 2.3 2.4 2.5 Chapter 3: 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 CHAPTER 4: 4.0 4.1 4.2 4.3 4.4 SETTING THE CONTEXT OF THE VISION 2030 MEDIUM TERM PLAN Overview Progress Achieved under the First Medium Term Plan 2008 - 2012 Critical Issues, Remaining and Emerging Challenges Priority Areas to be Addressed under the Second Medium Term Plan 2013 - 17 MDGs and Harmonisation with the Global Sustainable Development Goals (SDGs) in the post 2015 period Foreign Policy and International Relations Risks to the Implementation of the Second MTP and Mitigation Measures THE MACROECONOMIC FRAMEWORK Overview Economic Performance under the First MTP (2008 - 2012) Medium Term Macro-Fiscal Framework and Growth Strategy and Prospects Structural Reforms Statistical reforms Tax Reforms FOUNDATIONS FOR NATIONAL TRANSFORMATION Overview Infrastructure Information and Communications Technology Science, Technology and Innovation Land Reforms Public Sector Reforms Labour and Employment National Values and Ethics Ending Drought Emergencies (EDE) Security, Peace Building and Conflict Resolution THE ECONOMIC PILLAR Overview Tourism Agriculture, Livestock and Fisheries Trade Manufacturing
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
ii iv viii x
2 2 3 3 5 6 6
8 8 9 13 14 14
16 16 21 24 28 30 34 39 41 43
48 48 51 54 58 vi
4.5 4.6 4.7 CHAPTER 5: 5.0 5.1 5.2 5.3 5.4 5.5 5.6 CHAPTER 6: 6.0 6.1 6.2 CHAPTER 7: 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 ANNEX:
Business Process Outsourcing (BPO), and IT-Enabled Services (ITES) Financial Services Oil and Other Mineral Resources THE SOCIAL PILLAR Overview Education and Training Health Environment Water and Sanitation Population, Urbanisation and Housing Gender, Vulnerable Groups and Youth Sports, Culture and Arts THE POLITICAL PILLAR Overview Devolution Governance and the Rule of Law THE IMPLEMENTATION FRAMEWORK Overview Implementation of the MTP in the Context of National and County Governments Monitoring and Evaluation A Revised Public Procurement and Disposal Act Public and Private Partnerships Act (2013) Role of Non Governmental Organisations Aid Effectiveness and General Principles of Partnership Alignment with County Integrated Development Plans and MDA Strategic Plans Reporting on Implementation of the Second MTP THE IMPLEMENTATION MATRICES
62 63 67
71 71 77 82 86 88 94
98 98 101
112 112 113 113 113 114 114 115 115 116
LIST OF TABLES Table 2.1: Table 2.2: Table 2.3: Table 2.4: Table 4.1: Table 4.2 Table 5.1 MTP 2008 - 12 Targets and Actual Performance Real GDP and Sectoral Growth Targets 2012 - 2017 Macroeconomic indicators underlying the MTEF framework 2011/12 - 2017/18 Employment Projections 2013 - 2017 First MTP Tourism Performance Indicators Financial Services Sector Institutional Overview Selected targets for Health Sector 9 10 11 13 48 79 79
vii
VISION 2030
LIST OF ACRONYMS ADR Alternative Dispute Resolutions AGOA African Growth Opportunity Act ASAL Arid and Semi-arid Land ASDS Agricultural Sector Development Strategy BASAs Bilateral Air Agreement Services BDS Business Development Support Services BRRU Business Regulatory Reform Unit CBK Central Bank of Kenya CBOs Community Based Organisations CBTAS Cross border Trade Association CCIs Charitable Children Institutions CCRS Common Cash Receipting System CEAP County Environment Action Plan CIC Constitutional Implementation Commission CIDCs Constituency Industrial Development Centres CIDPs County Integrated Development Plans COE Centres of Excellence COMESA Common Market for Eastern and Southern Africa CRA Commission for Revenue Allocation CSPF Consolidated Social Protection Fund CWES Constituency Women Enterprise Scheme DFIs Development Financial Institutions DFZ Disease Free Zones DTMs Deposit Micro-finance Institutions EAC East African Community EACC Ethics and Anti-Corruption Commission EARNP East Africa Road Network Project EASA East African Civil Aviation Authority ECDE Early Childhood Development and Education ECTS Electronic Cargo Tracking System EDE Ending Drought Emergencies EEZ Exclusive Economic Zone EMIS Education Management Information System EPA Economic Partnership Agreement EPZs Export Processing Zones ERS Economic Recovery Strategy ESD Education for Sustainable Development ESP Economic Stimulus Programme ETR Electronic Tax Register EU European Union FAO Food and Agriculture Organisation FDI Foreign Direct Investments FPE Free Primary Education
GDI GDP GER GFCS GHRIS GIS GJLOS GoK HNWIs ICAO ICT IEC IFMIS IGAD IMF IMR IRA ISO ITES ITMS ITNs JSC KAM KDHS KEBS KEFRI KEMFRI KENAS KeNHA KENIA KenTrade KEPSS KeRRA KESWS KETRACO KIE KIHBS KIRDI KNBS
Gender Development Index Gross Domestic Product Gross Enrolment Rate Global Framework for Climate Services Government Human Resource Information System Geographical Information System Governance, Justice, Law and Order Government of Kenya High Net Worth Individuals International Civil Aviation Organisation Information and Communication Technology Information, Education and Communication Integrated Financial Management Information Systems Inter Governmental Authority on Development International Monetary Fund Infant Mortality Rate Insurance Regulatory Authority International Organisation for Standardisation IT Enabled Services Integrated Tax Management System Insecticides Treated Nets Judicial Service Commission Kenya Association of Manufacturers Kenya Demographic and Health Survey Kenya Bureau of Standards Kenya Forestry Research Institute Kenya Marine and Fisheries Research Institute Kenya Accreditation Services Kenya National Highways Authority Kenya National Innovation Agency Kenya Trade Network Agency Kenya Electronic Payments and Settlement System Kenya Rural Roads Authority Kenya Electronic Single Window System Kenya Electricity Transmission Company Kenya Industrial Estates Kenya Integrated Household Budget Survey Kenya Industrial Research and Development Institute Kenya National Bureau of Statistics
VISION 2030
viii
KNOCS KNSDI KPA KRA KRC KSG KTDC KURA KWS LAPSSET LVEMP MDGs MFIs MICE MMR MSE MSMEs MTEF MTP NACADA NACC NACOSH NASEP NCAJ NCCA NCCRS NCSTI NCTIP NDDCF NEMA NER NGOs NIMES
Kenya National Occupational Classification Standards Kenya National Spatial Data Infrastructure Kenya Ports Authority Kenya Revenue Authority Kenya Railway Corporation Kenya School of Government Kenya Tourism Development Corporation Kenya Urban Roads Authority Kenya Wildlife Service Lamu Port and Southern Sudan-Ethiopia Transport Lake Victoria Environment Management Programme Millennium Development Goals Micro-Finance Institutions Meetings Incentives Conventions and Exhibitions Maternal Mortality Rate Micro and Small Enterprise Micro Small and Medium Enterprises Medium Term Expenditure Framework Medium Term Plan National Authority for the Campaign Against Alcohol and Drug Abuse National Aids Control Council National Council for Occupational Safety and Health National Agricultural Sector Extension Programme National Council on Administration of Justice National Climate Change Action Plan National Climate Change Response Strategy National Commission for Science, Technology and Innovation Northern Corridor Transport Improvement Project National Drought and Disaster Contingency Fund National Environment Management Authority Net Enrolment Rate Non-Governmental Organisations National Integrated Monitoring and Evaluation System
NMK NOFBI GCCN NSE NSS NSSF NTBs NYS OECD OVOP PC PFM PMS PPP PWDs R&D RBA RBM RRA RRS SACCOs SADC SAGAs SALW SASRA SDGs SEZ SME ST&I STEM TA TJRC TVET UN WEECs WHO WTO YECs YEDF YPs
National Museums of Kenya National Optic Fibre Backbone Infrastructure Government Common core network Nairobi Securities Exchange National Statistical System National Social Security Fund Non-Tariff Barriers National Youth Service Organisation of Economic Cooperation and Development One Village One Product Performance Contract Public Financial Management Performance Monitoring System Public-Private-Partnerships Persons Living with Disability Research and Development Retirement Benefits Authority Result Based Management Rapid Results Approach Regulatory Reform Strategy Savings and Credit Cooperative Societies Southern African Development Community Semi Autonomous and Government Agencies Small Arms and Light Weapons SACCO Societies Regulatory Authorities Sustainable Development Goals Special Economic Zones Small and Medium-Enterprise Science, Technology & Innovation Science, Technology, Engineering, and Mathematics Transition Authority Truth Justice and Reconciliation Commission Technical and Vocational Education and Training United Nations Women Economic Empowerment Centers World Health Organisation World Trade Organisation Youth Empowerment Centres Youth Enterprise Development Fund Youth Polytechnics
ix
VISION 2030
Executive Summary
The second Medium Term Plan (MTP) of Vision 2030 identifies key policy actions, reforms, programmes and projects that the Government will implement in the 2013-2017 period in line with its priorities, the Kenya 2010 constitution and the long-term objective of Vision 2030. Accordingly, the theme of this MTP is Transforming Kenya: Pathway to Devolution, Socio-Economic Development, Equity and National Unity. The MTP gives priority to devolution as spelt out in our constitution and to more rapid socio-economic development with equity as a tool for building national unity). The Second MTP also aims to build on the successes of the first MTP (2008-2012), particularly in increasing the scale and pace of economic transformation through infrastructure development, and strategic emphasis on priority sectors under the economic and social pillars of Vision 2030. Under this MTP, transformation of the economy is pegged on rapid economic growth on a stable macro-economic environment, modernisation of our infrastructure, diversification and commercialisation of agriculture, food security, a higher contribution of manufacturing to our GDP, wider access to African and global markets, wider access for Kenyans to better quality education and health care, job creation targeting unemployed youth, provision of better housing and provision of improved water sources and sanitation to Kenyan households that presently lack these. In doing all this, Kenya will pay full attention to securing our environment and building our resilience to climate change. Much of this will be done in collaboration with county governments and new urban management boards as provided for under the constitution and our laws. The overall aim of the plan is that by 2018 Kenyan families will have experienced a positive transformation in their earnings and quality of their livelihoods, and Kenya will be a more united, more prosperous society commanding respect in African and the world. The Macroeconomic Framework: Macro economic stability will continue to be a key objective in national economic management. The second MTP aims at sustained growth in agriculture, manufacturing, and service sectors in order to achieve an overall GDP growth rate of 10 per cent by 2017.To sustain and increase the growth momentum inherited from the first MTP, this plan aims to increase local savings, remittances from the Kenya diaspora and foreign direct investment in all the sectors. The Second MTP also aims at an enhanced regional and international trade strategy to grow and diversify our exports, in order to improve our balance of payments position and ensure exchange rate stability. Foundations of the Economy and Society: The second MTP will sustain and expand our physical infrastructure to ensure that it can support a rapidly-growing economy, the demands imposed on it by higher rural and urban incomes, and by new economic activities. A national spatial plan and county specific spatial plans will be developed in order to rationalize utilisation of space for economic and social development. In addition, air transport facilities will be expanded within the country, and Kenya will strengthen its position as the air transport hub in our region. Priority will also be given to improving the efficiency of our ports, and the implementation of the single window clearance system. With the construction of the standard gauge railway line from Mombasa to Malaba, rail transport will be expected to handle 50 per cent of the freight cargo throughput, thus easing the pressure on our roads, lowering the cost of doing business, and enhancing trade and regional integration in Eastern Africa. The new Lamu port and the LAPSSET corridor will be implemented as part of upgrading our national transport framework in collaboration with other countries in Eastern Africa. To relieve congestion in our main urban areas, planned mass rapid transit systems will be constructed. Expansion of roads will be continued, aiming at achieving a road network with 75-80 per cent of the classified roads in good condition and construction or rehabilitation of 5,500 km of roads. With regard to energy, a strategy is in place for modernizing energy infrastructure network, increasing the share of energy generated from renewable energy sources, and providing energy that is affordable and reliable to businesses and homes. This will ensure that our energy supply is adequate and efficient in order to support increased use in manufacturing, agriculture, services, public facilities and households. The Plan aims at increasing installed capacity for electricity generation by 5,538 MW in 2017.
VISION 2030
EXECUTIVE SUMMARY
Development in the ICT sector will build on achievements realized under the first MTP. This will include a modern ICT policy aimed at more growth and regulation that is necessary to increase local and foreign investment in ICT. The policy will provide for more utilisation of digital technology in our all our goods and service sectors. The government, for its part, intends to promote the use of ICT in our learning institutions starting with schools, and improve cyber security in order to facilitate more use of ICT in business and commercial transactions. New policies will also aim at facilitating usage of ICT in research and development, and to drive learning and innovation in the Kenyan economy. In addition, the Second MTP will ensure that on-going efforts in land reform, security of land tenure, more efficient registration of titles and records, and resolution of historic grievances are completed. Public service reforms will be strengthened and cascaded to the counties. Most importantly, the government realizes the importance of security at personal, county, and national levels, and will continue to support security sector reforms and infrastructure, while paying full attention to the constitutional requirements and human rights. The Second MTP has identified National Values and Ethics as one of the cornerstones of our overall development. The Government aims to inculcate the positive values and ethics as spelt out in the constitution. This will build sustainable peace, reduce ethnic rivalry, and promote issue-based politics that places national interest above individual and sectional ones. The overall objective will be to build unity with diversity as envisioned in our constitution as a defining characteristic of our solidarity and nationhood. Security and Rule of Law at both levels of government will remain a priority. Economic and social development is impossible without security. Insecurity in the country will therefore be addressed in order to provide individual safety to Kenyans, to address investors concerns about security-related increase in cost of doing business in Kenya, and to minimize crime whose occurrence affects the poor and the residents of arid and semi-arid lands disproportionately. This will require a better trained and equipped Kenya Police Service backed by research and technology, capacity to secure our borders, better ways to pre-empt crime and to protect life and property. In line with the constitution, security force regulations and behavior will be made to conform to local and international human rights standards. The Economic Pillar: The economic pillar in the Second MTP now consists of six priority sectors: tourism; agriculture, livestock and fisheries; trade; manufacturing; BPOs/ITES; oil and other minerals. The overall strategy for the tourism sector is to turn the country into a top 10 long haul tourist destination in the world. This will be achieved through growth and diversification of tourist sources from the traditional areas ( i.e. Western Europe and North America), and from nontraditional sources in the Middle East and East Asia. The sector will also market new high- end tourist segments like business, cultural and ecological tourism. Tourist arrivals are expected to double from an average of 1.5 million in the recent years, to 3 million each year by the end the plan period. Construction of two coastal resort cities and three upcountry tourist resort cities in Isiolo, Lamu and Lake Turkana will be initiated, and measures taken to increase bed capacity, to open more five-star hotels, and improve the standards of tourist accommodation and facilities. Under Agriculture and Livestock the second MTP will give top priority to increased acreage under in irrigation in order to reduce the countrys dependence on rain fed agriculture. A total of 404,800 hectares will be put under irrigation during the plan period. Measures will be taken to mechanize agricultural production, revive cooperatives and farmers unions, and subsidize farm inputs to raise productivity. Trade within and outside the country remains a priority sector of the economic pillar. Over the plan period the government will strengthen economic partnerships with our neighbours in East Africa and the rest of Africa. Our foreign policy will aim at increasing international trade, and international economic partnerships. This policy will encourage Kenyan producers and the private sector to open new product lines to meet demand in new African and global markets that will be identified. The government will also intensify reforms to improve the overall climate of doing business in Kenya. The Second MTP will give additional attention to growth and diversification in our manufacturing sector with the aim
xi
VISION 2030
EXECUTIVE SUMMARY
of increasing the sectors contribution to the GDP and foreign exchange earnings. To achieve this, three special economic zones targeting manufacturing in Mombasa, Kisumu and Lamu will be established. Other initiatives in the sector will include building clusters for meat and leather products, a stronger dairy sector, and the development of industrial and SME parks that will provide linkages to other sectors like agricultural and services. Kenya has established itself as a global leader in mobile money, and growth driven by new information and communications technology. This trend will be continued. Growth in global business outsourcing (BPO) industry has also opened a new window for Kenya to initiate greater expansion of IT Enabled Services (ITES) and BPO. The sector is especially critical to this plan because it has the potential to create job opportunities in large numbers while contributing strongly to the overall GDP growth as it has in the past. To achieve this,the Government will aim at universal access to ICT, development of digital content, promoting e-Government services and encourage the establishment of more ICT based industries. Oils and Other Mineral Resources is a new priority sector under the economic pillar of this plan given the continued discovery of oil and other minerals in Kenya. In the plan period, the government will develop the policy, legal, and institutional framework for the exploitation and management of Kenyas natural resources (oil, gas and other minerals) for the maximum economic benefit of the country and local communities, done in a transparent and accountable manner. It will also ensure that legislation for transparency and fair sharing the revenue generated is enacted, and safeguards erected to protect the environment and to avoid risks usually associated with huge inflows of resourcebased external earnings. The Social Pillar: Under education, ECDE will be mainsteamed and the government will continue strengthening access to universal primary education and to provide wider access to secondary education for all primary school leavers. It will also introduce universal access to computers starting with standard one in 2014, promote wider use of ICT as an instrument of instruction and training in schools, lower the student/teacher ratio by more recruitment of teachers, and provide more textbooks and teaching equipment to schools. Education in ASAL counties will be enhanced through special programmes. In the health sector, the government in partnership with county governments, will continue to emphasize primary health care, access to clean water to households, and better management of communicable diseases. Additional resources will be devoted to the challenges posed by maternal and child mortalities and by rise in morbidity by noncommunicable diseases. The government will continue to support efforts to make Kenya a regional health services hub, and to encourage new local and foreign investment in medical research, pharmaceutical production, and modern hospital care. Kenya has a young growing population and it is urbanizing rapidly. Urban housing and improvement of rural homes are priorities in the social pillar of this MTP. In association with the private sector and county government, the national government will aim at increasing the supply of modern housing units especially for the low-income segment of the market where supply lags behind demand. The government will address this problem by facilitating the construction of 200,000 units annually through PPP arrangements. In addition, the government will develop integrated investment plans for six key metropolitan areas and reform the NSSF to increase available investment to the housing sector. The government will increase support for policies and institutions devoted to promoting gender equity. It will also increase allocation of resources to enterprises led by youth and women. In addition to the Youth Enterprise Development Fund, and Women Enterprise Fund, the Uwezo Fund will provide more funds for loans to the youth, women and vulnerable groups in order to support them start small business. More resources will be allocated to social protection, including cash transfers to the most vulnerable members of our society. The Government will fully implement policies for protection of rights for women, the handicapped and vulnerable groups. The government will also identify and nurture talent, especially among youth, and support commercialisation of talent in order to raise personal incomes and widen employment opportunities. It will also provide the necessary infrastructure at national
VISION 2030
xii
EXECUTIVE SUMMARY
and county levels to nurture youth talents in sports and entertainment. More secure centres for victims of domestic violence will be established and the government will strengthen education against female genital mutilation and spouse abuse. Devolution and implementation of the Constitution Making Devolution work is a cross-cutting theme of this MTP. The Government is committed to ensuring a rapid and efficient transition to a two-tier government under which county governments assume full responsibility of the functions assigned to them under the constitution. Priority at the national level will be given to provision of adequate finance to match functions allocated to counties, and capacity for policymaking and project implementation in all county governments in order to bring the full benefits of devolution to the people. This will in turn ensure more accountability as government is brought closer to the people. The Public Financial Management Act (2012) will be implemented with the aim of exercising controls in public spending and improving the quality of public expenditure through full implementation of the Integrated Public Financial Management Systems (IFMIS) at national and county levels. Further training of public officials involved in MTEF and budgeting and expenditure at both levels of government will be undertaken. The Government will ensure that all pending legislation required by the Constitution are completed and enacted. It will provide full support to the ongoing transformation of an independent judiciary by providing it with adequate human and financial resources and with political support. Under the Second MTP, the government will also strengthen public service reforms, performance contracting, accountability and transparency. Under the plan, the Governance, Justice and Rule of Law Programme will be expanded to build capacity in the State Law Office, the Office of Public Prosecution and the relevant independent commissions. Conclusion: The policies, legal and institutional reforms that are required for the successful implementationof the second MTP are elaborated in subsequent sections of this document. The Government would like to assure the Kenyan public, private investors and our international development partners that it will honour the pledges it has made to the people of Kenya through major policy statements and under this MTP. It is convinced that with the broad partnership between Kenyans and our partners, the objectives contained in this medium term plan will be achieved, and will create a better Kenya for all.
xiii
VISION 2030
1
1.0
The Kenya Vision 2030 aims to make Kenya a middle-income country by 2030. The delivery of that target is driven by a series of 5-year Medium Term Plans (MTPs) of which this is the second. Since the inception of the First MTP, Kenya adopted a new constitution, which significantly altered the governance framework by creating a two-tier government - a national government and 47 county governments. The Constitution entrenches devolution, which will play a major role in service delivery and give all Kenyans key social and economic rights. In March 2013 Kenyans elected a new government, the Jubilee Coalition, whose policy manifesto Agenda for Kenya 2013-17 and Beyond, highlights the governments priorities over the next years. This MTP has been formulated taking into account both the constitution and the priorities of the Jubilee Coalition Manifesto. The Plan will build on the achievements of the First MTP and put the economy on a high, broad based, inclusive and sustainable growth trajectory to attain the Kenya Vision 2030 targeted annual average growth rate of 10 per cent. This growth will create a large number of jobs especially for Kenyan youth and reduce the high poverty levels that affect an estimated 45 per cent of the population. The Plan also aims at increasing gross investment by about 10 percentage points of GDP. The MTP will integrate the proposed international community development goals now known as Global Sustainable Development Goals (SDGs) for the post 2015. The SDGs are a follow up to the Millennium Development Goals (MDGs) that Kenya implemented and made significant progress.
1.1
In the initial year of the First MTP, a number of projects aimed at national healing and reconciliation following the post election violence were implemented. Repair of damaged infrastructure; assistance to affected small scale businesses; and resettlement of IDPs were all undertaken in order to raise GDP growth (which fell to 1.5 per cent in 2008) and to promote national reconciliation. Up to the year 2012, progress recorded included the following: Enrollment in early childhood education increased by 40 % from 1.72 million in 2008 to 2.4 million; Transition rate from primary to secondary education increased from 64 % in 2008 to 77 %; The number of students enrolled in university education increased by 103 % from 118,239 in 2008 to 240,551; A total of 2,200 km of roads were constructed exceeding the MTP target of 1,500 km; Three undersea submarine fibre optic networks linking Kenya to the global internet networks were completed including 5,500 km of terrestrial fibre optic network; Total installed capacity for generation of electricity increased by 22%; and Enactment of the Constitution of Kenya (2010).
VISION 2030
1.2
Despite the achievements made during the first MTP Kenya still faces significant development challenges which need to be addressed during the Second MTP. These include: Low domestic savings and investments - Kenyas saving rate was 13 per cent of GDP during the last MTP period, just half of the average for low income countries, and less than the 17 per cent of sub Saharan Africa average; Low per-capita income growth Real per-capita income grew by 7.8 per cent in the last 5 years; High levels of unemployment and poverty The last published rate of unemployment by the Kenya National Bureau of Statistics is 12.7 per cent based on the 2005/6 Kenya Integrated Household Budget Survey. Recent estimates by non-Bureau sources puts the youth unemployment rate at 25 per cent which suggest almost doubling of the unemployment over the last 8 years given that the youth unemployment rate the world over is generally lower than the overall unemployment; High energy costs of up to 21 US cents per Kwh compared to approximately 6 US cents per Kwh in India and China; High costs of finance high bank lending rates and wide interest rates spread; Inefficiencies in rail and port operations, inhibiting regulations and procedures to business and investors; Major economic and social disparities across regions of the country; A rapid population growth rate, proliferation of informal settlements, governance problems and insecurity; High dependence of the country on rain-fed agriculture and, low agricultural productivity, remain problems in the sector which employs more Kenyans than any other; Slow structural transformation exemplified by low and declining share of manufacturing to GDP and low share of export to GDP; Narrow range of exports and the slow growth in their value compared to the growth of imports; Upsurge in non-communicable diseases across the country and global pandemics; Cyber crime; and Threats emanating from climate change.
1.3
Priority Areas to be Addressed under the Second Medium Term Plan 2013-17
The Second MTP outlines policies designed to implement devolution, accelerate growth, reduce poverty, transform the structure of the economy and create more quality jobs, as the country prepares to achieve middle income status by 2030. The following are key priority areas that Government will implement over the Plan period: Constitution and Devolution: The Government is committed to full implementation of the Constitution to ensure the rapid set-up of all the county institutions. Chapter Two, Article 6 (1) to (3) and the Fourth Schedule of the constitution will be implemented without disrupting public service delivery at national and county levels. Priority will be given to the development of the capacity of all county governments, improve policy coordination and implementation in order to get the full benefits of devolution.
VISION 2030
National cohesion: The government believes in unity with diversity as a principle. It will therefore build peace, reduce ethnic rivalry and promote issue-based politics by providing a framework for inter-ethnic peace building founded on mutual respect and resolution of conflicts. Security: Security in the country will be addressed in order to provide individual safety to Kenyans and to investors. The National Police Service will therefore be better trained and equipped and the operational capability improved. In line with the Constitution, security regulations and behavior must conform to local and international human rights standards. Drought Emergencies and Food Security: The Government will prioritize implementation of the Ending Drought Emergencies (EDE) plan as an integral part of this MTP. Priority will also be given to increasing investment in irrigation to reduce the countrys dependence on rain-fed agriculture. Strategies to mechanize agriculture, revive cooperatives and farmers unions and subsidize farm inputs will be undertaken. Additionally, emphasis on value addition in the production and supply chain will be prioritized. Equity in access to opportunities and lower cost of living: The government will lay emphasis on implementation of affirmative action in employment opportunities in public sector, and ensure resource distribution addresses regional imbalances. Another key priority will be to reduce the cost of living through lowering the cost of food and other basic needs. The government will therefore support expansion of production of food through irrigation, use of local competitively priced supply chains to deliver food to consumers more cheaply and improved management of the marketing systems. Health: Kenya has made major gains in health care especially in tackling communicable diseases such as HIV-AIDs, T.B and Malaria, however, a lot still needs to be done to improve the overall health care system. The Government will put emphasis on universal access to health care, preventive and primary health care, clean water, management of communicable disease, maternal and child health, and non-communicable diseases. It will also invest in medical research, pharmaceutical production and health tourism as a means of diversifying external revenue sources and serve as a regional hub for health services. Education: Significant progress was made under First MTP but several challenges persist and in particular, quality. The Government will therefore focus on addressing low enrollment in areas that remain below the national average, retain students in school up to 18 years, provide education more effectively through a digital platform, and match education and training with the demand for the skills required in the workplace. In addition, the Government will hire additional teachers in order to lower pupil-teacher ratio and improve quality as well as ensure that teachers devote the required time to teaching and learning. Infrastructure: The Second MTP will build on successes of the First MTP. New investments will include cheaper and adequate electricity; local and regional rail and road networks that provide safe, efficient and cost effective transport; adequate water for households and industry; affordable quality housing and sustainable environmental management. Industrialisation: The Kenyan economy is still reliant primarily on agriculture and services. The growing consumer demand for manufactured goods has been met mainly by imports. The government will facilitate growth of the manufacturing sector; make agriculture competitive and diversify the economy for employment creation. The government will also support local entrepreneurs to increase their share in local and external markets through better supply chain and making local enterprises more price-competitive in order to serve a growing local, regional and continental market. Improved Trade: The country will focus on expanding trade to increase its share in the fast expanding regional and other emerging markets. Trade in the broader region will be backed by joint infrastructural investments with neighboring countries. During the plan period, the government will facilitate research in business development and entrepreneurship under a new entity called Biashara Kenya to provide funding and leverage investment from local banks. This will develop capacity and productivity of local manufacturing geared to competitively priced quality exports to Africa and the global market.
VISION 2030
Investment to support growth: The strategies in the Second MTP are designed to increase investment to GDP ratio by investing prudently in key sectors. Land reforms and registration will be undertaken to make land a productive asset. In addition, new initiatives will be undertaken to encourage the financial sector mobilize savings and improve resource allocation to key growth sectors. Competitiveness and Rebalancing Growth: To make Kenya globally competitive, the government will increase investment in expansion, development and modernisation of roads, rail, ports, ICT and telecommunications in order to make Kenya a top logistics hub. In addition, priority will be given to development of the Lamu Port, Southern Sudan and Ethiopia Transport (LAPSSET) corridor and the oil, gas and other mineral resources sector to spur higher economic growth. Priority will also be given to implementing the National ICT Master Plan (2012-2017), and the implementation of reforms to improve World Bank. The PPP Act will be operationalized to facilitate private sector investment in infrastructure in order to enhance efficiency and competitiveness of the economy. Strengthening social protection: The Government will deepen the effectiveness of social protection by bringing more areas and groups under social protection coverage. This will be done by enhancing social assistance, social security and health insurance. Governance and Public Financial Management Reforms: The Public Financial Management Act (2012) will be implemented with the aim of exercising controls in public spending and improving the quality of public expenditure through full implementation of the Integrated Public Financial Management Systems (IFMIS) at national and county levels. Further training of public officials involved in budgeting and expenditure at both levels of government will be undertaken. Reforms in public financial management will be guided by transparency, cost- efficiency better delivery of public services, and accountability to the public on taxation and the use of public funds. Land Reforms: The National Land Policy of 2007 will be reviewed to align it with the Constitution. Land will be adjudicated and title deeds issued to individuals and communities that presently lack these in order to promote secure land ownership and more investment. Arts, Sports and Culture: Investment will be made to position creative arts, cultural heritage and sports as major sources of employment and income earning opportunities especially for the youth. The strategy will be to identify and nurture talents, support its commercialisation and provide necessary infrastructure at national and county levels.
1.4
MDGs and Harmonisation with the Global Sustainable Development Goals (SDGs) in the post 2015 period
During the First MTP, devolved funds such as Constituency Development Fund (CDF), Local Authority Transfer Fund (LATF), Bursary Fund, Youth and Women funds targeted achievement of the MDGs. In the 2011 MDGs Status Report, Kenya achieved significant improvement in the well-being of its people. This includes; increased enrollment in primary and secondary education, full child immunisation, reduction in HIV-AIDs prevalence, access to safe drinking water, electricity, mobile telephone handsets and drop in Under 5 mortality. Some targets such as reduction of maternal deaths remain a challenge. This and other unmet MDGs targets will be addressed in the Second MTP.
VISION 2030
The Second MTP will integrate the SDGs for the post 2015 which include: Ending extreme poverty and hunger; Achieve development and prosperity for all without ruining the environment; Ensure learning for all children and youth; Achieving gender equality and reduce inequalities; Achieve health and wellbeing at all ages; Increasing agricultural production in an environmentally sustainable manner, to achieve food security and rural prosperity; Make cities productive and environmentally sustainable; Curb human-induced climate change with sustainable energy; Protect ecosystems and ensure sound management of natural resources; and Improve governance and align business behavior with all the goals.
1.5
During the second MTP period and beyond, measures will be taken to realign Kenyas foreign policy with the nations international trade objectives. These include more training of staff in trade analysis and negotiation techniques, deepening economic and commercial diplomacy, regional integration, bilateral and multilateral partnerships to increase market share in traditional export destinations, penetration of new markets in emerging economies as well as enhancing the role of private sector in regional integration initiatives. Additionally, the realigned foreign policy will link regional peace and security with Kenyas economic and commercial diplomacy interests and ensure the diplomatic presence in all African region and new emerging economies. Kenyas foreign policy shall also be directed towards promoting Nairobi as a diplomatic centre, international economic hub, and venue for multi-lateral diplomacy.
1.6
The Second MTP has been prepared against the backdrop of sluggish growth in the Euro Area and economic instability in Southern Europe. Promises of renewed growth of the industrialized economies such as the US, Britain and Japan in mid2013 provides positive prospects. However, growth in Brazil, Russia, India, China and South Africa (BRICS) states generally seemed to be slowing down. Likewise, some Kenyan markets in North Africa such as Egypt have suffered low growth and instability. Diversification of trade and investment will be influenced by the recovery in the BRICS economies. Other risks include un-anticipated geo-political developments which could include increased international oil prices, negative effects of climate change, and external and internal security risks. The government will implement strategies to mitigate against these risks.
VISION 2030
2
2.0 2.1
The medium term macroeconomic framework for the period 2013-2017 is consistent with Kenya Vision 2030 and aims at putting the economy on a high growth path, to ensure that double digit growth is realized, by the end of the plan period. The effectiveness of the framework is supported by the policy, legal, institutional, and structural reforms that will be implemented by the government to enhance macroeconomic stability, improve business environment and ensure transparent and accountable use of public resources. Employment creation is a key component of the overall strategy to contribute to the socio-economic objectives of tackling poverty and income inequality.
The implementation of the Economic Recovery Strategy (ERS) 2003-2007 saw the economy grow from 2.9 % in 2003 to 7.1 % in 2007. However, during the first MTP 2008-2012, growth slowed as a result of adverse multiple shocks, namely, the post-election crisis, drought, the global financial and economic crisis, high international oil and food prices, and slowdown in global economic activity. These factors contributed to low attainment of projected GDP growth, and investment and savings targets. In addition, the slow implementation of key economic reforms, such as the policy and legal framework for Public Private Partnerships (PPPs) enacted at the end of the Plan period, and absense of legislative framework for establishment of Special Economic Zones partly explains the missed sectoral investment and growth targets in agriculture, industry and service sectors of the economy. Nonetheless some sectors such as financial services, building and construction, and the ICT registered strong growth during the first MTP period. The Government also made notable progress in meeting macro-fiscal targets related to revenue collection and increased share of development spending to GDP, with actual outcomes exceeding the set targets (Table 2.1).
VISION 2030
Table 2.1 shows the First MTP Macro-Fiscal targets against actual performance. Table 2.1 shows the First MTP Macro-Fiscal targets against actual performance.
Table 2.1: MTP 2008-12 Targets and Actual Performance
2008/09
Target Act.
2009/10
Target Act.
2010/11
Target Act.
2011/12
Target Act.
2012/13
Target Est.
Annual percentage change National account and prices Real GDP GDP deflator CPI Index (eop ) Investment and saving Investment Gross National Saving Central government budget Total revenue Total expenditure and net lending Development Spending Overall balance (commitment basis) including grants Nominal public debt Monetary Sector Broad Money, M3 Credit to Private Sector External Sector Current external balance, including official transfers Gross international reserve coverage in months of import cover 23.2 16.2 20.9 26.2 7.1 -3.9 43.3 19.6 14.4 21.8 26.6 7.2 -5.2 43.2 24.6 18.5 21.3 25.7 7.1 -2.9 40.9 20.0 12.1 23.8 29.5 8.7 -7.1 46.6 27.0 20.4 21.4 12.3 21.5 23.9 25.8 29.1 7.3 -2.7 7.9 -4.3 29.7 19.8 24.4 10.4 21.5 22.6 27.0 28.7 8.9 9.1 32.6 27.7 21.7 27.3 9.7 -3.6 40.6 20.5 11.9 24.7 32.7 11.8 -6.5 46.2 6.2 11.0 7.5 2.1 11.3 11.7 8.3 5.8 5.0 4.2 5.6 3.5 9.1 4.2 5.0 5.1 7.8 14.2 9.7 4.2 5.0 4.1 12.5 10.1 10.0 4.2 5.0 5.4 9.2 6.0
In percentage of GDP
41.1 48.7
Annual percentage change 16.5 15.9 16.0 19.0 17.9 16.8 20.2 16.9 26.4 17.5 15.5 17.6 17.9 17.8 17.8 15.6 15.4
-7.0 3.7
-6.4 3.2
-6.1 3.9
-7.1 3.7
-5.6 4.1
-9.1 3.3
-5.0 4.7
-8.7 3.9
2.2
The macroeconomic prospects remain favorable despite the challenges in the previous 5-year plan period. Forecast for the global economy shows that world output will recover slowly expanding by 3-5 per cent over the next five years. Growth in the emerging economies such as the BRICS is expected to improve - offering opportunities for expanded trade and investment between developing countries such as Kenya and the BRICS. Africas growth is also projected to remain strong. The realignment of Kenyas foreign policy and international relations is expected to promote and diversify Kenyas economic partnerships and trade. This will boost economic growth by targeting alternative markets including those in the African region.
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
On the domestic front, Kenya is implementing major legal and institutional reforms that will provide a better environment for sustained macro-economic stability and improved management of public resources. These include: the Public Finance Management Act (2012); the County Governments Act (2012); the Urban Areas and Cities Act (2011), National Government Coordination Act (2013), and Transition to Devolved Governments Act (2012). In addition, the government is continuing to deepen reforms in the judiciary, police and land sectors. These reforms will enhance administration of justice, governance, law and order, and provide the country with a more conducive environment for doing business, promote investment, growth and employment creation. Foreign direct investment is expected to increase especially following the recent discovery of oil, gas, rare earth minerals and coal. In addition, the country will maximize its geographical comparative advantage through implementation of the LAPSSET corridor project, modernisation of the Port of Mombasa, construction of a standard gauge railway from Mombasa to Malaba, and expansion of Jomo Kenyatta International Airport to serve as the regional airport hub. Construction of the Ethiopia power interconnectivity line, to source cheaper hydropower, and completion of the Olkaria IV by 2014 and other geothermal energy projects are also expected to boost growth through supply of cheaper and reliable power. The growth strategy will also benefit from exploitation of green growth opportunities such as the use of carbon credits (especially in reforested catchment towers), clean energy use in geothermal, hydro, wind and solar power, the promotion of natural products initiatives, promotion of resource efficiency and clean production systems. During the plan period, the 47 Counties are also expected to attract investment and emerge as regional growth hubs. The Government projects growth to continue gathering momentum from about 6.1 per cent in 2013 to 8.7 per cent in 2015 and reach 10.1 per cent in 2017. The higher growth is premised on increased investment, which is targeted to reach 30.9 per cent of GDP by 2017/18 from 24.7 per cent in 2013/14. The current level of public sector investment, at 8-10 per cent of GDP will be sustained. However, the bulk of the increase in overall investment level is expected to be financed by the private sector, including foreign direct investments.
Table 2.2: Real GDP and Sectoral Growth Targets 2013-2017
Agricultural Sector To achieve the growth targets, the government will pursue macro-economic policies that will benefit key economic and social sectors. Agricultural sector is expected to grow by an annual average of about 6.4 per cent during the period. The sector will benefit from output and productivity gains through institutional reforms such as land reforms already started during the First MTP. Priority will be given to the implementation of the fertilizer cost reduction strategy, expansion of land under irrigation through construction of the High Grand Falls Dam and implementation of other irrigation projects across the country, increase the access of Kenyas livestock products to regional and international markets, support to extension services, and establishment of greenhouses and agro processing plants in the counties. In addition, the national government will continue to actively promote value addition in farm products and to increase exports of agricultural and livestock products.
10
VISION 2030
Industrial sector To transform the economy, the industrial sector growth needs to expand steadily from 6.0 per cent in 2013 to 10.2 per cent in 2017. The Government will focus on an export led growth strategy through the establishment of Special Economic Zones (SEZs), industrial clusters, and SME parks. In addition, the government will support growth in the mining industry by creating an enabling policy, legal, and institutional framework for investment and maximisation of benefits from exploitation of Kenyas natural resources especially oil, natural gas, coal, and other minerals. The construction and building sector will benefit from continued infrastructure spending with expansion of roads, ports, rail and power plants. Kenya will also continue to aggressively exploit market opportunities through regional integration, and exploit export opportunities in African states outside the East African Community (EAC), Common Markets for Eastern and Southern Africa (COMESA) and in the global market. Service Sector Services sector is expected to grow from about 6.5 per cent in 2013 to about 10 per cent by 2017. The sector will benefit from sustained growth in tourism, ICT, and related businesses such as Business Process Outsourcing (BPOs), and expansion of regional trade and transport services. In addition, the financial sector is expected to expand rapidly as business confidence improves and as new strategies to boost savings are implemented. The establishment of the Financial Services Center during the plan period is expected to further improve the sectors growth, and to attract more local and international firms in the sector.
2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 2017/18 *prov. Proj. Projection Annual percentage change Real GDP CPI Index (eop) CPI Index (avg) 4.5 10.1 16.1 5.4 6.0 5.9 6.7 5.5 6.0 7.8 5.0 5.0 8.7 5.0 5.0 9.6 5.0 5.0 10.6 5.0 5.0
In percentage of GDP Investment Gross National Saving Total revenue Total expenditure and net lending Overall balance (commitment basis) excl. grants Overall balance (commitment basis) incl. grants Nominal public debt, net
Current external balance, including official transfers Gross international reserve coverage in months of
Source: KIPPRA, *BPS 2013
VISION 2030
11
2.2.1
The government will pursue prudent macroeconomic policies to ensure fiscal and debt sustainability. The debt to GDP ratio is projected to decline to 39.2 per cent by 2017/2018 from 43.9 per cent in 2013/14. The implementation of the contributory pension scheme for public servants (The Public Service Superannuation Act, 2012) will enhance domestic savings and reduce government contingent liabilities. Tax reforms will be given priority including enhancing compliance and broadening the tax base. These will be supported through the implementation of Integrated Tax Management system (ITMs) and revamping enforcement mechanisms. The Government will continue to borrow from domestic and external sources with the latter being largely on concessional terms and will aim at a 30:70 ratio of domestic to external financing. This will ensure that the private sector is not crowded out in the credit market and that Government projects are financed at lower costs. The Government will also issue a debut sovereign bond at the International markets within the Second MTP period. This bond will primarily finance infrastructure development in the country, help the Government diversify its investor base, establish a pricing benchmark for future issuance by both the public and private sector, and promote Kenyas reputation and visibility in the international investor community. The Central Bank of Kenya (CBK) will pursue a prudent monetary policy to ensure price stability with inflation projected to remain at about 5 per cent as a policy target. In addition, the CBK will build international reserves to 6 months import cover as agreed by all EAC Member States compared to 4 months during the First MTP period. In order to cushion the country from the vulnerabilities of hikes in food prices and higher inflation, the government will maintain sufficient strategic grain reserves. 2.2.2 Medium Term Employment Projections
The First MTP had projected an annual average employment growth of 6.0 per cent and creation of a total of 3.7 million new jobs. However, an annual average of 511,000 jobs against a target of 740,000 jobs was created between 2008 and 2012. Moreover, about eighty (80) per cent of the new jobs created were in the informal sector, where most jobs are characterized by underemployment and low productivity. The challenge under the Second MTP is to increase the share of quality jobs created in the formal sector. During the Second MTP, the Government is committed to create 1 million new jobs annually to address youth unemployment and also improve skills training. The government will also seek a major and permanent shift toward formal employment, with the aim of increasing the proportion of modern sector employment from 12 per cent in 2012 to 40 per cent by the end of the plan period. Table 2.4: Employment Projections 2013-2017 As part of the employment creation strategy, the government will: Initiate labour intensive public works programs; Support SMEs; Facilitate establishment of Special Economic Zones and Industrial Parks; and Exploit green employment opportunities in organic products industries, organic farming, resource efficient and clean production, renewable energy, forestry, environmental planning and urban waste management. Over the plan period, rationalisation of the public service will continue. The government aims at an efficient, effective and accountable public service that will adopt innovative ways to deliver public services including leveraging on ICT. The public service wage bill will be managed on the principle of moderation. The Salaries and Remuneration Commission (SRC) will continue to set the salaries of state officers that will ensure fiscal prudence and sustainability among other key public finance principles. In addition, the government will develop wages and incomes policy to 12
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
Table 2.4: Employment Projections 2013-2017 Employment Projections, 2013 2008 -2012 (MTPI) Total Total Employment 2,557 Avg 511 723 2013 2014 Projections 821 1,000 1,194 1,432 2015 -2017 ('000 ) 2016 2017 2013 -17 (MTPII) Total 5,170 Avg 1034
334 15 52 267
67 3 10 53
108 31 22 55
164 48 34 83
250 93 54 103
0.15 0.85
0.2 0.8
0.25 0.75
0.35 0.65
0.4 0.6
0.29 0.71
Note: Employment targets were based on the 2001-2011 elasticity defined as per cent increase in employment level for every one per cent increase in GDP levels as follows: Agriculture 0.43; Industry 0.50; and Services 0.75 Source: Ministry of Devolution and Planning, The National Treasury
provide a framework and necessary guidance on wage levels, wage formation and adjustment mechanisms and other wage administration issues to reduce incidences of industrial disputes.
2.3
Structural Reforms
Kenyas global ranking on the World Banks Ease of Doing Business Indicators fell from 72nd position in 2008 to 121st position in 2012. The government is committed to reversing this trend, and the overall goal is to ensure that by the end of the Plan period the country rank among the top 50 countries in the both Ease of Doing Business ranking and the World Economic Forums Global Competitiveness Index. The government will, thus speed-up implementation of structural and institutional reforms and put in place the necessary enabling legislation in all sectors to enhance efficiency and competitiveness and investment. During the first year of the Plan, priority will be given to: full implementation of the provisions of the PPP Act (2013); fast tracking the enactment into law of the Business Regulatory Reform Bill and Special Economic Zones Bill. These key pieces of legislation are expected to facilitate private sector investment in infrastructure and in other areas of the economy. To enhance competition and economic efficiency, the National Productivity Center and the Competition Authority will be strengthened to effectively perform their mandates. In addition to reforms under the Public Finance Management Act (2012), the National Treasury will strengthen the Debt Management Office and establish a financial management
VISION 2030
13
system for all levels of government. Implementation of the Strategy for Public Finance Management Reforms (PFMR) 2013-2018 will enhance transparency and accountability for improved service delivery. The Public Procurement and Disposal Act, 2005 will be reviewed to address procurement bottlenecks and build capacity at the national and county government levels. ICT initiatives such as the re-engineered IFMIS, NIMES, e-Promis, and e-government will be fast-tracked and cascaded to the devolved government level to ensure faster project implementation, and monitoring and evaluation.
2.4
Statistical reforms
The government will strengthen the national statistical system to support planning, and monitoring and evaluation of government policies and programmes. This will include establishment of statistics offices in all the 47 counties, which will supervise and coordinate statistical programmes at the county level and ensure that international standards are applied in the production and dissemination of county statistics, and that there will be harmony between national data and aggregated county data. Continuous capacity building and development of regulatory procedures will be undertaken, to ensure that statistics produced are of high quality. To improve the quality of data, the following surveys and censuses will be carried out within the period of the second MTP: Kenya Integrated Household Budget Survey (KIHBS) II; Census of Agriculture; Labour force survey; Census of Business establishments ; and Generation of county statistical profiles.
2.5
Tax Reforms
Tax reforms are key to enhancing the governments revenue capacity to finance development programmes and projects. Kenya Revenue Authority (KRA) will continue to benchmark its services to the standards of selected upper middle income countries so as to meet the international best practices. The following interventions will be implemented under tax reforms in the plan period: The second phase of the Integrated Tax Management System (ITMS); Payments of taxes via mobile money; Revamping the Turn over tax to make it more efficient and easy for the taxpayers to comply with; Use of geo-spatial information to enhance revenue collection from the real estate sector; Taxation of High Net Worth Individuals (HNWIs); Implementation of Single Customs Territory (SCT) to introduce tax payment at first point entry; Development of the KRA dynamic risk management system; Implementation of Electronic Cargo Tracking System (ECTS); Review the governance of transfer pricing programme; Review of tax legislation; and Local KRA offices reorganisation to assist County governments collect County revenue, and to strengthen and revamp tax enforcement mechanisms.
14
VISION 2030
VISION 2030
15
3
3.0 3.1
The realisation of the objectives and targets of the Second MTP hinges on successful implementation of the enablers or foundations. These include: infrastructure (roads, rail network, sea ports airports and pipeline); Information Communication and Technology (ICT); Science Technology and Innovation (ST&I); Land Reforms; Human Resource Development, Labour and Employment; Security; Public Sector Reforms; National Values and Ethics; and Ending Drought Emergencies (EDE). This Chapter outlines the policies, programmes and projects planned for implementation during the Plan period.
Infrastructure
Deploying World Class Infrastructure Facilities and Services.
The target for the Second MTP will be to gradually close Kenyas infrastructure deficit while building on the achievements of the first MTP. Efficient, accessible and reliable infrastructure is an enabler for sustained economic growth, development and poverty reduction. It lowers the cost of doing business; improves security; improves livelihoods and the countrys global competitiveness. Implementation of programmes and projects will focus on accessibility, quality, their functionality, job creation, disaster preparedness and protection of the environment. The strategies for successful improvement of infrastructure both at national and county governments include: strengthening of the institutional framework for infrastructure development; operationalizing the Public Private Partnership (PPP) legislation to encourage private investment in public projects; establishing a Kenya Development Bank to provide finances to the private sector for investment in infrastructure development; regular maintenance of infrastructure facilities; raising the efficiency and quality of infrastructure as well as increasing the rate of implementation of infrastructure projects.
