Of The Landowner Responsible For Performing Tree Planting and Care), in Accordance With The Final
Of The Landowner Responsible For Performing Tree Planting and Care), in Accordance With The Final
This Agreement made and entered into this _____ day of __________, 20__ by and between
_____________________________ (Owner)_________________________________________(address)
and the Montgomery County Planning Board of The Maryland-National Capital Park and Planning
Commission (the “Board”).
WHEREAS, Owner holds title to certain real property, more particularly described as
___________________ as evidenced by appropriate documentation recorded among the land records of
Montgomery County, Maryland at Liber-Folio __________ (Property), and
WHEREAS, this Property has obtained (indicate the type subdivision, site plan, etc.) approval
from the Board, referenced as __________ and plan number __________; and
WHEREAS, the Board or the Planning Director, as a condition of the approval of (Type of Plan)
Plan No. _____________, required a Forest Conservation Plan (“Plan”), to provide for the afforestation
and/or reforestation (Forestation) pursuant to Section 22A of the Montgomery County Forest
Conservation Law; and
WHEREAS, the Owner entered into a Forest Conservation Easement Agreement on [DATE]
(“Easement”);
WHEREAS, pursuant to Section 22A-12(h) of the Montgomery County Code, also known as the
Montgomery County Forest Conservation Law, the Owner is required to enter into a Maintenance and
Management Agreement (the “Agreement”); and
WHEREAS, the Board requires full compliance with the Plan and that the Easement be
adequately maintained, managed and monitored for two years (5 years if in a specially protected area-
SPA) by the Owner to ensure forest protection and establishment.
2. The Owner shall provide the Board, or its designee, reasonable access to the Property to
make routine inspections from the execution of this Agreement continuing through the end of the
two-year (5 years if in an SPA) maintenance period to the areas of the afforestation and/or
reforestation for the purpose of inspection or for the purposes of maintenance should the owner
default.
3. Upon completion of all required plantings, the Owner shall notify the Board’s Forest
Conservation Inspector “Inspector” to schedule a post planting inspection for Plan compliance.
Upon acceptance of the plantings, the Inspector will provide the Owner with written notice of the
maintenance and management commencement date.
April 2009
5. The Owner shall maintain and manage the forest plantings in accordance with the Plan.
This shall include but is not limited to:
* planting native plant species compatible with the existing habitat.
* watering, fertilizing, controlling competing vegetation and protecting plants from
disease, pests and mechanical injury during the initial planting and through the
two-year (5 years if in an SPA) maintenance period as necessary.
* providing protection devices such as fencing, retainer walls, raised sidewalks and
interpretive signs as necessary to prevent the destruction or degradation of the
planting site.
6. The Owner shall monitor the forestation site of the Property for two years (5 years if in
an SPA) and the Owner shall replace any plantings that die within that two year (5 years if in an
SPA) period to a minimum standard of 100 trees per acre or at least 75% of the total trees planted
per acre (whichever is greater), so as to ensure compliance with survival requirements stated in
the Forest Conservation Regulations.
8. The Owner must notify the Board’s Inspector at the end of the two-year (5 years if in an
SPA) maintenance period to schedule a final inspection. After verifying Plan compliance, the
Inspector shall issue to the Owner a written notice of completion.
9. The Owner shall provide financial security in the form of a letter of credit or bond in a
form approved by the Board’s Office of the General Counsel, in the amount of $__________,
estimated to cover the cost of plantings, installation and maintenance for two years. The security
must be posted prior to any clearing or land disturbing activities on the Property.
10. Up to half of the security may be released after the planting has been completed if, the
Board has determined that the planting Plan has been followed and the stock is properly planted
and in good condition.
11. After the second year, or the fifth year in a SPA, if the forest conservation inspector has
determined that the survival requirements have been met, the financial security may be released
upon final inspection.
12. A legal, permanent protection mechanism approved by the Board for all forestation
area(s) in the form of a conservation easement, deed restriction, covenant, or dedication is
attached to this Agreement in the form of the record plat for this Property attached hereto as
Attachment B.
13. This Agreement shall be recorded by the Owner in the Land Records of Montgomery
County, Maryland and shall constitute a covenant running with the land and shall be binding on
the Owner, its administrators, heirs, executors, and other successors in interest.
14. This Agreement may be reviewed at 8787 Georgia Avenue, Silver Spring, Maryland.
April 2009
Witness the following signatures:
__________________________
Owner’s Signature Date
_______________________________________ ___________________________
Chief, Environmental Planning Division
Date
____________________________________________________________________________
State of ________________
County of _______________
_____________________________________
Notary Public
My Commission Expires:__________________
State of ________________
County of ______________
_____________________________________
Notary Public
My Commission Expires:__________________
The Maintenance and Management Agreement is hereby released on ____day of ______ 20____.
_______________________________
Chief, Environmental Planning Division
April 2009