AXON
Drawing No.
SR.No.
PAINTING/SLAG BLASTING INSPECTION REPORT
PART DESCRIPTION
PART IDENTIFICATION FINAL PAINTING STATUS(INSIDE- SINGLE COAT/OUTSIDE- DOUBLE COAT) FOUND OK, REFER RFI NO.
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchpinda, Chhattisgarh
SLAG BLASTING STATUS(INSIDE & OUTSIDE) FOUND OK, REFER RFI NO.
FLUE DUCT GAS PIPING FOR CHIMNEY
QC CHECK SHEET
NOT APPLICABLE SURFACE DEFECT CHECK OVER LAPPING PHYSICAL COND. SURFACE ROUGHNESS
INSPECTION RESULTS : Inspection passed. Rectification works listed above to be completed and inspection is required after repair works Rectification works listed above to be completed but no further inspection required. Rejected CONTRACTOR SIGNATORY
NAME SIGN DATE NAME SIGN DATE
AXON PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER
AXON QA/QC
PAGE NO
WORK ORDER No.:
REPORT NO.
SURFACE DEFECT CHECK SAGGING
ve to be completed and inspection is required after repair works
ve to be completed but no further inspection required.
SGS/TCE
NAME SIGN DATE
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION REPORT
TRUSS NO
MEMBER NO 1 1 1 1 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh
WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO. Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
T-1
2 2 2 2
QC CHECK SHEET
CHECKED
WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT
RKM Q.C.
SR. No.
CERTIFY AUTHORITY
NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
CLIENT: RKM Power Gen Pvt. Limited
FIELD INSPECTION
WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010
CORRECTION, If Any REMARKS
Discontinuities Found
Rectified
ok
Discontinuities Found
Rectified
ok
DEFECT CHECK
INST. USED Inst. ID No. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
VALIDITY
CERTIFY AUTHORITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION REPORT
TRUSS NO
MEMBER NO 3 3 3 3 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh
WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW
T-1
4 4 4 4
QC CHECK SHEET
CHECKED
WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
RKM Q.C.
SR. No.
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh
WELDER NO. Joint Type Fillet/Groove
CLIENT: RKM WORK ORDER REPORT Power Gen Pvt. No.: No.:RKMFY/TLimited Axon/WO/014/2 1/001 010
FIELD INSPECTION CORRECTION, If Any REMARKS
Fillet/Groove Discontinuities Found Fillet/Groove Fillet/Groove Fillet/Groove Discontinuities Found Fillet/Groove Fillet/Groove Fillet/Groove
Rectified
ok
Rectified
ok
WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT LUMPS / HIGHSPOT POROSITY / PINHOLES
Inst. ID No. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
VALIDITY
CERTIFY AUTHORITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION REPORT
TRUSS NO
MEMBER NO 5 5 5 5 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh
WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO. Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
CLIENT: RKM Power Gen Pvt. Limited
FIELD INSPECTION
T-1
6 6 6 6 Fillet/Groove Discontinuities Found Fillet/Groove Discontinuities Found Fillet/Groove Fillet/Groove
QC CHECK SHEET
CHECKED
WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME
RKM Q.C.
SR. No.
CERTIFY AUTHORITY
SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
PAGE NO.:1
WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010
CORRECTION, If Any REMARKS
Rectified Rectified
Inst. ID No.
VALIDITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION REPORT
TRUSS NO
MEMBER NO 7 7 7 7 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh
WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO. Joint Type Fillet/Groove
CLIENT: RKM Power Gen Pvt. Limited
FIELD INSPECTION
WORK ORDER No.: Axon/WO/014/2 010
Fillet/Groove Discontinuities Found Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
T-1
8 8 8 8
QC CHECK SHEET
CHECKED
WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
INST. USED UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
RKM PRODUCTION
STATUS ACCEPT
RKM Q.C.
SR. No.
CERTIFY AUTHORITY
COMPANY
RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
PAGE NO
WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010
CORRECTION, If Any REMARKS
Rectified
Inst. ID No.
VALIDITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION REPORT
TRUSS NO
MEMBER NO 9 9 9 9 10 10 10 10 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh
WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO. Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
CLIENT: RKM Power Gen Pvt. Limited
FIELD INSPECTION
T-1
QC CHECK SHEET
CHECKED
WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
RKM Q.C.
SR. No.