3.1.1
Situation Analysis
During the First MTP, the infrastructure sector recorded good progress in the development and expansion andimprovement of airports, ports, rail, pipelines, hydropower, geothermal plants, ferries, housing and public works facilities. Key achievements realized include: Expansion and modernisation of Aviation facilities at Jomo Kenyatta International Airport, Kisumu International Airport and selected airstrips countrywide; Improvement of Shipping and Maritime Facilities that includes dredging and widening of Mombasa Port and the development of Berth No.19; Improvement of Railway Transport Systems that includes the upgrading of the Commuter Core System, completion of JKIA Commuter Rail Phase I, the construction of a railway station at Syokimau and completion of preliminary designs for Mombasa - Malaba / standard Gauge Rail; Road Expansion Programme which consisted of 2,200 km of roads constructed, 1,863km rehabilitated/reconstructed, 16
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
2,649km on periodic maintenance and 236,603km routine maintenance. The completion of Nairobi-Thika super-highway, Northern Corridor Transport Improvement Project (NCTIP); Decongestion of cities, towns and urban centres; Construction of Nairobi missing links; Improvement of rural accessibility through the Roads 2000 Programme; Implementation of National Road Safety Programme; Installed capacity of electricity generation, increased from 1,268MW in 2008 to 11,606MW in 2012; New customer connectivity to electricity increased from 1,060,383 in 2008 to 2,330,962 customers by June 2013; an increase of 1,270,579 new customers against the first MTPs target of 1,000,000 customers; Installed capacity from the new and renewable sources increased from 100MW in 2008 to 241MW in 2012. Initiation of the development of Lamu Port Southern Sudan and Ethiopia Transport (LAPSSET); and Key policy, legal and institutional frameworks were developed and fast-tracked to support implementation of programmes and projects in the sector. 3.1.2 Emerging Issues and Challenges
Emerging issues that slowed down further infrastructure development include concerns over the length of future planning and consultative processes, inadequate funding, contracting disputes and low/poor maintenance of key projects. In addition to the above, the sub-sector specific challenges include: Aviation: Lack of adequate and skilled flight safety inspectors; rapid technological changes in equipment for the provision of Air Navigation Services; Shipping and Maritime: lengthy customs and documentation procedures; lack of electronic cargo tracking system and non-tariff barriers; multiple weighbridges; inadequate equipment and machinery thereby limiting handling capacity of the port; lack of training vessel to offer sea time to trainees; Railway: huge capital outlay required to construct standard gauge railway line and commuter rail services, inadequate trained engineers, encroachment of railway lines, and aging wagons; Roads: Congestion in Cities and Urban areas, lack of harmonisation of cross-border transport regulation and operational procedures, rapid urbanisation and increased traffic volume, lack of specific standards and capacity for devolved county roads, huge maintenance backlog of the road network, weak enforcement of axle load rules and regulations, high cost/delays in relocation of utilities and services along and across road reserves, and high cost of road construction; Buildings and Other Public Works: Outstanding problems include completion of stalled projects under the Economic Stimulus Programme, and high rental accommodation charges in foreign missions abroad; Energy: over-dependence on hydropower with its vulnerability to variations in hydrology and climate, high cost of rural electrification projects, outdated refinery and pipeline system, inadequate storage infrastructure for strategic reserves of the petroleum products, volatility of international crude oil prices and weak legal and regulatory framework for energy resources exploration, exploitation and development. 3.1.3 Programme and Projects for 2013-2017
Flagship Programmes and Projects The infrastructure sector is expected to play a pivotal role in steering Kenyas economy towards a middle income level as envisaged in the Vision 2030. The following are the key programmes and projects to be implemented. Expansion and Modernisation of Aviation Facilities: The Government aims at making Kenya the aviation hub in the African region through construction and modernisation of aviation facilities and targets annual capacity of 45 million passengers. Key projects includes: reconstruction of terminal two at JKIA; construction of Green Field Terminal, second runway and associated facilities at JKIA; improvement of terminal and airside capacity at Kisumu International Airport,
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
17
improvement of safety and support operations at Moi International Airport; modernisation of Air Navigation Services Phase II & III and construction, rehabilitation and maintenance of Airstrips and Airports. Expansion of the Route Network: The Government will negotiate and conclude additional Bilateral Air Agreement Services (BASAs) and ratify new international conventions and protocols aiming at expanding the route network of Kenya Airways and other designated national carriers. Improvement of Shipping and Maritime Facilities: The objective of this programme is to build port capacity of 50 million tonnes and transform Kenya into a maritime hub by facilitating trans-shipment of cargo at the port of Mombasa. In order to achieve this, the Government will improve port efficiency, construct second container terminal at KPA, provide new handling facilities at the Mombasa Port, develop Dongo Kundu Free Trade Port, and modernize ferry services to increase passenger capacity per year. Expansion of Railway Transport: the aim will be to increase the railway capacity to handle 50 per cent of freight cargo (25 Million Tonnes) from the Mombasa Port. To achieve this objective, the government will: develop a standard gauge railway line between Mombasa through Nairobi to Malaba with connectivity to Kisumu,Uganda and Rwanda; expand Nairobi Commuter Railway Services system that involves upgrading of the Commuter Core System (existing commuter rail line); construction of a railway line from JKIA to the Syokimau Railway Station, and construction of Kisumu and Mombasa commuter rail systems. Expansion of Roads Programme: The programme is aimed at enhancing domestic and regional trade through upgrading of the national and county roads network. The target is to construct and rehabilitate approximately 5,500 km of roads comprising of 3,825 km national trunk roads and 1,675 km county roads. About 1,700 km for Non-Motorized Transport (NMT) including paths and walkways will be constructed. About 800 km of roads will be designed and 4,257 km and 1,735 km of national trunk roads and county roads will be periodically maintained respectively. In addition approximately 200,000 km will be routinely maintained. The PPP arrangements, such as concessioning, Build Operate Transfer, Design Build Operate, Design and Build will be used for roads construction and/or maintenance on Nairobi bypasses and other major roads including sections of Mombasa-Nairobi-Malaba, Mau-Summit-Kisumu-Busia and Nairobi-Thika highway. To achieve the above targets, the following flagship programmes/projects will be implemented: Northern Corridor Transport Improvement Project (NCTIP); East Africa Road Network Project (EARNP); Kenya Transport Sector Support Project; Rehabilitate and Upgrade Eldoret-Kitale-Lodwar-Nadapal (600km): This is a transnational project to promote and facilitate regional economic integration between Kenya and South Sudan; Decongestion of Cities, Urban Areas and Municipalities: aimed at easing congestion, reduce travel time and costs and enhance connectivity in cities, urban areas and municipalities. These will include Construction of Bypasses, Construction of Missing Links and improvement of roads in Nairobi and other Cities and Municipalities; and Scale up the Roads 2000 Programme which is labour intensive and has the potential to create more jobs. Development of the Lamu Port-Southern Sudan-Ethiopia Transport (LAPSSET) Corridor: The objective of the LAPSSET project is to open up northern Kenya and provide a reliable transport corridor for Ethiopia and Southern Sudan. The following components will be constructed: A standard gauge railway line; A new road network; An oil pipeline, crude oil pipeline and refined oil pipeline from Lamu to Jubaa and Ethiopia; An oil refinery at Lamu with capacity of 120,000 barrels per day; A modern oil terminal at Lamu port to facilitate tanker loading and offloading; A refined petroleum products pipeline from Lamu connecting to the existing Mombasa-Kampala pipeline;
18
VISION 2030
International airports at Lamu, Isiolo and Lokichoggio; A free port at Lamu (Manda Bay) including three berths to handle container, conventional and bulk cargo vessels, Lamu Port Management Building, Lamu Port Police Station and staff housing, and dispensary and a club house; Three resort cities in Lamu (at Manda Bay), Isiolo and on the shores of Lake Turkana; and 1,420km 220 KV double circuit electricity transmission line along the LAPSSET Corridor. National Road Safety Programme: The established National Transport and Safety Authority (NTSA) will be operationalised while Transport Integrated Management System (TIMS) will be developed to automate and integrate data from traffic department, registrar of motor vehicles, transport licensing board, motor vehicles inspection unit, Association of Kenya Insurers, Courts and the Ministry of Transport and Infrastructure for effective management of the road transport sub-sector. Development of Mass Transport Transit Systems in Major Cities: Rapid Bus Transport Network and the Light Rail Technology will be developed. Kenya Transport Support Sector Project (KTSSP) will be implemented. Development of a 50 Year Transport Master Plan (TMP): The aim of the project is to ensure that investment and location of the transport infrastructure and services are consistent with other public policies. The government will finalize the TMP and implement the recommendations contained therein. Improvement of Living and Working Conditions in Government Buildings: The objective of this program is to improve functionality and appearance of public buildings as well as securing them from man-made and other calamities. It will include completion of 35 stalled public buildings; design, document and supervise completion of 300 new government buildings as requested by government ministries, agencies, departments and county governments; and rehabilitate and maintain 250 public buildings in both national and county governments. Development and Maintenance of Coastline Infrastructure and Inland Water Transport: Construction and maintenance of 8 jetties and 7,500 meters of sea wall will be undertaken to improve movement into and out of waters, and protect land and property in low lying areas from erosion, flooding and sea wave action. Inland water berths facilities will also be improved Improvement of Communication in Human Settlements: The objective of this programme is to improve accessibility especially in areas of difficult terrain through the construction and maintenance of footbridges. It is targeted that 250 footbridges will be constructed in various parts of the country. Regulation and Development of the Construction Industry in Kenya: The National Construction Authority (NCA) will be stregthened to regulate standards in the construction industry; oversee and coordinate construction industry; register contractors and regulate their conduct for improved performance in the construction industry. Development of Foreign Missions Abroad and Development of Nairobi as a Multilateral Hub: This programme aims to facilitate accommodation of foreign missions and ensure reduction in rental bills. The programme further aims at promoting Nairobi as a multilateral hub. The projects to be undertaken during the plan period include: the construction of chancery and ambassadors residence in Kampala, Uganda; the construction of commercial buildings with chanceries in Juba, Bujumbura and Kigali; the construction of convention centre, office blocks and hotel in Gigiri, Nairobi and construction of an ultra modern building to house the Ministry headquarters. Research in Appropriate Building Technology: The aim of the programme is to conduct research and disseminate findings on appropriate building technologies. Over the plan period, seven researches on alternative building technologies will be undertaken namely: brick/soil based materials; natural stones; cement based materials; wood based materials; indigenous roofing materials; interlocking bricks; and prefabricated buildings.
VISION 2030
19
Increasing Electricity Availability through Power Generation: The government will improve the energy infrastructure network and promote development and use of renewable energy sources to create a reliable, adequate and cost effective energy supply regime to support industrial take off for economic growth. The key programmes and projects prioritized for implementation to increase electricity installed capacity by 5,538 MW in 2017 are as follows: 250 MW (Diesel Plants); 24 MW (Hydropower Kindaruma and import from Ethiopia); 1,646MW (Geothermal Resources: Orpower 4;at Olkaria I; at Olkaria IV; Olkaria V; Olkaria II; Eburu geothermal project; new wellheads; Menengai; and Silali-Bogoria Phase I); 630 MW (Wind power at Ngong, at Lake Turkana, Kinangop Aeolus, Kipeto, Prunus, and Isiolo); 1,920 MW Coal 18 MW co-generation 1,250 MW LNG Liquified Natural Gas /Compressed Natural Gas (CNG). Drilling and Steam Field Development of Wells: A total of 620 geothermal steam production wells will be drilled and developed at Olkaria (80), Menengai Phase 1(120), Mengai Phase 2 (210) and Silali-Bogoria Phase 1 (210) to be completed by 2017. Development of Multi-Purpose Dams by Regional Development Authorities: The dams with their power generation capacities to be developed include: High Grand Falls Multipurpose dam (700 MW); Magwagwa Multipurpose dam (120 MW); Development of the Arror Multipurpose dam (60 MW); and Development of the Nandi Forest Multipurpose dam (50 MW). Increasing Electricity Access: The government will increase access to electricity through upgrading and expansion of the national power transmission and distribution network to improve supply and reliability, reduce losses and connect two million new customers by 2017. Rural Electrification Authority (REA) will continue implementing Rural Electrification Programme countrywide and targets to connect 6,304 public facilities.These will include electrifying the remaining 2,600 main public facilities (trading centres, secondary schools, health centres and dispensaries) and other public facilities including primary schools, tea buying centres, water supply systems, places of worship among others. Construction of Pipeline and Storage Facilities: the programme will be implemented through: Development of the Mombasa Petroleum Trading Hub: It entails development of Very Large Crude Carrier (VLCC) size tankers and a tank farm of at least 800,000MT through Public Private Partnership to provide storage for strategic petroleum stocks; construction of a new oil pipeline from Mombasa to Nairobi (Line-5); construction of a parallel oil pipeline from Sinendet to Kisumu; Kenya Uganda Oil Pipeline; construction of additional storage tanks at Nairobi Terminal (4 tanks) and at JKIA Depot ( 2 tanks); installation of a third pump in the Mombasa Nairobi oil pipeline; expansion of truck loading facilities at Eldoret depot; installation of integrated security system in all KPCs depots; and upgrading of the oil refinery. Development of New and Renewable Sources of Energy: The government will promote development of renewable energy as an alternative source of energy. This includes generation of energy from solar, wind, biogas (Biogas for Better Life) and development of bio-energy including bio-ethanol and diesel value chains. The use of improved cooking stoves and charcoal kilns, and re-afforestation of water towers will be promoted. National Renewable Energy Master Plan and updated renewable energy database will be developed. Other Programmes and Projects Other key projects to be implemented in the plan period include: Capacity Building Programme for East African School of Aviation (EASA) and Kenya National Shipping line; Improvement of Aviation Facilities at the Wilson Airport; Equipment Replacement Programme at KPA; Construction of container depot with forklift and purchase of new containers; Implementation of vessel chartering and purchase of new ones;
20
VISION 2030
Implementation of the Resettlement Action Plan for 10,006 displaced persons along the railway reserve in Nairobi; County Roads programmes involving constructing/rehabilitating 1,675 km, maintenance of 1,735 kms and routine maintenance of 130,000 km of roads; Acquisition of road construction plant and machinery; Road construction materials research and testing; Establishment of Transport Data Centre; Establishment of One-Stop Border Post at Malaba, Busia, Isebania, Taveta, Lungalunga, and Namanga to harmonized systems for processing of transit cargo and this will facilitate cross border trade; Develop Transport Integrated Management System to integrate all road transport and related institutions; Introduction of second generation smart card based driving license; Establishment of Nairobi LPG storage, bottling and distribution facilities; Construction of an oil and container storage terminal at Konza; Upgrading of Supervisory Control and Data Acquisition/Energy Management System (SCADA/EMS); Improvement of Geographical Information System (GIS) utility database by completing the digitizing and mapping of the grid network; Implementing customer service improvement programs including roll out of Automatic Meter Reading (AMR) for large customers and pre-paid meters for small to medium customers; and Expansion of Fuel Retail Network 3.1.4 Policy, Legal and Institutional Reforms
To promote timely implementation of programmes and projects, the following Policies, Legal and Institutional Reforms will be fast-tracked: Transport: Establish an Autonomous National Aircraft Accident Investigation agency; review of Kenya Ports Authority (KPA) and Kenya Railway Corporation (KRC) Acts; review and implement the Sessional Paper No.2 on Integrated National Transport policy; finalisation and enactment of the Roads Subsector Policy and Kenya Roads Bill 2013; establishment of Nairobi Metropolitan Transport Authority and setting up of the LAPSSET Corridor Implementation Fund; and development of Intergrated Maritime Policy. Energy: Review of the Feed in Tariffs policy; Review and approve competitive Profit Sharing Contracts; Enact legislation to govern proposed petroleum special economic zones and petroleum trading; Legislation of regulatory framework for enhancement of an independent system operator; Finalisation and enactment of the Energy Bill; Development of a policy on management of commercial discoveries of oil and gas resources; Review and update the Petroleum (Exploration and Production) Act (Cap 308); Review of the existing legislations on Licensing of Petroleum Businesses; Review of the Energy (Petroleum Pricing) regulation, 2010; Review of the National Oil Corporation Act; Building and Construction: Review of the Architects and Quantity Surveyors Act, CAP 525 to establish separate legislations for each profession.
3.2
The government recognizes ICT as a foundation for economic development. Kenyas vision of knowledge based economy aims at shifting the current industrial development path towards innovation where creation, adoption, adaptation and use of knowledge remain the key source of economic growth. ICT is a critical tool for expanding human skills and rests largely on a system of producing, distributing and utilizing information and knowledge that in turn plays a great role in driving productivity and economic prosperity. 3.2.1 Situation Analysis
VISION 2030
21
Under the First MTP, the sector made tremendous progress. Kenya led the world in electronic cash transfer through mobile telephony platform as a result of which micro-credits and savings are being raised using the same platform. The sector also witnessed development of 60 per cent of the planned national ICT infrastructure to improve universal access to ICT services. The country is currently connected to the international broadband highway through the SEACOM, TEAMS, EASSY, and LION cables. All major towns in the country are now connected through the National Optic Fibre Backbone Infrastructure (NOFBI) and Government Common Core Network (GCCN). Demand for internet and data services has been rising with Internet subscription increasing from 1,579,387 subscribers in 2009 to 8,506,748 in 2012. This has enhanced business activities and created job opportunities. The Government developed the tier-2 Government Data Center (GDC) infrastructure to ensure security of Government data and applications. Bandwidth support to government offices was increased from 80 to 100 MB Broadband internet capacity. This has improved the quality and reliability of Government communication system. Several ministries have developed online systems geared towards improving service delivery. These systems include: the re-engineered Integrated Financial Management Information System (IFMIS), County Revenue Collection System, application of public service jobs online, status tracking of ID and passports, public examination results and candidate selection into secondary schools, digitized education content in 12 subjects in secondary school level; online submission of tax returns, online custom declaration, electronic reporting of corruption, and a business licensing e-registry. Konza Techno City business plan with its physical development plan was developed. The focus areas to drive growth of Techno City include Business Process Outsourcing (BPO), Internet Enabled Services (ITES), software development, data centers, disaster recovery centers, call centers and light assembly manufacturing. Other initiatives in the sector included: establishment of digital villages, digitalizing government records and providing connectivity to government, learning and social Institutions; software development and film production; and establishment of an open data portal. This has made Kenya to be ranked second in Africa and 22nd (2012) worldwide in the open data initiative. The government developed and implemented Kenya Communications (Amendment) Act, 2009 and Kenya Information and Communications Regulations, 2010. These legislations led to improved competition and broad choices of ICT services. 3.2.2 Emerging Issues and Challenges
The sector faced the following challenges in implementation of its programmes: Inadequate financing coupled with delayed disbursement; Inadequate human capacity for research and development in ICT and the film industry; Inadequate legislation for better exploitation of ICT in commerce and entertainment with adequate safeguards against crime and ICT media abuse; Decentralized ICT coordination structures leading to slow implementation of automated systems, duplication and implementation of ICT innovations; Digital divide between the rural and urban areas which limits public awareness of the advantages and opportunities of ICT; Slow adoption of ICT services by learning, social and government institutions; Non-incorporation of ICT cabling in new building designs; Lack of harmonized data management system; Inadequate information resource centers in the rural areas; Low ICT skills; Vandalism of ICT infrastructure; Sophistication in cyber attacks and cyber crimes; Lack of or inadequate supply of affordable and uninterrupted power supply; and 22
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
Limited penetration of telecommunication infrastructure in rural areas. 3.2.3 Programme and Projects for 2013-2017 . Flagship Programmes and Projects: Upgrading National ICT Infrastructure through: Expansion of Fibre Optic Networks to cover hospitals, schools, police stations and other public service institutions. A universal service fund that finances the roll out of infrastructure and access of service to the unserved and underserved areas will be created. Establishment of Wide Area Network and Network Operations Centre to ensure that each county headquarters use a broadband network with a minimum capacity of 4mbps per agency, VOIP telephony and unified communication systems. Roll out of 4 G Networks to provide faster internet and increase bandwidth capacity. Establish Data Centres designed to ensure that strategic public data is stored in secure locations with minimal risk and delivered cost-effectively; Setting up National ICT Centres of Excellence in order to develop a critical mass of human resource required to support capacity for the industry; Promote local ICT software development and make ICT Software more affordable and accessible through the existing fiscal concessions by the Government; Enhance cyber security to reduce the risk of cyber attacks and create a more secure network from the level of the major national public gateways to the user; Implement Public Key Infrastructure (PKI) to authorize and authenticate information systems in the country. The Root Certificate Authorities which will facilitate the use of digital certificates will be set up; Build capacity for the Kenya Computer Incidence Response Team and Coordination Center (KE-CIRT/CC) to coordinate computer related incidences in the country; and Roll out of the Digital TV Infrastructure in all the remaining counties (from 60% coverage to 100%) to move from analogue to digital TV broadcasting migration. Improving Public Service Delivery Using ICT through: Support for food security through development of the following: a digital land management system, GIS, mapping of farm productivity, forecasting, digital meteorological systems, and market information systems, e-farming, farm produce management systems, agricultural information systems, remote sensing, population management systems, and health and nutrition information systems; E-government systems initiative to complete development of the following systems: National Integrated Monitoring and Evaluation System (NIMES), e-Promis, National Integrated Education Information Management System (NIEIMS), National Integrated Land Management Information System (NILMIS), performance contracting online tracking system, Government shared services, Government Data Centre, Community Learning Information Centres, IFMIS, Revenue collection system (CIFMIS), Interactive Voice Response System and Government unified messaging system; Enhancing the Kenya Open Data Initiative (KODI) portal and ensure that relevant organisations and ministries upload information in a timely manner so that information available on the portal is current and consistent; and Integration of ICT in education to familiarize young Kenyans with ICT as a learning tool. Primary school pupils will be provided with laptops to enable them access information on a wider scale online. ICT Industry Development through: Development of Konza Technology City (KTC) to position Kenya as the ICT hub in Africa. The project will be developed in phases and the first phase will consist of the following: construction of a BPO Park; a science park, residential buildings, a data centre and part of central business district. It will also involve construction of basic infrastructure including access roads, telecommunications, water and sewerage and electricity;
VISION 2030
23
Generation of ICT contents. The Kenya ICT board in partnership with Strathmore University and other local universities will generate content aimed at spurring new business concerns in the 47 counties. The Board in partnership with the universities will conduct county commissioned research, data analysis and the best business opportunities and potential investors in each county; Setting up of digital villages to provide over 30,000 opportunities for Business Process Outsourcing (BPO) by 2017 up from the current 13,000; and Development of e-commerce to enable entrepreneurs obtain skills to sell their products/services over the internet. The programme will involve use of high resolution GIS maps of all the inhabited areas of Kenya; development of a national e-commerce master plan, an e-commerce policy, an updated courier services policy, a content business model policy; and e-commerce legislation and related regulation. Upgrading ICT Capacity through: Setting up of County ICT Incubation Hubs to empower the youths with the necessary training and work experience to develop market-ready ICT services and products; Development of a National Addressing System project to identify streets, buildings, plots and other infrastructure and allocating them a street address; and Development of ICT human resource in government to enhance ICT knowledge and skills needed for better performance of organisations within the public sector. Career progression with clear ranks, qualification and rewards for government ICT staff will be established. 3.2.4 Policy, Legal and Institutional Reforms
The following policy, legal and institutional reforms will be necessary for effective implementation of projects: Policy Reforms Review National ICT Policy, 2006 to re-align with the Constitution of Kenya 2010 and the best international practice; Develop and rollout of the National ICT Master Plan; Develop National Broadband Strategy; and Finalize and operationalize National Cyber Security Framework. Legal Reforms Review of Media Act 2007 and Kenya Information and Communication Act (KICA) Institutional reform Establishment of a National ICT Agency
3.3
Science, Technology and Innovation have become one of the most important enabling tools, leading to shifts in comparative advantage and competitiveness of economies worldwide. The Kenya Vision 2030 and the Constitution explicitly place a premium on the generation and management of a knowledge-based economy and the need to raise productivity and efficiency. To achieve the goals in the second MTP, the sector will adopt various supporting initiatives including: Public Private Partnerships (PPPs); linking industry with academia; value chain analysis; synergy (as opposed to institutional competition) and initiatives for closed-cycle cluster approach for enhanced cooperation. The sector will play a critical role in ensuring that all sectors of economy have access to the necessary technologies that will increase production and quality in a diverse range of products, processes and services. 3.3.1 Situation Analysis
The implementation of the first MTP recorded significant achievements in the growth and development of the ST&I 24
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
sector. These include; the establishment of the National Bio Safety Authority in 2009; the National Science, Technology and Innovation Fund; an Award Scheme for recognition of outstanding scientists in Kenya and construction of new laboratories and workshops in all Technical and Vocational Education and Training (TIVET) Institutions. Kenyas ST&I interventions for 2008-2012 were to be implemented through an enabling legal and policy framework. The ST&I policy and ST&I 2013 Act provides a platform to leverage ST&I to transform the economy through implementation of the national priority areas, create an effective and efficient Kenya National Innovation System, operationalize the triple helix, and commercialize research outputs through the Innovation Agency (KENIA), mobilize at least the equivalent of 2% of GDP annually from the Government, Private Sector and other sources to fund the entire ST&I value chain. 3.3.2 Emerging Issues and Challenges
Whereas the sector registered key successes during the First MTP, it also experienced some challenges that impacted on full achievement of its objectives. Some of the challenges include: Uncoordinated and fragmented innovation system where synergies and networking among government, research and training institutions, industry, financial sector and professional groups are weak; Lack of a harmonized National Research Policy, agenda and priorities; Inadequate funding for research; Absence of a skills inventory and inadequate alignment of the planning of human resource to development needs; Poor state of infrastructure and equipment for research in higher education and training; and Weak ST&I culture among the population. 3.3.3 Programme and Projects for 2013 2017
In setting the sector priorities, strategic thrusts will focus on strengthening technical capacities and capabilities of individuals and institutions at both the national and devolved levels involved in research, in order to develop a highly skilled human resource base that can trigger intensification of technologies and innovations in the priority fields. Flagship Programmes and Projects Nano-Sciences, Material Science and New Production Technologies Programme: Nano-sciences entails the development of appropriate high strength materials which are low cost, effective and efficient and find wide application in numerous technological developments. Key priority areas for implementation on nanotechnology will include: Capacity building on nanotechnology (education) through scholarships; Investment in Instruments and techniques supporting Nanoscience and Nanotechnology research; Implementation of the policy on Nanotechnology; Public engagement and awareness on nanotechnology; Research in Medicine (nanomedicine), Water and sanitation; Nanomaterials for infrastructure development and manufacturing. The following projects will be implemented over the medium term: The Kenya Institute of Nanotechnology: The Kenya Institute of Nanotechnology (KIoN) will be established as a multidisciplinary institution focused on specialized training in nanoscale science and technology. The Centre will focus on the combined skills of universities and industry in the fields of; Chemistry, Physics, Materials, Medicine, Electrical and Electronic Engineering, Mechanical Engineering, Chemical Engineering, Biochemical Engineering and Earth Science. The National Physical Science Research Laboratory for Engineering and New Production Technologies. This will provide infrastructure and equipment for research that will deliver cutting edge physical science solutions from small equipment and research tools to large projects in need of complex design and fabrication. The formation of research units of NPSRL will provide consulting, engineering, fabrication and calibration services for both public institutions and private businesses worldwide.
VISION 2030
25
Energy Technologies Programmes: In order to meet the energy needs, the government has proposed power generation mix which includes nuclear energy. The projects to be implemented include: Establishment of a Centre for Nuclear Research for Peaceful Applications: The core mandate of the research Centre will be to sustain peaceful applications of nuclear energy for power generation, for isotopes in industries, groundwater resource management, medicine for cancer treatment and agriculture. The Centre will also conduct research in spent fuel processing, and safe disposal of nuclear waste. Establishment of the Kenya Institute of Oil and Gas (KIOG) and the Kenya Institute of Mining and Geology: The goal of the project is to provide skills for petroleum and mining industry to enable workers and enterprises to improve productivity. Science, Technology, Engineering and Mathematics (STEM) Programme: The STEM education and training applies inter-disciplinary research in learning and cognition, STEM integration, instructor development and evaluation and assessment to STEM teaching from early childhood through graduate education. To deliver on the STEM the following projects will be implemented: Kenya Advanced Institute of Science and Technology: The establishment of an advanced research institute in Kenya will provide for specialized training in various engineering and science fields. Repackage STEM in Education and Training: The project is expected to promote experiential learning, innovation creativity and attraction to STEM related disciplines through well-coordinated programmes in education, R&D and Training in all aspects of ST&I at all levels starting from Early Childhood to Primary and Secondary Education levels up to University. Integration of Science, Technology and Innovation in Education Management: The project will establish a Sector Wide Education and Training Management Information System linking all education related Agencies in the public and private sectors. Conduct a National Skills Inventory and Audit for ST&I: A National Critical Skills Development Strategy will be formulated and implemented in order to increase the number of researchers, scientists and engineers for the industry. This project will include an audit on the existing SET skills and the requirements for the country and draw up a strategy for closing the gap. Coordination of the Technology, Innovation and Commercialisation Programme: The government will implement Knowledge Management Information System (KMIS), Innovative Technology Transfer System and undertake Science, Technology and Innovation Indicators Surveys that will include development and adoption of Kenyan Common Science, Technology and Innovation Indicators and establishment of an African STI Observatory. County Technology and Innovations Delivery Services Programme: This programme aims at delivering science, technology and innovations services to the grass roots by focusing on the County units in line with the provisions of the Kenya Constitution. The programme will establish and empower County Technology and Innovations advisory and prospecting centers to coordinate technology transfer and adoption. The projects to be implemented include: Establishment of the Kenya National Innovation Agency (KENIA): This project will seek to operationalize KENIA as provided for in the Science, Technology and Innovation Act 2013. Establishment of County Technology and Innovations Advisory and Prospecting Centres: This project will involve the establishment of centers in the counties to coordinate innovations and technology transfer and adoption at the county level. Key activities of the project include: Surveillance of the 47 counties to establish readiness for the centers; Acquisition of premises and operational equipment; Setting up the centers; and Recruitment and deployment of staff. Develop and Transfer County Specific Technologies: The project will ensure that the technology and innovations delivery services are available at the county level. This will entail determination of specific technological needs for each of the 47 counties in line with the mandate of KENIA. The centers will perform the following functions: harness existing indigenous knowledge and technological innovations for the socio-economic development of the respective counties; scout for technological innovations from the national and global research communities; negotiate for the proprietary rights of the acquired technologies and facilitate their adoption through appropriate technology transfer
26
VISION 2030
approaches. Other Priority Programmes and Projects Biotechnology and Biosciences Programme: The programme will be implemented through the following projects: Biotechnology Policy and Legal Framework: The goal of this project will be to review the existing Biotechnology policy, legal and regulatory framework (National Biotechnology development policy and Biosafety Law) and develop a new policy, legal, regulatory and institutional framework for the governance of Biological/life Sciences. Establish Centres of Excellence in Biotechnology Research in Research and Higher Learning Institutions: The goal of this project will be to identify and equip Biotechnology Research laboratories in research and higher learning institutions. Development of Human Capacity for Biotechnology Research and Product Development: The goal of this project will be to develop a critical mass of a competent human resource for the development and application of Biotechnology. Public Education and Awareness on Biotechnology and Biosciences: The goal of this project will be to educate the public and create awareness on the whole subject of Biotechnology and Biosciences. Delivery of genetically modified (GM) crop varieties for commercial production by Kenyan farmers: The goal of this project will be to facilitate the commercialisation of genetically modified crop varieties as products of modern Biotechnology. Telecommunications, Electronics and Computers Technologies Programme: Under this programme, the following projects will be pursued: The Kenya Electronics Telecommunications and Computing Research Institute (KETCRI): This programme involves establishment of a national Electronics Telecommunications and Computing Research Institute that will advance the formulation of innovative ideas; develop new techniques; and training professional individuals in the area of Electronics, Telecommunications and Computing to ultimately enhance social and economic aspects of the modern society. Software Development and Commercialisation: The project will ensure that Kenya develops its software application locally in order to ensure that the software available in the market are transaction based for easier and more effective use. Manufacture of Electronic Devices: The project aims at increasing the use of Kenyan manufactured electronic devices in order to make them cheaper and more available to the local users. KETRCI will be expected to develop electronics, telecommunications and computing equipment and devices. Baseline Survey and assessment of National ICT Capacity / Readiness: The project aims at addressing current and future market needs in ICT by comprehensively identifying existing knowledge/skills, supportive infrastructure as well as other related gaps. The assessment of infrastructure and knowledge/skills adequacy will take account of practices and benchmark with competitive countries in regard to the intensity and reach of infrastructure, and the product and service levels that Kenya should be able to attain and maintain. The Natural Products Programme: The programme aims at building a vibrant natural products industry through development and exploitation of an interface between indigenous knowledge and modern science, technology and innovations. This will promote home-grown innovations that will lead to development and manufacture of niche products that meet national and international standards. The key programmes to be implemented include: documentation, profiling and securing of indigenous knowledge, technologies and associated biological resources; scientific testing and validation. 3.3.4 Policy, Legal and Institutional Reforms
The following will be developed and implemented: Biosciences Policy and Bill: The policy will govern the entire Biosciences sub sector including Biosecurity, Bioeconomy,
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
27
Biomedical, Bioinformatics and other related life sciences. Atomic Energy Policy and Bill: This will address statutory and operational issues of nuclear electricity power generation, peaceful application of nuclear science in all sectors of the economy and services, nuclear waste management and security, radiation protection and adherence to international and regional treaties and agreements. Kenya Institute of Nanotechnology legal framework: The framework will provide for broad strategic areas in line with vision 2030 for investing in nanotechnology. Kenya Space Science and Technology policy and bill: This will set the platform for mounting of a national space programme. Natural Products Policy and Bill: This will create an institutional set-up that will serve as the primary custodian of the natural products industry by strategically promoting, directing and coordinating all the activities of the multiple and diverse players in the knowledge and product value chain.
3.4
Land Reforms
Land is the most important natural resource that Kenya is endowed with. It is critical to economic, social, political and cultural development. It is also considered as the principal source of livelihood and material wealth by playing host to natural resources. Secure access to land, sustainable land use planning and equitable distribution of land remain immensely important for food and nutrition security, attraction of foreign investors, employment, foreign exchange earnings, growth of industries and generally the socio-economic development of the country. 3.4.1 Situation Analysis
During the First MTP, the government undertook the following reforms: Modernisation of land registries: Constructed seven (7) land registries in Bondo, Siaya, Uasin Gishu West, Thika, Isiolo and Trans Nzoia; Constructed a banking hall in the Ministry headquarters, Nairobi; Initiated construction of Lamu and Meru Ardhi houses; and Rehabilitated nineteen (19) land registries in Kericho, Kwale, Nyeri, Kajiado, Garrissa, Mandera, Koibatek, Kisumu, Kisii, Naivasha, Migori, Central Registry(Nairobi), Nairobi Registry, Kajiado, Kisumu, Kiambu, Nakuru, Ugenya and Bomet. Land Registry computerized (development of a National Land Information Management System): Initiated the safeguarding and digitisation of land records at the Ministry headquarters, Mombasa, Kitale, Nakuru land registries; Established a Land Records Conversion Centre (LRCC) at the Ministry headquarters for digitizing the land records; Acquired and installed an electronic Records Management System in the Ministry headquarters which is at testing stage; On development of National Land Information System the following was achieved: - 10% of the National Land Information Management System developed; - Re-engineered and redesigned the Ministrys processes and procedures in preparation for developing a Geographical Information System (GIS) based National Land Information Management System; - Developed and implemented the Integrated Land Rent Information System and captured details of 150,000 Government leased plots into the system; - Modernized the National Geodetic Framework by constructing thirteen (13) zero order Pillars/Stations; and - Installed LAN in Thika, Nakuru, Isiolo and Kisumu Ardhi houses to ensure ease of communication and sharing of information. National Spatial Plan: Concept papers on National Land Use Policy and National Spatial Plan prepared. Established the institutional framework for the preparation of the National Spatial Plan
28
VISION 2030
Land cover and land use maps updated/modernized: 188 topographical map sheets database created; and 100 topographical map sheets updated. Land Reform Programme: Environment and Land Court Act, 2011, National Land Commission Act, 2012, Land Act, 2012 and Land Registration Act, 2012, Sessional Paper No 3 of 2009 on National Land Policy; Other Bills prepared include; the draft Evictions and Resettlement Bill and draft Spatial Planning Bill; and Collected Kshs. 29.5billion in revenue and Kshs. 1.13 billion in AIA. Land settlement Settled 58,009 poor landless households; Finalized 90 land adjudication sections; and Registered and issued 435,650 title deeds. 3.4.2 Emerging Issues and Challenges
The Constitution made fundamental changes to the management of the land resource. These changes revolve around the guiding principles for the management of resources in the country. The imperative of this is that, a review of all policy, legal and institutional instruments will be required to ensure compliance and conformity of land management interventions with the Constitution in a manner that supports achievement of Kenya Vision 2030 objectives. On implementing the Programmes and Projects as set out in the first MTP, the sector was constrained by lack of adequate funding, inhibitive cultural practices, demographic shifts and urbanisation, disparities in land ownership, unsustainable land use, climate change, conflicts in land laws and the manual land information system. 3.4.3 Programme and Projects for 2013 2017
Flagship projects National Land Information Management: This will involve development of a transparent, decentralized, affordable, effective and efficient GIS based Land Information Management System. The system development will require finalizing the safeguarding and digitisation of land paper records, deployment of the electronic Land Records Management System, development and implementation of a Cadastral Database System, development and implementation of a GIS based National Land Information Management System (NLIMS). National Land Title Register: In accordance with the Land Registration Act, 2012, a National Land Title Register will be established and will contain all land in the country. The following activities will be implemented; geo-referencing of all parcels of land, conversion of existing land under various land registration statutes to the Land Registration Act, 2012, transfer of the converted land records to the county land registries and issuance of both manual and digital certificate of titles, and resolution of any disputes that may arise. Modernisation of Land Registries: This will involve construction, rehabilitation and equipping of land registry offices to enhance security of land information and in readiness for the implementation of the NLIMS. National Spatial Plan: This will involve preparation of long-term framework to guide the sectoral integration and rationalisation of the social, economic and territorial development of the country. County Spatial Plans: This will involve preparation of guidelines to ensure that all counties follow the same standards in implementing development projects in the country. This will involve the following:
VISION 2030
29
Developing a framework for the preparation of 47 County Spatial and Urban development Plans; Reviewing and finalizing of physical planning manuals, guidelines and standards; and Monitoring and supervision of integrated strategic physical development plans for the major cities and urban areas. Kenya National Spatial Data Infrastructure (KNSDI): This will involve development of a national infrastructure for access and use of geospatial information in decision making, establishing a modern Geodetic Framework, updating and digitisation of maps and KNSDI guidelines at local, county and national levels. Land Adjudication and Titling Programme: During the second MTP, the following will be carried out under this programme: Finalisation and operationalisation of Community Land Bill in order to embark on adjudication and titling of community land Establish special community land tribunals working with local leaders to resolve disputes on Community Land Finalisation of land adjudication and settlement programmes in order to ensure the land owners have security of tenure for their land. Complete the process of registering and unregistering community land Policy, Legal and Institutional Reforms; National Land Policy: A comprehensive review will be done to incorporate the emerging issues and the changes that have been brought about by the Constitution. Finalisation of the Kenya National Spatial Data Infrastructure Policy: This will provide an appropriate framework for preparation and implementation of national, regional and local area land use plans and ensure that the planning process is integrated, participatory and meets stakeholder needs. Legal Reforms: Preparation of subsidiary legislation and review of the enacted Acts to eliminate any inconsistencies will be undertaken. Land related legislations will also be harmonized with the new Acts such as the Survey Act Cap. 299. In addition to the Community Land Bill and the Spatial Planning Bill, the Eviction and Resettlement Bill will be finalized and enacted. Institutional Reforms: The National Land Commission will be operationalized and field offices and County Land Management Boards will be established.
3.5
Public sector reforms will be guided by the principles in the Constitution and the Kenya Vision 2030 which bind all public officers to observe the principles of efficiency, human rights and good governance, integrity, transparency, accountability and sustainable development. The sector will be transformed by building and implementing service delivery systems that will not only ensure efficiency, quality, speed, convenience and dignity in service delivery, but also global competitiveness. 3.5.1 Situation Analysis
During the First MTP, a number of public sector reform initiatives were undertaken: These include: institutionalisation of Results Based Management (RBM) through such tools as; Rapid Results Approach (RRA) in implementation of programs; Performance Contracting and Performance Appraisal Systems. Other reforms focused on transformative leadership, structured stakeholder engagement, Public Financial Management, and mainstreaming gender and disability issues.
30
VISION 2030
3.5.2
Some of the challenges faced include: high expectations of citizens on public service delivery; Inadequacy of some specialized skills and incentives necessary for implementation of Vision 2030 projects. Inadequate linkage between, budgeting, planning and results. Inadequate budgetary support for public sector reforms Weak monitoring and evaluation of public sector reforms 3.5.3 Programme and Projects for 2013 2017
The proposed programmes and projects will have the potential for the creation of a public service that upholds integrity, innovation, creativity, diversity and inclusiveness for efficient service delivery. Flagship Programmes and Projects Public Service Transformation Strategy: The government will implement a Public Service Transformation Strategy aimed at creating an efficient and effective public service with moral and ethical values and ethical standards, and a highly motivated human resource capacity for efficient public service delivery. The Strategy will seek to address the global governance environment by enhancing responsible citizenship and value based socialisation. Institutionalisation of Results Based Management (RBM) in the Public Service: Institutionalisation of RBM in the Public Service will continue with a special focus on the County Governments to ensure citizens access quality services in line with the spirit of the Constitution. Current RBM tools that include Rapid Results Initiatives, Performance Contracting, Performance Appraisal System, among others will continue to be implemented. Huduma Kenya Integrated Service Delivery Model: Integrated Service Delivery is now a global standard for Public Service innovation in service delivery and has been adopted by many developed and developing countries such as Canada, Singapore, South Africa, Australia, Brazil and India. The Huduma Kenya programme aims at providing a Multichannel, single window citizen access to transactional Government services using a variety of channels such as: i) One Stop Shop Huduma Citizen Service Centres; ii) online Huduma web portal; iii) mobile phone Huduma platform; iv) a Huduma call centre and; v) an Integrated Huduma payment gateway. The Huduma Kenya programme will also unlock opportunities for the ICT Sector, create Business Process Outsourcing (BPO) jobs and promote youth enterprise to accelerate economic development and enable the achievement of Kenya Vision 2030. Training and Capacity Building: During the Second MTP, focus will shift to competency based training and capacity building for improved service delivery. The Kenya School of Government (KSG) will continue the development of infrastructural facilities and curriculum for training of both national and county government officials. The curricula will include such programs as: transformational leadership; management for results; Business Process Re-engineering; public service values, and; Information, Communication and Technology. The school will also ensure that the right trainer capacity is built to respond to the needs of the Public Service. Other Programmes and Projects Tax Reforms: The following tax reforms will be implemented to raise resources to finance government programmes and meet the fiscal deficit targets: i. Integrated Tax Management System (ITMS): The second phase of the implementation of ITMS will ensure that a wide range of electronic services will be availed including electronic filing and registration, electronic payment, electronic taxpayer accounts, core internal modules covering compliance, audit, debt and refund, incorporation of road transport departments functions into ITMS and electronic tax register data transmission. The system will
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
31
ii.
iii.
iv. v. vi.
vii.
viii.
ix.
x.
enable large and medium taxpayers make online filing of their returns as well as online payments. It will also reduce the frequency of payments made in a year and thereby improve Kenyas ranking as a preferred investment destination in the World Banks Doing Business ranking. Payments of Taxes via Mobile Money: Common Cash Receipting System (CCRS) as a common revenue collection platform in KRA will be enhanced and rolled out to cover all business systems. In addition, CCRS will be fully integrated with CBK and appointed commercial banks for seamless flow of revenue collection information. CCRS will be enhanced to incorporate electronic payment of taxes (e-Pay) and mobile banking. Turnover Tax: The Turn over tax will be revamped to make it more efficient and easy for the taxpayers to comply with. A sector specific taxpayer education programme as well as an expanded scope of electronic payment will be implemented to increase recruitment and registration of taxpayers and revenue collection. Taxation of Real Estate Sector: KRA will put in place new information technology called GEOCRIS that uses geospatial information to locate property and track landlords to pay rental income. Taxation of High Net Worth Individuals (HNWIs): KRA will enhance its strategy to identify and tax HNWIs and work with other jurisdictions through tax information exchange agreements to conduct joint audits of HNWIs. Single Customs Territory: Implementation of Single Customs Territory (SCT) and introduction of tax payment at first point of entry requires that Customs Services Department (CSD) develop an optimal revenue sharing agreement formula with partner states. The CSD will: strengthen the computerised systems to reduce cost of doing business and ensure timely disbursement of revenues; separate policy and oversight functions from implementation roles through addressing the non-trade barriers (NTBs) that may inhibit free movement of trade; undertake audit visits to partner states in order to increase governance in revenue management; and also train CSD staff on SCT procedures and structure. Dynamic Risk Management System: A wide Dynamic Risk Management System (DRMS) will be developed, implemented, and integrated with all relevant KRA systems to target resources for higher end activities and facilitate increased efficiency. Implementation of Electronic Cargo Tracking System (ECTS): Multi-vendor ECTS will be completed and rolled out to allow other service providers to come on board. In addition, the system will be integrated with other regional authorities electronic cargo systems to ensure seamless monitoring of cargo throughout the region. Transfer Pricing: To prevent loss of revenue and foreign exchange through transfer pricing the Authority will review the governance structure of the transfer pricing programme, enhance the transfer pricing risk assessment, implement an alternative dispute resolution strategy, build up the Authoritys third party information base and sources and strengthen tax information exchange agreements and partnerships. Implement the strategy for taxation of mining sector: The increasing activities in the mining sector are a pointer to the potential of the sector to contribute substantially to the economy and government revenue. This follows the recent discovery of various mineral resources in the country. KRA will put in place the requisite mechanisms and framework to collect increased revenue from this emerging sector. Review of Revenue Acts: Several revenue statutes will be repealed to provide a wider scope for revenue enhancement. In particular the Value Added Tax Bill will be tabled before Parliament for enactment. County Taxation: KRA will re-organize its regional structure in a manner that will bring services closer to Kenyans and position itself for the expanded role of assisting County Governments in collecting County revenue. Strengthening and Revamping Tax Enforcement Mechanisms: KRA will revamp enforcement strategy to address cyber crimes and other information technology related frauds to safeguard revenue and enhance compliance. Key initiatives to be undertaken include: Implementation of automated risk-based audit across all tax heads with automated selection and flagging of compliance risks; Overhaul of the electronic tax register (ETR) system. The focus is on electronic linkage between the ETRs and the ITMS to allow for automated population of taxpayers accounts and electronic monitoring of noncompliant taxpayers; Expanding mandatory reporting requirements for business, professionals, barter exchange income, broker transactions, non-employee compensation, real estate transactions, rent and sale of securities; Enhance use of enforcement tools including scanners, boats and ECTS;
32
VISION 2030
Use of automated third party information to increase potential for detection of non-registered taxpayers; Increasing the range of transactions for which the personal identification number (PIN) will be required as a means of increasing the potential for detection; Implementation of Phase II of Valuation Database covering exports and other customs regimes to detect under-valuations; Enhance Investigations and Enforcement Departments capacity to tackle cyber crime and IT related fraud; and Ensure full implementation of the referral guidelines.
Capacity Building Reforms Programmes: A skills audit shall be undertaken at both the National and county governments to be matched against the competencies required for the Public Service. Further greater efforts shall be placed on building the required ICT skills which will include enterprise architecture. Integrated Human Resource Information System: During the First MTP, a Government Human Resource Information System (GHRIS) portal was developed with the objective of addressing all Government Human Resource (HR) needs. The System will be configured to interface with other existing and future systems like IFMIS, G-Pay, and IPPD in a platform that will ensure smooth operations in a linked up government. E-procurement System: An e-procurement and interactive system will be developed and implemented to store information on all pre-qualified suppliers, market prices of goods and services. This will enable any supplier to bid for tenders in a transparent manner to avoid the delays and corruption in the procurement system. Modernisation of Records Management: Proper IT-based records management systems will be developed and implemented to avoid loss of records and delays in service delivery. Real-time Performance Monitoring System (PMS): A real-time Performance Management System will be developed to enable online real-time monitoring of performance at all levels by the President, Cabinet Secretaries, Principal Secretaries and Chief Executive Officers down to the lowest institutional levels and obtain feed-back. A Performance Awards System will be developed modelled around the principles of the Company of the Year for Counties. Rolling out of Information, Education and Communication (IEC) Strategy: The IEC strategy will be rolled out with an objective of empowering citizens by disseminating information on policies, strategies, programs and results of the public service. Restructuring of the Kenya Foreign Service Institute: The Foreign Service Institute, established in 2007, will be transformed to a Foreign Service Academy and Semi Autonomous Government Agency in order to tackle the increasingly complex international and regional diplomatic processes. It will also enhance the skills and knowledge of members of the Foreign Service, making them more professional, effective and able to perform a variety of tasks. 3.5.4 Policy, Legal and Institutional Reforms
Rationalisation of the National Government: The National Government will be rationalized and reorganized into a lean, efficient organisation. The rationalisation will also include a review of existing state corporations and enactment of a new legislation to govern the management of State Corporations. Review of Legislation to recognize electronic records and support Huduma Kenya Integrated Service Delivery and Business Process Re-engineering: Practices, rules, regulations and pieces of legislation governing service delivery processes will be reviewed to allow redesigning of improved processes of service delivery and recognition of electronic records in line with Integrated Service Delivery and Business Process Re-engineering in the Public Service. Policy on Performance Management: In order to operationalize article 190 (3) of the Constitution, the national
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
33
government in consultation with county governments will formulate a policy framework that will guide performance of public service institutions.
