Ove Arup & Partners Hong Kong LTD.: Tensile Reinfrocement Compression Reinforcement

This document contains calculation sheets from Ove Arup & Partners Hong Kong Ltd. for the design of slabs and strips in Tower 2 of a residential development at Ho Man Tin. The sheets provide design details such as dimensions, reinforcement requirements and spacing, shear reinforcement calculations, and conclusions that design criteria are satisfied. Reinforcement is specified for tension and shear as required.

Uploaded by

sitehab
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
139 views16 pages

Ove Arup & Partners Hong Kong LTD.: Tensile Reinfrocement Compression Reinforcement

This document contains calculation sheets from Ove Arup & Partners Hong Kong Ltd. for the design of slabs and strips in Tower 2 of a residential development at Ho Man Tin. The sheets provide design details such as dimensions, reinforcement requirements and spacing, shear reinforcement calculations, and conclusions that design criteria are satisfied. Reinforcement is specified for tension and shear as required.

Uploaded by

sitehab
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 16

Ove Arup & Partners Hong Kong Ltd.

Job No.

214807

Sheet No.

Rev.

ARUP
Job Title

Calculation Sheet Member / Location Drg. Ref. Made by T.V. 26th Floor - Slab S13 - Strip X1 Bot.

Residential Development At Ho Man Tin Typical 1-way Slab Design - Tower 2 Design Information: Flange width, bf Web width, bw Section depth, D Flange depth, hf Top clear cover Bottom clear cover Concrete strength Rebar strength Design Moment
Tensile Reinfrocement

Date

9-Jul-13

Chd.

N.T.

= = = = = = = = =

1000 1000 150 0 40 40 45 460 22.0

mm mm mm mm mm mm Mpa MPa kNm


Compression Reinforcement (Not required)

As, req.

618

sq.mm

> As, min < As, max

6000 Provide

sq.mm

Provide 1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing 4th Layer Spacing = T = = T = = T = = T = 10 125 0 200 0 200 0 200 8 mm 5 mm 5 mm 5 mm

1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing As, prov.

= T = = T = = T =

0 5 200 mm 0 5 200 mm 0 5 200 mm sq. mm % > As, req.

= 0 = 0 ==> OK

As, prov.

= 628 = 0.419 ==> OK

sq. mm %

> As, req.

Shear Reinforcement

Design Element With shear reinfrocement vc vmax. Location av Shear froce v Enhanced vc Asv/sv, req. = = = = = = = = 0.959 5.367

= = N/mm2 N/mm2

slab no

(e.g. Slab or Beam) (e.g. Yes or No)

OK!
2 500 90.0 0.947 0.959 0.000 3 1000 0 0.000 0.959 0.000 4 1500 0 0.000 0.959 0.000 5 2000 0 0.000 0.959 0.000 6 2500 0 0.000 0.959 0.000 7 3000 0 0.000 0.959 0.000 8 3500 0 0.000 0.959 0.000

1 0 500.0 5.263 5.367 0.000

Bar size

10

NO SHEAR LINKS IS REQUIRED

Ove Arup & Partners Hong Kong Ltd.

Job No.

214807

Sheet No.

Rev.

ARUP
Job Title

Calculation Sheet Member / Location Drg. Ref. Made by T.V. 26th Floor - Slab S13 - Strip X2 Top.

Residential Development At Ho Man Tin Typical 1-way Slab Design - Tower 2 Design Information: Flange width, bf Web width, bw Section depth, D Flange depth, hf Top clear cover Bottom clear cover Concrete strength Rebar strength Design Moment
Tensile Reinfrocement

Date

9-Jul-13

Chd.

N.T.

= = = = = = = = =

1000 1000 150 0 42 42 45 460 21.5

mm mm mm mm mm mm Mpa MPa kNm


Compression Reinforcement (Not required)

As, req.

618

sq.mm

> As, min < As, max

6000 Provide

sq.mm

Provide 1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing 4th Layer Spacing = T = = T = = T = = T = 10 125 0 200 0 200 0 200 8 mm 5 mm 5 mm 5 mm

1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing As, prov.

= T = = T = = T =

0 5 200 mm 0 5 200 mm 0 5 200 mm sq. mm % > As, req.

= 0 = 0 ==> OK

As, prov.

= 628 = 0.419 ==> OK

sq. mm %

> As, req.

