Surveying I Lab Manual PDF
Surveying I Lab Manual PDF
Surveying I Lab Manual PDF
S.No Name of the expe !me"t 1. 2. 3. Survey of an area by Chain Survey (Closed Traverse) & Plotting Chaining across Obstacles eter!ination of t"o inaccessible #oints "ith Co!#ass
$. Survey of a given area by Pris!atic Co!#ass (Closed Traverse) and #lotting after ad%ust!ent &. +. ,. -. 0. 13. 'adiation( )ntersection *ethods of Plane Table Surveying T"o Point and Three Point Proble! in Plane Table Survey Traversing by Plane Table Surveying .ly /eveling ( ifferential /eveling) 1n e2ercise of /.S. and /. S. and Plotting T"o 42ercises on Contouring
OBJECTIVE: Study of various instruments used in chain surveying and their uses INSTRUMENTS: 1) Chain or tape 2) Arrows 3) Ranging rods 4) Cross staff 5) Offset rods 6) Pegs 7) Plumb bob
DESCRIPTION OF INSTRUMENTS:
1 a) Chain: The chain is composed of 100 or 150 pieces of galvanized mild steel wire, 4mm in diameter called links .The ends of each link are bent into a loop and connected together by means of three oval rings. The ends of the chain are provided with handles for dragging the chain on the ground, each wire with a swivel joint so that the chain can be turned without twisting. The length of the chain is measured from the outside of one handle to the outside of another handle.
Page No. 1
Metric chain: Metric chains are made in lengths 20m and 30m. Tallies are fixed at every five-meter length and brass rings are provided at every meter length except where tallies are attached
b) Tapes:
Among the above, metallic tapes are widely used in surveying. A metallic tape is made of varnished strip of waterproof line interwoven with small brass, copper or bronze wires. These are light in weight and flexible and are made 2m, 5m 10m, 20m, 30m, and 50m.
Page No. 2
2.
Arrows: Arrows are made of good quality hardened steel wire of 4 mm diameter. The arrows are made 400 mm in length, are pointed at one and the other end is bent into a loop or circle
3.
Ranging rods: Ranging rods are used to range some intermediate points in the survey line The length of the ranging rod is either 2m or 3m. They are shod at bottom with a heavy iron point. Ranging rods are divided into equal parts 0.2m long and they are painted alternately black and white or red and white or red, white and black. When they are at considerable distance, red and white or white and yellow flags about 25 cm square should be fastened at the top.
4.
Cross staff: The simplest instrument used for setting out a right angle.
Page No. 3
5.
OFFSET ROD: The offset rod is used for measuring the off set of short lengths. It is similar to a ranging rod and is usually of 3m lengths.
6.
PEGS:
These are rods made from hard timber and tapered at one end, generally 25mm or 30mm square and 150mm long wooden pegs are used to mark the position of the station on.
7.
PLUMB BOB: While chaining along sloping ground, a plumb bob is required to transfer the points to the ground.
OFFSET ROD PEGS PLUMB BOB
Page No. 4
UNFOLDING:
Remove the strap of the folded chain and take both the handles in the left hand and hold the remaining portion of the chain in the right hand. Holding both the handles in the left hand, throw the remaining portion o f the chain in the forward direction on the ground. Now the follower stands at the starting station by holding one handle and directs the leader to move forward by holding the other handle until the chain is fully stretched.
FOLDING:
Bring the two handles together on the ground by pulling the chain at the center. Commencing from the center two pairs of links are taken at a time with the right hand and placed alternatively in both directions in the left hand. When the chain is completely folded the two brass handles will appear at the top. Now tie the chain with leather strap.
Page No. 5
EXPERIMENT NO. 01
Surveyor: Helpers:
Date: Time:
ranging.
INSTRUMENTS:
1 No. 04 Nos.
RANGING ROD
RANGING ROD
RANGING ROD
A PROCEDURE:
Fix the ranging rods at the two given stations, where pegs are already driven on the ground. The follower stand behind station A and directs the leader, with ranging rod to come in line with AB by signals of ranging
Page No. 6
When the ranging rod comes in the line of AB the follower directs the leader to fix the ranging rod in position. Let the intermediate point be C which should be less than 20m / 30 m . Now the leader taken another ranging rod and stands between A and B about 2/3 distance from A The follower directs the leader to come in line of AB by using signals of ranging. As and when the point is located in the line of AB the follower instructs to fix the ranging rod in position. Let the other intermediate position be D which is less than 20 m / 30 m from B Now A, B, C and D are in one line.
Now the leader and follower measure the distance by measuring along A, C, D, B.
RESULT: The distance between AB = __________ meter. FIELD APPLICATION:
It can be extended to measure the lengths of more than two chain lengths. By measuring the boundaries of given traverse the areas can be calculated. The features can be located either by measuring oblique or perpendicular offset from the chain line.
