0% found this document useful (0 votes)
158 views24 pages

Developed By: Engr. Md. Mahabub Hasan, Peng

This document contains soil test data from 10 boreholes for pile foundation design. It includes the pile length and soil type by depth for each borehole location, as well as the Standard Penetration Test N-values with depth. The piles have a diameter of 3 feet and a factor of safety of 6 was used. Skin friction, end bearing, and total bearing capacity values in tons are provided for each borehole location.

Uploaded by

murad_ce
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
158 views24 pages

Developed By: Engr. Md. Mahabub Hasan, Peng

This document contains soil test data from 10 boreholes for pile foundation design. It includes the pile length and soil type by depth for each borehole location, as well as the Standard Penetration Test N-values with depth. The piles have a diameter of 3 feet and a factor of safety of 6 was used. Skin friction, end bearing, and total bearing capacity values in tons are provided for each borehole location.

Uploaded by

murad_ce
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 24

Developed By: Engr. Md. Mahabub Hasan, PEng.

habub Hasan, PEng.

SUMMARY
Total Bore Number Pile Dia F.S = 6

= 20.00 in = 3.00

BH ID BH - 1 BH - 2 BH - 3 BH - 4 BH - 5 BH-6 BH-7 BH-8 BH-9 BH-10

Skin Friction (t) 49.95 63.88 55.27 41.21 44.95 44.94 -

End Bearing (t) 45.79 28.35 53.42 53.42 53.42 57.78 -

Avg.

50.03

48.70

Total Bearing Capacity (t) 95.74 92.23 108.69 94.64 98.38 102.73 -

Pile Length ft. 95 90 90 90 95 90 -

98.73

BH-1
Pile Length =

95.00 ft
Soil Type Non Cohesive Non Cohesive Non Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Non Cohesive Non Cohesive Cohesive Non Cohesive Cohesive Non Cohesive Cohesive Non Cohesive Non Cohesive Non Cohesive N 0 5 5 2 4 5 6 6 7 27 31 8 10 18 16 12 17 20 27

Depth (ft) 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95

BH-2
Pile Length = 90.00 ft

Depth (ft) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90

Soil Type Non Cohesive Non Cohesive Non Cohesive Non Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Non Cohesive Non Cohesive Non Cohesive Cohesive Non Cohesive Cohesive Cohesive Cohesive Cohesive Non Cohesive

N 0 0 5 4 2 4 4 6 3 10 12 29 34 18 20 22 11 12 13

BH-3
Pile Length = 90.00 ft

Depth (ft) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90

Soil Type Non Cohesive Non Cohesive Non Cohesive Non Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Non Cohesive Non Cohesive Cohesive Non Cohesive Cohesive Cohesive Cohesive Cohesive Non Cohesive

N 0 0 5 4 12 14 2 3 2 3 20 17 4 7 18 21 11 8 34

BH-4
Pile Length = 90.00 ft

Depth (ft) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90

Soil Type Non Cohesive Non Cohesive Non Cohesive Non Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Non Cohesive Non Cohesive Cohesive Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive

N 0 0 7 9 11 5 6 5 2 5 18 12 4 12 18 30 32 8 34

BH-5
Pile Length = 95.00 ft

Depth (ft) 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95

Soil Type Non Cohesive Non Cohesive Non Cohesive Non Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Non Cohesive Non Cohesive Cohesive Non Cohesive Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive

N 0 3 6 3 4 5 5 2 5 34 36 24 7 13 18 19 7 24 34

BH-6
Pile Length = 90.00 ft

Depth (ft) 0 5 10 15 20 20 30 35 40 45 50 55 60 65 70 75 80 85 90

Soil Type Non Cohesive Non Cohesive Non Cohesive Non Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Cohesive Non Cohesive Cohesive Non Cohesive Non Cohesive

N 0 0 4 10 12 3 2 4 2 5 12 13 16 7 26 25 28 34 38

BH-7
Pile Length = 60.00 ft

Depth (ft) 3 6 9 12 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Soil Type Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive

N 0 0 0 0 0 0 5 7 10 12 18 25 30 35 0 0 0 0 0

BH-8
Pile Length = 60.00 ft

Depth (ft) 3 6 9 12 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Soil Type Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive

N 0 0 0 0 0 0 5 7 10 12 18 25 30 35 0 0 0 0 0

BH-9
Pile Length = 60.00 ft

Depth (ft) 3 6 9 12 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Soil Type Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive

N 0 0 0 0 0 0 5 7 10 12 18 25 30 35 0 0 0 0 0

B H - 10
Pile Length = 60.00 ft

Depth (ft) 3 6 9 12 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85

Soil Type Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive Non Cohesive

N 0 0 0 0 0 0 5 7 10 12 18 25 30 35 0 0 0 0 0