PRO2000
PRO2000
HYDRAULICS I.
Annular Hydraulics Bit Hydraulics Optimized Bit Hydraulics Carrying Capacity Index (CCI) Slip Velocity
IV.
HOLE DISPLACEMENT
Displace in Casing Displace in Open Hole
V.
STUCK PIPE
Dogleg Severity Stuck Pipe
VI.
WELL CONTROL
Well Kill Fracture Gradient
VOLUMES IIX.
Rectangular Tank Vertical Cylindrical Tank Horizontal Cylindrical Tank
DRILLING OPERATION X.
Fill Hole on Trips Find Hole in Pipe Pump Output
XI.
XII.
SOLIDS ANALYSES
Non-Weighted Mud Weighted Mud
Considerable care was exercised in developing this software. However, McCord Testing Equipment
or A.J. Andary make no warranty regarding the accuracy of using this software and shall not be held liable for any damages resulting from its use. Developed By: Available at: A.J. Andary Yukon, Oklahoma McCord Testing Equipment Oklahoma City, Oklahoma 73127 Phone (405) 787-9124
INPUT DATA
Depth (ft) : Hole Size (in) : Surface Csg. Size (in): Intermediate Csg Size (in): Drilling Liner Size (in) : DC Size, String #1 (in) : DC Size, String #2 (in) : DP Size (in) : Mud Wt. (ppg) : Pump Output (GPM): % Hole Washout : Surface Csg. Set @ : Intermediate Csg Set @ : Drilling Liner Set @ : DC Length, String #1 (ft) : DC Length, String #2 (ft) : Max. Operating Pressure (psi): 2300 Press. Loss @ Motor (psi): Surface Equipment Case # (1-4): 0
Surface Csg. I.D. (in) : Intermediate Csg. I.D. (in) : Drilling Liner I.D. (in) : DC I.D., String #1 (in) : DC I.D., String #2 (in) : DP I.D. (in) :
OUTPUT DATA
Recommended Jets Pump Output Jet Velocity Horsepower Impact Force Circulating Pressure Pressure Loss @ the Bit Pressure Loss @ the Bit
Site Consultants
ED BIT HYDRAULICS
NPUT DATA
ANNULAR HYDRAULICS
Date: Operator: Well Name: Legal: County: State: Prepared By: Drilling Contractor: Rig Number:
INPUT DATA
Depth (ft) : Hole Size (in) : Last Casing Set @ (ft) : 18550 4 3/4 17242 % Hole Washout : Last Casing I.D. (in) : 5 4 8/9
DC Size, String #1 (in) : DC Size, String #2 (in) : Hevi Wt. DP Size (in) : DP Size (in) :
Mud Wt. (ppg) :
DC Length, String #1 (ft) : 979 DC Length, String #2 (ft) : Hevi-Wt. DP Lenght (ft) : 14038 Plastic Viscosity : Pump Output (spm) : 51 52
DC I.D., String #1 (in) : DC I.D., String #2 (in) : Hevi Wt. DP I.D. (in) : DP I.D. (in) : Yield Point : Pit Volume (bbls) :
OUTPUT DATA
Pipe Capacity = Surface to Bit = Surface to Bit = Annular Volume = Bottoms Up = Bottoms UP = 115 47 2,444 225 93 4,836
bbls min strokes bbls min strokes bbls bbls min strokes
373 198
Critical Velocity @ Drill Collar #2 = Annular Velocity @ Drill Collar #2 = Critical Velocity @ Drill Pipe = Annular velocity @ Drill Pipe =
Laminar Flow @ DP
312 150
ft/min ft/min
Hole Volume = 340 Total System Volume = 797 Total Circulating Time = 328 Total Circulation = 17,056
18.99 18.85
ppg ppg
HOLE VOLUME
Date: Operator: Well Name: Prepared By: Drilling Contractor: Rig Number:
INPUT DATA
Depth (ft) : Hole Size (in) : Last Casing Set @ (ft) :
Check Box if a Drlg Liner has been Set.