3.6
An efficient, motivated and healthy human resource base is pivotal for enhanced national competitiveness, economic growth and development. The Constitution advocates for decent work, where freely chosen productive employment is promoted simultaneously with fundamental rights at work, adequate income from work, representation and social security. 3.6.1 Situation Analysis
Since the launch of the Kenya Vision 2030 and its First Medium Term Plan, the country has made significant achievements in the Human Resource Development, Labour and Employment sector. Despite improvement in economic growth, the economy has not been able to generate sufficient employment opportunities for entrants into the labour market. For instance, the country created 2.7 million jobs against the cumulative MTP target 3.27 million jobs between the 2008/092011/12 period. The National Manpower Survey was conducted in 2009/2010 and a basic report prepared. Key sector policies were also developed to strengthen its implementation process. These include: the National Employment Policy and Strategy; National Productivity Policy; National Occupational Safety; and Health Policy; National Industrial Training and Attachment Policy and National Policy on Child Labour. The legislations that were enacted to strengthen the framework for implementation of programmes included: the Industrial Training (Amendment) Act; 2011, Micro and Small Enterprise Act; 2012; and the Industrial Court Act, 2012. The latter elevated the Industrial Court to the status of a High Court and transferred it to the Judiciary. The Work Injury Compensation Bill, 2013 was also developed to amend the Work Injury Benefits Act, 2007 and align it to the Constitution. Key labour market institutions were established with the primary aim of facilitating social dialogue. These are the National Labour Board, National Council for Occupational Safety and Health (NACOSH), Occupational Safety and Health Fund, Wages Councils for General services, Agriculture, Building and Construction, Protective and Security Services, and Floriculture and Rules Board for the Industrial Court. Construction of the Occupational Safety and Health Institute progressed with the completion of the structure in 2013. Other key institutional reforms included the transformation of the Directorate of Industrial Training (DIT) into a Semi Autonomous Government Agency known as the National Industrial Training Authority (NITA) and establishment of the Micro and Small Enterprise Authority (MSEA). Other key achievements realized include: Development of the Industrial Training and Attachment Portal (ITAP) to provide online reporting of industrial attachment vacancies and placements of trainees on attachment; Training of 18,759 individuals in various industrial skills; Examination and certification of 127,866 in various trades and expansion; Upgrading of the Technology Development Centre (TDC), Athi River, jointly funded by the governments of Kenya and Korea; Establishment of 6 new Public Employment Offices; Development and rehabilitation of 130 worksites for Micro and Small Enterprise (MSE) activities; and Training of 470 productivity Technical Service Providers (TSPs) and reduction of the average time taked to resolve labour disputes from 12 to 4 months. 3.6.2 Emerging Issues and Challenges
The sector still faces various challenges. Unemployment is still high; and the problem is compounded by rapid population 34
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
growth, a growing youth population estimated at 67 per cent and structural rigidities within the labour market. Besides these, past interventions towards addressing unemployment has been piece meal, uncoordinated and implemented based on weak policies, legal and institutional frameworks. Other major challenges include: lack of timely labour market information and data base on skills available in the country; limited linkages between industry and training institutions; poor management of industrial attachment; low registration levels with the National Industrial Training Authority (NITA); outdated trade testing; inadequate infrastructure and obsolete technology in industrial training centres; gaps between skills possessed by graduates of training institutions and those demanded by industry; minimal expansion of formal sector jobs; lack of a legal framework on diaspora issues; poor coordination of the Micro and Small Enterprise (MSE) and informal sector; poor uptake of appropriate technologies coupled with low quality of products by MSE operators, low levels of awareness on productivity; weak occupational safety and health culture; weak and uncoordinated labour enforcement mechanisms; ignorance of labour laws; a weak and outdated social security system; and lack of policies on wages and income, child labour, unregulated foreign employment and labour migration. 3.6.3 Programme and Projects for 2013 2017
Implementation of the Sessional Paper on the National Employment Policy and Strategy for Kenya: Key programmes to be prioritized under the policy will include: the establishment of Special Economic Zones; development and implementation of youth targeted employment programmes; and development of MSEs. In addition, a framework for employment creation analysis for all major projects and programmes will be developed. Promotion of internship and industrial attachment: A Sessional Paper on national industrial training and attachment will be developed and implemented to promote internship and industrial attachment programmes for students from all training institutions to gain practical skills relevant to the needs of industry. Incentives will be put in place to encourage industry actors to provide internship and attachment opportunities. National Skills Audit and Integrated National Human Resource Development Strategy: A National Skills Audit will be undertaken to provide a foundation for aligning training opportunities and available resources to respond to national and county human resource demands. Further an Integrated National Human Resource Development Strategy will be developed to realize greater harmonisation between the planning and development of the countrys human resource base. Updating of the Kenya National Occupational Classification Standards (KNOCS), 2000 and development of the Dictionary of Occupational Classifications: The government will update its Kenya National Occupational Classification Standards (KNOCS), 2000 to be in line with International Standard for Classification of Occupations (ISCO-08), 2008. Further, the government will develop a Dictionary of Occupational Classifications to be used by both employers and human resource practitioners in defining jobs and job requirements. Development of the National Labour Market Information System (LMIS): An interactive LMIS will be developed to enable storage, access, retrieval, and interrogation of data on various facets of human resource planning, development and employment. The existing public employment services framework will be expanded and strengthened while utilizing the proposed county industrial training and attachment offices to provide the institutional basis for the system. Enhancing and modernisation of employment services: The existing public and private employment offices will be modernized mainly through expansion, adoption of ICT and capacity building for officers. 17 new Public Employment Offices will be established, and staffed while administration of Private Employment Agencies within the law will also be enhanced. The employment offices will also be used in implementing internship programmes and career guidance and counseling for both trainees and jobseekers.
VISION 2030
35
National Labour Force Survey: A comprehensive National Labour Force survey will be carried out in order to provide up to date data to address the countrys unemployment challenge. Establishment of model vocational training institutions: The government will establish model vocational training centers in each constituency. Links will also be established between the model vocational training centers, technical institutes, institutes of technology and other institutions of higher learning to ensure that graduates from the vocational centers are able to transit for diploma and even degree courses. National Youth Employment Policy and National Action Plan on Youth Employment: A National Youth Employment Policy and National Action Plan on Youth Employment will be developed and implemented to provide clear direction on implementation of programmes for employment of youths. Youth leadership and entrepreneurship development: A draft National Youth Leadership and Entrepreneurship Strategic Plan 2013-2017 has been developed and will be implemented over the medium term. The plan clearly outlines six blocks that seek to address Youth leadership and entrepreneurship development namely; Livelihoods/economic opportunities, Voice-citizenship and public service opportunities, Technology/ICT opportunities, Social and community opportunities, Sports opportunities, and Arts and culture. Youth skills development: The government will implement programs that will impart the youth with basic and advanced sets of skills to enhance their employability. These include: entrepreneurship development and trainings, youth development research, youth art and culture, talents identification and development, upgrading of the National Youth Service (NYS), and establishment of centre of excellence for driver training and a maritime training institution. Establishment of Youth Development Centres: A youth empowerment centre in each county will be upgraded to a Youth Development Centre of Excellence that will house a fully equipped library, an ICT hub, and a social hall. In addition, establishment of the Youth Empowerment Centres will be completed in all the remaining constituencies. National Sports Promotion: The government will undertake a number of programs to promote sports development as a source of employment for the youth. These will include: Establishment of a National Lottery Scheme to fund and support professionalisation of local sporting leagues across the major sporting disciplines; Facilitation and encouragement of better management of sports; Professionalisation of sports through introduction of professional coaches in schools; Establishment of facilities for five sports (football, swimming, basketball, netball volleyball) in each of the County Youth Development Centre of Excellence; Building five new national sports stadia in Kisumu, Mombasa, Nakuru, Eldoret and Garissa; Existing sporting facilities at the County level to accommodate swimming, tennis, basketball and rugby will be upgraded; Support will be given to the Kenya Motorsport Federation to ensure Kenya gets back the Safari Rally in the World Rally Championships calendar; Establish a network of national academies for young people each one specializing in a particular sport; and Building capacity to facilitate a bid to host the 2019 Africa Cup of Nations and the 2019 World Athletics Championships. Youth employment and sustainable livelihoods: To create sustainable employment and guarantee improved livelihoods for the youth, the Government will implement the following programs: Agribusiness development among the youth; Conversion of waste to wealth; Implementation of the 1 billion tree planting campaign; Transformation of the Youth Enterprise Development Fund and Kenya Industrial Estates into a new national enterprise
36
VISION 2030
agency Biashara Kenya as a catalyst for further economic growth. Establishment of a Youth Enterprise Capital/Fund designed along the CDF model to enable youth access interest free business financing either individually or in groups without the requirement of traditional collateral. Establishment of youth business incubation centres; Development of youth SACCOs and providing grants to youth in ASALs and other marginalized areas; and Youth specific affirmative action to allocate 30% of all Government procurement to youth-run enterprises. Upgrading youth polytechnics: The Government will upgrade youth polytechnics to Institutes of Technology in every ward under National Vocational Certificate in Education and Training (NVCET) curriculum to empower youth with effective and relevant skills to service a modern economy. The basic vocational skills will be offered free of charge at these institutions while also ensuring remuneration and recognition of graduates are rationalized to put premium on technical education and training. Strengthening Linkages between Industry and Training Institutions: The government will collaborate with industry and other institutions in providing targeted and demand-driven industrial training. This will focus on enhancing management of industrial attachment and internship for trainees, development of curriculum and national training and testing standards, enhancing local production of training equipment and building the capacity of the National Industrial Training Authority (NITA). Micro and Small Enterprise development: The government will implement the MSE Act 2012 to ensure a vibrant Micro and Small Enterprise (MSE) sector for employment and wealth creation. MSE Baseline and informal sector surveys will be undertaken to provide accurate profile of the sector in terms of all its facets. In addition, MSE Centres of Excellence will be established in all counties for promoting product development and marketing of MSE products. The centres will also avail common usage of equipments which are more often expensive for MSEs to procure and undertake incubation programmes. Productivity management: The Sessional Paper on the National Productivity Policy will be finalized and implemented. Productivity measurement and improvement will be strengthened and supported by national productivity campaigns that aim at reinforcing the productivity movement. The Productivity Centre of Kenya will be transformed into the National Productivity Council with enhanced capacity for implementation of programmes and projects. Promotion of Occupational Safety and Health (OSH): Implementation of the National Occupational Safety and Health Policy will be fast-tracked to mainstream OSH issues in management systems in all sectors of the country. Priority will be given to institutionalisation of an OSH culture, mainstreaming of OSH in training curricula at all levels and development of a comprehensive national occupational safety and health (OSH) database. The National OSH Institute will be completed to spearhead research and training in addressing existing and emerging OSH challenges including those in the new oil and mineral resources sector. Development of a Wages and Income Policy: The Government will develop a Wages and Incomes Policy to provide a framework and necessary guidance on wage levels, wage formation and adjustment mechanisms and other wage administration issues in line with the Constitution. Establishment of the Conciliation and Mediation Commission: The government, in collaboration with the social and other key partners will establish the Conciliation and Mediation Commission as an Alternative Dispute Resolution (ADR) mechanism for industrial disputes in line with Article 159 (ii) (c) of the Constitution. Capacity building for the Labour Inspectorate: The labour inspectorate will be strengthened to enhance the enforcement of labour laws and improve conditions at work places. This will include building the human resource, infrastructure and financial capacities. In addition, a baseline National Child Labour Survey will be conducted to collect
VISION 2030
37
data on all facets of child labour and thereafter, develop programmes for combating worst forms of the vice. The Green Jobs Approach: The government will mainstream a green jobs approach in the various infrastructural projects and programmes. Mapping of current green jobs and future green jobs opportunities in various sectors will be finalized and human resource training strategy in green processes and technologies will be developed and implemented. Priority will be accorded to sectors with high potential for creation of green jobs such as tree planting and re-afforestation programme, urban waste collection and recyling projects and renewable energy projects. Diaspora engagement: The government will mainstream and integrate the diaspora in the national development agenda. To support this course, National Diaspora Policy will be finalized and a National diaspora Council of Kenya (NADICOK) established to play an advisory role to the government on diaspora issues. Foreign employment management, orientation and re-entry programmes: The Government will develop orientation and re-entry programmes to prepare and sensitize Kenyan immigrants on the nature of jobs abroad, their terms and conditions; the rights, obligations and remedies of the workers in case of violations; and pre-departure preparations for the job seekers. Guidelines on employment of foreigners and on registration and accreditation of private employment agencies will be developed/reviewed and enforced. The government will also enter into bilateral agreements with key labour destination countries. Transformation of the National Social Security Fund (NSSF) to a pension scheme: The NSSF will be transformed into a social insurance pension scheme. The transformation will seek to increase coverage of the NSSF, improve adequacy of benefits provided by the NSSF, provide benefits in the form of pension, retain a link between benefits and contributions with the benefits largely being determined on a defined contribution basis, and ensure sustainability and affordability of social security. Other key programmes include: Capacity Building for the National Industrial Training Authority (NITA); Establishment and Upgrading of Industrial Training Centres; Establishment of Industrial Attachment, Training and Training Levy offices in the Counties; Establishment of employment attachs offices in Saudi Arabia and United Arab Emirates; Signing and implementation of Bilateral Labour agreements; Formulation and implementation of Labour Policy on Employment for Expatriates; Development and implementation of a National Internship/Volunteerism programme; Upgrade the National Youth Service (NYS); Development and upgrading of MSE infrastructure; Improvement of the quality of Micro and Small Enterprises Products; Enhancing access to affordable credit for MSEs; National Occupational Safety and Health awareness campaign; Surveillance of work environment and workers health; Reforming the work injury compensation system; and Awareness creation on Labour Laws. 3.6.4 Policy, Legal and Institutional Reforms
The policies that will be developed and/or implemented include: Finalisation and implementation of the National Diaspora Policy; Review of the MSE Policy; Formulation and implementation of the Labour Relations Policy; Formulation and implementation of the Foreign Employment Policy (Labour Export Policy); Development of a Labour Relations Policy; Finalisation and implementation of the National Policy on Child Labour; 38
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
Implementation of Social Protection Policy; Finalisation and implementation of the National Policy on Youth Polytechnics and the Vocational Sector (NPYPVS); Reviewing the National Youth Policy (2007); Development and implementation of a policy on Youth Talent, Identification and Nurturing; and Development and implementation of a National Youth Volunteerism Policy.
Legal reforms: Implementation of the Micro and Small Enterprise (MSE) Act, 2012; Finalise and implement the Foreign and Diplomatic Service Representation Bill, 2013; Enactment and implementation of the National Productivity Council Bill, 2011; Enactment and implementation of the Work Injury Compensation Bill, 2013; Alignment of the labour laws to the Constitution ; Enactment and implementation of the National Youth Enterprise Development Authority Bill; Youth Societies and Youth Development Bill; National Youth Talent Development Authority Bill; Review the National Youth Council Act 2009; and Amendment of the National Youth Service (NYS) Act. Institutional reforms: Transformation of Directorate of Occupational Safety and Health Services (DOSHS) to the Occupational Safety and Health Injury Compensation Authority (OSHICA); Capacity building for the Occupational Safety and Health Fund; and Transformation of the National Social Security Fund to social insurance pension scheme.
3.7
National value and ethics are highly emphasized in the Constitution. They enable the nation to build a tolerant culture based on diversity that gives top preference to the common nationhood. 3.7.1 Situation Analysis
Since Kenyas independence, there has been a challenge of ethnic fragmentation and rivalries which led periodically to conflict and slowed national development. The Constitution included a commitment towards nurturing and protecting the well-being of the individuals, the family, communities and the nation. This is to be achieved through a set of values and principles set out in Article 10 of the Constitution that are binding to all state organs, state officers and public officers. These values and principles are classified in four categories: loyalty to the republic; promotion and protection of the rights of individuals; integrity; and development. The Constitution ensures that each Chapter elaborates and builds upon the framework under Article 10 and mandates the President under Article 132 to report to the nation the measures taken and progress achieved. The national values and principles of governance are intended to address challenges relating to: strong national identity; effective representation and leadership; equitable allocation of resources and opportunities; good governance; and sustainable development. Key areas of focus include: Education and Training: The education sector is instrumental in inculcating National Values and Principles of governance because it prepares individuals to participate effectively in society in an informed manner as it opens the mind to the world, nation, and community. It will therefore play a key role in promoting positive national and cultural expressions through literature, arts, traditional celebrations, science, communication, information, mass media, publications, libraries and other cultural heritage. Education will be used to dissuade young Kenyas from adopting ethnic prejudice and to think of themselves first as Kenyans.
VISION 2030
39
The Public Service: Every state organ will be required to establish systems, structures, programmes and guidelines for the promotion of the National Values and Principles of Governance. The Public Service Commission will be mandated to protect the sovereignty of the people, secure observance by all state organs of democratic values and principles of governance and promote constitutionalism within the public service and also pay attention to ethnic and gender diversity in its appointments. The Presidency and County Governments: A report regarding the state of national values and principles of the governance system will be prepared upon which the President will issue an annual national address. A comprehensive monitoring and evaluation framework will be established to collect and compile the information on the progress the country is making in national values at all levels of government. Private Sector: The government will work with the private sector associations to promote national unity and cohesion in their daily work. The private Sector will be encouraged to promote diversity in appointments and business contacts. The private sector will also be encouraged to pursue affirmative action programmes. Others Key Players: Professional associations, media, art, music and entertainment sector, civil society, political parties, sports associations, families and individuals will be enjoined by national leaders and the government to promote national values in the interests of national cohesion, peace and stability. 3.7.2 Emerging Issues and Challenges
Lack of strong national identity, negative ethnicity, class disparities, and impunity; Manipulation of political process by abuse of political office by powerful elite; Human rights violations, unequal distribution of resources, discrimination; Corruption, abuse of office and unethical practices; and Cyber-crime and abuse of social media. Programme and Projects for 2013 2017
3.7.3
Development of an institutional framework: This framework will be charged with promoting national pride, sense of identity, ethnic harmony, and national culture tolerant of diversity. A civic education and public awareness programme: This is aimed at informing the Kenyan public on the contents of the National Values Policy and inculcating a change of behaviour towards more positive values, national reconciliation and national unity. A county value systems program: The government will establish centres in all the 47 counties to build more incounty cohesion and harmony. The centres will at the same time emphasize our national values. Programmes and guidelines for the promotion of the national values and principles of governance in all relevant institutions will be created to ensure that national values policy is fully implemented, and adopted. A Legal, Policy and Institutional Review to integrate national values and principles of governance into national, county and sectoral policies by amending or removing all laws or regulations that are contrary to Kenyan national values. A public service national values program to promote, uphold and enforce national values and principles of governance in public service. Citizen service delivery charter will be instituted and upheld in line with the National Values and Principles of Governance. This will be carried out by all constitutional public service bodies, all state organs and private sector organisations. Internal code of conduct and ethics will be instituted to give further effect to the National Values and Principles of Governance; enhance professionalism and ethics in service delivery in order to eradicate corrupt practices and increase ethics in service delivery. Performance Contracting will integrate National Values and Principles of Governance in . 40
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
A national recognition honours and awards program for individuals and institutions advancing national values and principles of governance. This will be achieved by instituting mechanisms for recognizing, honoring, rewarding and celebrating outstanding achievements on national values and principles of governance. Establishing Monitoring and Evaluation (M&E) mechanisms for preparation of an annual report which will be used for the presidential address to the Kenyan public on the status and progress on national values and national unity. To establish a national program that targets youth aimed at inculcating national values and principles of good governance with the objective of achieving generation shift on values and attitudes. The National Youth Service (NYS) will be used more effectively in training youth in national values, leadership and entrepreneurship skills. 3.7.4 Policy, Legal and Institutional Reforms
Laws that will be implemented in order to foster national values include: National Cohesion and Integration Commission Act, 2008; Public Finance Management Act, 2012; Ethics and Anti-corruption Commission Act, 2011; Elections Act 2011; Independent Electoral & Boundaries Commission Act 2011; Political Parties Act 2011, Public Service Commission Act 2012; and National Police Service Commission Act 2011.
3.8
Kenya is susceptible to natural disasters such as drought and flooding which are likely to increase as a result of climate change. The management of these disasters is a cross-cutting issue that requires collaborative action by public and private sector agencies at national, county and community levels. In this regard, the government has prioritized the management of climate induced disasters by strengthening peoples resilience to drought and improving the monitoring of, and response to emerging drought conditions. 3.8.1 Situation analysis
Drought is the single most disastrous natural hazard in Kenya. It destroys livelihoods and causes hunger, disease, and even death. Of the US$12.1 billion in drought-related damages and losses between 2008 and 2011, US$11.3 billion was attributed to lost income flows across all sectors of the economy. The livestock sector was particularly badly hit, accounting for 72% of total damages and losses. The Arid and Semi-Arid Lands (ASALs) are more vulnerable to drought related disasters. The three most critical foundations for drought resilience are security, infrastructure and human capital.Competition between communities over natural resources increases insecurity within Kenya and across its borders. Insecurity in turn increases vulnerability to drought, by impeding migration, curtailing access to services and resources, destroying assets, and damaging inter-communal relations. Poor infrastructure increases vulnerability to drought by reducing access to markets and basic services and by deterring the investment needed to expand and diversify the economy. Educated and healthy people can draw on greater reserves of capital to withstand shocks such as drought. Despite recent improvements in early warning and contingency planning systems, drought management in Kenya has continued to take a reactive crisis management approach. Failure to act promptly and appropriately on early warning information, coupled with lack of contingency finance, contributes significantly to drought emergencies leading to an over-reliance on emergency food aid. The National Drought Management Authority has now been established with a statutory underpinning to coordinate and harmonise multi-stakeholder responses to drought. Key projects and programmes implemented during the First MTP include:
VISION 2030
41
Sessional Paper No. 8 of 2012 on the National Policy for the Sustainable Development of Northern Kenya and other Arid Lands was developed, adopted and approved by the cabinet; Development of Vision 2030 Strategy for Northern Kenya and other Arid Lands; Ending Drought Emergencies strategy was formulated as part of IGADs Drought Disaster Resilience and Sustainability Initiative (IDDRSI) to provide guidance and leadership in drought management in IGAD region; and Institutional framework for ASAL development was approved with various components established. 3.8.2 Emerging issues and challenges
These include: Pastoral transformation: Pastoralism is affected by the disruption of seasonal transhumance patterns, the expansion of community conservancies, the unchecked influx of people and livestock, and the spread of invasive species. Pastoralism nevertheless remains the dominant production system in the ASALs and underpins its regional economy. In some counties, it provides employment and food security to more than 70 per cent of households. New investment: New-found oil and other natural resources, LAPSSET, and its associated investments will create new economic opportunities and strengthen integration, but if not well designed and managed, they may pose significant environmental challenges leading to climatic changes and drought 3.8.3 Programme and Projects for 2013-2017
Programmes and projects to build drought resilience and end drought emergencies fall into two categories: those which will be implemented under the leadership of the National Drought Management Authority, and those which will be implemented through other sectors. Flagship projects The National Drought and Disaster Contingency Fund: The NDDCF will reduce the response and turn-around period. Integrated Drought Early Warning System: This will provide accurate drought early warning information to all actors and triggers for response. Integrated Knowledge Management System for Drought: This will be a platform where data, information and learning on drought and ending drought emergencies will be collected, collated and disseminated Hunger Safety Net Programme: The NDMA will take on institutional responsibility for implementation of the HSNP and oversee its scale-up within the national drought management system The sectoral priority projects include: Establishing 23 County Early Warning & Response Hubs to support drought & conflict mitigation; Implementation of targeted peace dividend projects in 23 ASAL counties; Constructing and rehabilitating nine water supply systems in the ASAL counties; Scale up the High Impact Nutrition Intervention (HINI) in ASAL counties; Range land rehabilitation, fodder production & conservation; Promotion of ecotourism, gums & resins & aloe production as alternative sources of livelihoods; Establishment food security and drought information platform; Constructing, upgrading or rehabilitating 2,209 km of priority roads in ASAL region; Establishment of 20 solar-powered ICT Maarifa centers; Harnessing ASAL regions energy potential through construction of various wind farms; Constructing and/or rehabilitating nine water supply systems in well-established permanent settlements in the arid region; Constructing 9 waste water treatment plants and 9 solid waste management projects in well-established permanent settlements in the arid region;
42
VISION 2030
Groundwater Mapping in Turkana and Marsabit, Isiolo and four other counties selected on the basis of their water stress indices; Establishment of and operationalise the National Council on Nomadic Education in Kenya (NACONEK); Establishment of one computer laboratory in each ASAL primary school; Improving 100 existing mobile schools; Constructing and equiping 70 Community Learning Resource Centres (CLRCs) in arid and pastoral counties; Equiping 600 low-cost boarding schools in 14 arid and pastoral counties; Constructing 15 feeder schools in each of 14 arid and pastoral counties; Constructing and equip one middle-level college in 6 ASAL counties; Establishment of and strengthening outreach and mobile clinics among nomadic communities; Completion and operationalisation of the abattoirs in Isiolo, Wajir and Lokichoggio, with a clear management model in place for each, in partnership with the private sector; Preservation of 3,000 hectares of fodder in Turkana, Marsabit and Garissa counties; Dry land crop production, through production and marketing of drought-tolerant crops in semi-arid areas; Establishment and operationalise the Northern Kenya Investment Fund (NKIF); Operationalisation of Livestock Marketing Board; Establishment of a national livestock insurance scheme; Range lands rehabilitation, fodder production and conservation; Apiculture, eco-tourism, gums and resins and aloe vera production and emerging livestock promotion; Conservation agriculture promotion in semi-arid areas; Marketing, value addition and agro-processing in 23 semi-arid counties; Development of land use/land cover assessments for spatial planning of ASAL region; and Rainwater harvesting expansion and construction of sand dams in 9 counties. 3.8.4 Policy, legal and institutional reforms
Domesticate the African Union Policy Framework for Pastoralism in Africa (2010); Policy on Small Arms and Light Weapons (SALW); Trans-boundary waters policy and management strategy; Finalize the NDMA Bill; and Create and operationalize the ASAL Secretariat, the National Council on Nomadic Education in Kenya, the Livestock Marketing Board, and the National Drought and Disaster Contingency Fund.
3.9
Security is a key incentive for attracting investment as it provides an enabling environment for individuals and businesses to thrive. The economic growth and development anticipated in the Kenya Vision 2030 can only be achieved and sustained in a peaceful, stable and secure environment. The sector aims at guaranteeing every person in Kenya freedom from danger (protection from physical or direct violence), and freedom from fear (a sense of safety and overall well-being). 3.9.1 Situation Analysis
During the First MTP, the security sector endeavored to address issues of national security with special emphasis on security reforms aimed at enhancing the capacity of the state to protect its citizens and property from both internal and external threats. These reforms included modernizing security infrastructure, enhancing policing, transforming penal facilities into correctional institutions, improving security officers welfare, refocusing policing to be more intelligence led, enhancing surveillance by incorporating CCTVs, and integrating vital data needed for effective security management. The sector achieved 60% implementation of the six flagship projects namely: Forensic laboratory; Installation of
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
43
surveillance cameras in Nairobi, Mombasa, Nakuru and Kisumu; Police reforms programme including Police Housing project; Establishment of a National Security Database; Construction of 6 new prisons in Mwingi, Nyamira, Kwale, Rachuonyo, Vihiga and Kaloleni and; Establishment of an Integrated Population Registration System (IPRS) and Procurement of e-visa / Border Management System. Other major achievements included: establishment of peace building and conflict management structures throughout the country; scaling up of campaign against alcohol and drug abuse; acquisition of modern security infrastructure; implementation of prisoners and prison warders welfare reforms; strengthening collaboration with International and continental peace and security architecture; implementation of youth empowerment programmes aimed at discouraging youths from engaging in crime and criminal activities; suppressing external security threats (like al shabaab and piracy) and terrorism; strengthening humanitarian aid to civic authority (HCA) programme; improved efficiency in provision of immigration and registration of persons services; improved street lighting of Nairobi Metropolitan Region; and improved security to vital water catchment areas, wildlife and tourists, among others. 3.9.2 Emerging Issues and Challenges
These include: Political instability in the neighboring countries especially in Somalia and Sudan leading to proliferation of illicit small arms and light weapons and influx of refugees and aliens; Conflicts over resources especially water, pastures and grazing areas; Sophistication of traditional criminal practices such as cattle rustling and banditry; Slow pace of modernisation and replacement of obsolete security infrastructure; Inadequate capacity (equipment, personnel, and facilitation) for effective and efficient provision of security and policing as needed; Inadequate support and slow pace of implementation of security reforms (police reforms, prisons reforms etc); Weak collaboration framework between the security agents and the members of the public; High rate of unemployment and poverty in majority of sections of the population leading to high vulnerability to engage in crime and criminal behavior; Inadequate research in crime and punishment to inform public policy on crime management; Human wildlife conflict due to environmental degradation; Poaching and illegal logging of forests; Organized crime and gangs; High magnitude of drug supply and abuse; Limited treatment and rehabilitation services for persons with substance use disorders; Litigations in the case of regulation of alcoholic drinks production, sale and consumption; Lack of policy framework for dealing with security and safety of Kenyans outside Kenya; and Lack of integrated approach to security management. 3.9.3 Programme and Projects for 2013 2017
Flagship projects Completion of the Forensic Laboratory; Installation of CCTV cameras in Nairobi, Mombasa, Kisumu and Nakuru ( Including establishment of a command control centre with an Integrated Security Intelligence and Surveillance System); Complete the Police Reform Programme including housing projects; Establishment of a National Security Data Centre; Completion of the construction of 6 prisons; Completion of Integrated Population Registration System (IPRS); and Restoration of the five water towers. 44
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
Other priority programmes Security and Policing reform Initiative: Focus will be on: modernisation of security infrastructure; incorporation of modern technology in investigations; policing and surveillance using an integrated approach; influencing public against criminal behavior; replacement of ageing security infrastructure; improvement of wildlife Park management and security of wildlife; improvement of security officers welfare (both housing and pay); improvement of security operations efficiency; deepening of security and policing services reforms; community policing; research capacity in crime control; and deepening of security and safety mechanism for Kenyans abroad. Conflict Prevention, Management and Resolution: This will focus on: establishing effective peace and conflict structures throughout the country; re-engineering the national government coordination mechanism to prevent; manage and resolve conflicts efficiently and effectively; and enhancing the capacity of international cross border conflict management. It also focuses on restoration of animal migratory routes to resolve human wildlife conflict. 3.9.4 Policy, Legal and Institutional Reforms
Policy Reforms Develop and implement the National Security Policy; Develop and implement the National Policing Policy; Develop and Implement the National Community Policing Policy; Develop and Implement the National Disaster Management (NADIMA) Policy; Develop and implement the National Small Arms and Light Weapons Control and Management Policy; Implement regulatory policy on private security providers; Review and Implement the National Youth Policy; Review recruitment and management of police reserve; Review the Anti-Terrorism Strategy to enhance its effectiveness; Review and implement the National Youth Policy to incorporate universal conscription of youth into the NYS; Review and implement the National crime prevention strategy; Enhance implementation of Intelligence Led Policing Model; Develop and implement Integrated transport policy; Implement Peace Building and Conflict Management Policy; Develop and implement Disaster operation and coordination policy; Develop and implement the framework on security and safety of Kenyans abroad; and Enhance experiential learning in both security agencies and public service. Legal Reforms Amend the National Police Service Commission Act 2011; Amend the National Police Service Act 2011; Enact Private Security Industry Regulation Bill 2013; Enact the National Coroners service Bill 2013; Enact the National Disaster management (NADIMA) Act; Enact the Anti-terrorism Act; Fast track the review and implementation of Wildlife Act (CAP 376); Review NYS Act, Freedom of Information Act 2010, Refugee Act, Alcoholic Drinks Act 2010; Community Service Order (CSO) Act No 10 of 1998, Prisons Act (Cap 90); Finalize the review of Kenya Defense Forces Act to enhance its embrace of Humanitarian Civic Activities (HCA); Develop and implement the Kenya Corp Engineers Act; Enhance implementation of Alternative Dispute Resolution (ADR) Act 2009 to institutionalize peace building and
VISION 2030
45
conflict transformation in the country; Implement the National Government Coordination Act 2013; Fast tracking review and implementation of Caps 90 and 92 of Prisons Act and correctional services policy and rolling the parole for convicted prisoners; Review of the NYC Act to be in line with the Kenya Constitution 2010; Finalize development of Metropolitan Areas Bill; Revise the Forest Act; Finalize Kenya school of Adventure & Leadership (KESAL) Draft order/Act; and Fast tracking review and implementation of Caps 90 and 92 and correctional services policy and rolling the parole for convicted prisoners. Institutional reforms Create a new Border Security Force / Unit; Restructure Provincial Administration in accordance with the devolved system of government; Enhance the capacity of the National Police Service to train 15,000 police officers annually to comply with the UN recommended police to population ratio of 1:450; Establish Kenya Coast Guard Service (KCGS) and Kenya National Maritime Security and Safety committee; Establishment of peace Building and Conflict Management structures in all the counties; Introduce bolus technology to deal with cattle rustling and other forms of livestock theft; Establish a framework for coordination of public and private security stakeholders; Upgrade early warning system and disaster management coordination mechanism in the country; Establish a mechanism to re-integrate retirees/ex-servicemen into the society; Roll out the integrated population registration system (IPRS); Transform prison farms and Industries into SAGA and Review of Kenya Prisons standing orders; Automate offender management system and build the capacity of probation officers to manage the developed aftercare policy; Implement the parole system to expand the scope of community supervision and reintegration; Develope internal framework for promotion, protection and fulfillment of the right of victims support services; Promote peaceful coexistence and conflict management regionally and internationally through diplomacy; Establish a Technical Cooperation Fund to be used to advance Kenyas influence in the region; Establishment of youth desk offices in all the MDAs; Enhance the capacity of NYS to recruit 10,000 more youth into the National Youth service annually; Creation of Metropolitan Police Unit; Creation of an agency (similar to Kenya Ordnance Factories) with re-structured and modernized Kenya Army Corps of Engineers with seconded resources from relevant ministries and agencies, and capacity progressively built to complete autonomy akin to similar outfits in the world e.g. USACE Establishment of a statutory Police Reforms Implementation Commission to coordinate, monitor and supervise the implementation of Police Reforms; Establishment of a borstal girls institution; Establishment of one prison for special needs inmates; Establishment of an ultra-modern training facility at Manyani Prison for senior Kenya Prisons services officers and also for use by the other prison officers from other regional member states; Strengthen security measures for the Kenya Prisons Services institutions (through purchase of helicopter / speed boats) to curb emerging crimes like piracy; Establishment of Drug Rehabilitation Centres with medical centres; Implementing the custodial sentence in the rehabilitation of Youth affected by Alcohol and substance abuse in collaboration with the Judiciary and law enforcement agencies; Enhance the capacity of the Kenya Forest Service; Enhance Capacity of Kenya school of Adventure and Leadership to offer functional leadership and endurance training to security agencies and MDAs;
46
VISION 2030
Establish functional images in various disciplines of the armed forces to maximize their respective capacities; and Strengthen the new Independent Police Complaints mechanisms.
VISION 2030
47
4
4.0 4.1
Overview
Kenya Vision 2030 identied six priority sectors with high potential of spurring the countrys economic growth and development. The sectors are: tourism, agriculture and livestock, wholesale and retail trade, manufacturing, business process outsourcing/IT Enabled Services (ITES) and nancial services. Oil and mineral resources has been introduced as seventh sector in the Second MTP. These sectors will drive achievement of 10 percent GDP growth by 2017.
Tourism
To be a top 10 long haul tourist destination offering a high-end, diverse, and distinctive visitor experience
The tourism sector remains vital for the continued growth of the Kenyan economy. In recent times, tourism has maintained its position as one of the leading foreign exchange earners. The sector is based on a wide array of natural assets particularly: the abundant wildlife living in their natural eco-systems in game-parks and reserves across the country, over 500 km long all-year warm sandy coastal beaches, a rich and diverse cultural heritage and products and a robust and thriving business hub that attracts most of regional and international business travellers. 4.1.1 Situation Analysis
Tourist arrivals rose from 1.2 million in 2008 to 1.78 million in 2012, while earnings rose from KSh. 52.7 billion in 2008 to KSh. 96.02 billion in 2012. Likewise, bed nights both available and occupied grew by an average of 5.4 per cent and 6.4 per cent respectively. The slowdown in tourist arrivals in 2012 is attributed to global economic slowdown especially in the Euro Area and negative publicity related to security along the Kenyan coast (Table 4.1). Kenyas tourism volumes remain relatively low compared to regional competitors such as South Africa and Egypt.
Table 4.1: First MTP Tourism Performance Indicators Year Tourist Arrivals 1,203,200 1,490,400 1,609,100 1,822,900 1,780,768 1,581,274 Annual Growth % -34.00 23.87 7.96 13.29 -2.31 1.76 Earnings (KSh bn) % 52.70 62.50 73.70 97.90 96.02 76.56 Annual Growth % -19.00 18.60 17.92 32.84 -1.92 9.69 Bed-Nights Annual (%) Available Growth Occupancy % 14,233,600 -3.25 25.99 17,125,300 20.32 36.45 17,161,800 0.21 38.82 17,419,600 1.50 40.27 18,849,600 8.21 36.40 16,957,980 5.40 35.59 Bed-Nights Annual Occupied Growth 3,699,000 6,242,800 6,662,300 7,015,200 6,860,800 6,096,020 -46.69 68.77 6.72 5.30 -2.20 6.38
48
During the First MTP, signicant progress was made in implementing the agship programmes and projects. Land for Isiolo and Lake Turkana resort cities was identied and prefeasibility studies completed. The marketing of Kenyas tourism both internationally and the domestically was undertaken under the Tourism Markets Recovery Programme. Through these marketing efforts, tourism volumes from emerging markets such as India, China and Russia increased. The government developed a Cultural and Heritage Tourism strategy and an Agro-Tourism strategy, and a Cradle of Mankind Tourist Circuit that incorporates Sibilo National Park, Central Island National Park and Southern Island Park around Lake Turkana region to promote niche product. In addition, the government surveyed, gazetted and rehabilitated several national monuments and historical sites for tourists attraction. A National Strategy on Meetings Incentives Conventions and Exhibitions (MICE) was developed. The sector nalized the development of a new legal and policy framework, namely, Tourism Act 2011 and a Sessional Paper, to guide the development of the sector. 4.1.2 Emerging Issues and Challenges
The critical issues and challenges affecting the sectors performance include: Untapped product diversity as Kenyas tourism continues to be based on a narrow product range that includes, beach and safari holidays; Declining product quality due to lack of provision of unique and diverse experiences at the beach and a lack of investment incentives to spur new developments. The Safari product is facing challenges that include weak product monitoring standards, poor regulation and control of developments in wildlife areas and migration corridors. Security concerns, negative travel advisories and effects from global economic performance especially with regard to key source markets; Inadequate standards and regulations and tourism infrastructure; Inadequate bed capacity and poor distribution of facilities across regions; Inadequate physical Infrastructure; Poaching; and Human wildlife conicts. 4.1.3 Programmes and Projects for 2013 2017
The main targets for the tourism sector over the plan period include: Increase tourism arrivals from 1.8 million in 2012 to 3 million visitors (international and cross border); Increase tourism earnings from KSh. 96.0 billion in 2012 to KSh. 200 billion; Increase bed-nights by domestic tourists from 2.8 million in 2012 to 4 million; and Develop an additional 30,000 beds in high quality accommodation facilities across the country. Flagship Projects Development of Lamu, Isiolo and Lake Turkana Resort Cities: Lamu, Isiolo and Lake Turkana resort cities have been proposed as part of the bigger LAPSSET project. Land for Isiolo (2,600 hectares) and Lake Turkana resorts has been identied. A master plan and resort designs will be developed, and an international investor conference will be held to market the resorts to both local and international investors. Development of Coastal Beach Ecosystem Management: This project will entail the re-development of Kili, Kwale and Lamu into modern resort destinations by upgrading transport infrastructure and beach management programmes. Private sector will renovate existing hotels and build new ones, and participate in improving hygiene and sanitation facilities and beautication programmes. The project will also entail development of new niche products that include water sports (scuba diving, surng, water skiing), development of Marina along the marine continental shelf, enhanced security and safety (such as establishment of a coast guard service).
49
Destination Marketing Programmes: The Government will implement a comprehensive tourism marketing programme aimed at increasing both the number of tourist arrivals and earnings per tourist. The interventions will include: Implementation of the tourism market recovery programme; Global brand advertising campaigns to build global awareness of Kenya; Market consolidation or penetration in new and emerging markets with special focus on BRIC (Brazil, Russia, India, and China); Enhanced market segmentation to attract higher yield tourists; and Focused product promotion and activation with priority given to Safari, Beach, Culture, Sports; and heritage sites tourism products. Premium Parks Initiative: Infrastructural improvements in Amboseli and Lake Nakuru national parks will be undertaken. Segmentation based on product and price in the parks will be sustained. Facilities to be rehabilitated include Lake Nakuru National Park observation, picnic/camp sites; campsites and visitor facilities across the parks; and upgrading road network of about 300 km. Under Utilised Parks Initiative:The underutilized parks include Meru, Mt. Kenya, Tsavo East, Tsavo West, Mt. Elgon and Ruma. Infrastructural improvements and development initiated during the First MTP will be continued. Products in these parks shall be repackaged to increase the diversity. Specic actions will include: Marketing the underutilized parks; e.g. marketing Tsavo to cruise tourists; Providing incentives such as concessionary land leases and tax incentives; and Revamping the KWS ranger force to curb poaching and insecurity (including human-wildlife conict through installing electric fence around the parks) Maasai Mara National Reserve: The Maasai Mara National Reserve agship project will be implemented as an independent project from the premium parks initiative. To address problems of unplanned development of lodges, poor access roads and mismanagement of revenues, the government will work with the County government to develop and market the Maasai Mara as a national iconic brand; and implement the Mara Ecosystem area plan. Eden Cradle of Humankind: The broad objective of the Eden Cradle of Humankind project is to position the Lake Turkana Basin as the renowned place for human origins internationally, while opening up the area for economic growth and poverty alleviation for the local communities. The project will be implemented in two phases. The rst of phase will be a premier Science Park that will form the core of the story of human origins in the area. The second phase will involve the development of camp sites at the actual location where Kenyas most famous collections have been found, on both the eastern and western sides of the lake. Development of Niche Products Programme Heritage Tourism: The facilities and infrastructure of three cultural heritage sites (Fort Jesus in Mombasa, Lamu old town and the sacred Mijikenda Kaya Forests); three natural heritage sites (Great Rift Valley lakes - Lake Elmentaita, Lake Bogoria and Lake Nakuru); and Mount Kenya National Park/Natural Forest will be improved to international visitor expectations. This will involve the following programmes: Development of the National Museum of Kenya (NMK) Nairobi Circuit; Gazettement of new heritage sites; Revision of museum entry fees; Heritages sites, monument rehabilitation and maintenance promotion; Heritage research programs; and New museums and associated establishments at strategic areas in counties. Business and Conference Tourism Initiatives: Kenya has large potential for business and conference tourism as a major product owing to its location and ease of international connections. The Government will continue to promote this high yield tourism segment through development of international-branded hotels, MICE and shopping tourism.
50
Community-based Tourism Initiative: The government will promote community-based tourism including home stays and cultural tourism development. To leverage on the rich cultural diversity in the country, county governments will provide incentives for community-based enterprise investors to engage in home-stay development. Development of Health and Medical Tourism: These programmes will enhance the development of health and medical tourism by enhancing the marketing of Kenyas relatively specialized health and medical services and the health system infrastructure. As a starting point, the government will target the regional market. Other programmes: Promote Nairobi as a Multilateral Diplomatic Hub: Globally Kenyas environmental diplomacy has been boosted by the presence of United Nations Environment Programme (UNEP) in Nairobi. Strategies to position Nairobi as a multilateral diplomatic hub will be developed and implemented. Eco-tourism: Eco-tourism will be promoted through the following activities: Identifying and mapping potential eco-tourism development sites; Creating awareness of the value of eco-tourism to the industry players; Developing standards for eco-tourism establishments; Facilitating access to eco-tourism development incentives; and Marketing eco-tourism facilities. Agro-Tourism: The Government will conduct research to come up with an inventory of Agro-tourism sites. This will eventually generate an Agro-tourism site guide for tourists. Potential sites to visit will include tea, coffee estates, and food festivals. 4.1.4 Policy, Legal and Institutional Reforms
The Government will improve the policy and regulatory environment through implementation of the following: Tourism Act 2011 and Sessional Paper No.1 of 2010; Development and implementation of national Tourism Master Plan; Implementation of a National Tourism Coordination Initiative involving an inter-ministerial / multi-agency committee to fast-track implementation of the tourism interventions; and Wildlife Policy and Bill.
4.2
The agriculture sector contributes about 24 per cent of the GDP, about 75 per cent of industrial raw materials and 60 per cent of export earnings. The sector accounts for 65 per cent of Kenyas total exports, 18 per cent and 60 per cent of the formal and total employment respectively. The sector comprises ve subsectors industrial crops, food crops, horticulture, Livestock and sheries and employs such factors of production as land, water and farmer institutions (co-operatives, associations). Kenya will adopt climate-smart agriculture such as harnessing farm waste as source of organic fertilizer, and use of bio-fertilizer that does not contribute to harmful emissions, better weather forecasting/early warning systems, growing resilient food crops, managing post harvest losses and crop insurance. Efforts will be put in place for increased involvement of the youth in income generating ventures in the Agriculture, Livestock and Fisheries sector. 4.2.1 Situation Analysis
51
During the First MTP, the sector recorded an average annual growth rate of 4.3 per cent against a target of 7 per cent. This was mainly caused by adverse weather conditions in some years, post election violence and increasing costs of major inputs such as seeds, fertilizer and fuel. The value of agricultural output increased by KSh. 70,550 million per annum between 2008 and 2011 against a target of KSh. 80,000 million per year as set out in Kenya Vision 2030 and Agricultural Sector Development Strategy (ASDS). Several agship projects were implemented as follows: Enactment of the Consolidated Agricultural Reform Bill: Out of the ve (5) Bills set for enactment, three (3) Acts were enacted and assented namely: the Agriculture, Fisheries and Food (AFFA) Act 2012, Crops Act 2012 and National Agricultural Research Act 2012. Fertilizer Cost Reduction Project: A total of 274,000 MT of fertilizer was procured as a price stabilization mechanism while the feasibility study for viability of a manufacturing plant was completed. The process of identifying a strategic investor is almost complete. Establishment of Disease Free Zones (DFZ): A road map for implementation of Kenya DFZ was developed focusing on one out of the four DFZ due to nancial and other logistical challenges. Expansion of Irrigation Coverage: The area under irrigation expanded from 119,000 to 159,000 hectares in small holders as well as large schemes namely; Bura, Hola, Kano, Bunyala, Pekere an Mwea. Other Programmes and Projects: The sector implemented a number of other priority programmes and projects. These interventions were in research and development; improving delivery of extension services; strengthening producer institutions; intensication and expansion of irrigation; seed improvements; livestock development and sheries development. 4.2.2 Emerging Issues and Challenges
The sector faced a number of challenges that impacted negatively on its development. Some of the key challenges include: Inadequate funding; Unreliable weather patterns and effects of climate change; Low adoption of technology and un-coordinated Research and Development (R&D); Security concerns/ cattle rustling, resource based conicts; Low utilization of the 200 mile Exclusive Economic Zone (EEZ) for exploiting sheries and marine resources; High Population and negative cultural practices; Regional and international barriers to trade; Global economic recession; Conversion of agricultural land to other competing land uses; and Availability and affordability of energy.