Page No. 7
EXPERIMENT NO. 02
OBJECTIVE: Chaining a line when a hill or high ground intervenes preventing Intervisibility of ends of line. INSTRUMENTS: Chain 20m / 30m Ranging rods 1 No. 04 Nos. Arrows 10 Nos.
M A M M3 M2 PROCEDURE:
N B N
N3 N2
M1
Fix the two ranging rods at the given stations A and B which are not intervisible due to raising ground. Select two intermediate points M1 and N1 such that from each point both A and B are visible. The person at M1 directs the person at N1 to move to a new position N2 in line with M1B. The person at N2 then directs the person at M1 to move to a new position M2 in line with N2A. The person at M2 directs the person at N2 to a new position N3 in line with M2B. The person at N3 directs the person at M2 to a new position M3 in line with N3A. The process is repeated till the points M and N are located in such a way that M finds the person at N in line with AB and the person at N finds the person at M in line with AB. After fixing the points M and N, other points are also fixed by direct ranging and the length of the line is measured. Result: Length of AM = ____ meter. Length of MN = ____ meter. Length of NB = ____ meter.
EXPERIMENT NO. 03
OBJECTIVE: To measure the area of the given field by chain triangulation.. INSTRUMENTS:
1 No. 6 Nos.
D
Let ABCDE be the given field whose area is to be measured, fix the pegs at A, B, C, D & E.
Divide area into three triangles ADE, ABD and BCD by joining AD and BD. Measure the lengths AB, BC , CD, DE, EA, AD and BD. Calculate the area of the triangles. The sum of the areas of the three triangles is the area of the given field.
FORMULA:
Page No. 9
EXPERIMENT NO. 04
OBJECTIVE: To chain around the building to cover small area by chain triangulation INSTRUMENTS: Chain 20m / 30m Ranging rods Tape 20m/30m
SKETCH:
1 No. 4 Nos. 1 No
TIE LINE
CHECK LINE
S P
f R Q B
A D PROCEDURE:
Select three survey stations A, B and C such that from each survey station the other two stations are visible.. Fix the ranging rods at A, B and C Fix the intermediate stations along the chain line AB, BC and CA by ranging. Measure the offsets of the corners of the building either perpendicular or oblique. Each point requires two measurements from two definite reference points on the same line or from two adjacent chain lines. Measure the points which are very far away from the main chain lines from tie line i.e , the corners points of building R and S. Measure the check line CD.
RESULT:
NOTE: The student should prepare a layout of the given area covering building roads etc.
Page No. 10
VIVA QUISTIONS
1) What is meant by surveying? 2) What are the principles of surveying? 3) How many links are provided in a 20-meter metric chain? 4) Differentiate between ranging rod and offset rod. 5) Define the terms base line tie line and check line. 6) When the reciprocal ranging is adopted. 7) What is meant by perpendicular and oblique offset? 8) What are the instruments required for erecting perpendicular offset. 9) What is meant by survey station? 10) What is meant by ranging?
Page No. 11
TOPIC 2
COMPASS SURVEYING
1. 2. 3. 4. Familiarity with instruments used in compass surveying prismatic compass. Setting up the compass observation of bearings. Traversing with prismatic compass and chain calculation of included angles and check. Traversing with prismatic compass and chain closed traverse covering the given area recording. Traversing with prismatic compass and chain open traverse and recording.
5.
Page No. 12
SKETCH:
Parts List 1. Compass Box 4. Pivot 7. Adjustable Mirror 10. Lifting Lever 13. Focusing Stud 16. Sun Glasses 2. Magnetic Needle 5. Objective Vane 8. Spring Brake 11. Lifting Pin 14. Glass Cover 3. Graduated Ring 6. Eye Vane 9. Brake Pin 12. Prism 15. Prism Dust Cap
DESCRIPTION OF INSTRUMENTS
COMPASS BOX: It is a circular box of diameter 85 to 110 mm having pivot at the center and covered with plain glass at top. It facilitates in taking the bearings of survey lines with reference to the magnetic north.
MAGNETIC NEEDLE:
Page No. 13
GRADUATED RING:
The bearings are marked inverted on the graduated rings from 0 to 360 in a clockwise starting 0 from south.
PIVOT:
Magnet is freely held with this. It consists of prism with a sighting slit at the top. prism magnifies and erects the inverted graduations. The
OBJECT VANE:
It is pressed to stop the oscillations of the graduated ring. On pressing it brings the lifting lever into action. Red and blue glasses are provided with the prism to sight luminous objects.
COLOUR GLASSES:
Page No. 14
EXPERIMENT NO. 05
PROCEDURE:
The following station adjustments are to be done at each station where the compass is set up.
1.
CENTERING:
a. b. c. Centering is the process of keeping the prismatic compass over the station point. By moving the legs of the tripod suitably, centering will be done. Centering is checked by dropping a stone so that it falls on the top of the peg. Leveling is the process of making the compass exactly horizontal. Level the compass by means of ball and socket arrangements. When the compass is leveled, the aluminum ring swings freely. To adjust the height of the prism so that the observations can be read clearly.
2.