DC Size, String #1 (in) : DC Size, String #2 (in) : Hevi Wt. DP Size (in) : DP Size (in) :
DC Length, String #1 (ft) : DC Length, String #2 (ft) : Hevi Wt. DP Lenght (ft) :
DC I.D., String #1 (in) : DC I.D., String #2 (in) : Hevi Wt. DP I.D. (in) : DP I.D. (in) :
3.68
OUTPUT DATA
Pipe Capacity: Ann. Vol. (Open Hole): Ann. Vol. (Cased Hole): Total Annular Volume: Hole Volume (Pipe In): Hole Volume (Pipe Out) : 0 0 0 0 0 0 bbls bbls bbls bbls bbls bbls
PRO 2000
HYDRAULICS
1. 2. 3. 4. 5. 6.
Annular Hydraulics Bit Hydraulics Optimized Bit Hydraulics Carrying Capacity Index (CCI) Slip Velocity Surge & Swab afififka
DIRECTORY PRINT
Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .
A.J. Andary
Sheet1(6)
DATABASE
E DC Size 2 7/8 3 4 4 1/4 4 1/2 4 3/4 5 5 1/2 5 3/4 6 6 1/4 6 1/2 6 3/4 7 7 1/4 7 1/2 7 3/4 8 8 1/4 8 1/2 9 9 1/2 9 3/4 10 11 12
F I.D.(in) 1.25 1.5 1.25 1.5 1.75 2 2 2.25 2.5 2.25 2.5 3.00 3.25 3 3.25 3.5 3.75 3 3.25 3.5 3.5 3.35 3.5 3.75 3.75 4
G CSG Size 4 1/2 4 3/4 5 5 1/2 5 3/4 6 6 5/8 7 7 5/8 8 8 1/8 8 5/8 9 9 5/8 10 10 3/4 11 3/4 12 13 13 3/8 14 16 18 5/8 20 21 1/2 24 1/2
H I.D. (in) 3.64 4.082 4.156 4.778 4.99 5.14 5.675 5.92 6.345 7.386 7.185 7.511 8.032 8.125 9.384 9.45 10.772 11.384 12.22 11.937 13.34 14.688 17.65 18.73 20.51 23.65
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
Page 8
Sheet1(6)
Page 9
BIT HYDRAULICS
Date: Well Name: Legal: County: State: Engineer : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Hole Size = Mud Weight = Pump Output = Pump Pressure =
Conventional Bit Diamond Bit
OUTPUT DATA
Jet Velocity = Horsepower = Impact Force = Pressure Loss @ bit = Pressure Loss @ bit = ft/sec hp/in2 lb.Fc/in2 psi %
SLIP VELOCITY
Date: Well Name: Legal: County: State: Engineer : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Hole Size = Hole Washout = Drill Collar Size = Drill Pipe Size = Mud Weight = Plastic Viscosity = Yield Point = Average Diameter of Cuttings = Sp. Gravity of Cuttings = Pump Output = inch % inch inch ppg cp 2 lb/100 ft inch gal/min
OUTPUT DATA
Annular Velocity (DP) = #DIV/0! ft/min Slip Velocity (DP) = #DIV/0! ft/min Relative Velocity (DP) = #DIV/0! ft/min Annular Velocity (DC) = #DIV/0! ft/min Slip Velocity (DC) = #DIV/0! ft/min Relative Velocity (DC) = #DIV/0! ft/min
INPUT DATA
Mud Weight = Plastic Viscosity = Yield Point = Annular Velocity = ppg cp lbf /100ft2 ft/min.
OUTPUT DATA
Carrying Capacity Index (CCI) = #DIV/0!
INPUT DATA
Trip in Hole Trip out of Hole
Depth = Vertical Depth = Hole Size = Drill Collar Size = Drill Pipe Size = Running Pipe Speed = Mud Weight = Plastic Viscosity = Yield Point =
% ft. ft.
OUTPUT DATA
Surge Pressure = #DIV/0! ppg
PRO 2000
DIRECTORY PRINT
HOLE DISPLACEMENT
1. 2. 3. Displace in Casing Displace in Open Hole Displace in Drilling Liner
Note: You may select any program by clicking it with the mouse. You can return to main MENU by clicking DIRECTORY .
