The document provides an overview of various drilling fluid and drilling operation programs available in the PRO-2000 drilling software. The programs are organized into sections that address topics like hydraulics, mud properties and systems, hole displacement, stuck pipe issues, well control, pressure control, tank volumes, formation tests, drilling operations, directional drilling, and solids analysis. The software was developed by A.J. Andary to provide calculations and analysis to assist drilling operations.

Uploaded by

scrbdgharavi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
386 views72 pages

PRO2000

The document provides an overview of various drilling fluid and drilling operation programs available in the PRO-2000 drilling software. The programs are organized into sections that address topics like hydraulics, mud properties and systems, hole displacement, stuck pipe issues, well control, pressure control, tank volumes, formation tests, drilling operations, directional drilling, and solids analysis. The software was developed by A.J. Andary to provide calculations and analysis to assist drilling operations.

Uploaded by

scrbdgharavi
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 72

PRO-2000 DRILLING FLUID PROGRAMS

HYDRAULICS I.
Annular Hydraulics Bit Hydraulics Optimized Bit Hydraulics Carrying Capacity Index (CCI) Slip Velocity

WATER MUDS II.


Aklalinities Rheology n & k Raise Mud Wt. Lower Mud Wt. Mix Two Muds

OIL MUDS III.


Build Oil Muds Calculate O/W ratio Change O/W Ratio Lower Mud Wt. Blend Two Oil Muds

IV.

HOLE DISPLACEMENT
Displace in Casing Displace in Open Hole

V.

STUCK PIPE
Dogleg Severity Stuck Pipe

VI.

WELL CONTROL
Well Kill Fracture Gradient

PRESSURE CONTROL VII.


Equivalent Mud Wt. Circulating Pressure Hydrostatic Pressure

VOLUMES IIX.
Rectangular Tank Vertical Cylindrical Tank Horizontal Cylindrical Tank

MISC. PROGRAMS IX.


Formation Leak-Off Test Packer Calculation Set A Balanced Plug

DRILLING OPERATION X.
Fill Hole on Trips Find Hole in Pipe Pump Output

XI.

DIRECTIONAL Basic Curve


Straight Section Projected Target

XII.

SOLIDS ANALYSES
Non-Weighted Mud Weighted Mud

* See Disclaimer below:

Considerable care was exercised in developing this software. However, McCord Testing Equipment
or A.J. Andary make no warranty regarding the accuracy of using this software and shall not be held liable for any damages resulting from its use. Developed By: Available at: A.J. Andary Yukon, Oklahoma McCord Testing Equipment Oklahoma City, Oklahoma 73127 Phone (405) 787-9124

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

Operator: Well Name: Date:

Prepared By: Phone:


Well Kill Input Data
True vertical depth Casing depth Casing shoe test .. Mud wt. . Shut in drill pipe pressure . Shut in casing pressure .. Trip margin (50-100 psi) . Drill collar capacity Drill collar length DC annular volume . Hevi-wt drill pipe capacity Hevi-wt drill pipe length Hevi-wt drill pipe annular volume DP capacity .. DP length .. DP annular volume/open hole .. DP annular volume/in casing . Kill rate pressure .. Casing burst pressure Mud volume in pits .. Gallons/stroke ft ft ppg ppg psi psi psi bbl/ft ft bbl/ft bbl/ft ft bbl/ft bbl/ft ft bbl/ft bbl/ft psi psi bbls gal/stroke

Well Kill Output Data


Mud wt. equivalent of kick . Kill mud wt. required . Initial circulating pressure Final circulating pressure . Do not exceed psi on casing Drill string capacity .. Surface to bit .. Ann. volume in open hole .. Ann. volume in casing .. Total ann. volume . Bit to choke Total circulation volume . Total circulation Barite required ppg ppg psi psi bbls strokes bbls bbls bbls strokes bbls strokes 100# sxs

PRESSURE REDUCTION SCHEDULE


STEP STROKES PRESSURE BBLS

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

OPTIMIZED BIT HYDRAULICS


Date: Operator: Well Name: Legal: County: State: Prepared By: Drilling Contractor: Rig Number:

INPUT DATA
Depth (ft) : Hole Size (in) : Surface Csg. Size (in): Intermediate Csg Size (in): Drilling Liner Size (in) : DC Size, String #1 (in) : DC Size, String #2 (in) : DP Size (in) : Mud Wt. (ppg) : Pump Output (GPM): % Hole Washout : Surface Csg. Set @ : Intermediate Csg Set @ : Drilling Liner Set @ : DC Length, String #1 (ft) : DC Length, String #2 (ft) : Max. Operating Pressure (psi): 2300 Press. Loss @ Motor (psi): Surface Equipment Case # (1-4): 0

