SATECH - Eagle Control-Matic - WHC System EH36 Series - Product Brochure (Ed011211 1214Hr) PDF
SATECH - Eagle Control-Matic - WHC System EH36 Series - Product Brochure (Ed011211 1214Hr) PDF
SATECH - Eagle Control-Matic - WHC System EH36 Series - Product Brochure (Ed011211 1214Hr) PDF
SYSTEM AUTOMATION
Product Brochure
EH 36 SERIES PC2P1H SERIES
FEATURES
316L Stainless Steel TECO Panel 316L Stainless Steel TECO Hydraulic Reservoir Hydraulic Power Generating Unit High Pressure High Flow Hydraulic Filtration Unit Hydraulic Energy Storage Accumulator Rack Main Header Analog Pressure Transmitting Unit Choke Valve Hydraulic Supply Unit Wellhead Control Modules Diverter Valve Control Module SDV Control Module Equalization Valve Control Module Flow Valve Control Module Remote Terminal Unit (RTU) Human Machine Interface (HMI) Explosion-proof Air-Conditioning Nitrogen Intensifier Unit (optional) Hydraulic Cleanliness Filtration Unit (optional)
BENEFITS
Eliminates the need for pneumatic supplies Eliminates the low pressure hydraulic pilot system Reduce massive cabling between the WHCP and PCS/SIS Utilizing High Pressure Pilot Solenoid Valve A* Block before bleed valve operation A* Snap acting operation A* High Flow A* Reduce tubing & fittings from the Low Pressure Pilot System Field proven design Specific timing control by the PMCS via RTU eliminating the use of the conventional flow control valve design Interchangeable module design will enable any faulty modules to be removed and replaced with a spare module at a minimum downtime. NAS 1638 Class 6 hydraulic cleanliness compliant Low Operating Cost and Minimum Spare Parts Inventory
A*
Eagle Control-Matic
RTU Section
SSV-A
(FMC HY-155 Actuator )
HP and IP Pump Suction and Discharge Hydraulic Line to Hydraulic Pump Skid
Hydraulic line to Flow Control Valve Hydraulic line to Equalizing Valve Hydraulic line to SDV Hydraulic line to Diverter Valve Hydraulic line to SCSSV
SDV
(Bettis G01001.7-SR4-CW )
Equalizing Valve
(Bettis G01001.7-SR4-CW )
(Schlumberger TRMAXX-10E )
Flame Arrestor The fully welded hydraulic supply reservoir which is mounted at the top of the panel is constructed from 3mm thick 316L stainless steel, sized for 36 modules operation. The supply reservoir is equipped with a filter-breather for filtering during filling, level sight glass for local visual indication, flame arrestor for avoiding any possible cause Level Sight Glass of fire or explosion at the tank from external sources of ignition, inspection cover for reservoir inspection & cleaning and drain valve to drain the reservoir during cleaning.
A HART protocol differential pressure transmitter mounted at the side of the reservoir facilitates remote monitoring of the hydraulic level and stop the pump when low-low reservoir level is detected.
Hydraulic Reservoir
The Hydraulic Power Generating System comprises of 2 main header namely the High Pressure Header (HP) and Medium Pressure Header (MP). The MP & HP Header shall consist of 2 nos. of motor driven check ball design hydraulic piston pump, 1 duty and 1 standby, with isolation valve arrangement to permit on line repair and replacement. Each hydraulic pump suction side will have a of 0.8mm screen strainer for hydraulic fluid straining before entering the pump suction port. At each pump discharge side, a pressure safety valve sized to the pump flow rate to provide over-pressure protection and a 2-1/2 dial stem mounted pressure gauge with blow-out plug for local pressure monitoring is provided. An additional check valve in additional to the check ball in the pump is also installed to prevent any possible back flow of the discharge hydraulic back to the pump. Each of the MP Hydraulic Pump is sized to charge the energy storage accumulators at the MP header from 1200 psig to 1600 psig in 5 minutes and from 0 psig to 1200 psig in 10 minutes. Similarly, each HP Hydraulic Pump is sized to charge the energy storage accumulators at the HP header from 3600 psig to 4800 psig in 5 minutes and from 0 psig to 3600 psig in 10 minutes. An optional manual hand pump facility for HP header hydraulic back-up is provided for manual pumping of HP pressure when the electric driven pumps fails.
