Pa - 04-09-13

The document contains details of 7 planned network maintenance activities related to BTS sites and BSCs. It lists the activity owner and their contact details, the affected network elements, activity type, department, severity, dates and times of the activities, as well as brief descriptions and reasons for the activities.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views7 pages

Pa - 04-09-13

The document contains details of 7 planned network maintenance activities related to BTS sites and BSCs. It lists the activity owner and their contact details, the affected network elements, activity type, department, severity, dates and times of the activities, as well as brief descriptions and reasons for the activities.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 7

PWR_No 1 2 3 4 5 6 7

NW_Element BTS BTS BTS BTS BTS BTS BTS

Act_Owner_Name GNSC CM GNSC CM GNSC CM GNSC CM GNSC CM GNSC CM GNSC CM

Act_Owner_Mail [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]

Act_Owner_Mobile 4439941290 4439941290 4439941290 4439941290 4439941290 4439941290 4439941290

AType Planned Planned Planned Planned Planned Planned Planned

Functn BSS BSS BSS BSS BSS BSS BSS

Act_Dept GNSC_CM GNSC_CM GNSC_CM GNSC_CM GNSC_CM GNSC_CM GNSC_CM

Severity Minor Minor Major Critical Minor Non outage Major

Impact_NE
ATHANITHR(BSC60) BSC24 site outage needed for sites mentioned in the attachment BSC outage needed for BSC13, BSC47 site outage needed for sites QUILANDYTWN, ELATERY(BSC13) BSC13 BSC67

Start_DT 9/5/13 0:00 9/5/13 0:00 9/5/13 0:00 9/5/13 0:00 9/5/13 0:00 9/5/13 0:00 9/5/13 0:00

End_DT 9/5/13 5:00 9/5/13 5:00 9/5/13 5:00 9/5/13 5:00 9/5/13 5:00 9/5/13 5:00 9/5/13 5:00

Act_Details DLCIR parameter modifications new ater for WBAMR CRC measurement enabling PCU card addition in BSc's csdap deletion & creation liscence loding in BSC's BSC parameter modifications

Reason to increase BW to reduce WBAMR utilisations ET measurement enabling new card additions to reduce dhr fail due to csdap for new PCU card additions parameter standardisations

Remarks