52
4.2.3
Flagship Projects The sector will implement the following agship programmes / projects: Implementation of the Consolidated Agricultural Reform Legislations: This includes preparation of necessary regulations to actualize implementation of the Acts and setting up institutions such as the Agriculture, Fisheries and Food Authority (AFFA); and the Kenya Agricultural Research Organization (KARO) proposed in the new Acts. Additionally, efforts will be made to fast track passing of the Livestock and Fisheries Bills in Parliament. Fertilizer Cost Reduction Strategy: This will address issues of access and affordability of fertilizer. Having identied and short-listed potential investors, the process of establishing a local fertilizer plant will be hastened. Similarly, the identication of a private investor for blending will also be undertaken. Establishment of Disease Free Zones (DFZ): Four DFZ will be established to facilitate access of Kenyan meat, leather and leather products to local, regional and international markets. The rst zone will be established at the Coast, covering the counties of Kwale, Mombasa, Kili, Tana River, Lamu and parts of Taita-Taveta outside the Tsavo National Park. The other three zones will be established in the Laikipia-Isiolo complex and Uasin Gishu and Garissa Counties. Fisheries Development and Management: This will be achieved through expanding the area of sh farming from the current high potential areas to Arid and Semi Arid Lands (ASALs) and developing sheries related infrastructure and strengthening of monitoring, control and surveillance systems. ASAL Development Irrigation: 404,800 hectares will be put under irrigation by 2017 especially in the Arid and Semi Arid area in Turkana and Tana Delta. Other Priority Programmes: These will include: Agricultural Development along LAPSSET corridor: This will involve feasibility studies, documenting investment opportunities in the corridor and providing investment incentives to those interested in agricultural enterprises along the corridor. National Agricultural Sector Extension Programme (NASEP): This programme aims at improving access to agricultural extension by farmers and further strengthening agricultural research and development. Agri-Business Development Programme: This programme is geared towards improving access to markets by all agricultural value chain players as well as improving and modernizing market facilities. It will further transform agricultural marketing functions through value chain development and strengthening producer and marketing systems. Under this programme agricultural product development will be done through value addition programmes. The programme will ensure creation of local, regional and international marketing opportunities for agricultural commodities. Accelerated Agricultural Inputs Access Programme: This programme aims at improving access of agricultural inputs such as fertilizer, agrochemicals and certied seeds. Agricultural Credit and Financial Services Access Programme: This programme aims at improving access of agricultural credit and insurance to agricultural value chain players.
53
Integrated basin based development programme: The sector will undertake the development of multipurpose dams that will support irrigation in ASAL areas and ensure food security. Agricultural Programme for Schools: This programme aims to train pupils in 35,000 primary schools and 7,000 secondary schools in agricultural skills and engaging them in irrigated agriculture. Revitalising of the Coconut Industry Programme: This programme aims at revitalising the coconut industry within the traditional coconut growing areas and other potential parts of Kenya to create wealth and employment. 4.2.4 Policy, Legal and Institutional Reforms
The Sector will undertake the following institutional and policy reforms aimed at facilitating the sustainability of agriculture and guide the county governments in developing their policies: Agricultural Policy; The National Oceans and Fisheries policy 2008; National Livestock Policy; National Camel Policy; Urban and Peri-urban Agriculture and Livestock Policy; Agro-chemical Industry Policy; Organic Agriculture Policy; Oil and Nut crops Policy; Sugar Industry Policy; and Develop Insurance Policies that will cushion producers against vagaries of the weather.
4.3
Trade
A Formal Sector that is Efcient, Multi-tiered, Diversied in Product range and Innovative
The Trade sector has been identied as one of the key engines of the economy due to its immense contribution to Kenyas GDP and employment creation through trade and investments. 4.3.1 Situation Analysis
The Government has been implementing four agship projects during the rst MTP namely establishment of Special Economic Zones, creation of producer business groups, creation of wholesale hubs and tier 1 retail markets. These projects have however achieved little progress in their implementation because of inadequate budgetary allocations, the challenge of acquiring appropriate land and absence of enabling legislative framework.. Development of Special Economic Zones (SEZs): A Special Economic Zones (SEZs) Policy and Bill was developed, approved by the Cabinet and is awaiting approval by parliament. A total of 2,000 km2 and 700 km2 of land have been identied for Mombasa and Lamu SEZs respectively. Consultations to identify suitable land for the proposed Kisumu SEZ are ongoing. Create between 1,000 1,500 Producer Business Groups: To enhance integration of small and fragmented individual producers into a big individual source for nal consumers and intermediate players, 1,326 producer business groups were created. Create at least 10 wholesale Hubs with a pilot project in Maragua: A concept paper was developed for the development of the wholesale hub that incorporates best international practices. Twenty (20) acres of land for the construction of the pilot Wholesale Hub in Maragua was identied and fenced. The process of preliminary design was initiated.
54
Create at least 10 Tier one Retail Markets with a pilot project in Athi-River: A concept paper for tier one retail market that incorporates best international practices was developed and fty (50) acres of land for the construction of the pilot market identied and fenced in Athi River. The process of preliminary design was initiated. Domestic Trade The sector share contribution to GDP averaged 10.1 per cent over the First MTP period. The main factors that supported growth in the sector include low ination and stable macroeconomic environment and increased credit to the private sector. The government also undertook licensing reforms by reviewing the regulatory regimes that resulted in the elimination, simplication, consolidation and harmonization of business licenses. The sector generated a total of 783,700 jobs during the plan period. About 95 per cent of these jobs were created by the private sector. International Trade The value of total merchandise exports grew by 48 per cent between 2008 and 2012 while imports increased from KSh. 770.7 billion in 2008 to KSh. 1.37 trillion in 2012 representing 78.3 per cent increment. The rapid increase of imports over exports has led to widening of trade balance. Most of the imports are capital goods or raw materials for industrial production while exports consist of agricultural products. Regional Integration and Preferential Trade Arrangements East African Community: Kenyas total exports to EAC increased by 60 per cent from Ksh 83.9 billion to KSh. 134 billion between 2008 and 2012. In 2012, Uganda was Kenyas leading export destination (absorbing 13 percent of the countrys total exports) while Tanzania was second at 9 per cent. Kenyas exports to the region are diversied and include chemicals, fuels and lubricants, machinery and transport services. In 2012, Kenyas exports to the EAC accounted for 54 percent of the countrys total exports to Africa and 26.1 percent of its total exports. Common Market for Eastern and Southern Africa (COMESA): Kenyas exports to COMESA increased by 58 percent from KSh. 111.2 billion in 2008 to KSh. 175.73 billion in 2012 and accounted for 34 per cent of total exports in 2012. On the other hand, the total imports from COMESA increased by 117 per cent from KSh. 28.27 billion in 2008 to KSh. 61.6 billion in 2012. World Trade Organization (WTO): Through the WTO, Kenya has negotiated for enhanced market access through improved trading rules in goods, services and intellectual property rights. Economic Partnership Agreement (EPA) between EAC and European Union (EU): Kenya along other EAC partner states is negotiating an EPA that when successfully completed should see the EAC region have duty free and quota free market access to the EU which accounts for 24 per cent of Kenyas total exports. African Growth Opportunity Act (AGOA): Total exports from Kenya to US increased by 28.8 percent from KSh. 20.5 billion in 2008 to KSh. 26.4 billion in 2012 out of which KSh. 22.3 billion were derived from EPZ apparel exports. 4.3.2 Emerging Issues and Challenges Among the challenges that impede growth of trade include: Weak business regulatory framework; High cost of doing business; Commodity price volatility; Fragmented and informal trade sector; Infrastructure - majority of MSMEs operate from temporary business premises/work sites, inefcient distribution
55
value chains and inadequate utilities- water, energy; Inadequate Business Development Support Services (BDS) including business/ trade information, consultancy, counselling and aftercare services; Limited access to trade nance for MSEs - access to affordable trade nance is crucial to the growth of trade sector; Long and cumbersome process of acquisition of public land for development projects; Inux of counterfeit goods. Stringent technical requirements/Rules of Origin in the export markets; Inadequate capacity to develop new products, innovation, inventions and value addition on produced goods; Under funding of export related activities; Erosion of advantages accrued from preferential trade arrangements; Non-tariffs barriers; and Minimal market and product diversication. 4.3.3 Programmes and Projects for 2013 - 2017
Flagship Projects Building wholesale hub markets: Construction of one pilot wholesale hub in Maragua to serve as a model for the private sector. Creation and Proling of Producer Business Groups: Prole the 1,000 -1,500 Producer Business Groups to identify their needs and interventions. Building Tier-1 retail markets: Construction of one pilot Tier 1 Retail Market in Athi River to serve as a model for the private sector. National Electronic Single Window System: Implement the National Electronic Single Window System that allows parties in trade and transport to lodge standardized information and documents with a single entry-point to fulll all imports, exports and transit-related regulatory requirements. Credit Guarantee Scheme: Establish and operationalize a Credit Guarantee Scheme and Export Development Fund. Establishment of Distribution Infrastructure: Establish distribution infrastructure; warehouses and business information Centers in Kinshasa and Lubumbashi (Democratic Republic of Congo); in Juba (Republic of South Sudan); and in Dubai (United Arab Emirates). Establishment of Micro Small Medium Enterprise (MSME) Centers of Excellence (COEs): Establish and operationalize forty seven (47) Micro Small Medium Enterprise (MSME) centers in all counties.
56
Other Programmes and Projects Establish and institutionalize the International Road Transport (T.I.R) Carnet in Kenya and its application in East Africa. Establish an information system on goods and services that will collect, collate and disseminate trade information through Business Information Centers (BICs). Development and institutionalization of capacity building and training programmes on technology, value addition and business procurement negotiation skills for traders associations and their members (Producer Business Groups/Business Membership Organizations). Revitalization of Joint Loans Board Scheme through carrying out socio economic impact assessment, establishing enabling legal and institutional framework and enhanced funding. Develop Regulatory Reform Strategy. Roll out an e-Registry that entails developing an Electronic platform for online license applications and payments. Construction of Metrology laboratories in 47 counties to meet international best practices. Formulate and implement the Private Sector Development Strategy II (2013 -2017). Develop a strategy to address the inux of counterfeit goods. Development and upgrading of 235 MSE Infrastructure worksites throughout the country. MSE survey and informal sector surveys. Carry out Regulatory Impact Assessment RIA Guidelines will be developed and all Regulators subjected to the RIA process for all upcoming regulations. Implement Licensing and other Business Reforms. Establishment of EMPRETEC Centre to provide entrepreneurial and management training, consultancy and counseling services to Micro, Small and Medium scale enterprises and other interest groups (MSMES). Establishment of MSME Tool room and incubation center at Kenya Institute of Business Training Establishment of a MSME National Documentation Centre. Establish an open learning programme centre on entrepreneurship in 47 counties. Establish Trade Commission in key trading commercial capitals between 2013 and 2017 in USA (New York), Switzerland (Geneva), China (Shanghai), South Africa (Johannesburg), Belgium (Brussels), Germany (Frankfurt) and India (Mumbai). Decentralize the operations of the Export Promotion Council to Counties and establish and operationalize a Centre for Product Design and Development. Diversify export products and markets through market research in high potential markets and participation in export promotion programmes. Attract investments in the export related value chains for production of value added products. Establish a world class trade centre and a modern exhibition and convention centre. Develop an Export Development Strategy. Develop an e-trade policy. Conclude negotiations for Economic Partnership Agreement (EPA) between the EAC Partner States and the EU. Formulate and implement a coherent regional integration strategy for Kenya. Implement the EAC Single Customs Territory through introduction of tax payment at rst point of entry. Conclude negotiations on COMESA-EAC-SADC Tripartite FTA. Establish constituency women economic empowerment centers (WEECs). Implement the MSME Act 2012.
Policy, Legal, and Institutional Reforms Adoption of Trade Policy and the fast tracking of the enactment the Trade Development Bill and the Trade Remedies Bill. Adoption of the Special Economic Zones Policy and enactment of the SEZ Bill. Implement the Public Private Partnership Act (2013). Review of the Weights and Measures Act and Kenya Bureau of Standards Act. Finalization of the National Quality Policy and Technical Regulation Bill.
57
Enactment of the Export Development and Promotion Bill. Review of the Value Added Tax Bill to simplify VAT administration, increase compliance and revenue collection. Review of the Anti-Counterfeit Act to address emerging issues in counterfeiting and product piracy. Develop E-Trade Policy. The policy will provide framework for expansion of Domestic and Export Trade. Develop a framework for effective linkages and collaboration mechanism between Government, Private sector Fora, Non-State Actors (NSAS) and Development Partners. Adopt cluster development approach to programmes and projects within the trade sector to enhance competitiveness.
4.4
Manufacturing
Robust Diversied and Competitive Manufacturing Sector
Kenya Vision 2030 overall goal for the sector is to increase its contribution to Gross Domestic Product (GDP) by at least 10% per annum and propel Kenya towards becoming Africas industrial hub. The sector has a high potential of employment creation; provides stimulus for growth of the agricultural sector and offers signicant opportunities for export expansion. 4.4.1 Situation Analysis
The sector grew at an annual average of 3.2 per cent during the First MTP period. The sectors contribution to the GDP averaged 9.8 percent over the same period. The growth was affected by inadequate and costly infrastructure, low technology adoption, high cost of doing business, soaring cost of fuel, a weak Kenya shilling, and recurring drought. Formal employment within the manufacturing sector over the First MTP grew by 5 per cent from 264,800 in 2008 to 277,900 in 2012 while informal employment grew by 17 per cent from 1.57 million in 2007 to 1.83 million in 2011. The informal sector created more additional jobs than formal sector with private sector contributing the largest share of employment in manufacturing. The structure of Kenyas manufacturing sector comprises of micro, small, medium and large industries classied mainly by employment levels and capital investment. The medium and large industries constitute less than 5 per cent of the total number of enterprises but contribute over 60 per cent to the manufacturing sector GDP contribution. Similarly, the micro and small enterprises comprise about 95 per cent of total industries but contribute only about 20 per cent to the manufacturing sector GDP contribution. The sub-sectors which recorded the highest growth changes in 2011 include textile and clothing 18 per cent; petroleum and other chemicals 14.6 per cent; non-metallic minerals14.4 per cent; beverages and tobacco 10.3 per cent; and metal products 10 per cent. In the export sub-sector, locally-manufactured goods comprise 25 per cent of Kenyas exports. However, the share of Kenyan products in the regional market is only 7 per cent of the US $11 billion regional market. The Eastern African market is dominated by imports from outside the region and therefore provides potential market for Kenyan products. Key achievements in implementation of programmes and projects during the First MTP period included: Development of Small and Medium Enterprises (SME) Parks: Development of master plans and structural designs are in progress for SME industrial parks in Nairobi, Nakuru, Mombasa, Eldoret and Kisumu while135 and 20 acres of land were identied in Eldoret and Taita Taveta respectively. Development of Special Economic Zones (SEZ): The SEZ concept was approved by Cabinet and a Government-toGovernment agreement signed with the Government of Singapore for the development of the Master Plan; a SEZ policy and Bill were developed and approved by cabinet and a sessional paper on the same prepared in readiness for tabling in
58 VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
parliament. Land was identied in Dongo Kundu and Lamu for development of SEZ in Mombasa and Lamu respectively. Development of Two Industrial Parks: 3,000 and 1,000 acres of land were identied for development of industrial parks in Mombasa and Kisumu respectively. A third Industrial Park was identied for development at Jomo Kenyatta University of Agriculture and Technology (JKUAT) in Juja. Development of Industrial and Manufacturing clusters: A study was conducted which identied priority sectors for implementation of the cluster strategy to enhance regional and national competitiveness. Sensitization and training of entrepreneurs in these clusters was undertaken. Development of the Iron and Steel Mill: A concept paper on development of the sub-sector was approved by the Cabinet, a Memorandum of Understanding (MoU) between the Government of Kenya and a South Korean investor to develop mini steel mill was signed, a strategy paper for promoting the sector was developed and Iron and Steel Bill 2012 drafted. Transformation of Kenya Industrial Research and Development Institute (KIRDI): The government adopted transformation of KIRDI as a agship project within the manufacturing sector to undertake industrial research, technology and innovation and disseminate ndings that are expected to have an impact on national development. Progress made in implementing other programmes and projects include: development of a strategy paper on training of engineers; 80 One Village One Product (OVOP) projects were started in 11 pilot districts; construction of 188 CIDC; nalization of drafting of the Anti Dumping Bill; establishment of a One-stop-shop for business licensing, registration and taxation; fast-tracking the expansion, modernization and maintenance of roads, rail, airports, seaports and ICT networks to industrial areas and to areas with high potential for industrial development and development of technologies that are cognizant of climate change (low emissions of harmful gases). Legal and institutional reforms: These included enactment of the Anti-Counterfeit Act, 2008, restructuring Kenya Industrial Training Institute and establishment of Kenya Accreditation Services (KENAS). 4.4.2 Emerging Issues and Challenges
The emerging issues and challenges include: Lack of Industrial land: Non-availability of suitable land hampered the timely implementation of projects and programmes such as CIDCs, SME parks, industrial clusters among others. Similarly, FDI inows were constrained by the high cost of land. The National Land Commission will establish land banks for industrial development. Devolution under the Constitution: Since the Constitution has created a devolved system of governance, agship projects and other programmes outlined in the Second MTP will be implemented at the county level. This calls for closer collaboration between the national and county governments and capacity building at the local level to ensure success in the implementation of agship projects. Access to nancial services for industrial development: Access to long term nancing is limited and this has inhibited the competitiveness and growth of the manufacturing sector.
59
Market Access: Most of Kenyas manufactured products face stiff competition in the local, regional and global market due to high cost of production (high energy costs, inadequate and inefcient road network, port and rail infrastructure, slow movement of cargo), non-compliance to international standards and non-tariff barriers. Counterfeit, dumping and substandard goods: The importation of counterfeit, sub-standard, and subsidized goods into the country has continued to impact negatively on locally produced products. Business environment: Investment rate in the manufacturing sector has been low partly due to low investment returns attributable to the high cost of doing business. Infrastructure: Inadequate, unstable and costly supply of energy in Kenya has led to low productivity, high production and distribution costs; and uncompetitive products and services. In addition, inefciencies at the port and under developed rail system aggravate the problem. Innovation and Technology Development: Low technology utilization, lack of innovation and use of obsolete technology has led to low productivity and competitiveness in the manufacturing sector. Budget Allocation: Inadequate budgetary allocation of development funds has hampered the implementation of the various programmes and projects. Global Recession: The recession experienced in key Kenyan export markets has negatively affected Kenyan industrial performance through reduced demand for goods arising out of the volatile global nancial and economic developments. Climate Change: The decline in rainfall as a result of climate change has resulted in decline in water quantities leading to interruptions in electricity generation especially given that most of the electric power is hydro-generated. The availability of agro-raw materials needed by industries is also adversely affected by recurring drought. 4.4.3 Programmes and Projects for 2013 2017
Flagship projects Establishment of Special Economic Zones (SEZs): The SEZs will be established in Mombasa (including Dongo Kundu Free Port), Lamu and Kisumu. The specic objectives are: Attraction of both local and foreign investments; Expansion and diversication of produce of goods and services for domestic and export Markets; Promotion of value addition; Promotion of local entrepreneurship through SMEs; Enhance technology development and innovation; and Promotion of rural and regional industrialization by exploiting comparative advantages of local resources. Development of SME and Industrial Parks: SME and industrial parks will be developed in each of the 47 counties to attract new companies, expand employment opportunities to citizens and attract FDI. The parks will offer infrastructure and shared resources such as power supply, telecommunication hubs, management ofces and internal transportation. Development of Industrial Clusters: Cluster approach as a development strategy will focus on market-oriented research, value addition and marketing of region specic products through the support of academia, the private sector and related actors.The Sector will pursue the development of three clusters which include: Meat and leather cluster through establishment of meat processing plants; Tanneries and other related industries in Isiolo, Garissa and Kajiado; and
60
Promotion of dairy products processing in Kiganjo (Nyeri). Development of Integrated Iron and Mini Steel Mills: Numerical Machining Complex (NMC) has been identied as a focal point for promoting development of iron and steel industry. The NMC will be transformed to be able to realize its full potential in supporting the development of iron and steel sector. Skills development for technical human resource for the manufacturing sector: A strategy for training engineers, technologies and craftsmen will be developed and operationalized while skills need analysis will also be conducted. To effectively support the manufacturing sector the ratio of engineers to population is proposed to improve from approximately 1:6700 to 1:5000 benchmarked against South Africas 1:3200. Transformation of KIRDI into a world class research institution: KIRDI will play a critical role in facilitating technology transfer to MSMEs, improving product designs and promoting product innovations. The transformation of KIRDI into a reputable and competitive research institution will be realized through deliberate capacity building initiatives, attracting and retaining high calibre professionals, upgrading quality of Research, Technology and Innovation programmes and activities and modernization of the institutes infrastructure in line with the demands and expectations of industry. Natural Products Initiatives: Kenya is endowed with an abundance of natural resources including plants with high medicinal, cosmetic and nutritional value that is not fully exploited locally. Investment in creation of capacity for value addition to the enormous biodiversity in the country will be prioritized. A sustainable source of raw material to support the harnessing of this sub-sector on a commercial scale through setting up of botanicals and plantations by application of modern biological and information technologies will also be prioritized. Other Programmes Value addition and productivity improvement programme: The overall objective is to promote value-addition and commercialization of resource endowments by small and medium size industries, improve labour and total factor productivity and promote resource efciency and cleaner production and improve competitiveness at the enterprise level for enhanced value-addition. The programme will be implemented through OVOP, productivity improvement and cleaner production and research development and commercialization. Branding and Marketing of Kenyan MSME Products: This is aimed at enhancing productivity, quality and competitiveness of MSMEs products through provision of technology, design, product development, standardization, and protection of innovations. Development of a standards infrastructure: The sector will strengthen the standards infrastructure to meet the rapidly changing consumer needs, preferences and quality requirements which include standardization, metrology, testing and quality management including certication and accreditation. Enhancement of local content in Government projects: The government will improve local content in all government sponsored projects. Guidelines on the threshold for local content for the projects and programmes will be developed and appropriate amendments made to Public Procurement and Disposal Act 2005. Energy provision for the manufacturing sector: Energy mapping survey will be conducted with a view of increasing peak energy surplus, and reduce waiting period for power connection.
61
Establishment of trading houses in export markets: The Export Promotion Council and the Kenya National Trading Corporation (KNTC) will work together to establish and operationalized trading houses in Democratic Republic of Congo (Kinshasha and Lumbumbashi commercial hubs), South Sudan (Juba) and United Arab Emirates. Focus on Home Based Value Addition: The government through PPP will promote home based value addition both at household and community level. This will be implemented through providing appropriate trainings and adoption of new production technologies. Cooperatives Development: the government will strengthen cooperatives to enhance collective marketing, mobilization of nancial resources and technological transfer. 4.4.4 Policy, Legal and Institutional Reforms
The development and growth of the sector will be supported by the following: Implementation of the Sessional paper No. 9 of 2012 on National Industrialization Policy framework (2012-2030); Implementation of the EAC Industrial Policy and Strategy (2012-2032); Enactment of the SEZ Bill; Implementation of National Industrialization Policy; Development an Anti-counterfeit Policy and strengthen the Anti-counterfeit Agency; Fast tracking the development of the National Quality and Standards Policy; and Review of the Master Plan for Kenyas Industrial Development.
4.5
To be a top off-shoring destination in Africa The growth in the global business outsourcing industry has opened a new window for Kenya to exploit a new growth area for the Business Process Outsourcing (BPO) and IT Enabled Services (ITES). The Kenya Vision 2030 identied BPO as a priority sector under Economic Pillar to create over 20,000 jobs and contribute over 10 per cent to GDP. To achieve this goal, the government is implementing various initiatives that include improving universal access to ICTs, promotion of the BPO/ITES, capacity building, development of digital content, roll out of e-government services and promotion of ICT based industries among others. 4.5.1 Situation Analysis
During the First MTP, Kenya witnessed growth of key BPO companies such as KenCall, Safaricom, Kentech and Horizon. Growth was also witnessed in other related industries such as computer hardware manufacturing, software development, information and broadcasting, lming and digital content development. The government heightened its promotion activities and ensured increased job opportunities from 1,000 in 2008 to 13,500 by June 2012. Key Achievements under First MTP As envisaged in Kenya Vision 2030, the government plans to make Kenya a knowledge based economy through the establishment of the Konza Techno City. The Government is nalizing planning stage with the engagement of Master Delivery Partner (MDP) to prepare a business plan and also prepare a detailed Local Physical Development Plan of the project for phase one. This will pave way for the commencement of construction work.
62
The legal notice on the establishment of Konza Technopolis Development Authority (KOTDA) and the board were gazetted and operationalized. Marketing campaigns have been undertaken at 8 international venues and local media campaigns have also been done. Access to nancial services especially on money transfers has improved substantially. Mobile money applications have enabled nancial inclusion of un-bankable incomes since allowing it through banking and withdrawal of small amounts. Payments of bills, pensions and other small transactions are done through Mobile Money like M-Pesa, M-shwari, M-Kesho, Orange Money and Airtel Money. 4.5.2 Emerging Issues and Challenges
Most of the BPO companies in Kenya face various challenges that impede their growth and development. This include: inability of small rms to enjoy economies of scale; lack of comprehensive policy; regulatory and incentive framework to attract investors; small talent pool; lack of marketing; rigid labour laws for export services; lack of a formalized one stop shop to facilitate the ease of doing business; competition from other countries offering competitive prices due to their comparative advantage occasioned by availability of cheap broadband infrastructure; and lack of knowledge development procedure in various BPO companies workforce and other amenities. 4.5.3 Programmes and Projects for 2013-2017
The governments goal over the plan period is to transform Kenya into the BPO/ITES hub for East Africa region and beyond, building on the progress achieved to connect every Kenyan to the new infrastructure and harness ICT for efcient and effective government, e-commerce, economic growth and job creation for the youth. Flagship projects Establishment of Konza Technology City: The government intends to complete the rst phase of the Konza Technology City. This will involve construction of BPO Park, Science Park, Residential Buildings, Data Centre and part of Central business District. The rst phase will also involve construction of basic infrastructure including sales pavilion, access roads, tele-communications, water and sewerage and energy. Other Programmes and Projects Capacity and Skills Development: The project aims at creating a pool of BPO skills, products and services at an operational, professional and strategic level to support expanding market needs. Local Digital Content Development: The government will embark on initiatives aimed at leveraging on digital content to unlock new opportunities to do business especially for the youth. This will cover development of multimedia local content, e-government, e-learning, e-health care, e-commerce, e-marketing, and information and data gathering, retrieval, storage and communication. IBM Research Laboratory: This science and technology research laboratory established in 2012, will be conducting both applied and exploratory research. It is intended to encourage and strengthen an innovative culture, and engage local entrepreneurs and innovators to develop solutions to the challenges faced by the people of Kenya and the region.
63
The goal for the sector will be achieved by deepening the nancial markets through enhancing its access, efciency, and stability. The FSS consists of banking, capital markets, insurance, retirement benets/pensions, development nance and nancial co-operatives (SACCOs) sub-sectors.
4.6.1 Situation Analysis During the First MTP, net assets in the nancial system increased from KSh. 951 billion in 2007 to KSh. 2,330 billion in 2012. As a result, the sectors share of GDP increased from 6.6 per cent in 2007 to 7.8 per cent in 2011. The nancial sector continues to be dominated by the banking sector. At the end of December 2012, banking sectors assets stood at about 66.2 per cent of GDP. Credit extended to the private sector amounted to 36.8 per cent of GDP in 2012 compared to 28.3 per cent in 2007. As of December 2012, the banking sector comprised of 44 banking institutions (43 commercial banks, 1 mortgage nance company), 8 Deposit Taking Micronance (DTM) institutions, 5 representative ofces of foreign banks, 112 foreign exchange bureaus, and 2 credit reference bureaus. The banking sector is regulated and supervised by CBK under the provisions of the Banking Act, while DTMs are licensed and supervised under the provisions of the Micronance Act. A number of factors contributed to the sector not meeting the envisioned First MTP targets which include major shocks from the post-election violence of 2007/2008, adverse weather impacting the key agricultural sector, the global nancial crisis and subsequent worldwide economic slowdown. As a result:
64
Gross national savings (as % of GDP) actually decreased from 15.4 per cent in 2007/08 to 10.4 per cent in 2011/12, well below the First MTP set target of 24.4 per cent. Total investments as a percentage of GDP rose marginally to 21.9 per cent in 2012/2013 compared to 20.1 per cent in 2010/2011 against a set target of 30-32 per cent.
Table 4.2 presents the institutional overview of the Financial Services Sector in Kenya. Table 4.2: Financial Services Sector Institutional Overview Category Commercial Banks 2.33 trillion 1.30 trillion 1.71 trillion 15.9 million 75.9% 4.6% 20.1% 41.9%% 44 1,272 CBK DTMs Deposit taking SACCOs 201.0 billion 154.4billion 146.1 billion 2.54 million 106.2% 7.3% 8.6% 17.7% 124 529 SASRA Non-deposit SACCOs 21.6 billion 13.2 billion 14.4 billion .34 million 91.6% 3,632 CoCD 29 billion 53 Non-deposit taking MFIs
Total Assets (Ksh) Gross Loans (Ksh) Total Deposits (Ksh) Total Deposit Accounts Loan/Deposit Ratio NPLs Avg. CAR Avg. Liquidity Ratio No. Institutions No. Branches Regulator
30 billion 19.1 billion 13.8 billion 1.8 million 129.2% Approx. 5.9% 15.0% 8 67 CBK
Source: CBK, MixMarkets, SASRA, AMFI. Data for commercial banks and DTMs as of December 2012. Data for SACCOs as of end 2012. Data for MFIs is not widely available. CoCD-Commissioner for Cooperative Development
65
Key Achievements under the First MTP: Nairobi International Financial Centre (NIFC): A Concept Note on the NIFC has been developed. It has been agreed that the framework should take the form of a hybrid centre compared to either off-shore or on-shore centre. In this regard, relevant legislation and regulations will be drafted for the framework. The initiative is expected to raise jobs, nancing for the agship projects and tap into new investments coming to Africa. Financial incentives will encourage investment groups, stock brokerages, pension funds, banks and insurance companies to set up ofces at the NIFC. Access: According to the FinAccess Survey of 2009, overall nancial inclusion increased from 26.4 per cent in 2007 to 40.5 per cent in 2009. Formal nancial inclusion also increased from 18.9 per cent to 22.6 per cent. More recent data indicate that this rate of improvement in the headline quantitative measure of access has continued. Efciency: Increased efciency of nancial services directly supports improved access by reducing transaction costs. A number of interventions, including payments system, capital markets infrastructure and credit referencing contributed to efciency gains during the First MTP. Stability: Attention has been focused on the deposit-taking institutions, which account for the largest proportion of the assets in the system. However, insurers, pension and other investment funds are anticipated to become increasingly signicant as the system develops and diversies. Oversight of these sub-sectors has been strengthened with all the regulators adopting a risk based approach to the supervision of institutions/entities under their regulation. AML/CFT legislation: The Proceeds of Crime and Anti-Money Laundering Act was enacted in 2009 and the new AntiMoney Laundering Board appointed in June 2011. The Financial Reporting Centre has developed the regulations to make the Proceeds of Crime and Anti-Money Laundering Act fully operational. The regulations are in the process of being gazetted. 4.6.2 Emerging Issues and Challenges
These include: High level of exclusion from nancial services; High bank lending rates and wide interest rate spend; Low utilization of nancial services; Inadequate access to nance for SMEs; Low insurance penetration; and Low pension coverage. 4.6.3 Programmes and Projects for 2013 2017
Flagship Project Nairobi International Financial Centre (NIFC): The NIFC will be established to raise funds for projects and tap into new investments coming to Africa. Deepening of Capital Markets: Deepening of the capital markets will be anchored on four thematic areas, namely: Robust policy and regulatory framework for the capital markets; Diversication of capital markets products and services; Efcient capital markets infrastructure and institutional arrangements; and Investor education and public awareness for the capital markets products and services.
66
Other Programmes and Projects Promote EAC nancial services integration: The objective of integration is to facilitate trade, enable cross-border operations and movement of capital. This is expected to improve the stability of the nancial services sector by modernizing the supervisory approach for all sectors in line with new and emerging international standards. Stimulate long-term savings and reduce vulnerability: This initiative has four broad objectives: to mobilize funds at the sector level for investment by the Government and private sector; to increase individual savings for personal investments in education, housing; to provide a replacement pension (income) in old age; and to provide appropriate protection, through insurance, against risks such as illness, accident, and adverse weather. Facilitate the expansion of electronic payments: The achievement of a cash-light economy through the expansion of electronic e-payments will signicantly reduce transaction costs across the nancial system, especially in the provision of retail nancial services and in improving the lending and investment environment. Climate Change Fund: The Kenya Climate Fund (KCF) will be the key vehicle for mobilising and allocating resources from international development partners towards climate change related activities and will be used for allocating domestic public resources towards responses to adverse impacts of climate change. 4.6.4 Policy, Legal and Institutional Reforms
These include: Nairobi International Financial Centre: A draft policy was developed in 2012 and the NIFC legislation is expected to be developed in 2013. Institutionalizing the Centre may require amendments to existing legislation relating to banks, capital markets, insurance and pensions. EAC Integration: The policies towards EAC integration in nancial services were developed as part of the overall efforts related to the East African Monetary Union. New legislation may be required for Kenyas participation in the EA Monetary Authority. Architecture of nancial sector: This is the policy on consolidation of nancial service providers. Government Debt Market: Policy related to consolidation of Government bonds will be developed. Long-term savings policy: This will include an overall pension policy framework (including a policy for a Pillar 0 universal pension the most basic of all pensions) and development of a policy document on retail savings bonds and municipal/county bonds. Leasing environment: Amendments to existing legislation will be done to include requirements to simplify the tax regime to reduce the costs of doing business and to facilitate leasing and factoring. National Credit Guarantee Scheme (CGS): An appropriate policy will be developed to guide structured implementation and development of a vibrant national credit guarantee scheme. The National CGS will embrace a public private partnership structure.
4.7
The Oil and Other Mineral Resources sector has been identied as an additional priority sector under the Economic Pillar of Kenya Vision 2030. Even though the sector currently accounts for only one per cent of GDP and three per cent
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017 67
of total export earnings, recent discoveries of oil, gas, and other mineral resources point to an increasing importance of this sector to contribute to increased export earnings, higher GDP growth, broader social development, and a major spur for infrastructure development and job creation. 4.7.1 Situation Analysis
Kenya has a wide range of minerals such as Soda Ash, Fluorspar, Limestone, Barite, Gypsium, Salt, Dimension Stones, Silica Sand, Kisii Stone (Soapstone), Manganese, Zinc, Wollastonite, Graphite, Kaoline, Copper, Gold, Lead, Nickel, Iron ore, Carbonic Dioxide, Chromite, Pyrite, Various Clays, Niobium and Rare Earths, and Phyrochore. Major mineral sand deposits like titanium ores - rutile, ilementine and zircon have been discovered along the coast. Signicant concentrations of Coal deposits exist in the Mui Basin. Recent discoveries of oil in the Tertiary Rift Basin and gas in one of the offshore wells of Lamu Basin indicate the existence of viable quantities of oil and gas and the potential of the country becoming an oil and gas producing nation. The discoveries and promotions at regional and international gas forums has seen a number of International Oil Companies (IOC) signing production sharing contracts with the government to carry out oil exploration in four sedimentary basins, namely: Lamu covering an area of 261,000 km2 , Mandera 43,404 km2, Anza 81,319 km2 and Tertiary Rift 105,673 km2. The government has gazetted 46 blocks, 45 of which were licensed to 25 international oil companies. At least ve new exploration blocks will be availed (2 onshore in Tertiary Rift Basin and 3 offshore in Lamu Basin). Oil developments in Uganda and Southern Sudan additionally make Kenya a site for oil transportation and processing facilities. The government has signed agreements with neighbouring countries governments to develop regional infrastructure to support the oil and gas industry. Small scale mining operations make up the largest number of rights granted for mining activities (782 by February 2013); 175 exclusive or special prospecting licenses and 10 mining leases have been issued. The government issued a tender in January 2013 to 9 pre-qualied companies for coal mining at Mui Basin, which is located in Kitui County in the eastern part of the country. It is approximately 100 km long and 5km wide and is situated 180km North East of Nairobi. The basin has been subdivided into four Blocks, namely: A,B,C and D. The Ministry of Energy and Petroleum has carried out exploratory drilling in these four blocks where a total of 76 wells have been drilled. Block C has coal reserves estimated at 400 million tonnes, while further assessment will be undertaken in the other three blocks to quantify the reserves. The concession for Blocks C and D is at advanced stage. Blocks A and B are at Request for Proposals evaluation stage. Another thirty one (31) coal blocks elsewhere in the country are earmarked for gazettement and concessioning. At present, the Kwale mineral sands deposit mining project is Kenyas largest mine development carried out over an area of approximately 1,355 hectares with the potential to become an important global producer of rutile, zircon, and titanium concentrates. 4.7.2 Emerging Issues and Challenges
Several issues and challenges have emerged which include: Huge nancial outlays for exploration and production of oil, gas and other mineral resources; Attraction of capital for exploration and production activities; Technical capacity constraints with a shortage of specialized local manpower in the elds of mining, petroleum geology, geo-physics and reservoir and production engineering; Inadequate infrastructure development of the requisite network of roads, railways, ports, pipeline, and rening and distribution systems to support the mining and oil sector; Weak legal and regulatory framework inherent weaknesses in the Petroleum Exploration and Production Act
68 VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
Cap 308 and Model Production Sharing Contract (PSC) include lack of provision for: Compensation regime; Licensing Rounds; Community awareness and participation; Windfall prots; Gas Sharing terms; Corporate Social Responsibility Requirements; Mechanism for working out government share out of monetary gains from transfer of a PSC; Dened Criteria for evaluation of terms provided in PSC applications for prudence and competitive bidding of blocks and environmental protection, conservation and management. 4.7.3 Programmes and Projects for 2013 2017
Flagship Project Exploration and Development of Oil and Other Mineral Resources: The following activities and projects will be undertaken with the objective of establishing the commercial viability, developing the requisite infrastructure and production in the oil, gas and other minerals sector. Restructure the institutions within the sector. Sub division and creation of new petroleum exploration blocks based on technical data. Enhance primary data acquisition, analysis and interpretation in the open blocks so as to make them attractive to investors. Establish a national petroleum data centre. Conducting a National Airbone Geo-physical Survey. Establishment of an Internationally accredited Mineral Certication Laboratory and Audit Agency. Establishment of Minerals and Metal Commodity Exchange. Creation of Special mineral Processing Economic Zones. Enhance partnership in data exchange so as to reduce cost in exploration and access to new technology; Skills Development and enhancement of local expertise in petroleum exploration and production through training, technical collaboration with exploration companies and universities. Restructure and enhance the National Oil Corporation of Kenya nancial capacity to conduct up stream business. Commercial production of the Kwale mineral sands project starting in 2014. Over the 13 years life of the project, the estimated production of the mine is approximately 850,000 tons of rutile, 320,000 tons of zircon, and 3.5 million tons of ileminate. Development of the rail and road networks for exploitation of the Coal deposits in Mui Basin and other parts of the country. Development of Logistics and Supply Chains Management for the oil, gas and other minerals; and Effective management of the environment and social footprints. Other Programmes and Projects Establishment of a Regional Geological Survey and Research Centre. Mineral Exploration and Evaluation. Undertake Geo-hazard Mapping and Monitoring. Establishment of a Mineral Sovereign Fund. Establishment of a National Seismological Network. Development of the LAPSSET corridor which includes construction of 1,400 km of crude oil pipeline from Lamu to Juba in South Sudan, an oil renery in Lamu with a capacity for 120,000 barrels per day, modern oil terminal at Lamu port to facilitate tanker loading and ofoading, a second oil pipeline to transport rened oil product to the Ethiopian market, and construction of a pipeline from Lamu to the existing Mombasa Kampala pipeline. 4.7.4 Policy, Legal and Institutional Reforms
The following policy, legal and institutional reforms will be put in place to support the development of the sector:
69
Development of a policy on management of commercial discoveries of petroleum resources; Revise the Energy Bill of 2012; Review and updating the Petroleum (Exploration and Production) Act (Cap 308); Restructure and enhance NOCKs nancial capability to conduct up stream business; Reconstituting the National Fossil Fuels Advisory Committee (NAFFAC); Enhancing corporate governance in the Government Institutions charged with petroleum exploration and development; Develop a National Mining policy, Legal, Regulatory and Institutional Framework; Develop a single scal regime for mining; and Participation in the Extractive Industry Transparency Initiative (EITI). Establish a National Mining Corporation.
70
5
5.0 5.1
Overview
The sectors which make up the Social Pillar are Education and Training; Health; Environment, Water and Sanitation; Population, Urbanization and Housing; and Gender, Youth and Vulnerable Groups. Under the Second MTP, Sports, Culture and Arts have been included as an addition. The Second MTP will focus on implementation of policies, programmes and projects in each of these sectors to ensure that they contribute towards prosperity and building a just and cohesive society that enjoys equitable social development in a clean and secure environment.
Kenya views Education and Training (E&T) as the primary means of upward social mobility, national cohesion and socioeconomic development. Kenya Vision 2030 places great emphasis on the link between E&T and the labour market, the need to create entrepreneurial skills and competencies, mainstreaming natural values in E&T and strong public and private partnerships. The Government is further committed to achieving international development commitments such as the Millennium Development Goals (MDGs) and Education for All (EFA). It will also address issues related to access, equity, quality, relevance, service delivery, curriculum, teacher development and management as well as trainers in the areas of technology and entrepreneurial skill development. 5.1.1 Situation Analysis
During the First MTP, the sector made the following progress: Early Childhood Development and Education (ECDE): Gross Enrolment Rate (GER) increased from 60.2 per cent to 66.3 per cent, whereas Net Enrolment Rate (NER) increased from 43.0 per cent to 53.3 per cent in 2012 against a target of 76.6 per cent. Low levels of NER are attributable to low participation across the country because ECDE is not mainstreamed into basic education. Primary Education: Number of pupils increased from 8.56 million in 2008 to 9.97 million in 2012 with 4.96 million and 5.01 million girls and boys respectively. The GER increased from 109.8 per cent in 2008 to 115.8 per cent in 2012. The NER increased marginally from 92.5 per cent in 2008 to 95.3 per cent in 2012 against the target of 90 per cent in 2010. Completion rate increased marginally from 79.8 per cent in 2008 to 80.3 per cent in 2012, whereas transition rate from primary to secondary increased from 64.1 per cent in 2008 to 76.6 per cent in 2012 and the gender disparity improved in favour of girls from 0.96 in 2008 to 1.00 in 2012. However, there were regional imbalances with the North Eastern region recording an NER of 40.3 per cent against 95.3 per cent at the national level in 2012. Kenya Certicate of Primary Education (KCPE) examination candidates increased from 695,710 pupils in 2008 to 811,930 pupils in 2012. During the First MTP, 29,060 teachers were employed against a target of 28,000 and on the average, pupils to teacher ratio at primary level moved from 44:1 in 2007 to 57:1 2011/12 against target of 42:1. Textbook Pupils Ratio (TPR) for lower primary improved from one textbook for more than 10 pupils before 2003 to 1:1 in 2010. For upper primary, TPR improved from 1:2 in 2007 to 1:1 in 2010 against a target of 1:1 for both lower primary and upper primary. The KNEC established a national assessment system for monitoring learner achievements at standard 3, 5 and Form II.
71
Secondary Education: The number of secondary schools increased from 6,566 in 2008 to 8,197 in 2012. Enrolment grew from 1.3 million in 2008 to 1.9 million below the target of 2.2 million in 2012. The GER increased from 42.5 per cent in 2008 to 49.3 per cent in 2012, whereas NER increased from 28.9 per cent in 2008 to 33.1 per cent in 2012. The growth in secondary schools to match growth in primary schools, remains a major constraint especially in urban areas where 90 per cent of all primary school children are expected to transit to secondary school by 2018 and progress to 100 per cent thereafter as part of basic education. Special Needs Education: There are 3,464 special needs institutions in the country with 2,713 integrated institutions and 751 special schools. Eastern region has highest units at 734, while North Eastern had 56. Among these, there were 10 public secondary schools for learners with hearing impairments, three for learners with physical handicaps and four for learners with visual impairments. This indicates that access and participation of children with special needs is low and their needs are not being specically addressed. Absence of reliable data on children with special needs across all levels of education and inadequate funding constrained effective special education service delivery and planning. Adult and Continuing Education (ACE): Only 61.5 per cent of adult population has attained minimum literacy level, with only 29.6 per cent of adult population attaining desired literacy competences, leaving 7.8 million illiterate. About 29.9 per cent of youth aged 15 to 19 years and 49 per cent of adults aged 45 to 49 years are illiterate and high regional and gender disparities in literacy achievement exist. Enrolment in ACE increased from 126,700 in 2007 to 320,000 in 2010, while 880 teachers were recruited. Alternative Provision to Basic Education(APBE): APBE was formerly known as non formal education. In 2010, there were 392 registered APBE institutions with the majority in Nairobi region. The government has been giving capitation grants to registered non formal schools against the target of 700. Teacher Education: There are 22 public and 97 private primary Teacher Training Colleges (TTCs) graduating an average of 11,500 primary one (P1) teachers yearly within a two year program. The public diploma teacher training colleges trains 1,340 per year within a three year programme, while ECDE teachers are trained mainly through in-service programs at certicates and diploma levels. On an annual basis, 10,000 teachers are trained at certicate level while 12,000 are trained at diploma level. Despite the fact that the services of these teachers are required, TSC is not able to absorb all trained teachers due to budgetary constraints. Technical, Vocational Education and Training (TVET): Registered institutions increased to 813 institutions of which 493 were fully registered by 2012. There are two national polytechnics, 24 technical training institutes, 14 institutes of technology, 817 youth polytechnics, one technical teachers training college and 706 private TVET institutions. In 2008, both Kenya Polytechnic and Mombasa Polytechnic were upgraded to university colleges and ultimately to universities in January 2013. Enrolment increased from 85,200 in 2008 to 127,691 in 2012. The sector initiated construction of 13 new public institutions as well as establishment of centres of excellence in order to provide quality and relevant skilled human resources in the middle level cadre. Under the economic stimulus package, a total of KSh2.1 billion was utilized for the construction of new laboratories and workshops in 48 institutions. University and Higher Education: The number of private universities increased from 13 in 2003 to 26 in 2012, while the number of public universities and constituent colleges increased from six universities and one constituent college in 2003 to seven fully edged universities and 24 constituent colleges in 2012. Enrolment in public universities increased from 100,649 in 2008/09 to 195,528 students in 2012/13. In private universities, enrolment for 2008/09 was 22,198 growing to 45,023 in 2012/13. However, despite increase in enrolment, transition rate from secondary level to university is low and it was 6.5 % in 2010. On gender parity, female students constituted 43.8 % of the total enrolled in public universities and 43.1 % of the total enrolled in private universities in 2012/13. Private Sector Provision of Education: In 2008, 10.8 per cent of total primary education students were enrolled in private schools while 12.3 per cent of total enrolment were in private secondary schools. Growth of private secondary
72
schools has been restricted largely by high cost of establishing facilities such as science and computer laboratories, lack of access to adequate land, nancing and limited incentives for potential entrepreneurs. Laptop Programme: The laptop programme will be aligning integration of ICT into teaching and learning and the Jubilee Manifesto key programme of provision of laptops computers equipped with the relevant content for every school age child. There are over 20,307 public primary schools with a total enrolment of 9.97 million learners and 1,378,622 learners are expected to join standard one in 2014. The current state of e-readiness status in primary schools is poor, with a personal computer to pupil ratio of 1:1,000. Only about 200 schools have ICT equipment such as computers, televisions and radios. The physical infrastructure in most of the schools is undeveloped and/or dilapidated with classrooms which lack windows, doors and concrete oors. Data show that only about 2,037 schools (10%) are connected to the mains grid, 8,147 schools (40%) are near the main grid with the remaining 10,184 (50%) far from main grid and have to rely solely on solar or other alternative power sources. Since 2004, ICT curriculum has been in place in teacher training colleges and compulsory in the rst year. Over this period, 72,000 teachers have been trained and possesses ICT competencies though majority are still unemployed. Most of the serving teachers (180,000) in primary schools lack ICT literacy and need to be trained and re-oriented on new pedagogies of teaching and learning using ICT. Digital content for primary education in Kenya is still very limited. However, KICD has digitized content for classes 3 to 8 in science and mathematics. Class 1 and 2 content was done in July 2013. Seven subjects of primary teacher education have also been digitized and a mechanism has been developed to vet digital content developed by other publishers. About 200 primary schools have ICT infrastructure supported by government, parents and donor partners interventions. Among these are 23 primary schools which are utilizing laptops equipped under a pilot project funded by USAID in conjunction with the Ministry. The outcomes and lessons learnt from this project will inform the laptop programme. In recognition of the unique and signicant mandate of the Ministry regarding the integration of ICT in education, an institutional framework has been created to address ICT integration in education. Two specialized units have been created, namely; the ICT for Education (ICT4E) to spearhead the pedagogical use of ICT, while National ICT Innovation and Integration Centre (NI3C) is to carry out the testing of technical solutions submitted for consideration by rms in order to establish their appropriateness and use in curriculum delivery. Further, in order to ensure ICT is entrenched in the curriculum, the Ministry developed an ICT integration model which emphasizes four key pillars critical to effective implementation of ICT initiatives, which are teacher capacity development; relevant digital content; deployment of ICT infrastructure and robust policy and strategy. 5.1.2 Emerging Issues and Challenges
The Constitution has provisions for childrens right to free and compulsory basic education, quality services and access to educational institutions and facilities for all persons including those with disabilities, and from minorities and marginalized groups. This marks a distinct shift to a rights based agenda from the hitherto supply side policy and, as such, has fundamental importance to the way in which education services will be provided and the structure of E&T. The challenges include: Insufcient number of trained teachers; Inadequate and uncoordinated funding; Inadequate number of pre-primary and day care centres and care givers; Limited availability of teaching and learning materials; Limited community participation; Low morale of teaching staff due to poor remuneration;
73
Poor enforcement of guidelines and standards; Lack of qualication framework; Inadequate nutrition and health support services at primary and pre-primary; High drop-out and repetition rates; Weak governance and nancial management; Gender and regional disparities especially in ASALs and pockets of poverty in rural and urban areas; Imposition of levies and other fees by schools; Limited facilities in informal settlements; Cultural prejudice and negative attitude towards children with special needs and Orphans and Vulnerable Children (OVCs); Increased number of OVCs; Inadequate data on number of children with special needs; Inadequate tools and skills for assessing and identifying learners with special needs, inadequate funding, and inadequate facilities and teachers; Geographical disparities in quality, equity, affordability and access to education; Mismatch between skills acquired and demands of industry; Weak collaboration with professional accreditation bodies; Imbalance between number of students studying science and arts based courses; Inadequate funding and support for research and development; Inadequate integration of values, attitudes and patriotism in education curriculum; Inadequate ICT skills in teaching and learning; Poor planning of human resource; Poor governance and management; Land availability for construction and expansion of education facilities;
5.1.3 Programme and Projects for 2013 2017 The sector has identied seven priority areas namely: Actualizing the right to free and compulsory basic education Enhancing quality and relevance of E&T Integrating ICT into teaching and learning. Governance of E&T sector Enhancing post-basic education Financing E&T Enhancing education in ASALs Flagship Projects Mainstreaming of Early Childhood Development Education (ECDE): This will involve: review of ECDE policy framework; establishment of ECDE resource centres in each of the 47 counties including three feeder schools in each of the nine pastoral counties; provision of capitation grants at KSh 1,020 (with adjustment for children with special needs for education) per child enrolled in public ECDE centres; and recruitment of 48,000 trained ECDE teachers (24,000 in rst year and 6,000 in each of the four subsequent years). The government will also develop a framework for identifying childrens inherent abilities and talents and aligning them to early childhood education and future professional training. Curriculum Review and Reform: This will involve comprehensive curriculum review, reform and digitalization at all levels in response to the Constitution, national values (mentoring and moulding), talents nurturing and any other emerging issues in education. This will also involve establishment of competency assessment facilities in at least 10 centres every year over the plan period.