Duty Pump Pressure Safety Valve Pressure Gauge Pressure Safety Valve Pressure Gauge Check Valve Isolation Ball Valve
Check Valve
Standby Pump
To Hydraulic Header
C. High Pressure High Flow Hydraulic Filtration System - with DP Filter Status Monitoring
The MP header will provide the required hydraulic supply pressure to operate the WVs, SSVs and SSIVs while the HP header will provide the required hydraulic supply pressure to operate the SCSSVs and Down hole Choke Valves. To ensure the hydraulic on each MP and HP header is free from impurity for problem-free hydraulic valve operation and prolong the system components life span, a set of high pressure high flow Tee-Type Filter for each header is provided to filter the pump discharged hydraulic to a cleanliness level of NAS 1638 Class 6 or better. Isolation block valve arrangement to permit on line cleaning and replacement of the filter is provided to ensure easy filter maintenance without disrupting the panel operation to monitor the filter element clogging status at each MP and HP header, a differential pressure transmitter with local indication for each header is installed in parallel to the set of filters.
PSD Pushbutton
ESD Pushbutton
WV Pressure
SSV Pressure
SSIV Pressure
SCSSV Pressure
Well Shutdown WV Open / Close SSV Open / Close SSIV Open / Close SCSSV Open / Close
WV Pressure
SSV Pressure
SSIV Pressure
SCSSV Pressure
Well Shutdown WV Open / Close SSV Open / Close SSIV Open / Close SCSSV Open / Close
A Solenoid Valve B Manual Isolation Valve C Manual SCSSV Hyd. Selector Valve D 316SS Pressure Switch E Pressure Gauge F Thermal Safety Valve G Check Valves H Isolation Ball Valves Hydraulic Supply Line Hydraulic Return Line Hydraulic Tubing
From RTU
To RTU A B
Legend
D To SSV-A
IP Supply
From RTU
A Solenoid Valve B Manual Isolation Valve C Manual SCSSV Hyd. Selector Valve D 316SS Pressure Switch E Pressure Gauge F Thermal Safety Valve G Check Valves H Isolation Ball Valves Hydraulic Supply Line Hydraulic Return Line Hydraulic Tubing
From RTU
To RTU A B
Legend
D To SSV-A
IP Supply
A Solenoid Valve B Manual Isolation Valve C Manual SCSSV Hyd. Selector Valve D 316SS Pressure Switch E Pressure Gauge F Thermal Safety Valve G Check Valves H Isolation Ball Valves Hydraulic Supply Line Hydraulic Return Line Hydraulic Tubing
From RTU
To RTU A B
A Solenoid Valve B Manual Isolation Valve C Manual SCSSV Hyd. Selector Valve D 316SS Pressure Switch E Pressure Gauge F Thermal Safety Valve G Check Valves H Isolation Ball Valves Hydraulic Supply Line Hydraulic Return Line Hydraulic Tubing
From RTU
To RTU A B
Legend
D To SSV-A
IP Supply
From RTU
A Solenoid Valve B Manual Isolation Valve C Manual SCSSV Hyd. Selector Valve D 316SS Pressure Switch E Pressure Gauge F Thermal Safety Valve G Check Valves H Isolation Ball Valves Hydraulic Supply Line Hydraulic Return Line Hydraulic Tubing
From RTU
To RTU A B
A Solenoid Valve B Manual Isolation Valve C Manual SCSSV Hyd. Selector Valve D 316SS Pressure Switch E Pressure Gauge F Thermal Safety Valve G Check Valves H Isolation Ball Valves Hydraulic Supply Line Hydraulic Return Line Hydraulic Tubing
From RTU
To RTU A B
IP Supply
E To XVO F
From RTU
Legend
To XVC
A Solenoid Valve B Manual Isolation Valve C Manual SCSSV Hyd. Selector Valve D 316SS Pressure Switch E Pressure Gauge F Thermal Safety Valve G Check Valves H Isolation Ball Valves Hydraulic Supply Line Hydraulic Return Line Hydraulic Tubing
G Return Header
Opening Sequence During normal operation, the opening of the double acting Diverter Valve shall be by operator activation with inter-locking logic controlled by the RTU. The inter-locking logic in the RTU shall activate the XVO solenoid while de-energizing the XVC solenoid upon initiation to open the Diverter valve.
