From The Data Given Below Calculate Labour Cost Variance
From The Data Given Below Calculate Labour Cost Variance
Actual gross wages (direct)Rs 2,00,000 Standard hours produced Standard rate per hour Actual hours worked 8000 Rs 30 8200
The standard cost of a chemical mixture is as under: 8 tons of material A at Rs 40 per ton 12 tons of material B at Rs 60 per ton Standard yield is 90% of input. Actual cost for a period is as under 10 tons of material A at Rs 30 per ton 20 tons of material A at Rs 68 per ton Actual yield is 26.5 tons