0% found this document useful (0 votes)
40 views

Core Team: Date (Orig) : Date (Rev)

This document outlines a manufacturing process with inputs and outputs specified along with process specifications and control limits. It also lists the current control method, responsible parties, location, and timing for the process as well as a reaction plan.

Uploaded by

Michael Wu
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views

Core Team: Date (Orig) : Date (Rev)

This document outlines a manufacturing process with inputs and outputs specified along with process specifications and control limits. It also lists the current control method, responsible parties, location, and timing for the process as well as a reaction plan.

Uploaded by

Michael Wu
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Core Team:

Date (Orig): Date (Rev):

Process Step

Input

Output

Process Spec (LSL, USL, Target)

Cpk / Date (Sample Size)

Measure %R&R or ment P/T System

Current Control Method (from FMEA)

Who

Date (Orig): Date (Rev):

Where

When

Reaction Plan

You might also like