Retrofit for gas-insulated high voltage switchgear (GIS) - 8D1 and 8D2

Table of Contents
1 2 3 4 5 6 7 8 9 10 11 Introduction .............................................................................................................. 4 Description of retrofit circuit-breaker 8DN8 ................................................................ 5 Technical data for retrofit circuit-breaker 8DN8 .......................................................... 6 Adapter - retrofitting circuit-breaker 8DN8 - existing switchgear ................................. 7 Retrofitting steps ..................................................................................................... 12 Circuit-breaker maintenance comparison old vs. new ............................................... 19 Time schedule for retrofit solution............................................................................ 21 Scope of delivery ..................................................................................................... 21 Life time expectation of existing GIS without new circuit-breaker.............................. 21 Type tests ................................................................................................................ 21 Options ................................................................................................................... 22

Page 2 of 23

List of Figures
Fig. 1: Existing substation with 8D2 double-pressure circuit-breaker ............................................... 4 Fig. 2: Main dimensions of retrofit circuit-breaker 8DN8 ................................................................. 5 Fig. 3: 8D2 bay with old blast piston circuit-breaker........................................................................ 7 Fig. 4: 8D2 bay with 8DN8 circuit-breaker ...................................................................................... 8 Fig. 5: 8DN8-circuit-breaker with two adapters equipped with gas-tight bushings towards the GIS section ............................................................................................................................... 9 Fig. 6: Side view of the 8DN8 circuit-breaker with two adapters...................................................... 9 Fig. 7: Top view of 8DN8-circuit-breaker with two adapters .......................................................... 10 Fig. 8: Top view of contact arrangement ...................................................................................... 11 Fig. 9: Side view of an 8D switchgear with doublel-pressure circuit-breaker .................................. 12 Fig. 10: Electrical view ................................................................................................................. 12 Fig. 11: SF6 pressure view ............................................................................................................ 13 Fig. 12: Third retrofitting step (a)................................................................................................. 14 Fig. 13: Third retrofitting step (b)................................................................................................. 14 Fig. 14: Fourth retrofitting step (a)............................................................................................... 15 Fig. 15: Fourth retrofitting step (b) .............................................................................................. 15 Fig. 16: Fifth retrofitting step (a).................................................................................................. 16 Fig. 17: Fifth retrofitting step (b).................................................................................................. 17 Fig. 18: Sixth retrofitting step: Bay after retrofitting ..................................................................... 18 Fig. 19: Standardized maintenance costs ..................................................................................... 20

List of Tables
Tab. 1: Technical data for circuit-breaker 8DN8 .............................................................................. 6 Tab. 2: Technical data of the adapter ............................................................................................. 7 Tab. 3: Comparison SF6 content old/new ........................................................................................ 8 Tab. 4: Comparison of the maintenance intervals of the different circuit-breakers......................... 19

Page 3 of 23

Introduction

The first SF6-gas insulated switchgear of type 8D1 and 8D2 delivered by Siemens are now 40 years and older. These substations have proved outstanding in operation. They are rugged, reliable, and virtually leak-free (SF6 or oil) and still fulfill their function perfectly. Today, stricter and more economically focused standards apply with respect to the maintenance of gas-insulated switchgear. Especially the SF6 double -pressure circuit-breakers used since GIS systems were first introduced on the market are highly maintenance-intensive. However, since the other GIS components (excluding the original circuit-breaker) require very little maintenance and have an expected life span of over 50 years provided the Siemens maintenance recommendations described in the operating manual are followed, Siemens offers a retrofit solution. This is in the form of a state-of-the-art SF6-circuit-breaker with spring mechanism based on more than 40 years of accumulated experience and intensive research.

Fig. 1: Existing substation with 8D2 double-pressure circuit-breaker

Page 4 of 23

Description of retrofit circuit-breaker 8DN8

The circuit-breaker employed in this retrofit solution is used in the current GIS and HIS substations 8DN8 up to 145 kV and also in 123 kV and 145 kV outdoor circuit-breakers. This type-tested breaker has proven itself in service over the years in thousands of applications. The most important advantages of this self-compression circuit-breaker of the latest generation are: Significantly lower maintenance costs (see chapter 6) Type-tested to the latest IEC standard (at the time of the development) State-ofthe-art spring mechanism with extremely low maintenance

Fig. 2: Main dimensions of retrofit circuit-breaker 8DN8

Page 5 of 23

Technical data for retrofit circuit-breaker 8DN8


IEC, latest edition (at the time of the development) 123 145 kV 50/60 Hz 230 275 kV 550 650 kV 3150 A 40 kA 40 kA </= 3 s 100 kA 1.5 0.56 MPa 0.52 MPa 0.50 MPa 35kg 60 ms 32 +/- 3 ms 24 ms 55 +/- 6 ms CO-15s-CO or O-0.3s-CO-3min-CO 220 V DC / 3.0 A / 10 A 230 V AC / 8.0 A / 20 A 3-pole 225 W at 220 V DC 225 W at 220 V DC 8 NO/8 NC/1 WI; 250 V / 2.5 A 900 kg