LEVELLING:
a. b. c.
3.
FOCUSSING:
Page No. 15
4.
OBSERVING BEARINGS: a. b. c. d. Set up the prismatic compass over station O and perform station adjustments. Rotate the compass till the line of sight bisects the object at A. Read the graduated ring through prism. The reading directly gives the magnetic bearing of OA in whole circle bearing system. Follow the same procedure to observe the magnetic bearings OB OC also.
5.
Page No. 16
EXPERIMENT NO. 06
Date: Time:
To find the bearings of various station points and to calculate the included angles. Prismatic compass, Tripod, Ranging rods, etc.
A N
INSTRUMENTS: SKETCH:
Let O be the instrument station selected from which all other points are visible. Complete all station adjustments like setting, centering and leveling accurately. Sight the object A looking through the prism vane, while the object vane is directed towards the object. Observe the bearing by looking through the prism. Enter the readings in the tabular form. Repeat the process at all objects stations B,C,D etc and enter the readings.
Included angle: bearing of 2nd line bearing of first line. (If the value is more than 180 than subtract the value from 360 ).
FORMULA:
* *
*
Page No. 17
EXPERIMENT NO. 07
TRAVERSING WITH PRISMATIC COMPASS AND CHAIN CLOSED TRAVERSE COVERING THE AREA (Given) RECORDING
Surveyor: Helpers: Date: Time:
OBJECTIVE : To conduct compass survey along the closed traverse. INSTRUMENTS: Prismatic compass, chain, ranging rods.
N E D
SKETCH:
A C PROCEDURE:
Fix the closed traverse A B C D E . Set up the compass at the station A. Perform the temporary adjustments. Sight the object at B and note down the FB of line AB and measure the distance. Sight the object at E and note down the BB of EA. Sight the instrument to station B performs all the temporary adjustments. Sight the object at A and take the BB of AB. Take FB of BC and measure the length of BC. Check whether the difference of FB and BB is 180 or not, at all stations. Continue the same process all at other stations. TABULAR FORM FOR CLOSED TRAVERSE Sl.No. Line Length F.B. B.B Remarks
FORMULA: Included angle = B.B of previous line F.B of next line. CHECK: The sum of the included angles should be equals to (2n-4) x 90 Where n is number of sides of the traverse.
Page No. 18
EXPERIMENT NO. 08
TRAVERSING WITH PRISMATIC COMPASS AND CHAIN OPEN TRANRSE AND RECORDING Surveyor: Helpers: Date: Time:
OBJECTIVE: To perform the compass survey in open traverse formed by series of connected straight lines.
INSTRUMENTS: SKETCH: Prismatic compass, tripod, tape, chain, arrows and ranging rods.
PROCUDURE:
Set the instrument at the starting station A and perform all the necessary adjustments. Sight the next station B, take fore bearing of AB and measure the distance AB. Take F.B of AE which provides check; similarly bearing of any line AC, CE, etc. also provides the check. Shift the instrument to subsequent station B. After fixing the instrument sight the previous station A and observe the reading, which gives the B.B. of AB. Sight next station C observe F.B of BC and measure the distance BC. Locate the details surrounding the traverse station if necessary, by taking bearings or lengths or both from chains line. Repeat the process at every station.
Page No. 19
It is to be noted that first and last stations have only fore bearing and back bearings respectively. Take Back bearings of the first point from the last point. Enter the reading in a tabular form. Sl.No. 1. 2. 3. 4. Line AB BC CD DE Length F.B. B.B. Remarks
The difference between Fore bearing and back bearing of each line should be 180, if no local attraction exists at either station.
CHECK:
Page No. 20
VIVA QUISTIONS
1. 2. 3. 4. 5.
6.
What is the purpose of prismatic compass in surveying? State when do you go for compass surveying? For what a mirror is provided to the object vane? Where is the 180 marked on the graduated ring? What is the least reading that can be read from a compass?
States the reason for the graduations of prismatic compass are written inverted.
Define the whole circle bearing? Define the reduced bearing? Define fore bearing and back bearing? What is the difference between fore bearing and Back bearing? The fore bearing of a line 60 30, find its back bearing? Convert 8030, 13040into reduced bearing? Convert S 5230 into whole circle bearing? What is meant by traverse? Explain the check applied to a closed traverse Define local attraction. How do you detect it?
Page No. 21
TOPIC - 3
PLANE TABLE SURVEYING
1. 2. 3. 4. 5. Introduction to plane table equipment and accessories. Setting of the plane table and plotting a few objects (points) by radiation method Plotting building and other features of the campus by intersection method. Traversing an area by plane table. Calculating the area for the given land and marking plots by using plane table.