CERTIFY AUTHORITY
PAGE NO.:1
WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010
CORRECTION, If Any REMARKS
Inst. ID No.
VALIDITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION REPORT
TRUSS NO
MEMBER NO 11 11 11 11 12 12 12 12 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh
WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO. Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
CLIENT: RKM Power Gen Pvt. Limited
FIELD INSPECTION
T-1
QC CHECK SHEET
CHECKED
WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
RKM Q.C.
SR. No.
CERTIFY AUTHORITY
PAGE NO.:1
WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010
CORRECTION, If Any REMARKS
Inst. ID No.
VALIDITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION REPORT
TRUSS NO
MEMBER NO 13 13 13 13 14 14 14 14 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh
WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO.
T-1
QC CHECK SHEET
CHECKED
WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
RKM Q.C.
SR. No.
oal Fired 4*360 MW er Project, Chhattisgarh
Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
CLIENT: RKM Power Gen Pvt. Limited
FIELD INSPECTION
WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010
CORRECTION, If Any REMARKS
SURFACE DEFECT CHECK MENT HSPOT PINHOLES
Inst. ID No. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
VALIDITY
CERTIFY AUTHORITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION REPORT
TRUSS NO
MEMBER NO 15 15 15 15 16 16 16 16 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh
WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO. Joint Type
CLIENT: RKM Power Gen Pvt. Limited
FIELD INSPECTION
Fillet/Groove Discontinuities Found Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
T-1
QC CHECK SHEET
CHECKED
WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
RKM Q.C.
SR. No.
CERTIFY AUTHORITY
PAGE NO.:1
WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010
CORRECTION, If Any Rectified REMARKS
Inst. ID No.
VALIDITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION REPORT
TRUSS NO
MEMBER NO 17 17 17 17 18 18 18 18 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh
WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO.
T-1
QC CHECK SHEET
CHECKED
WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
RKM Q.C.
SR. No.
oal Fired 4*360 MW er Project, Chhattisgarh
Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
CLIENT: RKM Power Gen Pvt. Limited
FIELD INSPECTION
WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010
CORRECTION, If Any REMARKS
SURFACE DEFECT CHECK MENT HSPOT PINHOLES
Inst. ID No. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
VALIDITY
CERTIFY AUTHORITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION REPORT
TRUSS NO
MEMBER NO 19 19 19 19 20 20 20 20 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh
WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO.
T-1
QC CHECK SHEET
CHECKED
WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
RKM Q.C.
SR. No.
oal Fired 4*360 MW er Project, Chhattisgarh
Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
CLIENT: RKM Power Gen Pvt. Limited
FIELD INSPECTION
WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010
CORRECTION, If Any REMARKS
SURFACE DEFECT CHECK MENT HSPOT PINHOLES
Inst. ID No. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
VALIDITY
CERTIFY AUTHORITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION REPORT
TRUSS NO
MEMBER NO 21 21 21 21 22 22 22 22 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh
WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO.
T-1
QC CHECK SHEET
CHECKED
WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
RKM Q.C.
SR. No.
oal Fired 4*360 MW er Project, Chhattisgarh
Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
CLIENT: RKM Power Gen Pvt. Limited
FIELD INSPECTION
WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010
CORRECTION, If Any REMARKS
SURFACE DEFECT CHECK MENT HSPOT PINHOLES
Inst. ID No. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
VALIDITY
CERTIFY AUTHORITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION REPORT
TRUSS NO
MEMBER NO 23 23 23 23 24 24 24 24 PART NO 1 2 3 4 1 2 3 4 STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION X NOT APPLICABLE
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh
WELDING PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW WELDER NO.
T-1
QC CHECK SHEET
CHECKED
WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
RKM Q.C.
SR. No.
oal Fired 4*360 MW er Project, Chhattisgarh
Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
CLIENT: RKM Power Gen Pvt. Limited
FIELD INSPECTION
WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010
CORRECTION, If Any REMARKS
SURFACE DEFECT CHECK MENT HSPOT PINHOLES
INST. USED Inst. ID No. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
VALIDITY
CERTIFY AUTHORITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION REPORT
TRUSS NO
MEMBER NO PART NO STAGE FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION FABRICATION
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh
WELDING WELDER NO. PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW Joint Type Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
CLIENT: RKM Power Gen Pvt. Limited
FIELD INSPECTION
T-1
QC CHECK SHEET
CHECKED
NOT APPLICABLE WELD VISUAL & SURFACE DEFECT CHECK REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND. UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
RKM PRODUCTION
STATUS ACCEPT RECTIFY & RE-OFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
RKM Q.C.
