Bill of Quantity For Eoht: Rate To Be Quoted Rate in RS./ Unit

The document provides a bill of quantities for an EOHT project. It lists 9 items with their quantities, units, and rates to be quoted in rupees per unit. The items include excavation at various depths, return fill and ramming, structural steel installation, concrete work, reinforcement, shuttering, and handrailing made of 32mm and 25mm pipes. The rates need to consider the total supply including cement and reinforcement steel.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views1 page

Bill of Quantity For Eoht: Rate To Be Quoted Rate in RS./ Unit

The document provides a bill of quantities for an EOHT project. It lists 9 items with their quantities, units, and rates to be quoted in rupees per unit. The items include excavation at various depths, return fill and ramming, structural steel installation, concrete work, reinforcement, shuttering, and handrailing made of 32mm and 25mm pipes. The rates need to consider the total supply including cement and reinforcement steel.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

BILL OF QUANTITY FOR EOHT

QUANTI TY SL. NO. RATE TO BE QUOTED RATE IN RS./ UNIT


Considering total supply including cement & reinforcement steel

ITEM

1.0

Excavation in all types of soil manually or by mechanical means a) Excavation upto 1.5 m b) Excavation from 1.5 m to 3.0 m c) Excavation from 3.0 m - 6.0 m
M3 M3 220 800 M3 M3 330 330

2.0

Return fill & ramming in layers as per TS manually, or mechanically Insert plate / lugs - Supply, fabrication and necessary installation with all requisite materials Structural steel including fabrication, Erection and painting Plain Cement Concrete (1:4:8) including supply of all

3.0 4.0

KG MT

UNIT

600 12

5.0 materials and placing concrete in position and

M3

subsequent curing as per TS Reinforcement Cement Concrete (M-25) including supply of all materials and placing concrete in position and 6.0 subsequent curing as per TS (Concrete pouring at height complying all safety norms are to be considered)

M3

350

Reinforcement (Tor Steel) - Supply and Cutting, bending, 7.0 shaping, placement in position including binding wire etc. MT complete Steel Shuttering making fixing & Removal including scaffolding (for measurements, only the shuttering area 8.0 would be considered). Necessary staging complying all safety norms are to be considered
9.0 Handrailing- Fabrication & fixing completed

36

M2

2600

a) 32 NB Pipe b) 25NB Pipe

RM RM

300 175