Standard Rated voltage Rated frequency Rated short-time power-frequency withstand voltage Rated lightning impulse withstand voltage Rated normal current Rated short-circuit-breaking current Rated short-time withstand current Rated duration of short-circuit Rated peak withstand current First-pole-to-clear-factor SF6 filling pressure at 20 C Loss of SF6 General lockout SF6 Volume of SF6 gas: Break time Opening time Arcing time (50 Hz) Closing time Operating sequence (IEC) Motor spring operating mechanism Auto reclosing Closing coil Tripping coil Auxiliary switch Weight of circuit-breaker without SF6 gas:
Tab. 1: Technical data for circuit-breaker 8DN8

Replaces: Circuit- breaker for 8D1 and 8D2 up to 145 kV, double-pressure type and blast piston type

Page 6 of 23

Adapter retrofitting circuit-breaker 8DN8 existing switchgear

The adapter, two of which are needed for connecting the new circuit-breaker to the existing switchgear, is type-tested with 650 kV rated lightning impulse withstand voltage and connects the three-phase encapsulated circuit-breaker with the single-phase encapsulated switchgear. The adapter forms a single SF6-gas compartment with joint gas monitoring together with the circuit-breaker. It is connected to the existing GIS switchgear through gas-tight bushings. Rated lightning impulse withstand voltage: Weight of an adapter: SF6 filling pressure at 20C: Volume of SF6 gas/adapter:
Tab. 2: Technical data of the adapter

650 kV approx. 200 kg 0.56 MPa 18.75 kg

Fig. 3: 8D2 bay with old blast piston circuit-breaker

Page 7 of 23

Retrofit 8DN8 selfcompression circuitbreaker 123 kV Circuit-breaker 35 kg Adapter 2 x 18.75 kg Total volume SF6 gas 72.5 kg Tab. 3: Comparison SF6 content old/new

8D1/2 double pressure circuit-breaker 123 kV

8D2 blast piston circuitbreaker 123/145 kV

105 kg

87 kg

Fig. 4: 8D2 bay with 8DN8 circuit-breaker

Page 8 of 23

Fig. 5: 8DN8-circuit-breaker with two adapters equipped with gas-tight bushings towards the GIS section

Fig. 6: Side view of the 8DN8 circuit-breaker with two adapters

Page 9 of 23

Fig. 3 shows the original system with 8D2 blast piston circuit-breaker. In Fig. 4, the circuit-breaker is replaced by an 8DN8 circuit-breaker. The connection between the 3-phase encapsulated 8DN8 circuit-breaker and the remaining single-phase 8D2 encapsulated GIS section is implemented via two adapters as shown in perspective in Fig. 5. Fig. 6 shows a side view from left to right: Upper and lower adapter - transition from single-phase encapsulation to 3-phase encapsulation 3-phase encapsulated 8DN8 circuit-breaker

Fig. 7: Top view of 8DN8-circuit-breaker with two adapters

Fig. 7 shows the top view of the three-pole encapsulated 8DN8 circuit-breaker with indicated contact arrangement connected to the single-pole encapsulated adapters.

Page 10 of 23

Fig. 8: Top view of contact arrangement

Fig. 8 shows the contact arrangement of the adapter.

Page 11 of 23

Retrofitting steps

Fig. 9: Side view of an 8D switchgear with doublel-pressure circuit-breaker

Fig. 9 shows the typical design of a 8D bay with doublel-pressure circuit-breaker

Fig. 10: Electrical view Legend: red= voltage, green: no voltage

Page 12 of 23

Fig. 11: SF6 pressure view Legend: blue= air at atmospheric pressure; yellow= SF6 at rated pressure

Views 10 and 11 show the second step of the retrofit 1) Switch off circuit -breaker -Q0 2) Switch off disconnectors -Q1, -Q2 and -Q8 3) Switch on and secure earthing switches -Q51 and -Q52 4) Switch off and earth the cable from the remote end 5) Switch off the auxiliary and tripping circuits 6) Perform gas work in accordance with diagram 7) Disassemble old circuit-breaker -Q0 with accessories 8) Check the existing 8D2 bushings and contacts 9) Install the new circuit-breaker with preassembled adapters 10) Install the new circuit-breaker module 11) Evacuate the new circuit-breaker module 12) Modify or replace the VOS (local control cubicle) 13) Top up SF6 to rated pressure 14) Commission the new circuit-breaker 15) Switch on the auxiliary and tripping circuits 16) Switch off the earthing switches -Q51, -Q52 and -Q8 and the earthing switch at the remote end of the cable. 17) Switch on disconnectors -Q1, -Q2 and -Q8 18) Switch on circuit-breaker -Q0 19) Bay is energized Figs. 12-18 show the individual steps of the retrofit graphically

Page 13 of 23

Fig. 12: Third retrofitting step (a)

Fig. 13: Third retrofitting step (b)