SR. No.
CERTIFY AUTHORITY
PAGE NO.:1 O
WORK ORDER REPORT No.: No.:RKMFY/TAxon/WO/014/2 1/001 010
CORRECTION, If Any REMARKS
Inst. ID No.
VALIDITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION
TRUSS NO
MEMBER NO PART NO STAGE FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh WELDING
PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW
WELDER NO.Joint Type
CLIENT : RKM Power Gen
FIELD INSPECTION
WORK ORDER No.: Axon/WO/014/20 10
Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
T-1
QC CHECK SHEET
CHECKED
NOT APPLICABLE WELD VISUAL & SURFACE DEFECT CHECK INST. USED
REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
RKM PRODUCTION
STATUS ACCEPT RECTIFY & REOFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
RKM Q.C.
SR. No.
CERTIFY AUTHORITY
COMPANY
PAGE N
WORK ORDER No.: Axon/WO/014/20 10 CORRECTI
ON, If Any
REPOR T No.:RK MFY/T-
REMARKS
Inst. ID No. VALIDITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION
TRUSS NO
MEMBER NO PART NO STAGE FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh WELDING
PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW
WELDER NO.Joint Type
CLIENT : RKM Power Gen
FIELD INSPECTION
WORK ORDER No.: Axon/WO/014/20 10
Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
T-1
QC CHECK SHEET
CHECKED
NOT APPLICABLE WELD VISUAL & SURFACE DEFECT CHECK INST. USED
REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
RKM PRODUCTION
STATUS ACCEPT RECTIFY & REOFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
RKM Q.C.
SR. No.
CERTIFY AUTHORITY
COMPANY
PAGE N
WORK ORDER No.: Axon/WO/014/20 10 CORRECTI
ON, If Any
REPOR T No.:RK MFY/T-
REMARKS
Inst. ID No. VALIDITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION
TRUSS NO
MEMBER NO PART NO STAGE FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh WELDING
PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW
WELDER NO.Joint Type
CLIENT : RKM Power Gen
FIELD INSPECTION
WORK ORDER No.: Axon/WO/014/20 10
Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
T-1
QC CHECK SHEET
CHECKED
NOT APPLICABLE WELD VISUAL & SURFACE DEFECT CHECK INST. USED
REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
RKM PRODUCTION
STATUS ACCEPT RECTIFY & REOFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
RKM Q.C.
SR. No.
CERTIFY AUTHORITY
COMPANY
PAGE N
WORK ORDER No.: Axon/WO/014/20 10 CORRECTI
ON, If Any
REPOR T No.:RK MFY/T-
REMARKS
Inst. ID No. VALIDITY
COMPANY
PAGE NO.:1 OF 1
RKM
SR.No.
WELD VISUAL INSPECTION
TRUSS NO
MEMBER NO PART NO STAGE FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION FABRICAT ION
PROJECT: Coal Fired 4*360 MW Thermal Power Project, Uchhpinda, Chhattisgarh WELDING
PROCESS MMAW MMAW MMAW MMAW MMAW MMAW MMAW MMAW
WELDER NO.Joint Type
CLIENT : RKM Power Gen
FIELD INSPECTION
WORK ORDER No.: Axon/WO/014/20 10
Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove Fillet/Groove
T-1
QC CHECK SHEET
CHECKED
NOT APPLICABLE WELD VISUAL & SURFACE DEFECT CHECK INST. USED
REINFORCEMENT SPATTER LUMPS / HIGHSPOT SLAG POROSITY / PINHOLES CRACK BEAD APPEARANCE / WEAVING PHYSICAL COND.
UNDER CUT WELDSIZE UNDER FILL ARC STRIKE CLEAT MARK
RKM PRODUCTION
STATUS ACCEPT RECTIFY & REOFFER REJECT NAME SIGN DATE TIME RKMFY/FORM/001 R.0 Dated 02/12/2012
RKM Q.C.
SR. No.
CERTIFY AUTHORITY
COMPANY
PAGE N
WORK ORDER No.: Axon/WO/014/20 10 CORRECTI
ON, If Any
REPOR T No.:RK MFY/T-
REMARKS
Inst. ID No. VALIDITY
COMPANY
PAGE NO.:1 OF 1