Future Aerated Stabilization Basin No. 3 Future Aerated Stabilization Basin No. 4 Future Settling Basin
Volume = 16,500,000 Volume = 16,500,000 Volume = 12,000,000
Chemical
Feed Pump
Chemical
Defoamer Feed Pump
Tote/Drum
Process Wastewater From
Mill, Utility Wastewater, Aqua Ammonia
Landfill Leachate and Tank
Stormwater
Chemical
Feed Pump
Flow Monitoring Aerated Stabilization Basin No. 1 Aerated Stabilization Basin No. 2
Station 1 Volume = 16,500,000 GAL Volume = 16,500,000 GAL
Phosphoric
Acid Phase I - III HRT = 5 Days Phase I - III HRT = 5 Days
Phase IV HRT = 3 Days Phase IV HRT = 3 Days