74
Integrating Information, Communication and Technology into Teaching and Learning: This will entail review of policy and institutional framework for ICT integration in E&T, procurement of ICT infrastructure for schools, carrying out capacity development for ICT Integration in E&T and facilitating integration of ICT in special needs education. The implementation of this programme will take into account the special needs of all those involved particularly learners and teachers. Laptop Programme: The government will roll-out a laptop programme estimated to cost KSh 53 billion spread over the rst three years in primary schools. The programme will include infrastructure (energy, security and connectivity), devices, content and building of teachers capacity. Establishment of Education Management Information System (EMIS) Centres: In order to enhance transparency and accountability in the education system, EMIS centres will be established in all the counties. This will strengthen and harmonize EMIS and Education Financial Management Information System (EFMIS). Training of Artisans: This will entail training a high number of artisans in-order to meet the high demand especially in the construction industry. Youth polytechnics and vocation training colleges will be expanded to provide students with adequate opportunities for pursuing modular based courses. Basic Education Infrastructure: This will entail construction/rehabilitation of 46,000 classrooms and 92,000 toilets at ECDE level, rehabilitation of 3,000 classrooms in 1,500 primary schools, construction of 60 new classrooms in special needs schools, 10 new classrooms in existing rescue centers. At ACE, 4,400 classes will be constructed and equipped, 300 learning and resource centres and a Multipurpose Development Training Institute (MDTI) will be constructed, ve MDTIs will be repaired and rehabilitated and 300 Alternative Basic Education (ABE)/Non Formal Education (NFE) secondary centres will be constructed. At secondary school level, extra classes will be constructed to ensure that each school has at least three streams as well as 600 new secondary schools, rehabilitation of 470 secondary schools, 20 special secondary schools will be constructed and 312 stalled education support programme projects will be completed. Kagumo diploma TTC will be rehabilitated while construction of Kibabii diploma TTC will be completed. In addition, ve new diploma TTCs will be constructed, 18 TTCs will be rehabilitated, while a pedagogy/internship centre will be established. The government will ensure that all schools infrastructure have requisite energy networks/sources installed and accessible to all physically challenged persons through utilizing universal designs. Technical, Vocational Education and Training (TVET) Infrastructure and Equipment: This will entail establishment of technical training institutions in nine counties without public TVET institutions and will be done in conjunction with a rebranding and raising awareness programme for TVET to ensure increased enrollment. The TVET institutions will also be provided with engineering and science equipment, and laboratories. This programme will be based on strong public private and community partnerships. Human Resource in Support of University Education: This programme aims at strengthening human capital development for science, technology and engineering courses by training faculty at PhD and masters level. This will go hand in hand with provision of engineering and science equipment to the institutions as an initiative of addressing quality of education. Education in Arid and Semi Arid Lands: To enhance participation in ASALs, the following strategies will be put in place: Establish and operationalise the National Council on Nomadic Education in Kenya (NACONEK) in order to promote access, retention and quality education for nomadic communities; Recruit more teachers for schools in arid and pastoral counties so as to reach the desirable ratio at primary level of 1:25, and at secondary level of 1:40; Establish one computer laboratory in each ASALs primary school; Construct/rehabilitate 140 low-cost boarding schools in arid and pastoral counties. The programme will supplement the national infrastructure programme under NESSP;
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017 75
Construct 15 feeder schools in each of 14 arid and pastoral counties; Equip 600 low-cost boarding schools in 14 arid and pastoral counties; Designate and upgrade three TTCs as centres for Nomadic Education in order to provide teachers in nomadic communities with tailor-made professional support; Improve 100 existing mobile schools with logistics and teaching equipment; Develop curriculum support materials tailored to the needs of nomadic communities; Construct and equip one middle-level college in six ASALs counties so as to increase skilled manpower for the region; Increase the bursary allocation for learners in middle-level technical colleges in ASALs; Increase bursary scholarship for girls education in arid and pastoral counties, channeled through the Northern Kenya Education Trust; Develop a costed implementation strategy for the adult literacy policy framework to guide its implementation in 14 arid and pastoral counties; and Establish 500 Adult and Continuing Education (ACE) centres in ASALs counties.
Other Programmes and Projects: School Health and Nutrition: School health and nutrition will be provided to socio-economically disadvantaged and nutritionally vulnerable children, especially girls in pre-primary and primary schools in targeted ASALs districts and informal settlements in Nairobi and other large urban areas in-order to ensure that children are well fed, healthy and are able to learn. Specically, the project will entail provision of school based health and enhancement of the provision of sanitary towel programme, hygiene education and providing midday meals to disadvantaged children. In addition, school milk programme will be re-introduced to boost the health of the pupils as well as the Home Grown School Meals Programmes (HGSMP). School Feeding: The programme targets vulnerable children from food insecure communities in ASALs. This will support the Governments efforts in achieving universal primary education (MDG 2). In order to ensure sustainability of the School Feeding Programme, support will be provided to the current HGSMP, which provides mid-day school based meals to children in ASALs and gradually roll-out this programme in arid areas. Afrmative Action: Afrmative action will be undertaken to correct cultural and historical gender imbalance, physical segregation and regional disparities in-order to promote equity in access to education. The sector will undertake a national survey on special needs and disabilities, identify and nurture talents, revive the most vulnerable children support grant programme, provide laboratory equipment grants and award bursary and scholarships. Enhancing Quality and Relevance of Education: To enhance quality and relevance of E&T, skills and competencies mapping will be carried out and a national human resource development plan will be developed. Other projects will include teacher education, recruitment and management, modernization of teacher training, recruitment of more teachers, establishment of education standards and quality assessment council to oversee quality assurance and standards functions and automation of teacher management. Education Sector Governance: This will involve reviewing and developing policies necessary to ensure that national government and county governments cooperate in management of education sector in harmony. In this regard, the sector will establish E&T governing bodies, develop and review education policies, establish county education data centres, undertake capacity building for E&T sector leadership and management and establish a ministerial monitoring and evaluation system. Technical, Vocational Education and Training (TVET): This will involve: establishing a central admission service for TVET government sponsored students; establishing vocational training centre at constituency level and at least one technical college at county level; establishing a TVET authority; streamlining management and assessment of industrial
76
attachment process; institutionalization of quality assurance and accreditation system and monitoring, evaluation, reporting and inspection in TVET; and establishing labour market information system and other survey instruments for data on actual employability of TVET graduates in partnership with industry. University Education: This will focus on delivering University E&T system that is internationally competitive as envisaged in Kenya Vision 2030. It will involve expanding access and equity, improving quality and relevance and investing in human resource by enhancing institutionalization of excellence and increasing the level of research funding. Formalization of linkages of private sector with academia and the government through curriculum development will be enhanced. Education and Training Financing: The sector will develop an E&T nancing model that will allow and guide the participation of national government, county governments, development partners, Non State Actors (NSA), private sector and households. This will entail reviewing, operationalizing and enforcement of fee guidelines to protect parents, developing allocation criteria for sharing resources among E&T programmes in devolved governance system and developing a public private partnership policy on nancing E&T. 5.1.4 Policy, Legal and Institutional Reforms
Finalization of Sessional Paper No 14 in 2012 on A Policy Framework for E&T on Reforming E&T in Kenya. Implementation of the Basic Education Act, TVET Act, University Act, STI Act, KICD Act, KNEC Act, TSC Act and KQF Act.
5.2
Health
Equitable, Affordable and Quality Health Care of the Highest Standard
The Constitution through the Bill of Rights puts a heavy responsibility on the health sector to ensure realization of right to health. The goal for the health sector is to provide equitable, affordable and quality health care to all citizens. 5.2.1 Situation Analysis
About 52 per cent of Kenyas population have access to basic health services within 5 km. Access to basic Primary Health Care (PHC) and referral services however, still remains a signicant challenge. Signicant disparities in service availability exist between rural and urban areas and in hard to reach areas. Mortality rates remains high. The main causes of deaths include: HIV/AIDS (29.3%), perinatal conditions (9.0%), lower respiratory infections (8.1%), Tuberculosis (TB) (6.3%), diarrhoea (6.0%) and malaria at (5.8%) among others. The other causes of death include cerebrovascular diseases, ischaemic heart disease, road trafc accidents and violence. Maternal deaths remains a major challenge. The target of reducing Maternal Mortality Rate (MMR) from 410 to 147 per 100,000 live births was not met and instead increased to 488. One half of mothers are anaemic with an uptake of recommended iron supplements during pregnancy below 3 per cent. Use of skilled attendance at delivery stands at 46 per cent. Although some gains have been achieved in use of modern contraceptives, the rate of contraceptive use remain relatively low at 46 per cent. Consequently Kenyas population growth and fertility rates remain high at 2.7 per cent and 4.7 respectively. Malaria remains a health and socio-economic burden and accounts for 30 per cent of outpatient consultations, 19 per cent of hospital admissions and 35 per cent of inpatient deaths. In order to reduce the upsurge of malaria, the government has been issuing Insecticides Treated Nets (ITNs) to children and pregnant women and undertaking indoor residual spraying. This led to a signicant reduction in infant mortality from 73.7 per cent in 2000 to 52 per cent in 2011, and under ve mortality rate from 111.5 per cent to 74 within the same period.
77
Child malnutrition remains rampant with stunting levels standing at 30 per cent of children under the age of ve due to long-term under-nutrition. About 40,000 children die annually due to being underweight, vitamin A deciency and wasting especially with populations in the chronically food-insecure arid and semi-arid districts being most affected. In 2012, there was 105, 369 registered medical personnel with a ratio of 259 per 100,000 persons. However, distribution of human resource for health remains skewed. The ASALs remain the most disadvantaged in the provision of health services especially, the distribution of health facilities and availability of health personnel. Throughout the country, some categories of health workers are more concentrated in urban and private sector services. One hospital was constructed, 48 health facilities were upgraded to hospital status, 92 hospitals were rehabilitated and 201 model health centres under Economic Stimulus Programme were constructed. In addition, 5 referral hospital were equipped with renal equipments and one cancer equipment was installed at Kenyatta National Hospital. The country spends approximately 5.4 per cent of GDP on health accounting for 4.6 per cent of government expenditures. This however remains below the Abuja target of 15 per cent. The private sector remains an important stakeholder for health and the government is increasingly promoting Public Private Partnership (PPP). Private sector nancing accounts for 37 per cent of total health spending. 80 per cent of the population remains largely uninsured. The total membership for National Health Insurance Fund (NHIF) is currently 3.33 million with the formal sector having 2.45 million and the informal sector 0.88 million. 5.2.2 Emerging Issues and Challenges
Even though the sector recorded improved performance in various aspects, there still remain important issues that will need to be addressed and foreseeable challenges that are contemplated to be considered in programming in the Second MTP and key among these include: Inadequate requisite infrastructure for comprehensive basic health care (model health facilities) and level 4 health facilities; Shortage of essential medicines and medical supplies; Low doctor to population and nurse to population; Inadequate emergency transportation; Emergence of drug resistant TB strains; Prevalence of HIV/AIDS, TB and Malaria; Increased morbidity and mortality associated with HIV/AIDS; Rise of cancer; hypertension, heart diseases and diabetes; Rise in road trafc accidents causing injuries and death; Micronutrient deciency disorders for children and under-ves; Lack or inadequacy of a rapid referral system; Insufcient facilities to handle immediate maternal cases; Inadequate rapid and effective maternity services; Understaffed public health facilities; Inequitable distribution of the available human resource coupled with shortages of skill mix; High cost of health care and nancing; Low coverage of health insurance; and Provision of health services under devolved system 5.2.3 Programmes and Projects for 2013-2017
The programmes proposed and dened in their respective investment areas under Second MTP period will accelerate the progress towards attaining key health sector targets.
78
Table 5.1 Selected targets for Health Sector Indicator Maternal Mortality Rate (MMR) Under ve Mortality Rate Infant Mortality Rate (IMR) HIV/AIDS prevalence (%) Under one immunization coverage Malaria in-patient case fatality
Source: National Health Policy Framework 2012 2030, 2012
Flagship Projects Country-wide Scale up of Community Health High Impact Interventions: The priority focus areas will be achieved through the following strategies: Provision of level 1 MNCH high impact interventions services for all cohorts and socioeconomic groups, including the differently-abled taking into account their needs and priorities; Building MNCH high impact interventions capacity of the Community Health Extension Workers (CHEWs) and community based resource persons to provide services at level 1; Strengthening MNCH high impact interventions health facilitycommunity linkages through effective decentralization and partnership for the implementation of level one MNCH high impact interventions services; Strengthening the community to progressively realize their rights for accessible and quality care and to seek accountability from facility based health services; and Accelerating initiatives targeting nutrition services, family planning, immunization, sanitation and safe motherhood. Improve Access to Referral Systems: This will be achieved through the following strategies: Increasing the utilization of services at lower levels of the health services and reduce self-referral to the higher levels of care; Developing the service providers capacity to offer services and appropriately refer at each level of the healthcare system; Improving the systems ability to transfer clients and specimens between the different levels of the health care system; Improving supportive supervision thereby ensuring up to-date management practices in use across the country; Improving reverse referral and feedback information system; Improving preparedness and response to emergencies and disasters; Strengthen outreach systems for provision of health services to marginalized and vulnerable population; Provision of quality emergency health services at the point of need regardless of ability to pay; and Establishing fully edged low cost diagnostic centres and provide adequate screening and treatment facilities for persons with chronic or terminal conditions, including cancer, diabetes and kidney failure in every county. Construct Model Level 4 Hospitals: The following strategies will be used: Review the health facility infrastructure norms to address emerging considerations such as distance from facility (enforcement of norms and standards); Assessment of the status to identity candidate level 4 hospitals. Results from the Service Availability and Readiness Assessment Mapping survey will inform this process; and Constructing, upgrading and equipping 100 identied facilities to conform to the norms and standards for level 4
79
hospitals; Health Care Subsidies for Social Health Protection: This will be achieved through the following strategies: Consolidating, expanding (new and existing) and coordinating social health subsidy mechanism for the poor with a view of achieving universal coverage; Provision of free maternity services in all public health facilities; Expanding coverage of health benets to all the indigents; Establishing a national social health insurance mechanism that caters for employees, employers and the informal sector with a view to gain universal coverage; Reforming National Hospital Insurance Fund (NHIF) to effectively act as a vehicle to implement the National Health Insurance Scheme; Designing a harmonized and progressive resource mobilization strategies targeting all sources of funds, both domestic and international; Strengthening programming of external funding of health through improved harmonization and alignment to sector priorities and improved reporting; Ensuring efcient allocation and utilization of resources; and Progressively eliminating payment at the point of use of health services, especially by the marginalized. Re-engineering Human Resource for Health: To realize achievements in this project, the following strategies will be pursued: Training and career paths development for human resources; Review and application of evidence based health work force norms and standards; Improving management of the existing health work force by putting in place attraction, retention and motivational mechanism; Putting in place systems to measure performance and competence of health work force; and Facilitation of national capacity development. Health Products and Technologies: Policies, guidelines and legal frameworks to guide the process of procurement and quality of drugs at both tiers of the governments will be institutionalized to ensure availability and rational drugs use. During the plan period, the sector will employ different strategies to ensure quality drugs and commodities for service delivery and include: Dening and applying an evidenced based essential package of health products and technologies; Establishing rational appraisal mechanism for health product and technologies; Promoting local production, research and innovation of essential health products and technologies; and Ensure availability of affordable, good quality health products and technologies. Establish E-Health Hubs in 58 Health Facilities: The following strategies will be put in place: Establish and equipping 50 e-health hubs in selected areas by 2017; Establish 8 national e-health hubs by 2014; Establish a web portal (including inventory of personnel/specialists and master rota) and develop software module by 2017; and Capacity building for health workers in client exchange parameters for e-referral. Mainstreaming Research and Development in Health: The sector will achieve this through developing a research communication strategy, and establishing and maintaining a policymakertargeted website that provides one-stopshop for optimally packaged high quality and high relevance reviews. Health Tourism: The specic strategies to achieve this will be:
80
Positioning the country as a destination for specialized health and medical services; Training and retaining specialized expertise; Giving Kenyans access to specialized medical services within the country; and Creation of employment in specialized health care.
Locally Derived Natural Health Products: This will be achieved through rening existing regulatory guidelines to allow registration of natural health products of acceptable varying standards of processing. Modernize Kenyatta National Hospital: This will entail implementation of the ICT master plan, and constructing and equipping a fully edged 300 bed private wing, 2,000 accommodation units and conference facilities for health tourism. Modernize Moi Teaching and Referral Hospital: This will entail developing Cancer Management Centre, constructing a children hospital and modernization of infrastructure and hospital equipment. 5.2.4 Policy, Legal and Institutional Reforms
Establish a health policy and legislation, standard setting and Standard Operating Procedures (SOPs); Develop policies to guide and encourage local manufacturers to produce drugs and commodities locally; Develop policies and guidelines to embrace research on alternative medicines (natural products) underpinned in the legal and institutional framework; Develop a national policy on development of physical facilities; Legislate the process of accrediting and licensing health facilities; Finalize health care nancing strategy; Institutionalize regulatory framework for the control of health products, health product research and technologies; and Developing an explicit research policy and legal framework to guide research activities by various institutions.
81
5.3
The overall goal of Environment, Water and Sanitation sector is to attain a clean, secure and sustainable environment by 2030. This sector forms critical linkages with the main productive sectors namely agriculture, tourism, manufacturing and energy. These sectors are heavily dependent on use of natural resources that are derived from the environment. Environmental issues are also closely linked to other sectors of the economy such as development planning, population dynamics, nance, public health and sanitation, and trade. The Economic Survey of 2013 reported that about 42% of the countrys Gross Domestic Product (GDP) is derived from natural resource-based sectors. Environmental conservation and management of natural capital is pivotal to the socio-economic development of the economy hence this calls for sound management and governance structures in the sector. This consideration is even more critical in light of commitments at the RIO+20 Summit held in Rio de Janeiro in 2012. 5.3.1 Situation Analysis
As Kenya implements the constitutional requirement of devolution to county governments, it is important that the country ensures that sustainable exploitation, utilisation and management of its natural resources is strengthened and that the benets are shared equitably. Below is a summary of the current status of key natural resources and the issues related to their utilisation and management. Water: The Kenya Population Census, 2009 indicated that 27.9% of the population obtained piped water from water service providers while 37.2% obtained their water from either improved or un-improved springs, wells or boreholes. Over 29% received their water supply from other unsafe sources like streams, lakes, ponds and 5.9% received water from water vendors. The sector is faced with high levels of non-revenue water (45%)- water that is produced but is not accounted for. Irrigation: The National Water Master Plan, 2013 estimates the irrigation potential at 890,000 hectares of which the existing schemes currently cover 153,800 hectares (17%). Investment in the irrigation sub sector has increased eight fold over the last three years because of the economic stimulus package and the expanded irrigation programme. This has facilitated rehabilitation and expansion of irrigation schemes throughout the country. Land Degradation: Land and environmental degradation is one of the most serious challenges affecting the country causing an estimated annual economic loss of USD 390 million or 3 percent of the countrys GDP. In addition, land degradation leads to socio-economic problems such as food insecurity, insufcient water, regular loss of livestock, limited agricultural development and out-migration, especially from rural areas. Sanitation: The development of water supplies and water distribution networks has not been matched by a corresponding increase in facilities for sanitary disposal of wastewater. The policy framework for implementing sanitation and hygiene activities in rural and urban areas is provided in the National Environmental Sanitation and Hygiene Policy. The policy places emphasis on sanitation components in both rural and urban water supply for all projects. Biodiversity and Ecosystem Services: Kenya is endowed with an enormous diversity of ecosystems and wild species of ora and fauna that constitute biodiversity assets as well as the home to ve hot spots of globally important biodiversity and 62 Important Bird Areas (IBAs). These unique and biodiversity-rich regions include Mau Forest Ecosystem; Cheranganyi Hills; Indian Ocean Islands of Lamu and Kisite; coastal forests of Arabuko-Sokoke and lower Tana River; Afro-montane forests of Mt. Kenya; Aberdare range and Mt. Elgon forests; Kakamegas Guineo-Congolian equatorial forest and the northern dry lands that form part of the distinct Horn of Africa biodiversity region. In addition, the country has documented threatened ecosystems of national and global importance that are of major concern on ve of the hot spots due to their critical contribution to community livelihoods and the national economy. These are Nairobi National Park, Maasai Mara National Reserve, Lakes Naivasha, Nakuru National Park and Tsavo National Park.
82 VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
Forests: Forests have important environmental benets including water catchment conservation and also act as carbon sinks. This mitigates against and provide adaptation to climate change. The area under forest and tree cover was estimated at 4.4 per cent in 2012. Gazetted forests cover 1.24 million hectares out of which 141,000 hectares are industrial exotic plantations which supply wood materials to the forest based industries. In addition, the country has 9.3 million hectares under farm forestry and 37.6 million hectares covered by woodlands and bush lands in ASALs. Further, there are 60,000 hectares of mangrove forest which is important for sheries and shoreline stabilisation among others. Wildlife: Kenyas known wildlife assets include 315 mammals, 1,133 birds, 191 reptiles, 88 amphibians, 180 freshwater sh, 692 marine and brackish sh, 25,000 invertebrates (21,575 of which are insects), 7,000 plants, and about 2,000 species of fungi and bacteria. Kenya is ranked third in Africa in terms of mammalian species richness with 14 of these species being endemic while 51 mammals have been classied as threatened. The country is famous for its diverse assemblage of large mammals like the African elephant, black rhino, African lion, cheetah, leopard and buffalo. The existing protected area (PA) system takes care of the most famous of wildlife herds, but fall short of conserving the wealth of Kenyas ora and fauna. Over the last 40 years, the country has lost almost a half of the wildlife population especially outside Protected Areas (PAs) and experienced increased incidences of Human Wildlife Conicts (HWC). This wildlife population decline and HWC are mainly attributed to encroachment by human settlements and expanding agricultural and livestock development activities that have resulted in the loss, fragmentation and degradation of wildlife habitats. In addition, other causes of wildlife population decline include natural attrition, climate change, bio-piracy and over exploitation. Nonetheless, wildlife based tourism contributes about 70% of the gross tourism earnings, 25% of GDP and 10% of total formal employment, underpinning its importance to the economy. 5.3.2 Emerging Issues and Challenges
These include: Climate-related extreme weather events such as droughts, oods and landslides; Increased waste generation and unsustainable disposal particularly in urban areas; Degradation of water catchments due to human settlement, agricultural activities and encroachments; Unsustainable land management practices that threatens the quality of the environment goods and services; Increased human wildlife conicts affecting conservation and community livelihoods; Poaching and trade in wildlife trophies; Increased competition and conicts of natural resources; Inappropriate disposal of e-waste; Over reliance on non-renewable source of energy; and Low levels of Research and Development and funding. 5.3.3 Programmes and Projects for 2013 -2017
Flagship Programmes and Projects Strengthening Environmental Governance: This will entail harmonisation of sectoral policies, legislation, regulations and strengthening of institutions. Waste Management and Pollution Control: This will involve research, legislation, viable technologies and enforcement of statutory mechanisms for the disposal of human and industrial waste, elimination of harmful emissions including those from factories and motor vehicles. Rehabilitation of Urban Rivers: This will involve full rehabilitation of the Nairobi River and other major urban rivers
83
catchment basins in order to make them recreation sites. Modernisation of Meteorological Services: This will be undertaken in ve thematic areas: observation network, data exchange network, data processing- analysis and forecasting systems, weather products dissemination and research for development. In addition, the implementation of the Global Framework for Climate Services (GFCS) will be undertaken. Advertent Weather Modication Programme: This will entail the establishment and equipping of a weather modication operation and research centre and the establishment and equipping of a weather modication cloud physics laboratory. Rehabilitation and Protection of the Water Towers: This programme will entail rehabilitation and protection of Kenyas ve water towers namely; the Aberdares, Cherangany, Mau, Mt. Kenya and Mt. Elgon. In addition, other smaller signicant water towers and catchment areas in the country such as; the hills in Machakos and Kitui, the Chyulu, Igembe, Manga, Maragoli, Ngong, Shimba and Taita Hills, and Mt. Kulal, Marsabit, Ndoto, Nyiru and Shella Dunes of Lamu, and oases in the arid areas such as Loiyangalani in Marsabit will be rehabilitated. Forest Conservation and Management: Ecosystem and participatory forest management plans will be prepared to support sustainable forest management. Bamboo, commercial forestry and other nature based enterprises will be promoted for poverty alleviation and environmental sustainability. This programme will be implemented both on farmlands and dry-lands in collaboration with Community Forest Associations. Farm and dry-land provide the best opportunity for increasing the tree cover to 10 per cent. Famers will be encouraged to integrate planting of appropriate tree species on their land to increase the availability of tree products on farm and also attain the requisite forest cover. Forestry Research and Development: Conduct research to develop intervention measures for causes of forest degradation, provide forestry related base line data, establish a monitoring system on forests and aspects of climate change. In addition, identication and improvement of tree species for various uses and services, development and demonstration of forestry technologies and new products; generation and dissemination of knowledge and technologies will be undertaken. Wildlife Conservation and Management: This will involve identication, mapping and documenting hotspots and boost their connectivity to enhance ecological integrity of habitats for wildlife. In addition, wildlife research stations will be refurbished and equipped; ecological monitoring programs will be enhanced in all PAs and a national wildlife research, information and database will be developed at Kenya Wildlife Service (KWS) headquarters. Wildlife security and management will be enhanced. To promote eco-tourism among communities living with wildlife, a program of mapping and securing community areas with ecotourism potential shall be initiated. Promotion and Piloting of Green Energy: The sector will develop projects and pilot eco-community and renewable energy concepts in at least eight counties. This will include promoting and sensitizing communities on the use of biogas, solar and wind energy sources. Carbon Credit Trading: Kenya will be positioned as the African Continents carbon credit trading hub by establishing carbon trading schemes and establishment of a regional framework for carbon trading across the East African Community and the wider African region and beyond. Rehabilitation of Storm Water Drainage Systems in Selected Towns: Undertake rehabilitation of storm water drainage systems in selected towns. Digitisation of urban plans: This will involve supporting urban centres to undertake digital mapping and prepare strategic urban development plans to guide the general development of 45 towns.
84
Water Resources Management Programme: The programme will entail the review of six catchment management strategies; preparation of 200 sub-catchment development plans; construction of 50 sand dams and/sub-surface dams along seasonal rivers especially in ASALs; up-grading of 100 gauging stations to telemetric stations complete with data-loggers; rehabilitation or establishment of 100 water quality monitoring stations; and development of a national water allocation plan. The water policy will be made more accountable and the current eight regional water service boards will be combined into a single national water services authority with devolved units at county level. Trans-Boundary Waters: The shared water resources of the country will be mapped and their parameters established. International treaties on trans-boundary waters will be reviewed to address the water supply management and the negotiations for the joint management and development of all shared water resources within the riparian states will be nalized. Water Harvesting and Storage Programme: This will involve construction of two large multipurpose dams in Nzoia and Nyando; construction of 21 medium sized dams for multi purpose uses; development of national rainwater harvesting strategy and water storage investment plans for all the villages and urban centres; and revision of building by-laws to require all new development to have water harvesting. Marine Resources and Fisheries: Kenyas marine resources are substantial and constitute a huge base for employment and incomes generation and improved livelihoods, especially for residents of coastal regions. In collaboration with the relevant stakeholders such as Kenya Marine and Fisheries Research Institute (KEMFRI) and KWS among others, efforts will be made to harness this potential through creation of more marine reserves and protection of Kenyas sh stocks by enforcing shing regulations and more effective policing of our marine parks and resources. Urban Water Supply Sub Programme: This will involve clustering of water supply in the counties to improve on the sustainability of the county water supplies; undertake a study on introduction of at rate water charges on area basis; improve water supplies in the major urban towns of Nairobi, Mombasa Kisumu, Nakuru and their surrounding satellite towns; and strengthen WASREB to regulate water price. In addition, there will be expansion of water supply and sanitation in the proposed resort cities of Isiolo and Lodwar; expansion of water supply for the new port at Lamu under Lamu Port, Southern Sudan and Ethiopia Transport (LAPSSET) corridor; and expansion of water supply and sanitation in 15 medium sized towns (Chuka, Maua, Chogoria, Homabay, Runyenjes, Muranga, Naivasha, Narok, Ol kalao, Maralal, Moyale, Machakos, Wote, Kitui, Mavoko, Matuu, Wajir, Lamu, Hola, Mois Bridge, Matunda, Malava, Nyahururu, Kajiado, Kirinyaga, Marsabit and Nanyuki). Rural Water Supply Sub Programme: During the plan period, the sector will construct and rehabilitate 150 rural water schemes annually, drill an average of 70 boreholes annually in areas lacking adequate surface water and construct 160 small dams/pans in ASALs. Operationalisation of Water Research and Resource Center (WARREC) Programme: The WARREC programme in collaboration with other stakeholders will hold an annual national and international scientic conference to capture new and emerging issues, trends and technologies in the broader water sector. Provision of Water to Poor Un-Served Areas Including Informal Settlements: The programme will entail strengthening the Water Services Trust Fund (WSTF) in order to ensure that the less fortunate and vulnerable members of society who mostly live in the rural areas and the informal settlements are catered for. The interventions will include building of water kiosks and yard taps, development of water supply pipeline systems and sewers, and a comprehensive mapping of all water supplies systems in the informal settlements. It will also explore opportunities of providing subsidized water
85
through WSPs to meet the basic water services supply in the informal settlements. Irrigation and Drainage Infrastructure: The programme will put under irrigation 404,800 hectares and undertake research based on cost benet analysis and introduce water recycling for irrigation purposes. Land Reclamation: Undertake rehabilitation and reclamation of 50,000 hectares in the counties prone to landslides, oods, heavy soil loss that lead to gullies formation and loss of landscape. 5.3.4 Policy, Legal and Institutional Reforms
This includes: Finalisation of National Environment Policy, Geology, Mineral and Mining Policy and Bill, Education for Sustainable Development Policy, National Chemicals Management Policy, Natural Products Industry Policy, and Master Plan for the conservation of water towers and the National Climate Change Response Strategy; Revision of Environmental Management and Coordination Act 1999; Multilateral Environmental Agreements such as climate change will be domesticated and a Climate Change Policy formulated and a Bill prepared to guide the countrys mitigation and adaptation; Finalisation of the Meteorological Services Policy and Bill ; Formulate an Explosives Policy and Bill to repeal the Explosives Act; Finalisation of Geo-information Policy; Finalisation of the Water Policy and Bill; Development of a National Water Harvesting Policy; Finalisation of the Irrigation Policy and Bill; Development of irrigation standards and regulations; Finalisation of the Land Reclamation Policy and Bill; Finalisation of Trans-Boundary Water Policy and Implementation Plan; Development of a Groundwater Management Policy for managing the resources with a groundwater governance strategy; Review of Forest Act 2005, Forest Policy, Timber Act and nalisation of the National Forest Programme; Review of the Wildlife Policy and Bill; Validation of Natural Products Industry Policy 2012 and accompanying Bill; Finalisation of National Urban Development Policy and development of a framework to guide solid waste management and storm water drainage systems in urban areas; Development of Geographic Information System strategy to enhance land information management systems; Implementation of the National Climate Change Action Plan; and Development of a National Green Economy Strategy.
5.4
High population growth, rapid urbanisation, high cost of housing and their subsequent implications on socio-economic development are challenges the Government is committed to addressing. The Second MTP puts emphasis on formulation of a sound policy framework for rational planning, a suitable legal framework and development and management using the requisite technology to promote sustainable urbanisation in the realisation of the Kenya Vision 2030. 5.4.1 Situational Analysis
According to the 2009 Population and Housing Census, the countrys population was 38.6 million and was estimated at 41.4 million in 2012. The census indicated that the population was increasing by one million people per year and is projected to be 46.7 million by 2017. The population aged 15 to 24 years increased from 4 million in 1989 to 6 million
86 VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
in 1999 and was 7.9 million in 2009. It is currently estimated at 8.6 million and is projected to be 9.9 million by 2017. The rapid population growth is expected to adversely affect allocation and utilisation of resources and availability of social amenities. Population density increased from 66.4 persons per square km in 2009 and is currently estimated at 71.2. It is projected to reach 80.3 by 2017. About 18 per cent of Kenyas land is arable while the remaining 82 per cent is ASAL. This will continue to put pressure on natural resources and cause environmental degradation, and constrain the countrys ability to produce food and guarantee quality health care and development. Majority of the Kenyan population reside in the rural areas although recent data indicates that there has been an increase in the rate of urbanisation mainly caused by increasing rural-urban migration and the rate of natural population increase in urban areas. Urban population increased from 5.4 million in 1999 to 12.2 million in 2009. It was estimated to have increased to 14.24 million in 2012 and projected to increase to 17.64 million in 2017. According to the 2009 Population and Housing Census, the dwelling units enumerated in rural areas were more than four times the units in urban areas while the physical state of housing stock was better in urban than in rural areas. The results further indicate that while only 24 per cent of dwelling units in urban areas had earth oor, 77 per cent in rural areas had the same condition. Further, over 80 per cent of households in rural areas own their dwellings while less than 30 per cent of urban households do so. 5.4.2 Emerging Issues and Challenges
This includes: Youthful nature of the population as a consequence of past high fertility rates; Teenage pregnancies; High rural-urban migration; High maternal mortality rate; Increasing housing shortages; Inadequate affordable and decent housing; Slow absorption of modern housing technologies; Inadequate nancing; High unemployment; High poverty levels; High crime rates; Emergence and proliferation of informal settlements; High HIV and AIDS prevalence. Programmes and Projects for 2013 2017
5.4.3
Flagship Programmes and Projects Implementation of the Population Policy for National Development. Preparation and implementation of strategic development and investment plans in six metropolitan regions (Nairobi, Mombasa, Kisumu-Kakamega; Nakuru-Eldoret, Wajir-Garissa-Mandera, Kitui-Mwingi-Meru) and their respective Spatial Plans. Similar plans will be developed for special border towns and all other municipalities. The agship projects will include preparation of strategic integrated physical development plans for ve urban centres along the Lamu Port, Southern Sudan and Ethiopia Transport (LAPSSET) Corridor and operationalisation of outstanding metropolitan regions of Mombasa, Kisumu-Kakamega, Kitui-Mwingi-Meru, Wajir-Garissa-Mandera and NakuruEldoret. Formulation and implementation of planning standards and guidelines. Review and formulation of National Urban Development Policy.
VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017 87
Implementation of Cities and Urban Areas Act of 2011. Facilitation of production of 200,000 housing units annually through various initiatives. Development of affordable, quality and affordable houses for lower income Kenyans. Development of appropriate building materials and technologies. Installation of physical and social infrastructure in slums and informal settlements in selected urban areas. Implementation of Kenya Informal Settlement Improvement Programme.
Other Programmes and Projects: Population Advocacy on population issues. Establishment of a secondary mortgage nance corporation. Public awareness and behaviour change communication on population issues. Improving institutional capacity for management of population programmes. Population Policy Analysis and Research. Partnerships on Population and Development. Urbanisation Preparation of Integrated Development Plans for designated urban areas as dened in the Urban Areas and Cities Act 2011. Finalisation and implementation of National Urban Development Policy, Metropolitan Policy, Markets Development Policy, Physical Development Plans for Resort Cities of Lamu, Turkana, Isiolo, Kili and Diani Ukunda. Implementation of 24 hour economy initiative. Development and implementation of the following programmes; a metropolitan branding and promotion, metropolitan safety and emergency, metropolitan social Infrastructure and quality of life, metropolitan planning and environment management. Technical assistance and support to County Governments in planning, urbanisation and infrastructure development. Completion, review and harmonisation of legal and institutional framework governing urbanisation. Housing Establishment of national housing data base and a monitoring and evaluation framework. Development and implementation of housing nance initiatives. 5.4.4 Policy, Legal and Institutional Reforms
Reforms on Population, Urbanisation and Housing will include: The development of supportive legislation and Implementation of the National Housing Policy formulated in 2004; Enactment of Built Environment Bill 2012 and Landlord and Tenant Bill; Review and harmonisation of legal and institutional framework governing urbanisation; The enactment of the Housing Bill of 2012 and formulation of the following policies; Housing, Maintenance, National Slum Prevention and Upgrading, Housing Infrastructure framework and Leasing and Accommodation; Implementation of the Sessional Paper No. 3 of 2012 on Population Policy for National Development; Formulation and implementation of Urban Development Policy; and Reviewing existing land tenure and administrative policy issues.
5.5
88
Youth and Vulnerable Groups. The sector continues to play a critical role in creation of an enabling environment for socio-economic service delivery and human resource utilization with a view to achieving desirable national economic growth and development. The sector has also recognized the need to emphasize on sustainable programmes for women, youth, vulnerable groups, and persons living with disability 5.5.1 Situation Analysis
Gender Kenya has ensured its compliance with international and regional obligations on gender equality and women empowerment. Key among the obligation and commitments include, the Millennium Development Goals, United Nation Convention on Elimination of All forms of Discrimination against Women and the Protocol to the African Charter to the Human and Peoples Rights on the Rights of Women in Africa. The country has over the years implemented various gender equality and womens empowerment intervention programmes and policies to achieve gender parity. In 2010, Kenya adopted a progressive Constitution that promotes gender equality and women empowerment. Womens participation in leadership, governance and decision-making has increased from 20.5 percent in 2008 to 38.6 percent in 2012 due to the afrmative action measures. Notably the inclusion of gender mainstreaming in the performance contracting process has strengthened accountability on gender equality in public service. Women are progressively realizing their potential in all sectors especially in agriculture, education and sexual reproductive health rights. Kenya has also made strides to ensure access to alternative nancial services for women through the Women Enterprise Fund. The Fund, a agship project under the rst medium term plan 2008-2012, disbursed Ksh 1.55 billion through the Constituency Women Enterprise Scheme. An additional Ksh 1.85 billion was disbursed through 83 active nancial intermediaries. In total, approximately 704,026 beneciaries from across the country accessed the fund. Youth The youth comprise 36% of the national population but alarmingly 61% of them remain unemployed. About 92% of the unemployed youth lack vocational or professional skills demanded by the job market. The high unemployment levels have led to increased dependency levels, slow economic growth, increasing poverty levels and rising national security challenge that negatively impacts on the overall objectives of the Vision 2030 and the Millennium Development Goals (MDGs). The unemployment challenge is further compounded by low transition to and completion rates in secondary education, as well as limited opportunities in technical and vocational skills training institutions for the youth. Skills development is among the sustainable interventions employed towards reducing youth unemployment in Kenya. As of 2012, the Youth Enterprise Development Fund (YEDF) spent Kshs.6.5 billion to fund 141,316 youth enterprises. 129 youth entrepreneurs beneted from incubation services, 62,239 youth trained on entrepreneurship (before receiving loans), 9,370 facilitated to secure foreign jobs, 11,052 underwent pre-departure training, facilitated formation of 24 youth SACCOs, market support services provided to 1,982 youth entrepreneurs and 148 small enterprises linked top large enterprises. Youth labour export was explored with mixed success, however, the need for a better structured framework for implementation of a deliberate strategy for youth employment abroad was realized during the period under review. This arose out of the realization that the country lacked a system to collect and disseminate job opportunities abroad to Kenyans. Measures were taken to increase accessibility and quality of technical and vocational skills training. These include revitalization, expansion and equipping of YPs, development and implementation of the Subsidized Youth Polytechnic Tuition Scheme (SYPT). The National Youth Service recruited a total of 25,000 youths who were engaged in basic paramilitary training, nation building activities and vocational and technical skills training. Specically, the youth were engaged in national
89
development projects such as road and dam construction, disaster response, irrigation projects, environmental conservation and community service or volunteerism. During the First MTP, 130 Youth Empowerment Centres (YECs) were constructed (one wing) out of which 74 were equipped to make them operational. This fell short of the target of 210 YECs. At the same time, the trees for jobs component of Kazi Kwa Vijana (KKV) created 101,174 short-term jobs for the youth who were engaged to plant more than 8 million trees countrywide. Vulnerable Groups The sector has been focusing on the improvement of livelihood of vulnerable groups specically the orphans and vulnerable children, the elderly, and persons with disability. Various Interventions have been initiated to support these deserving vulnerable members of society. These include the establishment of Consolidated Social Protection Fund and National Fund for Persons With Disabilities (PWDs). During the period 2008 2012, the PWDs fund was able to provide12,000 assistive devices to PWDs, 1,000 scholarships to students with disabilities and funding for 205 institutions providing services to PWDs. 1,824 Disabled Persons Organization members received training in entrepreneurial skills among others. The government also introduced disability mainstreaming as standard target in all MDAs annual performance contract with standardized indicators. In order to provide care, custody and rehabilitation services to children in need of special protection, the sector has established rehabilitation schools, Children remand homes, children rescue centers, child protection centers and child helpline stations. Further, National Standards & Regulations for Charitable Children Institutions (CCIs) were nalized. The state embarked on an effort to formalize the process of foster care and guardianship by preparing the necessary guidelines in a process that involved state and non-state actors. A Consolidated Social Protection Fund was created. This established three cash transfer interventions (Cash Transfer to the Older Persons (CT-OP), Cash Transfer to the severely Disabled Persons and the Urban Food Subsidy). This was in addition to the Cash Transfer programme to Orphans and Vulnerable Children (CT-OVC) established in 2004.In addition, the Kenya National Social Protection Policy was developed to enhance coordination, harmonization and consolidation of activities across the line ministries and other key social protection practitioners including the non-state actors. 5.5.2 Emerging Issues and Challenges
Gender Harmful social cultural and religious factors, e.g. female genital mutilation and forced early marriages; Low levels of awareness on gender equality and women empowerment; High incidences of gender based violence especially to women and girls; Low levels of implementation of gender related policies and laws. Valnanerable Groups Minimal reach of the Consolidated Social Protection Fund due to insufcient and unsustainable funding; Poor infrastructure in rehabilitation schools, children homes, remand schools and vocational rehabilitation schools; Lack of proper co-ordination mechanisms for the consolidated social protection programmes; Increase in the number vulnerable groups in need of social protection.
90
Youth Low access to youth capital and asset base; Expanding youth population; Increasing youth unemployment; Mismatch between skills training and industry requirement; Low entrepreneurial culture and skills; Inadequate nancial and human resources; Inadequate public land for youth programmes and projects; Low levels of youth empowerment related legal, regulatory and institutional framework; Increased drugs and substance abuse among the youths; High vulnerability of youth to HIV/AIDS. ender based violence especially to women and girls. Vulnerable Groups Low coverage of Consolidated Social Protection Fund due to insufcient funding; Poor infrastructure in rehabilitation schools, children homes, remand schools and vocational rehabilitation schools; Lack of proper coordination mechanisms for the consolidated social protection programme; Over reliance on donor funds creates uncertainty and sustainability issues especially when dealing with vulnerable groups such as children; and Increase in the number of children in need of special protection. Youth High youth population; Expanding youth unemployment; Mismatch between skills training and industry requirements; Low entrepreneurial culture and skills; Inadequate nancial and human resources; Inadequate public land for youth programmes and projects; Weak legal, regulatory and institutional framework; Increased drugs and substance abuse among the youths; High vulnerability of youth to HIV/AIDS; and 5.5.3 Programmes and Projects for 2013-2017
Flagship Projects for 2013 2017 Gender Gender Mainstreaming: The following specic interventions will be undertaken: Coordinate monitoring of gender mainstreaming across MDAs: The sub-sector will enhance the capacities of the decentralized gender functions in order to effectively push forward the gender mainstreaming agenda; Enactment of a national afrmative action policy and monitoring compliance: The sub-sector will operationalize and monitor compliance to the Constitution of Kenya 2012 provision of not more than 2/3 of either gender representation in all appointive and elective positions; Development and implementation of the National Gender and Development policy: The sub-sector will develop and implement a National Gender and Development policy in line with COK 2012 and international and regional gender related commitments and instruments; Gender disaggregated data to guide policy decision making: The sub-sector will collect, analyze and utilize gender
91
disaggregated data to update the gender development index; Establishment of Gender Research and Documentation Centre: The sub-sector will establish and equip the centre with requisite resources; Establishment of integrated one stop sexual and gender based violence response centers in all healthcare facilities in Kenya. The proposed centers will offer medical, legal and psychosocial support to victims of SGBV; Public awareness campaign against FGM, early and forced marriages: The sub-sector will develop and implement a national sexual and gender based violence policy and operationalize the FGM Act 2011.The sub-sector will work closely with the National Gender and Equality commission to issue sanctions and recommend prosecution on gender discrimination cases. Womens Empowerment: The following specic interventions will be undertaken: Implementation of the 30 percent public procurement preference for women entrepreneurs: The sub-sector will carry out a public awareness campaign on the provisions of the Public Procurement and Disposable [Preference and Reservation] Regulations 2013 for women; Implementation of the Uwezo Fund; the sub-sector will seek to expand access to nances and promote women led enterprises at the constituency level through the Uwezo Fund; Women Enterprise Fund: The sub-sector will seek to review the funds product and services, re-brand and re-launch the Women Enterprise Fund. Vulnerable Groups Consolidated Social Protection Fund Establishment of the single registry for all CSPF Initiatives; Support to Persons with Albinism (PWA); and Establishment of National Safety Nets Program. Scale up the National Development Fund for PWDs: This fund will provide assistance to persons with disabilities for their socio-economic empowerment. It will also support infrastructure improvement to institutions providing services to PWDs and capacity building for disabled persons organizations. Implementation of the 30 percent public procurement preference for Person With Disability: The sub-sector will carry out a public awareness campaign on the provisions of the Public Procurement and Disposable [Preference and Reservation] Regulations 2013 for PWDs. Disability Mainstreaming (inclusion and accessibility): This will ensure that issues that directly affect PWDs are adequately addressed in policies and legal frameworks, programmes and projects. Child Protection Programmes: Under this agship project the following interventions will be undertaken: Establishment of Child Protection Centres; Development of Integrated Data Management System for children; Implementation of Children Rehabilitation Programmes; Facilitating alternative family care services (Adoption, foster care and guardianship); and Finalize and implement the National Community Development Policy. Other Programmes Public awareness on the needs, aspirations and capacities of vulnerable persons; Review Child participation Guidelines (2006); Support Children Assemblies; and Child helpline (116) .
92
Youth Flagship Projects Youth Skills Development: Among the specic interventions under this agship will be the following; Establishment of youth development centers, offering mentorship, nation-building, value building opportunities, vocational and entrepreneurial skills development. Ensure allocation of 2.5% of the budget to youth development. Development of creative industry hubs. Establishment of Biashara Kenya enterprise parks with job opportunities for the youth. Develop incentive framework for employers who hire fresh graduates and have internship programs for college students. Integrated e-youth ICT platform. The sub-sector will establish a youth portal to enhance information access to the youth Upgrade the National Youth Service (NYS) with projected annual youth recruitment of more than ten thousand recruits. Establish a Regional Centre of Excellence for Driver Training and a Maritime Training Institution Youth Empowerment: Among the specic interventions under this agship will be the following; Implementation of the 30 percent public procurement preference for all youth in all MDAs: The sub-sector will carry out a public awareness campaign on the provisions of the Public Procurement and Disposable [Preference and Reservation] Regulations 2013 for youth Implementation of the Uwezo Fund; The sub-sector will seek to expand access to nances and promote youth led enterprises at the constituency level through the Uwezo Fund. Youth Enterprise Fund: The sub-sector will seek to review the funds product and services, re-brand and re-launch the Youth Enterprise Fund. Development and implementation of Youth leadership and entrepreneurship strategy 5.5.4 Policy, Legal and Institutional Reforms
Gender Development and Enactment of the WEF Bill Develop and Implement the National Equality Bill; Develop and Implement the Sexual and Gender Based Violence Policy; and Finalize and Implement the National Afrmative Action Policy Review the National Gender and Development Policy Develop and Implement the Public Financial Management (Uwezo Fund) Regulations 2013. Implementation of Public Procurement and Disposable [Preference and Reservation] Regulations 2013 for women.