A.J. Andary
DISPLACE IN CASING
Date: Operator: Well Name: Legal: County: State: Prepared By:
INPUT DATA
Depth =
Casing Set @ (ft) : DC Size, String #1 (in) : DC Size, String #2 (in) : Hevi Wt. DP Size (in) : DP Size (in) : Pump Output (gpm) :
5500 5500 7
Casing I.D. (in) : 10 DC Length, String #1 (ft) : 700 DC Length, String #2 (ft) : Hevi-Wt. DP Lenght (ft) : Pump Output (spm) : 110
5 385
DC I.D., String #1 (in) : DC I.D., String #2 (in) : Hevi Wt. DP I.D. (in) : DP I.D. (in) :
3.75
4.3
OUTPUT DATA
Pipe Capacity = Annular Volume = Total Hole Volume = Surface to Bit = " " " = Bottoms Up = " " = Total Hole Volume = Total Circulation = " " = 96 385 481 10 1,150 42 4,620 481 52 5,720 bbls bbls bbls min strokes min strokes bbls min strokes
INPUT DATA
Depth (ft) : Hole Size (in) : Last Casing Set @ (ft) : 16500 8 3/4 5600
10 8 1/3
DC Size, String #1 (in) : DC Size, String #2 (in) : Hevi Wt. DP Size (in) : DP Size (in) : Pump Output (gpm) :
DC Length, String #1 (ft) : DC Length, String #2 (ft) : Hevi-Wt. DP Lenght (ft) : 5 1/2 348 Pump Output (spm) : 100
DC I.D., String #1 (in) : DC I.D., String #2 (in) : Hevi Wt. DP I.D. (in) : DP I.D. (in) : Pit Volume (bbls) :
4.778 700
OUTPUT DATA
Pipe Capacity = Surface to Bit = Surface to Bit = Annular Volume = Bottoms Up = Bottoms UP = Hole Volume = Total System Volume = Total Circulating Time = Total Circulation = 366 44 4,400 874 105 10,500 1,240 1,940 234 23,400
bbls min strokes bbls min strokes bbls bbls min strokes
INPUT DATA
Depth = Last Casing Set @ (ft) : Top of Liner Set @ (ft): DC Size, String #1 (in) : DC Size, String #2 (in) : Hevi Wt. DP Size (in) : DP Size (in) : Pump Output (gpm) :
16,500 Last Casing I.D. (in) : Bottom of Liner Set @ (ft) : DC Length, String #1 (ft) : DC Length, String #2 (ft) : Hevi-Wt. DP Lenght (ft) : Pump Output (spm) : Liner I.D. (in) : DC I.D., String #1 (in) : DC I.D., String #2 (in) : Hevi Wt. DP I.D. (in) : DP I.D. (in) :
OUTPUT DATA
Pipe Capacity = Surface to Bit = " " " = Annular Volume = Bottoms Up = " " = Total Hole Volume = Total Circulation = " " = 0 bbls #DIV/0! min #DIV/0! strokes 0 bbls #DIV/0! min #DIV/0! strokes 0 bbls #DIV/0! min #DIV/0! strokes
PRO 2000
PRESSURE CONTROL
1. 2. 3. 4. Equivalent Mud Wt. Circulating Pressure Hydrostatic Pressure d Exponent
DIRECTO PRINT
Note: You may select any program by clicking with the mouse. You may return to the main MENU by clicking DIRECTORY .
A.J. Andary
INPUT DATA
Vertical depth of Casing Shoe = Mud Weight in Hole = Pressure Required to Fracture Formation = ft. ppg psi
OUTPUT DATA
Equivalent Mud Wt. Required = #DIV/0! ppg
CIRCULATING PRESSURE
Date: Operator: Well Name: Legal: County: State: Prepared By: Drilling Contractor: Rig Number:
INPUT DATA
Depth (ft) : Hole Size (in) : Surface Csg. Size (in): Intermediate Csg Size (in): Drilling Liner Size (in) : DC Size, String #1 (in) : DC Size, String #2 (in) : DP Size (in) : Mud Wt. (ppg) : Pump Output (GPM):
Conventional Bit : Diamond Bit :
% Hole Washout: Surface Csg. Set @ : Intermediate Csg Set @ : Drilling Liner Set @ : DC Length, String #1 (ft) : DC Length, String #2 (ft) :
Surface Csg. I.D. (in) : Intermediate Csg. I.D. (in) : Drilling Liner I.D. (in) : DC I.D., String #1 (in) : DC I.D., String #2 (in) : DP I.D. (in) :
Press. Loss @ Motor & MWD (psi): Surface Equipment Case # (1-4): Enter Number of Jets
OUTPUT DATA
Circulating Pressure Pressure Loss @ the Bit Pressure Loss @ the Bit #DIV/0! #DIV/0! #DIV/0! psi psi %
HYDROSTATIC PRESSURE
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Total Vertical Depth = Mud Weight = ft. ppg
INPUT DATA
Pressure Gradient = Hydrostatic Pressure = 0 0 psi/ft. psi/ft.
