Directional Drilling
Directional Drilling
Directional Drilling
7/3/3 7/3/4
7/3/7
7/3/9
9 9
12 12 12
4.3
Topic 2
Other factors
Applications of directional drilling
13 14
7/3/15
Topic 3
1 2
Well planning
Reference Planning systems and co-ordinates the well trajectory (anti-collision) analysis
7/3/20
20 24
3
4
Nudging
Proximity
28
30
Topic 4 1
2
7/3/34
motors
34 39 7/3/41 41 43 46
7/3/52 52
Topic 5 1
2
3 Topic 6 I 2 3
Topic 7 1 2 2.1 2.2 2.3
Jetting
Downhole motor and bent sub Toot face orientation Deviated well geometry Constructing vector triangles Setting the toolface
Directional control with conventional rotary systems
53
55
7/3/61
61 62 62
Side force and tilt angle Basic directional The fulcrum The pendulum The stabilisation control principle (packed-hole) principle principle principles
66 68
2.4
practices
69
Over /...
Page 7/3/1
V 2.0.0
3
4 5
70 72
74 74 75
77 78 78
Topic 8 1
7/3/79 79
80 80 81 82 82 82
Steerable turbines
2
2.1 2.2 3
Theoretical geometric dog - leg severity Tilt angle First string stabiliser
4
4.1 4.2
4.3
Kicking off
Bottomhole assemblies Recommended guidelines
Length to drill in oriented mode
83 84 84 86 86
87 87 87 87 88
5
5.1 5.2 5.3 6 7
guidelines
89 7/3/90 90 91 93 96 7/3/98 98 99
100 100 102 103 7/3/105 7/3/109 7/3/115
Topic 9
1
2 3 4 Topic 10 1
2
The AuroTrak system The PowerDrive systems The Geo-Pilot system BHA weight and weight on bit
Along - hole components Required Running 3.2 BHA weight of force for rotary assemblies
4
Appendix Appendix
buckling
Questions
Page 7/3/2
V 2.0.0
Sections C & L
Sections B &J
Tables
API Bull 5C2: Bulletin on performance properties of casing, tubing, and drill pipe API Spec 5D: Specification for drill pipe API Spec 7 Specification for rotary drill stem elements API RP 7G Recommended practice for drill stem design and operating limits
Page 7/3/3
V 2.0.0
trajectory to
as a "black
drilling has evolved to the point where it can truly be regarded as a science. The offshore
the use of directional with advances
techniques,
Improvements
tion techniques have led to a steady increase in the proportion of wells drilled directionally rather than vertically. As the search for oil extends into ever more hostile and demanding environments, this trend is continuing. While studying this Parr there are some terms with which you need to be familiar concerning
the geometry of a borehole. These are inclination, and explained azimuth, dogleg angle and dogleg severity. They are fully defined, illustrated in the "Borehole surveying" Part of this
After studying this Part, consulting other relevant documents and, if necessary, discussions with your mentor, you will be able to:
List the main causes of deviation from the vertical.
anisotropy
tory of the drill bit. Explain how to design a BHA to drill a vertical hole in a formation drilling. of given hardness.
of directional
"magnetic
North"
and "grid North". are used. well patterns and list the applications and dis-
systems
of the common
advantagesof each. Explain Calculate what is meant trajectories by "nudging" for basic "Build and why it is done. and hold" and "S type" well patterns (2-d well paths)
Describe the two basic types of downhole motor and give a simple explanation of the operating principles of each.
Explain what is meant by "multi-Lobe" PDM motors.
Page 7/3/4
V200
Quote
the relationships
between
torque
and differential
pressure,
and between
flow rate
and RPM.
Explain drilling. what is meant by "reactive torque" and the importance of this in directional
List the main deflection tools available and state the advantages and disadvantages Explain the basic concept of the jet deflection method.
Explain the basic concept of using a downhole motor and bent sub as a deflection tool. Specify a typical motor and bent sub BILA.
Explain Explain what is meant by the "toolface" torque of a deflection of a motor tool. and how to
compensate
of a PDM motor
over a turbine
"Magnetic
Tool Face".
Using rules of thumb, select the required tool face settings to achieve any desired result with a deflection tool..
Explain the terms "dogleg" and "dogleg severity" and calculate their values in specific
cases.
Determine tool face orientation and predict the results obtained by drilling ahead with thecalculated TFO, usinga vector analysis method. List the main factors which affect the directional
Explain the Fulcrum, Stabilisation and Pendulum
of a fulcrum
which eachhas.
Explain the effect of varying assembly. the drilling parameters (WOB, RPM, etc) on the build rate
of a fulcrum
Explain the effect of varying the gauge of the first string stabiliser on the directional behaviour of a packed assembly.
Explain the effect of varying the drilling parameters on the directional behaviour of a
packed assembly.
List and explain Explain the optimum design WOB features of a pendulum assembly.
assembly.
Design a suitable rotary BHA for any given application, including the exact placement
Page 7/3/5
V2.00
Explain Explain
what is meant
drilling
system".
in steerable
turbines.
List the components of both the double tilt assembly and the adjustable kick-off assembly and explain the function of each component. Explain the concept of "three-point geometry" and calculate the "Theoretical Geometric Dogleg Severity" (TGDS) of a Navigation System. List the main design features of both stabilisers used with steerable motor systems and
explaintheir purpose.
Explain the criterion used in selecting the gauge of the first string stabiliser and select an
appropriate gauge for a given application. bottomhole assembly incorporating a steerable mud motor for any given
Design
a suitable
application. Explain the guidelines to be followed when kicking off with a steerable mud motor.
assembly.
of BHA to avoid running drill pipe in compression,
the maximum
WOB, under
which
drill pipe may be run in compression. load" and calculate values of critical buckling
by "critical
buckling data.
force for drill pipe, given the necessary Explain in general terms
friction
on BHA weight
requirements.
Page 7 /3/6
V 2.0.0
why directional
drilling
may be required,
the geometrical
design
of a well to reach a specified objective, and all the tools and techniques used in normal directional drilling, including the use of steerable systems.
The first Topic deviation looks at how a vertical well can be maintained as are the mechanical close to the vertical. behaviour of drilling Causes of assem-
are considered
blies. Formation effects are also discussed. Methods of deviation control in vertical wells are then outlined. Much of the material in this first section anticipates topics discussed in later
sections Topic with reference to directional wells. of directional drilling.
2 briefly outlines
Topic 3 covers well planning and includes an explanation of reference systems and coordinates. The discussion focusses mainly on the geometrical and collision are describedplanning of the well path and deals briefly with subjects In Topic 4, downhole such as "nudging" drilling motors avoidance. The operating principles of both turbine
Topic 5 provides a brief review of the traditional tools and methods of deflecting wellbores in a controlled fashion. Whipstocks, the jet deflection method and the use of bent subs with downhole motors are all described.
Topic 6 deals with the vital subject of toolface orientation, which is relevant not only to the
traditional
deflection toots but also to steerable motors. Typical examples of rotary BHA design are given and
In Topic 7 the principles used to take advantage of the natural directional tendencies of rotary
discussion
of "steerable
systems"
The currently
most com-
mon system - using downhole motors - is described in detail, newly developed rotary steerable systems are presented
Finally, Topic 10 deals with BHA weight requirements. There is a discussion of buckling analysis which is relevant to the subject of running drill pipe in compression. The section
explains how directional BHAs can be shortened anti-stick by running drill pipe in compression, which is consistent with the Group's philosophy.
Page 7/3/7
V2.00
Page 7/3/8
V 2.0.0
0 0
INTRODUCTION
Drilling a vertical deviated well. well is, in fact, a special case of drilling a directionally
In the normal course of drilling all wells will depart naturally from the vertical. Whether they are spiralling or deviating away in a particular dirention, this is not a problem until it can be seen that there is a risk of missing the target that has been specified in the drilling programme. If that happens the techniques of directing the trajectory in a chosen direction have to be applied to ensure that the target is achieved. For that to be done it is necessary to know the reasons why a drilling assembly does not just continue in a straight line.
is applied
to the bit.
The formation being drilled will also exert an influence on the direction in which the hole will tend to deviate. A homogeneous formation will have little effect, a bedded (or unhomogeneous) formation will have some effect and alternating layers of rocks having different hardnesses will have the most effect. The direction in which the well will tend to deviate from its current track will depend on the relative inclinations of the borehole and the formation.
The principal mechanical forces acting on the lower section assembly are shown in Figure 7.3.1, overleaf. W1, W2 and W3 are arise from the axial forces transmitted
Page 7/3/9
collars from the upper part of the bottom hole assembly the drill string.
of
W1 = the total weight -on-bit, which acts along the axis of the bit. W2 = the component of
W1which
acts along the axis of the hole. and normal to W2, acting at
If the BHA and the hole are co - axial then W1 = W2 and W3 = 0. In that case it will not produce a tendency to deviate . However in practice the BHA will bend until one or another component touches the borehole wall. In this situation the axes of borehole and bit are not coincident and W3 will have a nonzero value producing a tendency for the inclination of the hole to change. Since it is due to the bending of the assembly this effect is known as the "buckling effect ". For more details of this effect see overleaf. The forces W4, W5 and W6 are due to gravity BHA, below the wall contact point. W4 = the vertical downward wall contact point. acting on the lower part of the of the section below the
W5 = the component of the drill collar weight axis of the assembly, and
contributes weight-on-bit, to the W1. total Drill collar
Hole axis
axis I/ /i
/ I/ l' W
we
W4
2.2
When weight is applied to the bit the lower part of the drill collars will bend to some extent under the compressive load. The direction of the force applied at the bit will then no longer coincide exactly with the centre line of the hole; as the bit drills ahead the lateral component of the bit weight, W3, will tend to deflect it.
W1
W2
Page 7/3/10
V 2.0.0
The direction
of W3 depends
on the direction
of bending
the bottom hole assembly, which in turn depends system - in particular the position of the lowest fulcrums). In the figure no stabiliser is present, the lower side of the hole and the inclination at greater than that of the hole. The inclination of increase. The amount of inclination will depend on: the and the the the change,
on the geometry of the two stabilisers (which act as the BHA is sagging towards the lower end of the collars is the hole is thus likely to
point,
stiffness of the drill collars, which is a function material properties hole diameter arrangement of stabilisers in the assembly compressive load applied and the corresponding lateral
of their dimensions
Bending,
by:
greater clearance between the drill collar assembly smaller, more flexible drill collars. more compressive force, i.e. weight-on-bit.
As bending increases, the length of the assembly from the bit to the first point of drill collar wall contact tends to shorten. This is called the "active drill collar length", and in practice the position of the first stabiliser determines this dimension. Usually not more than the bottom 50 in (150 ft.) of the assembly is active in the absence of stabilisers; or at high inclination or with high bit weight, it could be less than 20 in (60 ft.).
2.3
The effect of gravity on the drill collars below the wall contact point acts vertically downward. Part of this force is transmitted to the bit along the axis of the drill collars, and its complementary component, W6, acts towards the vertical, perpendicular to the axis of the assembly. This force is transmitted the formation at the wall contact point and at the bit (see diagram). This lateral force at the bit tends magnitude increases: to reduce the inclination of the hole. Its to
when hole inclination is greater. when heavier drill collars are used below the contact when the active drill string length is increased.
point.
In Figure 7.3.1 each of the above factors will tend to increase the value of the lateral component (W6) of the drill collar weight (W4) below the wall contact point.
2.4
By changing it is possible
Page 713111
V 2.0.0
path
There is no completely satisfactory explanation for naturally occurring deviation. However, theory and practice indicate that uncontrolled deviation will not exceed an angle perpendicular to, or parallel to, the formation dip.
the pendulum technique. the use of packed-hole drilling THE PENDULUM TECHNIQUE
assemblies.
the magnitude
the drill collar weight below the wall contact the active drill string length. weight-on-bit.
point.
The use of heavier drill collars above the bit increases the lateral corrective force (W6). Larger collars are also stiffer and more resistant to buckling, and their larger outside diameter allows less displacement of the assembly from the centre line of the hole.
Page 7 /3/12
V 2.0.0
The logic of this approach has been clearly demonstrated by experimental work using extra-heavy drill collars above the bit, which are manufactured from depleted uranium or tungsten. With these collars, higher bit weights could be used without increasing inclination. Raising the wall contact point by including a stabiliser at a specified distance above the bit increases the active drill string length, and also therefore the lateral force (W6). This will again reduce the displacement of the drill collars from the axis of the hole, and the lateral force (W3). This approach is limited by the possibility of buckling below the stabiliser if this is placed too high, which would then necessitate a reduction in bit weight. Reducing bit weight alone will cause less buckling and decrease the lateral force W3, but less weight-on-bit will produce a lower rate of penetration and higher cost per meter. In 1953/1955 Woods and Lubinski published data with recommended optimum stabiliser positions for the fastest penetration rate within given deviation limits. For quoted hole sizes and inclinations, combined with values for formation dip and an index which represents the severity of the formation effect, the tables specify: drill collar diameter, position of the first stabiliser allowable weight-on-bit, above the bit, of the forces at the bit,
Modern developments of such research provide computer programs which evaluate a comprehensive range of forces acting at the bit and at other points in the assembly. In particular the magnitude of the transverse forces exerted by the bit on the formation, perpendicular to the hole axis, can be predicted. A positive transverse force tends to increase inclination. The value of this force, and the tendency of the formation influence, together determine whether existing inclination will remain constant or change. Such predictions can be very helpful when selecting a drilling assembly, both to control inclination and obtain the best possible progress. Further information on this subject is given in Topic 7.
4.2
This technique seeks to prevent further deviation by preventing displacement of the lower 120 ft/40 in of the assembly from the centre line of the hole. Progressive application of the principle would involve: the use of drill collars with the largest practicable outside diameter. using three or more stabilisers. using square drill collars (the maximum development of the first two points) having a diagonal dimension equal to 1/16" or 1/8" less than the bit size.
Page 7/3/13
V 2.0.0
Square drill collars are effective in hard rock when natural deviating effects are severe, but they can be difficult to trip, are liable to stick, and are difficult to fish. They also have to be used from the beginning. Packed-hole assemblies minimise trends to deviate from the current track, but equally they make it difficult to correct any unwanted deviation that does occur. In addition the decreased annular clearance and increased number of stabilisers substantially increase swabbing risks, overpulls, and the chances of sticking the string. Also, extra handling time is involved on the rig floor.
Page 7/3/14
illustrate
applications
of
In a conventional development, the wells cannot be drilled until the platform has been constructed and installed in position. This may mean a delay of two to three years before production can begin. This delay can be considerably reduced by pre-drilling some of the wells through a subsea template while the platform is being constructed. These wells are directionally drilled from a semi-submersible rig or jack-up and tied back to the platform once it has been installed.
.Vv
Page 7/3/15
Original hole
Sidetracking
Sidetracking out of an existing wellbore is another application of directional drilling. This sidetracking may be done to bypass an obstruction (a "fish") in the original wellbore, to explore the extent of the producing zone in a certain sector of a field, or to sidetrack a dry hole to a more promising target. Wells are also sidetracked to access more reservoir by drilling a horizontal hole section from the existing well bore.
Page 7/3/16
V 2.0.0
Inaccessible locations
Directional wells are often drilled because the surface location directly above the reservoir is inaccessible, either because of natural or man-made obstacles. Examples include reservoirs under cities, mountains, lakes etc.
Fault Drilling
Directional wells can be used to avoid drilling a vertical well through steeply inclined fault plane which could slip and shear the casing. They are also used to drain, tions trapped below a fault. a
in one well, a staggered series of small accumulaThis technique is known as "fault scooping".
4111111b.-
Page 7/3/17
V 2.0.0
Shoreline Drilling.
In the case where a reservoir lies offshore but quite close to land, the most economical way to exploit the reservoir may be to drill directional wells from a land rig on the coast.
Page 7 /3/18
Relief Wells
Directional techniques are used to drill relief wells from a safe distance order to "kill" wells which are flowing out of control (blow-outs). in
The relief well(s) is/are designed either to enter the reservoir close to the blow-out well, for a so-called saturation kill with water, or to intersect the blow-out well for a direct kill using high density drilling fluid.