Vulnerable Groups Establishment of National Safety Net Program; Finalize and Implement the Disability Act Amendment Bill 2012; Finalize and Implement the Afrmative Action Policy on PWDs; Develop and Implement the National Disability Mainstreaming Strategy; Implementation of Accessibility Action Plan;
93
Finalize and Implement the National Community Development Policy; Development of a National volunteerism policy; Passing of the Children Amendment Bill into law; Revision of child participation guidelines and guidelines on childrens services delivery to take into account amongst others, Kinship Adoption; Development of a National Action Plan on Children for the implementation of the National Childrens Policy; Development of a National Social Protection Sessional Paper based on the National Social Protection Policy; Establishment of a National Social Protection Council; Development of a Social Assistance Bill; and Review of various Social Protection components (Social Insurance, Health insurance) policies to be in line with the National Social Protection Policy.
Youth Reviewing the National Youth Policy (2007); Review the National Youth Council Act 2009; Review National Youth Service Act(1964); Develop and Enact the National Youth Enterprise Development Bill; Implementation of the National Industrial Training Attachment Policy; Develop the National Youth Employment Policy; Finalization and implementation of the National Policy on Youth Polytechnics and the Vocational Sector (NPYPVS); Develop the Youth Societies Bill; Develop the Policy and Framework on Youth Talent, Identication and Nurturing; Develop National Youth & Internship Volunteer Policy; Implementation the Public Procurement and Disposable [Preference and Reservation] Regulations 2013 for youth; Develop and Implement the Public Financial Management (Uwezo Fund) Regulations 2013.
5.6
Kenya Vision 2030 recognizes that regulation and effective exploitation of Public Benets Organisations (PBOs) sector, positive promotion and effective exploitation of our cultural diversity, preservation and promotion of national heritage, sports and arts are critical to socio-economic, political and cultural development. 5.6.1 Situation Analysis
The sector has proved to be a major contributor to socio-economic development. Towards this end, a national policy on heritage and culture was developed aimed at creating an enabling environment for the development of creative cultural industry with a view to preserve, promote Kenyas rich cultural heritage and employment creation. An international sports academy will be set up at the Moi International Sports Centre Kasarani where land has already been identied for development and the initial concepts, design and bill of quantities developed. The academy will nurture top level skills development of sports men and women whose talent is tapped from the grassroots level countrywide as well as train sports administrators, instructors and coaches. The Kenya National Library Services has increasingly continued to improve access to information and knowledge sources to all communities. With a network of 59 branch libraries countrywide, 11 million Kenyans visit these library centres annually to seek information to meet their various needs, this represents a paltry 26% of total population.
94
5.6.2
This includes: Lack of adequate sports facilities and infrastructure has hindered the nurturing and enhancement of talent; Lack of credible sports institutions in the country; Heavy investment required to develop sports facilities; Low level of quality instruction in sports; Insufcient funding; Low level of interest in competitive sports, culture and arts as careers; Poor governance and management; Inadequate talent identication, nurturing and promotion mechanism 5.6.3 Programmes and Projects for 2013-2017
Flagship Project International Academy of Sports: The academy will be set up at the Moi International Sports Centre Kasarani to serve as an international centre for excellence in sports and thus contribute to Kenyas tourism package. County Sports Talent Centers will also be established and will act as feeds to the international centre to scout, nurture and develop sports talents at the sub-national levels. Build and Rehabilitate Sports Stadia: Five national stadia will be built in Mombasa, Kisumu, Nakuru, Eldoret and Garissa and existing sporting facilities at the county level upgraded to accommodate swimming, tennis, basketball and rugby. Rehabilitation of 47 county stadia to international standards to enable the youth to actively develop and tap the immense talent in sports will be undertaken. Establishment of Kenya Houses in International Sports Competitions: The government will upscale the establishment of Kenya Houses in international sports competitions specically Olympic Games, Commonwealth Games, all Africa Games and world championships. This will help to brand and market Kenya as a tourism destination. In addition, cash and kind awards scheme will be established to improve sportsmens and womens impetus or psyche to participate in international competitions and stem outow of athletes defecting to other countries. The National Sports Lottery Fund: The fund will provide a tool for raising funds targeting sports development. The lottery fund will have the potential to inject more than KSh500 million into the sports budget annually. The funds raised will be used for development of the less developed sports in the country to increase the diversity and to supplement the budgets of major sports events. In addition, the funds will be used to train the necessary technical personnel, increase the award scheme to enhance competitiveness of the countrys sports men and women. The International Arts and Culture Centre: This facility will be established at the Moi International Sports Centre. The facility will be a centre of excellence for development of youth potential and nurture talent in music, arts and theatre and also house the international hall of fame. The theatre will provide showrooms, exhibition and performance halls for marketing and showcasing Kenyas cultural goods and services and act as a linkage with tourism and provide platform for cultural exchange and dialoguing. The centre will also act as a resource centre for linkages with related sectors. The hall of fame will be used for honoring and recognizing special talents from all walks of life in the area of sports, music, culture and other cultural contributions. Other Programmes and Projects:
95
Digitalization of Documents: The national archives aims at digitizing more than a million copies of documents annually to enhance access to the archival materials. This will ensure online access through the internet and Local Area Network (LAN), break the barriers of time and space in the utilization of the archival materials, generate backup copies of the archival materials for security purposes and enhance preservation of the original archival materials. Construction of Cultural Centers: This will involve construction of community cultural centres countrywide as focal points for the revitalization, development, dissemination and promotion of the countrys diverse cultural expressions. Kenya National Sports Institute (KNSI): The Institutes mandate will be to develop a national institute for training of sports coaches, instructors and technical staff. Establishment of National Council for Kiswahili: A proposed Bill to establish the council will be reviewed to harmonize with the proposed new legislation bill of the languages policy which will also cater for indigenous and sign language. Empowerment of Cultural Practitioners: The project entails building capacity for cultural practitioners through workshops, exhibitions, festivals and competitions. Records Management: The Kenya National Archives will undertake audit and review records management best keeping practices in all public ofces to improve service delivery. This entails visits to all the public ofces in the country to undertake records survey, appraisal, monitoring and evaluation, sensitization workshops and seminars. Acquisition and Preservation of Kenyas Documentary Heritage: This will involve restoration of documents in order to ensure that archival holdings do not suffer from natural, chemical and man-made deterioration. Conservation, audiovisual and microlming will also be enhanced. Retrieval of Migrated Archives: The retrieval of records taken away by Britain at the eve of independence will be undertaken. The records being retrieved are based on a survey carried out in 1979. A further survey will be undertaken to enable extension of the exercise to other countries, such as United States of America and India where records relating to Kenya are believed to be located. Refurbishment of the Archives Building: The current archives building is old having been built in 1930, hence requires constant maintenance and installations. Controlled Environment in the Records Storage Areas: To achieve this, materials in all formats will be stored under controlled temperatures and relative humidity which requires installation of air conditioners, mechanical ventilators and de-humidiers in all records storage areas both at the headquarters and regional archives. Installation of High-Density Storage System: The current records space is lled to capacity which has impacted negatively on acquisition, preservation and provision of access to public records. To enhance the records storage capacity and security of the archives, there is need for high-density storage system in all storage areas both at the headquarters and regional archives. Publicity and Marketing of Archival Services: A publicity and marketing division will be established in the Ministry of Sports, Culture and Arts and a documentary on services of the national archives will be developed. Opening of County Archives: In order to effectively serve all public ofces, archives will be established in all counties. Increasing Accessibility to Sources and Resources of Information: This will involve establishment of 27 county
96
libraries and upgrading of six other county libraries countrywide. The programme aims at increasing equitable accessibility to sources and resources of information for knowledge development and transformation of livelihoods by all communities. Preservation and Conservation of the National Documentary Heritage for Posterity: The project will enhance preservation and conservation of the national documentary heritage for posterity, support research for innovation and development of a knowledge-based economy. Establishment of Kenya Film School: This project is geared towards promoting indigenous Kenyan creativity and production of talent and increasing domestic Kenyan content on local television to 60 per cent, half of which should be independently produced. Support will be given to the Kenya Film Commission in order to improve its facilities and to promote local talent and innovation .
5.6.4
The following policy, legal and institutional reforms will be undertaken: Provision of necessary policy framework for tax incentives for individuals and organizations investing in sports, culture and arts; Review of Cap 19 of the Laws of Kenya under which national archives and documentation service operates to take into account the provisions of the Constitution and the emerging best practices; Implementation of the national records management policy in the public service; Development of national policy for audio visual archives to safeguard the materials from deterioration; Development of a policy for the national library of Kenya and public libraries; Review the Bill on the establishment of the national council for Kiswahili; and Implementation of the Kenya National Culture and Heritage Policy.
97
6
6.0
Overview
The Political Pillar envisages a democratic political system that is issue-based, people-centered, result-oriented and accountable to the public. During the rst MTP period, the country achieved the most important objective under the Political Pillar namely the promulgation of the Constitution in August 2010. Since the inauguration of the Constitution, progress has been made in advancing strategic political, governance and institutional reforms and these include enactment of legislation mandated by the Constitution, establishment of new governance institutions at national and county levels, civic education, judicial transformation, police reforms, reforms in prisons and correctional services, changes in the electoral processes, promoting national cohesion and social integration, transparency and accountability and the rule of law. In addition, the Constitution (2010) devolves considerable functions and powers to the county governments, which include agriculture, health services, control of air and other pollution, cultural activities, transport, animal control and welfare, trade development, planning and development, pre-primary education, natural resources and environmental conservation, public works and services, re ghting services and disaster management, control of drugs and pornography and coordinating participation of communities. The Constitution introduced a bi-cameral legislature, separation of powers between the three branches of government, wider distribution of executive power between cabinet secretaries and independent commissions and more stringent requirements for transparency and accountability for holders of public ofce at all levels. The Constitution also contains an extensive Bill of Rights that gives Kenyans the right to affordable health care, education, housing, clean and safe water, social security and adequate and quality food. Under the Constitution (2010), Kenya is governed under a two-tier system: a national government and 47 county governments, which are distinct but interdependent. With the exception of a few urban areas that will be legally designated as cities, most urban areas will be managed by boards that will be responsible to the county governments and assemblies. Devolution is, therefore the most challenging constitutional commitment that Kenyans have made to themselves and as such, Making Devolution Work with be the running theme and key agship project of the Political Pillar under the Second MTP so that every Kenyan is provided with the social and economic benets that they are entitled to under the Constitution. Article 10 (2), prescribes the national values and principles of governance which include sharing and devolution of power. The objects of devolution that are outlined in Article 174 provide the basis for Kenyas system of devolved government and framework pursuant to which relevant laws for the operationalization of county governments have been developed.
6.1
Devolution
6.1.1 Situation Analysis Devolution is by far the most signicant initiative in governance that Kenya has undertaken since independence and as such Making Devolution Work will be the running theme and key agship project of the Political Pillar. Devolution will empower citizens to exercise their democratic rights both at national and county levels in order to realise social, political and economic development. The objectives of devolution outlined in Article 174 provide the basis for Kenyas system of devolved government and framework pursuant to which relevant laws for the operationalization of county governments have been developed.
98
Under the constitution, Kenya will be governed under a two-tier system: a national government and 47 county governments. With the exception of a few urban areas that will be legally designated as cities, most urban areas will be managed by boards that will be responsible to the county governments and legislatures. The County governments will play a pivotal role in planning and implementation of projects and programmes of the Second MTP and Kenya Vision 2030 through the preparation and implementation of County Integrated Development Plans (CIDPs). The enactment and enforcement of supportive legislations, creation of strong governance institutions and enhancement of human and technical capacities in all counties is paramount. Policies, legal and institutional measures which have been undertaken to operationalise and implement devolution include: preparation of a report on implementation of devolved government; formulation of policy paper on implementation of devolution; enactment of ve laws on devolution (Urban Areas and Cities Act, 2011; County Governments Act, 2012; Transition to Devolved Government Act, 2012; Intergovernmental Relations Act, 2012 and Public Finance Management Act, 2012); National Government Coordinating Act 2013; County Governments Public Finance Transition Act 2013; and establishment of Transition Authority and Commission on Revenue Allocation. Over the planned period, the government will continue with the implementations of the reforms envisioned under the new laws and it will also provide human and nancial resources required to build the institutional framework mandated by the Constitution. The Transition Authority was established to facilitate and coordinate the transition to the devolved system of government. Its mandate include: analysis and the phased transfer of the functions; coordinate integrated development planning and funding mechanisms; undertake a comprehensive human resource audit and capacity development; conduct civic awareness; conduct an audit of Assets and Liabilities; and determine resource requirements for each of the functions.
6.1.2
Some of the key issues and challenges include: Concurrent functions are likely to present conicts in terms of interpretation of mandates; Low levels of awareness of the devolved system of governance in both the public sector and the general public; Weak or inadequate nancial and performance management systems in counties; Inadequate county proling; Inadequate capacity for planning, implementation, monitoring and evaluation both at national and county level; Inadequate and delayed release of resources leading to a disproportionate reform pace, inefciencies and ineffectiveness in service delivery; Weak inter and intra-agency/sectoral collaboration and coordination; Weak monitoring and evaluation critical to tracking performance and inform programming; Human resource and management at both levels of governments; and Competition for resources and inuence between counties, and counties and national government, leading to high demand for resources; 6.1.3 Programmes and Projects for 2013-2017
Flagship Projects Capacity building (Training and System Development): In order for devolution to fully become operational a training needs assessment will be undertaken within the rst one year of the Second MTP to determine the capacity gaps and build capacity of public servants to fully embrace and implement devolution. The training will target staff both at the national and county levels. Civic Education on Devolution: The general citizenry and key stakeholders need to be fully sensitized on devolution with a view to enhancing their knowledge and support to the Kenyan devolution process. The civic education programmes
99
will aim at empowering citizens and public sector employees on principles and values of devolution. Policy, Legal and Institutional review: The TA will nalise the analysis of all current laws relating to devolution to identify gaps and make recommendations on reforms so as to provide guidance and a roadmap in the overall implementation of devolution for the second MTP period. Resource Mobilization and Utilization: A resource mobilization programme for nancing devolution will be developed and operationalised to ensure availability of sufcient resources for effective implementation of the devolution process. Towards this end, a Devolution Fund will be established by the government with the support of development partners. Human Resource Management and Development: A human resource audit will be undertaken to establish stafng and skill levels and gaps at national and county levels to guide human resource management and development issues under the new dispensation. Change management, institutional development and coordination: Targeted reforms and civic education on change management will be undertaken to ensure a human resource that embrace new and revolutionary ways of doing things. County Infrastructure and other Facilities: This will involve refurbishment/ repair of existing facilities/infrastructure as well as building new facilities in order to facilitate county governments to take off. Kenya National Spatial Data Infrastructure: County government will be required to develop integrated plans which will also include spatial planning. The spatial planning process will require spatial data infrastructure which will be useful in minimizing land disputes and enhancing its utilization. Comprehensive Data Management System: This will involve development of a comprehensive data compilation and management system to cater for all sectors of the economy. The system will be managed and coordinated by Kenya National Bureau of Statistics or its equivalent in matters of Monitoring and Evaluation. Performance Management: Kenya has been implementing reforms in the public service, aimed at improving efciency and effectiveness in delivery of public services and ultimate increase in overall economic growth. The country aims to build a public service that is citizen-focused, ethical, professional and results-oriented as reected in the entrenchment of national values and principles of governance in the Constitution. In view of the above, a performance management programme to facilitate improvement of public service delivery for both national and county governments will be developed. A national audit function will also be devolved to facilitate transparency and accountability in resource utilization at the county and sub-county levels. Integrated Development Planning: In the new constitutional dispensation, there will be regional integrated plans for programmes/projects transcending several counties as well as the County Integrated Development Plans. The Ministries of Devolution and Planning, and Land Urban Development, and the TA will be facilitated to develop initial ve-year County Integrated Development Plans; ten-year County Sectoral Plans; County, Urban Areas and Cities Spatial Plans; strategic plans and resource mapping during the transitional period. Capacity building Transition Authority: For TA to effectively discharge its duties and responsibilities, there will be need to undertake a needs assessment and develop the requisite capacity and skills for better delivery of its mandate. 6.1.4 Policy, Legal and Institutional Reforms
Management of the Transition to facilitate the realization of a devolved system of government through effective and efcient coordination of the transition process; Implementation of the Public Finance Management Act 2012 to ensure prudent management of public nances and
100
promote equitable development of the country; Implement the National Government Coordination Act 2012 to facilitate the exercise of executive authority as provided for under Article 131 and Article 132, of the constitution, and to ensure effective coordination of national government functions; Review of the Urban Areas and Cities Act 2011with a view of capturing the unclassied areas; and Finalization of the Urban Development Policy.
6.2
6.2.1
During rst MTP, Governance, Justice, Law and Order Sector (GJLOS) initiated a number of key agships and other high priority programmes and projects aimed at achieving, among other things, the national healing and reconciliation and reconstructing the country following the 2007/08 post election violence. Some of the key achievements include the promulgation of the Constitution (2010), establishment of various commissions and committees, implementation of various programmes, enactment of laws as set out in the Fifth Schedule of the Constitution and adoption of devolution. Devolution is by far the most signicant initiative in governance that Kenya has undertaken since independence in 1963 and Kenyans wanted a devolved system of government, which is capable of contributing to the enhancement of service delivery and citizens participation in governance. Kenyas form of devolution creates a system that combines a measure of autonomy and inter-dependence, leading to a cooperative system of devolved government that assigns each level of government functions exclusive and concurrent as per Article 186 and Fourth Schedule of the Constitution (2010) and thus, establishing mandates for each level of government. However, the government realises that there will be challenges and in order to address these challenges, the government will support devolution with regular consultations between the Presidency and the 47 governors. The County governments are expected to play a pivotal role in planning and implementation of programmes and projects of Vision 2030, using their strategic plans. Key importance in this regard is the enactment and enforcement of supportive legislations, creation of strong governance institutions and enhancement of human and technical capacities in all counties. It is also important to ensure that during MTP period, citizens are well informed through civic education and devolution process of their role in development. The objects of devolution that are outlined in Article 174 provide the basis for Kenyas system of devolved government and the framework pursuant to which the relevant laws for the operationalization of county governments have been developed. In order to actualise this, the Constitutional Implementation Commission (CIC) was created under an Act of Parliament in October 2010 with the mandate, among other things, to monitor, facilitate, and oversee the development of legislation and administrative procedures required to implement the constitution. Between its inception in 2010 and July 2013, CIC originated 22 bills required for the implementation of the Constitution most of which have been enacted into laws. Other policies, legal and institutional measures which have been undertaken to operationalise and implement devolution include preparation of a report on implementation of devolved government, formulation of policy paper on implementation of devolution, enactment of ve laws on devolution (Urban Areas and Cities Act, 2011; County Governments Act, 2012; Transition to Devolved Government Act, 2012; Intergovernmental Relations Act, 2012 and Public Finance Management Act, 2012), National Government Coordinating Act 2012 and County Governments Public Finance Transition Act 2013, establishment of Transition Authority and Commission on Revenue Allocation. Under second MTP, the government will continue with the implementation of the reforms envisioned under the new laws and it will also provide human and nancial resources required to build the institutional framework mandated by the Constitution.
6.2.2
101
During the implementation of First MTP, the sector faced a number of cross-cutting challenges that affected implementation across all the institutions under the pillar and some of the key challenges included: Inadequate and delayed release of resources leading to a disproportionate reform pace, inefciencies and ineffectiveness in service; Slow implementation of Constitution occasioned by lack of political will and political party differences; Slow and lengthy procurement procedures; Weak inter and intra-agency/sectoral collaboration and coordination; Hardware inadequacies and lack of modernization for the Kenya Police Service; Weak monitoring and evaluation critical to tracking performance and inform programming; Lack of a national anti- corruption policy; Slow pace of implementation, transparency problems and accountability on programmes due to insufcient political commitment; and High level of insecurity. The devolution process, being a new governance system is characterized by a number of challenges that the sector will have to address. The legal and institutional framework in place may pose implementation challenges some of which include: Concurrent functions are likely to present conicts in terms of interpretation of mandates. There may be need for policy and legal guidance in this regard; Devolution represents a major paradigm shift in the governance system and many people, including public sector employees may resist change thus presenting obstacles to implementation of devolution; and Current legislative and institutional framework may have some gaps especially because regulations intended to operationalise key laws are yet to be approved. In respect to human resource management and civic awareness, the following are some of the emerging issues and challenges: How to deal with any excess staff after rationalization in both levels of governments; Financial implications of early, voluntary and compulsory retirement if necessary; Unclear reporting system in execution of mandates given the distinctiveness and interdependence of governments as well as the need for mutual communication, consultation and cooperation; Initial capacity gaps of staff in county public service; Low levels of awareness of the devolved system of governance in both the public sector and the general public; Given the need for enhanced performance management, there is need to continue spearheading public sector reforms including Results Based Management (RBA), Performance Contracting (PC), national audit and the implementation of National Integrated Monitoring and Evaluation System (NIMES). In pursuit of these objectives or goals, the following challenges are foreseen: Where to place the coordination role of RBM, PC, and NIMES Availability of adequate resources for such programmes Reduction in momentum arising from operationalization of devolution Likely failure of the national government to meet capacity building demands from county government, especially in the initial stages. Integrated development planning and nancial management for county activities is a major component of devolution that may potentially face the following issues and challenges: Competition for resources and inuence between counties, and counties and national government, leading to high demand for resources; Possibility of conicts between the national and county governments in exercising their powers and executing their mandates; Weak or inadequate nancial and performance management systems in counties;
102
Inadequate county proling; and Inadequate capacity for planning, implementation, monitoring and evaluation both at national and county level.
The County governments are, therefore expected to play a pivotal role in planning and implementation of projects and programmes that are aimed at translating these national goals and aspirations into highly productive ventures. Of key importance is the enactment and enforcement of supportive legislations, creation of strong governance institutions, allocation of adequate budgetary resources, and enhancement of human and technical capacities in all counties. It is, therefore important to ensure that during MTP II, citizens are informed properly through civic education and devolution process is accorded the necessary political good will from all players at national and county levels. The overall goal of devolution is to empower citizens to exercise their democratic rights both at national and county levels in order to realise social, political and economic development. 6.2.3 Programmes and Projects for 2013 2017
Under Second MTP GJLOS focuses on 13 key programmes categorized into six agships programmes and seven other projects and programmes. Flagship Programmes and Projects for 2013 2017 During the plan period, the sector will implement six agship projects, which include. 1. Implementation of Constitution and Legal Reforms This agship project has three components, namely the development of laws to implement the Constitution (fth schedule laws), civic education on the Constitution and inculcating a culture of constitutionalism. (i) Development of Laws to Implement the Constitution With regard to the development of laws to implement the constitution, the following strategies will be adopted: Prioritization and audit of all existing laws to ensure their conformity with the Constitution; Review of legislation leading to recommendations for amendment, consolidation or repeal; Development of model laws and provision of technical assistance to counties on the development of county specic legislation; Drafting of bills in support of progressive fulllment of schedule ve; and Development of rules and regulations on all Constitution implementation legislation. (ii) Civic Education on the Constitution It is critical that the Kenyan people understand their rights and responsibilities under the supreme law well enough to actively engage government and governmental processes as part of their civic engagements. In this regard, the sector will ensure sustainable access to information and awareness on the Constitution, its principles, structures and processes. (iii) Inculcate a Culture of Constitutionalism It is important to ensure adherence to Constitution amongst government agencies, non-state actors and individuals. Steps will be undertaken to build a culture of respect for the rule of law while fostering a system that ensures governmental responsiveness to its citizens and citizens responsibility for keeping government in check. 2. Leadership, Ethics and Integrity During second MTP leadership, ethics and integrity programme will be implemented. This programme seeks to strengthen legislative, policy and institutional framework for ethics and integrity. To implement the programme, the
103
following key strategies will be adopted: Reviewing and strengthening legislative, policy and institutional framework for ethics and integrity in the country; Strengthening capacity of ethics and anti corruption agencies to promote leadership, ethics and integrity; Enhancing investigative capacity of Ethics and Anti-Corruption Commission (EACC) and granting the Commission prosecutorial powers; Enhancement of asset tracking and asset recovery ; Establishment of effective accountability mechanisms; Education, sensitization and awareness on corruption, integrity and ethical issues; Mainstreaming preventive measures against corruption; Promoting standards and best practices in ethics, integrity and anti-corruption for state and public ofcers; Promoting targeted and integrated research, monitoring and evaluation on governance, ethics, anti-corruption and integrity policies, strategies and programmes; Enhancement of mechanism for ling, analysis and access to wealth declarations of public ofcers; Development of the National Ethics and Integrity Policy; Leadership and integrity training, education programme, establishment of a leadership and integrity institute; Development of whistleblower protection legislation; Enacting necessary legislation so that Kenyan companies found guilty of corrupt practices will be liable to have their assets frozen by the courts; and Introducing an automatic freeze on the assets of anyone indicted on corruption charges with appropriate judicial approval 3. National Cohesion and Integration During second MTP, National Cohesion and Integration programme will be implemented and the main focus will include: Reviewing of National Cohesion and Integration Act (2008) and align it to Constitution 2010; Enactment and operationalisation of policies and legal framework towards National Cohesion and Integration; Integration of National Cohesion into the curriculum for training staff from the public and private sector; Development and implementation of cohesion barometer to evaluate the contribution of the activities done towards promoting cohesion and integration in the country; and Monitoring of hate speech as well as negative. 4. Legal Aid and Awareness This programme has two sub-programmes legal aid and legal education and professionalises the cooperation of the non-state actors in the legal sector (i) Legal Aid and Legal Education The following strategies will be undertaken to implement the respective sub-programmes. Operationalise countrywide legal aid scheme and establish fully functional legal resource centres. Finalization of legal aid policy and legislation framework Development of legal aid guidelines. (ii) Professionalise the Cooperation of the Non-State Actors in the Provision of Legal Aid In view of non-existence of a robust state-lead legal aid scheme, there is need for the state to: Develop of a regulatory framework for legal aid; Enhance capacity of non-state actors; Undertake measures to streamline the training, certication, accreditation and remuneration of paralegals; and Establish a code of conduct for paralegals. 5. Strengthening the Criminal Justice System A just and cohesive society is one that enjoys equitable social development. The sector will undertake to
104
strengthen the criminal justice system by ensuring independent institutions with a clear mandate as well as formal collaboration mechanism amongst the relevant institutions such as the police service, Ofce of the Director for Public Prosecution (ODPP), judiciary, correction services, prison and probation and aftercare service and EACC among others. This programme will entail three sub programmes, which are prosecution services, correction service (including probation and prison services) and witness protection services (i) Prosecution Services Fully operationalizing ODPP Professionalization and absorption of police prosecutors into ODPP Decentralization of prosecution services in alignment with the judiciarys decentralisation of court services. (ii) Correction Services (Prison and Probation Services) Audit, review and develop relevant legislation for correction services Decongestion of correctional facilities through infrastructural development of facilities for both the ofcers and the detainees Strengthening alternatives to imprisonment and promoting non-custodial sentences Enhance measures for effective reintegration of offenders through establishment of community reception centers and half way houses Develop policy and legislative framework for the enhancement of alternative measures to imprisonment Strengthen correctional and rehabilitation centres for youthful offenders (iii) Witness Protection Services Providing special protection, on behalf of the state, to persons in possession of important information and who are facing potential risk or intimidation due to their cooperation with prosecution and other law enforcement agencies. 6. Judicial Transformation In fulllment of its constitutional mandate as provided under Article 159 and responding to the high public expectations and demands for improved performance, the judiciary has developed an Integrated Judiciary Transformation Framework (IJTF). The framework aims at transforming the judiciary into a legitimate, effective and independent custodian of justice through ensuring access to and expeditious delivery of justice to all - the transformation envisions: Transforming judiciary into an independent but complementary partner with other arms of government, other institutions of justice chain and other stakeholders involved in justice sector. Transforming court procedures, processes, organizational culture and management to re-orientate them towards a culture of responsive, proactive, friendly, effective and accessible service delivery. Redesigning institutional and administrative arrangements of judiciary to create a unied national institution with appropriate levels of devolution. Equipping judiciary to develop a robust, indigenous, patriotic and progressive jurisprudence. Other Programmes and Projects 1. Implementation of the Bill of Rights (i) National Policy and Action Plan on Human RightsThe sector will prioritize the adoption and implementation of the national policy and action plan on human rights which provide a comprehensive framework for the implementation of the Bill of Rights and adoption of the policy by Parliament as well as its dissemination to stakeholders.
105
(ii) Human Rights Based Approach to Development The Constitution 2010 espouses a human-rights based approach to development by encapsulating important national values and principles of governance, which must inform all aspects of government development planning. The sector therefore will undertake to build capacity and implement human-rights based approaches to development and service delivery. The sector will further ensure that the rights of all Kenyans are preserved through good governance, democracy, respect for the rule of law, social protection and welfare for the disadvantaged (iii) Human Rights Reporting Mechanism Over the medium term period, the sector will continue to develop timely and periodic reporting on national, regional and international obligations on human rights treaties that Kenya has ratied or acceded to.
2.
Coordination of Sector Reforms i. GJLOS Policy and Results Framework The overall sector policy, reform dialogue plan implementation and coordination will be championed by the National Council on the Administration of Justice (NCAJ) and the National Collaboration for Oversight and Accountability (NCOA).
ii. National Council on the Administration of Justice The NCAJ is a high level policy making, implementation and oversight coordinating mechanism established under Section 34 of the Judicial Service Act (No. 1 of 2011). During the planning period, the sector will undertake to formulate policies relating to the administration of justice; implement, monitor, evaluate and review strategies for the administration of justice; facilitate the establishment of Court Users Committees at the county level and mobilise resources for purposes of the efcient administration of justice. Periodically, NCAJ will provide feedback to Parliament on the status of the justice system. iii. National Collaboration for Oversight and Accountability The NCOA is a high level policy making, implementation and oversight coordination mechanism established under GJLOS II. The NCOA covers public oversight and accountability institutions within GJLOS. The mechanism will mainstream cross-cutting public sector reforms and provide a forum for engagement with wider public sector reforms. The strategies to be implemented under MTP II include: Strengthening GJLOS coordination ofce Roll out county pilots of GJLOS institutions for reform monitoring and coordination at county levels. Operationalization of NCAJ secretariat Implementing a comprehensive monitoring and evaluation and reporting framework. Formulation of a joint-sector investment plan. 3. Political and Economic Governance (i) Electoral and Political Processes Credible elections are a critical component for issue-based politics. To ensure that electoral and political processes form a core element of the Constitution implementation, the sector will facilitate the full operationalization of the Political Parties Act, 2011, the Elections Act, 2011, and Campaign Finance Bill, as well as the provision of the civic education programmes on electoral and political processes. The sector will develop a policy and further introduce a charities legislation to regulate political campaigning and conduct of Non Government Organizations to ensure that they only campaign on issues that promote their core mandate but not engage in party politics. (ii) Economic Governance
106
In order to achieve an economic growth rate of 10% as envisaged in the Economic Pillar, the following laws will need to be implemented among others Anti-Corruption and Economic Crimes (Amnesty and Restitution) Regulations, 2011, Proceeds of Crime and Anti-Money Laundering Act, 2009, Mutual Legal Assistance Act, 2012, and Leadership and Integrity Act 2012. In addition, the sector will promote timely provision of legal advice and implement strategies to ensure adherence to contractual obligations. 4. Judicial Transformation The following priority projects and programmes will be undertaken during the plan period to enhance service delivery and sustain judicial transformation. Construction of 19 Magistrates Courts and refurbishment/renovation of 10 more courts across the country towards achieving the goal of a Magistrate Court in every sub-county. Establishment of a High Court in each of the 47 counties and Courts of Appeal in each of the former provinces headquarters. Establish and encourage use of Alternative Dispute Resolutions (ADR) mechanisms as well as Alternative Justice Systems (AJS) to help address the case loads and backlogs. This will include training and accreditation of formal and informal ADR providers and provision of mechanisms for diversion of dispute to ADR where appropriate. Development and deployment of an electronic case management system and an integrated document management system, audio-visual recording and transcription of court proceeding to facilitate expeditious delivery of justice. Institutionalise performance management and contracting for judicial ofcers in order to improve efciency and clear historical backlogs. Continued strengthening of NCAJ. 5. Legal Education Programme The legal education programme will develop a national policy on legal education and training. Public hearings will be conducted at the national and counties to solicit views from institutions offering legal education and training. 6. Victim of Offences Programme The victim of offences programme will be established in key institutions working with victims of crime. Policies, programmes and projects related to victims will be developed and implemented. Work that is already underway relating to the protection, rights and welfare of the victims of offences including victim information and notication, restitution and compensation and provision of reconciliation and psychosocial services within the criminal justice system will be strengthened with the enactment of the Victim of Offences Bill. 7. Democracy and Public Participation In working towards the strategic vision on democracy and public participation, a people-centred and politicallyengaged open society, the following sector priorities will be implemented. National values and ethics Promotion of peaceful coexistence of all communities in the country and county; Respect for the Constitution including devolution; and Leadership, ethics and integrity 8. Parliament Procurement of facilitiesto support two chambers of parliament; Senate with (68) Members, and National Assembly with three hundred and fty members; Recruitment of staff to support the signicant expanded number of members of parliament; and
107
To achieve the objectives set out under the Political Pillar, the following policy, legal and institutional reforms will be implemented. Policy Reforms In order to guide its decisions on the implementation of its programmes and projects, the sector will develop and oversee the implementation of the following policies: National Cohesion and Integration Policy; National Values and Principles of Governance Policy; National Legal Education and Training Policy; GJLOS Sector Policy; National Ethics and Anti-Corruption Policy; National Policy and Action Plan for Human Rights; The National Correctional Policy; The Gaming Policy; Prosecution Policy; Afrmative Action Policy (gender, disability, marginalised, special interest groups and minority); Victim of Offences Policy; Policing Policy; Access to Justice Policy; Sentencing and Bail Policy; Plea Bargaining Policy; Policy on Refugees and Migration; Policy on facilitating and regulating traditional dispute resolution mechanisms; and Finalization of Urban Development Policy Legal Reforms The sector will undertake various legal reforms which will entail development, review and implementation of all legislations relating to reforms in governance, access to justice and rule of law. Some of the reform Bills and Acts that will be attended to will include: Bail Information and Supervision Act; Victim of Offenders Act; Aftercare Offenders Act; National Cohesion and Integration Act (2008); Legal Aid; Small Claims Court Bill; Plea Bargaining Bill; Refugee Evidence Act (Cap. 80); Communications Commission (Amendment) Act, 2008; Criminal Procedure Code, (Cap. 75); Prisons Act; Borstal Institutions Act; Transfer of Prisoners; Community Service Orders Act (No. 10 of 1998); Probation of Offenders Act (Cap 64);
108 VISION 2030 SECOND MEDIUM TERM PLAN 2013 - 2017
Civil Procedure Code; Petty Offenders Bill; Court Bailiffs Bill; Rights of Persons Deprived of Liberty Act; and Enforcement of Orders of Constitutional Commissions and Local Tribunals Act. Review of Urban Areas and Cities Act 2011
In addition, and in order to ensure quality and consistency of delivery of legal services, the sector will: Establish quality assurance and control measures for providers of legal services; Undertake measures to streamline training, certication, accreditation and remuneration of paralegals; and Establish guiding standards and code of conduct and institute reforms within the legal practice sector to deepen professionalism. Institutional Reforms During the plan period, the sector will enhance and sustain institutional reforms in the following institutions and services. (i) Prosecution Services; Under prosecution services, the following strategies will be adopted: Absorption of police prosecutors to ODPP and professionalization of prosecutorial services ; Devolution of prosecution services to the counties; and Fostering collaboration and coordination between the investigators and courts. (ii) State Law Ofce Reforms: Under State Law Ofce Reforms, implementation strategies will be undertaken: Operationalization of the regional arbitration centre; Establishment of the asset recovery centre; Establishment of a treaty registry and asset recovery; Decentralization of services to counties; and Implementation of online service delivery. (iii) Correctional Service Reforms In order to ensure sustainable implementation of correctional service reforms by the probation and prison establishments, the following strategies will be adopted: Review of institutional and administrative framework for prisons, probation, after care and community service orders programme to enhance service delivery; Revision and development of guidelines and administrative procedures to guide correctional services sector; Revision of legislations on non-custodial options to incorporate modern offender management schemes Development and adoption of reform programme that addresses capacity constraints and respond to reform requirements; Review and implementation of training curriculum for inmates and offenders; Development and implementation of curriculum for prisons, probation aftercare service ofcers; Application of appropriate technology to respond to emerging security challenges in correctional facilities and remands; Development of institutional capacity for probation service to effectively implement policy and legislation on alternative measures to imprisonment; Introduction of electronic offender surveillance system for prolic offenders under supervision in the community; Construction of halfway houses for effective reintegration of ex-prisoners; Introduction of evidence based offender rehabilitation programmes that is responsive to needs and risk posed
109
by the offender; Development of policy and legislation on diversion of minors and young offenders out of criminal justice system by creation of diversion programme for juvenile offenders as well as for special needs offenders; Development of policy and legislation to establish parole system; Establishment of dog and horse units to mitigate security search challenges in prisons services; Repossession of all illegally acquired parcels of land belonging to correctional services. (iv) Policing Services To create a national police service that will provide professional security and law enforcement services necessary for the objectives of this plan, priority will be given to implementing the constitutional reforms in the National Police Service and the National Police Commissioner as spelt out in Articles 243 to 247 of the constitution. In addition, the government will proceed with the implementation of the Ransley Committee Report on training, accommodation, salaries and benets, forensic laboratory, transport and equipment. The government will also undertake legislation and enactment of the National Coroners Bill (2010) and the Private Security Providers Regulation Bill (2010). (v) National Council on the Administration of Justice During the plan period, the sector will undertake to: Formulate policies relating to the administration of justice; Implement, monitor, evaluate and review strategies for the administration of justice; Facilitate the establishment of Court Users Committees at the county level; and Mobilise resources for purposes of the efcient administration of justice. (vi) National Collaboration for Oversight and Accountability The NCOA will mainstream cross-cutting public sector reforms and provide a forum for engagement with wider public sector reforms.
110
7
7.0
The Implementation Framework for the second Medium Term Plan (MTP) 2013-17 is aligned with and supported by policy, legislation and constitutional and requirements including the following: (i) The Fourth Schedule of the constitution of Kenya (2010). This outlines the functions of the national and county governments and supporting laws such as the Public Financial Management Act (2012), the Transition to Devolved Government Act (2011), and the Intergovernmental Fiscal Relations Act (2011). (ii) Planning, Monitoring and Evaluation (M&E); M&E Policy and M&E Act, which will provide the legal and institutional framework for operationalisation of an efficient and computerized M&E system to monitor implementation of programmes and projects from the national up to county level. (iii) A reformed Public Procurement Act that will facilitate faster implementation of programmes and projects. (iv) Operationalisation of the PPP Act (2013) to facilitate investment including investment in key infrastructure projects. (v) Adherence by the government and development partners to Aid Effectiveness and General Principles of Partnership that will ensure faster and full absorption of donor funded programmes and projects to achieve development results; and (vi) Alignment of the County Governments Integrated Plans and Ministries, Departments, and Agencies (MDAs) Strategic Plans (2013-17) to the MTP 2013-2017 and linking them to a Results Based Framework through Performance Contracts.
7.1
The Fourth Schedule of the constitution outlines the functions of the National and County Governments. A number of laws have been enacted to support the devolution process. The Intergovernmental Relations Act (2011) establishes a framework for intergovernmental consultation and cooperation between the two levels of government. The Transition to Devolved Government Act (2011) provides for a framework for transitional arrangements and operationalisation of devolved government while the Public Financial Management Act (2012) provides guidelines on efficient use of public resources at the national and county government level. The implementation of programmes and projects of the MTP 2013 -17 will be done in accordance with the Fourth Schedule (as reflected in the MTP Implementation Matrices) and in conformity with the various enacted laws that support the framework for inter-governmental consultation and the devolution process. The government will thus implement the Constitution of Kenya (2010) quickly and effectively to expedite economic growth and development and decentralize service provision to the 47 counties, bringing service delivery closer to the people.
112
VISION 2030
7.2
The Constitution of Kenya provides the basis for M&E as an important part of operationalizing government activities to ensure that transparency, integrity, access to information and accountability principles are embraced in resource allocation and management at National and Devolved levels of Government. The scope of M&E is derived from the provisions related to planning under articles 10, 56, 174, 195, 201, 203, and 225, 226, 227 of the Constitution. A robust M&E system is essential for efficient and effective implementation of the MTP 2013 -2017, County Integrated Development Plans, and MDA Strategic Plans. Towards this end, the Ministry of Devolution and Planning has developed an M&E Policy and M&E Bill which will, respectively, be submitted to Cabinet and Parliament for approval and enactment into law. The M&E Policy and Act, once approved and enacted respectively, will support the implementation of a computerized National Integrated Monitoring and Evaluation System (NIMES) from the national, county and up to the local level. It will also establish structures for M&E at the national level to be chaired by the Principal Secretary in-charge of Planning, Ministerial M&E committees chaired by respective Principal Secretaries and County M&E committees chaired by Governors. These Committees will identify national and county level indicators; establish compliance with reporting standards and ensure consistency of indicators and reporting formats nationally and at the county level. The Policy and the Act will ensure that all government ministries and County Governments establish M&E units with specific budgets; employ qualified M&E officers and acquire appropriate equipment for effective implementation of NIMES. Capacity building and training on M&E will be undertaken at both the national and county levels throughout the MTP period to ensure effective implementation of NIMES. Stakeholders and the public will be able to access data on implementation of programs and projects at the national and county levels through various channels such as online access, national and county forums, and the Annual Progress Reports (APRs) prepared by the Monitoring and Evaluation Directorate (MED) of the Ministry of Devolution and Planning. When reporting progress in implementation of program budgets and public expenditures, the MED will liaise closely with the national and county governments as well as the offices of the Controller of Budget and Auditor General who are constitutionally mandated to report and audit the implementation of budgets at the national and county levels.
7.3
The Public Procurement and Disposal Act (2005) will be revised to facilitate faster public procurement and reduce the delays in implementation of projects over the second MTP period. The revision of the Act will also provide for affirmative action in awarding tenders to youth groups as a means to promote entrepreneurship and employment for the youth.
7.4
The second MTP includes major infrastructure projects such as the development of the second transport corridor (LAPSSET), power projects, and development of light rail and mass transit transport systems in major urban centres. These projects require massive capital investments and will not be implemented through sole reliance on public resources. The government has thus enacted a Public Private Partnerships Act (2013) to mobilize funds for infrastructure and other development projects under PPP arrangements. The Act also provides for county governments to approve and undertake PPP projects which do not pose contingent liabilities to the national or county governments. For those programs that will generate liabilities, counties will seek clearance from National Government. The Government will therefore
VISION 2030
113
prioritize the operationalisation of the PPP Act (2013) to facilitate investment in infrastructure and in other development projects which is necessary for the country to achieve the targeted double digit economic growth rates under this MTP.
7.5
The Government has enacted the Public Benefit Organisations Act (2013) to provide for the establishment, operation, registration, administrative and regulatory framework within which public benefit organisations can conduct their affairs and for connected purposes. In addition, the Act will facilitate mechanisms for government collaboration with public benefit organisations, including funding of public benefit organisations activities and involvement of public benefit organisations in the implementation of government projects. The government will also introduce a Bill for enactment of a Charities Act to regulate NGOs. This will establish full transparency in funding both for NGOs and individual projects. A Charity Agency will also be established to coordinate funding flows from various sources to the NGO sector. This will promote accountability and coordination between the NGO sector and national and county governments. The development of strong partnerships with the NGO sector will strengthen implementation of the MTP and enhance the countys development agenda.
7.6
The macro-economic chapter makes the case for increased official Development Assistance as one of sources for the increased investment levels targeted by the Second MTP. On average, external resources constituted about 57% of Kenyas development budget. To ensure effective implementation of the Second MTP, measures will be put in place to ensure a higher absorption ratio of ODA from the present 44% per annum to over 80% for achievement of development results. This will be realized through a more vigorous implementation of Aid Effectiveness and Partnership Principles: The five Aid effectiveness principles are: Country Ownership and Leadership; Alignment and Use of Country systems; Harmonisation; Managing for Development Results; and Mutual Accountability. The government will work closely with its international partners to put these principles into effective operation. Furthermore, Aid Effectiveness and Partnership principles will take into consideration guidelines and statutory requirements of the Constitution, the Public Finance Management Act (2012), the Kenya External Resources Policy (2013) and the devolution process. In implementing these principles, the Kenya Government and Development Partners commit to the following: The Government will: (i) Set the countrys development objectives and policies through a broad based and inclusive stakeholder dialogue and consultations. (ii) Translate Vision 2030 into prioritized results oriented operational programmes as expressed in Medium Term Plans (MTP), Medium Term Expenditure Frameworks (MTEF), and annual budgets. (iii) Take the lead in coordinating ODA assistance among development partners, civil society and private sector. (iv) Coordinate and maintain a harmonized and rationalized timetable for all development partners joint missions. (v) Adopt a participatory approach in formulating a Mutual Accountability Framework and joint assessment of progress to achieve aid and development effectiveness. (vi) Ensure a smooth transition in development partners engagement at the county level. (vii) Harmonize the definition of sectors for MTP and MTEF to improve consistency and transparency on the annual budgetary allocations compared to development priorities defined in the MTP. This will also enable development partners to align their support to MTP and the budget process (viii) Develop harmonized MTP and MTEF indicators that will be used to track annual progress of set targets (ix) Coordinate the Development Partnership Forum (DPF), which is the principal forum for follow up, review and dialogue between Government and Development partners.
114
VISION 2030
Development Partners will: (i) Align their various country strategic policies and assistance programmes to Vision 2030, Second MTP, the revised Public Procurement and Disposal Act and other relevant Acts of Parliament. (ii) Align their support to the country through use of GoKs country systems in budgeting, procurement, reporting, accounting, auditing and monitoring and evaluation. Annual assessments will be done to monitor progress of development partners use of country systems. (iii) Ensure that their support is integrated within the MTP framework and use the sector wide approaches and Sector Working Groups (SWGs) in planning, budgeting and implementation of programmes (iv) Undertake division of labour process as agreed on in the Mutual Accountability Framework led by the Government. (v) Work closely with the National Treasury to ensure that development partner support is integrated into the MTEF to provide reliable indicative commitments of aid over a multi -year period (3 years). This information will be provided at least three months before commencement of the finalisation of the preparation of the annual budget. In addition, development partners will submit expenditure returns to the National Treasury on resources channeled to non state actors on a quarterly basis. (vi) Development partners will seek to improve the predictability of aid flows and absorption of aid funding. (vii) Commit to update information on Appropriation in Aid in NIMES including e-ProMIS to ensure timely information and transparency in implementation of programmes/projects (viii) Hold Development Partners Group (DPG) meetings for review and follow up on the effectiveness of their support to government
7.7
Alignment with County Integrated Development Plans and MDA Strategic Plans
The Ministry of Devolution and Planning will prepare guidelines on aligning the County Development Integrated Plans and Strategic Plans of MDAs with the Second MTP. The Performance contracts of the MDAs will also be tied to Second MTP targets to ensure implementation of the Plan. The National Treasury will also prepare guidelines for the County Governments engagements with the development partners.
7.8
The MDAs will prepare quarterly and annual progress reports on the implementation of the second MTP. The Ministry of Devolution and Planning will consolidate and prepare regular reports as well as annual progress reports which will be presented to the Cabinet; the Summit of 47 Governors chaired by H.E. the President, the National Economic and Social Council (NESC), and the Vision 2030 Delivery Board. These Reports will be published and availed on the Ministry website. They will also be shared with all stakeholders including the public, development partners, private sector and civil society.