From RTU
IP Supply
E To XVO F
From RTU
To XVC
G Return Header
10
SDV CONTROL MODULE, EQUALIZING VALVE CONTROL MODULE, FLOW CONTROL VALVE CONTROL MODULE
Closing Sequence During closing operation, the closing of the single acting SDV, Equalizing Valve or Flow Control Valve shall be by operator activation via the RTU.
IP Supply
From RTU
To RTU A B E
Return Header
Legend A Solenoid Valve B Manual Isolation Valve C Manual SCSSV Hyd. Selector Valve D 316SS Pressure Switch E Pressure Gauge F Thermal Safety Valve G Check Valves H Isolation Ball Valves
To SDV, Equalizing Valve, Flow Valve
Opening Sequence During normal operation, the opening of the single acting SDV, Equalizing Valve or Flow Control Valve shall be by operator activation via the RTU.
D E
IP Supply
From RTU
To RTU A B
Return Header
11
S800 SIL 3 certified RTU suitable for Zone 2 Hazardous Area Application
B. Controls
The electrical signals from the level transmitter, pressure transmitters and pressure switches shall be connected to the SIS through the junction box, where it will perform the necessary interlocking, delay and shutdown functions, and sent out the necessary output 24VDC signals to activate the corresponding solenoid valves. The controls perform by the SIS will consist of : Motor Control - Control of motor Start/Stop from MP and HP header pressure transmitter and hydraulic reservoir level transmitter signals Wellhead Control Module - Wellhead Control Module sequential opening operation upon initiation to open at the panel mounted pushbutton shall be as follow : 1) Opening of SCSSV 2) Opening of SSV (after a user defined time delay) 3) Opening of WV (after a user defined time delay) - Wellhead Control Module sequential closing operation upon operator initiation to shutdown at the panel mounted pushbuttons shall be as follow : 1) Closing of WV 2) Closing of SSV (after a user defined time delay) 3) Closing of SCSSV (after a user defined time delay)
12
No-Gap-Gauge Testing
13
ESD PSD Activated by Process via SIS PSD activated via Pushbutton at WHCP
PSD
SYSTEM SPECIFICATION
Utilities:
Field Panel Power Supply for RTU Field Power Supply for Air Conditioner Field Power Supply for Motors Hydraulic System - HP Hydraulic Header - MP Hydraulic Header - HP Relief Valves Set Pressure - MP Relief Valves Set Pressure - HP Hydraulic Accumulator Volume - MP Hydraulic Accumulator Volume - Hydraulic Pump - Hydraulic Reservoir Volume - Hydraulic Fluid : 24 VDC, : 220 VAC, 1-ph, 50Hz, 500W : 380 VAC, 3-ph+N, 50Hz, 2.2KW : 3,600 psig to 4,800 psig : 1,200 psig to 1,600 psig : 5,280 psig : 1,760 psig : 10 litres (for 1 SCSSV for 2 cycles operation) : 100 litres
(for 1 SSV-A, SSV-B, SDV-6310, Diverter Valve & Choke Valve)
Physical Data: Enclosure material Enclosure Thickness Hydraulic Reservoir Dimension Overall Panel Dimension Overall Panel Dry Weight Overall Panel Operating Weight
: Stainless Steel 316L : 3mm : 1710(W) x 1000(D) x 400(H) mm : 4000(W) x 1000(D) x 2006(H) mm : 3,300 kg : 3,970 kg
: 684 litres : Shell Tellus 32 (or equal grade) : 1 NPTF : 3/8 O.D. : 3/8 O.D. : 1/2 O.D. : 1 NPTF
Standards: Panel enclosure design in accordance to IP65 standard Hydraulic cleanliness to NAS 1638 Class 6 (minimum) All electrical devices shall be suitable for Zone 2 hazardous area application Documentation: Control Schematic and Panel Design Drawings Utility Consumption Calculations Accumulator, Pump and Reservoir Sizing Calculation Factory Acceptance Test Procedure / Report Start-Up Manual Operating & Maintenance Manual Manufacturer Data Record Mill Certificates / Certificate of Compliance Instrument Calibration Certificates Functional Design Specification (optional)
Connection line: Actuator Return Header SSV Hydraulic Control Line SCSSV Hydraulic Control Line Reservoir Drain Panel Drain
14
Eagle Control-Matic
Eagle Control-matics code EH Series Quantity of Modules
WH
EH
Electro-Hydraulic
XX (max. 36 nos.)