d EXPONENT
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Hole Size = Rate of Penetration = Weight on Bit = Bit Rotation = inch ft./hr. lbs RPM
OUTPUT DATA
d Exponent = #DIV/0!
PRO 2000
DIRECTORY PRINT
SOLIDS ANALYSES
1. 2. Non-Weighted Mud Weighted Mud
Note: You may select any program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .
A.J. Andary
NON-WEIGHTED MUDS
Date: Well Name: Legal: County: State: Prepared By : Operator: Operator: Drilling Contractor: Rig Number:
INPUT DATA
Mud Weight = Oil Content = Chlorides = Bentonite = ppg % ppm ppb
OUTPUT DATA
Bentonite Content = Drill Solids = Drill Solids = 0.0 -59.0 -537 % % ppb
WEIGHTED MUDS
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Mud Weight = Sp. gr. of Wt. Material = Chlorides = Retort Oil = Retort Solids = Bentonite Content = MBC of Shale = ppg ppm % % ppb ml MB / 100 lbs Shale
OUTPUT DATA
Low Gravity Solids = Low Gravity Solids = High Gravity Solids = High Gravity Solids = Total Bentonite = Drilled Bentonite = Commercial Bentonite = Drill Solids = Drill Solids = Average Sp. Gravity = Corrected Solids = #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0.0 0 0 #DIV/0! #DIV/0! #DIV/0! 0.0 % ppb % ppb % ppb ppb % ppb %
PRO 2000
WATER MUDS
1. 2. 3. 4. 5. Alkalinities Rheology n & k Raise Mud Weight Lower Mud Weight Mix Two Muds
DIRECTORY PRINT
Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .
A.J. Andary
ALKALINITY
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Pf = Mf = Pm = Water Content =
OUTPUT DATA
0 0 0 0 0
RHEOLOGY n & k
Date: Well Name: Legal: County: State: Prepared By: Operator: Drilling Contractor: Rig Number:
INPUT DATA
Hole Size = Hole Washout = Drill Collar Size = Drill Pipe Size = 600 RPM Reading = 300 RPM Reading = Pump Output = inch % inch inch rpm rpm gal/min
OUTPUT DATA
n= K (DC) = Shear Rate (DC) = K (DP) = Shear Rate (DP) = #DIV/0! #DIV/0! Dynes-Sec #DIV/0! 1/Sec #DIV/0! Dynes-Sec #DIV/0! 1/Sec
INPUT DATA
Mud Volume = Present Mud Wt. = Desired Mud Wt. = bbls ppg ppg
OUTPUT DATA
Barite Required = Volume Increase = Final Volume = 0 0 0 sxs bbls bbls
INPUT DATA
Mud Volume = Present Mud Wt. = Desired Mud Wt. = bbls ppg ppg
OUTPUT DATA
Water Required = Final Volume = 0 0 bbls bbls
INPUT DATA
Volume of Mud # 1 = Mud Wt. of Mud # 1 = Volume of Mud # 3 = Mud Wt. of Mud # 2 =
OUTPUT DATA
Final Volume = 0 bbls Final Mud Wt. = #DIV/0! ppg
PRO 2000
DIRECTOR PRINT
STUCK PIPE
1. 2. 3.
Dogleg Severity
Stuck Pipe Spot Oil
Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .
A.J. Andary
DOGLEG SEVERITY
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Survey #1 = Angle Build Rate = Survey #2 = Angle Build rate = Degrees Degrees / 100 ft. Degrees Degrees / 100 ft.
