0% found this document useful (0 votes)
55 views1 page

Connection No.: 8: Load BEAM UB1525x89x16 Brace L70X70X6

This document provides details for connection number 8 on a structural steel project. It includes load information for a UB1525x89x16 beam experiencing 25 kN of axial load and a L70X70X6 brace experiencing 35 kN of axial load and 20 kN of vertical shear. All bolts are M20 grade 8.8, the steel is S275, and welds are 6mm continuous fillet welds. An inspector has approved the details as shown.

Uploaded by

rts123
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views1 page

Connection No.: 8: Load BEAM UB1525x89x16 Brace L70X70X6

This document provides details for connection number 8 on a structural steel project. It includes load information for a UB1525x89x16 beam experiencing 25 kN of axial load and a L70X70X6 brace experiencing 35 kN of axial load and 20 kN of vertical shear. All bolts are M20 grade 8.8, the steel is S275, and welds are 6mm continuous fillet welds. An inspector has approved the details as shown.

Uploaded by

rts123
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Client : ADCO Project : SAHIL & SHAH Job no : F0800 Area : SAHIL RDS-1 Sheet no :PRO.

HEADER VALVE OPE. PLTF / 8 / 1

Date : OCT-11 Calc'd by : BND Checked by : JKG

CONNECTION NO. : 8 (Typical beam & brace end detail to beam b/w grid 6/7 & along grid A in plan
@ TOS EL. + 100.650, Refer dwg no. 16-11-76-1617 Rev.01 Sht. 1 of 3.) LOAD BEAM UB1525x89x16 Axial Ver. shear F := 25 kN ( Assume) Brace L70X70X6 Axial F1 := 35 kN

Fv := 20 kN ( Assume)

NOTES:All bolts are M20, Grade 8.8, U.N.O., All main steel & fittings are S275, U.N.O., All welds are 6mm CFW, U.N.O.,
Variation no:

BY INSPECTION, DETAILS ARE O.K.

Rev / Date A / OCT' 2011