The above are only some of the many applications of directional drilling. Although it is not a new concept, horizontal drilling is the fastest growing branch of directional drilling, with major advances occurring in the tools and techniques used. One application which is specific to horizontal (and almost horizontal) wells is to drill through a shallow reservoir parallel to the bedding plane, thus allowing one well to drain an area which would have required several vertical or medium angle wells. Horizontal wells also make possible the recovery of liquid hydrocarbons from an interval between an oil-water contact and a gas-oil contact that is so thin that it could not be produced at all from a vertical well, because of the coning effect.
Page 7/3/19
00
INTRODUCTION
There are many aspects involved in planning a well and many individuals from various companies and disciplines are involved in designing various programs for the well (e.g. drilling fluid program, casing program, drill string design for each section, bit program, etc.). The engineered approach to well planning means that service contractors become equally involved in areas such as drill string design which are vitally important in planning a deviated well, especially horizontal or extended wells. In this Topic we shall concentrate on those aspects of well planning have always been the province of directional drilling companies. which
1.1
There
DEPTH REFERENCES
are two kinds of depths: Measured depth measured along ence point to the way, for example, depth counter. or the depth "along hole" (ahd) is the distance the actual course of the borehole from the surface refersurvey point. This depth is always measured in some pipe tally, wireline depth counter, or mud loggers
True vertical depth (tvd) is the vertical distance from the surface reference point to a point on the borehole course. This depth is always calculated from the deviation survey data. operations the Rotary Table or Derrick Floor elevation is used
In most drilling
Page 7/3/20
V 2.0.0
as the working depth reference. The abbreviations "brt" (below rotary table) and "bdf" (below derrick floor) are used to indicate depths measured from the rotary table. The kelly bushing (KB) is sometimes also used as a depth reference. For floating drilling rigs the rotary table elevation is not fixed and hence a mean rotary table elevation has to be used. In order to compare individual wells within the same field, a common reference must be defined and always referred to. Offshore, mean sea level is usually used, in which case the depth is called a sub-sea depth. Variations in actual sea level from MSL can be read from tide tables or can be measured. As an example, the drilling crew would usually refer to the depth of a casing shoe as being 1,000 in ahbdf, whereas the field development geologist would prefer to relate it to a formation boundary and would say that the casing is at 700 in tvss. (There is no significance in these numbers.)
1.2
INCLINATION REFERENCES
The inclination of a well is the angle (usually expressed in degrees) between the vertical and the bore hole axis at a particular point. The vertical reference is the direction of the local gravity vector and would be indicated by, for example, a plumb bob.
1.3
For directional
North
All "magnetic type" tools initially give an azimuth (hole direction) reading referenced to Magnetic North. However, the final calculated co-ordinates are always referenced to either True North or Grid North. True (Geographic) North This is the direction of the geographic North Pole which lies on the axis of rotation of the Earth. The direction is shown on maps by the meridians of longitude.
Grid North
During drilling operations we are working on a curved surface (i.e., the surface of the Earth) but when we calculate horizontal plane co-ordinates we assume we are working on flat surface. Obviously it is not possible exactly to represent part of the surface of a sphere on a flat well plan. Corrections have to be applied to the measurements. There are many different projection systems which can be used.
Page 7/3/21
V 2.0.0
UTM System As an example of a grid system, let us examine the Universal Transverse Mercator (UTM) System. In the transverse mercator projection, the surface of the spheroid chosen to represent the Earth is wrapped in a cylinder which touches the spheroid along a chosen meridian. (A meridian is a circle running around the Earth passing through both geographic North and geographic South Poles.) The meridians of longitude converge towards the North Pole and therefore do not produce a rectangular grid system. The grid lines on a map form a rectangular grid system, the Northerly direction of which is determined by one specified meridian of longiTrue N tude. This direction is called
GN
GN
GN
GN
GN
GN
The relationship between True North and Grid North is indicated by the angles `a' in Figure 7.3.10. Convergence is the difference in angle between grid north and true north for the location being considered. The reference meridians used are 6 apart starting at the
Greenwich meridian, which
0
Figure 7.3.10 : Azimuth references
means the world is divided into 60 zones. The zones are numbered 0 to 60 with zone 31 having the 0 meridian (Greenwich) on the left and 6 East on the right. Each zone is further divided into grid sectors - a grid sector covering 8 latitude starting from the equator and ranging from 80 South to 80 North. The sectors are given letters ranging from C to X (excluding I and 0). Therefore each sector is uniquely identified by a number from 0 to 60 (zone number) and a letter. For example, sector 31 U, shown in Figure 7.3.11, is the Southern North Sea. Co-ordinates in the UTM system are measured in meters. North co-ordinates are measured from the equator. For the Northern hemisphere, the equator is taken as 0.00 in North whereas for the Southern hemisphere the equator is 10,000,000 in North (to avoid negative numbers). The East co-ordinates for each sector are measured from a line 500,000 in west of the central meridian for that sector. In other words, the central meridian for each zone is arbitrarily given the co-ordinate 500,000 in East. Again, this avoids negative numbers. So UTM co-ordinates are always Northings positive numbers. See Figure 7.3.12. and Eastings, and are always
Page 7 /3/22
V20.0
DEG W DEG E 24 18 12 6 0 6 12 18 24 30 36 42 48 54 60 66 72 V 56 U 48
1U
.
P
40 DEGN 32 24
Central Meridian
550,027.0E
6253,194.ON
16
. . N
. . . . . . . . . . . . . . . . . . . . . .
e
0
500,000m E
. . . . .
M
To the Equator
27
30
35
40
-8
Lambert
Projection.
An alternative projection system used in some parts of the world is the conical projection or LAMBERT system, whereby a cone as opposed to a cylinder covers the spheroid under consideration. This produces a representation with meridians as convergent lines and parallels as arcs of circles. Further discussion of the co-ordinate beyond the scope of this text. systems and map projections is
1.4
FIELD CO-ORDINATES
Although the co-ordinates of points on a well path could be expressed as UTM co-ordinates, it is not the normal practice. Instead, a reference point on the platform or rig is chosen as the local origin and given the co-ordinates 0,0. On offshore platforms this point is usually the centre of the platform. The Northings and Eastings of points on all the wells drilled from the platform are referenced to this single origin. This is important for comparing positions of wells, in particular for anti-collision analysis.
1.5
DIRECTION MEASUREMENTS
N
950 0 10 2o
Survey tools measure the direction of the wellbore on the horizontal plane with respect to the North reference, whether it is True or Grid North. There are two systems used for reporting the direction: The azimuth system
^^y
Ko
41 a
w p AZIMUTH
sE
In the azimuth system, directions are expressed as a clockwise angle from 0 to 359.99, with North being 0.
0K! Dy[ W
Figure 7.3.13
Page 7/3/23
The quadrant
system
20 p 10
N
0 1o
Figure 7.3.14
20
In the quadrant system (Figure 7.3.14), the directions are expressed as angles from 0- 90 measured from North in the two Northern quadrants and from South in the Southern quadrants. Figure 7.3.15 shows how to convert from the quadrant system to azimuth, and vice versa, and also shows how to apply the correction from Magnetic to True North in the two systems. The subjects of Magnetic Declination Corrections and Grid Convergence Corrections will be dealt with in detail later, in the Part on surveying.
Wg,
QUADRANT
BEARINGS
0
Figure 7.3.15
N Zo 10 0 10 20
350 0
R R
10 20
AZIMUTHtIUADRATURE CONVERSION
g gE
o per'
One area of well planning in which directional companies are often closely OA OE OST O61 OZ involved is the planning of the well O! 0 or S trajectory. Again, this is not as simple a task as it might seem at first glance, particularly on a congested multi-well platform. A number of aspects carefully considered before calculating the final well path.
must be
2.1
THE TARGET.
The target is specified by the geologist, who will not merely define a certain point as the target but also specify the acceptable tolerance (e.g. a circle of radius 100 feet having the exact target as its centre). A target zone should be selected as large as possible to achieve the objective. If multiple zones are to be penetrated, the multiple targets should be selected so that the planned well trajectory is reasonable and can be achieved without causing excessive drilling problems.
2.2
With the advent of steerable systems, some wells are planned and drilled with complex paths involving 3-dimensional turns. This happens particularly in the case of re-drills, where old wells are sidetracked and drilled to completely new targets. These complex well paths are, however, harder to drill and the old adage that "the simplest method is usually the best" holds true. Therefore, most directional wells are still planned using the traditional well trajectories which
Page 7 /3/24
V 2.0.0
have been in use for many years. The common trajectories used for the vertical projection are shown on this and the following pages. A mathematical treatment is given in Appendix 1.
Figure 7 .3.16 : Build& hold trajectory
Tangent
section are:
to TD
TANGENTSECTION
Its applications
Deep wells with large horizontal displacements. Moderately deep wells with moderate horizontal displacement, where intermediate casing is not required.
TARGET
S Type Well
The features of this trajectory are:
Shallow KOP
Build-up section Tangent section Drop-off section variations:
TANGENT SECTION START of DROP DROP SECTION ENO of DROP KICK-OFF POINT BUILD-UP SECTION END OF BUILD
Build, hold and drop back to Build, hold, drop and hold (illus tratedhere) Build, hold and continuous through reservoir are: drop
HOLD
Its applications
Multiple pay zones. To reduce final angle in reservoir for easier completions. Lease or target limitations. For well spacing requirements on multi-well fields. Deep wells with a small horizontal displacement. of the S-Type well are: torque and drag. risk of key-seating.
TARGET
Page 7/3/25
V 2.0.0
Deep KOP
Build-up section Short tangent section are: (optional)
Its applications
Appraisal wells to assess the extent of a newly discovered reservoir. Repositioning of the bottom part of the hole or re-drilling. Salt dome drilling.
KICK-OFF POINT BUILD-UP SECTION
The disadvantages of the Deep Kick-off and Build-Type well are: Formations
tion may
are harder
be more
so the initial
to achieve.
deflecTARGET
difficult
It is more difficult to achieve desired tool face orientation with steerable motor assemblies due to a longer more flexible string, more friction and more reactive torque (see Topic 5.3). Longer trip time for any BHA changes required. On multi-well platforms, only a very few wells may be given deep kickoff points because of the small separation of the slots and the difficulty of keeping wells vertical in firmer formation. Most wells must be given shallow kick-off points to reduce congestion below the platform and minimise the risk of collisions.
Page 7 /3/26
V 2.0.0
2.3
Even this is not always as simple as you would think. Obviously, from a directional driller's viewpoint, slots on the North East of the platform or pad should be used for wells whose targets are in a North Easterly direction. However, there are generally other considerations (e.g. water injection wells may have to be grouped together for manifolding requirements). Also, as more wells are drilled and the reservoir model is upgraded, it has been known for targets to be changed! The inner slots are used to drill to the innermost targets (i.e., those targets at the smallest horizontal distances from the platform) and these wells will be given slightly deeper kick-off points. The outer slots are used to drill to the targets which are furthest from the platform. These wells will be given shallow kick-off points and higher build-up rates to keep the maximum inclination of the well as low as possible.
2.4
The selection of both the kick-off point and the build-up rate depend on many factors including the hole profile selected, the casing program, the drilling fluid program, the required horizontal displacement and the maximum tolerable inclination. Choice of kick-off point may be severely limited by the requirement to keep the well path at a safe distance from existing wells. The shallower the KOP and the higher the build-up rate used, the lower the maximum inclination to reach a given target. In practice, the well trajectory may be calculated for several choices of KOP and build-up rate and the results compared. The optimum choice is that which gives a safe clearance from all existing wells, keeps the maximum inclination within desired limits and avoids unnecessarily high dogleg severities.
2.5
TANGENT SECTION
During the eighties, a number of extended reach drilling projects were successfully completed. If wells are drilled at inclinations up to 80, the area which can be covered from a single platform is approximately 8 times that covered if the maximum inclination of the wells is limited to 60. However, inclination angles over 65 may result in excessive torque and drag on the drill string and present hole cleaning, logging, casing, cementing and production problems. These problems can all be overcome with today's technology, but should be avoided whenever there is an economic alternative. Experience over the years has been that directional control problems are aggravated when the tangent inclination is less than 15. This is because there is more tendency for bit walk to occur (i.e. change in azimuth) so more time is spent keeping the well on course. To summarise, most run-of-the-mill directional wells are still planned with inclinations in the range 15 - 60 whenever possible.
Page 7/3/27
2.6
DROP-OFF SECTION
ease of It is in the spent
On S-type wells, the rate of drop off is selected mainly with regard to running casing and avoidance of completion and production problems. much less critical with regard to drilling because there is less tension drill pipe that is run through this deeper dogleg and less time will be rotating below the dogleg.
2.7
On many well plans, the horizontal projection is just a straight line drawn from the wellhead position to the target. On multi-well platforms it is sometimes necessary to start the well in a different direction to avoid other wells. Once clear of these, the well is turned to aim at the target. Of course, this is a 3-dimensional turn, but on the horizontal plan it would typically look like
Figure 7.3.19.
The path of the drilled well is plotted on the horizontal projection total North/South co-ordinates (Northings) versus total East/West nates (Eastings). These co-ordinates are calculated from surveys. 2.8 LEAD ANGLE by plotting co-ordi-
In the old days (pre 1985) it was normal practice to allow a "lead angle" when kicking off a well. Since roller cone bits used with rotary assemblies tend to "walk to the right", the wells were generally kicked off in a direction several degrees to the left of the target direction. In extreme cases the lead angles could be as large as 20. The greatly increased use of steerable motors and the widespread use of PDC bits for rotary drilling have drastically reduced the need for wells to be given a "lead angle". Most wells today are deliberately kicked off with no lead angle (i.e. in the target direction).
3 NUDGING
The technique of "nudging" is used on platforms in order to "spread out" conductors and surface casings and thereby minimise the chance of a collision when wells are drilled. Basically, when the hole for surface casing is drilled, some angle is built at a low rate (e.g. 1/100') in the chosen direction. As well as the basic reason "nudging" are: of "spreading things out", other reasons for
to drill from a slot located on the opposite side of the platform target, when there are other wells in between to keep wells drilled in the same general direction as far apart
if the required horizontal displacement of a well is large compared to the total vertical depth, then it is necessary to build angle right below the surface conductor to avoid having to use a high rate of build later
Page 7 /3/28
Exploration,
(Structure Field Platform 5 - JRG Field 5 - JRG Location
Inc.
North Sea
East -->
I e
s.. I
East -->
Figure 7.3.19 : A three-dimensional turn on the horizontal plan
3.1
The most common method is to use a mud motor of 91/2" OD or greater with a 171/2" bit and a 11/2 bent sub. Using a 11/2 bent sub gives a low build rate and hence a low dogleg severity as required. The hole is opened out to the required gauge after the mud motor run. Occasionally the job is performed with a large mud motor and 26" bit from the start. In this case either a 11/2or 2 bent sub might be used.
3.2
The directions in which the wells are "nudged" should be chosen so as to achieve maximum separation. The wells will not necessarily be nudged in their target directions.
Page 7/3/29
The nudges will not only be shown on the individual well plans for each well, but also a structure plot will be drawn which will show the well positions at the surface casing point after the nudge.
COMPASS or WELLPLAN
Survey uncertainty must also be computed both for the proposed well and the critical existing wells. All the major operating companies have established criteria for the minimum acceptable separation of wells, which are usually linked to "cone of error" or "ellipse of uncertainty" calculations.
Three
examples
pages.
Page 7 /3/30
Strac-ure
-_-
Platform
5 -
JRG
Fleid
Field 5 -
JRG
Location
North
Sea
East -->
,CHRIS TtNSEN
L -ST i :N
Figure 7.3.20: Typical directional well plan showing both vertical and horizontal projections
Page 7/3/31
''Structure Field
-J
Location
North Sea
- - - -
WELL PROFILE G- T,
----
Figure 7.3.21 : Well plan of a complex re-drill performed with a DTU steerable motor system
Page 7/3/32
V 2.0.0
Structure Field
Location
North
Sea
'CHRISTENSEN
EASihaAN
East -->
Figure 7.3.22: Example of surface plan view of wells drilled from an offshore platform
Page 7/3/33
V 2.0.0
INTRODUCTION
The idea of using a downhole motor to directly turn the bit is not a new one. Indeed, the first commercial motor used was turbine driven. The first patent for a turbo-
The turbine consists of a multistage vane type rotor and stator section, a bearing section, a drive shaft and a bit rotating sub. Each stage consists of a rotor and stator of Figure7.3.23 identical profile. The stators are stationary, Differences between the turbine motor (left) and positive displacement motor locked to the turbine body, and deflect the (right) designs flow of drilling fluid onto the rotors which are locked to the drive shaft. The rotors are forced to turn; the drive shaft is thus forced to turn, causing the bit sub and the bit to rotate. A positive displacement motor is a hydraulically uses the Moineau principle to drive the drilling
rotation.