OUTPUT DATA
STUCK PIPE
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Before you begin pipe stretch measurements, fix a point on drill pipe that would allow few pulls above string weight. Pull sufficient tension above string weight and mark as point "A". Pull three (3) more times, recording each time the pull in pounds (lbs) and pipe stretch in inches. Total Depth =
Length of DC #1 = Length of DC #2 = Length of Hevi-Wt. DP =
Wt. of DC #1 =
Wt. of DC #2 = Wt. of Hevi-Wt DP = Wt. of DP =
Pull #1 = Pipe Stretch of Pull #1 = Pull #2 = Pipe Stretch of Pull #2 = Pull # 3 = Pipe Stretch of Pull #3 =
OUTPUT DATA
Pipe is Stuck @ #DIV/0! ###
SPOT OIL
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Depth = 10,000 ft. Hole Size = 7 7/8 inch Hole Washout = 15 % Last Casing Set @ = Last Casing I.D. = Drill Collar Size (string #1) = Drill Collar Length (string #1) = Drill Collar I.D. (string #1) = Drill Collar Size (string #2) = Drill Collar Length (string #2) = Drill Collar I.D. (string #2) = Hevi-Wt. Drill Pipe Size = Hevi-Wt. Drill Pipe Length = Hevi-Wt. DP I.D. = Drill Pipe Size = Drill Pipe I.D. = Length of Hole to be Covered = Amount of Oil to Leave in Pipe = Pump Output = 4.5 3.68 1,000 25 4.6 1,500 ft. 9.125 inch 6.5 500 2.75 inch ft. inch inch ft. inch inch ft. inch inch inch ft. bbls gallons/stroke
OUTPUT DATA
Volume of Oil Required = Displace Oil with Displace Oil with 49 99 904 bbls bbls of mud strokes
PRO 2000
DIRECTORY PRINT
VOLUMES 1. 2. 3. 4. Rectangular Tank Vertical Cylindrical Tank Horizontal Cylindrical Tank Hole Volume
Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .
A.J. Andary
RECTANGULAR TANK
INPUT DATA
Length of Tank = Width of Tank = Height of Tank = Height of Fluid = ft. ft. ft. in.
OUTPUT DATA
Volume of Fluid = 0 bbls Volume of Tank = 0 bbls Capacity of Tank = #DIV/0! bbl/ft. Capacity of Tank = #DIV/0! bbl/in.
INPUT DATA
Diameter of Tank = Height of Tank = Height of Fluid = ft ft inch
OUTPUT DATA
Volume of Fluid = #DIV/0! bbls Volume of Tank = 0 bbls Capacity of tank = #DIV/0! bbl/ft. Capacity of tank = #DIV/0! bbl/in.
INPUT DATA
Diameter of Tank = Length of Tank = Height of Fluid = Feet Feet Inches
OUTPUT DATA
Volume of Fluid = #DIV/0! gallons Volume of Fluid = #DIV/0! bbls Volume of Tank = 0 gallons Volume of Tank = 0.0 bbls
PRO 2000
OIL MUDS
1. 2. 3. 4. 5. 6. Build Oil Mud Calculate O/W Ratio Change O/W Ratio Lower Mud Weight Blend Two Oil Muds Calculate Water Activity
DIRECTOR PRINT
Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .
A.J. Andary
INPUT DATA
Desired volume = Desired Mud Wt. = Desired O/W ratio = Wt. of Oil (e.g. Diesel) = Wt. of Brine = bbls ppg ppg ppg
OUTPUT DATA
Oil Required = Brine Required = Barite Required = Volume gain = O/W Ratio = Final Volume = #VALUE! #VALUE! #VALUE! #VALUE! 0 #VALUE! bbls bbls sxs bbls bbls
INPUT DATA
Retort Oil = Retort Water = % %
OUTPUT DATA
Oil/water Ratio = #DIV/0!