Surface Csg. I.D. (in) : Intermediate Csg. I.D. (in) : Drilling Liner I.D. (in) : DC I.D., String #1 (in) : DC I.D., String #2 (in) : DP I.D. (in) :

#N/A #N/A #N/A #N/A #N/A 3.64

Conventional Bit, Number of Jets :

OUTPUT DATA
Recommended Jets Pump Output Jet Velocity Horsepower Impact Force Circulating Pressure Pressure Loss @ the Bit Pressure Loss @ the Bit

gal/min ft/sec hop/sq.in lbf/sq.in psi psi %

Site Consultants

P.O. Box 984 ray, Texas 79086

ED BIT HYDRAULICS

NPUT DATA

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

ANNULAR HYDRAULICS
Date: Operator: Well Name: Legal: County: State: Prepared By: Drilling Contractor: Rig Number:

INPUT DATA
Depth (ft) : Hole Size (in) : Last Casing Set @ (ft) : 18550 4 3/4 17242 % Hole Washout : Last Casing I.D. (in) : 5 4 8/9

Check Box if a Drlg Liner has been Set.

DC Size, String #1 (in) : DC Size, String #2 (in) : Hevi Wt. DP Size (in) : DP Size (in) :
Mud Wt. (ppg) :

3 1/2 3 1/2 2 7/8 16.4 102

DC Length, String #1 (ft) : 979 DC Length, String #2 (ft) : Hevi-Wt. DP Lenght (ft) : 14038 Plastic Viscosity : Pump Output (spm) : 51 52

Pump Output (gpm) :

DC I.D., String #1 (in) : DC I.D., String #2 (in) : Hevi Wt. DP I.D. (in) : DP I.D. (in) : Yield Point : Pit Volume (bbls) :

1.5 2.86 2.151 16 457

OUTPUT DATA
Pipe Capacity = Surface to Bit = Surface to Bit = Annular Volume = Bottoms Up = Bottoms UP = 115 47 2,444 225 93 4,836
bbls min strokes bbls min strokes bbls bbls min strokes

Critical Velocity @ Drill Collar #1 = Annular Velocity @ Drill Collar #1 =


Laminar Flow @ DC #1

373 198

ft/min ft/min ft/min ft/min

Critical Velocity @ Drill Collar #2 = Annular Velocity @ Drill Collar #2 = Critical Velocity @ Drill Pipe = Annular velocity @ Drill Pipe =
Laminar Flow @ DP

312 150

ft/min ft/min

Hole Volume = 340 Total System Volume = 797 Total Circulating Time = 328 Total Circulation = 17,056

ECD @ the Bit = ECD @ Casing Seat =

18.99 18.85

ppg ppg

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

HOLE VOLUME
Date: Operator: Well Name: Prepared By: Drilling Contractor: Rig Number:

INPUT DATA
Depth (ft) : Hole Size (in) : Last Casing Set @ (ft) :
Check Box if a Drlg Liner has been Set.

% Hole Washout : Last Casing I.D. (in) :

DC Size, String #1 (in) : DC Size, String #2 (in) : Hevi Wt. DP Size (in) : DP Size (in) :

DC Length, String #1 (ft) : DC Length, String #2 (ft) : Hevi Wt. DP Lenght (ft) :

DC I.D., String #1 (in) : DC I.D., String #2 (in) : Hevi Wt. DP I.D. (in) : DP I.D. (in) :

3.68

OUTPUT DATA
Pipe Capacity: Ann. Vol. (Open Hole): Ann. Vol. (Cased Hole): Total Annular Volume: Hole Volume (Pipe In): Hole Volume (Pipe Out) : 0 0 0 0 0 0 bbls bbls bbls bbls bbls bbls

PRO 2000

HYDRAULICS
1. 2. 3. 4. 5. 6.
Annular Hydraulics Bit Hydraulics Optimized Bit Hydraulics Carrying Capacity Index (CCI) Slip Velocity Surge & Swab afififka

DIRECTORY PRINT

Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .

A.J. Andary

Sheet1(6)

DATABASE

C Pipe Size 2 7/8 3 1/2 4 4 1/2 5 5 1/2

D I.D. (in) 2.151 2.602 3.34 3.64 4.276 4.67

E DC Size 2 7/8 3 4 4 1/4 4 1/2 4 3/4 5 5 1/2 5 3/4 6 6 1/4 6 1/2 6 3/4 7 7 1/4 7 1/2 7 3/4 8 8 1/4 8 1/2 9 9 1/2 9 3/4 10 11 12

F I.D.(in) 1.25 1.5 1.25 1.5 1.75 2 2 2.25 2.5 2.25 2.5 3.00 3.25 3 3.25 3.5 3.75 3 3.25 3.5 3.5 3.35 3.5 3.75 3.75 4

G CSG Size 4 1/2 4 3/4 5 5 1/2 5 3/4 6 6 5/8 7 7 5/8 8 8 1/8 8 5/8 9 9 5/8 10 10 3/4 11 3/4 12 13 13 3/8 14 16 18 5/8 20 21 1/2 24 1/2

H I.D. (in) 3.64 4.082 4.156 4.778 4.99 5.14 5.675 5.92 6.345 7.386 7.185 7.511 8.032 8.125 9.384 9.45 10.772 11.384 12.22 11.937 13.34 14.688 17.65 18.73 20.51 23.65

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Page 8

Sheet1(6)

Page 9

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

BIT HYDRAULICS
Date: Well Name: Legal: County: State: Engineer : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Hole Size = Mud Weight = Pump Output = Pump Pressure =
Conventional Bit Diamond Bit

inch ppg gpm psi

Number of Jets = FALSE

OUTPUT DATA
Jet Velocity = Horsepower = Impact Force = Pressure Loss @ bit = Pressure Loss @ bit = ft/sec hp/in2 lb.Fc/in2 psi %

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

SLIP VELOCITY
Date: Well Name: Legal: County: State: Engineer : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Hole Size = Hole Washout = Drill Collar Size = Drill Pipe Size = Mud Weight = Plastic Viscosity = Yield Point = Average Diameter of Cuttings = Sp. Gravity of Cuttings = Pump Output = inch % inch inch ppg cp 2 lb/100 ft inch gal/min

OUTPUT DATA
Annular Velocity (DP) = #DIV/0! ft/min Slip Velocity (DP) = #DIV/0! ft/min Relative Velocity (DP) = #DIV/0! ft/min Annular Velocity (DC) = #DIV/0! ft/min Slip Velocity (DC) = #DIV/0! ft/min Relative Velocity (DC) = #DIV/0! ft/min

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

CARRYING CAPACITY INDEX (CCI)


Date: Well Name: Legal: County: State: Engineer : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Mud Weight = Plastic Viscosity = Yield Point = Annular Velocity = ppg cp lbf /100ft2 ft/min.

OUTPUT DATA
Carrying Capacity Index (CCI) = #DIV/0!

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

SURGE & SWAB


Date: Well Name: Legal: County: State: Engineer : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Trip in Hole Trip out of Hole

Depth = Vertical Depth = Hole Size = Drill Collar Size = Drill Pipe Size = Running Pipe Speed = Mud Weight = Plastic Viscosity = Yield Point =

ft ft inch inch inch sec/stand ppg cp. lbf/100 ft2

Hole Washout = Drill Collar Length = Pipe Stand Length =

% ft. ft.

OUTPUT DATA
Surge Pressure = #DIV/0! ppg

PRO 2000

DIRECTORY PRINT

HOLE DISPLACEMENT
1. 2. 3. Displace in Casing Displace in Open Hole Displace in Drilling Liner

Note: You may select any program by clicking it with the mouse. You can return to main MENU by clicking DIRECTORY .

A.J. Andary

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

DISPLACE IN CASING
Date: Operator: Well Name: Legal: County: State: Prepared By:

Drilling Contractor: Rig Number:

INPUT DATA
Depth =

Casing Set @ (ft) : DC Size, String #1 (in) : DC Size, String #2 (in) : Hevi Wt. DP Size (in) : DP Size (in) : Pump Output (gpm) :

5500 5500 7

Casing I.D. (in) : 10 DC Length, String #1 (ft) : 700 DC Length, String #2 (ft) : Hevi-Wt. DP Lenght (ft) : Pump Output (spm) : 110

5 385

DC I.D., String #1 (in) : DC I.D., String #2 (in) : Hevi Wt. DP I.D. (in) : DP I.D. (in) :

3.75

4.3

OUTPUT DATA
Pipe Capacity = Annular Volume = Total Hole Volume = Surface to Bit = " " " = Bottoms Up = " " = Total Hole Volume = Total Circulation = " " = 96 385 481 10 1,150 42 4,620 481 52 5,720 bbls bbls bbls min strokes min strokes bbls min strokes

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

DISPLACE IN OPEN HOLE


Date: Operator: Well Name: Legal: County: State: Prepared By: Drilling Contractor: Rig Number:

INPUT DATA
Depth (ft) : Hole Size (in) : Last Casing Set @ (ft) : 16500 8 3/4 5600

% Hole Washout: Last Casing I.D. (in) :

10 8 1/3

Check Box if a Drlg. Liner has been Set.

