History Background Document: IP 4-4-1 Marine Piers and Mooring Facilities

This document provides background history on marine piers and mooring facilities. It includes a table that lists design load conditions and combinations for facilities accommodating one vessel at a time. The document also notes load conditions are different from other standards and specifics needs to address loads from berthing impacts, mooring, transportation, and environmental conditions. Owner approval is required for environmental envelopes.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views1 page

History Background Document: IP 4-4-1 Marine Piers and Mooring Facilities

This document provides background history on marine piers and mooring facilities. It includes a table that lists design load conditions and combinations for facilities accommodating one vessel at a time. The document also notes load conditions are different from other standards and specifics needs to address loads from berthing impacts, mooring, transportation, and environmental conditions. Owner approval is required for environmental envelopes.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

INTERNATIONAL PRACTICE

HISTORY BACKGROUND DOCUMENT


Marine Piers and Mooring Facilities

IP 4-4-1
Page 1 of 1 Rev. 0 June 1997

BACKGROUND HISTORY DOCUMENTATION FOR CORRESPONDING PARAGRAPHS OF IP 4-4-1 (REV. 0)


S,O S,O S S I S S,O S,O S,O R S O
[H]

4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12

Table 2 provides the overall design loads conditions and combinations which should be addressed when only one vessel must be accommodated at one time. These are not given in Industry Standards. The overall design loads conditions and combinations which should be addressed when more than one vessel must be accommodated at one time. These are not given in Industry Standards. This specifies how the load shall be applied. These loads are specific to Marine Piers and Mooring Facilities and are different to those loads given in IP 4-1-3. These loads are specific to Marine Facilities. Laterally loaded piles are not common for most facilities. Environmental conditions must be specified. Berthing Impact loads must be specified. Breasting loads must be specified. Mooring Loads must be specified. Transportation conditions must be considered. Environmental envelopes must be approved by the Owners Engineer.

[H]

[H] [H]

[H] [H] [H] [H] [H] [H] [H] [H]

Notes: (1) (2) Each paragraph to identify the Purpose Code(s) of the corresponding paragraph number of the applicable International Practice (IP). The symbol [H] is used to denote all History Background Paragraphs which are for INFORMATION ONLY.

THIS INFORMATION FOR AUTHORIZED COMPANY USE ONLY EXXON RESEARCH AND ENGINEERING COMPANY FLORHAM PARK, N.J.