Page 7/3/34
V 2.0.0
1.1
A by-pass valve allows drilling fluid to fill the drill string while tripping in the hole and drain while tripping out. While the drilling fluid is being pumped, the valve closes so that it passes through the motor. Most valves are of a spring piston type which closes under pressure to seal off ports to the annulus. When there is no downward pressure, the spring forces the piston up so the fluid can channel through the ports to the annulus. (Figure 7.3.24) 1.2 MOTOR SECTION application
I
aae
Pump OFF
Pump ON
000
9 i
i i
Open
Closed----,*
This is a reverse
of Rene Moineau's
section
pump principle.
consists
The motor
and
of a stator
steel rotor. The stator is made of an elastomer compound and is moulded inside the outer steel 56 romrl rrar housing. The stator will always have one more lobe than the rotor. Hence motors will be described as
As drilling fluid is pumped through the motor, it fills the cavities between the dissimilar shapes of the rotor and stator. The rotor is forced to give way by turning or, in other words, is displaced; hence the name positive displacement motor. It is the rotation of the rotor shaft which is eventually transmitted to the bit.
1.3
Since the rotor is a helix, and is not supported by bearings inside the stator, it does not rotate concentrically - rather it traces a back and forth motion. This
Page 7/3/35
V 2.0.0
motion must be converted to concentric motion before being transmitted the bit via the drive sub. This is achieved by a connecting rod assembly. are several possible types.
to There
Universal-joint
U-joint assemblies (Figure 7.3.26a) have been conventionally utilised by the industry and are still used in most positive displacement motors presently in the field. The assembly consists of two universal joints, each grease filled and sealed with oil-resistant reinforced rubber sleeves which protect them from drilling fluid contamination. A drawback of the U -joint assembly is that its strength is critical for higher torque applications such as that encountered with recent generations of high torque PDMs, particularly when used with
Flex rod
U-ioint
sleeves as with U-joints. Their utilisation has generally been limited to low offset steerable motors or straight motor applications. One unique approach has been to mount the flex rod inside the hollow rotor of a short, high torque steerable PDM rather than connecting it to the bottom of the rotor. By connecting a long flex rod to the inside of the top end of the rotor and extending the flex rod through the rotor to connect to the top of the drive sub assembly, the overall rate of bend of the flex rod is decreased due to its increased length.
1.4
BEARING SECTION
A typical positive displacement motor utilises three sets of bearings attached to the drive shaft. These are two sets of radial bearings ("upper" and "lower") with one set of axial thrust bearings. The axial thrust bearing section supports the hydraulic thrust. It consists of a series of ball the other, each set being contained in its own axial thrust bearings will vary, depending on on and off bottom loading and bearings stacked one on top of race (or groove). The number of the size of the tool.
Page 7/3/36
The upper and lower radial bearings are lined with elastomers, or with tungsten carbide inserts. The function of these bearings is to support the concentrically rotating drive shaft against lateral loads. The inherent design of the upper radial bearing limits the amount of fluid flow diverted to the annulus to cool and lubricate the bearing package. This diversion of flow
is typically 2 - 10%, depending
Inner rin
on motor and bit pressure Rotating drive su drop. The major portion of the drilling fluid is collected by Radial bearing assembly ports in the drive shaft and exits through the bit. In some Figure 7.3.27 : Bearing sections motors, diamond bearings are being used and may need up to 20% of the flow to be diverted, depending upon conditions. Figure 7.3.27 illustrates typical bearing sections found in
PDMs.
1.5 TYPES OF POSITIVE DISPLACEMENT MOTORS
PDMs come in various configurations. As has been mentioned previously, the stator will have one more lobe than the rotor. The first types of PDMs, and the simplest, are 1/2 motors. These generally give medium to low torque output and medium to high speed. Torque output is directly proportional to pressure drop across the motor. The 1/2 motors have good applications in performance drilling with a PDC, diamond, or TSP-type bits. Some shorter models are used for directional purposes. Multi-lobe motors have high torque output and relatively slow speed. They therefore have good applications with roller cone bits and for coring. These motors are also suitable for use with PDC bits, especially the large cutter types which require a good torque output to be efficient. Being fairly short, they also have good directional applications with bent subs as a deflection device. Multi-lobe motors may be constructed with a hollow rotor plus a seat at the top into which either a nozzle or blank can be placed. A nozzle enables high pumping rates to be accommodated by allowing some of the drilling fluid to by-pass the motor section while the entire flow still passes through the bit. Figure
motor.
7.3.28 is an illustration
of a multi-lobe
(5/6) positive
displacement
Page 7/3/37
1.6
CHARACTERISTICS
Bypass valve
Torque is directly proportional to the motor differential pressure. This makes the tool very simple to operate. RPM is directly proportional to flow rate, though somewhat affected by torque output. Hydraulic Hydraulic Where power input =
Rotor
Stator
P6XQ
kW
power input = P X Q HP 1,714 : P = the pressure drop across the motor (kPa / psi) = the flow rate (m3/min / Q gals/min) power output =
TxN
Universal joint
Mechanical Where
5,252
: T = the torque (Nm / lbs-ft) N = the bit speed (rpm) = Mechanical Hydraulic power output power input
Efficiency 1.7
OBSERVATIONS Motor stall will be obvious due to an increase of surface pressure. Motor stalling is best avoided as it erodes the elastomer of the stator and shortens the service life of the motor.
Figure 7.3 .28 : Navi-Drill Mach 1C
LCM can be pumped safely, though care should be taken that the material is added slowly and evenly dispersed, and the system is not slugged. Sand content Temperature ture stators in the drilling fluid should be kept to a minimum. 270F, 130C, but higher is typically temperaof limits are normally around have been developed.
in the range
Allowable wear on axial bearings upon tool size. The tool should be flushed
In general, drilling fluids of a low aniline point may damage the rubber stator. As a rule, the oil in oil based muds should have an aniline point of at least 150F (60C). Usually, this is related to the aromatic content which should be equal to or less than 10%. Contact the local supplier if there is any doubt. If a by-pass nozzle is fitted to a multi-lobe rotor, then it must be sized very
Page 7 /3/38
V 2.0.0
carefully to allow the motor section to develop the necessary power. Any subsequent variation from the flow for which the nozzle was designed will compromise the motor's performance.
1.8
MOTOR ORIENTATIOWCONTROL
runs,
All directional wells require steering during initial kick-offs, correction sidetracks, and re-drills. This is discussed in subsequent Topics.
2 TURBINES
The turbine is made up of several sections:
The drive stages or motor section. The axial thrust bearing assembly The bit drive sub.
and radial
bearings.
The drive stages, or motor section, consists of a series of stator and rotor discs of a bladed design. One stator and one rotor together form a stage. Turbines will be referred to as 90 stage, 250 stage, etc. The number of stages will determine the torque generated. Each stage, theoretically, applies an equal amount of torque to the control shaft and it is the sum of those torques which will be output to the bit. The drive sub is simply the bit connection and bearing shaft. The radial bearings support the shaft during lateral loading. The thrust bearings support the downwards hydraulic thrust from drilling fluid being pumped through the tool and the upward thrust of weight being applied to the bit. Theoretically, the correct a-, T bine section amount of weight on bit should be applied to equalise the hydraulic thrust and thereby unload the bearings and prolong their life. 2.1 DRIVE SECTION
Seal Bearing and Radial
seal section
This consists of a series of bladed stators, fixed to the outer tool housing and bladed rotors fixed to the central rotating shaft. Drilling fluid flow is deflected at a pre-determined angle off the stator blades to hit the rotor blades and cause the shaft to rotate. The angle of the blades will affect the torque and speed output of the turbine. (Figure 7.3.29)
I
I/ v i Radial bearings
Seal
Thrust bearings
Page 7/3/39
V 2.0.0
2.2
BEARING SECTION
Usually, thrust bearings are made up of rubber discs (Figure 7.3.29) which are non-rotating, being fixed to the outer housing of the tool, and rotating steel discs attached to the central rotating shaft. Long bearing sections known as cartridges are used for long life in tangent or straight hole drilling sections. These are changeable on the rig. If the bearings wear past the maximum point, considerable damage can be inflicted as the steel rotors will crash into the steel stators below.
2.3
DIRECTIONAL TURBINE
This is a short tool which has a set number of stages and its bearing section entirely within one housing. That is, it is not a sectional tool and will be typically less than 30 ft (9 m) long. It is designed for short runs to kick off or correct a directional well, using a bent sub as the deflection device. Steerable turbodrills do exist and will be discussed later.
2.4
CHARACTERISTICS
Torque and RPM are inversely decreases and vice versa). RPM is directly proportional proportional (i.e., as RPM increases, torque). torque
Torque is a function of flow rate, drilling fluid density, blade angle and the number of stages, and is affected by varying weight on bit. Optimum Changing Off bottom,
zero.
takes
bearings
Optimum performance is at half the stall torque and at half the runaway speed, the turbine then achieves maximum horsepower. A stabilised turbine used in tangent to "walk" to the left. sections will normally cause the hole
2.5
OBSERVATIONS
There is minimal Turbines Sand content surface indication of a turbine stalling.
do not readily
of the drilling
Pressure drop through the tool is typically 500 psi to over 2,000 psi. Turbines Usually, do not require the maximum a by-pass allowable valve. bearing
Page 7/3/40
V 2.0.0
INTRODUCTION
Deflection tools are those which are used to force the bit to drill along a different trajectory from that which could be obtained by taking advantage of the normal deviating tendencies of a "straight" drilling assembly. What they all have in common is that they must be oriented in a specifically chosen direction. Methods of doing this are described in the following Topic. There are two basic methods of forcing the BHA to deviate from its natural trajectory. One is simply to push the bit sideways by means of a whipstock which is external to the string. The others use equipment included in the string. Normally this is equipment which causes the bit to rotate about an axis which is at an angle to the axis of the main part of the assembly. It follows that, in order for this to be effective it, the string cannot be rotated (at least until the required trajectory has been achieved). In other words, it involves the use of the downhole motors described in the previous Topic. A different, little used, method of using equipment internal wash away the formation preferentially in a given direction asymmetric arrangement of nozzles in the bit. to the string is to by using an
A recent development has been a combination of the two basic methods involving pushing the bit sideways by means of equipment installed in the BHA. This has the advantage that it can be activated at will when required, and left inactivated when the trajectory being followed corresponds to what is desired. This system is not described in the present Topic but in Topic 9 Rotary steerable systems.
WHIPSTOCKS
The whipstock was the main deflection tool from 1930-1950. Its use then declined as directional drilling techniques improved, but is being used increasingly again in multilateral applications. Whipstocks are now also used in coiled tubing drilling for re-entry work. There are three types of whipstock:
1.1
The standard removable whipstock is used mainly to kick off wells, but is also used for sidetracking. It consists of a long inverted steel wedge which is concave on one side to hold and guide a whipstock drilling assembly. It is also
WDLP - Directional drilling Page 7/3/41
V200
provided with a chisel point at the bottom to prevent the tool from turning, and a heavy collar at the top to withdraw the tool from the hole. This whipstock is used with a drilling assembly consisting of a bit, a spiral stabiliser, and an orientation sub, rigidly attached to the whipstock by means of a shear pin. The whipstock assembly is lowered to the bottom of the hole and orientated. Weight is applied to set the whipstock and shear the pin. The bit is then drilled down and forced to deflect to one side by the whipstock. A 12 to 16 foot (4-5 m) "rat hole" is drilled below the toe of the whipstock. The assembly is then pulled out of hole, taking the whipstock with it. A hole opener run is made to open the rat hole out to full gauge. The hole opener assembly is then tripped out and a rapid angle build assembly run in hole to "follow up" the initial deflection. This whole procedure may have to be repeated several times in the kick-off. It is obvious that the major disadvantage of the Figure7.3.30 standard whipstock is the number of "trips" involved The standard removable whipstock which uses a lot of rig time. The other important disadvantage is that the whipstock produces a sudden, sharp deflection - in other words, a severe dogleg - which may give rise to subsequent problems with the hole. The advantages are that it is a fairly simple piece of equipment which requires relatively little maintenance and has no temperature limitations.
1.2
CIRCULATING WHIPSTOCK
The "circulating whipstock" is run, set and drilled like the standard whipstock. However, in this case the drilling fluid initially flows through a passage to the bottom of the whipstock which permits more efficient cleaning of the bottom of the hole and ensures a clean seat for the tool. It is most efficient for washing out bottom hole fills.
1.3
The "permanent casing whipstock" (Figure 7.3.31) is designed to remain permanently in the well. It is used where a "window" is to be cut in casing for a sidetrack. The casing whipstock is set using a permanent packer. The special stinger at the base of the whipstock slips into the packer assembly. A stainless steel key within the packer locks the whipstock's anchor-seal and prohibits any circular movement of the whipstock during drilling. The normal procedure is to set the packer and then measure After this, the starting mill is pinned to the casing whipstock assembly run slowly in hole and seated in the packer. its orientation. and the whole
Page 7/3/42
V 2.0.0
After the whipstock has been "seated" in the packer, the pin is sheared and circulation and rotation begun. The starting mill is used to make an initial cut through the casing and mill approximately 2 ft (50-60 cm) of casing. The lug that held the starting mill to the whipstock must also be milled off.
Starting mill
This assembly is tripped out and the mill changed. A tungsten carbide or diamond speed mill is used to cut the rest of the window. Once the window has been cut, approximately 5 ft (150-160 cm) of formation is cut before pulling out of hole. Next, a taper mill is run with a watermelon mill immediately above it. This is done to "clean" the top and the bottom of the window. Finally, another trip is made to change over to the drilling assembly which is used to drill ahead. The advantage of using a casing whipstock, instead of the normal method of milling a relatively long section of casing, setting a cement plug and sidetracking through it is that window milling usuall Y takes less time. The main disadvantage is that it gives a sharp dogleg, and so the casing whipstock is not recommended if there is a considerable distance to drill below the sidetrack, i.e. if several trips in and out through the window may be required. This is because problems can occur when trying to pull stabilisers, etc. back into the casing through the window. On the other hand, if there is only a short distance to be drilled below the sidetrack point, then the casing whipstock is well worth considering. In recent years, improvements in the design of casing whipstock systems have eliminated the need for so many trips in and out of hole.
Shear pin
<LI
Wear pad
or lug
Casing Whipstock
Whipstock
a
-
anchor assembly
Whipstock
2 JETTING
Jetting (or badgering) is a technique used to deviate wellbores in soft formation. The technique was developed in the mid 1950s and superseded the use of whipstocks deflection technique.
Figure 7.3.31:
The permanent casing
Although jetting has subsequently been supplanted by downhole motor deflection assemblies (as the primary deflection method) it is still used frequently and offers several advantages which make it the preferred method in some situations. A special jet bit (like the one shown in the figure overleaf) may be used, but it
Page 7/3/43
is also common practice to use a standard soft formation tricone bit, with one very large nozzle and two small nozzles. 2.1 REQUIREMENTS FOR
u1
JETTING
The formations must be soft enough to be eroded by the drilling fluid emerging from the large jet nozzle. As a rough rule of thumb, if formations cannot be drilled at penetration rates of greater than 80 ft/hr using normal drilling parameters, they
are not suitable for jetting.
Largejet
Figure 7.3 .32 : A jetting bit
Jetting is most effective in soft, sandy formations, and of course effectiveness is reduced as depth increases, since the formations become more compacted. In the Gulf of Mexico, the maximum depth for effective jetting is approximately 2500 feet. Adequate rig hydraulic horsepower must be available. For jetting to be successful there must be adequate hydraulic energy available at the bit to erode the formation. A rule of thumb for jetting is that drilling fluid velocity through the large jet should be 500 ft/sec or greater.
