Kick Scooters : Show Work
Kick Scooters : Show Work
assembly. Each frame is made up of three pieces: one unit of part A and two units of part B. The parts are fabricated by a single stamping machine that requires a set up time of 90 minutes switching between two part types. Once the machine is set up, the activity time for parts, regardless of type, is 30 seconds each piece. Currently, the stamping machine rotates its production between one batch of 120 part As and 240 part Bs. Completed parts move only when the entire batch is produced. At assembly, parts are assembled manually to form the finished products. The three parts and a number of small purchased components are required for each unit of final product. Each product requires 30 minutes of labor time to assemble. There are 12 workers in assembly, each working individually (i.e., no assembly line). There is sufficient demand to sell every scooter the system can make. SHOW WORK a) At the current batch sizes, is the bottleneck of the system Stamping or Assembly? b) At the current batch sizes, what is the process capacity in units per hour? c) True or False: Increasing the batch size increases capacity of the entire process? d) Which batch size for the stamping machine would match the Stamping and Assembly capacities?