System Fault Level Calculation 15MW AA

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5

IKE ELECTRIC PVT. LTD.

Title : System Fault Level Calculation Client : M/s TNEB Project : 15MW COGEN POWER PLANT ARIGNAR DOC No. :TNEB-WILIKE-A94 DATE : 21 - 4 - 2011

ANNA,TNEB.

OBJECTIVE: SYSTEM FAULT LEVEL CALCULATION FOR 15MW ARIGNAR ANNA A/c TNEB Project. INPUT DATA AVAILABLE: 1. Alternator Data Sheet : 18.75 MVA , 15MW , 984 A synchronous speed = 1500rpm , p.f 0.8 lag , voltage 11kV +-10% , reactance Xd 26% = 0.26 2. Generator transformer data: As per GTP of M/s Indo Tech Transformers Ltd 15/20 MVA ,11/110kV star / delta , YNd1, Percentage impedance (%Z) 12.5 % with tolerance as per IS (+- 10 % considered). Distribution transformer data: As per GTP of M/s Tech Transformer Ltd. 1.6 MVA , 11/0.433kV ,star / delta , Dyn11, percentage impedance (%Z) 6.25 % No negative tolerance. (Two transformer never operate in parallel, we have considered one transformer for this fault level calculations) 4. DOCUMENT REFERED AT THE TIME OF CALCULATION: AS per electrical load list No. TNEB-WIL-IKE-A11.

3.

CALCULATION AS FOLLOWS: 1. Equivalent impedance diagram (Attached) Calculation Base MVA Generator Fault MVA = 1.6 = MVA 18.75/26 x 100 = Therefore Zg (Gen. Impedance) = 72.115 MVA MVA

1.6 x 100 / 72.115

Page 1

= 110 kV system Fault MVA

2.2186 % = kA x 3 x kV

IKE ELECTRIC PVT. LTD.


Title : System Fault Level Calculation Client : M/s TNEB Project : 15MW COGEN POWER PLANT ARIGNAR DOC No. :TNEB-WILIKE-A94 DATE : 21 - 4 - 2011

ANNA,TNEB.

= = Therefore Zs (system Impedance) = Generator Trafo Impedance Zgt = Generator Trafo Impedance Zgt 1.6 MVA base

31.5 x 1.732 x 110 6001.38 = 1.6 x 100/6001.38

0.02666 % = 12.5 - 1.25 (-10 % Tolerance)

11.25 % = = 11.25 x 1.6 / 20 0.9 %

A)

Fault MVA at 415 V bus at 1.6 MVA base = = = 1.6 / Z eq 1.6 x 100 / 6.903 23.17 MVA

B) Motor contribution for fault Above 37 KW non VFD motor load as per electrical load list No. TNEB-WIL-IKE-A11.

1) 37kW x 3 Nos (2 Working + 1 Standby ) 2) Total kW = 111

= 111 kW

kW

Page 2

3) Therefore kVA at 0.8 p.f lag & Efficiency 0.9 = 154

kVA

Motor contribution for fault

= kVA x 5 times = 154 x 5 kVA

kVA

IKE ELECTRIC PVT. LTD.


Title : System Fault Level Calculation Client : M/s TNEB Project: 15MW COGEN POWER PLANT ARIGNAR DOC No. :TNEB-WILIKE-A94 DATE : 21 4 - 2011

ANNA,TNEB.

= 770 = 0.770

kVA MVA

Therefore total fault MVA bus + Motor contribution = =

Fault MVA at 415V MVA MVA

29.34 + 0.770 30.11

Fault at 415V Bus

= =

30.11 / 3 x 0.415 41.89 KA

As per the above value against 50kA Conclusion found is SAFE.

C)

Fault MVA at 11kV Bus considering Base kV 0.433V = 1.6 x 100 / (ZB) As per equivalent impedance diagram ZB = 0.6533 Fault MVA at 11kV = 1.6 x 100 / 0.6533 = 244.91 MVA

Page 3

Fault current on 11kV Bus

= 244.91 / ( 3 x 11 ) = 12.85 kA

As per the above value against 40kA Conclusion found is SAFE.

IKE ELECTRIC PVT. LTD.


Title : System Fault Level Calculation Client : M/s TNEB Project : 15MW COGEN POWER PLANT ARIGNAR DOC No. :TNEB-WILIKE-A94 DATE : 21 - 4 - 2011

ANNA,TNEB.

Project: 18MW COGENERATION PLANT AT ARIGNAR ANNA A/c TNEB. READ WITH SYSTEM FAULT LEVEL CALCULATION, DOC NO: TNEB-WIL-IKE-A94 EQUIVALENT IMPEDANCE DIAGRAM Zs = 0.0266 %

Zg = 2.2186 % Zgt = 0.9 % 11kV Bus Zdt = 6.25 % 0.415 kV Bus

ZA = Zs + Zgt =0.9266 11kV Bus Zdt = 6.25 % 0.415kV Bus

Page 4

ZB = ZA l l Zg 0.6533 11kV Bus Zdt = 6.25 % 0.415 kV Bus

IKE ELECTRIC PVT. LTD.


Title : System Fault Level Calculation Client : M/s TNEB DOC No. :TNEB-WILIKE-A94 DATE : 21 - 4 - 2011

Project : 15MW COGEN POWER PLANT ARIGNAR

ANNA,TNEB.

Zeq = ZB + Zdt = 6.903 Reactance

MOTOR transformer Impedance

M M M m M m m
MOTOR

0.415 kV Bus

Zg = Generator Zs = System Impedance Zgt = Generator Zdt = Distribution transformer

Impedance

Page 5