2.2
JETTING ASSEMBLIES
assembly used to drill a 121/4" pilot hole is:
A typical jetting
DC
This is essentially a strong angle build rotary assembly (see Topic 8) with a suitable bit for jetting. The upper stabiliser is optional and is often omitted.
2.3
There
Page 7/3/44
WDLP
Directional drilling
V 2.0.0
b) Fit one large and two small nozzles in a conventional c) Blank off one nozzle of a conventional other two. bit to divert
tri-cone
bit. the
Flow through two jets may be desirable in large hole sizes (e.g. 171/2") because of the large washout required to deflect the bit and near bit stabiliser. Both (a) and (b) work well in most hole sizes which are commonly jet drilled. (b) is the most common option because it uses standard bits and nozzles and results in a bit dressed in such a way as to be suitable for both jetting and drilling. A 121/4" bit dressed for jetting
or 28 / 32" and the other two
would typically
nozzles
10/32" or 8/32".
2.4
1. The assembly is run to bottom, a survey is taken and the large jet nozzle (the "toolface") is orientated in the required direction. 2. Maximum circulation is established (e.g. 800 gpm [3,000 1/min] in 121/4" hole) and a controlled washing away of the formation opposite the large jet is effected, with the kelly in the rotary table and the table locked. 3. The drill string may be spudded up and down periodically, but not rotated, until several feet of hole have been made and the bit and near bit stabiliser have been forced into the washed out pocket. The technique is to lift the string 5 to 10 feet (2-3 m) off bottom and then let it fall, catching it with the brake so that the stretch of the string causes it to spud on bottom rather than using the full weight of the string. Another technique which may improve the effectiveness of jetting involves turning the rotary table a few degrees (15) right and left while jetting. 4. Having jetted 3 to 8 feet (1-3 m) of hole, the exact distance depending on required build rate and previous results, drilling is begun. The circulation rate is now reduced to about 50% of that used for jetting. Hole cleaning considerations are ignored while drilling the next 10 feet (3 m) or so. High
weight on bit (40-45 Klb / 18-22 tons) and low rotary speed (60-70 RPM)
should be used to bend the assembly and force it to follow through the trend established while jetting. Progress may be difficult at first because of interference between the stabiliser and the irregularly shaped jetted hole.
5. After approximately 10
_-4
feet (3 m) of hole has been drilled, the pump rate can be increased to perhaps
Page 7/3/45
jetting. High WOB and low RPM should be maintained. down to the next survey point.
6. A survey is taken to evaluate progress. If the dogleg is too severe the section should be reamed and another survey taken. 7. At the start of a kick-off, jetting is repeated every single until about 3 of angle has been built. After that, it is normal to jet every "double". After drilling each section, the jet nozzle has to be re-orientated to the desired tool face setting before jetting again. The operation is repeated until sufficient angle has been built and the well is heading in the desired direction. The principle is that, during the initial spudding and washing process, a pocket is produced in the formation opposite the jet nozzle. When high WOB is then applied and the drill string rotated, the bit and near bit stabiliser work their way into the pocket (the path of least resistance). The collars above the near-bit stabiliser bend and contact the low side of the hole. This causes a bending moment about the near-bit stabiliser which acts as a pivot or fulcrum, and the bit is pushed harder into the pocket (i.e. the direction in which the large jet nozzle was originally orientated).
2.5
The survey tool is not far behind the bit, so survey less than the corresponding bit depths. Orientation of tool face is fairly easy. can be used for normal rotary The same assembly build assembly.
drilling
as an angle
2.6
Page 7 /3/46
well as downwards. This sideways component of force at the bit gives the motor a tendency to drill a curved path, provided there is no rotation of the drill string. The degree of curvature (dogleg severity) depends on the bent sub angle and the OD of the motor, bent sub and drill collars in relation to the diameter of the hole. It also depends on the length of the motor. A downhole motor and bent sub assembly may be used for kicking off wells, for correction runs or for sidetracking. Notice the absence of any stabilisers in the lower part of this assembly. Usually there would be no stabilisers for at least 90 feet (30 m) above the bent sub. In fact, it is not uncommon for the entire BHA to be "slick" when a motor and bent sub is used for kicking off at shallow depths. 3.1 REACTIVE TORQUE
torque is a factor in the use
Bent sub
Motor
- Bit
Reactive
assembly of both types of downhole motor. It is created by the pressure of the drilling fluid pushing on the stator. The stator is locked to the body of the motor, so the effect of this force is to twist the motor and, hence, the whole BHA anticlockwise. As the weight-on-bit is increased, the drilling torque created by the motor increases. The reactive torque increases in direct proportion. Thus a reasonable, although simplistic, way to view this is that the clockwise drilling torque generated at the bit is the "action" and the counter-clockwise torque on the motor housing is the "reaction". The reactive torque at the motor is equal to the drilling torque. Reactive torque causes a problem for directional drillers when they are using a motor and bent sub to deflect the well-bore. The twisting of the BHA caused by reactive torque changes the facing of the bent sub (i.e. the tool face orientation). If they are obtaining tool face orientation from single shot surveys, the directional driller has to estimate how much turn to the left they will get due to reactive torque. He initially sets the tool face that number of degrees round to the right of the desired tool face, so that the reactive torque will bring it back to the setting required while drilling. Drill string design will affect the extent of "drill string twist." This concept is
Page 7/3/47
V 2.0.0
important to understand because it can directly affect the tool face orientation of the downhole motor. This twisting of the drill string becomes more critical at greater depths, especially when using smaller OD drillpipe in a high torque environment. When drilling is in progress, drilling parameters constant a steady tool face setting. every endeavour must be made to keep the and, hence, obtain constant reactive torque and
The estimation of reactive torque has always been a problem for the directional driller. Several charts and rules of thumb have evolved to give a first estimate in the absence of data . One such rule is that the reactive torque will produce a rotation of the order of 10-20 / 1000 feet measured depth (3060/1,000 m). The lower end of the range may be used for low torque motors and the higher end for high torque motors.
3.2
RUNNING PROCEDURES
and then tested using standard procedures. the bent sub
Before drilling can begin with a motor and bent sub assembly, (toolface) must be orientated in the desired direction.
The pipe is worked until string torque is eliminated. Best results are obtained by using a moderately fast up and down pipe movement. It is recommended that the bit be kept a minimum of 5 feet from the bottom the hole. Make a reference mark on the kelly bushings, lock the rotary take a survey to determine tool face orientation. Turn the pipe to achieve the desired tool face orientation. should include an allowance for the anticipated left-hand table and
of
When orienting, turn the pipe to the right unless the turn is less than 90 left of the present setting. Work the string up and down so that the turn reaches the bottomhole assembly. Lock the rotary table before beginning to drill.
Page 7/3/48
V 2.0.0
3.3
POSITIVE DISPLACEMENT MOTORS VERSUS TURBINES FOR USE WITH A BENT SUB
For directional work with a bent sub, positive displacement motors offer several advantages over turbines. When drilling with a PDM, the directional driller can use the pump pressure gauge as a weight indicator. If the pump pressure is constant, the differential pressure across the PDM is constant, so the torque and WOB are constant. It is also much easier to tell if a PDM has stalled because there will be an immediate large increase in surface pressure. PDMs give a longer bit life than turbines because of the slower rotational speed. They can tolerate LCM whereas turbines cannot (or only a very limited amount). Finally, instead of using a bent sub, a PDM with a small bend at the adjustable housing can be used. As this bend is nearer to the bit, a smaller angle of bend will have the same effect as a larger bent sub angle. This reduces the problem of the bit riding the side of the hole while tripping in and
out.
of turbines
at higher
tempera-
3.4
It can be used in most formations. As there is no "steering tool" Measurement normal choice rotation from surface, it is possible to use a wireline for surveying and orientation while drilling. Alternatively, While Drilling system can be utilised, which would be the nowadays. a
3.5
3.6
An alternative to using a bent sub is to use a PDM with a single bend in the universal joint housing, described either as a kick-off sub or a bent housing by different manufacturers. Historically, these "single tilt" motors were used for difficult deviation jobs such as sidetracking over a short section of hole into hard formation. Since the bend is closer to the bit than when a bent sub is used, a smaller tilt angle can be used while still giving a strong deviation tendency.
Page 7/3/49
A further development of the single tilt motor was the double tilt motor in which there are two bends in the housing (in the same plane). The effect of this is to tilt the axis of rotation of the lower section with the bit, but keep the bit closer to the axis of the hole. Both single and double tilt motors have been used as steerable motors. If the drill string is rotated so that the body of the motor rotates, then a fairly straight path is drilled, whereas if the tilt (tool face) is orientated in a desired direction and there is no drill string rotation, then the motor will drill a controlled curve. This subject is more fully discussed in Topic 8. After having been tried, double tilt motors are being phased out again in favour of the single tilt versions as they slide better and give better control of the desired inclination change. 3.7 TURBINES WITH A BENT HOUSING
Currently some operators are using a steerable turbine design which incorporates a bent housing close to the bit. It has been demonstrated that they can sustain a dog-leg capability of up to 8/100 ft. Incorporation of a stalling pressure indicator has also been achieved with these new designs.
Page 7/3/50
V200
Deliberately
left blank
Page 7/3/51
INTRODUCTION
The "Toolface" of a deflection tool or steerable motor system, is the part which is oriented in a particular direction to make a desired deflection of the wellbore. There are two basic ways of expressing toolface orientation: Magnetic or Gyro Toolface: this is the toolface orientation measured as a direction on the horizontal plane. If measured by a "magnetic" type survey tool, this is called a magnetic toolface; whereas if it is measured by a gyroscopic survey device, it is called a gyro toolface. Toolface orientation is only measured and expressed in this way at low inclinations, say less than 5 typically. High Side Toolface: this is the toolface orientation measured from the high side of the hole in a plane perpendicular to the axis of the hole.
It must also be pointed out that the term toolface is commonly used by directional drillers and surveyors as a shortened version of "toolface orientation". A magnetic or gyro toolface reading reading using the formula: High side toolface = mag/gyro can be converted to a high side toolface
(A negative answer means the angle is measured anti-clockwise or left of high side). The above formula is based on the fact that the high side direction is the azimuth of the borehole. In the remainder of this Topic, methods for selecting the required toolface orientation are discussed. These methods are also used to predict the changes in inclination and azimuth which result from drilling ahead with that toolface setting.
1 DEVIATED-WELL GEOMETRY
Before discussing the orientation of deviation tools further it is important that you can visualise the significance of the values of azimuth and inclination in deviated wells. This is shown in Figure 7.3.35. The inclination at any survey point, S, is the angle I between the well bore and the vertical. the tangent to
Page 7/3/52
V 2.0.0
S
Tangentto well bore
path at survey point
), the
(A) can
be measured
relative to north (true, magnetic or grid). In practice, changes in inclination and azimuth
W
S
Figure 7 .3.35
usually occur simultaneously and it is necessary sions in order to define the change points Si and S2.
to consider the situation in three dimenin course of the well between two survey
If the inclination and azimuth at each survey diagrams can be constructed enabling: the position of S2 to be calculated
relative
to S1. i.e.
In practice this may be done using a computer program cosine rules or by constructing vector triangles.
in downhole
to the following
data:
Survey
Inclination
Azimuth
Survey Inclination
Al
point
Sl It =
S2 12
Azimuth
A2 =
87Mag.
the survey points, and the toolface-setting angle
Page 7/3/53
Construct
as follows:
directions
N
- Al (initial)
and A2 (required)
A2
W
to the initial
Scale 1cm : 1
A2 W
A Q
Complete
(6)
12(=6)
Az (=87)
(i
(8)
li (=8)
Ai (=95)
Figure 7.3.36
Measure these angles with a protractor and ruler. You may then confirm them using a computer. You should have found that the toolface-setting angle was 158 (a) and the dogleg was 2.1 ((3). We will now move on to look at the ways in which these vector triangles be practically applied. may
Page 7/3/54
V 2.0.0
inclination azimuth
What will be the effect over an interval 1. Setting 2. Setting 1. Setting the toolface the toolface at 0 at 180
the toolface
and azimuth
Construct
an arc representing
set at 0
Continue
Il until it meets
I2
is 15.
Figure 7.3.37a
Page 7/3/55
2.
Setting
the toolface
inclination
and azimuth
with
Dogleg radius 3
Measure
is 9.
To maintain a constant inclination with a tool of given dogleg potential the resultant azimuth change can be determined as shown in the example overleaf. You should note that there is only one toolface-setting angle possible when a change in azimuth is required. You are given the following Existing Required Existing inclination inclination azimuth Al Il 12 data: 8 8 117 Mag 3.5/100 ft the
Assuming that a left-hand change in azimuth is required over a 100 ft interval, what will be the new azimuth of the bore-hole (A2) ? Estimate toolface setting required.
Page 7 /3/56
V 2.0.0
the initial
Construct
an arc representing
the tool
Tool dogleg radius 3.5
Ai
the
12-8
Construct
TooIface
/setting Azimuth than e AA angle
Read off the azimuth change (AA) and toolface setting angle (a).
DA = 25.3
a=102.7
For a left hand toolface setting: Determine the new borehole azimuth (A2)
A2 = Al-AA
A2 = 117- 25.3 = 91.7 Mag Note: for a right hand
For a left hand toolface setting: toolface setting azimuth = Al-a = 117-102.7 = 14.3 Mag
Figure 7.3.38
The new bore-hole azimuth is thus 91.7 Mag. This is achieved toolface setting angle of 102.7 left side (azimuth = 14.3 Mag).
with a
Page 7/3/57
You require an azimuth change of 20.16 (left) over an interval of 100 ft. What toolface-setting angle would be required to achieve this change given the following data? Required inclination Existing inclination Existing azimuth = 10 = 10 = 198 Mag
= 3.5/100 ft
Scale2 = 1cm
Tooldagleg
potential = 3.5
\z `
11 = 10
Azimuth
Al
Figure 7.3.39
program
angle azimuth
When setting tools for combined inclination and azimuth change there are always two possible toolface settings. The setting you choose depends on the required inclination. However, as you increase the azimuthal change, the capacity to change the inclination is reduced (See below). Consider overleaf. the following worked example which is illustrated in Figure 7.3.40
You want to change the azimuth dance with the data below: Existing Existing Azimuth inclination azimuth change setting (SA)
of 100 ft in accor-
= 17 = 93 Mag
= 3.5/100 ft
= 10.5 right and what will be the new inclination ?
is required
Page 7/3/58
V 2.0.0
the
Scale 1 cm =3
AI= 93'mag
A1=93'mag
Construct
a line representing
the
(in
I,= 17 AA 12=15
this case there are two) and read off the required data
A2
II=17
s A,
12= 18.4 A2
Figure 7.3.40
for maximum
azimuth
change A2
N ' AA
ll
oglegarc Azimuth at
survey point, Al
tool is
run in Figure 7.3.41
order to achieve the maximum possible azimuth correction. In these circumstances a small decrease in inclination may also be expected. However, this effect is only significant at low angles of inclination.
Page 7/3/59
Effect of Inclination on Potential Azimuth Change For a given dogleg potential the maximum azimuth change rapidly decreases as inclination increases. The effect of inclination on azimuth change for a dogleg angle of 3 is illustrated in the table alongside and in Figure 7.3.42. Over a wide range of inclination its effect on potential azimuth change is more conveniently shown on a graph - see Figure Table2.4.1 Inclination Azimuth ( are sin{ 5 arc sin 3 -17.5 110
arc sini151
change = 36.9
100
3
J
= 11.5
3
Azimuth change = 17.5
Azimuth change = 1 1 5
Figure 7.3.43
You can see that there is a big advantage in maintaining a low angle of inclination. It allows greater azimuthal changes in course direction to be made for a given tool dogleg potential. However you should remember that inclination angles below 15 also allow the bore hole to "wander" more easily.
change
30
20
10
10
20
Inclination
30
Page 7 /3/60
INTRODUCTION
An important aspect of a directional driller's job is to design which will drill the planned trajectory. In this Topic we shall the basic principles used in directional control when drilling assemblies, and the typical assemblies used for each section. drilling parameters such as weight-on-bit will be considered of formation anisotropy. rotary BHAs concentrate on with rotary The effect of as will the effect
Historically, it has always been possible to control the angle (inclination) of directional wells during rotary drilling by correct design of the assembly and use of suitable drilling parameters. However, the control of hole direction has traditionally been poor. Roller cone bits usually walk to the right, and directional control was formerly limited to using well-stabilised assemblies to reduce this tendency, or initially to aim off to the left to allow for it The normal procedure has been to drill as much of a directional well as possible using a conventional rotary asssembly designed according to the principles explained in the Topic, and to use orientable turbines/Moineau motors to initiate major changes of angle and/or direction and for fine-tuning. However, as mentioned in the Introduction to Topic 5, recent technical advances have enabled rotary steerable systems to be developed that are now coming into use. These are described in Topic 9. Their advantage is that as long as the bit lasts the same assembly can be kept in the hole and used both for straight and curved sections. Even so, the principles described here still need to be applied so that the natural tendency of the string will help rather than hinder the maintenance of the required trajectory.
