0% found this document useful (0 votes)
39 views3 pages

Task 1:: Function of Selected Workstation: Printing

The document summarizes the workstation and tasks of a laser printer operator. The operator stands while taking orders, printing sheets using the laser printer, stapling them, calculating costs, and handing the finished prints to customers. The workstation includes a chair, shelf, printer, stapler, and calculator. The lone female operator is 24 years old and works 9 hours with a 30 minute rest period.

Uploaded by

rammistien
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views3 pages

Task 1:: Function of Selected Workstation: Printing

The document summarizes the workstation and tasks of a laser printer operator. The operator stands while taking orders, printing sheets using the laser printer, stapling them, calculating costs, and handing the finished prints to customers. The workstation includes a chair, shelf, printer, stapler, and calculator. The lone female operator is 24 years old and works 9 hours with a 30 minute rest period.

Uploaded by

rammistien
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Task 1:

Name of selected workstation: Laser. Function of selected workstation: Printing sheets. Workstation flow diagram:

Operating steps description: o Types of working area: Standing. o Activities that worker perform: 1. Put a package of sheets in the printer. 2. Take the customer's order. 3. Printing sheets:
Select the sheets to be print. Identify the number of needed copy. Print the sheets.

4. Stapling the sheets. 5. Calculate the cost of sheets. 6. Handling the sheets to the customer. o Working area surrounding worker: Chair. Shelf. o Machines and tools are used: 1. Printer.

2. Stapler.

3. Calculator.

Workers information: o Sex: female. o Age: 24. o Number: 1. o Working hours: 9 hours. o Rest periods: 30 minutes.

You might also like