VISION 2030
115
ANNEX:
B1:
INFRASTRUCTURE
Goal: Deploying world class infrastructure facilities and services Strategic Objectives Strengthen the institutional framework for infrastructure development and accelerating the speed of completion; Raise efficiency and quality of infrastructure projects, and increasing timely implementation of infrastructure projects; Develop and maintain an integrated safe and efficient transport network; Benchmark infrastructure facilities and services provision with globally acceptable performance standards targeting to enhance customer satisfaction; Enhance private sector participation in the provision of infrastructure facilities and services strategically complemented by government sector interventions Project/ Programme Objective Expected Output/ Implementing Time Source of Indicative Budget (Kshs. Millions) Outcome Agency Frame Funds Total 2013/14 2014/15 2015/16 2016/17 2017/18 Expansion and Modernization of Aviation Facilities Construction of Green To decongest JKIA and Terminal with associated KAA 2013-2017 GoK 68,000 8,000 17,500 17,500 12,500 12,500 Field Terminal and Second meet forecasted traffic facilities constructed; Second PPP Runway demand runway Code F of 5.6 km constructed. Maintenance, expansion To modernize aviation Expanded and modernized KAA 2013-2017 GoK 4,151.5 1,484.5 1,126 665 440 440 and rehabilitation of facilities airports and aviation facilities MOTI Airstrips. Other construction and capacity building activities to modernize aviation facilities Expansion and To improve terminal and Expanded and modernized KAA 2013-2015 KAA 2,000 300 800 900 modernization of Moi, airside capacity airports Eldoret and Kisumu International Airports Improvement of Ports, Shipping and Maritime Facilities Second Container Terminal To increase Container Increase Port Capacity By 1.2 KPA 2013-2017 KPA 23,000 2,000 6,000 6,000 6,000 3,000 Handling Capacity Million TEU GoK Construction of New Oil To relocate the oil jetty to New jetty in place KPA 2013-2017 KPA 4,500 500 1,000 1,000 1,000 1,000 Terminal a new site GoK Modernization of Ferry To increase capacity to 2 ferries purchased; KFS 2013-2017 GoK 9,020 5,560 1,850 1700 740 170 services. handle the increased Expanded ramps and high population now and Improved ferry services
Objective
Expected Output/ Outcome Improved maritime infrastructure 800 1000 1000 1000 KFS KPA/KMA/ KNSL KNSL
Implementing Agency
Time Frame
Source of Funds
in the future T0 improve maritime infrastructure 2013-2016 KPA/GoK/KF 7,662 S World Bank 2013-2017 GoK 4,500 PPP 700
Expansion and upgrading of jetties and other shipping facilities Purchase of new vessel
To enhance commercial shipping to create employment and job opportunities 2013-2016 World Bank KMA 7,660 1,100 2,305 3,400
Increased trade along the coastal region; Trained seafarers; Increased jobs in the maritime industry; Vessel purchased. Physical infrastructure KMA provided; Skilled staff; Training Vessel acquired. Standard Gauge Railway line KRC constructed Rail network constructed KRC 2013-2017 GoK PPP 593,810 118,762 2013-2017 GoK DP 317,300 10,000 69,325 79,325
855
79,325
79,325
118,762
118,762
118,762 118,762
Railway Transport Mombasa Malaba/ Kisumu Standard Gauge Railway Development of new Transport Corridor from Lamu to Ethiopia and S. Sudan (LAPSSET Project) Construction of Commuter Rails in Nairobi, Mombasa and Kisumu Efficient commuter rail network in place; Reduced transport cost. 1748 4767 KRC 2013-2017 GoK/ PPP 82,851 4,229 1748 2382 -
17,179
14,634
14,305
22,504
1533 852
System Wide Relocation Action Plan (RAP) Rolling Stock Programme & Modern maintenance Deport
To establish Kenya as an efficient transport and logistics hub in the region To establish efficient rail transport linking Lamu to South Sudan and Ethiopia To provide modern mobility solution within the area with neighboring counties To clear encroachment of railway reserve To establish a rolling Stock Programme & Modern maintenance Deport System Wide RAP produced KRC and operationalized Sets of DMUs KRC Makadara Deport established KRC 2013-2014 GoK World Bank 2013-2015 GoK 2013-2015 GoK Effective road transport regulatory regime/ Framework; Reduced road fatalities; Functional ICT system Smart Card driving license MOTI /NTSA RTD/ AKI/TLB TRAFFIC Depart. Courts 2013-2015 GoK World Bank 1817 900
Road Safety Programme To improve road safety in Operationalization of the the country National Transport and Safety Authority, and other projects
917
117
IMPLEMENTATION MATRICES
Project/ Programme Total 29,520 14,220 2,844 2,844 2,844 5,904 5,904 5,904 5,904 2,844
Objective
Implementing Agency
Time Frame
Source of Funds
Indicative Budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 2017/18 5,904 2,844
19,980
3,996
3,996
3,996 5,454
3,996 5,454
3,996 5,454
2013-2017 GoK DPs 2013-2017 GoK DPs 2013-2017 GoK DPs 57,600 11,500 11,500
640 km constructed
KeNHA/KURA
11,500
11,500
11,500
532,142
93,600 1,150
100,600 1,150
105,600 1,150
KeRRA/ KURA
121,750
24,350
24,350
24,350
24,350
24,350
54,000 25,000
10,800 5,000
10,800 5,000
10,800 5,000
10,800 5,000
10,800 5,000
Expansion of Roads Programme East Africa Road Network To Promote trade and Project (EARNP) regional integration Rehabilitation of Northern To promote trade in East Corridor Transport African region and Improvement Project enhance economic and (NCTIP) social integration Kenya Transport Sector To increase the efficiency Support Project (KTSSP) of road transport Rehabilitate Eldoret-Kitale- To promote and facilitate Lodwar-Nadapal road regional economic Corridor (600km) integration Lamu Port South Sudan To promote trade Ethiopia Transport Corridor between regions and (LAPSSET) enhance socio economic activity along the corridor Improving road network To enhance economic countrywide and social integration Capacity Building and M&E To build human capacity in the infrastructure sector; To conduct performance appraisals in road development projects. County Roads Programme Rehabilitation, To provide access to reconstruction and economic and social maintenance of county services roads To improve travel time, and reduce vehicle maintenance costs Construct new road To enhance economic sections and social integration Routine maintenance To increase accessibility and promote economic and social activities Roads 2000 Programme To improve rural /urban 600 km of new roads constructed 130,000 km maintained on a routine basis 4,700 km constructed using KeRRA/ KURA KeRRA/ KURA/ KWS KeRRA/ 2013-2017 GoK DPs 2013-2017 GoK DPs 2013-2017 GoK 25,900 5,900 5,000 5,000 5,000
5,000
Objective
Time Frame
accessibility
Expected Output/ Outcome labour intensive techniques; Youth employed. MOTI 2013-2017 GoK 91,312 19,375 22,061 18,673 15,379
15,823
2013-2017 GoK
4,800
500
700
1,200 375
1,200 400
1,200 450
MOTI
2013-2017 GoK
7,600
1,000
1,200
1,500
1,800
2,100
IPP KenGen
55,863 6,745
49,855 1,000
6,008 -
164,992
29,644
91,738
43,611
753,926
172,938
149,416
139,070
122,070 119,520
5,606 20,400
5,606 20,400
5,606 20,400
Buildings and Other Public Works Construction of new To improve functionality Stalled building projects building, completion of and visual appeal of completed; stalled buildings projects public buildings as well Diplomatic missions and development of as securing them from constructed; mission abroad manmade and other New buildings completed. calamities. Development and To protect land and 8 jetties constructed and maintenance of coastline property sea wave action maintained infrastructure and improvement 7500 meters of seawall movement into and out of constructed water. Improvement of To improve accessibility 250 footbridges constructed communication in human in human settlements settlements especially in areas of difficult terrain Energy Increasing Electricity Generation Capacity and Availability Development of MSD To increase power 302 MW installed plants capacity Kindaruma Upgrade To increase power 32MW installed capacity and lower cost of power Development of wind To increase power 690.4 MW installed power projects capacity and lower cost of power Development of To increase power 3,085 MW installed geothermal in Olkaria, capacity and lower cost Menengai and Silaliof power Bogoria Karura hydro To increase power 90 MW installed capacity Raising of Masinga dam To increase power Dam walls constructed capacity Coal plant at Kilifi To increase power 600MW installed
119
IMPLEMENTATION MATRICES
Objective
Expected Output/ Outcome 620 Wells drilled KenGen GDC KenGen KNEB 300 300 51,000 10,200 10,200 10,200
Implementing Agency
Time Frame
Source of Funds
Indicative Budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 2017/18 68,146
capacity. To support 560 MW geothermal generation 2013-2017 GoK China Exim Bank/DPs 2013-2017 GoK DPs 2013-2014 GoK/DPs -
Drilling of wells at Olkaria, Menengai and SilaliBogoria LNG import handling facility Nuclear Power Programme
10,200
10,200 -
To increase power 495MW installed capacity To prepare the countrys readiness to establish nuclear power plants. To increase power 930 MW installed capacity MOEP 2013-2017 GoK/DPs 2,263,088 575,259 225,000
225,000
225,000 188,540
KETRACO
2013-2017 GoK/DPs
134,388
47,558
44,837
31,323
15,120
5,750
2013-2015 AfDB/GoK
4,900
3,430
1,470
127km of 400 kV double KETRACO Circuit; Uupgrading Lessos S/Stn and 2x75MVA transformers at Lessos. 612km 500kV HVDC bipolar; KETRACO 400kV/220kV substation. KPLC/REA KPLC
13,000
26,000
19,500
6,500
10,000 221
10,000 -
10,000 -
10,000 -
10,000 -
2013-2016 GoK/ADB/AF 65,000 D/ World Bank 2013-2017 GoK/KPLC/R 50,000 EA/DPs 2013-2014 KPLC/IDA/D 221 Ps
High Grand Falls, Magwagwa, Arror and Nandi Forest multipurpose projects Increasing Electricity Access Extension and Improve quality power rehabilitation of electricity supply, meet demand transmission lines growth, and increase reliability of power and increase access rate. Lessos-Tororo Connect Kenya and transmission line. Uganda and the great lakes region countries to facilitate regional power trade. Ethiopia Kenya Connect Kenya and transmission line. Ethiopia to facilitate regional trade Connection of new Enhanced power customers. connectivity. Energy Sector Recovery To reduce system losses, Project (ESRP) Group increase grid coverage scheme and Contract 1,2,3 and 4 Kenya Electricity Improve quality power Expansion Project (KEEP) supply, meet demand growth, and increase reliability of power and New distribution and power line constructed. KPLC 2013-2015 KPLC/IDA 4,813 3,369
1,444
Objective
Implementing Agency
Time Frame
Source of Funds
MOEP through NOCK. KPC KPC 2013-2015 GoK 5,556 1,500 2,028 2013-2015 KPC 30,000 10,000 10,000 8,686 2,028
52,500
10,500
10,500
10,500
10,500
10,500
KPC GoK KPC NOCK 5,250 2,338 240 1,050 30,000 10,000
3,919
1,719
increase access rate. Development of Oil Pipelines and Storage Facilities Development of the Increased up stream Increased oil and gas Mombasa Petroleum petroleum services. exploration and exploitation. Trading Hub Construction of Mombasa Supply reliability and Modernized Msa-Nrb Nairobi New Oil Pipeline safety. pipeline. Construction of a parallel Supply reliability and Completed Pipeline oil pipeline from Sinendet Safety to Kisumu Development of other oil Improve capacity and Improved capacity infrastructure efficiency of oil facilities Kenya Uganda Oil Supply reliability and Modernized pipeline. Pipeline Project safety. Construction of additional Additional Tanks storage tanks Expansion of NOCK Expansion of retail 20 additional retail stations Market share network per year established 2013-2015 KPC/PPP/Go K/DPs 2013-2015 GoK DPs 2013-2017 GoK DPs 2013-2017 NOCK GoK, NOCK, KPC. MOEP, IOCs. LAPSSET Authority/MOTI MOEP 2013-2017 GoK 14,000 2,800 2,800 2,800 2,800
2,800
255,000 900,000
51,000 100,000
51,000 200,000
51,000 200,000
51,000
Procurement of National Strategic Stocks of petroleum products Oil Exploration and exploitation. LAPSSET oil pipelines and port facilities 2013-2017 IOCs MOEP 2013-2017 GoK PPP
MOEP/REA
2,500
500
500
500
500
500
1.5 million barrels of bulk petroleum products in Strategic Stocks Discover and exploit oil -exploitation of oil from and gas reserves. explored wells; wells drilled. To develop the Crude and refined Oil and LAPSSET corridor port facilities developed; Mombasa-Nairobi pipeline to Lamu extended. Development of New and Renewable Sources of Energy Solar Energy Development Enhance access to 500 institutions connected renewable energy by with solar energy institutions and households far from the main grid Other renewable energy Enhance access to Household/institutions projects renewable energy by supplied with renewable institutions and energy facilities. MOEP REA 2013-2017 GoK REA
2,901.4
575
482.1
519.1
646.1
685.1
121
IMPLEMENTATION MATRICES
Objective
Implementing Agency
Time Frame
Source of Funds
Small hydro Power Plants 2013-2017 GoK PPP 4,900 980 980 980
households far from the main grid Small hydro powerPromote development and utilization. -access modern energy 980
980
Develop national hydropower MOEP atlas; 20 MW from hydro power based projects developed; 10 community projects facilitated. 20 wind, solar hybrid MOEP/REA generators installed in isolated mini-grids. 2013-2017 GoK PPP 3,358 550 605 666
732
805
B2:
Provision of ICT infrastructure To facilitate BPO to leverage Kenyas reputation as an innovative ICT hub; To increase access to ICTs; To enable universal access to technology and information in order to build knowledge based economy Time Source of Frame Funds Total 2013-2017 GoK 23,000 PPP Indicative Budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 2017/18 3,000 5,000 5,000 5,000 5,000
Programme/ Objective Project Establishment of Facilitate BPO to leverage Kenyas Konza Technology City reputation as an innovative ICT hub.
78,000
15,600
15,600
15,600
15,600
15,600
CCK ,MICT, ICT Agency, KEBS, KIE, KBC, MCK OCIO, MICT, KeGA,, ICT
2013-2017 GoK
130
52
32
22
12
12
Development of ecommerce
Expected Output/ Outcome BPO Park; Science park, Data centre Construction of basic infrastructure including access roads, telecommunications, water and sewerage and electricity Increase access to ICTs; Universal access to ICTs Enabling universal access to Secured data; technology and information in order Enhanced access to Public to build knowledge based information and / or services. economy. Increase efficiency, quality, Broadcasting sector modernized affordability and access in broadcasting; Daily monitoring of print, broadcast and online media. Enhance skills to market and sell GIS maps of all the inhabited products over the internet and to areas of Kenya developed; 2013-2017 GoK
2,500
500
500
500
500
500
Objective
deliver each product to the satisfaction of the customer CCK ,MICT, ICT Agency, KEBS, KIE, KBC, MCK 2013-2017 GoK 65,000 13,000 13,000 13,000 13,000
Expected Output/ Outcome National e-commerce master plan developed, Policies and related regulations developed. Secured networks; Reduced cyber attacks;
Time Frame
Put in place preventive measures and detect potential threats; Investigate and resolve cyber crime; Carry out research and analysis; Reduce the risk of cyber attacks. Reducing costs of access to ICTs; Legal, institutional and policy reforms implemented. Encourage entrepreneurship, innovation and employment creation; OCIO, MICT, KeGA,, ICT Agency, KEBS, KIE, KBC 2013-2017 GoK 70,230 10,050 20,100 20,080
10,000
10,000
Data, Content Development and Innovations Programme/ Objective Project Development and To develop, evaluate and dissemination of digital disseminate digital content at all content levels of education.
2013/14 348
Indicative Budget (Kshs Millions) 2014/15 2015/16 2016/17 348 348 348
2017/18 348
2013-2017 GoK
930
212
212
212
172
122
2013-2017 GoK
80
40
20
20
Expected Output/ Implementing Outcome Agency KIE Increased access to quality digital educational materials; Vetted digital materials MICT Awareness creation To heighten awareness of Kenya Jobs created Modern ICT Board multi media centre as an ICT hub, source of professional and innovative ICT established; Universal access to information; talent, products and services. Increased ICT sectors contribution to the GDP. Complaints Management Mediate and arbitrate media 100% resolution of media MCK and Media Alert System disputes disputes. Professional, responsible and ethical media industry Digitization of National Preserve archives of national National digital archive; ICT Board E-government Archives value Local content Open access; development; eCreate e-commerce opportunities commerce; Employment opportunity; 2013 - 2014 GoK 25.5 World Bank
25.5
123
IMPLEMENTATION MATRICES
Indicative Budget (Kshs Millions) 2014/15 2015/16 2016/17 352.75 246.5 212.5
2017/18 212.5
2013-017
GoK
4,597.5
1,129.5
1,129.5
1,079.5
729.5
529.5
Expected Output/ Implementing Outcome Agency Capacity building of the creative Center of Excellence ICT Board sector to reap the benefits of the established; E-government creative economy; Incubation infrastructure Implement a business incubation in place; program to increase the capacity Local content enhanced; of ICT start-up companies to National Awards Scheme operate for the long term for The Arts and Sciences in place; IBM Research Lab Africa established; Jobs created. Capacity building and To build and sustain the capacity Skilled technical staff; e-Government, training of the public workers to use ICT to knowledgeable citizens ICT Board deliver timely, affordable and that can transact with effective services to Kenyans; Government Provide an enabling environment (digital literacy) through ICT training for Citizens so that everyone can effectively access and use Government services. e-government systems To improve service delivery by Improved efficiency and e-Government, bringing services closer to the effectiveness in rendering ICT Board people; Improve on performance services to citizen and tracking and provide information reduced transaction cost real time for decision making. and time; Improved resource and asset management and accountability; Reduced duplication of efforts. 2013-2017 GoK 2570.25 1179.25 814.25 260.25 158.25
158.25
B3:
To leverage application of nanoscience and nanotechnology in all sectors of the economy To establish endogenous capabilities for nanoscience and nanotechnology interfacing among applied physics, chemistry and life sciences
Goal Strategic Objectives Programme/ Project Establishment of Kenya Institute of Nanotechnology (KIoN) Expected Output/ Outcome Functional interdisciplinary KIoN in place; Nanoscale Sciences and Technologies Act enacted. Implementing Agency MOE, NCST&I, Universities and Research Institutions Time Frame 20132017 Source of Funds GoK DPs PPP Indicative Budget (Kshs. Millions) 2014/15 2015/16 2016/17 1,223 1,223 1,322
2017/18 1,320
Establishment of National Physical Science Research Laboratory National Physical Science Research Laboratory established NCST&I,MOLHUD, MOTI,MOE 20132016 GoK DPs PPP 5,400 150
To establish endogenous capabilities for nanoscience and nanotechnology; To provide a legal framework for the centre To promote research 250 300
4200
500
Energy Technologies
To fulfill the energy demands of the growing economy To ensure energy security through the generation and application of scientific knowledge and related technological innovations. Expected Output/ Outcome Nuclear Research Centre and Kenya Institute of Oil and Gas established MOEP, MOLHUD, MOTI, MOE 20132014 GoK DPs PPP Lead Implementing Agency Time Frame Source of Funds Indicative Budget (Kshs. Millions) Total 4,500 2013/14 740 2014/15 1,260 2015/16 1,240 2016/17 1,380 2017/18 380
Programme/ Project
Objective
Establishment of Centre of Nuclear Research and Kenya Institute of Oil and Gas (KIOG)
125
IMPLEMENTATION MATRICES
To harness biotechnology for the countrys development To enhance institutional and human capacity and develop an enabling policy and legal environment for harnessing biotechnology and other bio resources to produce goods and services by 2017 Programme/ Project Objective Expected Output/ Lead Implementing Time Source of Indicative Budget (Kshs. Millions) Outcome Agency Frame Funds Total 2013/14 2014/15 2015/16 2016/17 2017/18 Develop the National bio- To establish the Kenya Institutions MOE, NCST&I, State Law 2013GoK 1,614 91 342 526 371 284 sciences sector Biosciences Institute established; office; Universities 2017 DPs (KBI) and Biological Policy and the bioResearch Institutions PPP Resources Centre sciences Act enacted (KNBRC)
Programme/ Project
Objective
To provide a legal framework for running TEC programmes in Kenya; Increase use f of Kenyan manufactured electronic devices and software applications
Expected Output/ Outcome TEC Policy and bill developed; Locally manufactured electronic devices; TEC centre established.
Programme/ Project
Objective
Utilize indigenous knowledge and modern ST&I to exploit Kenyas natural resources to produce goods and services To create an interface between indigenous knowledge and associated practices with STI and business expertise for economic development while ensuring environmental sustainability Expected Output/ Implementing Time Source of Indicative Budget (Kshs. Millions) Outcome Agency Frame Funds Total 2013/14 2014/15 2015/16 2016/17 2017/18 NPI Policy MoSC&A; 2013GoK 900 50 160 250 250 190 developed; MOE; 2017 DPs
Objective
Time Frame
Source of Funds
2017/18
technologies sector
Expected Output/ Outcome New innovations of natural products; Technologies mainstreamed into formal education curriculum.
Objective
To integrate ST&I in education management and curriculum delivery To enhance STEM capabilities in the education institutions in Kenya Expected Output/ Implementing Time Source of Outcome Agency Frame Funds KAIST established; MOE, NT, 2013GoK Skilled graduates; Research 2017 PPP Manpower strategy Institutions DPs developed. KENIA Universities NCST&I
Indicative Budget (Kshs. Millions) 2014/15 2015/16 2016/17 335 335 310
2017/18 250
Programme/ Project
Objective
To provide the right knowledge related information to the key ST&I Institutions and Organizations; Establish and equip a national ST&I data
Implementing Agency MOE, NCST&I, Research Institutions, ICT Board, MOICT, KNBS, Universities
127
IMPLEMENTATION MATRICES
Objective
Implementing Agency
Time Frame
Source of Funds
2017/18
Goal Sector Priority Expected Output/ Outcome KENIA established; County Advisory and Prospecting Centres in place; Technologies identified, transferred and adopted MOE, KENIA, Research Institutions Universities Collaboration Partners 20132017 GoK Total 1,100 2013/14 300 Implementing Agencies Time Frame Source of Funds
To Promote social and economic development through provision of proximate, easily accessible Technology and Innovations services at the country level. County Technology and Innovations Delivery Services Indicative Budget (Kshs. Millions) 2014/15 2015/16 2016/17 300 250 200 2017/18 50
Programme/ Project
Objectives
To enhance and generate new ideas through advances in technologies and innovativeness at the county level
Goal Strategic Objective Expected Output/ Outcome National Space Agency established MOE, State Law Office 20132016 GoK Implementing Agencies Time Frame Source of Funds Total 660
To promote Space Science and Technology To establish a National Space Agency to oversee Space Science and Technology development in the country 2013/14 110 Indicative Budget (Kshs. Millions) 2014/15 2015/16 2016/17 200 300 50 2017/18 -
Programme/ Project
Objectives
To establish a National Space Agency to oversee Space Science and Technology development in the country
B4:
LAND REFORMS
Sustainable land management Finalization of various Land Bills in line with the Constitution; Facilitation of the implementation of Kenya Vision 2030 flagship projects relevant to the Ministry; Provision of appropriate and adequate land use framework to guide socio-economic development; Provision of efficient and effective Land administration services; Facilitation of the provision of secure land tenure; Provision and maintenance of current and accurate geospatial information; Provision of capacity for effective and efficient Ministerial service delivery; Promotion of opportunity for inter-Ministerial relationships and Public/Private partnerships; and Institutionalization of the use of information and communication technology (ICT). Implementing Agency MOLHUD/NLC Total 23,000 Time Frame 20132017 Source of Funds GoK/ DPs/PPP Indicative budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 4,660 5,660 5,560 3,560 2017/18 3,560
Programme/ Project
Objectives
To develop a GIS based National Land Information Management System; Finalize land adjudication programmes; Provide appropriate programmes for sustainable land use
Expected Output/ Outcome GIS based National Land Information Management System established; Finalized land adjudication and settlement; Efficient administration of land resources
B4:
Programme/ Project
Objectives
To develop a National and county policy on performance management and automate the Integrated PMS To improve the access, quality and efficiency of public One Stop Shop Huduma Centers established across 47 Counties MODP 20132017
GoK
16,200
6,200
2,500
2,500
2,500
2,500
129
IMPLEMENTATION MATRICES
Objectives
Implementing Agency
Time Frame
Source of Funds
Delivery programme
Indicative budget (Kshs. Millions) 2014/15 2015/16 2016/17 800 800 800
2017/18 800
Re-engineering of Government Business Processes BPR Secretariat 20132017 GoK 2,100 300 500 500
Single Window Huduma Web Portal, Huduma Mobile Phone platform, Huduma Call Center and Huduma Payment Gateway established BPR projects undertaken at the National, Ministry, Department/Agency and county levels 400
400
Regulations and Legislation that recognize electronic records and allow for redesigning service delivery processes MDAs, Law Reform Commission 20132017 GoK 190 100 NT 20132017 GoK 9.6 1.6 2
50
20
10
10
To reduce operational bureaucracies and provide fast and convenient services to customers To create an enabling environment to redesign efficient service delivery processes and systems To ensure efficiency, transparency and speed in financial management and procurement 2 Reliable Integrated Financial Management System and eprocurement and payment system established Enhanced capacity of KSG. 20132017 20132017 GoK Competencies and Skills Audit done; and recruitment strategy developed MSPS, PCD PSC(K), CGs, TA PSC (K), MODP, County Service Boards GoK 11,879 2,220 1,687 1,220
960
760
HRM that includes public sector stakeholders partnerships and gender mainstreaming
To build the requisite skills for a modern and transformed Public Service
2,845
2,405
1,955
2,552
2,122
B6:
Goal Strategic Objectives Strategic Thrust Programme/ Project Total 1,369 2013/14 264
Objectives
Development and implementation of an Integrated National HR Development Strategy (IHRDS) and National Labour Market Information System (LMIS)
To streamline national human resource planning and development To ensure that the country has the right skills to actualize Vision 2030 Aligning skills development to the needs of industry Expected Output/ Implementing Time Source of Outcome Agency Frame Funds Harmonized and MOLSS&S 2013GoK coordinated National MOE 2017 DPs Capacity Building KNBS programmes; VDS National skills audit conducted.
2017/18 55
Skills Development
Objectives
Capacity building for the National Industrial Training Authority (NITA) and establish model vocational training centers
To build capacity and develop vocational and technical skills relevant to the labour demands of industry
Create a pool of skilled manpower for Industry To develop human resource within employment; To equip the youth with appropriate technical and vocational skills for the industry Enhance Youth and industrial training Expected Output/ Implementing Time Source of Indicative Budget (Kshs. Millions) Outcome Agency Frame Funds Total 2013/14 2014/15 2015/16 2016/17 Capacity for the MoLSS&S 2013GoK PPP 41,540 7,847 8,279 8,497 8,535 National Industrial MOE 2017 Training Authority PPP (NITA) enhanced NITA model vocational Training training centers Institutions and established. Industry
2017/18 8,382
131
IMPLEMENTATION MATRICES
Employment Promotion
Objectives
Facilitate employment creation and access to employment opportunities To promote employment creation as a key macro economic indicator Mainstreaming employment creation in all sectors and re-engineering public and employment services Expected Output/ Implementing Time Source of Indicative Budget (Kshs. Millions) Outcome Agency Frame Funds Total 2013/14 2014/15 2015/16 2016/17 National employment MoLSS&S, NITA, 2013 GoK 1,961 753 466 340 223 strategy and policy for NSIS, Kenya 2017 Kenya implemented; Green Police, MOFA&IT jobs in the country created; MoLSS&S Diaspora policy developed KIPPRA and approved. ILO NTA/ CBK/ CMA
2017/18 179
Programme/ Project
To Promote growth and development of MSE To enhance the capacity of MSEs to create employment and reduce poverty among Kenyans Conducive policy, legal and regulatory environment; Infrastructure development; Enhancing productivity of MSE products; Increase access to debt and equity sources of capital within the MSE sector; Increase MSEs access to markets and market information; Inculcate entrepreneurship culture Objectives Expected Output/ Implementing Time Source of Indicative Budget (Kshs. Millions) Outcome Agency Frame Funds Total 2013/14 2014/15 2015/16 2016/17 2017/18 To promote 47 MSE COE established; MOI&ED, KEBs, 2013GoK DPs 14,725 2,535 2,715 3,137 2,768 3,570 technological transfer, MSE and informal sector KIRDI, PCK, KIPI, 2017 PPP capacity building, surveys conducted and NMC, MOA, products designs and Reports prepared; Improved MOIED, NT, development and access to cheap and capital; MOCDM, MODP, marketing of MSEs Expanded Markets for MSEs MOGCSD, MSEs, products products; MFIs, CBK, CMA MSE Act, 2012 implemented
Productivity Management
Strategic Thrust
To raise the countrys productivity levels and competitiveness To provide quality information on Kenyas competitiveness; To raise awareness & adoption of productivity improvement tools in the public and private sectors of the economy; To develop a framework for coordination of policies, strategies and programmes on productivity; To improve the countrys productivity and competitiveness Increase availability of information on productivity and mainstream a productivity culture and enhance
Objectives
Indicative Budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 173 197 238 252
2017/18 280
Objectives
To mainstream occupational safety and health issues into management systems of both private and public sectors
Safe and healthy workplaces To mainstream occupational safety and health issues into management systems of both private and public sectors; To inculcate safety and health preventative culture in Kenyan workplaces Continuous reduction in the incidence of work-related fatalities and injuries Expected Output/ Implementing Time Source of Indicative Budget (Kshs. Millions) Outcome Agency Frame Funds Total 2013/14 2014/15 2015/16 2016/17 2017/18 National OSH database MOLSSS, MOE, 2013 GoK 2,581 634 802 366 579 200 management system MOEP, MOH, 2017 established; COTU, AG, AKI, Improved OSH research IRA programmes capacity; FKE, COTU, Occupational Safety, Health Media, PSC, and Injury Compensation MODP, NT Authority established and Research operationalized. Institutions, Universities, DPs
To promote industrial peace and harmony, and guarantee social economic rights of workers To establish and strengthen institutions of social dialogue; Expedite arbitration of industrial disputes; To enhance social dialogue; To fast track review of labour laws; To minimize industrial disputes through enforcement of labour laws Ensure social justice, industrial peace and guarantee workers rights for enterprise competitiveness Implementing Agency MOLSSS, NT, MOTI; Time Frame 20132017 Source of Funds GoK DPs Total Cost 3,337 Indicative Budget ( Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 288 512 937 915 2017/18 685
Programme/ Project
Objectives
133
IMPLEMENTATION MATRICES
Objectives
Expected Output/ Outcome Labour laws aligned to the constitution; National Labour Complex constructed; Reduced industrial strife. Social partners, AG PSC DPs ILO
Implementing Agency
Time Frame
Source of Funds
2017/18
Child Labour
Goal Strategic Objectives Strategic Thrust Programme/ Project Source of Funds GoK DPs ILO
Objectives
To strengthen child protection services; To enhance capacity on the elimination of the worst forms of child labour.
To eliminate the worst forms of child labour by 2015 To create child labour free zones Expand programmes for elimination of child labour Expected Output/ Implementing Time Outcome Agency Frame Child protection MOLSSS, 2013services established; MOIED, NT, 2017 National Child Labour Social partners Policy developed and AG implemented; Strengthened interventions on child labour.
Indicative Budget (Kshs. Millions) Total 2013/14 2014/15 2015/16 875 471 143 305
2016/17 194
2017/18 128
Social Protection
Improve the socio economic status of citizens and vulnerable groups Institute empowerment programmes targeting citizens and vulnerable groups Enhance social security for poverty reduction Time Frame 20132017 Source of Funds GoK DPs Total 610 Indicative Budget Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 90 105 120 135 2017/18 160
Programme/ Project
Objectives
Expected Output/ Outcome NSSF transformed into Social Insurance Pension Scheme; Social protection policy implemented.
Goal Strategic Objectives Strategic Thrust Programme/ Project Indicative Budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 10,356 12,639 13,790 13,977
Objectives
Youth empowerment
To provide adequate and appropriate technical, vocational, entrepreneurial and life skills to the youth. 4,843 31,942
2017/18 15,889
All youths accessing employment and skills development opportunities To provide capacity building and employment opportunities for youths Promoting entrepreneurship, internship, sports development and training for youths Expected Output/ Implementing Time Source of Outcome Agency Frame Funds Total National Youth Employment MODP, 2013GoK 66,653 Policy and National Action Plan on MoLSS&S, 2017 Youth Employment developed; UNDP Legal and institutional frameworks for the youth strengthened; National Internship/ Volunteerism programme established; Youth Polytechnics strengthened and expanded. 2013 GoK 123,865 Kenya National Sports Academy MoSC&A 2017 PPP established; New stadia built and existing ones refurbished; community sports grounds for grassroots trainings developed; International centre for performing arts and culture operationalized. 30,581 30,175
26,325
B7:
A society free from danger and fear To build effective and efficient security and policing services; To reduce the social costs of conflicts and disasters; To reduce the probability of the public engaging in criminal activities Objective Outcome/ Implementing Time Source of Indicative Budget (Kshs. Millions) Output Agency Frame Funds Total 2013/14 2014/15 2015/16 2016/17 2017/18 To improve surveillance; CCTV cameras installed; MOICNG (NPS) 2013-2017 GoK 78,985 18,118 13,488 14,634 15,682 17,063 To strengthen crime Forensic Laboratory MIRP investigation; To improve completed; National security data management Security Data Centre and usage. established.
135
IMPLEMENTATION MATRICES
Outcome/ Output Enhanced capacity of security and policing; Police and prison staff houses and correctional facilities constructed. Peace structures established; Enhanced collaboration with International and continental peace and security architecture; Enhanced coordination of conflict management between the national and county government; five water towers restored. MOICNG (NSC) NDMA MOD KFS 2013-2017 51,906 10,214 10,241 GoK DPs 10,293 10,502
Indicative Budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 51,919 84,955 83,557 84,435
2017/18 90,486
To build and modernize capacity of the national police services; To improve conditions of housing and correctional facilities. To establish and operationalise effective peace structures in the country; To restore the five water towers.
10,656
B8:
Programme/ Project
To make Kenya a cohesive country To facilitate and promote equality of opportunity, good relations, harmony and peaceful coexistence between persons of different ethnic and racial backgrounds in Kenya and to advice the government thereof. Objectives Expected Output/ Implementing Time Source of Indicative Budget ( Kshs. Millions) Outcome Agency Frame Funds Total 2013/14 2014/15 2015/16 2016/17 2017/18 Enhance capacity National Values and MoJNCCA 2013GoK 1,980 308 410 412 411 439 to inculcate Governance Policy NCIC 2015 national values developed and MODP and principles of implemented; National NYS governance Values and Principles centres established; National Values and Principles integrated into curriculum of higher learning institutions.
B9:
Programme/ Project
Objectives
To strengthen the institutional framework for drought management; To develop an integrated drought, climate and food security information system and a harmonized data gathering & processing mechanism.
Enhanced drought resilience & climate change adaptation To reduce drought vulnerability and enhanced adaptation to climate change To provide drought and climate information to facilitate concerted actions by relevant stakeholders To protect the livelihoods of vulnerable households during drought crises To ensure coordinated action by government and other stakeholders To develop and apply knowledge management approaches that generate evidence for decision-making and practice Expected Output/ Implementing Time Source of Indicative Budget (Kshs. Millions) Outcome Agency Frame Funds Total 2013/14 2014/15 2015/16 2016/17 Institutional framework for NDMA, ILRI, 2013GoK 31,875 5,551 5,720 6,631 7,270 drought management WFP, FAO, 2017 DPs developed; National NDMA, UN CGs Drought & Disaster agencies, Contingency Fund NGOs, CBOs, (NDDCF) established; CGs Integrated knowledge management System for Drought developed; Drought Risk Reduction and Climate Change Adaptation promoted; Hunger Safety Net Programme expanded.
2017/18 6,705
137
IMPLEMENTATION MATRICES
ECONOMIC PILLAR
C1:
TOURISM
Goals
Increase tourism arrivals from 1.8 million in 2012 to 3 million visitors by 2017; Increase tourism earnings from Kshs 96.0 billion in 2012 to Kshs 200 billion by 2017; Increase bed- nights by domestic tourists from 2.8 million in 2012 to 4 million by 2017; Develop an additional 30,000 beds in high quality accommodation facilities across the country by 2017 Strategic Objectives Tourism Product Diversification; Increasing bed capacity that is well distributed; Increased tourism yield; Enhanced Tourism Promotion and Marketing; Enhanced Tourism Investment; Expansion of tourism manpower training Time Source of Frame Funds 2013-2017 PPP GoK Total 1,913 Indicative Budgets (Kshs. Millions) 2013/ 14 2014/ 15 2015/ 16 2016/ 17 2017/ 18 400 506 78 744 185
Objectives
TBD
TBD
TBD
TBD
TBD
TBD
18,350 3,150
3,400
3,600
3,900
4,300
Expected Output/ Outcome Implementing Agency To open up new tourists Land acquired in Isiolo and MOEAACT circuits with greatest potential Turkana; 2 Resort Cities MOLHUD of attracting tourists by master plan, regional physical NT/MODP initiating development of two plan development plan and LAPSSET Resort Cities in the plan period model designed; Resort cities PPP (Isiolo and Turkana) developed CGs Development of To make coastal beach a Transport infrastructure and MOEAACT Coastal Beach premium product and beach management MOLHUD Ecosystem encompass the development programmes upgraded; hotels NT/ MODP/ Private Management of the Kilifi, Kwale and Lamu renovated/ construct, new Sector/CGs resort cities niche products developed Destination Marketing Enhanced Global Brand Increased tourist arrivals MOEAACT, Programme Campaign and Brand Increased domestic bedKTB, PPP Refreshment; Enhanced nights. MOFA&IT market penetration Enhanced domestic tourism promotion; Entrenching the Magical Kenya Expo & Festival Premium Parks To ensure sustainability of the Upgraded facilities for MOEAACT, Initiative parks and better revenue Amboseli and Lake Nakuru KWS, KTDC, CGs, yield; To revitalize Parks; Rehabilitated MOTI/MOI&CNT underutilized parks infrastructure for the 2 parks; PPP/CGs Premium parks decongested. 2013-2017 KWS CGs PPP GoK KTDC 2,878 551 608
572
578
569
Expected Output/ Outcome Implementing Agency Higher revenue per tourist MOEAACT; KTFC; visiting the Mara; Mara KTB; Narok County ecosystem area plan government implemented Total TBD 2013-2017 NMK KTB GoK PPP TBD TBD TBD TBD TBD TBD
Programmes/ Objectives Projects Maasai Mara National To develop and market the Reserve Maasai Mara as a national iconic product; To review and implement the Mara ecosystem area plan Eden Cradle of Position the area as renowned Humankind place for human origins; Open up the area for economic growth and poverty alleviation. NMK KTB MOTI PPP Turkana County Government NMK KTB MOTI PPP 2013-2017 NMK KTB GoK PPP 5,578 1,017 1,101 960 1,209 1,291
Indicative Budgets (Kshs. Millions) 2013/ 14 2014/ 15 2015/ 16 2016/ 17 2017/ 18 TBD TBD TBD TBD TBD
Development of Niche To develop new niche Products products for the tourism sector.
Cradle of Mankind circuit established; Premier Science Park; develop camp sites and Tourist Centre established; Employment creation and improved living standards. New Nairobi monuments and heritage sites circuit established; Upgraded Heritage sites and monuments conservation and gazettement; New monuments and heritage sites established; Home stay developed across the country; Promoted and Marketed Cultural tourism through festivals; Medical tourism and new agro-tourism products and circuits developed; Cruise tourism facilities developed. skilled personnel in the hospitality industry increased through training 2013-2017 KUC TF (CTDLT) GoK 2013-2017 GoK PPP KICC KTDC 5,085 1,530 1,580 1,40 KUC/TF (CTDLT) MOEAACT, Institutions of higher learning MOEAACT KICC KTB KTDC PPP 11,142 1,404 4,408 619
125
10
Expansion And To increase the number of Regulation Of Tourism trained tourism manpower Training To standardize and regulate tourism training Business and To develop a diversified MICE Increased number of Conference Tourism product business and conference Initiative tourists; New convention centres developed; MICE strategy implemented
4,355
355
139
IMPLEMENTATION MATRICES
Programmes/ Objectives Projects Tourism Sustainability To ensure environmental Programmes sustainability; To ensure well planned and managed tourism development; To provide in investment/refurbishment financing and incentives to SMES.
Indicative Budgets (Kshs. Millions) Total 2013/ 14 2014/ 15 2015/ 16 2016/ 17 2017/ 18 23,890 4,814 4,853 4,771 4,741 4,711
To enhance diplomatic relations Eco-Tourism and AgroTourism frameworks established; Eco-Tourism and Agro-Tourism increased. MOEAACT MOEWNR PPP CGs 2013-2017 GoK TBD TBD
Expected Output/ Outcome Implementing Agency Tourism Area Management MOEAACT MOEWNR Plans developed; PPP/CGs Environmental Guidelines and Standards for the sector developed; Tourism Databank and information system; Investment/ refurbished; Funds/ Incentives well regulated sector. Nairobi a Multilateral MOEAACT/MODP/CGs Diplomatic Hub 2013-2017 GoK TBD TBD TBD TBD TBD TBD TBD TBD
TBD
To create the necessary infrastructure and frameworks for the development of Ecotourism
TBD
C2:
Innovative, Commercially-oriented, Competitive and Modern Agriculture Institutional reforms; Increasing productivity; Increased access to markets; Land use transformation; ASAL development; Development and management of 200 mile EEZ Objectives Expected Output/ Implementing Time Frame Source of Indicative budget (Kshs. Millions) Outcome Agency Funds Total 2013/14 2014/15 2015/16 2016/17 2017/18 Agriculture Policy and MOALF, ASCU, 2013-2017 GoK 7,000 3,000 2,000 1,000 500 500 Develop MOLHUD, NTD, PPP appropriate policy legal framework consolidated MOIED, CG, DPs framework Sector specific policies Finalize, review updated and finalized and update agricultural legislations 2013-2017 GoK 31,500 10,000 10,000 10,000 1,000 500 Fertilizer cost reduction Facilitate access Increase in use of fertilizer MOALF PPP MOIED to affordable and by smallholder farmers NT quality fertilizer Feasibility study on CGs fertilizer plant
Objectives
Time Frame
Source of Funds
2017/18
Expected Output/ Implementing Outcome Agency implemented Increased output/yield Volume of beef exports MOALF, CGs, and other animal products increased 2013-2017 GoK DP PPP 870
774
Stock assessment & set NTD, FAO, MOEWNR, 2013-2017 MOALF, CG reference points Increased fish production from capture and culture fisheries; Reduced fish post harvest losses per annum; Increased exports of marine products.
GoK PPP DP
46,600
10,600
10,500
8,700
8,500
8,300
Increase irrigated land by 1 MOIED, NIB, million acres (especially in MOALF, Turkana and Tana Delta) Kerio Valley Devt Authority, Lake Basin Devt Authority, Tana and Athi Rivers Devt Authority, Increased new varieties Increased extension outreach MOALF, Producer organizations 2013-2017
2013-2017
320,000
67,000
61,000
68,000
66,000
58,000
To facilitate access of animal products to local, regional and external markets within international standards. Fisheries Development To increase fish production from capture and culture fisheries by 10% annually To reduce post harvest losses from approximately 25% to 5% by 2017; Development of the 200 mile EEZ for marine fisheries. Irrigated Agricultural Increase Programmes agriculture production Reduce overreliance on rainfed agriculture especially in ASAL areas National Agricultural Improved Sector Extension agricultural Programme (NASEP) research To improve GoK/ PPP 29,000 7,000 7,000 5,000
5,000
5,000
141
IMPLEMENTATION MATRICES
Objectives
Implementing Agency
Time Frame
Source of Funds
2017/18
access to agricultural extension service Increase access to agric inputs Access to agricultural inputs simplified MOALF 2013-2017 15,000 3,000 3,000 3,000 MOALF 2013-2017 GoK 15,000 3,000 3,000 3,000 3,000 3,000
3,000
Accelerated Agricultural Inputs Programme Agricultural Credit and Increase access Financial Services to credit and Access Programme financial services MOALF, MOIED,NIB, MOEWNR 2013-2017 GoK PPP 160,418 31,884 31,884 32,300
3,000
Development and rehabilitation of Water harvesting and irrigation infrastructure MOALF, MOIED, EAC, 2013-2017 KIRDI CGs GoK/ PPP 8,000 2,000
32,550
31,800
Construct water harvesting structures Expand area under irrigation To enhance agricultural product development and marketing systems.
1,500
1,500
1,500
1,500
Agro-processing support.