Page 7/3/61
Factors which affect the directional behaviour of rotary assemblies are: Gauge and placement of stabilisers. Diameter collars. Weight -on-bit. Bit type. anisotropy and dip angle of the bedding planes. Formation hardness. Flow rate Rate of penetration. are interrelated.
Hole gaug
Side forc at bit
and
length of drill
Rotary speed.
i
C:nl.. f ..--..1
Hole
axis
Formation
, anisotropy
Figure 7.3.44 : Bit forces and tilt angle
The Stabilisation
Principle
the inclination
We shall now consider each of these principles assemblies which are used. 2.1 THE FULCRUM PRINCIPLE
in turn
An assembly with a full gauge near-bit stabiliser, m) of drill collars before the first string stabiliser, will build angle when WOB is applied.
As illustrated in Figure 7.3.45, the collars above the near-bit stabiliser bend, partly due to their own weight and partly because of applied weight-on-bit. The near-bit stabiliser acts as the pivot, or fulcrum, of a lever and the bit is pushed to the high side of the hole. The bit therefore drills a path which is gradually curving upwards (i.e. the assembly builds angle).
Page 7/3/62
V 2.0.0
'07
Weight
Component of force
on high side
Full gauge near-bit stabilizer
Force
Figure 7.3.45 : The fulcrum principle
Increase in hole inclination The rate of build of a fulcrum assembly increases as the inclination increases because there is a larger component of the collars own weight causing them to bend. A simplified picture of the mechanics involved predicts that the rate of build should increase in direct proportion to the sine of the inclination. In reality, the situation and the actual response are more complicated. To take an example, a strong build assembly which built at a rate of 1.5 per 100ft/30 in when the inclination was only 15 might build at 4 per 100ft/30 in when the inclination was 60.
Page 7/3/63
Weight-on-Bit
Increasing the weight on bit will bend the drill collars behind stabiliser more, so the rate of build will increase. the near-bit
Rotary Speed
A higher rotary speed will tend to "straighten" the drill collars and hence reduce the rate of build. For this reason, low rotary speeds (70 - 100 RPM) are generally used with fulcrum assemblies. Flow Rate In soft formations, a high flow rate can lead to washing ahead of the bit which reduces the build tendency. out the formation
171/2" bit / 171/2" NB stab / 3 X 91/2" x 30' DCs / 171/2" stab / 91/2" x 30' DCs as needed/ etc. This assembly will build angle rapidly, typically at 2.0 3.5/100', depending on the inclination and the drilling parameters. Figure 7.3.47. shows a 60' Build Assembly
171/2" bit / 171/2" NB stab / 2 x 91/2" x 30'DCs / 171/2" stab / 91/2" x 30' DCs as needed / etc. This assembly will build angle at the rate of 1.5 2.5/100', depending on the inclination and the drilling parameters. Figure 7.3.48 shows a Gradual Angle Build Assembly
171/2" bit / 171/2" NB stab / 91/2" x 12' DC / 91/2" x 30' DC / 171/2" stab / 91/2" X 30'DCs as needed / etc. This assembly will build typically at 0.5 1.5/100', depending on the inclination and the drilling parameters. Figure 7.3.49 shows a Gradual Angle Build Assembly section when it is neces-
121/4" bit / 121/4" NB stab / 8" x 30' DC / 121/4" stab / 8" x 30' DCs as needed
/ etc. This assembly would be used in the tangent
Page 7/3/64
Drill collar
Drill collar
Drill collar
Drill collar
Drill collar
Drill collar
Drill collar
Full gauge string stabilizer Slightly under gauge string sl Drill collar
Drill collar
S S
Undergaugestringstabilizer
Drill collar
i
WDLP - Directional drilling V 2.0.0
Page 7/3/65
2.2
I I
II
Note that it is important that the stabilisers used should have blades that wrap in a clockwise direction. The contact area of the blades and the area left open for fluid flow are also important design parameters. Four different packed hole assemblies are illustrated on the opposite page:
Figure 7.3.51: This assembly will give a very slight build or drop rate of 0.1 0.5/100' depending on various factors such as formation characteristics,
Figure 7.3.54: The tandem stabilisers make this assembly very rigid. In the past it was more common to use tandem stabilisers to control the bit walk of roller cone bits. Presently, its use is limited to areas where extreme bit walk is common. Rotation of an assembly such as this will generate high rotary torque. Generally, as the number of stabilisers in the BHA increases, so does the possibility of hole sticking.
Page 7/3/66
Figure 7.3.51
Figure 7.3.52
Drill collar
Drill collar
Drill collar
Figure 7.3.53
Figure 7.3.54
Full gauge string stabilizer Drill collar Drill collar Full gauge string stabilizer Full gauge string stabilizer Drill collar
Full gauge string stabilizer 10' short drill collar 10' short drill collar
Drill collar
Bit
Bit
Page 7/3/67
2.3
This was the first directional control principle to be formulated and was originally analysed for slick assemblies drilling straight holes. We shall concentrate on pendulum assemblies used in deviated wells. The portion of the assembly from the bit to the first string stabiliser hangs like a pendulum and, because of its own weight, presses the bit to the low side of the hole. The major design feature of a pendulum assembly is that there is either no near-bit stabiliser or an undergauge near- bit stabiliser. In most cases where a pendulum assembly is used, the main factor causing deviation is the component of force at the bit acting on the low side of the hole. The length of collars from the bit to the first
Figure 7.3 .55 string stabiliser (the
pendulum")
must
not be
allowed to bend too much towards the low FORCE side of the hole.
If the collars make contact with effective length of the pendulum reduced. The situation depicted bit axis has been tilted upwards the dropping tendency. (In itself,
low side as shown in Figure 7.3.56, then the and the side force on low side are both in this figure is also undesirable because the in relation to the hole axis which will reduce this would produce a build tendency).
Careful selection of drilling parameters is required to prevent this. High rotary speed (120 to 160+) helps keep the pendulum straight to avoid the above situation. Initially, low weight-on-bit should be used also, again to avoid bending the pendulum towards the low side of the hole. Once the dropping trend has been established, moderate weight can be used to achieve a respectable penetration rate. Some elementary texts on directional drilling depict the pendulum effect as shown in Figure 7.3.57. The implication is that part of the dropping tendency is produced by a downward tilting of the bit axis. It is interesting to note '
that then if this the picture were true WOB dropping
Ar--Tangency point
w
Effective length
of pendulum
Figure 7.3.56 Reduction of pendulum force
Page 7 /3/68
tendency would be increased by increasing WOB and reducing rotary speed, the precise opposite of what was recommended in the previous paragraph. The example in Figure 7.3.57 is possible for certain lengths of pendulum when there is no near-bit stabiliser and only one string stabiliser. The collars above the upper stabiliser are sagging towards the low side of the hole causing a fulcrum effect about the string stabiliser and tilting the upper portion of the pendulum towards the high side of the hole as shown. Some experienced directional drillers recount instances of pendulum assemblies dropping faster with high WOB and low rotary speed.
Hole Axis
-*-Bit
axis
emphasised, however, that this is not what would normally occur. of the bit is effectively a point of support, so that for most assemblies, especially longer pendulums, the pendulum section is to bend towards the low side of the hole as described previously. PRACTICES.
The safest approach to designing and using a pendulum assembly is to concentrate on producing a side force at the bit on the low side of the hole. This is best achieved by running an assembly where the pendulum portion will be as stiff and straight as possible. It is also desirable that the section immediately above the first string stabiliser is also stiff and straight and so a second string stabiliser within 30 ft (9 m) of the first is recommended. Omit the near-bit stabiliser when azimuth control is not a concern or when drilling with a PDC bit. When drilling with a roller cone bit, use an under-gauge near-bit stabiliser if azimuth control is a consideration. Typically, the near-bit stabiliser needs to be 1/4" to 1/2" undergauge in order to produce a dropping tendency. The assembly should have two string stabilisers with the second stabiliser not more than 30 ft (9 m) above the first. Initially use a low WOB until the dropping tendency is established, then gradually increase bit weight until an acceptable penetration isachieved. Use a high rotary If possible, speed, depending on bit type. in hard formation. do not plan drop sections rate
Page 7/3/69
V 2.0.0
Four different
pendulum
assemblies
are illustrated
on the opposite
page:
Figure 7.3.58 shows a 30 ft (9 m) pendulum assembly. The rate of drop depends on the wellbore inclination and the diameter and weight of the bottom drill collar, as well as the drilling parameters. At 45 inclination,
this
Page 7/3/70
V200
Figure 7.3.58
Drill collar Drill collar
Figure 7.3.59
Drill collar
Bit
Bit
Figure 7.3.60
Drill collar
Figure 7.3.61
Drill collar
Drill collar
Full gauge string stabilizer Drill collar Short drill collar (10' to 15')
Bit
Bit
Page 7/3/71
assemblies maintaining
in tangent section drilling, longer gauged PDC bits seem to aid in inclination and direction due to the increased stabilisation at the
bit.
When used with angle drop assemblies, PDC bits may reduce the drop rate previously obtained with a tricone bit. Generally, the longer the gauge length of the PDC bit, the lower the rate of drop obtained because the bit gauge acts similar to a full gauge near-bit stabiliser. Short gauge length PDCs can be used effectively for dropping angle. When such a suitable PDC bit is used in a rotary pendulum assembly, the low WOB and high RPM, typical to most PDC bit applications, should assist in dropping angle.
by
I= 64 (OD4 - ID4) per unit length, W, is calculated from of the steel.
ID OD
The weight
W = 4 p(OD2 - ID')
where
p is the density
Notice that the stiffness is proportional powers of the diameters whereas collar between their squares. This means that significant effect on collar weight than
Table 2 .4.2 : Properties of steel drill collars Collar Ins mm Moment in4 of Inertia cm4
to the difference between the fourth weight is proportional to the difference the inside diameter has a much more on the stiffness. The relative weights and inertia of some common drill collar sizes are listed in the table alongside. It is interesting to notice that the moment of inertia of a 91/2" collar is double that of
Mass/unit
length kg/m
lbs/ft
OD
4.75 6.5 8.0 9.5
ID
2.25 2.81 2.81 3
OD
121 165 203 241
ID
57.2 71.4 71.4 76.2 24 85 200 400 1,000 3,500 8,200 16,400 47 93 151 217 70 135 234 321
Page 7/3/72
The component of weight/unit length tending to bend the drill collars and contributing to the lateral forces at the bit and stabilisers is WX
WX=WxBFxsinO
where: W = weight/unit length of the drill collar in air, BF = buoyancy factor of the drilling fluid (Well Engineers Notebook, Section A) 0 = inclination of the wellbore all in consistent units and density of various
The accompanying table gives the modulus of elasticity metals which can be used to manufacture drill collars. The main thing
to notice is that
ItlUIC . . fl, upeI tie ui
UIIICI
ei IL IIICItiIJ
UJCU
Ul
ULa
most
types
of
Modulus
of Elasticity
Density
(106 psi)
29.0 28.0 26.0 10.6 51.5
(106 kg/cm2)
2.04 1.97 1.83 0.75 3.62
(lbs/ft3)
491 501 529 170 1205
kg/l
7.87 8.03 8.47 2.72 19.30
ticity and
density. practice
stiffness of a drill collar depends almost entirely on its outside diameter and is proportional to the fourth power of the OD. However, aluminium drill collars would be more limber than steel drill collars of the same dimensions whereas tungsten collars would be much stiffer. In general, it is recommended that standard drill collar diameters should be used for each hole size. However, it is important that directional drillers understand the effect of changing the drill collar OD.
because
With a pendulum assembly, it is best that the pendulum portion be as stiff as possible so it is preferable to use large diameter collars if possible. Reducing collar OD increases the likelihood that the collars will bend towards the low side of the hole which will reduce the pendulum effect and the rate of drop obtained. Also, of course, reducing the collar OD reduces the weight of the bottom collars which reduces the pendulum force and the rate of drop.
In some cases, the nature and hardness of the rock being drilled can have a pronounced influence on directional tendencies, although in many cases the importance of formation effects is exaggerated. Of fundamental importance is whether the rock is isotropic or anisotropic. An isotropic rock is one which has the same properties, or behaves in the same way, no matter which direction you approach it from. Most sandstones are isotropic. Conversely, anisotropic rocks such as shales do not have the same properties in all directions.
Most oilfield drilling (although not all) is done in sedimentary formations. Due to the nature of their deposition, sedimentary rocks have layers or bedding planes and most sedimentary rocks show some degree of anisotropy. Experience from drilling into dipping (tilted) formations has shown that the drill bit is forced towards a preferential direction related to the dip angle and direction of the bedding. The trends are most prevalent in low angle medium to hard drilling, notably in formations with pronounced structure. A number of explanations and models have been proposed over the years to explain these effects. In their early work on the pendulum theory, Lubinski and Woods proposed a variable drillability model which related an index of the rock strength when attacked perpendicular to the bedding planes to the rock strength when attacked parallel to the formation beds. They produced tables of anisotropy indices and formation classes which could be used as a guide in selecting pendulum length, drill collar size or weight on bit. Another theory proposes that as the bit drills into hard layers, will fracture perpendicular to the dip. This creates a miniature which guides the bit to drill into the dip. the hard layer whipstock
Another explanation, proposed by McLamore and others, is that of preferential chip formation. This considers the mode of chip formation at a single tooth. Anisotropic formations have preferential planes of failure. As it impacts the formation, the bit tooth sets up a compressive stress in a direction perpendicular to the face of the tooth. Shear failure will occur more readily along the bedding planes in a sedimentary rock. When the bit is drilling an anisotropic rock, large chips will be cut rapidly on one side of the bit and small chips will be cut out more slowly on the other side. Unequal chip volumes will therefore
Page 7 /3/74
V 2.0.0
be generated
4Q
V,lurnes
Bedding plane
1)
0
UNEQUALchip
ca
The forces between the bit tooth and the rock will be greater on the right side of the tooth in the diagram. Therefore there will be a resultant force on the bit acting to the left. This is Fd, the deviation force. It follows that the deviation force depends on the angle of dip. THE RELATIONSHIP BETWEEN THE ANGLE OF DIP AND DEVIATION FORCE. Based on the preferential chip formation theory explained above, the graph shown below in Figure 7.3.64 has been derived from experimental work. The effective angle of dip is the angle at which the bit strikes the bedding planes. The graph predicts that when the effective angle of dip is less than 45 the direction of the deviation force is up-dip, but when the effective dip angle is greater than 45 the direction of the deviation force is down-dip. The
Figure 7.3.64 Maximum deviation force as a function of formation dip
5000 a v a 2500
1000
500
0 15 30 45 60 75
2500
500
1000 5000
Page 7/3/75
Up dip
OOOOIV
Down dip
meaning of up-dip and down-dip is illustrated in Figure 7.3.65. In practice, has sometimes been observed that an up-dip tendency is observed at dip angles as high as 60.
it
Experience of unwanted deviation in vertical wells over many years has borne out the predictions of the graph shown in Figure 7.3.64. Drilling through alternately hard and soft formations with low dip angles, using a well stabilised bit and weights high enough to cause collar flexure, usually results in a course perpendicular to the bedding planes. Figure 7.3.66 illustrates the ten d ency of the b it to deviate in the up-dipdirection when the formation dip angle is low.