DC Size, String #1 (in) : DC Size, String #2 (in) : Hevi Wt. DP Size (in) : DP Size (in) : Pump Output (gpm) :

DC Length, String #1 (ft) : DC Length, String #2 (ft) : Hevi-Wt. DP Lenght (ft) : 5 1/2 348 Pump Output (spm) : 100

DC I.D., String #1 (in) : DC I.D., String #2 (in) : Hevi Wt. DP I.D. (in) : DP I.D. (in) : Pit Volume (bbls) :

4.778 700

OUTPUT DATA
Pipe Capacity = Surface to Bit = Surface to Bit = Annular Volume = Bottoms Up = Bottoms UP = Hole Volume = Total System Volume = Total Circulating Time = Total Circulation = 366 44 4,400 874 105 10,500 1,240 1,940 234 23,400
bbls min strokes bbls min strokes bbls bbls min strokes

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

DISPLACE IN DRILLING LINER


Date: Operator: Well Name: Legal: County: State: Prepared By: Drilling Contractor: Rig Number:

INPUT DATA

Depth = Last Casing Set @ (ft) : Top of Liner Set @ (ft): DC Size, String #1 (in) : DC Size, String #2 (in) : Hevi Wt. DP Size (in) : DP Size (in) : Pump Output (gpm) :

16,500 Last Casing I.D. (in) : Bottom of Liner Set @ (ft) : DC Length, String #1 (ft) : DC Length, String #2 (ft) : Hevi-Wt. DP Lenght (ft) : Pump Output (spm) : Liner I.D. (in) : DC I.D., String #1 (in) : DC I.D., String #2 (in) : Hevi Wt. DP I.D. (in) : DP I.D. (in) :

OUTPUT DATA
Pipe Capacity = Surface to Bit = " " " = Annular Volume = Bottoms Up = " " = Total Hole Volume = Total Circulation = " " = 0 bbls #DIV/0! min #DIV/0! strokes 0 bbls #DIV/0! min #DIV/0! strokes 0 bbls #DIV/0! min #DIV/0! strokes

PRO 2000

PRESSURE CONTROL
1. 2. 3. 4. Equivalent Mud Wt. Circulating Pressure Hydrostatic Pressure d Exponent

DIRECTO PRINT

Note: You may select any program by clicking with the mouse. You may return to the main MENU by clicking DIRECTORY .

A.J. Andary

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

EQUIVALENT MUD WT.


Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Vertical depth of Casing Shoe = Mud Weight in Hole = Pressure Required to Fracture Formation = ft. ppg psi

OUTPUT DATA
Equivalent Mud Wt. Required = #DIV/0! ppg

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

CIRCULATING PRESSURE
Date: Operator: Well Name: Legal: County: State: Prepared By: Drilling Contractor: Rig Number:

INPUT DATA
Depth (ft) : Hole Size (in) : Surface Csg. Size (in): Intermediate Csg Size (in): Drilling Liner Size (in) : DC Size, String #1 (in) : DC Size, String #2 (in) : DP Size (in) : Mud Wt. (ppg) : Pump Output (GPM):
Conventional Bit : Diamond Bit :

% Hole Washout: Surface Csg. Set @ : Intermediate Csg Set @ : Drilling Liner Set @ : DC Length, String #1 (ft) : DC Length, String #2 (ft) :

Surface Csg. I.D. (in) : Intermediate Csg. I.D. (in) : Drilling Liner I.D. (in) : DC I.D., String #1 (in) : DC I.D., String #2 (in) : DP I.D. (in) :

Press. Loss @ Motor & MWD (psi): Surface Equipment Case # (1-4): Enter Number of Jets

OUTPUT DATA
Circulating Pressure Pressure Loss @ the Bit Pressure Loss @ the Bit #DIV/0! #DIV/0! #DIV/0! psi psi %

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

HYDROSTATIC PRESSURE
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Total Vertical Depth = Mud Weight = ft. ppg

INPUT DATA
Pressure Gradient = Hydrostatic Pressure = 0 0 psi/ft. psi/ft.

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

d EXPONENT
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Hole Size = Rate of Penetration = Weight on Bit = Bit Rotation = inch ft./hr. lbs RPM

OUTPUT DATA
d Exponent = #DIV/0!

PRO 2000

DIRECTORY PRINT

SOLIDS ANALYSES
1. 2. Non-Weighted Mud Weighted Mud

Note: You may select any program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .

A.J. Andary

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

NON-WEIGHTED MUDS
Date: Well Name: Legal: County: State: Prepared By : Operator: Operator: Drilling Contractor: Rig Number:

INPUT DATA
Mud Weight = Oil Content = Chlorides = Bentonite = ppg % ppm ppb

OUTPUT DATA
Bentonite Content = Drill Solids = Drill Solids = 0.0 -59.0 -537 % % ppb

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

WEIGHTED MUDS
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Mud Weight = Sp. gr. of Wt. Material = Chlorides = Retort Oil = Retort Solids = Bentonite Content = MBC of Shale = ppg ppm % % ppb ml MB / 100 lbs Shale

OUTPUT DATA
Low Gravity Solids = Low Gravity Solids = High Gravity Solids = High Gravity Solids = Total Bentonite = Drilled Bentonite = Commercial Bentonite = Drill Solids = Drill Solids = Average Sp. Gravity = Corrected Solids = #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0.0 0 0 #DIV/0! #DIV/0! #DIV/0! 0.0 % ppb % ppb % ppb ppb % ppb %

PRO 2000

WATER MUDS
1. 2. 3. 4. 5. Alkalinities Rheology n & k Raise Mud Weight Lower Mud Weight Mix Two Muds

DIRECTORY PRINT

Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .

A.J. Andary

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

ALKALINITY
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Pf = Mf = Pm = Water Content =

OUTPUT DATA

Carbonates = Hydroxyl Ions = Bicarbonates = Excess Lime = Lime Needed =

0 0 0 0 0

EPM EPM EPM lb/bbl lb/bbl

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

RHEOLOGY n & k
Date: Well Name: Legal: County: State: Prepared By: Operator: Drilling Contractor: Rig Number:

INPUT DATA
Hole Size = Hole Washout = Drill Collar Size = Drill Pipe Size = 600 RPM Reading = 300 RPM Reading = Pump Output = inch % inch inch rpm rpm gal/min

OUTPUT DATA
n= K (DC) = Shear Rate (DC) = K (DP) = Shear Rate (DP) = #DIV/0! #DIV/0! Dynes-Sec #DIV/0! 1/Sec #DIV/0! Dynes-Sec #DIV/0! 1/Sec

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

RAISE MUD WEIGHT


Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Mud Volume = Present Mud Wt. = Desired Mud Wt. = bbls ppg ppg

OUTPUT DATA
Barite Required = Volume Increase = Final Volume = 0 0 0 sxs bbls bbls

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

LOWER MUD WEIGHT


Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Mud Volume = Present Mud Wt. = Desired Mud Wt. = bbls ppg ppg

OUTPUT DATA
Water Required = Final Volume = 0 0 bbls bbls

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

MIX TWO MUDS


Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA

Volume of Mud # 1 = Mud Wt. of Mud # 1 = Volume of Mud # 3 = Mud Wt. of Mud # 2 =

bbls ppg bbls ppg

OUTPUT DATA
Final Volume = 0 bbls Final Mud Wt. = #DIV/0! ppg

PRO 2000

DIRECTOR PRINT

STUCK PIPE
1. 2. 3.

Dogleg Severity
Stuck Pipe Spot Oil

Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .

A.J. Andary

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

DOGLEG SEVERITY
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Survey #1 = Angle Build Rate = Survey #2 = Angle Build rate = Degrees Degrees / 100 ft. Degrees Degrees / 100 ft.

OUTPUT DATA

Dogleg Severity = #DIV/0! Degrees

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

STUCK PIPE
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Before you begin pipe stretch measurements, fix a point on drill pipe that would allow few pulls above string weight. Pull sufficient tension above string weight and mark as point "A". Pull three (3) more times, recording each time the pull in pounds (lbs) and pipe stretch in inches. Total Depth =
Length of DC #1 = Length of DC #2 = Length of Hevi-Wt. DP =

ft. ft. ft.


ft.

Wt. of DC #1 =
Wt. of DC #2 = Wt. of Hevi-Wt DP = Wt. of DP =

lbs/ft. lbs/ft. lbs/ft. lbs/ft.

Pull #1 = Pipe Stretch of Pull #1 = Pull #2 = Pipe Stretch of Pull #2 = Pull # 3 = Pipe Stretch of Pull #3 =

lbs. inches lbs. inches lbs. inches

OUTPUT DATA
Pipe is Stuck @ #DIV/0! ###

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

SPOT OIL
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Depth = 10,000 ft. Hole Size = 7 7/8 inch Hole Washout = 15 % Last Casing Set @ = Last Casing I.D. = Drill Collar Size (string #1) = Drill Collar Length (string #1) = Drill Collar I.D. (string #1) = Drill Collar Size (string #2) = Drill Collar Length (string #2) = Drill Collar I.D. (string #2) = Hevi-Wt. Drill Pipe Size = Hevi-Wt. Drill Pipe Length = Hevi-Wt. DP I.D. = Drill Pipe Size = Drill Pipe I.D. = Length of Hole to be Covered = Amount of Oil to Leave in Pipe = Pump Output = 4.5 3.68 1,000 25 4.6 1,500 ft. 9.125 inch 6.5 500 2.75 inch ft. inch inch ft. inch inch ft. inch inch inch ft. bbls gallons/stroke