Shear Reinforcement

Design Element With shear reinfrocement vc vmax. Location av Shear froce v Enhanced vc Asv/sv, req. = = = = = = = = 0.971 5.367

= = N/mm2 N/mm2

slab no

(e.g. Slab or Beam) (e.g. Yes or No)

OK!
2 500 90.0 0.968 0.971 0.000 3 1000 0 0.000 0.971 0.000 4 1500 0 0.000 0.971 0.000 5 2000 0 0.000 0.971 0.000 6 2500 0 0.000 0.971 0.000 7 3000 0 0.000 0.971 0.000 8 3500 0 0.000 0.971 0.000

1 0 475.0 5.108 5.367 0.000

Bar size

10

NO SHEAR LINKS IS REQUIRED

Ove Arup & Partners Hong Kong Ltd.

Job No.

214807

Sheet No.

Rev.

ARUP
Job Title

Calculation Sheet Member / Location Drg. Ref. Made by T.V. 26th Floor - Slab S13 - Strip Y1 Bot.

Residential Development At Ho Man Tin Typical 1-way Slab Design - Tower 2 Design Information: Flange width, bf Web width, bw Section depth, D Flange depth, hf Top clear cover Bottom clear cover Concrete strength Rebar strength Design Moment
Tensile Reinfrocement

Date

9-Jul-13

Chd.

N.T.

= = = = = = = = =

1000 1000 150 0 30 30 45 460 30.0

mm mm mm mm mm mm Mpa MPa kNm


Compression Reinforcement (Not required)

As, req.

770

sq.mm

> As, min < As, max

6000 Provide

sq.mm

Provide 1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing 4th Layer Spacing = T = = T = = T = = T = 10 100 0 200 0 200 0 200 10 mm 5 mm 5 mm 5 mm

1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing As, prov.

= T = = T = = T =

0 5 200 mm 0 5 200 mm 0 5 200 mm sq. mm % > As, req.

= 0 = 0 ==> OK

As, prov.

= 785 = 0.524 ==> OK

sq. mm %

> As, req.

Shear Reinforcement

Design Element With shear reinfrocement vc vmax. Location av Shear froce v Enhanced vc Asv/sv, req. = = = = = = = = 0.975 5.367

= = N/mm2 N/mm2

slab no

(e.g. Slab or Beam) (e.g. Yes or No)

OK!
2 500 100.0 0.952 0.975 0.000 3 1000 0 0.000 0.975 0.000 4 1500 0 0.000 0.975 0.000 5 2000 0 0.000 0.975 0.000 6 2500 0 0.000 0.975 0.000 7 3000 0 0.000 0.975 0.000 8 3500 0 0.000 0.975 0.000

1 0 550.0 5.238 5.367 0.000

Bar size

10

NO SHEAR LINKS IS REQUIRED

Ove Arup & Partners Hong Kong Ltd.

Job No.

214807

Sheet No.

Rev.

ARUP
Job Title

Calculation Sheet Member / Location Drg. Ref. Made by T.V. 26th Floor - Slab S13 - Strip Y2 Top.

Residential Development At Ho Man Tin Typical 1-way Slab Design - Tower 2 Design Information: Flange width, bf Web width, bw Section depth, D Flange depth, hf Top clear cover Bottom clear cover Concrete strength Rebar strength Design Moment
Tensile Reinfrocement

Date

9-Jul-13

Chd.

N.T.

= = = = = = = = =

1000 1000 150 0 30 30 45 460 30.0

mm mm mm mm mm mm Mpa MPa kNm


Compression Reinforcement (Not required)

As, req.

770

sq.mm

> As, min < As, max

6000 Provide

sq.mm

Provide 1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing 4th Layer Spacing = T = = T = = T = = T = 10 100 0 200 0 200 0 200 10 mm 5 mm 5 mm 5 mm

1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing As, prov.

= T = = T = = T =

2 5 200 mm 0 5 200 mm 0 5 200 mm > As, req.

= 15.708 sq. mm = 0.0105 % ==> OK

As, prov.

= 785 = 0.524 ==> OK

sq. mm %

> As, req.