Page No. 22
Plane table surveying is a graphical method of surveying in which field work and plotting are done simultaneously in the field. The plain table consists of the following:
1. Drawing board mounted on a tripod 2. Straight edge called an alidade.
THE DRAWING BOARD: The board is made of well-seasoned wood and varies in size from 40cm x 30 cm to 75cm x 60cm or 50 60 cm square. The Alidade: The alidade consists of metal or box wood straight edge or ruler about 50cm long. The be welled edge of the alidade is called the fiducially edge. Accessories to the plane table 1. Trough compass 2. U frame or plumbing fork 3. Water proof cover. 4. Spirit level or level tube 5. Drawing sheet 6. Pencil or eraser Trough compass: The compass is used to mark the direction of the meridian on the paper. U- frame or Plumbing fork: U frame with a plumb bob used for centering the table. Water Proof Cover: Water Proof cover protects the sheet from rain. Spirit level or level tube: A level tube is used to level the plane table. Drawing sheet: The drawing sheet is fixed on the top of the drawing board. Pencil and eraser: A pencil is used for constructing lines and eraser is used for erasing lines after completion of the plan.
Page No. 23
SETTING UP THE PLANE TABLE The setting up the plane table includes the following three operations. 1. Centering the plane table 2. Leveling the plane table 3. Orientation of plane table CENTERING THE PLANE TABLE: The table should be set up at a convenient height for working say about 1m. The legs of tripod should be spread well apart and firmly fixed in to the ground. The table should be approximately leveled by tripod legs and judging by the eye. Then the operation of centering is carried out by means of U-frame and plumb bob. The plane table is exactly placed over the ground station by U-frame and plumb bob. LEVELING THE PLANE TABLE: The process of leveling is carried out with the help of level tube. The bubble of level tube is brought to center in two directions, which are right angles to each other. This is achieved by moving legs. ORIENTING THE TABLE: The process of keeping the plane table always parallel to the position, which is occupied at the first station, is known as orientation. When the plane table is oriented, the lines on the board are parallel to the lines on the ground.
EXPERIMENT NO. 09
Page No. 24
SETTING OF THE PLANE TABLE AND PLOTTING A FEW OBJECTS (POINTS) BY RADIATION METHOD
SURVEY LAB:
method.
DATE:
OBJECTIVE: Setting up the plane table and plotting a few objects by radiation INSTRUMENTS: 1) Plane table 2) Tripod 3) Alidade RADIATION: The plane table is set up over only one station from which the whole traverse can be commanded. It is suitable for survey of small areas.
SKETCH:
A a D d
b B
PROCEDURE:
1) Select a point O so that all points to be located are visible from it. 2) Set up the table at O, level it, and do centering. 3) SELECT A POINT O on the sheet so that it is exactly over station O on the ground. 4) Mark the direction of the magnetic meridian 5) Centering the alidade on O BISECT the objects of traverse A, B, C and D. 6) Measure the distances OA, OB, OC and OD and plotted to convenient scale to locate a, b, c and d respectively 7) Join the points a, b, c and d on the paper.
EXPERIMENT NO. 10
Page No. 25
OBJECTIVE: Plotting building and other features of the compass by Intersection method. INSTRUMENTS: 1) Plane table 2) Tripod 3) Alidade A
FIGURE
PROCEDURE: 1) Select two points P and Q such that the points (building corners) to be plotted are visible from their stations. 2) Set the table on P and locate on the sheet. 3) Pivot on P bisect Q draw a ray. 4) Measure the distance PQ and locate Q on the sheet to a convenient scale. 5) Now pq is known as the base line. 6) Pivot p bisects the inaccessible objects A and B (building corners) and draw rays. 7) Shift the table to a such that q is over Q and do temporary adjustments. 8) Place the alidade along qp and the rotate the table till p is bisected clamp table. 9) Pivot on q bisect the objects A and B and draw rays. 10) The instruction of rays drawn from P and Q will give the points a and b. 11) To check the accuracy measured AB and compare with plotted distance ab.
12) The same procedure is applied for other features of the campus. each point is
EXPERIMENT NO. 11
Page No. 26
DATE:
2. Tripod
3. Alidade
PROCEDURE:
1) 2) 3) 4) 5)
6)
Select the traverse stations A,B,C,D,E etc on the ground. Set the table on starting station a and perform temporary adjustments. Mark the magnetic meridian. Locate A on the sheet as a. Pivot on a bisect the next station B and draw a ray
Measure the distance AB and locate b on the sheet with a suitable scale.
7) 8) 9)
10)
Shift the table to next station B, set the table over B, and do temporary adjustments.
Place the alidade along ba and bisect A for doing orientation of plane table.
11)
Report the same procedure at every successive station until the traverse is completed.
Page No. 27
NOTE: by using radiation method, intersection and traversing methods we can locate the points on the paper, which were already on the ground. By using algebraic formulae, we can calculate the area of the given land.
FORMULAE: 1) Area of a triangle = * base *height 2) Area of a square = side * side 3) Area of a rectangle = length * breadth 4) Area of a trapezium = * (a + b) * h A, b are the parallel sides . h is the distance between parallel sides.
Page No. 28
VIVA QUISTIONS
1. State the circumstance where plane table is suitable? 2. Name the accessories of plane table? 3. What is orientation; State the two methods of orientation? 4. State four demerits of plane table survey? 5. What is intersection? 6. What is Resection?