OUTPUT DATA
Volume of Oil Required = Displace Oil with Displace Oil with 49 99 904 bbls bbls of mud strokes

PRO 2000

DIRECTORY PRINT

VOLUMES 1. 2. 3. 4. Rectangular Tank Vertical Cylindrical Tank Horizontal Cylindrical Tank Hole Volume

Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .

A.J. Andary

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

RECTANGULAR TANK

Date: Well Name: Legal: County: State:

Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Length of Tank = Width of Tank = Height of Tank = Height of Fluid = ft. ft. ft. in.

OUTPUT DATA
Volume of Fluid = 0 bbls Volume of Tank = 0 bbls Capacity of Tank = #DIV/0! bbl/ft. Capacity of Tank = #DIV/0! bbl/in.

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

VERTICAL CYLINDRICAL TANK

Date: Well Name: Legal: County: State:

Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Diameter of Tank = Height of Tank = Height of Fluid = ft ft inch

OUTPUT DATA
Volume of Fluid = #DIV/0! bbls Volume of Tank = 0 bbls Capacity of tank = #DIV/0! bbl/ft. Capacity of tank = #DIV/0! bbl/in.

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

HORIZONTAL CYLINDRICAL TANK


Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Diameter of Tank = Length of Tank = Height of Fluid = Feet Feet Inches

OUTPUT DATA
Volume of Fluid = #DIV/0! gallons Volume of Fluid = #DIV/0! bbls Volume of Tank = 0 gallons Volume of Tank = 0.0 bbls

PRO 2000

OIL MUDS
1. 2. 3. 4. 5. 6. Build Oil Mud Calculate O/W Ratio Change O/W Ratio Lower Mud Weight Blend Two Oil Muds Calculate Water Activity

DIRECTOR PRINT

Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .

A.J. Andary

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

BUILD OIL MUDS


Date : Operator: Well Name: Legal: County: State: Engineer: Drilling Contractor: Rig Number:

INPUT DATA
Desired volume = Desired Mud Wt. = Desired O/W ratio = Wt. of Oil (e.g. Diesel) = Wt. of Brine = bbls ppg ppg ppg

OUTPUT DATA
Oil Required = Brine Required = Barite Required = Volume gain = O/W Ratio = Final Volume = #VALUE! #VALUE! #VALUE! #VALUE! 0 #VALUE! bbls bbls sxs bbls bbls

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

CALCULATE O/W RATIO


Date: Operator: Well Name: Legal: County: State: Engineer: Drilling Contractor: Rig Number:

INPUT DATA
Retort Oil = Retort Water = % %

OUTPUT DATA
Oil/water Ratio = #DIV/0!

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

CHANGE O/W RATIO


Date: Well Name: Legal: County: State: Prepared By: Operator: Drilling Contractor: Rig Number:

INPUT DATA
Mud Volume = Mud Wt. = Retort Oil = Retort Water = Enter Desired O/W Ratio ###### ppg #VALUE! #VALUE! #VALUE! #### bbls ###### bbls bbls ppg % %

OUTPUT DATA
Final Mud Wt. = Base Mud = #DIV/0! #VALUE! #### #### #### #### #### #### ppg bbls bbls bbls

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

LOWER MUD WEIGHT


Date: Well Name: Legal: County: State: Engineer : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Mud Volume = Mud Weight = Retort Oil = Retort Water = Weight of Oil = Weight of Brine = Desired Mud Wt. = 100 12 61 15 6.9 10.5 10 bbl ppg % % ppg ppg ppg 150 bbls

O/W Ratio is 80 / 20

If You need a specific final volume, enter volume here:

OUTPUT DATA
Final Mud Wt. = Base Mud Required = Oil Required = Brine Required = Final Volume = 10.0 82 55 14 150 ppg bbls bbls bbls bbls

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

BLEND TWO OIL MUDS


Date: Well Name: Legal: County: State: Engineer : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Mud #1 Volume Available = Retort Oil = Retort Water = Mud Wt. = Volume Available = Retort Oil = Retort Water = Mud Wt. = bbls % by vol. % by vol. ppg bbls % by vol. % by vol. ppg

O/W Ratio of Mud #1 =

Mud #2

O/W Ratio of Mud #2 =

I wish to have a specific final volume

I do not wish to have a specific final volume

OUTPUT DATA
Final Mud Wt = O/W Ratio = Volume Mud #1 = Volume Mud #2 = Final Volume = #DIV/0! #DIV/0! 0 0 0 ppg bbls bbls bbls

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

CALCULATE WATER ACTIVITY


Date: Well Name: Legal: County: State: Engineer : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Relative Humidity of CaCl2 = Relative Humidity of Nacl = Relative Humidity of Mud Sample = % % %

OUTPUT DATA
Water Activity = %

PRO 2000

DIRECTORY PRINT

WELL CONTROL
1. 2. 3. Well Kill Fracture Gradient Spot A Pill

Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .

A.J. Andary

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

FRACTURE GRADIENT
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Estimated Pore Pressure = ppg

OUTPUT DATA
Fracture Gradient = ppg

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

SPOT A PILL
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Spot Pill @ Hole Size = Last Casing Set @ ft. in. ft.

Hole Washout = Last casing I.D. =

% in.

Check Box if Drlg. Liner has been set.

DC Size (string #1) = DC Size (string #2) = Heavy Wt. DP Size = DP Size = Hole to be covered =

in in in in ft.

DC Length (string 1) = DC Length (string 2) = Heavy Wt. DP Length =

ft ft ft

DC I.D. (string 1) = DC I.D. (string 2) = Heavy Wt. DP I.D. = Drill Pipe I.D. =

in in in in

Pump Output =

gal/stroke

OUTPUT DATA
Volume of Pill = Displace with Displace with 0 0 #DIV/0! bbls bbls of mud strokes

PRO 2000

DIRECTOR PRINT

MISC. PROGRAMS
1. 2. 3. 4. Formation Leakoff Test Packer Calculation Set A Balanced Plug Loan Payment

Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .

A.J. Andary

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

FORMATION LEAK-OFF TEST


Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Total Vertical Depth of Casing Shoe = Equivalent Mud Weight Required = Mud Weight in Hole = 17,242 18.5 14.3 ft. ppg ppg

OUTPUT DATA
Surface Fracture Pressure Required = 3,766 psi.

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

PACKER CALCULATION
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Casing I.D. = Casing Weight = Depth of Packer = Size of Tubing = Tubing Weight = Tubing I.D. = Total Weight of Tubing on Packer = Mud Weight in Annulus = Weight of Fluid in Tubing = in. lbs/ft. ft. in. lbs/ft. in. lbs. ppg ppg

OUTPUT DATA
Pressure Required to Set Packer = #DIV/0! psi

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

SET A BALANCED PLUG


Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Select "Cased" or "Open" hole
Cased Hole Open Hole

Casing I.D. = Depth = Pipe Size (string #1) = Length of Pipe (String #1) = Pipe I.D. (string #1) = Pipe Size (String #2) = Pipe I.D. (string #2) = Size of Plug = Yield of Cement = Volume of water ahead of plug = Pump Output =

in. ft. in. ft. in. in. in. sxs of cement ft3/sx. bbls gal/stroke

OUTPUT DATA
Height of Plug = Top of Plug = Water behind Plug = Displace with #DIV/0! #DIV/0! #DIV/0! #DIV/0! ft. ft. bbls bbls of Mud

Displace with #DIV/0! strokes

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

PUMP OUTPUT
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Duplex Pump Triplex Pump

Liner Size = Stroke Length = Rod Size = Efficiency = Pump Output =

inch inch inch % Strokes/Min.

OUTPUT DATA
Pump Output = 0.00000 bbl/stroke " " = 0.00 bbl/min. " " = 0.00 gal/stroke " " = 0 gal/min.

LOAN PAYMENT
INPUT DATA
Auto Loan Bank Loan

Total Purchase Price = Down Payment = Annual Interest Rate = Number of Months =

dollars dollars % months

OUTPUT DATA
Monthly payment = Total Payment = Interest paid = #DIV/0! #DIV/0! #DIV/0! dollars/month dollars dollars

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086 0 0

Carrying Capacity Index


Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Plastic viscosity = Yield Point = 16 10

OUTPUT DATA

Carrying Capacity Index (CCI) =

0.50

0.691934 177.5599 0.498233

PRO 2000

DIRECTORY PRINT

DRILLING OPERATIONS
1. 2. 3. Fill Hole on Trips Find Hole in Pipe Pump Output

Note: You may select a program by clicking it with the mouse. You mar return to the main menu by clicking DIRECTORY .