Figure 7.3.66
Up-dip deviation
The formation attitudes will have a similar effect on directional tendencies. For dip angles less than 45, if the direction is due up-dip then the bit will tend to maintain direction but build angle. But if the borehole direction is left of up-dip, the bit tends to walk to the right; whereas if the direction is right of up-dip the bit tends to walk to the left. Both these phenomena are in reality just special cases of the up-dip tendency. When the formation dip angle is greater than 60, the usual tendency of the bit is to drill parallel to the bedding plane, i.e. down-dip as shown in Figure 7.3.67. For cases where the dip angle is greater than 60, if the hole direction (Figure 7.3.67) is right of down-dip direction then the bit tends to walk to the left. If the hole direction is left of down-dip direction, then the bit tends to walk to the right. Again, these are simply special cases of the down-dip tendency.
Page 7 /3/76
V 2.0.0
There will be no deflection of the bit caused by the formation at 0 or 90 dip. This is because the bit is cutting into a structure that is essentially uniform and is constantly cutting into the same layers at the same time or constantly drilling between layers.
5.3
Figure 7.3.68
Hole inclination
= 30
deviation
force.
Figure 7.3.69
There
Figure 7.3.70
35
= 35
There
will be no deviation
Page 7/3/77
5.4
FORMATION HARDNESS
The preceding discussion has concentrated on the effects of rock anisotropy and changes in hardness between layers on directional response. There are a few general points concerning the effect of rock hardness on directional behaviour which should be mentioned. In very soft formations, the formation may be eroded by the drilling mud exiting from the bit nozzles and an overgauge hole created. This can make it hard to build angle, even with a strong build assembly. If this problem is anticipated then fairly large nozzles should be fitted in the bit. If it occurs while drilling, then the pump rate should be reduced and prior to making each connection, increase the flow rate to clean the hole with the bit one joint off bottom. Hole washing or enlargement in soft formations may also cause packed assemblies to give a dropping tendency at high inclinations. This may be counteracted by increasing WOB and reducing flow rate. If anticipated beforehand, a possible solution would be to run a mild build assembly. BHAs tend to respond more closely to their theoretical behaviour in harder formations. This is mainly because the hole is more likely to be the correct gauge. In medium to hard formations, building assemblies are more responsive as maximum bit weight may be applied to produce the required build. The main directional problem encountered in hard formations is getting a pendulum assembly to drop angle. Generally speaking, the harder the formation, the longer it takes a dropping assembly to respond. There may also be a conflict between the need to reduce weight on bit to get the dropping trend established and the need for high weight on bit to maintain an acceptable penetration rate. Where possible, it is best to avoid planning a drop section in hard formation. When a drop section must be drilled in hard formation, either large diameter, heavy collars should be used or a steerable PD motor.
5.5
It should be emphasised that in many formations, the properties of the rocks have only a minor effect on the directional response of the BHA. In soft to medium soft formations and in isotropic formations, the rock has little influence on directional response and the BHA should follow its theoretical behaviour. In medium to hard sedimentary rocks which have an appreciable degree of anisotropy, directional tendencies can be significantly affected by formation attitudes and in particular by the effective dip angle of the bedding planes. If the effective dip angle is less than 45 - 60, then the bit tends to drill up-dip. If the effective dip angle is greater than 60, then the bit tends to drill down dip. When the effective dip angle is approximately 0, the bit has no tendency to deviate from a straight path. Unwanted deviation tendencies caused by formation effects can best be reduced by packed assemblies. The use of a full gauge near-bit stabiliser definitely reduces bit walk. In cases where strong formation effects have been observed on previous wells in the same area, the design of the assembly should be suitably modified to compensate for the anticipated effect.
Page 7/3/78 WDLP - Directional drilling
V 2.0.0
INTRODUCTION
In directional drilling with conventional rotating assemblies, extra round trips are sometimes necessary to change the BHA for directional control. Also, bit performance may be reduced by conventional deflection techniques. Several methods exist for continuously controlled directional drilling using "steerable downhole motors". These methods are based on tilting the axis of the bit with respect to the axis of the hole and/or creating a side force at the bit. If the drill string, and hence the body of the motor, is rotated from surface, then the bit will tend to drill straight ahead. However, if the drill string is not rotated from surface then the bit will drill a curved path determined by the orientation of the side force or the tilt of the bit axis. A steerable turbine exists which has been used successfully in the North Sea and elsewhere, however most steerable systems presently being used are based on a positive displacement motor and use the principle of tilting the axis of the bit with respect to the axis of the hole. The advantages of steerable drilling systems are that: They virtually eliminate thereby saving rig time. They permit Smaller They allow the drilled directional trips made for directional to be drilled. assembly changes,
1 STEERABLE TURBINES
Early steerable turbines used the side force method by having an eccentric stabiliser at the lower end of the bearing section, i.e. at the bottom end of the turbine body, quite close to the bit. One blade is larger in surface area and is offset by 1/8" as shown in Figure 7.3.71,. When the drill string is rotated, the offset stabiliser has no effect on the well path. When it is
1/8" Offset
Page 7/3/79
V 2.0.0
desired to deflect the well path, the toolface (the point opposite the centre of the offset blade) is orientated using an MWD tool. Drilling continues with no rotation from surface and the turbine drills a curved path. These are now obsolete. Modern steerable turbines incorporate a bent housing close to the
bit.
Steerable turbines have been used to perform various types of deflection including kick-offs. Their most successful application has been tangent section drilling, performing correction runs as required to keep the well on course.
2.1
Figure 6.2.72
a double tilted U -joint housing A motor section a by-pass A survey valve string stabiliser MWD. system, usually
Standardbypass valve
An undergauge
The double tilt steerable motor assembly is shown in Figure 7.3.72, and the geometry of the system, compared with a single tilt system is shown in Figure
7.3.73.
The concept of the double tilt is that by having the two tilts in the same plane but opposed (at 1800) to each other, the bit offset is minimised. This bit offset is the distance (in millimetres or inches) from the centre of the bit to the axis of the motor section (extrapolated down to the bit). A small bit offset facilitates
Standard bearing assembly with underdaude integral stabilize
Bit angle
Page 7/3/80
V 2.0.0
joint
Ot
2-
DTU<
Ot
is slightly longer than a straight housing and universal joint. is available in various tilt angles and is identified by the tilt angle, which is the mathematical resultant
Bit offset
is available in various diameters ranging from 43/4" to 111/4". Each diameter has three standard tilt angles designed to provide approximately 2, 3 and 4 per 100 ft/30 m theoretical dogleg rates.
As mentioned in Topic 5 the double tilted universal joint housing was developed from the single tilt housing. However after a period when it was used it has now been phased out again as most operators prefer the single tilt housing. 2.2 ADJUSTABLE SINGLE TILT ASSEMBLIES called adjustable of single-tilt kick-off housings) adjustable motors are that they:
(Sometimes
The advantages
incorporate a rig site-adjustable bent housing which can be set to achieve maximum build rates in the medium radius range (8/30m 20/30m), varying with tool size and stabiliser configuration, allow a single motor to be used for a variety well require fewer tools to be transported advantage for remote locations. of build rates on the same
The variable tilt angle is possible because the internal connections of the housing feature a tilted pin thread which screws into a tilted box thread. The relative position of the two tilted angles determines the tilt angle of the tool and the position of the High Side. This is rig floor adjustable between 0 and up to 2-3/4 - the maximum angle varies between tools.
Page 7/3/81
The addition of an alignment bent sub, with a 2 tilt angle, above the motor section allows the tool to achieve build rates up to 24/100 ft. This is the Double Adjustable Motor.
Firststringstabiliserf
An essential concept when designing and operating directional drilling assemblies is that of the Theoretical Geometric Dogleg
Li DTU4
Motor/UBH stabiliser
Az-
The bit
The motor stabiliser or Upper Bearing Housing Stabiliser
(UBHS).
The first string motor. stabiliser above the length/L) degrees per characteristic length
the tilt angle in degrees the length between the bit and the string = Li + L2 (in consistent units) stabiliser
This equation for calculating TGDS is based on a system contains full gauge stabilisers.
which
3.2
TILT ANGLE
is usually of the well
The proper tilt angle and steerable motor deflection technique dependent on the directional requirements and characteristics plan.
For kicking off or sidetracking, a high tilt steerable motor is recommended. The tilt angle selected should produce a greater dogleg severity in the oriented mode than the rate of change specified in the well plan. By getting higher dogleg severities than specified, the directional driller can "get ahead" of the well plan build requirements and begin utilising the practice of drilling intervals of oriented and rotary modes. The directional driller can reduce a high build up rate increasing the percentage of footage drilled in the rotary mode. Typically, the rate of penetration will increase greatly when switching from the oriented mode to the rotary mode. As a rule of thumb, the tilt angle selected should theoretically produce a minimum of 1.25 times the maximum dogleg severity required for the well plan. Directional drillers must keep in mind that the TGDS (Theoretical Geometric Dogleg Severity) assumes that
Page 7 /3/82
V 2.0.0
tool face orientation is constant. In practice this is difficult to do, especially in high torque applications. As a result of a constantly changing tool face orientation, the actual rate of change could be less than expected. When a choice is available, a tool with a higher dogleg capability overall efficiency by reducing oriented drilling requirements. can increase
When tangent section or straight hole drilling, a lower tilted tool may be more desirable to reduce bit wear and increase ROP. However, this depends on the extent to which orientation may be necessary and the anticipated ease of oriented drilling.
3.3
It is normal practice to run a string stabiliser either directly above the motor or with a pony drill collar between the motor and the stabiliser. Reasons for using this include: It defines It produces It centralises the third point of contact directional in the steerable response. drilling assembly.
a predictable
Placement Most commonly it is run directly above the motor. According to the 3-point geometry, increasing "U" by moving the first string stabiliser higher in the BHA reduces the Theoretical Geometric Dogleg Severity. This does not always work in practice. It has been found that moving the stabiliser higher can make it harder to get away from vertical in a kick-off. However, once some inclination has been achieved, the rate of build is often greater than the TGDS. For flat turns or for dropping angle, increasing "L" does reduce the dogleg rate as theory predicts.
Page 7/3/83
V 2.0.0
If the first string stabiliser diameter is decreased to less than the UBHS and a downward toolface orientation is present, then the oriented dogleg rate is reduced.
Figure 7.3.76 : Assembly for decreased dogleg rate
In either of the above cases, the more undergauge the first string stabiliser, the greater the effect. Again, the same basic effect is seen with both the single and double tilted systems.
8"
9 1/8"
83j8n
95/8"
Table 2.4.4 can be used as a general guideline for determining the required diameter of the first string stabiliser such that inclination is maintained.
The second table can be used as a general guideline for determining first string stabiliser changes in diameter to Inure c.4 . 3 : auuiy siduwser site iur p roduce a si g nificant chan g e (minimum of chan ging an g le 0 .2 5 per 10~30 m) i n rotary inc l ination
reaction. Hole Size 81/2" 121/4"
4 KICKING OFF
4.1 BOTTOMHOLE ASSEMBLIES
1/4" 3i8"
171/2"
During kick-off operations, two basic factors will determine general steerable drilling assembly design: Build up rate required. Expected length of run.
Four examples of BHAs are presented on the following two pages , two for 171/2" holes and two for 121 /4". Note that crossovers have not been mentioned although they have to be used wherever appropriate.
Page 7 /3/84
assembly
to have a rotary
171/4" UBHS
161/2" First String
171/4" UBHS
16" FirstStringStabiliser
HWDP
The following example hold tendency. 121/4" Bit 91/2" Steerable assembly for a 121/4" hole is designed to have a rotary
mud motor
121/8" UBHS
12" FirstStringStabiliser
Page 7/3/85
assembly
to have a rotary
121/8" UBHS
11" First String
4.2
RECOMMENDED GUIDELINES
When beginning a kick-off, it is recommended to have the first string stabiliser in open hole and not up in the casing to prevent hanging up or any other anomalous assembly reactions. Be aware of the fact that when using a steerable motor assembly in vertical or near vertical holes, the actual dogleg may be less than the
TGDS calculated.
Initially, in a kick-off, the directional driller should observe the actual oriented dogleg severity of the steerable assembly for a interval of at least 60 feet. Constant monitoring of the actual oriented dogleg severity is necessary to plan subsequent oriented/rotary drilling intervals. Minimising rotary speed will slightly increase practice can reduce oriented drilling intervals system. the fulcrum effect. This and further optimise the
During the initial stage of a kick-off from vertical, stabiliser hang-up can occur. This problem may exist until the wellbore is inclined and/or the first string stabiliser enters the curved, oriented hole. Consider beginning the kick-off early; this can reduce oriented requirements and the maximum inclination of the well path. drilling
4.3
An estimate of the proportion of the footage which will have to be drilled oriented mode can be determined by the following formula.
% foota
g e oriented :
where
DL = required dogleg (/unit length) DLO = actual dogleg when oriented (/unit length) DLR = actual dogleg when rotary drilling (/unit length)
Page 7/3/86
V200
Example:
when oriented = 3.5/30 in during rotary drilling = 0.5/30 in (2-5-0 5)x 100 =
35-05
67%
5.1
The assembly chosen should be capable of producing an acceptable dogleg rate to allow for shorter corrective oriented intervals. Decreasing the diameter of the first string stabiliser versus increasing "L" is preferred because TGDS is affected less. This practice also limits the number of variables to one, the OD of the first string stabiliser.
5.2
A typical
121/x" UBHS
113/4" String
5.3
OPERATIONAL GUIDELINES
After observing the steerable assembly directional tendencies over a rotary drilled interval of at least 200' (30 m) , a plan for drilling long distances between orientations should be established. This plan should minimise the
Page 7/3/87
V 2.0.0
number
of orientation
tool-sets
and maximise
penetration
Oriented drilling intervals should be minimised. Oriented tangent or hold section is performed to correct the present compensate for anticipated trends. Never let the drilled well path Temper this with the fact that more expensive than allowing calculate and plot the position times there must be a feasible the intended target.
get too far from the planned trajectory. "drilling on the line" can be significantly small deviations. As surveys are obtained, on both horizontal and vertical plans. At all course to drill from the current location to
6 DROP SECTIONS
When a drop section is to be drilled, the gauge of the first string stabiliser can be increased to produce more of a dropping tendency in the rotary mode. The recommended diameter, however, is no larger than the UBHS. Increasing the diameter of this stabiliser can also increase hole drag and stabiliser hang up. Typical rotary drop rates are seldom much higher than 1/100', with 0.5to 0.75/100' commonly produced when the angle is less than 20. If higher drop rates are required. then oriented drilling will be mandatory. The following is a general design for a drop assembly while rotary drilling.
121/4" Bit 91/2" Steerable mud motor (slick) 121/8" First String Stabiliser
Except in stringent circumstances, the drilled well path can be positioned "ahead" of the planned path. This will usually reduce the oriented drilling requirements. In hard-to-drill or problem minimised or avoided. formations, oriented toolsets should be
Actual dogleg rate when drilling less than the TGDS. The steerable drilling assembly is at least 125% of the required
oriented
to drop inclination
is usually
Stabilisers should be selected such that rotary drilling either assists achieving the desired dog-leg, or produces a neutral tendency.
Page 7/3/88
V 2.0.0
7 AZIMUTH CONTROL
Rotary Mode
Rotary drilling with steerable azimuth hold tendency. drilling assemblies usually exhibits an
The dip and strike of the formation drilling assembly to walk. The conventional directional concept assembly is applicable with steerable
Oriented Mode
Changes in azimuth are most efficiently performed in oriented mode. Due to the stabilisation of the steerable motor, the toolface can be orientated for maximum turn without dropping inclination (a typical problem with motor and bent sub assemblies in soft formations). A reduction in TGDS can be expected when oriented effect of the undergauge first string stabiliser. for a turn due to the
Page 7/3/89
V 2.0.0
INTRODUCTION
Rotary steerable systems bring a number of significant benefits to the directional drilling process in comparison with the use of conventional bent housing positive displacement motors. In short these are: Continuous rotation while steering means less friction between wellbore and pipe, resulting in better weight transfer to the bit. This in turn gives higher penetration rates both directly and by allowing the use of more aggressive bits. It also facilitates the drilling of extended reach wells. Compared with rotated bent housings these systems produce smoother, "in-gauge", non-spiralled borehole, which further reduces friction and results in easier casing, wireline, and completion operations as well as simpler tripping operations. Constant steering over the full drilling cycle instead of short periods of sliding results in a less tortuous well profile and again reduces friction, with the same benefits accruing. Constantly rotating pipe means improved cuttings the need for wiper trips, and reducing the chances removal, reducing of stuck pipe.