Page No. 29
TOPICS - 4
LEVELLING
1. 2. 3. Study of dumpy level and leveling staff Temporary adjustments of dumpy level. Taking out levels of various points and booking in a level field book. 4. Differential or fly leveling-reduced levels by H-I method rise and fall method. 5. Differential leveling involving invert levels-
Page No. 30
The telescope with vertical spindle is supported by two parallel triangular plates. The upper plate is called tribrach and the lower plate is called trivet FOOT SCREWS: By turning the foot screws, the tribrach can be raised or lowered to bring the bubble to the center of its run. LEVELLING STAFF: THE LEVELLING STAFF: It is used for measuring the vertical distance of the points above or below the horizontal line of sight. The different staves in use are 1. Sop with telescope staff 2. Folding staff 3. Solid staff 4. Target staff
SOP WITH TELESCOPE STAFF: It is usually arranged in three telescopic lengths. The staff is 4m long when fully extended. The top length 12.5m is solid slides into the central box of length 12.5m, which again slides in the bottom box of 1.50m long. The staff is provided with brass spring catches to keep the extended length in position. The meter numerals are marked on the left side and are pointed in red. The decimeter numerals are marked on the right side and are pointed in black. The background is painted in white. The smallest division on this staff is 5mm. The graduations are marked erect and are seen inverted when viewed through the telescope. FOLDING STAFF:
It is made of well-seasoned timber such as deodar, blue pine or aluminum. It is 4m long, 75mm wide, 18mm thick. It has two lengths of 2m each which are connected at the middle by a hinge so that the upper portion can be folded over the lower one. The minimum division on the staff is 5mm. The lengths of meter in numerals are marked on the left and painted in black. The entire background is painted in white. The graduations are inverted and hence when viewed through the telescope, they appear erect. SOLID STAFF: It consists only one length and is usually 3m long. It is also graduated in divisions of 5mm. This is used for precise leveling work.
TARGET STAFF:
It consists of two lengths, one sliding over the other. It is graduated from top downwards. The target is equipped with vernier, which is adjusted by the staff man. The target is to be moved along the rod until its center is bisected by the line of sight. The target is then clamped and reading is taken. Target staves are used when the sights are long, say more than 100m.
****** Page No. 32
2. LEVELLING UP
i) ii) iii) iv) v) vi) vii) Place the telescope parallel to a pair of foot screws. Bring the bubble to the center of its run by turning the foot screws equally either both inwards and both outwards. Turn the telescope through 90 so that it lies over the third foot screw. Turn this third foot screw so that the bubble corners to the center of its run. Bring the telescope back to the original position without reversing the eye-piece and object glass. Repeat the above operations until the bubble remains in the center of its run in both the positions. Turn the telescope through 180 and check whether the bubble remains central.
Page No. 33
3. ELIMINATION OF PARALLOX:
i) ii) iii) iv) v) Remove the lid from the object glass. Hold a sheet of white paper in front of the object glass. Move the eyepiece in or out until the cross hairs are distinctly visible. Direct the telescope towards the staff. Turn the focusing screw until a clear and sharp image in formed in the plane of the cross hairs.
TABULAR FORM FOR HEIGHT OF INSTRUMENT (H.I) METHOD Readings Station Back sight Inter Sight Fore Sight Height of Instrument Reduced Level Remarks
H.I = R.L of B.M + B.S R.L of other station points = H.I I.S or F.S ARITHMATICAL CHECK: B.S F.S = Last R.L First R.L
ARITHMATICAL CHECK:
Page No. 34
EXPERIMENT NO. 12
TAKING OUT LEVELS OF VARIOUS POINTS AND BOOKING IN A LEVEL FIELD BOOK
SURVEYOR: HELPER: DATE: TIME:
OBJECTIVE: Taking the levels of various points with Single setup, booking in a level field book.
INSTRUMENTS: 1. Dumpy level 2. Leveling staff.
PROCEDURE:
1. Set the level at a convenient point. 2. Perform the temporary adjustments. 3. Hold the staff vertically over the Benchmark, Observe the staff reading and write in the B.S column of the field book. 4. Hold the staff at other points and note the staff reading in the I.S column of the field book. 5. Hold the staff on the last point and enter the staff reading in the F.S column of the field book. 6. Find R.L. of all the points by both the methods.
7. Apply arithmetical check.
EXPERIMENT NO. 13
Page No. 35
DIFFERENTIAL OR FLY LEVELLING REDUCE LEVELS BY H.I METHOD AND RISE AND FALL METHOD
SURVEYOR: HELPER: DATE: TIME:
FIGURE:
PROCEDURE:
1. Let A and B be the two given points whose difference is elevation is to be found.
2. Set the level at a convenient point O1 carryout temporary adjustments and take B.S on A
3. Take FS on the Point C 4. Shift the instrument to point O2 and perform temporary adjustments. 5. Take B.S on C. 6. Take F.S. on D. 7. Shift the instrument to point O3 and perform temporary adjustments. 8. Take B.S on D 9. Take F.S on B. 10. Find the difference in elevation between A and B by both the methods.