A.J. Andary

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

FILL HOLE ON TRIP


Date: Operator: Well Name: Prepared By :

INPUT DATA
Depth = Drill Collar Size (string #1) = Drill Collar Length (string #1) = Drill Collar I.D. (string #1) = Drill Collar Size (string #2) = Drill Collar Length (string #2) = Drill Collar I.D. (string #2) = Heavy-Wt. DP Size = Heavy-Wt. DP Length = Heavy-Wt. DP I.D. = Drill Pipe Size = Drill Pipe I.D. = Average Stand Length = Pump Output = ft. in. ft. in. in. ft. in. in. ft. in. in. in. ft. gal/stroke

OUTPUT DATA
Fill per 5 Stds. Hevi-Wt. Drill Pipe = " " " " = 0.00 #DIV/0! 0.00 #DIV/0! 0.00 #DIV/0! 0.00 #DIV/0! 0 #DIV/0! bbls strokes

Fill per 5 Stds Drill Pipe " " " " " Fill per Std. of DC #2 " " " " Fill per Std. of DC #1 " " " " Total Hole Fill " " "

= = = = = = = =

bbls strokes bbls strokes


bbls strokes

bbls strokes

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

FIND HOLE IN PIPE


Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Depth = Drill Collar Length (string #1) = Drill Collar I.D. (string #1) = Drill Collar Length (string #2) = Drill Collar I.D.(string #2) = Hevi-Wt. Drill Pipe Length = Hevi-Wt. Drill Pipe I.D. = Drill Pipe I.D. = Pump Output = Number of Strokes Took Flag Down = feet feet inch feet inch feet inch inch Gal/stroke Strokes

OUTPUT DATA

#DIV/0! #DIV/0! feet

PRO 2000

DIRECTORY PRINT

Directional Drilling
1. 2. 3. 3. Basic Curve Straight Section Projected Target Complex Curve

Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .

A.J. Andary

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

BASIC CURVE
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Survey #1 = Depth @ Survey #1 = Survey #2 = Depth @ Survey #2 = deg. ft. deg. ft.

OUTPUT DATA
Length of Curve = 0 ft. Angle Build Rate = #DIV/0! deg./100ft. Vertical Height of Curve = #DIV/0! ft. Displacement = #DIV/0! ft.

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

STRAIGHT SECTION
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Survey #1 = Depth @ Survey #1 = Survey #2 = Depth @ Survey #2 = deg. ft. deg. ft.

OUTPUT DATA
Length of Section = Vertical Height = Displacement = 0 0 0 ft. ft. ft.

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

PROJECTED TARGET
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Present Measured Depth = Present Vertical Height = Present Displacement = Hole Angle = Angle Build Rate = Projected Measured Depth = ft. ft. ft. deg. deg./100 ft. ft.

OUTPUT DATA
Total Vertical Depth = Total Displacement = 0 0 ft. ft.

Sheet17

DIRECTORY PRINT

ADDITIONAL PROGRAMS
1. 2. 3. 4. Nipple Gas Flow Critical Rate of Penetration Total Flow Area (TFA) Drill String Design

Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .

Page 65

Sheet17

Page 66

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

Nipple Gas Flow


Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT Choke Size = Pressure Reading = Gravity = Flowing Temperature = 0.2500 25 68 inch psig
o

OUTPUT Flow Rate = MCF/Day

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

Critical Rate Of Penetration

Date: Well Name: Legal: County: State:

Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT
Cost Per Foot = Rate of Penetration = $/ft Ft/hr.

OUTPUT
Critical Rate of Penetration = 0 $/hr.

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

Total Flow Area


Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT Number of Bit Nozzles = Nozzle # 1 = Nozzle #2 = Nozzle #3 = 3 inch Inch Inch

OUTPUT Total Flow Area of Bit = 0 in2

Sheet17(4)

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

Date: Well Name: Legal: County: State:

Prepared By : Operator: Drilling Contractor: Rig Number:

Depth = Drill Collar Length (string #1) = Drill Collar I.D. (string #1) = Drill Collar Length (string #2) = Drill Collar I.D.(string #2) = Hevi-Wt. Drill Pipe Length = Hevi-Wt. Drill Pipe I.D. = Drill Pipe I.D. = Pump Output = Number of Strokes Took Flag Down =

feet feet inch feet inch feet inch inch Gal/stroke Strokes

Hole in pipe is at the bit

feet

Page 71

Sheet17(5)

Well Site Consultants


P.O. Box 984 Sunray, Texas 79086

PROJECTED TARGET
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:

INPUT DATA
Present Measured Depth = Present Vertical Height = Present Displacement = Hole Angle = Angle Build Rate = Projected Measured Depth = ft. ft. ft. deg. deg./100 ft. ft.

OUTPUT DATA
Total Vertical Depth = Total Displacement = 0 0 ft. ft.

Page 72