Since their introduction in the mid nineties, rotary steerable drilling systems have delivered significant gains in drilling efficiency. In addition to this fundamental benefit, they have also enabled ever more challenging wells to be drilled with a wide range of other benefits ranging from reduced HS&E exposure to improved hydrocarbon recovery, as well as improved hole cleaning. In this Topic three different rotary steerable drilling systems will be discussed, the Power Drive(s) developed by Schlumberger, the AutoTrak system developed by Baker Hughes Inteq and the Geo-Pilot from Halliburton.
1 OPERATING PRINCIPLES
There are two operating principles rotary steerable systems - namely that are often referred to when discussing "Push the Bit" or "Point the Bit".
Page 7/3/90
V2.00
1.1
A pure "push the bit" rotary steerable system steers simply by applying a side load to the bit - usually using pads close to the bit to apply this load. This forces the bit's outer cutting structure and gauge to cut sideways into the formation to drill a curved hole in that direction. Systems employing this principle are restricted to very short gauge bits (typically less than 2" gauge length) where the gauge is set with an active cutting structure. While these systems are agile, permitting a quick and precise response to any required changes in wellbore deviation, the short gauge bits used by these systems may drill a "spiralled hole" when high side-loading is applied. 1.2 THE " POINT THE BIT " OPERATING PRINCIPLE:
A pure "point the bit" rotary steerable system steers by precisely pointing (tilting) the bit in exactly the direction the wellpath needs to be steered. In doing so, the drill bit's face is pointing perfectly in the direction to be drilled and there is no side loading on the bit. The advantage of this operating principle is that longer gauge bits can be used to avoid hole spiralling. Unfortunately, these systems are slower to respond to required trajectory changes and the overall dogleg severity capability is typically lower than that of a "push the bit" system.
The AutoTrak system consists of a "Hybrid" operating system whereby the bit is either pushed in one direction or pointed in a certain direction. The AutoTrak Rotary Closed Loop System (RCLS, Figure 7.3.79) determines which operating mode is required for the wellbore's immediate requirement. When initiating a
Figure 7.3.77 : The AutoTrak tool
Page 7/3/91
V 2.0.0
I odhe,
Erats
change to a wellbore trajectory (e.g. ending a tangent, starting a 3-D turn etc.) the bit is immediately pushed to the side. Once a few feet of the new curvature is drilled, the steering mechanism is then used to bend the bottom hole assembly into the new curvature and effectively point the bit in the direction to be steered.
loop system
The Rotary Closed Loop System (RCLS) incorporates an automatic drilling mode in which the inclination is measured continuously (at 5 seconds intervals) by a near bit sensor. These measurements are fed into the tool's downhole logic system, which compares the near-bit inclination trends to the Target Inclination programmed into the system's downhole memory within a small fraction of a degree. If the inclination trends are of greater value than the Target Inclination the tool automatically steers down to drop inclination and vice versa. When required by the well plan, the Target Inclination value is reset by downlinking to the tool from surface.
Figure 7.3.79 : The rotary closed
Figure 7.3.8 shows a BHA with the bit, the non-rotating stabiliser (Ll) and the electronic control unit (1).
L2 4
M~
3
i
Lt
direction of steer
The autoilk
Figure 7 . 3.80:
The AutoTrak steerable system can be integrated with LWD systems such as Gamma Ray, Neutron Density, Calliper etc. With many of these measurements being at the bit and without a long conventional downhole motor assembly a much reduced BHA length is achieved. Additionally with formation measurements being much closer to the bit, improved geosteering capability is achieved. In addition to the AutoTrak called VertiTrak. system, BHI market a vertical drilling system
Page 7/3/92
V 2.0.0
3 POWERDRIVE SYSTEMS
Schlumberger provides three types of rotary steerable system with different principles of operation, and different generations of tools exist within some of these groups. The division of systems is as follows: PowerDrive Xtra, PowerDrive X5 PowerV - vertical drilling system PowerDrive Xceed to the above a fourth service is available that combines technology with an integrated motor power section. vorteX - PowerDrive + integrated motor power section.
In addition PowerDrive
PowerDrive
All these tools have one feature in common that is unique in the market place today. They are designed such that all external components exposed to the annulus are fully rotating at the same speed as the drillstring (or motor bit box should a power section be incorporated above the rotary steerable i.e. PowerDrive vortex configuration). The advantages of a fully rotating system versus those that utilise external stationary components can be summarised as follows... Less friction with the borehole wall More efficient cuttings removal Less chance of becoming mechanically or differentially stuck Less chance of drilling spiral hole Reduced interference through casing shoes, windows, and across whipstocks More transparency to the drilling operation e.g. more compatible with reaming operations.
3.1
These systems
FlexJoint
Figure 7.3.81
1) The Bias Unit consists of an internal rotary valve controlling actuation of three externally mounted pads. 2) The Control the collar. Unit is a geostationary electronics package
mounted
3) A Stabiliser acts as a third point of borehole wall contact for directional control. Selecting the option of string, integral blade, or sleeve type stabilisers allows the position and size to be varied to fine tune the behaviour in different environments. 4) An optional
system.
of the
Page 7/3/93
The Control Unit, mounted inside a Control Collar derives power from the flow of drilling fluid across an impeller. It houses the control electronics and directional instrumentation required to control the tools behaviour, and is able to hold itself stationary inside the rotating collar . Attached to the downhole end of the Control Unit is a control shaft . This runs down into the Bias Unit.
Next pad to act, as
When the Control Unit is stationary, so too is the control shaft. A valve on the end of this rod seats over three ports that rotate along with the rest of the Bias Unit. As the ports pass underneath the stationary valve drilling fluid is diverted into them . The fluid then activates each of the three p ads in turn such that they always push out at the same relative position in the borehole. The action of the pads on the same point of the borehole wall forces the bit in the opposite direction. The amount of time that the Control Unit is held stationary
over a given period of time determines the
Resultant Direction
w.
f_N .'\>11
Figure 7.3.82
dogleg capability
of the tool.
Communication to the tool to change steering direction and strength is achieved by executing combinations of flow rate changes at the surface.
closed
3.2
PowerV operates on the same principle as PowerDrive Xtra and PowerDrive X5. However, it is designed to drill vertical holes only. It maintains vertical hole by automatically correcting for any deviation from vertical. The system is fully rotating, even when performing corrections. As well as conferring the usual benefits of rotary steerable drilling, the system has the
Page 7/3/94
following
advantages...
More weight on bit can be applied without fear of building angle. The need for time consuming sliding intervals, or correction runs, is removed. No interaction from surface is needed to maintain vertical drilling. The system can be run stand alone i.e. without MWD systems
PowerV Features
150C rating Automatic closed loop vertical drilling Can be run below a motor power section (PowerDrive tion).
vorteX configura-
3.3
PowerDrive Xceed operates on a point the bit principle. It comprises three internal modules and a collar. Unlike PowerDrive all internal, as well as external parts rotate at the same speed as the drillstring.
Sensor package Motor rotation CCW
@ collar speed
i_.. r
Power generating
Collar rotation CW
Motor
turbine
Figure 7.3.83
The collar has two threaded shoulders for the mounting of variable size sleeve stabilisers. Along with the bit these provide the three points of contact that determine directional response. The Power Generation Module uses PowerPulse MWD technology generate tool power from the flow of drilling fluid over a turbine. The electronics contain an MWD type directional systems for the tools operation. package to
and control
The steering section orients an offset bit shaft to provide a toolface offset at the bit that determines the direction in which the hole is drilled.
In the steering section the bit shaft is connected to an electric motor slightly off centre from the tool axis. This results in an offset at the bit box, and thus at the bit itself. To hold a given toolface the motor is rotated at exactly the same speed as the collar, but in the opposite direction. The net result is that the bit shaft offset remains stationary relative to the borehole. PowerDrive Xceed will then drill in this direction. The amount of time that the offset position is held constant over a given period of time determines the dogleg capability of the tool. Drillstring RPM, torque, and weight are transmitted through the collar, and into the bitshaft just above the bit box by a universal joint arrangement. The internal components of the tool are thus protected from the forces generated
Page 7/3/95
by the drilling
process.
Communication to the tool to change steering direction and strength is achieved by executing combinations of flow rate changes at the surface. PowerDrive Xceed's method of operation certain applications. These are... results in it being very well suited to
High dogleg capability in unconsolidated or interbedded Open hole sidetracking. Drilling & steering with a bi-centre bit. Drilling in tough or abrasive environments.
formations.
and azimuth
hold i.e.
3.4
POWERDRIVE VORTEX
PowerDrive vorteX combines an integrated motor power section with PowerDrive systems. Combining these two technologies results in higher, more consistent bit RPM, and smoother power delivery. The following benefits to the drilling process can be realised... Increased penetration rates Reduced stick-slip Reduced casing and drillstring wear Rotary steerable usage on power limited
rigs
Page 7/3/96
constructive bit behaviours caused by short gauge bits i.e. hole spiralling. The extended gauge bits used with Geo-Pilot are box up bits (see Figure 7.3.85) and are usually provided by Halliburton DBS as part of the overall package.
Figure 7.3.85 :
Bit for use with Geopilot
Page 7/3/97
V 2.0.0
INTRODUCTION
An important consideration in designing the bottom-hole assembly is the total number of drill collars and heavy weight drill pipe required to provide the desired weight on bit. In drilling vertical wells, it has long been standard practice to avoid running ordinary drill pipe in compression. (This was recommended by Lubinski in 1950). This is achieved by making sure that the buoyed weight of drill collars and heavy weight pipe exceeds the maximum weight on bit. This practice was also adopted on low-angle directional wells. In directional wells it has to be remembered that, since gravity acts vertically downwards, only the along-hole component of the weight of BHA elements contributes to the weight on bit. The problem this creates is that if high WOB is required when drilling a high-angle well, then a long and expensive BHA would be needed in order to avoid having any drill pipe in compression. It is, however, common practice to use about the same BHA weight as would be used on a low-angle well and run the drill pipe in compression. Analysis of drill pipe buckling in inclined holes by a number of researchers, notably Dawson and Paslay, has shown that drill pipe can tolerate significant levels of compression in small-diameter high-angle holes because of the support provided by the low side of the hole. Drill pipe is commonly run in compression in drilling horizontal wells, without apparently causing damage to the pipe. Additional information about the design of bottom-hole assemblies wells is given in the Part dealing with drill string design. in deviated
of the weight
acting
axially
= W x BF x
and
0 is the borehole
inclination
(assuming
the BHA
borehole
are coaxial). 0 is used for inclination and I is used for axial moment
Page 7/3/98
V 2.0.0
If the BHA is not rotated, the friction force, Ff, acting up the borehole on the BHA element is given by Ffr = N, where t is the coefficient of friction and N is the normal reaction force between the BHA element and the bore hole wall.
Figure 7.3.86: Forces on the BHA If this normal reaction is due
only to the weight of the BHA Borehole -axis element itself, then N= W x BF x sin o and hence
Ffr=xWxBF
xsin 0
The net contribution to the WOB from this BHA element istherefore
Wbit=WxBFx(
cos 0 - sino)
if no drill pipe is to be run in compression, weight of BHA (in air) = maximum WOB x safety factor
Required Example
BF x cos o
Drilling 171/2" hole the tangent section avoid running any 10ppg. Use a 10% Required
with a roller cone bit, we want to use 45,000 lbs WOB in at 30 inclination. What air weight of BHA is required to drill pipe in compression? The drilling fluid density is safety margin. = 45, 000 x 1.1
BHA weight
Page 7/3/99
Suppose
weighing
= (180 x 220) + 3,400 + (90 x 154) lbs = 56,860 lbs = 67,500 lbs - 56,860 lbs =10,640 lbs =1,480 lbs 10, 640 1,480
It must be emphasised that the Safety Factor in the preceding example is to compensate for loss of weight due to friction while drilling in the deviated section of the well.
We are drilling a 121/4" tangent section in hard formation using an insert bit. We want to use 50,000 lbs WOB. The hole inclination is 60 and the drilling fluid density is 11 ppg. What air weight of BHA is required if we are to avoid running in compression ? Use a 15% safety margin. Required BHA weight = 50,000 x 1.15 0.832 x cos60 lbs any drill pipe
=138,200 lbs This is roughly the weight of ten stands of 8" drill collars, or alternatively, six stands of 8" collars plus 44 joints of HWDP ! This is just not practical ! It would be a long, stiff and expensive BHA.
3.1
Dawson and Paslay developed the following equation for critical buckling force in drill pipe. Where: E is Young 's modulus. I F -2 1
EIW sin 0
W is the buoyed
0 is borehole inclination. r is the radial clearance between the pipe (tool joint ) and the borehole wall. Note that consideration must be given to the possibility of an oversize hole when calculating 'r'.
WDLP - Directional drilling V 2.0.0
Page 7/3/100
If the compressive
load reaches
buckling
occurs.
The sinusoidal buckling equation given above can be used to develop graphs and tables of values such as those in Appendix 2. If the compressive load at a given inclination lies below the graph, then the drill pipe will not buckle. The reason that pipe in an inclined hole is so resistant to buckling is that the hole is supporting and constraining the pipe throughout its length. The low side of the hole forms a trough that resists even a slight displacement of the pipe from its initial straight configuration. It follows that this equation is not applicable for vertical holes, for which other equations are available. Note that, intuitively, it may seem that the "radial clearance" in the above equation would be that between the drill-pipe and the hole rather than between the tool joint and the hole. However in practice it appears that a better correlation with theory is obtained if the radial clearance of the tooljoint is used.
Suppose we have 41/2" drill pipe with a nominal weight of 16.6 lbs/ft in 81/2" hole at 50 inclination with a drilling fluid density of 14 ppg. Young's modulus, I E, for steel is 29 x 106 psi
The ID of the drill pipe is 3.826". This information 4= I= 64 4.5 -3.826 The approximate weights 9.61ins4 for different
The air weight = 17.98 lbs/ft = 1.498 lbs/in and the buoyancy factor for 14ppg drilling fluid = 0.786.
.. W = 1.498x 0.786 = 1.178 lbs/ in sin 50 = 0.766
Radial clearance = Y2(Hole OD - Tool joint OD)
Page 7/3/101
V 2.0.0
The values obtained above may now be substituted critical buckling force. =2 29x106 x9.61x1.178x0.7661bs 1.06
in our equation
for the
= 30,800 lbs
on bit by W HIT
BFxcosO
Continuing the example at the beginning of this sub-Topic 3, let us recalculate the weight of the BHA required assuming some drill pipe is to be run in compression. Suppose we are using 5" drill pipe; referring to the table for 5" drill pipe in 121/4" hole in Appendix 2, we see that the critical buckling load at 60 inclination is 29,300 lbs. Our equation then gives:
HHA W BHA
lbs
Thus a total air weight of 74,800 lbs is required. This is much more feasible than the value of 138,000 lbs previously calculated. The graphs and tables in Appendix 2 are for the particular drilling fluid density of 10.68 ppg. However, variations in drilling fluid density have only a minor effect on the value of critical buckling load and so the graphs could be used for drilling fluid densities of up to 14 ppg without introducing a significant error. For drilling fluid densities above 14 ppg, the value of critical buckling load should be re-calculated.
3.2
Page 7 /3/102
V 2.0.0
Given that the clearance is in the denominator of the Dawson & Paslay equation, the critical buckling force will decrease as the hole size increases, even in high angle holes. In hole sizes of say 16" or more the drill-pipe should only be run in compression in exceptional cases. In smaller hole sizes on high-angle wells (over 45), drill pipe may be run in compression to contribute to the weight on bit provided the maximum compressive load is less than the critical buckling force. This critical buckling force is the minimum compressive force which will cause sinusoidal buckling of the drill pipe. A safety margin of at least 10% should be used in the calculation to allow for some drag (friction) in the hole. However, axial drag is not a major factor when assemblies are rotated.
The preceding discussion concerned rotary assemblies. However, it would also apply to steerable motor systems used in the rotary mode. Provided the steerable system was to be used mainly in the rotary mode, with only minimal oriented drilling anticipated, then the required BHA weight could be calculated on the same basis. If a significant amount of oriented drilling was likely, then the following Sub-Topic is applicable.