Increase no. of producers accessing affordable financial services including insurance schemes Increased production from ASAL; Increased area under irrigation; Water harvesting & storage dams constructed. Producers and market associations formed and linked to markets New local and foreign markets opportunities created; Value chains developed/ analyzed; New modern markets constructed. Agro-processing technology increased MOALF, MOIED, KIRDI 2013-2017 GoK/ PPP 5,000 1,000 1,000
1,000
1,000
1,000
MOALF NDMA
2013-2017
GoK
11,600
2,000
2,200
2,400
2,500
2,500
To promote and support agroprocessing business To establish an insurance scheme and introduce acceptable livestock evaluation system. To promote entrepreneurship The Northern Kenya Investment Fund ASAL Secretariat 2013-2015
4,000
2,000
2,000
Programmes / Projects (NKIF) MOALF NDMA, CGs 2013-2017 GoK PPP 3,100 750 750 600 500 500
Expected Output/ Outcome established& operationalised Production of droughttolerant & early-maturing crops increased
Implementing Agency
Time Frame
Source of Funds
MOALF, LLM operationalised to offer strategic direction for NDMA / LMB livestock production & marketing Land use / land cover developed for spatial plans, MOLHUD NDMA 2013-2017 GoK 8,215 2,594 2,137
2013-2014
GoK
7,256
2,026
1,550
1560
1560
560
and employment in the region Access to high-quality To promote drought-tolerant & production & early-maturing seeds marketing of in semi-arid areas drought-tolerant crops Livestock Marketing To promote Board (LMB) livestock marketing both nationally & internationally To promote Develop land use / rational & land cover sustainable assessments for resource use; spatial planning 1,156 1,161
1,167
C3:
TRADE
Goal Move Towards Formalized domestic Trade sector that is efficient, multi-tiered diversified in product range and innovation Strategic Objective Improve the supply chain of small operators retail markets; Expand formal outreach; Expand market access Expected Output/ Outcome Time Frame 20132017 Source of Funds GoK PPP Total 15,000 Indicative budget (Kshs. Millions) 2013/14 2014/15 2015/ 16 2016/ 17 2017/ 18 3,000 3,000 3,000 3,000 3,000
Objectives
20132017 20132017
44
4.2
10
10
10
10
Implementing Agency Create 3 wholesale hubs Increased wholesale business MOEAACT (lead), NT and Producer Business activity easy market access to Lands, Muranga producers provided efficiency county government, Groups (PBGs) with a MOIED, NEMA, PPP in the supply chain by pilot wholesale hub in Maragua to serve as a reducing the role of middlemen enhanced model for the private sector. Profile 1000-1500 Improved supply chain MOEAACT (Lead) Producer Business efficiency MOALF/PPP Groups Tier 1 Retail Markets Build three Tier 1 Retail Improved efficiency and MOEAACT (lead) NT, Markets with a pilot in increased in the market share MOLHUD, MOIED
18,750
3,750
3,750
3,750
3,750
3,750
143
IMPLEMENTATION MATRICES
Programmes / Projects Total of products sold through formal marketing channels Electronic single window in place. Integrated platform NPS and KNESW in place Unified Platform for payment of trade related fees, tariffs and levies KENTRADE (Lead), CBK KBA, KPA, KRA, MOIED, MoC& I 20132014 23 23 TBD TBD EPC (Lead), Ken Trade 2013 2017 GoK PPP DPs GoK DPs 500 400 710 50 60 250 20132016 1,070 73.4 952 45 -
Objectives
Implementing Agency Machakos county government, MOIED, NEMA, PPP Kenya Trade Network Agency GoK/IFC Info World Bank GoK ICF -
Time Frame
Source of Funds
Kenya National Electronic Single Window (KNESW) National Payment system (NPS)
Athi River to serve as model for the private sector Facilitate trade through electronic management of trade documentation To facilitate electronic payment of fees, duties and levies by stakeholders involved in international trade 250
Trade Facilitation, Competitiveness and logistics MOIED (lead), EPC, 2013KNBS, KRA, MODP, 2017 County Govts,
100
Integration of the International Road Transport (T.I.R) Carnet in Kenya Information system on goods and services
50
50
2013/17
GoK
1,260
190
210
260
300
300
Reduced Turnaround time for Exports across the borders. Increased competitiveness of Kenyan Exports Established institutional Provide business/trade framework for the information and business collection, collation and development services dissemination of trade Business community that is information in Kenya ( equipped with relevant and establishment of accurate business information Business Information for business and investment Centres) decision Revitalization of JLB Carry out Socio One Socio Economic Impact scheme Access to Economic Impact Assessment carried out Trade Finance Assessment of the Joint Legal framework developed Loan board Credit Amount of grants allocated to Scheme in Kenya; JLB increased Develop institutional and legal framework for the management of Joint Loans Board Scheme. Construction of Legal Ensure accuracy of 47 Legal Metrology Metrology measurements of goods laboratories constructed laboratories in 47 and services counties to meet MOTI (Lead) MOIED MOEAACT 20132017 GoK 57 10
10
10
10
17
Objectives Total
Implementing Agency
Time Frame
Source of Funds
20132015
NT/CGs
127
49.9
77
Programmes / Projects international best practices. Formulate and implement the PPP Development Strategy II (2013 2017) Capacity building on counterfeiting and property rights in Kenya Survey conducted; Sensitization and training programmes implemented ACA 20132017 GoK DPs 160 72 22 22 22 22
To determine the extent and depth of counterfeiting and piracy in Kenya; To have law enforcement agencies sensitized on intellectual property rights and infringements; To make the members of staff more efficient and effective. To Promote decent working environment for MSE operators MSE worksites developed 7,050 1,410 1,410
1,410
1,410
1,410
350
70
70
70
70
70
Establishment of an EMPRETEC Centre Trade exhibitions held; Trade Exhibitions participated by MSMEs
20132017 20132017
1,000
200
200
200
200
200
Trade Exhibitions
MOLHUD (Lead) MOTI, MOLHUDG, MOLHUDs, MSEs Associations and SACCOs MOLHUD (Lead) KNBS, MOTI, MOIED, MOLHUDG, IDS, ACG, K-REP, MOALF, MSEs associations and SACCOs MOTI, KIRDI, UNCTAD, MOLHUD, Academia, MOTI (lead), PPP, CGs, EPC 50
10
10
10
10
10
145
IMPLEMENTATION MATRICES
Objectives
Implementing Agency
Time Frame
Source of Funds
trade exhibitions and Cross Border Trade Association (CBTAs) To provide incubation facilities for MSMEs MSME tool room and Incubation facility in place MOTI(Lead) , MOIED 20132017 GoK PPP DPs 157 50 45 25 22
15
Establishment of MSME Tool room and incubation center at Kenya Institute of Business Training Establishment of a MSME National Documentation Centre Fully fledged National Documentation Centre established MOTI 20132017 GoK PPP DPs 51 20 15 8 4
MOTI
20132017
170
50
30
30
30
30
MOLHUD, MOTI, MODP, MOIED, MOALF,MSEs Association and SACCOs, PPP 20132017 GoK
7,500
1,500
1,500
1,500
1,500
1,500
Seven independent MOTI (lead), commercial offices established NTA, NT, EPC MOFA&IT
469
39.33
130.731
45.25
161.54
92.354
To capture/ profile MSMEs for easier evaluation ,monitoring and counselling for establishment of case studies Establish an open Train MSMSEs in all the learning programme 47 counties through the centre in creation of a virtual Entrepreneurship in learning centre to 47 counties supplement lecturerMSMSE training methodology Establishment of To Promote technology Centres of transfer, capacity excellence (COEs) building, product design and development and marketing of MSE products. Establish seven To set up Independent Independent Trade Trade Commission in Commissions New York, Johannesburg, Mumbai, Geneva, Frankfurt, Shanghai and Brussels Decentralize the Decentralization of the operations of the operations of the Export Business Inquiry and Trade information Points at the EPC (Lead) and MOTI 2013 2017 GoK DPs 56 12 17.2
8.5
9.5
Objectives Total
Implementing Agency
Time Frame
Source of Funds
20132017
GoK DPs
202
50
50
50
50
Programmes / Projects Export Promotion Council to selected Counties, undertake outreach programmes to exporters and establish and operationalize a Centre for Product Design and Development EPC (Lead), 20132017 GoK 42 7 8 9 9 10
EPC
GoK
11
Promotion Council to County Offices established Counties Diversification of Export Product Design and Products base Development Centre established Value Added Products produced. Up-to-date export Relevant export trade and trade/business business intelligence information through established procurement of trade information (subscription to trade databases) Information to exporters Export ready enterprises and producers of export established goods and services Product and Market Information on Export Markets Diversification in the and Export Product profiles; regional and global Product recognition and market increased exports. EPC 337 1,019 343.5
345
EPC, KenInvest
20132017
25
Diversify export products and markets through market research in high potential markets and participation in global export promotion programmes. Attract investments in the export related value chain for production of value added products. Establish a world class Trade Centre in Nairobi and a modern Exhibition and Convention Centre. EPC (Lead), MOTI, DPs, NEMA, MOTI, CGs, Min. of Lands 20132017 GoK PPP DPs 1,795
Development of World Trade Centre and superior Business Convention Centre Infrastructure and super established structures in Kenya
590
360
360
125
360
147
IMPLEMENTATION MATRICES
Objectives Total 10 Indicative budget (Kshs. Millions) 2013/14 2014/15 2015/ 16 2016/ 17 5 5 -
Time Frame 20132015 20132015 GoK PPP DPs 4,000 2,000 2,000 -
Focused and coordinated export promotion activities Trade Finance and Guarantee scheme for Kenyas Export system EPC (Lead) ,NESC, NT, MOTI, MOIED, PPP
2017/ 18 -
Aligned export promotion activities Increased exports Available Export Development Fund; Credit Guarantee Mechanism operating; Export Business Finance and Guarantee Services Improved market Access for Kenyan Exports in Dubai, Juba, Kinshasa, and Lumbubashi EPC (Lead), MOTI, NT, NTA 20132017 GoK PPP 1,934 589 360 360 125
500
20132015
GoK
10
Programmes / Projects Develop an Export Development Strategy Establish and operationalize a Credit Guarantee Scheme and Export Development Fund Establish distribution infrastructure; warehouses and business information Centers in Kinshasa and LubumbashiDRC; in Juba-the Republic of South Sudan; and in DubaiUAE Formulate and implement a coherent regional integration strategy for Kenya. Implement the EAC Single Customs Territory through introduction of tax payment at first point of entry. EAC Secretariat 20132017 TBD TBD TBD TBD TBD TBD TBD EPC 20132014 20132014 GoK 3 3 -
To develop a revenue management framework To achieve free circulation of goods To review legal and institutional framework
Supportive instruments (Regulatory and Operational) in place; Pre-conditions for implementation of the SCT developed; Regulations for ICT; Institutional framework developed. Institution strengthening An Export Development and Enactment of the Promotion Act enacted Export Development and Promotion Bill Review the AntiTo tighten the identified Anti-Counterfeit Act reviewed Counterfeit Act loopholes and make the Act punitive ACA GoK DPs DPs
--
Objectives Total 25
Provide a policy e-trade policy in place direction in e-trade Provide framework for expansion of domestic and export trade Ensure international Legal Metrology bodies recognition of goods and accredited. services MOTI 20132015 GoK 20 15 3 2 -
Implement the Trade Remedies Law Business Inquiry and Trade information Points Increment in number of indigenous firms to export market under EPZ 2013 2017 197 EPC (Lead), MOTI, NTA MOFA&IT EPZA 2013 2017 GoK PPP DPs GoK 550 50
20132017
GoK
205
40
50
55
60
100
100
150
150
47
50
50
30
20
Accreditation of Legal Metrology bodies under ISO 17020 (Inspection Bodies), ISO 17024 (Certification and ISO 17025 (Laboratory). Establish an effective Trade Remedy Regime Trade(Commercial) Centers in London, New York and Dubai Development of phase 3 of Export Business Accelerator (EBA) in Athi River EPZ Formulate and implement cluster development policy Cluster development policy in MOIED & MOTI place (lead) , MOALF, Academia, KAM 20132017 GoK DPs 1,019 250 150
Communication with markets and Business information Terminals To provide access to nurturing of indigenous firms to venture into export market under EPZ To increase regional and national competitiveness
154
200
265
149
IMPLEMENTATION MATRICES
C4:
Manufacturing
2017/18 800
41,125
1,500
Cooperatives development
TBD
Competitive manufacturing sector Promote industrial dispersion and balanced economic development in the country; Enhance technology innovation Promotion of value addition Objectives Expected Output/ Implementing Time Frame Source of Funds Indicative Budget (Kshs. Millions) Outcome Agency Total 2013/14 2014/15 2015/16 2016/17 Construction of 3 Special Economic MOEAACT (Lead), NT, 2013GoK 4,500 400 1300 1000 1000 special economic Zones operational MOIED, MOTI, MOEP, 2017 PPP zones in Mombasa, MODP, MOLHUD, DPs Lamu and Kisumu PPP Promote industrial Land acquisition, MOIED, MoALF, NT, 2013-2017 GoK 24,5575 28,200 58,750 58,750 58,750 dispersion and Mater plan and EIA KIRDI, KIPI, KEBS, DPs balanced economic for 47 SME and KIE, KEPSA, MOLHUD, PPP development in the Industrial parks MODP, KenInvest, CGs CGs country Basic infrastructure EPZA, Research Enhance developed. Institutions technology innovation Promotion of value addition Promotion of value Land acquired, Mater MOIED, MoALF, KIRDI, 2013-2017 GoK 7,500 1,500 1,500 1,500 1,500 addition plan and EIA for3 KIPI, KEBS, DPs research and Industrial clusters CG, PPP development developed; Feasibility KIE, MoNT, KEPSA, studies reports; Basic MOLHUD, MODP, infrastructure KenInvest, Universities developed; Potential investors identified Improved Enhanced collective MOIED, MOALF, NTD, 2013-2017 GoK TBD TBD TBD TBD TBD bargaining power marketing through MOEAACT, CG, DPs &MOEAACT well managed PPP organized cooperatives marketing & value addition To promote local Land acquired, MOIED, MOEWMR, 2013-2017 GoK 11,700 3,300 2,100 2,100 2,100 production of Iron Feasibility study &EIA MOLHUD DPs and steel products reports; Strategic MoM, NMC PPP
2,100
Objectives
Implementing Agency
Time Frame
Source of Funds
2017/18
MOIED, MOEP, Universities, Research Institutions 2013-2017 GoK PPP DPs 12,760 760 3,000 3,000
3,000
3,000
2013-2017
4,800
800
1,000
1,000
1,000
1,000
2013-2017
150
20
25
30
35
40
2013-2017
250
80
60
50
40
20
2013-2017
40,000
8,000
8,000
8,000
8,000
8,000
Expected Output/ Outcome Investor identified; Mini steel mill in place-Restructured NMC Skills development for to create a globally Needs analysis report technical human competitive and Transformation of resource for the adaptive human KITI as centre of manufacturing sector resource base for excellence; MoUs in manufacturing place for sector academia/industry linkages; Packaging resource centre Transformation of KIRDI To enhance Upgraded equipment, into a world class capacity for expansion physical research institution research & infrastructure development and State-of-the art technology transfer. research facility in place. Enhancement of local Expand Guidelines prepared content in Government opportunities & for undertaking GoK projects Increase market projects; access for local Amendments to production. PPDA of 2005 Energy provision for the To enhance Energy requirement manufacturing sector provision of report. adequate, reliable & affordable energy supply to the manufacturing sector Reform and revitalize To provide low Restructured, the DFIs to support the interest rate long Reformed manufacturing sector term industrial &Recapitalized DFIs financing Natural Products To develop niche Countrywide and Industry products and cross-border product MOIED, NT, DFIs, CBK Natural Products Industry Coordination 2,074 40 450 640 840 104
151
IMPLEMENTATION MATRICES
Objectives
Time Frame
Source of Funds
2017/18
Implementing Agency Board, MOIED, KIRDI,KIPI, KIE, KEPSA; KAM; KNCCI; KEBS; PPB/MOEP/CGs
Expected Output/ Outcome distribution and uptake outlets; A number of locally derived value-added natural products in local and export markets; A functional revolving fund OVOP projects implemented in 47 counties MOIED MOALF MOSCA NT/JICA/CGs 2013-2017 600 80 100 GoK PPP DPs CGs 120 140 160
One Village One To increase Product Project (OVOP) communities incomes through targeted value addition and market access Productivity To promote labour improvement and and total factor cleaner production productivity improvement MOIED KNCPC PCK/MOEP/KAM MOLSSS 2013-2017 GoK PPP DPs 50 MOIED KIRDI Universities Research Institutions PPP 2013-2017 GoK PPP DPs 500 10 10 100 100
10
10
10
100
100
100
MOIEDCT& ED JICA
2013-2017
20
10
10
250 SMEs trained Energy, resource and waste management audits undertaken in targeted SMEs Research development To develop Database of research and commercialization innovative capacity outputs; 100 research and outputs for commercialization commercialization. of research findings 100 contracts signed; 100 new products produced Review of MAPSKID To provide an Reviewed implementation MAPSKID roadmap for the Sessional paper no.9 of 2012 on NIP Branding and Marketing To improve 50 niche products by of Kenyan SME competitiveness of MSMES produced Products SME products MOIEDCT&ED 2013-2017 KEBS/KIRDI/KIPI/KNTC KNFJKA GoK PPP DPs 150
30
30
30
30
30
C5:
Goal Strategic objectives Expected Output/ Outcome Implementing Agency Training sessions carried out e-Government, MOIEDCT, CGs Time Frame 20132017 Source of Funds GoK/ PPP
Transform Kenya into the ICT hub for East Africa and beyond To connect every Kenyan to the new infrastructure; To harness ICT for efficient and effective government, e-commerce, economic growth and job creation for the youth Indicative Budget (Kshs. Millions) Total 2013/14 2014/15 2015/16 2016/17 2017/18 229,511 49,962 50,017 39,634 39,936 49,962
Innovations
GoK/ PPP
12,500
2,500
2,500
2,500
2,500
2,500
Programmes / Objectives Projects Capacity building and To build and sustain the capacity training of the Kenya government workers to use ICT to deliver timely, affordable and effective services to Kenyans. Data, content To develop and disseminate development and digital content innovations IBM Research Encourage and strengthen an Laboratory innovative culture Trained human resource; research; Solutions to the challenges develop IBM, E-Government NT TBD TBD
TBD
TBD
C6:
FINANCIAL SERVICES
Goal Increased market access, efficiency and financial stability Strategic objectives Develop and implement policies to streamline the architecture to encourage consolidation and promote competition; Increase usage of electronic payments across the economy; Develop and enforce a comprehensive and effective framework of consumer protection for financial services; Create a sustainable national financial education programme; Improve the credit information infrastructure; Facilitate new market segments for equity investment; Facilitate new products for short term supply chain and asset finance for enterprises; Increased cross-border trade facilitated by integrated financial system Expected Output/ Outcome NT NT/ NIFCA Implementing Time Agency Frame Source of Funds 2014-2014 GoK 2013-2014 GoK/ PPP Total 30 300 Indicative Budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 2017/18 30 100 200 -
Programmes / Projects
Objectives
Nairobi International Develop conceptual framework and Financial Centre establish institutional structure Develop partnership and attract investors NIFCA CMA
Legal and institutional framework established Critical mass of potential new business identified and investment committed NIFC operationalized
70 TBD
TBD
70 TBD
TBD
TBD
TBD
Deepening of Capital To continue with development & Markets implementation of a master plan for
153
IMPLEMENTATION MATRICES
Objectives
Source of Funds
2013-2015 CMA
10
CAK CMA CBK IRA RBA SASRA NT 2013-2014 GoK/ PPP 186
46
140
60
25
30
20
20
10
Acquisition and implementation of An efficient and secure trade trade reporting infrastructure for reporting infrastructure hybrid bond/equity market development Implement Shariah compliant projects A vibrant market for Shariah compliant products Implement certification program for Certified and highly capital markets participants in Kenya professional markets participants in Kenya Architecture of the To develop strategy for banking Strategy for competition and Financial Services competition and consolidation; consolidation developed and Sector To complete demutualization of the implemented; Policy framework NSE and the sharing of infrastructure for insurance developed and between the CDSC and CBK-CSD; approved; Stronger Sacco To develop and implement a single sector; An efficient and secure Central Securities Depository unified CSD handling all asset classes of securities; New ownership structure of NSE. MoU between CDSC and CBKCSD. Supervision of To fully implement risk based Reduced risk from large Financial Services supervision; Implement consolidated financial service groups; supervision of conglomerates Stable financial services sector Payments economy Operationalize the National Payment Institutional framework for Systems Act electronic payments; Develop a national strategy for shift to Sustained and effective a cash-lite economy (e-payment coordinated public and private System) sector action to support expansion of e-payments Financial Capability Develop a policy and legal framework Shared national vision and Develop and implement strategy for enabling legal and institutional financial consumer protection framework for effective financial consumer protection and NT CBK 2013-2016 GoK/ PPP 46 14 22 10 -
Objectives
Source of Funds
2013-2015 GoK
52
18
25
RBA NT CBK SASRA NT CBK 2013-2014 GoK/ PPP 6 7 3 0 CMA NT PPP 2012-2014 GoK/ PPP 12 6 6 0
education; Strategy for financial consumer protection developed and implemented. Long Term Savings Expand provision of old-age pensions Reduction in old-age poverty Expand availability and use of micro- Credit information system insurance services expanded; Increased equity investment in SMEs Government Debt Introduce new products, markets and Broader range of government Market technologies debt products; Broader range of intermediaries EAC Financial Mutual recognition of stock Larger market for capital Services Integration exchanges markets trading operationalized Establishment of the EACB Harmonized approach to regulation encouraging crossborder operations; Lower cost, more timely and secure payments system 0
C7:
Goal Strategic objectives Expected Output/ Outcome Potential mineralized areas mapped MOM Implementing Time Agency Frame Source of Funds Total 2013-2017 GoK/DPs 27,000
Establish the commercial viability, develop the requisite infrastructure and production in the oil, gas and other minerals sector Data collection, collation and analysis; Enhance partnership in data exchange so as to reduce cost in exploration and access to new technology; Skills Development and enhancement of local expertise; Commercial production of oil and mineral resources; Development of the requisite infrastructure Indicative Budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 2017/18 7,000 5,000 5,000 5,000 5,000
Programmes / Projects
Objectives
To identify potential mineralized areas for ground followup To have a certification laboratory and audit agency Graded and certified MOM minerals; Strengthened capacity for mineral analysis
450
300
200
100
100
155
IMPLEMENTATION MATRICES
Programmes / Projects and identification. Regional hub created for trading in minerals and metals MOM 2013-2017 GoK/DPs 250 50 50 50 50
Objectives
50
Processed raw materials National government investment in prospecting and mining MOM 2013-2017 GoK/DPs 1,150 400
MOM
250
400
400
400
300
Minerals and metals To promote commodity exchange awareness on the potential and market of identified minerals Mineral processing To promote and economic zones develop skills and value addition National mining To serve as the corporation investment arm of the national government 300 250
100
100
SOCIAL PILLAR
D1:
Enhancing Quality and Relevance of Education Human Resource Development Indicative Budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 9,146 4,796 5,296 5,656 2017/18 6,156
Programmes/Projects
Objectives
ECDE Mainstreaming
Expected Outcomes/Output ECD policy reviewed and To review ECD policy and align to aligned with the constitution; the constitution; ECDE teachers recruited; To integrate County ECDE resource ECDE in to centres established; universal ECDE materials education development and curriculum. distributed
Time Sources of Funds Frame Total 31,050 2013-2017 GoK UNICEF DPs
Objectives
Indicative Budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 3,305 4,910 5,910 5,710
Expected Outcomes/Output To Promote Provide School Based nutrition and Health and Hygiene hygienic practices Education provided; in schools School Based Health Services provided; Midday Meals to ECDE children provided; To Promote good School Milk provided health of the pupils MOE 2013-2017 GoK 105,000 21,000 21,000 21,000 21,000 21,000 MOE, TSC CGs Parents NGOs CBOs FBOs 2013-2017 GoK CGs 51,825 6,505 19,090 20,940 17,035 15,255
To construct and rehabilitate class rooms; To create and provide friendly learning environment to all learners.
Affirmative Action
Primary schools constructed and rehabilitated; ASAL learning centres established; Multipurpose Development Training Institutes (MDTIs) established; CLRCs constructed and equipped; Additional Streams in secondary schools established; Secondary Schools constructed and rehabilitated; Special Secondary Schools rehabilitate and equipped; TTCs rehabilitated and upgraded; Pedagogy/Internship Institute/INSET Centre established. National Survey on Special Needs conducted; Talent Grants introduced for OVCs; Most MOE UNICEF CGs Parents 2013-2017 GoK CGs UNICEF 21,560 2,530 4,030
4,500
5,000
5,500
157
IMPLEMENTATION MATRICES
Objectives
Time Frame
Sources of Funds
Implementing Agency NGOs CBOs FBOs MOE 2013-2016 GoK DPs 5,000 100 100 2,400 2,400 -
Expected Outcomes/Output Vulnerable Children Support Grant; Programme revived and expanded. Skills Inventories and Mapping done
Carry Out Curriculum Review and Reform 2013-2017 GoK 11,620 2,324 2,324
19,000
1,000
1,000
7,000
6,000
4,000
Teacher recruitment and management 2013-2017 GoK CGs PPP 33,050 3,350
To establish the skills gap in the economy and develop a Human Resource Development Plan To align education curriculum with the Constitution To reduce teacher pupil ratio 2,324 KIE and other education stakeholders MOE TSC CGs MOE, MOICT, DPs 8,800 8,800
2,324
2,324
8,800
3,300
Education Sector Governance MOE, TSC, KNEC, KICD 2013-2017 GoK CGs
8,481
831
1,950
1,900
1,900
1,900
Curriculum Reviewed and Reformed in line with the constitution Teachers recruited; Quality of education improved. To review Policy Policy and Institutional and Institutional Framework for ICT Framework for Integration in Education ICT Integration in reviewed; ICT Equipment Education. for Schools procured; ICT integrated in SNE. To enhance Improved governance in efficiency and the education sector; effectiveness of Education sector policies education developed. services; transparency and accountability To mobilize Education and Training financial Financing Model resources for developed; education Fee Guidelines enforced; Allocation Criteria for Sharing Resources Among Education 2013-2017 GoK CGs PPP 115 45 55
Objectives
Time Frame
Sources of Funds
Project Name: Country wide Scale up of Community Health High Impact Interventions; To reduce Maternal Neonatal and child health (MNCH) Morbidity and Mortality Scale up of high impact interventions (HII) at level 1 in order to reduce Maternal and neonatal Mortality and Morbidity in the country. Objectives Expected Implementing Time Sources of Indicative Budget (Kshs. Millions) Outcomes/Output Agency Frame Funds Total 2013/14 2014/15 2015/16 2016/17 2017/18 To increase Community units MOH, Community, 2013-2017 GoK 47,359 8,435 9,275 10,519 11,973 7,157 access to established; CGs DPs health and Community strategy NACC CGs related services coverage for Nutrition, to communities FP, immunization HIV and AIDS and Malaria services expanded.
Improve access to referral systems Country-wide coverage of efficient and effective referral network and supporting systems Guide and support the establishment of efficient vertical and horizontal country-wide comprehensive referral system with national, intra and inter-county health services 2013/14 170 Indicative Budget (Kshs. Millions) 2014/15 2015/16 2016/17 200 200 200 2017/18 770
Programmes/Projects
Objectives
To guide and support the establishment of efficient vertical and horizontal country-wide comprehensive referral system
Expected Outcomes/Output Legal and institutional framework developed; Communication, related equipment and ambulances for national and county level procured.
159
IMPLEMENTATION MATRICES
Objectives
Time Frame
Sources of Funds
Project Name: Country wide Scale up of Community Health High Impact Interventions; To reduce Maternal Neonatal and child health (MNCH) Morbidity and Mortality Scale up of high impact interventions (HII) at level 1 in order to reduce Maternal and neonatal Mortality and Morbidity in the country. Objectives Expected Implementing Time Sources of Indicative Budget (Kshs. Millions) Outcomes/Output Agency Frame Funds Total 2013/14 2014/15 2015/16 2016/17 2017/18 To increase Community units MOH, Community, 2013-2017 GoK 47,359 8,435 9,275 10,519 11,973 7,157 access to established; CGs DPs health and Community strategy NACC CGs related services coverage for Nutrition, to communities FP, immunization HIV and AIDS and Malaria services expanded.
Improve access to referral systems Country-wide coverage of efficient and effective referral network and supporting systems Guide and support the establishment of efficient vertical and horizontal country-wide comprehensive referral system with national, intra and inter-county health services 2013/14 170 Indicative Budget (Kshs. Millions) 2014/15 2015/16 2016/17 200 200 200 2017/18 770
Programmes/Projects
Objectives
To guide and support the establishment of efficient vertical and horizontal country-wide comprehensive referral system
Expected Outcomes/Output Legal and institutional framework developed; Communication, related equipment and ambulances for national and county level procured.
Goal. 3 Strategic Objectives Expected Outcomes/Output 2013/14 1,000 1,200 1,440 1,728 2,074 2017/18 Improved access to MOH, CGs comprehensive services; Model level 4 Hospitals rehabilitated/upgrades 20132017 GoK DPs CGs 7,442 Implementing Agency Time Frame Sources of Funds Total Indicative Budget (Kshs. Millions) 2014/15 2015/16 2016/17
Construct Model level 4 Hospitals; To improve access to comprehensive health services To provide, a functional and sustainable infrastructure for comprehensive health services.
Programmes/Projects
Objectives
Rehabilitation/upgrading of To rehabilitate/ infrastructure and equipment upgrade health for level 4 facilities facilities to provide comprehensive health care services
Goal. 4
Project name: Health care subsidies for social health protection. Project Goal: Comprehensive coverage to health services by the economically disadvantaged Consolidate and expand social health subsidy mechanisms to contribute towards achieving UHC Objectives Expected Implementing Agency Time Sources of Outcomes/Output Frame Funds Total Cost To establish Framework for MOH/NT/MOGEVG/ 2013-2017 GoK 244,320 mechanisms management of County Government DPs for health health subsidies DPs CGs subsidies for established; the poor Economically disadvantaged identified and benefiting; Free maternity services at all public health facilities provided.
Indicative Budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 13,088 29,633 45,675 75,452
2017/18 80,472
161
IMPLEMENTATION MATRICES
Goal. 5
Strategic Objectives Time Frame 5 Total 3,107 2013/14 13 Sources of Funds GoK Indicative Budget (Kshs. Millions) 2014/15 2015/16 2016/17 60 1,010 1,012
Project name: Re-engineering Human Resources for Health 1.Establish incentive system for HRH 2. Improve leadership and management of health services. Improving management of the existing health workforce by putting in place, rational capacity development attraction, retention, motivational mechanisms for the workforce. 2017/18 1,012
Programmes/Projects
Objectives
Develop incentive and retention schemes for health workers in hardship areas
Expected Implementing Outcomes/Output Agency Rewards system MOH/County Govt established; Health system management institution established.
Goal. 6
Establish and equip 58 facilities to e-health hubs both in the county and national facilities.
Project name: Establish e-health Hubs in 58 health facilities. Project Goal: To Promote and facilitate use of ICT to improve Patient care. Use of e-health technology to facilitate management of cases. Objectives Expected Implementing Time Sources of Outcomes/Output Agency Frame Funds To increase e-health hubs both MOH/County Govt. 2013GoK access to health in the county and 2017 DPs information national facilities using ICT. established and equipped.
Indicative Budget ( Kshs. Millions) 2014/15 2015/16 2016/17 200 250 300
2017/18 300
Goal. 7
Project Name: Mainstreaming research and development in health To improve decisions about health systems in Kenya by improving policymakers access to and use of research evidence that is relevant, reliable, accessible and timely, to help improve the health care available for the poor and vulnerable groups 1. National priority setting and identification of sustainable funding mechanisms Strategic Objectives 2. To establish and maintain a policymakertargeted website architecture. Programmes/Projects Objectives Expected Implementing Time Sources of Indicative Budget (Kshs. Millions) Outcomes/Output Agency Frame Funds Total 2013/14 2014/15 2015/16 2016/17 2017/18 Mainstreaming research To provide Highly skilled MOH, KEMRI, 2013GoK 35,719 800 5,760 6,912 8,294 9,953 and development in health specialized training human resource NCST, Universities, 2017 DPs and capacity health issues; Industry, Private CGs building in the Appropriate health research
Expected Implementing Outcomes/Output Agency conduct, technologies, institutions and dissemination, use products and utility and impact models for measurement of improved service research. delivery developed.
Objectives
Time Frame
Sources of Funds
Goal. 8
Strategic Objectives Time Frame 20132017 Total TBD 2013/14 TBD Sources of Funds GoK PPP
Project name: Health and Medical tourism. Project Goal: Establish / Expand existing facilities to be center of excellence for Medical Tourism. Position the Country as a destination for specialized health and medical services Indicative Budget (Kshs. Millions) 2014/15 2015/16 2016/17 TBD TBD TBD 2017/18 TBD
Programmes/Projects
Expected Implementing Outcomes/Output Agency Health and Medical tourism. To increase Centre of excellence MOH/PPP medical tourism for medical tourism and access to established; specialized Specialized treatment medical services. facilities expanded.
Objectives
Goal. 9 Strategic Objectives Time Frame 20132017 Total 205 Sources of Funds GoK/DPs 2013/14 50
Project name: Locally derived natural health products. Project Goal: Regulatory guidelines to allow registration of natural health products Refine existing regulatory guidelines to allow registration of natural health products Indicative Budget ( Kshs. Millions) 2014/15 2015/16 2016/17 2017/18 50 35 35 35
Programmes/Projects
Objectives
Enhancing uptake of locally derived natural health products into national healthcare
Develop regulatory guidelines to allow registration of natural health products of acceptable standards.
Expected Outcomes/Output Regulatory framework for certification of locally derived value-added natural health products developed.
Implementing Agency MOH/ KEMRI, Natural Products Industry Coordination Board, PPB, KEBS,
163
IMPLEMENTATION MATRICES
D3:
Goals Strategic Objectives Expected Outcomes/Output National Green Economy Strategy MEMR/ developed; National Climate Change NEMA Action Plan implemented; Urban Rivers Rehabilitation Programme expanded; Modernized meteorological services; Waste Management and Pollution Control implemented; Geology, Minerals and Mining Bill finalized; Increased scientific data acquisition. Implementing Agency
Promote and Safeguard the State of Environnent for Economic Growth To improve Environmental Planning and Governance
Programmes/Projects
Objectives
Time Sources Indicative Budget(Kshs Millions) Frame of Funds Total 2013/14 2014/15 2015/16 2016/17 2017/18 2013- GoK/DPs 51,714 11,887 12,542 12,410 7,375 7,500 2017
Wildlife Management
Goal Strategic Objectives Time Frame 20132017 Sources of Funds Total GoK 11,240 KWS
Sustainably conserve and manage Kenyas wildlife and their habitats Enhance wildlife conservation and management 2013/14 2,400 Indicative Budget (Kshs. Millions) 2014/15 2015/16 2016/17 2,360 2,160 2,200 2017/18 2,120
Programmes/Projects
Expected Implementing Agency Outcomes/Output Manage Kenyas wildlife and To enhance Viable wildlife habitats KWS, KFS, NTW their habitats governance in and ecosystems MOEMR, NEMA, NMK the wildlife sector maintained.
Objectives
Forest
Implementing Agency KFS/KEFRI
Increase area under forest and sustainably manage natural forest resources for environmental protection and enhanced economic growth. To intensify management, conservation, utilization and protection of forest resources for sustainable production of environmental goods and services. Total 57,435 Indicative Budget(Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 10,770 11,020 11,520 11,875 2017/18 12,250
Programmes/Projects
Objectives
To increase area under forest and sustainably manage natural forest resources for environmental
Expected Outcomes/Output Five water towers rehabilitated; Tree out grower schemes developed; Increased forest
Programmes/Projects Total
Objectives
Implementing Agency
Time Frame
Sources of Funds
2017/18
Goals Strategic Objectives Programmes/Projects Time Frame 20132017 Total 280,007 Sources of Funds GoK DPs
Increase water availability in the country Increase water resources availability for multipurpose uses Objectives Expected Implementing Agency Outcomes/Output MEWNR, WSBs, NWCPC, To conduct policy, legal Policy, legal and institutional reforms CGs and institutional done; reforms; To expand and upgrade Multipurpose dams and medium sized water supply and dams constructed; sewerage systems Strengthened Increase in access to safe water.
Indicative Budget(Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 41,487 58,905 62,725 58,050
2017/18 58,440
Goals
Programmes/Projects
Objectives
Expected Outcomes/Output Implementing Agency To reclaim land for Policy, Legal and Institutional MOALF NIB Reforms done; irrigation and to enhance capacity/ Water harvesting and storage CGs build resilience and dams for irrigation schemes response to climate constructed; Canals and irrigation schemes change of the communities in the developed; Green houses established; reclaimed areas &reduce competition Land reclamation programmes and waste of natural expanded; Environmental protection and
2017/18 85,950
165
IMPLEMENTATION MATRICES
Programmes/Projects
Objectives
Time Frame
2017/18
D4:
Population
Programmes/Projects
Objectives
Expected Outcomes/Output To enhance capacity Improved policy environment and for coordination, implementation on planning, and population issues. Management of population issues
Implementing Time Sources of Agency Frame Funds 2013-2017 GoK/ DPs NCPD KNBS MD&P, NT MoH CGs FBOs, NGOs
Urbanization
To facilitate sustainable urbanization process through an Integrated Urban and Regional Planning Management Framework Provide well configured land use that optimizes social needs and minimizes adverse effects of built environment and nature; Enhance infrastructure, connectivity and accessibility, safety and security that facilitate investment in 6 metropolitan Regions; Prepare detailed plans for six new towns and transit corridors of NMR and 5 urban centres in the LAPSSET corridor. Total 33,878 Indicative Budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 7,478 7,767 7,606 6,917 2017/18 4,110
Programmes/Projects Objectives
Expected Outcomes/Output Strategic Integrated Development Plans of Urban Centres along LAPSSETT Corridor developed; Planning Standards and Guidelines formulated and implemented.
Solid and liquid waste management 5,000 1,000 1,000 1,000 1,000
20132017
GoK CGs
1,000
500
100
100
100
100
100
Metropolitan Development
Increased GDP growth, expanded urban economy and improved urban governance; Improved transport system within Nairobi metropolitan. 43,351 1,105 Reduced crime within the NMR MOTI, KDF, Metro Counties, MOICT 2013-2017 GoK/ PPP 7,258 135
NT, MOH, MODP, MEWNR NEMA, NESC,KARA,KLDA CGs 20132017 GoK PPP
9,567
10,509
11,170
11,000
To implement waste management systems in cities, towns and urban areas To coordinate the implementation of donor funded urban projects and programmes for cities, towns and urban areas. To prepare integrated Strategic Development Plans for 5 designated Metropolitan areas. To ensure a safe and secure 1,817 1,680 1,826
1,800
167
IMPLEMENTATION MATRICES
Expected Outcomes/Output
Sources of Funds
economy initiative 20132017 GoK/ PPP 43,351 1,105 9,567 10,509 11,170 11,000
metropolitan region To establish a Improved transport system NT, MOH, master commuter within Nairobi MODP, MEWNR service in the NMR metropolitan. NEMA, NESC,KARA,KLDA
Housing Development
Housing development
Housing finance
Increase housing production to 200,000 units and improve 300,000 rural housing units annually . Improve the livelihoods of 1,000,000 slum dwellers under the KENSUP and KISIP; Produce 55,000 units under employer incentives programme, 100,000 under urban renewal development programme and improvement of 1.5 million rural houses. Objectives Expected Implementing Time Sources of Indicative Budget (Kshs. Millions) Outcomes/Output Agency Frame Funds Total 2013/14 2014/15 2015/16 2016/17 2017/18 MOLHUDG 2013-217 GoK 78,460 14,375 24,825 15,225 11,730 12,305 Facilitate production of Physical and social Non State Actors DPs infrastructure housing units and to CGs CGs improve the lives of slum developed in slums and informal dwellers settlements; National housing stock increased; Increase in housing units in the informal settlement. 2013GoK 15,320 2,640 2,680 2,700 3,660 3,640 To establish to mobilize National Housing Fund NT, State Law Office, PPP 2017 PPP resources for housing established; Non-state development Improved access to actors low income households 290 458 332 40 30 2013GoK/ PPP 1,150 Housing Act enacted. NT/ State Law To fast-track the 2017 Non-state implementation of policy Housing policy revised; Office actors Landlord & Tenant Act Parliament and legislative MOLHUDG enacted; framework Improved housing sector.
D5:
Goal
Strategic Objectives Expected Outcomes/Output Social Protection Fund (SPF) consolidated; Vulnerable households supported; National Social Protection Council Bill prepared; structures for coordination of Social Protection Sector in place. MODP SPS Non-state actors 2013-2017 Go UNICEF DfID World Bank Uptake of Uwezo Fund and Women Enterprise Fund by women groups at the Constituency level; Utilization of 30% Public Procurement Opportunities by women entrepreneurs. Employment opportunities for women MODP; 2013-2017 Go National DPs Treasury ( PPD); PPOA; WEF; National Oversight Board Uwezo Fund. 11,620 3,930 2,070 2,330 2,525 Total 77,817 2013/14 12,185 2014/15 17,831 2015/16 15,720 2016/17 16,884 2017/18 15,197 Implementing Time Agency Frame Sources of Funds Indicative Budget (Kshs. Millions)
To empower all Women, Youth and Vulnerable groups to enhance their capacity and opportunities
Programmes/Projects
Objectives
To empower the poor and vulnerable to enhance their capacity and opportunities
Womens Empowerment
To expand access for women to financial services and promote women led enterprises
2,865
169
IMPLEMENTATION MATRICES
Programmes/Projects Gender Management Systems in all MDAs; National Affirmative Action Policy; National Gender and Development Policy; National Sexual and Violence Policy Gender Development Index; Integrated Sexual and Gender Based Violence Response Centers in all health care facilities; SGBV help lines Topical gender related research reports. MODP SPS Non-state actors Ministry of Health All MDAs 2013-2017 Go/DPs Total 400 2013/14 50 2014/15 100 2015/16 75 2016/17 75 2017/18 100
Objectives
Expected Outcomes/Output
Sources of Funds
Gender Mainstreaming
Programmes/Projects Total 456.5 474.5 483.5 533.5 488.5 13.5 2013/14 2014/15 2015/16 2016/17 2017/18
Objectives
Expected Outcomes/Output
Time Frame
Sources of Funds
PWDs Empowerment Increased access to basic services to PWDs; National PWDs Databaset developed; Scholarship provided; Institutions & Disabled Persons Organizations funded; Affirmative Action Policy on PWDs implemented. Utilization of 30% Public Procurement Opportunities by PWDs. Improved standard of living; Community groups supported Child protection centres established; Child trafficking eliminated/ Mitigated; Child helpline centres established. MODP 2013-2017 GoK 6,119 908 1,053 1,188 1,393
To enhance community capacities for self reliance and greater participation in decision making
1,577
Goal
Strategic Objectives Implementing Agency MoSCA National Museums Kenya National Archives & Documentation
To promote, preserve and develop all aspects of culture for sustainable development Time Sources of Frame Funds Total 2013- Go 32,304 2017 Indicative Budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 4,970 5,267 5,294 4,949 2017/18 11,814
Programmes/Projects
Expected Outcomes/Output Promotion, preservation and To promote, preserve and International Arts and development of all aspects of develop all aspects of culture Cultural Centre culture for sustainable for sustainable development established; development County Archives established;
Objectives
171
IMPLEMENTATION MATRICES
Programmes/Projects 2017/18
Objectives
Expected Outcomes/Output Public libraries constructed and rehabilitated; Culture information system in place.
Implementing Time Sources of Agency Frame Funds Total Service (KNADS) KNLS Board, KLRC & CIC NGO Coordination Board
Goal Strategic Objectives Time Frame 20132017 Sources of Funds Go PPP DPs
Youth Skills Development and Empowerment To develop youthskills for sustainable development 2017/18 2,258
Programmes/Projects
Objectives
20132017
Go County Government
260
48
50
52
54
56
Implementing Agency Youth Skills Development To develop Youth development infrastructure Training youthskills for in place; Institutions, sustainable County Youth Talent Development MOLHUD, MOTI, development Centers developed; MOIED, MODP, Youth Talent Development Trust PPP, SACCOs Fund established; Youth entrepreneurship strategy developed; Youth Polytechnics constructed, rehabilitated and equipped; National Vocational Certificate in Education and Training (NVCET)curriculum reviewed. Youth development centers / To offer MODP Functional Youth development Youth Empowerment Centers mentorship, nation centers County building Governments Youth mentorship programmes opportunities, Youth Enterprises vocational and entrepreneurial skills development Allocation of 2.5% of the Ensure allocation Youth Enterprise Fund; National Treasury budget to youth development of 2.5% of the MODP Youth Enterprises budget to County enterprise Governments development 20132017 Go DPs 10,000 2,000 2,000
2,000
2,000
2,000
Objectives
Expected Outcomes/Output
Bring together Youth employment creative and Youth creativity talented minds to interact and develop their skills Job creation and livelihood MODP MOLSSS 20132017 Go DPs 250 50 50 50 50 50
Indicative Budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 200 200 200 200
Establishment of Biashara Kenya enterprise parks with job opportunities for youth
Develop incentive framework for employers who hire fresh graduates and have internship programs for college students Skilled youth workers Job opportunities 500 400 MODP ICT 20132017 Go DPs 500 200 100
400
400
400
Use ICT to Enhanced information access to connect youth youth around the country to information and to each other
75
75
50
MOLHUD MOTI MOIED MODP 20132017 Go DPs MOT KMA MDP 20132017 Go DPs
30,986
6,198
6,197
6,198
6,197
6,598
Establish a Regional Centre of Excellence for Driver Training and a Maritime Training Institution
To rehabilitate, maintain and expand NYS facilities To impart maritime skills to the youth
NYS upgraded to offer more specialized market driven training; Para-military training curriculum reviewed. Skilled youth
2,000
500
400
300
400
400
Youth Empowerment
20132017
Go DPs
14,000
6,000
2,000
2,000
2,000
2,000
173
IMPLEMENTATION MATRICES
Programmes/Projects Total 2017/18 Uptake of Uwezo Fund by youth at the constituency level; Utilization of 30% PPO by youth entrepreneurs;
Objectives
Expected Outcomes/Output
Implementing Agency
33,106
32,505
31,505
Kenya Academy of Sports established; Sports stadia constructed and rehabilitated; National Sports Fund established; Existing and up-coming sports talents promoted and natured; Sports Disputes Tribunal established; Youth empowerment centers constructed and equipped; Kenya Institute for Youth Development and Research (KIYRD) established. ICT innovations promoted; Increased ICT accessibility. MoSCA e-government Media 20132017 Go/PPP 525 105 105
105
105
105
Development and expansion To increase ICT Infrastructure, of ICT Infrastructure to support youth programmes equipment, tools gadgets and accessible to youth Youth employment and To build youth sustainable livelihoods capacity and skills to sustain their livelihoods. Youth income generating activities MODP promoted; MoSCA Promote youth involvement in YEDF agriculture promoted; Trees planted; Youth Enterprise Development Fund (YEDF) Programme expanded; Information availed to the youth on 20132017 Go/PPP
20,271
3,628
3,981
4,176.5
4333
4,152.5
Programmes/Projects Total 3,130 620 650 650 620 650 2017/18 new opportunities. National Volunteer Policy developed; Youth Exchange Programmes expanded; Strategy for youth leadership development developed. MODP MoSCA 20132017 Go/PPP Rehabilitation for Youth Survivors MODP of Crime and Drugs/ Substance MoSCA Abuse established; Drugs, health and crime information provided; Sexual and Reproductive Health (SRH) Information and Services provided, 20132017 Go/PPP 702 115 122 129 136
Objectives
Expected Outcomes/Output
Implementing Agency
To inculcate a culture of innovation, leadership, entrepreneurship and invention among youth To protect young people against harmful cultural practices, crime and drugs.
200
Special Programmes
Improve the well being of the Vulnerable group To manage disasters through mitigation and preparedness, response and recovery for the vulnerable group Empowering Vulnerable Group Total 28,081 2013/14 5,518 Indicative Budget (Kshs. Millions) 2014/15 2015/16 2016/17 5,539 5,619 5,678 2017/18 5,735
Programmes/Projects Objectives
Expected Outcomes/Output All IDPs and forest evictees resettled; To mitigate severe effects of disasters to communities in disasterprone areas. Capacity of NACC enhanced; Improved quality of live for the infected and the affected HIV and AIDS Tribunal established. MOH NACC DPs 20132017 Go PPP
52,827
9,786
10,404
10,742
10,811
11,084
175
IMPLEMENTATION MATRICES
To save lives and livelihoods of needy populations during emergencies and storage of relief supplies
Indicative Budget (Kshs. Millions) 2014/15 2015/16 2016/17 15,846 10,929 12,230
2017/18 13,110
Goal Strategic Objectives Implementing Agency TA NT MODP Time Frame 20132017 Sources of Funds GoK/DPs
Establish 47 functional CGs Strategic Collaboration between national and CGs and between counties Total 50,535 Indicative Budget (Kshs. Millions) 2013/14 2014/15 2015/16 2016/17 15,160 5,054 10,107 10,107 2017/18 10,107
Projects/Programmes
Objectives
20132017 20132017
GoK/DPs
235
47
47
47
47
47
Expected Outcome Enhance capacity of CGs To capacity build Service Delivery and the coordination CGs; To Improved; mechanisms strengthen and Infrastructure facilities enhance TA improved; TA capacity capacity enhanced. Civic Education on Enhance civic Civic education Devolution knowledge and programme developed citizen rights and implemented. Resource mobilization for Increase resources Indicative Human CGs to county treasury Development Indicators TA NT MODP NT MODP GoK/DPs
165
165
E2:
2017/18 465
770
2,504
National Cohesion
To efficiently and expeditiously deliver justice To enact and operationalise policies and legal framework towards National Cohesion and Integration To establish a comprehensive framework for human rights To undertake various legal reforms including development, review and implementation of all legislations relating reforms in governance, judiciary and rule of law Objective Expected Output/ Implementing Time Source of Indicative Budget (Kshs. Millions) Outcome Agency Frame Funds Total 2013/14 2014/15 2015/16 2016/17 To ensure existing laws conform to the All legislation audited and AG, KLRC 2013GoK 2,040 320 385 445 425 constitution; Provide technical prioritized for harmonization; 2017 assistance on development of county CGs legislations developed/ specific legislation. Reviewed and enacted. To ensure sustainable information and Sustained citizens engagement in DOJ / Non 2013GoK/ 9,635 6,780 705 600 680 awareness on the Constitution, its the implementation of the State Actors/ 2017 UNDP principles, structures and processes; Constitution; Pocket sized Media Houses Emb. Japan To inculcate a culture of adherence to Constitution printed and Kenya School the constitution amongst government disseminated; Civic education and of agencies, and non-state actors and IEC materials printed and Government/ individuals; To ensure electoral and disseminated; National Civic Transition political processes forms a core element Education Act enacted and Authority of the constitutional reform. operationalized; Civic education programmes institutionalized and strengthened. GoK 11,146 1,657 2,923 1,950 2,212 To strengthen the institutional framework Leadership and Integrity Act, 2012 DOJ /EACC/ 2013DPP 2017 developed and operationalised; for ethics and integrity; To strengthen the capacity of the ethics Public Officer Ethics Act, 2003 and anti corruption agencies to Promote reviewed and amended; The Ethics and Anti-Corruption leadership, ethics and integrity; Commission Act reviewed and enhancing investigative and amended; Anti-Corruption and prosecutorial jurisdiction of corruption Economic Crimes (Amnesty and crimes. Restitution) Mechanism Reviewed and Implemented; Capacity of the ethics and anti corruption agencies strengthened. To enact and operationalise policies and The NCI Act, 2008 reviewed; DoJ/NCIC 2013GoK 3,215 470 485 530 780
950
177
IMPLEMENTATION MATRICES
Objective Total
Source of Funds
GoK
3,105
525
1,022
522
518
518
Prisons
20132017
GoK
159,310 32,118
31,928
31,788
31,788
31,688
GoK/World Bank
Expected Output/ Outcome legal framework towards National Values that enhance cohesion and Cohesion and Integration; integration embedded within the To establish a national cohesion and school curriculum and reflected in integration Research and Memorial the books used in schools; Centre. Research and Memorial Centre established. To operationalize a countrywide Legal Countrywide Legal Aid scheme Aid scheme and establish fully functional operationalised and fully legal resource centres. functional; Legal resource centres established; Legal Aid guidelines developed; Policy and legislative framework for legal education and training in Kenya established. To reduce congestion in prisons through New and on-going prisons completed; Staff houses modernization, expansion and constructed; Electronic development of the existing supervision for dangerous/sex infrastructure in prisons; To enhance offenders in the community institutional and technical capacity to operationalized; effectively service offenders in the community; To operationalize the ODPP Staff recruited and capacity built; County offices opened. and decentralize prosecution service. Magistrate courts To efficiently and expeditiously deliver constructed/refurbished; justice; To institutionalize performance A high court established in each management and accountability; county; Courts of appeal To decentralize State Law Office established; A comprehensive Services. Electronic Case Management System developed; Audio-Visual recording and transcription of court proceedings implemented; An Integrated Performance Management and Accountability System (IPMAS) implemented; Country wide Alternative Dispute Resolution (ADR) policy legislative framework established; NCAJ Secretariat operationalized; and Key policies/Acts developed. 152,470 20,778 30,790 30,760 30,797 40,837
To establish a comprehensive framework for human rights; To establish an effective system for reporting on all international human rights instruments that Kenya is party to.
National policy and action plan for human rights disseminated to stakeholders; Public sensitized; Capacity building & implementation of human rights based approach to development (HRBAD) and service delivery carried out; Kenyas periodic Country report on the African Charter on Human and Peoples Rights prepared and presented.
GoK
386
100
110
74
52
50
The Presidency Ministry of Devolution and Planning Treasury Building P.O. Box 30005 - 00100 Nairobi, Kenya Tel:+254 - 20 2252299 Email: [email protected] Website: www.devolutionplannning.go.ke