INPUT DATA
Mud Volume = Mud Wt. = Retort Oil = Retort Water = Enter Desired O/W Ratio ###### ppg #VALUE! #VALUE! #VALUE! #### bbls ###### bbls bbls ppg % %
OUTPUT DATA
Final Mud Wt. = Base Mud = #DIV/0! #VALUE! #### #### #### #### #### #### ppg bbls bbls bbls
INPUT DATA
Mud Volume = Mud Weight = Retort Oil = Retort Water = Weight of Oil = Weight of Brine = Desired Mud Wt. = 100 12 61 15 6.9 10.5 10 bbl ppg % % ppg ppg ppg 150 bbls
O/W Ratio is 80 / 20
OUTPUT DATA
Final Mud Wt. = Base Mud Required = Oil Required = Brine Required = Final Volume = 10.0 82 55 14 150 ppg bbls bbls bbls bbls
INPUT DATA
Mud #1 Volume Available = Retort Oil = Retort Water = Mud Wt. = Volume Available = Retort Oil = Retort Water = Mud Wt. = bbls % by vol. % by vol. ppg bbls % by vol. % by vol. ppg
Mud #2
OUTPUT DATA
Final Mud Wt = O/W Ratio = Volume Mud #1 = Volume Mud #2 = Final Volume = #DIV/0! #DIV/0! 0 0 0 ppg bbls bbls bbls
INPUT DATA
Relative Humidity of CaCl2 = Relative Humidity of Nacl = Relative Humidity of Mud Sample = % % %
OUTPUT DATA
Water Activity = %
PRO 2000
DIRECTORY PRINT
WELL CONTROL
1. 2. 3. Well Kill Fracture Gradient Spot A Pill
Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .
A.J. Andary
FRACTURE GRADIENT
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Estimated Pore Pressure = ppg
OUTPUT DATA
Fracture Gradient = ppg
SPOT A PILL
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Spot Pill @ Hole Size = Last Casing Set @ ft. in. ft.
% in.
DC Size (string #1) = DC Size (string #2) = Heavy Wt. DP Size = DP Size = Hole to be covered =
in in in in ft.
ft ft ft
DC I.D. (string 1) = DC I.D. (string 2) = Heavy Wt. DP I.D. = Drill Pipe I.D. =
in in in in
Pump Output =
gal/stroke
OUTPUT DATA
Volume of Pill = Displace with Displace with 0 0 #DIV/0! bbls bbls of mud strokes
PRO 2000
DIRECTOR PRINT
MISC. PROGRAMS
1. 2. 3. 4. Formation Leakoff Test Packer Calculation Set A Balanced Plug Loan Payment
Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .
A.J. Andary
INPUT DATA
Total Vertical Depth of Casing Shoe = Equivalent Mud Weight Required = Mud Weight in Hole = 17,242 18.5 14.3 ft. ppg ppg
OUTPUT DATA
Surface Fracture Pressure Required = 3,766 psi.
PACKER CALCULATION
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Casing I.D. = Casing Weight = Depth of Packer = Size of Tubing = Tubing Weight = Tubing I.D. = Total Weight of Tubing on Packer = Mud Weight in Annulus = Weight of Fluid in Tubing = in. lbs/ft. ft. in. lbs/ft. in. lbs. ppg ppg
OUTPUT DATA
Pressure Required to Set Packer = #DIV/0! psi
INPUT DATA
Select "Cased" or "Open" hole
Cased Hole Open Hole
Casing I.D. = Depth = Pipe Size (string #1) = Length of Pipe (String #1) = Pipe I.D. (string #1) = Pipe Size (String #2) = Pipe I.D. (string #2) = Size of Plug = Yield of Cement = Volume of water ahead of plug = Pump Output =
in. ft. in. ft. in. in. in. sxs of cement ft3/sx. bbls gal/stroke
OUTPUT DATA
Height of Plug = Top of Plug = Water behind Plug = Displace with #DIV/0! #DIV/0! #DIV/0! #DIV/0! ft. ft. bbls bbls of Mud
PUMP OUTPUT
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Duplex Pump Triplex Pump
OUTPUT DATA
Pump Output = 0.00000 bbl/stroke " " = 0.00 bbl/min. " " = 0.00 gal/stroke " " = 0 gal/min.
LOAN PAYMENT
INPUT DATA
Auto Loan Bank Loan
Total Purchase Price = Down Payment = Annual Interest Rate = Number of Months =
OUTPUT DATA
Monthly payment = Total Payment = Interest paid = #DIV/0! #DIV/0! #DIV/0! dollars/month dollars dollars
INPUT DATA
Plastic viscosity = Yield Point = 16 10
OUTPUT DATA
0.50
PRO 2000
DIRECTORY PRINT
DRILLING OPERATIONS
1. 2. 3. Fill Hole on Trips Find Hole in Pipe Pump Output
Note: You may select a program by clicking it with the mouse. You mar return to the main menu by clicking DIRECTORY .
