0% found this document useful (0 votes)
62 views9 pages

Design Process: A Aimed at Devising A For Changing An

A PURPOSEFUL ACTIVITY AIMED AT DEVISING A PLAN FOR CHANGING AN EXISTING SITUATION INTO A FUTURE PREFERRED STATE.

Uploaded by

Ellenor Erasan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views9 pages

Design Process: A Aimed at Devising A For Changing An

A PURPOSEFUL ACTIVITY AIMED AT DEVISING A PLAN FOR CHANGING AN EXISTING SITUATION INTO A FUTURE PREFERRED STATE.

Uploaded by

Ellenor Erasan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 9

DESIGN PROCESS

A PURPOSEFUL ACTIVITY AIMED AT DEVISING A PLAN FOR CHANGING AN EXISTING SITUATION INTO A FUTURE PREFERRED STATE.

DESIGN PROCESS

5.

1. PROGRAMMING 2. SCHEMATICS 3. DESIGN DEVELOPMENT 4. CONTRACT DOCUMENTS CONSTRUCTION ADMINISTRATION

PROGRAMMINGDATA GATHERING, RESEARCH,


INFORMATION SEARCH

Determining client needs, preferences, operations and aspirations Determine project constraints, parameters Problem definition

SCHEMATICS
Concept getting towards solution Collaboration of different disciplines as demanded by the design Formulating schemes with client involvement.

DESIGN DEVELOPMENT
Development of approved schemes Making the scheme definitive and realistic Decision making on specific concerns

CONTRACT DOCUMENTS
Production of working drawings, estimates and specifications Preparation and of bid documents and selection of contractors Application of various government permits

CONSTRUCTION ADMINISTRATION
Design implementation the architects role vary depending on the demand of the project and client Management and administration of construction

You might also like