Shear Reinforcement

Design Element With shear reinfrocement vc vmax. Location av Shear froce v Enhanced vc Asv/sv, req. = = = = = = = = 0.975 5.367

= = N/mm2 N/mm2

slab no

(e.g. Slab or Beam) (e.g. Yes or No)

OK!
2 500 100.0 0.952 0.975 0.000 3 1000 0 0.000 0.975 0.000 4 1500 0 0.000 0.975 0.000 5 2000 0 0.000 0.975 0.000 6 2500 0 0.000 0.975 0.000 7 3000 0 0.000 0.975 0.000 8 3500 0 0.000 0.975 0.000

1 0 550.0 5.238 5.367 0.000

Bar size

10

NO SHEAR LINKS IS REQUIRED

Ove Arup & Partners Hong Kong Ltd.

Job No.

214807

Sheet No.

Rev.

ARUP
Job Title

Calculation Sheet Member / Location Drg. Ref. Made by T.V. 26th Floor - Slab S2 - Strip X1 Bot.

Residential Development At Ho Man Tin Typical 1-way Slab Design - Tower 2 Design Information: Flange width, bf Web width, bw Section depth, D Flange depth, hf Top clear cover Bottom clear cover Concrete strength Rebar strength Design Moment
Tensile Reinfrocement

Date

9-Jul-13

Chd.

N.T.

= = = = = = = = =

1000 1000 200 0 30 25 45 460 47.0

mm mm mm mm mm mm Mpa MPa kNm


Compression Reinforcement (Not required)

As, req.

773

sq.mm

> As, min < As, max

8000 Provide

sq.mm

Provide 1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing 4th Layer Spacing = T = = T = = T = = T = 10 100 0 200 0 200 0 200 10 mm 5 mm 5 mm 5 mm

1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing As, prov.

= T = = T = = T =

0 5 200 mm 0 5 200 mm 0 5 200 mm sq. mm % > As, req.

= 0 = 0 ==> OK

As, prov.

= 785 = 0.393 ==> OK

sq. mm %

> As, req.

Shear Reinforcement

Design Element With shear reinfrocement vc vmax. Location av Shear froce v Enhanced vc Asv/sv, req. = = = = = = = = 0.763 5.367

= = N/mm2 N/mm2

slab no

(e.g. Slab or Beam) (e.g. Yes or No)

OK!
2 500 120.0 0.750 0.763 0.000 3 1000 0 0.000 0.763 0.000 4 1500 0 0.000 0.763 0.000 5 2000 0 0.000 0.763 0.000 6 2500 0 0.000 0.763 0.000 7 3000 0 0.000 0.763 0.000 8 3500 0 0.000 0.763 0.000

1 0 850.0 5.313 5.367 0.000

Bar size

10

NO SHEAR LINKS IS REQUIRED

Ove Arup & Partners Hong Kong Ltd.

Job No.

214807

Sheet No.

Rev.

ARUP
Job Title

Calculation Sheet Member / Location Drg. Ref. Made by T.V. 26th Floor - Slab S2 - Strip X2 Top.

Residential Development At Ho Man Tin Typical 1-way Slab Design - Tower 2 Design Information: Flange width, bf Web width, bw Section depth, D Flange depth, hf Top clear cover Bottom clear cover Concrete strength Rebar strength Design Moment
Tensile Reinfrocement

Date

9-Jul-13

Chd.

N.T.

= = = = = = = = =

1000 1000 200 0 30 25 45 460 31.0

mm mm mm mm mm mm Mpa MPa kNm


Compression Reinforcement (Not required)

As, req.

510

sq.mm

> As, min < As, max

8000 Provide

sq.mm

Provide 1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing 4th Layer Spacing = T = = T = = T = = T = 10 150 0 200 0 200 0 200 6.7 mm 5 mm 5 mm 5 mm

1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing As, prov.

= T = = T = = T =

0 5 200 mm 0 5 200 mm 0 5 200 mm sq. mm % > As, req.

= 0 = 0 ==> OK

As, prov.

= 524 = 0.262 ==> OK

sq. mm %

> As, req.

Shear Reinforcement

Design Element With shear reinfrocement vc vmax. Location av Shear froce v Enhanced vc Asv/sv, req. = = = = = = = = 0.666 5.367

= = N/mm2 N/mm2

slab no

(e.g. Slab or Beam) (e.g. Yes or No)

OK!
2 500 105.0 0.656 0.666 0.000 3 1000 0 0.000 0.666 0.000 4 1500 0 0.000 0.666 0.000 5 2000 0 0.000 0.666 0.000 6 2500 0 0.000 0.666 0.000 7 3000 0 0.000 0.666 0.000 8 3500 0 0.000 0.666 0.000

1 0 475.0 2.969 5.367 0.000

Bar size

10

NO SHEAR LINKS IS REQUIRED

Ove Arup & Partners Hong Kong Ltd.