SCSSV Min. Pressure SCSSV Max. Pressure SCSSV Swept Volume SCSSV & WHCP Distance 08 13 8,000 psig 13,000 psig 10 15 10,000 psig 15,000 psig SSV Min. Pressure SSV Max. Pressure SSV Swept Volume SSV & WHCP Distance 08 13 8,000 psig 13,000 psig 10 15 10,000 psig 15,000 psig WV Min. Pressure WV Max. Pressure WV Swept Volume WV & WHCP Distance Accumulator Design Code Accumulator Sizing Criteria Pump Sizing Criteria
XX
02 05
08 13
03 06
10 15
EH36 Series
02 05
03 06 (to enter volume in litres) (to enter in meter) 02 05 03 06 3,000 psig 6,000 psig 2,000 psig 5,000 psig
X
(to enter volume in litres)
X
(to enter in meter) S A P Manufacturers Standard ASME Code Section VIII Div 1 P.E.D. 97/23/EC
XX X Wells X Cycles X X
D2 A1 C A
Mins to charge from 0 to Min. pressure Mins to charge from Min. to Max. pressure
24VDC 110VAC, 1-ph, 50Hz CSA EExd IIC ATEX Ex II 2 GD A2 A3 220VAC, 1-ph, 50Hz 380VAC, 3-ph, 50Hz P Pneumatic
15
WH EH /
M S / SC -
/S -
Eagle Control-Matic
SDV Quantity SDV Min. Pressure SDV Max. Pressure SDV Swept Volume SDV & WHCP Distance Choke Valve Quantity 3,000 psig 4,000 psig Choke Valve Min. Pressure Choke Valve Max. Pressure Choke Valve Swept Volume Choke Valve & WHCP Distance F P A2 220VAC, 1-ph, 50Hz Fieldbus Protocol Profibus Protocol N S Non-Intrinsically Safe Intrinsically Safe Analog Signal Type RTU Operating Voltage 03 04 3,000 psig 4,000 psig
No. of SDV
01 02
03 04
01 02
03 04
EH36 Series
01 02
03 04
01 02
X
(to enter volume in meters) A H 4 - 20mA Signal HART Protocol D2 A1 24VDC 110VAC, 1-ph, 50Hz
X
(no. of external Digital Input Points)
X
(no. of external Digital Output Points)
X
(no. of external Analog Input Points)
(Class 1, Div 2, Gp B, C, D certified) (NAS 1638 Class 6) (NACE MR-01-75) (Glycol Based Hydraulic) (Mineral Oil Based Hydraulic) (For quick charging of Hydraulic Accumulators) (For Hydraulic Cleanliness Filtration
For any other special configuration not stated in this selection chart, kindly contact our factory for further information
16
/ / DI DO AI AO /
SD
/ CV
A-Seal
Valves
EEx'd, EExia and Eexemb. 316L Stainless Steel Block Before Bleed Arctic Service Options to -50C Solenoid rotates through 360 15 lpm flow rate
Bladder Accumulator
17
Our Clients
Amerada Hess (Thailand) Limited Brunei Shell Petroleum Co. Sdn. Bhd. Esso Petroleum Malaysia Inc. ExxonMobil Exploration & Production Malaysia Inc. Hoan Vu Joint Operating Company Japan Vietnam Petroleum Co. Ltd Murphy Sarawak Oil Co. Ltd. Petronas Carigali Sdn. Bhd. Petrofac Resources Malaysia Premier Petroleum Myanmar Limited Sabah Shell Petroleum Company Sarawak Shell Berhad Shell China Exploration & Production Co. Shell Philippines Exploration B.V. Talisman Malaysia Limited Toreador Turkey Limited Total Thailand, etc.