EXPERIMENT NO. 14
Page No. 36
DIFFERENTIAL LEVELLING INVOLVING INVERT LEVELS REDUCTION BY H.I AND RISE AND FALL METHODS
SURVEYOR: HELPER:
of collimation. THEORY:
DATE: TIME:
OBJECTIVE: To find the levels of certain points which may lie above the line When the point under observation is higher than the line of sight, staff should be kept inverted on the overhead point keeping the foot of the staff touching the point, and reading should be taken and recorded in the field book with a negative sign indicating invert level. 2. Leveling staff.
PROCEDURE:
1. Setup the instrument at a convenient point and take the B.S on the benchmark. 2. Place the staff in the inverted position at the required staff stations, which are lying above the line of collimation. 3. Take the reading on the staff and note it in the field book with a negative sign. 4. Calculate the R.L of the required staff station. 5. Repeat the process for all invert staff readings. 6. For all other points the procedure to find R.L is similar to that in the previous exercises.
Page No. 37
TOPIC-5
THEODOLITE SURVEYING
1. Study of Theodolite 2. Measure of Horizontal angle between given lines 3. Measurement of vertical angle 4. Determining distance between two in accessible points by measuring horizontal angle 5. Determining an height of object by measuring vertical angle
STUDY OF TRANSIT THEODOLITE
OBJECTIVE : To study different parts of transit Theodolite and Temporary adjustments.
Page No. 38
FIGURE
It is the axis about which the telescope can be rotated in a vertical plane. LINE OF COLLINATION: It is the imaginary line joining the intersection of the cross hairs of the diaphragm to the optical center of the object glass and its continuation. AXIS OF THE TELESCOPE: It is the line joining the optical center of the object glass to the center of the eye-piece. AXIS OF THE LEVEL TUBE: It is the straight line tangential to the longitudinal curve of the level tube at the center of the tube. CENTERING: The process of setting the theodolite exactly over the station mark is known as centering. TRANSITING: It is the process of turning the telescope in vertical plane through 180 about the trunnion axis. DESCRIPTION OF EQUIPMENT: TELESCOPE: It consists of eye-piece , object glass and focusing screw and it is used to sight the object. VERTICAL CIRCLE: It is used to measure vertical angles. LEVELLING HEAD: It consists of two parallel triangular plates called tribrach plates. Its uses are 1. To support the main part of the instrument. 2. To attach the theodolite to the tripod. LOWER PLATE: It consists of lower clamp screw and tangent screw. UPPER PLATE: The upper plate is attached to the inner axis and it carries two verniers. It consists an upper clamp screw and tangent screws. These screws are used to fix upper plate with lower plate accurately.] FOOT SCREWS: These are used to level the instrument PLUMB BOB: It is used to center theodolite exactly over the ground station mark. SWINGING THE TELESCOPE:
Page No. 40
It means turning the telescope about its vertical axis in the horizontal plane. A swing is called right or left according as the telescope is rotated clockwise or counter clockwise. FACE LEFT: If face of the vertical circle is to the left side of the observer, then the observation of the angles taken is known as face left observation. FACE RIGHT: If the face of the vertical circle is to the right side of the observation, then the observation of the angles taken is known as face right observation. CHANGING FACE: It is an operation of bringing the face of the telescope from left to right and vice-versa. TEMPORARY ADJUSTMENTS: There are three temporary adjustments of a theodolite. These are 1. Setting up the theodolite over a station. 2. Leveling up. 3. Elimination of parallax. SETTING UP: It includes two operations 1. Centering a theodolite over a station: Done by means of plumb bob. 2. Approximately leveling it by tripod legs only: Done by moving tripod legs radially or circumferentially. LEVELING UP: Having centered and approximately leveled the instrument, accurate leveling is done with the help of foot screws with reference to the plate levels, so that the vertical axis shall be truly vertical. To level the instrument the following operations have to be done. 1. Turn the upper plate until the longitudinal axis of the plate level is roughly parallel to a line joining any two of the leveling screws (A & B). FIGURE:
2. Hold these two leveling screws between the thumb and first finger of each hand uniformly so that the thumb moves either towards each other or away from each other until the bubble comes to the center.
Page No. 41
3. Turn the upper plate through 90 i.e until the axes of the level passes over the position of the third leveling screw C. 4. Turn this leveling screw until the bubble comes to the center. 5. Rotate the upper plate through 90 to its original position fig(a) and repeat step(2) till the bubble comes to the center. 6. Turn back again through 90 and repeat step 4 . 7. Repeat the steps 2 and 4 till the bubble is central in both the positions. 8. Now rotate the instrument through 180. The bubble should be remaining in the center of its run, provided it is in correct adjustment. The vertical axis will then be truly vertical.