When the drill string is not rotated the drill pipe is not subjected to the cyclical stresses which occur during rotary drilling. Therefore, sinusoidal buckling can be tolerated when there is no rotation of the drill string. Helical buckling must, however, be avoided. buckling occurs at 1.41 Far, where FeC is the compressive buckling occurs. force at
Helical
which sinusoidal
Therefore, if BHA weight requirements are evaluated as for rotary drilling, the results will be valid for steerable systems in the oriented mode except for unusual well paths which create exceptionally high values of axial drag. The standard practice of minimising BHA length and weight for steerable assemblies has not created any noticeable increase in the incidence of drill string failure, even when long sections are drilled in the oriented mode.
Page 7/3/103
V 2.0.0
Page 7/3/104
V 2.0.0
(slot) coordinates
Target coordinates
TVD of target
A
In the solution which follows for the vertical projection, the well is assumed to be vertical to the
KOP VD2
e
B
values
VD,
Horizontal displacement at end of build section (HI). Vertical depth at end of build section (VD2 ). Inclination
section (a). depth of Figure 7 .3.87 : Cross section through a "build and hold" type well
c
TTarots
H
Rz
of tangent
Horizontal
displacement
of target
First the horizontal displacement of horizontal plane coordinates: Hz = (NT - Ns) +(ET
2
Es
and Eastings
Page 7/3/105
Referring to Figure 7.3.78, the build-up section is assumed to be on an are of a circle of radius R. Let the build-up rate be BUR degrees per 100 ft. Then BUR 100 R 360 2 7tR 36,000 _ 18,000 2Ic(BUR) Ir(BUR)
OD
OT = Al
OD2+ DT2 R OT
BC7T = arccos
B(D=B(7T-
__ //
a = 90-B(D BT = OT'-R'
BUR
Horizontal displacement at end of build, H, = R(] - cos a) Alternatively, H, = H2 -CT Total measured depth to target = VD, + 100a BUR Note : The above solution assumes that the radius of curvature of the build-up section is less than the horizontal displacement of the target; that, however, need not be the case. The trainee is invited to sketch a new trajectory and work through the logic of the solution on the assumption that the R corresponding to the chosen build-up rate is greater than the horizontal displacement of the target. + BT
Page 7/3/106
V 2.0.0
R,
R,
through
vo3
The well is assumed to be vertical to KOP. The following values are calculated: Measured depth at end of
VD,
vna
P E
-I---
Target
T
f-"-I
Hr H, H4
Total measured
Let BUR be the build-up rate in degrees per 100 ft. and DOR be the drop-off rate in degrees per 100 ft. As before, the horizontal slot and target The radius coordinates. curve is calculated, as before, by: displacement of the target, H4, is determined from
of the build-up
Ri
_ 18,000 rt(BUR)
, the radius of curvature of the drop section is calculated by
Similarly
18,000 R 71(DOR)
Page 7131107
Now referring
to Figure
7.3.79, OF is constructed
parallel
to BC, therefore:
a=0+0
Angles /3,H4,VD4 and VD; are known quantities
OF = arctan OP Hence the inclination We can now calculate of the tangent all the required section values: can be calculated since a = 0+
x
= VD 1 +
100 a
BUR = VD1+R1sina
at end of build = R1(1-cos(x)
MD at end of drop
VD at end of drop, V4, was given
Horizontal displacement at end of drop, H,
= VD, +
100a BUR
+ BC +
100(a-P) DOR
Final note:
is simply
a special
case of
Page 7/3/108
Lt,
..q;,
i!
The tables and graphs on the following four pages give the critical buckling forces for specific values of hole inclination when using 5" S135 drillpipe and 5" Hevi-wate drill-pipe in 121/4" and 81/2" holes, with a drilling fluid density of 10.68 lbs/gal (1.28 kg/1). These are common combinations of hole size and drillpipe, and the drilling fluid density is of the order of magnitude of what will commonly be required. They provide therefore a quick approximation to the critical buckling forces which will be applicable when drilling many conventional wells in normally pressured formations. For critical
lated
conditions,
as explained
These tables and graphs have been made by applying the equations Topic 10.3, and using the dimensions of new drill-pipe.
given in
The lines plotted on the graphs do not start from 0 (where the equation would indicate a zero critical buckling force) because the equation is not valid for vertical wells. In that case, where a different equation applies. Fer will have a small but non-zero value. The graphs have (arbitrarily) been plotted from 2 to illustrate how sensitive the critical buckling force is to the inclination in this range. In practice it is irrelevant whether Fcr is zero or small in vertical wells, because both emphasise the point that drill-pipe should only be run in compression in significantly deviated wells.
Page 7/3/109
V 2.00
Critical
buckling
forces
(Fer)
for new 5" 19.5 lbs/ft S135 drill -pipe in 121/4" hole Drill pipe O.D.
Drill pipe I.D. Drill pipe weight*
5 inch
4.21 inch 22.60 lbs/ft
127 mm
106.9 mm 33.6 Kg/m
6.625 inch
12.25 inch
168.3 mm
311.15 mm
10.68 ppg
1.28 Kg/I
2 26.20 5.90
Inclination
Fer (KN))
120
KN
C Y U
80
40
Klbs 20
10
20
30
40
50
60
70
80
90`
Inclination
Page 7/ 3/1 10
buckling
forces
5" Hevi-wate
drill-pipe
127 mm 76.2 mm
73.4 Kg/m
6.50 inch
12.25 inch 10.68 ppg
165.1 mm
311.15 mm 1.28 Kg/I
FaC (Klbs)
Inclination Fer (KN)) Fer (Klbs) Inclination Fer (KN)) Fer (Klbs)
11.40
18.0
35 205.0 46.1 65 257.7 57.9
25.4
40 217.1 48.8 70 262.4 59.0
31.0
45 227.7 51.2 75 266.1 59.8
35.6
50 237.0 53.3 80 268.7 60.4
39.6
55 245.0 55.1 85 270.2 60.8
43.0
60 251.9 56.6 90 270.7 60.9
240
200
N
KN cm c 160
K16s 40
0
0 10 20 30
40
50
60
70
80
90
Inclination
Page 7/3/111
Critical
buckling
forces
(Fcr)
Drill pipe I.D. Drill pipe weight* Tool joint O.D. (NC50)
Hole diameter
10.68 ppg
1.28 Kg/1
0
0 0
5
71.6 16.1 35 183.8 41.3
10
101.1 22.7 40 194.5 43.7
15
123.4 27.8 45 204.0 45.9
20
141.9 31.9 50 212.4 47.7
25
157.7 35.5 55 219.6 49.4
30
171.6 38.6 60 225.8 50.8
Inclination
Fcr Fer
(1(N)) (Klbs)
Inclination
Fer (KN))
65
231.0 51.9
70
235.2 52.9
75
238.5 53.6
80
240.8 54.1
85
242.2 54.4
90
242.7 54.6
Fer (Klbs)
Figure 7.3.91
240
200
KN
160
U
rn
120
V
a m 80
U
Klbs 40
0
0 100 20 30 40 50 60 70 80 90
Inclination
Page 7/3/1
12
V 2.0.0
Critical buckling
forces (Fcr)
drill -pipe in 81/2" hole
Drill pipe O.D. Drill pipe I.D. Drill pipe weight* Tool joint O.D.(NC50)
Hole diameter
10.68 ppg
1.28 Kg/l
78.2 65
437.0 98.2
82.7 70
445.0 100.0
86.8 75
451.2 101.4
90.3 80
455.5 102.4
93.4 85
458.2 103.0
96.0 90
459.0 103.2
160 120
Klbs
80 40 0 0 10 20
30 40 50 60 70 80 90
Inclination
Page 7/3/113
V2.00
Page 7/3/1 14
V2.00
Candidate
(print name)
Received by mentor:
Name (print)
Signature
& date
1)
of directional
drilling.
2)
For the three applications above which you consider give a brief explanation of each.
most important,
3)
Convert
the following
quadrant
Quadrant bearing
Azimuth
N35E N66.5W
1
Page 7/3/115
4)
The drawing below is a schematic of a "build and hold" type well. The design data (VD1, VD3, H2 and BUR) are given. Fill in the values of the
VD1 4,200
R a BUR=2/100
P
VD2 "' ATVD MD1 i a=
MD2
H2 1,030
Page 7/3/1 16
V 2.0.0
5)
The drawing below is a schematic of an " S" type well. The design data (VD1, VD4, VD5, H3, BUR and DOR) are given . Fill in the values of the
derived data (VD2, VD3, Hl, H2 MD1, MD2, MD3, MD4 and W.
VD, 1,200
R,
VD2
VD3
1 1 1
a= 1
1
1 1 1
-------
MD2
Pry
DOR = 1.5/100
0I
H2
H3 2,405.95
Page 7/3/1 17
6)
An exploration land well is to be drilled to a target 1,002m North and 569m West of the wellhead position, at a depth of 3,300m below the reference level, which is mean sea level. The target is the top surface of the flank of an anticline in which a horizontal reflector can be seen possibly a hydrocarbon/water contact. It is required to set intermediate casing 20m vertically above the target formation and to penetrate at least 300m vertically into it in order to verify, and ascertain the depth of, the hydrocarbon/water contact. The operational area is hilly and a drilling location has been constructed by cutting and filling to a level of 320m above msl. The derrick floor elevation is 10m above ground level. It has been decided to kick off 10m below surface casing set at 990m bdf and use a build-up rate of 8/100m until a point is reached where a straight tangent section will pass through the target. What will be the inclination How much intermediate Hydrocarbons of the tangent section ? ? at
were indeed
3,990.7m ahbdf.
What is the depth 7) of the OWC below sea level ?
After drilling the above well it was found that, although hydrocarbons had been confirmed, the structure was more complex than had been anticipated, consisting of a series of stacked anticlines with successively deeper crests being displaced towards azimuth 330. It was decided that the most economical method of further appraising the structure would be to plug back the exploration well, recover the upper section of the intermediate casing, set a cement plug in the shoe of the surface casing and kick off from the same depth as before, and in the same direction, but to use a build up rate of 12/100m in order to stay above the previous hole. The plan was to penetrate the crest of the uppermost anticline at such an angle that the well would penetrate the crests of the successive anticlines until reaching a total depth 100 in below the OWC found in the original well. The project geologist produced a cross-section through the well along azimuth 330 showing that the uppermost crest was at a distance of 1200m from the rig at a depth of 3,200m below reference level. A line drawn on the cross-section joining the crests had an inclination of 10. It was again planned to set casing just above the uppermost objective formation; it was therefore decided that the end of the drop section should be 100 in vertically above that formation. A drop-off rate of 8/100m was chosen.
Page 7/3/1 18
What will be the inclination What will be the measured at the end of the build-up at the end of the tangent
section
at the end of the drop-off section ? when the uppermost objective is penetrated ?
It is planned to carry out a production test through a string of production casing run to 5m (ah) above TD. How much will be required 8) What is a "lead angle"and why is it used.
9)
means,
reason
10)
11)
In a Moineau motor, what is the relationship lobes of the rotor and the stator ?
between
the number
of
12)
Which of the two types of mud motor is most tolerant material in the mud, and why ?
to lost circulation
Page 7/3/119
V 2.0.0
13)
Which of the two types of mud motor is most suitable ture applications, and why ?
14)
pressure
PDM Motor
Turbine
15)
of torque
which is operating
Speed
16)
of a standard
removable
17)
Describe
the circumstances
is used.
18)
What nozzle sizes would you fit in a 121/4" tri- cone bit you intended use for jetting ?
to
19)
Specify a possible BHA you would use to jet drill a 121/4" pilot hole starting from vertical.
Page 7/ 3/120
V 2.0.0
20)
You are going to perform a kick-off in 171/2" hole with a mud motor and bent sub. The required build-up rate is 2.5/100'. Specify the BRA you would use.
21)
motors,
and
22)
List three
advantages
tool.
23)
off instead
of a motor plus
Page 7/3/121
V 2.0.0
24)
A 91/2" motor with a 21/4 bent sub is being used to kick off a well in
171/2" hole.
A dogleg severity of about 3/30m has been obtained consistently. The latest survey result is: 12.0 inclination, 327 azimuth. We want to build 2 and get some left turn over the next 30m. What tool face setting should be used and what result should be obtained ? Tool face orientation New inclination New hole azimuth = = =
25)
A steerable
motor system
The latest survey shows a 28.5 inclination, The expected dogleg severity is 3/30m.
We require to correct the azimuth to the right. Determine the tool face setting required for a maximum right turn and predict the result of drilling 18m with that setting. Tool face orientation New inclination New hole azimuth = =
26)
We are drilling
with a steerable
motor system
The predicted dogleg severity with this drilling system The latest survey is 44.2 inclination, 194.5 azimuth.
We need to turn left while maintaining inclination constant and have decided to drill the next two singles oriented. Find the required tool face orientation and the expected results after drilling 18m. Tool face orientation New inclination New hole azimuth = = =
Page 7/ 3/122
27)
We are drilling 171/2" hole with a steerable motor system theoretical dogleg severity of 4.0/30m. The latest survey tion, 77.5 azimuth.
We want to turn (azimuth) 2 to the right and build angle over an 18m course length. Determine the required tool face orientation and the expected results. Tool face orientation New inclination New hole azimuth 28) = the tool setting required for
Using the following data, determine maximum azimuth change: The existing The existing inclination azimuth is 17 is 117 Mag
is 3.5/100 ft.
of 23 is required
over an interval ?
this be attained
What inclination would be obtained over a 100 ft interval is set for maximum azimuth change ? New inclination 29) =
A well has been kicked off by jetting and the angle built to 15 approx. The hole has been opened to 171/2" diameter. It is now planned to run a conventional angle-build rotary BHA to increase the inclination to 62, which is the planned inclination angle of the tangent section. The build up section will all be in 171/2" hole. The planned build-up rate is 3.0/100'; the well is "on the line" on the vertical plan. Design a suitable rotary BHA using a soft formation tri-cone bit and incorporating an MWD tool. Specify on the description the actual gauge of stabilisers to be used and suggest possible drilling parameters.
WOB:
RPM:
Page 7/3/123
V 2.0.0
30)
Write down a packed assembly which could be used to hold angle in the tangent section of a directional well. Assume that the inclination angle is in the range 45 - 50 and that the 121/4" hole section is being drilled. Indicate on the description the gauge of all stabilisers. possible forma-
State whether a PDC or roller cone bit is to be used and suggest drilling parameters, assuming you are drilling medium hardness tion.
Type of bit:
31)
WOB:
RPM:
The tangent section of a directional well has just been drilled. The well plan requires that the angle be dropped from 50 to 25 at the rate of 1.5/100'. In fact, the well is slightly below the line and the actual inclination angle at the end of the tangent section was 47. Suggest a suitable angle drop assembly which might be used and indicate suitable drilling parameters. (The drop section is in 121/4" hole and 8" collars are to be used). State whether a PDC or roller cone bit is to be used.
Type of bit:
32) Describe response
WOB:
RPM:
stabiliser affects the
33)
List five recommendations that will help reduce stabiliser and string drag when drilling in the oriented mode with an NDS assembly.
Page 7/3/124
34)
It is planned
PDC bits.
In the following 2 questions assume that no drill pipe is to be run in compression and ignore drag in the calculation.
35)
needed Mud
weight
Safety
Angle 20 20 48
20
weight (lbs)
15%
10%
20,000 lbs
13 ppg
20
Page 7/3/125
V 2.0.0
36)
of joints
needed
in the following
c. 35,000 lbs air weight needed. 2 x 71/2" OD x 2" ID DCs plus 3 x 6" OD x 21/2" ID DCs are available How many joints 37) Calculate cases. the critical of 31/2" Hevi-Wate buckling are needed ?
In the following
questions force.
, assume
compression
the critical
90% of
in Appendix
38)
Page 7 / 3/126
WDLP-Directional drilling
V 2.0.0
39)
40)
weighing 96 lbs/foot.
How many joints of 5" HWDP are required?
41)
Suppose you have 100' of 8" tubulars weighing and 93' of 61/2" tubulars weighing 99 lbs/foot. How many joints of 5" HWDP are required ?
Page 7/3/127
Page 7/3/128