Maintenance
Our maintenance commitments cover not only hands on routines but can encompass all functions traditionally performed by the client: compliance to acceptable level of reliability, writing planned maintenance routines, scheduling work & reporting, performance monitoring, design & consultancy back-up, spares holding & procurement & providing full technical support. We ensure compliance of your systems to appropriate legislative standards. Optimization and retention of the integrity of the system.
18
TECHNICAL GUIDE
SYMBOL DESCRIPTION
2-WAY ISOLATION BALL VALVE CHECK VALVE PRESSURE GAUGE
OPERATION DESCRIPTION The valve which will either block or pass the media flow is operated by means of a manual selector handle. The valve having a spring poppet allows only a single direction flow and block the flow in the opposite direction. The gauge, which uses a bourdon tube connected to a needle on the front scale, will tension based on the pressure applied to its inlet port to indicate the corresponding pressure reading. The valve which has an internal spring, that can be set, will be compressed when pressure is applied to the inlet port. When the applied pressure is increased to more than the set pressure, the valve will open and vent the access pressure to its outlet port keeping the inlet pressure within the set limits. When the inlet pressure is restored to its normal level, the valve will close back to its original operating condition. A low power solenoid together with an internal build-in high pressure pilot provides the positive force to shift the valve position from normally close position to normally open position. With the build-in spring inside the valve, the valve will be actuated when the solenoid is energized and return to its original position when the solenoid is de-energized. The valve which has a common port will provide a through flow to either of the outlet ports by means of a manual selector handle. The hermetically sealed SPDT switch is activated by means of a spring and isolation diaphragm, that can be set, sensing the pressure at the inlet port. Upon sensing the pressure above the set point, the switch will change its contact position. Similarly upon loss of pressure below the set point, the contact will change its contact position back to its original position. Class 00 0 1 2 3 4 5 6 7 8 9 10 11 12 Maximum Particles / 100mL in Specific Size Range (um) 15 - 25 25 - 50 50 - 100 22 4 1 44 8 2 89 16 3 178 32 6 356 63 11 712 126 22 1,425 253 45 2,850 506 90 5,700 1,012 180 11,400 2,025 360 22,800 4,050 720 45,600 8,100 1,440 91,200 16,200 2,880 182,400 32,400 5,760
3/2-WAY HIGH PRESSURE PILOT DIRECT ACTING LOW POWERED SOLENOID VALVE
PRESSURE SWITCH
5 - 15 125 250 500 1,000 2,000 4,000 8,000 16,000 32,000 64,000 128,000 256,000 512,000 1,024,000
D and/or E
1 or 2 1 or 2
II II
C + H2 B
I I
1 or 2 1 or 2 1 or 2
B B C
Propylene Oxide Ethyl D and/or E Oxide Butadiene D and/or E Cyclopropane Ethyl Ether Ethylene Acetone, Benzene, D and/or E Butane, Propane Hexane, Paint Solvents, Natural Gases
1 or 2
II
1 or 2
II
1 or 2
19
[email protected]
Skype Name : satech.sales.sg
ech Sa T
SYSTEM AUTOMATION
[email protected]
SATECH Eagle Control-Matic Wellhead Control System EH36 Series Product Brochure (Ed011211 1214Hr) Issue 1