A.J. Andary
INPUT DATA
Depth = Drill Collar Size (string #1) = Drill Collar Length (string #1) = Drill Collar I.D. (string #1) = Drill Collar Size (string #2) = Drill Collar Length (string #2) = Drill Collar I.D. (string #2) = Heavy-Wt. DP Size = Heavy-Wt. DP Length = Heavy-Wt. DP I.D. = Drill Pipe Size = Drill Pipe I.D. = Average Stand Length = Pump Output = ft. in. ft. in. in. ft. in. in. ft. in. in. in. ft. gal/stroke
OUTPUT DATA
Fill per 5 Stds. Hevi-Wt. Drill Pipe = " " " " = 0.00 #DIV/0! 0.00 #DIV/0! 0.00 #DIV/0! 0.00 #DIV/0! 0 #DIV/0! bbls strokes
Fill per 5 Stds Drill Pipe " " " " " Fill per Std. of DC #2 " " " " Fill per Std. of DC #1 " " " " Total Hole Fill " " "
= = = = = = = =
bbls strokes
INPUT DATA
Depth = Drill Collar Length (string #1) = Drill Collar I.D. (string #1) = Drill Collar Length (string #2) = Drill Collar I.D.(string #2) = Hevi-Wt. Drill Pipe Length = Hevi-Wt. Drill Pipe I.D. = Drill Pipe I.D. = Pump Output = Number of Strokes Took Flag Down = feet feet inch feet inch feet inch inch Gal/stroke Strokes
OUTPUT DATA
PRO 2000
DIRECTORY PRINT
Directional Drilling
1. 2. 3. 3. Basic Curve Straight Section Projected Target Complex Curve
Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .
A.J. Andary
BASIC CURVE
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Survey #1 = Depth @ Survey #1 = Survey #2 = Depth @ Survey #2 = deg. ft. deg. ft.
OUTPUT DATA
Length of Curve = 0 ft. Angle Build Rate = #DIV/0! deg./100ft. Vertical Height of Curve = #DIV/0! ft. Displacement = #DIV/0! ft.
STRAIGHT SECTION
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Survey #1 = Depth @ Survey #1 = Survey #2 = Depth @ Survey #2 = deg. ft. deg. ft.
OUTPUT DATA
Length of Section = Vertical Height = Displacement = 0 0 0 ft. ft. ft.
PROJECTED TARGET
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Present Measured Depth = Present Vertical Height = Present Displacement = Hole Angle = Angle Build Rate = Projected Measured Depth = ft. ft. ft. deg. deg./100 ft. ft.
OUTPUT DATA
Total Vertical Depth = Total Displacement = 0 0 ft. ft.
Sheet17
DIRECTORY PRINT
ADDITIONAL PROGRAMS
1. 2. 3. 4. Nipple Gas Flow Critical Rate of Penetration Total Flow Area (TFA) Drill String Design
Note: You may select a program by clicking it with the mouse. You may return to the main menu by clicking DIRECTORY .
Page 65
Sheet17
Page 66
INPUT Choke Size = Pressure Reading = Gravity = Flowing Temperature = 0.2500 25 68 inch psig
o
INPUT
Cost Per Foot = Rate of Penetration = $/ft Ft/hr.
OUTPUT
Critical Rate of Penetration = 0 $/hr.
INPUT Number of Bit Nozzles = Nozzle # 1 = Nozzle #2 = Nozzle #3 = 3 inch Inch Inch
Sheet17(4)
Depth = Drill Collar Length (string #1) = Drill Collar I.D. (string #1) = Drill Collar Length (string #2) = Drill Collar I.D.(string #2) = Hevi-Wt. Drill Pipe Length = Hevi-Wt. Drill Pipe I.D. = Drill Pipe I.D. = Pump Output = Number of Strokes Took Flag Down =
feet feet inch feet inch feet inch inch Gal/stroke Strokes
feet
Page 71
Sheet17(5)
PROJECTED TARGET
Date: Well Name: Legal: County: State: Prepared By : Operator: Drilling Contractor: Rig Number:
INPUT DATA
Present Measured Depth = Present Vertical Height = Present Displacement = Hole Angle = Angle Build Rate = Projected Measured Depth = ft. ft. ft. deg. deg./100 ft. ft.
OUTPUT DATA
Total Vertical Depth = Total Displacement = 0 0 ft. ft.
Page 72