3. ELIMINATION OF PARALLAX:
Parallax is a condition arising when the image formed by the objective is not in
the plane of the cross hairs. Unless parallax is eliminated, accurate sighting is not possible. Parallax can be eliminated in two steps. a. FOCUSSING THE EYE-PIECE: Point the telescope to the sky or hold a piece of white paper in front of the telescope. Move the eyepiece in and out until a distant and sharp black image of the cross-hairs is seen. FOCUSSING THE OBJECT: Telescope is now turned towards object to be sighted and the focusing screw is turned until image appears clear and sharp.
b.
VIVA QUESTIONS:
1. 2. 3. 4.
State any four uses of a theodoite? What is meant by face left and face right? What does swinging of telescope means? What is meant by transiting?
Page No. 42
EXPERIMENT NO. 15
O PROCEDURE: 1. Set up the instrument over O and level it accurately. 2. With the help of upper clamp and tangent screw, set 0 reading on vernier A. Note the reading of vernier B. 3. Release the upper clamp and direct the telescope approximately towards the point P. Tighten the lower clamp and bisect point P accurately by lower tangent screw. 4. Release the upper clamp and turn the instrument clock-wise towards Q. Clamp the upper clamp and bisect Q accurately with the upper tangent screw. Note the readings of verniers A and B to get the values of the angle POQ. 5. Release the lower clamp and turn the telescope clockwise to sight P again. Bisect P by using the lower tangent screw. 6. Release the upper clamp, turn the telescope clockwise and sight Q. Bisect Q by using the upper tangent screw. 7. Repeat the process until the angle measured (required number of times is 3). The average angle with face left will be equal to final reading divided by three. 8. Change face and make three more repetitions as described above. Find the average angle with face right, by dividing the final reading by three. 9. The average horizontal angle is then obtained by taking the average of the two angles with face left and face right.
Page No. 43
No. Of Repetitions Sec Min .o Deg. Sec Min Sec Min .o Deg. Sec Min .o Deg. Mean FACE: RIGHT
Horizontal angle
Horizontal Angle A B
No. Of Repetitions Mean Sec Min .o Deg. Sec Min Sec Min .o Deg.
FACE: LEFT
Sighted to Instrumented to
Page No. 44
EXPERIMENT NO. 16
A SKETCH: O
PROCEDURE: If it is required to measure angles AOB, BOC, and COD etc by reiteration method The following steps are to be used.
1. Set the instrument over O and level it set the Vernier to zero and bisect point A accurately. 2. Loose the upper clamp and turn the Telescope clockwise to point B. Bisect B by using the upper tangent screw. Read both the Verniers, the mean of the Verniers will give the angles AOB. 3. Similarly, bisect successively C, D etc, thus closing the circle. Read both the Verniers at each bisection. 4. Finally sight to A the reading of the vernier should be the same as the original setting reading.
Page No. 45
Tabular Form
Sec Min .o Deg. Sec Min .o Deg. Sec Min .o Deg. Sec Min Sec Min .o Deg. Sec Min .o Deg. Sec Min .o Deg. Sec Min Sec Min .o Deg. Mean FACE: RIGHT SWING: LEFT FACE: LEFT SWING: RIGHT A B Mean
Horizontal angle
Horizontal Angle A B
Sighted to Instrumented to
EXPERIMENT NO. 17
Page No. 46
OBJECTIVE : To measure the Vertical angle of an object with respect to instrument station or any other point. EQUIPMENTS : Theodolite and stand. THEORY: A vertical angle is the angle between the inclined line of sight and the horizontal. PROCEDURE: To measure the Vertical angle of an object A at a station O. 1. Set up the instrument over O and level it with reference to the altitude bubble. 2. Set the zero of the vertical vernier exactly to the zero of the vertical circle by Means of the vertical circle clamp and tangent screw. 3. Bring the bubble of the altitude level to the center of its run. The line of Collimation is thus made horizontal, while the vernier reads zero. 4. Loosen the vertical circle clamp, direct the telescope towards the object A, and sighted approximately, clamp the vertical circle and bisect A exactly by turning the tangent screw. 5. Road both venires. The mean of the two, readings gives the value of the required angle. 6. Change the face of the instrument and repeat the process. The mean of the two vernier readings gives the second value of the required angle.
Page No. 47
A B
Figure 03 A
OBSERVATIONS
INSTRUMENT STATION
FACE LEFT
SIGHT TO
FACE RIGHT C SCALE Sec Deg Min Sec D SCALE Deg Min Sec
AVERAGE VALUE
RESULT:
EXPERIMENT NO. 18
OBJECTIVE: Determining distance between two inaccessible points by measuring horizontal angle EQUIPMENTS: 1. Theodolite 2. Chain / Tape 3. Ranging rods 4. Plumb bob 5. Stand SKETCH:
A B
PROCEDURE: 1. Select a base line CD and measure CD accurately. 2. Setup the theodolite at C and level it accurately. 3. Measure the horizontal angles DCA and ACB each on both faces of the instrument and take their respective mean values. 4. Observe horizontal angles ADB and BDC on both faces and take the mean values of each. 5. Using the angles DCA, ACB, ADB and BDC of the distance, the required distance AB can be calculated. 6. The Horizontal distance can also be calculated by plotting the angles and obtaining the intersection points A and B.
