0% found this document useful (0 votes)
437 views1 page

Bus Post Insulator Installation

The document provides a 10 step procedure for installing bus post insulators that includes checking nameplate details, visually inspecting the equipment, checking insulation values, mounting on a foundation with accessories, ensuring proper level and alignment, tightening bolts and clamps, checking alignments and connections of terminals, verifying earth connections, cleaning insulators, and checking terminations per drawings. It also lists insulation resistance testing as the only step for equipment testing.

Uploaded by

santoshkumar
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
437 views1 page

Bus Post Insulator Installation

The document provides a 10 step procedure for installing bus post insulators that includes checking nameplate details, visually inspecting the equipment, checking insulation values, mounting on a foundation with accessories, ensuring proper level and alignment, tightening bolts and clamps, checking alignments and connections of terminals, verifying earth connections, cleaning insulators, and checking terminations per drawings. It also lists insulation resistance testing as the only step for equipment testing.

Uploaded by

santoshkumar
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Bus Post Insulator installation Installation Procedure 1.

Name plate details are checked & compare to the specification 2. Physical visual check of equipment 3. Insulation value of Bushing insulator to be checked 4. Mount the equipment on foundation with all require accessories fitted 5. Check the level, alignment as per drawing. 6. Tightness of bolts , clamps 7. Alignment & connecting terminal to be checked 8. Earth connection are checked for tightness & proper contact 9. Insulator are thoroughly cleaned 10. Check Termination as per Drawing.

Equipment Testing 1. Insulation resistance