Insul Coord 800 KV
Insul Coord 800 KV
Insul Coord 800 KV
Power Systems DC - 1
abb.com/hvdc
Presentation items
! ! ! ! !
Operating experience Principles Smoothing reactor Insulation levels for different components Staging
Power Systems DC - 2 -
Presentation items
! ! ! ! !
Operating experience Principles Smoothing reactor Insulation levels for different components Staging
Power Systems DC - 3 -
Insulation coordination. Experience from operation. " Creepage flashovers -- Accurate creepage distance -- Accurate insulator design " Flashover because of uneven wetting -- Attention to physical layout " Overvoltages -- Excellent experience, no flashovers (Overdesign) " Cost of withstand for Lightning Impulse and Switching Impulse is small (exception: Thyristor valve) at 500 kv rating (creepage was dimensioning) " At 800 kV the Lightning Impulse and Switching Impulse will influence size, weight and cost of equipment
Power Systems DC - 4 -
Presentation items
! ! ! ! !
Operating experience Principles Smoothing reactor Insulation levels for different components Staging
Power Systems DC - 5 -
Power Systems DC - 6 -
Presentation items
! ! ! ! !
Operating experience Principles Smoothing reactor Insulation levels for different components Staging
Power Systems DC - 7 -
U1 U1
175 mH
U2 U2
175 mH
U3 U3
Power Systems DC - 8 -
175 mH
175 mH
Power Systems DC - 9 -
Smoothing reactor is located on neutral bus at Skagerrak, CU and Inga-Shaba +/-500 kV project
Weight ton 43 40
Power Systems DC - 10 -
Power Systems DC - 11 -
Presentation items
! ! ! !
Operating experience Principles Smoothing reactor Insulation levels for different components from a study using typical data NB! Only the upper 12-pulse converter is shown Staging
Power Systems DC - 12 -
Switching overvoltages By-pass blocking w/o by-pass pair (1345 kV) Ground fault on line (1040 kV) 1) Disconnection of last ac line in inverter (1216 kV) Lightning overvoltages Lightning surge (1625 kV) Shielding failure in dc switchyard OH line tower arcing horns 1) 1.7 p u at line midpoint
Two or three DC line arresters to cater for distance effects. All arresters are contributing to reduce switching surges
Power Systems DC - 13 -
Power Systems DC - 14 -
LIWL 1744 kV SIWL 1518 kV Switching overvoltages AC bus switching surges(1128 kV) Disconnection of last ac line in inverter (1312 kV) Inverter blocking w/o by-pass pair (1096 kV) Lightning overvoltages Lightning surge from ac network Lightning surge from dc line
YG
V MH
Power Systems DC - 15 -
The arrester YG will be installed if necessary to reduce switching overvoltages. Otherwise arresters MH+V protect phase-to-ground insulation
LIPL 386 kV SIPL 405 kV Switching overvoltages AC network switching surge Earth fault between transformer and valve Lightning overvoltages Lightning stroke from ac yard Lightning stroke from dc yard
Power Systems DC - 16 -
Switching overvoltages NA Lightning overvoltages Ground fault beside reactor Lightning surge from dc line
Power Systems DC - 17 -
Switching overvoltages NA Lightning overvoltages Ground fault beside reactor Lightning surge from dc line
Power Systems DC - 18 -
Neutral bus
Presentation items
! ! ! ! !
Operating experience Principles Smoothing reactor Insulation levels for different components Staging
Power Systems DC - 19 -
! ! !
2 x 12 pulse groups/pole Max power 6200 MW at 800 kV DC Transformer data (6200 MW)
! ! ! !
Power Systems DC - 20 -
Maximum flexibility & availability High speed by-pass switch Operational experience from Itaipu Operation at reduced voltage
! !
70 % 35 %
Power Systems DC - 21 -
Power Systems DC - 22 -
irst stage
Second stage Connection Voltage kV 1x12pulse 1x12pulse 1x12pulse 1x6pulse 1x6pulse 800 800 800 800 800
Cost %
x12pulse
x6pulse
Power Systems DC - 23 -