Page No. 49
EXPERIMENT NO. 19
Q1
1 2
S D Q
Q2
PROCEDURE: 1. Setup the instrument at station P. 2. Perform all temporary adjustments. 3. Bring the line of collimation horizontal 4. Enter the initial readings in the tabular form. 5. Swing the telescope and take staff reading over the given B.M. 6. Swing the telescope towards the object. 7. Release the vertical clamp screw, sight the top of the object Q1, and clamp the vertical clamp screw. 8. Read C and D verniers and enter the readings. 9. Release the vertical clamp screw, sight the bottom of the object Q, and clamp the screw. 10. Read vernier readings and enter in the tabular form.
Page No. 50
11. Measure the Horizontal distance between the instrument station and the object. 12. The above procedure will be repeated with the face right observation. 13. The average of the two observations by transiting the telescope taken with different faces will be vertical angle. 14. Calculate the height of the top point Q1 from horizontal line (h1) and height of the bottom point Q0 from horizontal line (h2) by using formula h = d tan
OBSERVATIONS
Average Vertical angle Sec Min .o Deg. Sec Min .o Deg. Sec Min .o Deg. Sec Min Sec Min .o Deg. Sec Min .o Deg.
Sec Min .o Deg. Sec Min Sec Min .o Deg. Sighted to Instrumented to C D Mean h1 = DTan1 h2 = DTan 2
Formula:
Vertical angle
Mean
Vertical Angle
.h = h1 + h2
Page No. 51
TOPIC-6
PLOTTING
1. Conventional signs in surveying. 2. Plotting of a perpendicular and oblique offsets. 3. Plotting of land survey Chain & Cross staff surveying calculation of areas. 4. Plotting of chain triangulation of small areas around building. 5. Plotting of closed & Open traverse by compass surveying Location of details.
Page No. 53
EXPERIMENT NO. 20
FIGURE:
PROCEDURE: 1) Run a chain line between the given station A and B 2) Hold the cross staff vertically on the chain line where the perpendicular from the point p is expected to meet 3) Turn the cross staff until one pair of opposite slit is directed to a ranging rod fixed at B (forward point) 4) Look through the other pair of slits and see that the point p bisect to which the offset is to be taken. 5) If not, the cross staff is moved in forward or backward on the chain line AB until the line of sight bisects the point p. 6) Measure the perpendicular offset distance PQ.
EXPERIMENT NO. 21
Page No. 54
PLOTTING OF LAND SURVEY CHAIN AND CROSS STAFF SURVEYING CALCULATION OF AREAS
OBJECTIVE: Plotting of land survey chain and cross staff surveying calculation of areas. INSTRUMENTS: 1. Two Chains 2. Arrows 3. Ranging Rods 4. Cross staff 5. Plumb Bob SKETCH: 6 A 1 2 3 D
E F 5
PROCEDURE:
B C
1. Let A B C D E F be the given field whose area is to be measured. 2. Divide the area into right-angled triangles and Trapezoids and measure their bases and
perpendiculars. 3. Two instruments are required a. A cross staff to divide the area into triangles and trapezoids b. A chain to measure lengths of base and perpendiculars. 4. Calculate the area of triangles and Trapezoids.
5. The sum of the areas of 1,2,3,4,5 and 6 gives the area of the given field. FORMULA: Area of the right angled triangle = Base x Height
Area of Trapezoid = ( a + b) h a, b are the parallel sides h is the distance between the parallel sides.
EXPERIMENT NO. 21
Page No. 55
OBJECTIVE: Plotting Of Chain Triangulation Of Small Areas Around The Building INSTRUMENTS: 1. Chain 20m / 30 m 2. Ranging rods 3. Arrows 4. Pegs - 1 No. - 6 Nos. - 10 Nos. - 5 Nos.
PROCEDURE: 1. Prepare key plans for layout of plots. 2. Let A B C D E be the given field whose area is to be measured. Fix the pegs at A , B , C , D and E 3. Divide the given area into three triangles ADE, ABD and BDC by joining AD and BD. 4. Measure the lengths AB, CD, DE, EA and BD. 5. Calculate the area of the triangles. 6. The sum of the Three triangles is the area of the given field. FORMULA:
Area of the Triangle = s (s-a) (s-b) (s-c) Where a, b, c are the sides of triangle S = (a + b + c) / 2 SKETCH:
D
LOCATION OF DETAILS
Draw a line indicating the magnetic meridian at A Draw a line AB at A to a suitable scale according to the measured distance and bearing of AB. Draw a meridian at B parallel to the meridian at A and Draw BC to the same scale according to the measured distance and bearing of BC. Complete the transverse, by repeating the same procedure at all other
stations.
*************************************
Page No. 57