Freshwater Aquifer
Drill site
3
Groundwater protection
Freshwater Aquifer
Cement Production casing Drill pipe
Wellbore
thousands of feet below the surface to the kickoff point. From there, the curved and horizontal sections are drilled laterally thousands of feet into the target formation.
5. In a controlled operation, a
specialized mixture of water, sand and chemical additives are injected into the wellbore at sufficient pressure to create small cracks or fractures in the shale. hydraulic fracturing process is completed over a 2 to 5 day period. After the well is completed and surface facilities are installed, the well is placed on production for 20 to 30 years. Portions of the well site not needed for production are restored.
6
Empire state Building 1,250 ft.
Fractures in the shale allow natural gas to flow into the wellbore and then up to the surface