Page 14 of 23

SF6-Gas Scheme 1,5 to

-T5 -Q52 -Q8

-Q9 -Q0 -Q51 -Q2 -Q1 -Z1

BB II

BB I

Fig. 14: Fourth retrofitting step (a)

Fig. 15: Fourth retrofitting step (b)

Page 15 of 23

Fig. 16: Fifth retrofitting step (a)

Page 16 of 23

Fig. 17: Fifth retrofitting step (b)

Page 17 of 23

1,5 to

-Q52

-T5 -Q8

5335

4000

-Q9 -Q0 -Q51


3000

4050

-Q2

-Q1

-Z1

1335

BB II

BB I

1792

1115

1245

940

Fig. 18: Sixth retrofitting step: Bay after retrofitting

Page 18 of 23

Circuit-breaker maintenance comparison old vs. new


8D1/2 Double -pressure circuitbreaker

8D2 Blast piston circuit-breaker

8DN8 Self compression circuit-breaker

Minor inspection (or enhanced visual inspection)

1000 x CO in rated nominal current range or after 5 years Taking out of service necessary Replacement of blast valve

3000 x CO in rated nominal current range or after 10 years Taking out of service necessary

3000 x CO in rated nominal current range or after 17 years

Taking out of service not necessary

Major Inspection (or standard inspection)

5000 x CO in rated nominal current range or after 10 years Taking out of service necessary Replacement of blast valve

6000 x CO in rated nominal current range or after 20 years Taking out of service necessary

6000 x CO in rated nominal current range or after 25 years Taking out of service necessary

Tab. 4 Comparison of the maintenance intervals of the different circuit-breakers

Table 4 compares the maintenance intervals of the individual circuit-breaker types over a period of 25 years. It can be plainly seen that the maintenance expenditure as well as the short maintenance intervals for double-pressure circuit-breaker are no longer economical compared with the new 8DN8-circuit-breaker and no longer in keeping with todays needs. Fig. 19 shows the standardized maintenance costs (at todays costs) of the different circuit-breaker types over a 25-year operating period which naturally does not represent the whole life span of the new 8DN8 circuit-breaker. Compared to the new 8DN8-circuit-breaker the maintenance costs for the 8D1 double-pressure circuit-breaker are about 15 times higher, and the costs for the 8D2- blast piston circuit-breaker still 3 times as high.

Page 19 of 23

Fig. 19: Standardized maintenance costs

blue: Double-pressure circuit-breaker 8D1/8D2 red: Blast piston circuit-breaker 8D2 yellow: Self compression circuit-breaker 8DN8

Page 20 of 23

Time schedule for retrofit solution

The total duration from the receipt of the order to the provisional acceptance test is approximately 9 months referred to 1 bay. The actual retrofit, for example the dismantling of the existing circuitbreaker, installation of the new circuit-breaker, start-up and high voltage testing takes approximately 4 weeks.

Scope of delivery
Circuit-breaker 8DN8, 3-phase encapsulated, including supporting structure SF6 gas (2 x 40 kg bottles to ensure problem-free conversion); SF6 gas from the old 8D1/2 breaker is reused) 2 adapters from 3-phase encapsulated circuit-breaker to single-phase switchgear Small parts such as sealing material, filter material, etc. Control cubicle adaptation components or complete new control cubicle

The scope of delivery comprises:

Life time expectation of existing GIS without new circuit-breaker

A life expectancy > 50 years is predicted for the remaining GIS components, provided that the Siemens maintenance recommendations have been followed as described in the operating manual. Tests on the gastight insulators of an over 40-year old 8D2 GIS did not show any discrepancies. The insulators did not produce any partial discharges. Naturally, if desired, a retrofit can be carried out on the existing disconnector and earthing switches. These devices can then be equipped with the latest motor drives.

10

Type tests

Type tests are available for the retrofit 8DN8-circuit-breaker.

Page 21 of 23

11

Options
Local control cubicle, including control cable Service measures on the bays in conjunction with the planned retrofit Retrofitting of the disconnector / earthing switch drives with the latest generation of drives Overhaul of the dismantled 8D1/8D2 circuit-breaker Decentralized SF6 gas monitoring Replacement of old cast-resin voltage transformer with SF6-insulated transformer UHF antennas

Page 22 of 23

Published by and copyright 2011: Siemens AG Energy Sector Freyeslebenstrasse 1 91058 Erlangen, Germany Siemens AG Energy Sector Power Distribution Division Transmission and Distribution Services Humboldtstrasse 59 90459 Nuremberg, Germany For more information, please contact our Customer Support Center. Phone: +49 180/524 70 00 Fax: +49 180/524 24 71 (Charges depending on provider) E-mail: support.energy@siemens.com Power Distribution Division Transmission and Distribution Services Order No. SE_AS_1010e_W3233-8D1D2Retrofit Printed in Germany
Printed on elementary chlorine-free bleached paper. All rights reserved. Trademarks mentioned in this document are the property of Siemens AG, its affiliates, or their respective owners. Subject to change without prior notice. The information in this document contains general descriptions of the technical options available, which may not apply in all cases. The required technical options should therefore be specified in the contract.