Job No.

214807

Sheet No.

Rev.

ARUP
Job Title

Calculation Sheet Member / Location Drg. Ref. Made by T.V. 26th Floor - Slab S2 - Strip Y1 Bot.

Residential Development At Ho Man Tin Typical 1-way Slab Design - Tower 2 Design Information: Flange width, bf Web width, bw Section depth, D Flange depth, hf Top clear cover Bottom clear cover Concrete strength Rebar strength Design Moment
Tensile Reinfrocement

Date

9-Jul-13

Chd.

N.T.

= = = = = = = = =

1000 1000 200 0 40 35 45 460 44.0

mm mm mm mm mm mm Mpa MPa kNm


Compression Reinforcement (Not required)

As, req.

772

sq.mm

> As, min < As, max

8000 Provide

sq.mm

Provide 1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing 4th Layer Spacing = T = = T = = T = = T = 10 100 0 200 0 200 0 200 10 mm 5 mm 5 mm 5 mm

1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing As, prov.

= T = = T = = T =

0 5 200 mm 0 5 200 mm 0 5 200 mm sq. mm % > As, req.

= 0 = 0 ==> OK

As, prov.

= 785 = 0.393 ==> OK

sq. mm %

> As, req.

Shear Reinforcement

Design Element With shear reinfrocement vc vmax. Location av Shear froce v Enhanced vc Asv/sv, req. = = = = = = = = 0.792 5.367

= = N/mm2 N/mm2

slab no

(e.g. Slab or Beam) (e.g. Yes or No)

OK!
2 500 115.0 0.767 0.792 0.000 3 1000 0 0.000 0.792 0.000 4 1500 0 0.000 0.792 0.000 5 2000 0 0.000 0.792 0.000 6 2500 0 0.000 0.792 0.000 7 3000 0 0.000 0.792 0.000 8 3500 0 0.000 0.792 0.000

1 0 800.0 5.333 5.367 0.000

Bar size

10

NO SHEAR LINKS IS REQUIRED

Ove Arup & Partners Hong Kong Ltd.

Job No.

214807

Sheet No.

Rev.

ARUP
Job Title

Calculation Sheet Member / Location Drg. Ref. Made by T.V. 26th Floor - Slab S2 - Strip Y2 Top.

Residential Development At Ho Man Tin Typical 1-way Slab Design - Tower 2 Design Information: Flange width, bf Web width, bw Section depth, D Flange depth, hf Top clear cover Bottom clear cover Concrete strength Rebar strength Design Moment
Tensile Reinfrocement

Date

9-Jul-13

Chd.

N.T.

= = = = = = = = =

1000 1000 200 0 40 35 45 460 29.0

mm mm mm mm mm mm Mpa MPa kNm


Compression Reinforcement (Not required)

As, req.

509

sq.mm

> As, min < As, max

8000 Provide

sq.mm

Provide 1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing 4th Layer Spacing = T = = T = = T = = T = 10 150 0 200 0 200 0 200 6.7 mm 5 mm 5 mm 5 mm

1st Layer Spacing 2nd Layer Spacing 3rd Layer Spacing As, prov.

= T = = T = = T =

2 5 200 mm 0 5 200 mm 0 5 200 mm > As, req.

= 15.708 sq. mm = 0.0079 % ==> OK

As, prov.

= 524 = 0.262 ==> OK

sq. mm %

> As, req.

Shear Reinforcement

Design Element With shear reinfrocement vc vmax. Location av Shear froce v Enhanced vc Asv/sv, req. = = = = = = = = 0.692 5.367

= = N/mm2 N/mm2

slab no

(e.g. Slab or Beam) (e.g. Yes or No)

OK!
2 500 100.0 0.667 0.692 0.000 3 1000 0 0.000 0.692 0.000 4 1500 0 0.000 0.692 0.000 5 2000 0 0.000 0.692 0.000 6 2500 0 0.000 0.692 0.000 7 3000 0 0.000 0.692 0.000 8 3500 0 0.000 0.692 0.000

1 0 800.0 5.333 5.367 0.000

Bar size

10

NO SHEAR LINKS IS REQUIRED