BSC 6000
BSC 6000
BSC 6000
ISSUE 1.0
GSM BSS Training Team
HUAWEI Confidential
This course describes the hardware structure of the HUAWEI BSC6000 system, board module functions, system operating principles, system signal flows, and O&M flows. In addition, this course describes the principles of hardware configuration and lists some typical configurations.
HUAWEI Confidential
Page 2
Reference
HUAWEI BSC6000 Hardware Reference HUAWEI BSC6000 System Description HUAWEI BSC6000 Architecture and Principles
HUAWEI Confidential
Page 3
Purpose
After learning this course, you should understand the following contents: HUAWEI BSC6000 function and features HUAWEI BSC6000 hardware structure HUAWEI BSC6000 system principle HUAWEI BSC6000 typical configuration
HUAWEI Confidential
Page 4
HUAWEI Confidential
Page 5
Um
Abis
PDN
HUAWEI Confidential
Page 6
HUAWEI Confidential
Page 7
HUAWEI Confidential
Page 8
HUAWEI Confidential
Page 9
Summary
Summary
This chapter describes the following contents: Design mentality of the HUAWEI BSC6000 system System specifications Functions and Features
HUAWEI Confidential
Page 10
HUAWEI Confidential
Page 11
HUAWEI Confidential
Page 12
Abbreviation
Abbreviation
Full Name
GBCR
GBSR GBAM GEPS GMPS GTCS GIMS
HUAWEI Confidential
Page 13
Structure of Rack
Model: The BSC6000 uses HUAWEI N68-22 rack. The rack design complies with the IEC60297 and IEEE standards. Structure Dimension: 600mm (width) x800mm (depth) x 2200mm (height) Weight: Empty rack 150kg; full configuration 350kg Type The BSC6000 rack is categorized into two types: GBCR: GSM BSC Control Processing Rack
HUAWEI Confidential
Page 14
Rack GBCR
GBCR (GSM BSC Control Processing Rack ): It must be configured with main processing subrack and GBAM server. It processes the BSC6000 services and performs operations and maintenance. In the GBCR, a GIMS and at most two Cabling subrack Air defence subrack Subrack Power distribution box
Subrack
HUAWEI Confidential
Page 15
Rack GBSR
GBSR (GSM BSC Service Processing Rack ): It is only configured with subracks. It performs service processing functions of the BSC6000. One service rack can be configured with three subracks. According to the requirement of service quantity, each BSC6000 system contains a maximum of three service racks. subrack Air defence subrack Power distribution box
Dummy panel
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential
Page 16
Subrack
Subrack: The subrack complies with the IEC60297 standard. The width of it is 19 inches. A backplane is in the middle of the subrack, and boards are inserted from the front and the rear of the subrack. Both the front subrack and the rear subrack provide 14 slots. The slots are numbered 0027 from the front to the rear. The BSC6000 contains three subracks: GMPS main processing subrack GEPS extension processing subrack GTCS voice processing subrack Front of subrack Rear of subrack Cabling Trough Board Fan box
HUAWEI Confidential
Page 17
SubrackGMPS
GMPS: It performs the basic service processing and operation maintenance functions. In addition, it provides system clock. The GMPS is configured in the GBCR. Compared with the GEPS subrack, the GMPS also is configured with the GGCU board.
GSCU Slot 67
GGCU Slot 1213 GEIUB Slot 1827 GEIUT Slot 1617 GEIUP Slot 1415
HUAWEI Confidential
Page 18
SubrackGEPS
GEPS: It performs basic service processing function of the BSC6000. Each BSC6000 has 03 GEPS that can be configured in the GBCR or GBSR. It can process the services of a maximum of 512 TRXs in full configuration.
GXPUM slot 02 GTNU slot 45 GSCU slot 67 GEIUB slot 1827 GEIUT slot 1617 GEIUP slot 1415
HUAWEI Confidential
Page 19
SubrackGTCS
GTCS: A GTCS (GSM TransCoder Subrack ) performs transcoding, rate adaptation and submultiplexing. When the BSC6000 uses E1 transmissions on the A interface, a GTCS provides a maximum of 3,840 speech channels.
GTNU slot 45 GSCU slot 67 GEIUB slot 913 GEIUT slot 1417 GEIUA slot 1827
HUAWEI Confidential
Page 20
SubrackGTCS
When the BSC6000 uses STM-1 transmissions on the A interface, a GTCS provides a maximum of 7,680 speech channels.
HUAWEI Confidential
Page 21
HUAWEI Confidential
Page 22
Abbreviation
Abbreviation
GGCU GSCU GTNU GXPUC GXPUM GDPUC GEIUA GEIUB GEIUP
Full name
GSM General Clock Unit GSM Switching and Control Unit GSM TDM Switching Unit GSM Extended Processing Unit for Cell broadcast service GSM Extended Processing Unit for Main service GSM Data Processing Unit for CS service GSM E1/T1 Interface Unit for A GSM E1/T1 Interface Unit for Abis GSM E1/T1 Interface Unit for Pb
GEIUT
GOIUA GOIUB GOIUP GOIUT
HUAWEI Confidential
Page 23
BoardGGCU
The GGCU is the general clock unit in the BSC6000. The active GGCU and
GGCU
the standby GGCU are configured in slots 12 and 13 in the GMPS. The GGCU board provides synchronous timing signals for the system The GGCU has the following functions: Generating and keeping synchronous clock signals Keeping the consistency of synchronization information output from the active and standby GGCUs
Matching Port CLKOUT09 Function Connector Synchronization signal output port, used to output 8 kHz clock signals to the GSCU COM01 TESTOUT TESTIN CLKIN01 Standby Standby Standby Synchronization clock signal input port, used to input one route of external 2.048 MHz signal and RJ45 SMB male connector SMB male connector SMB male connector RJ45
4 5 6 7
8 9 COM0 COM1
CLKLIN0 TESTOUT
CLKLIN1
TESTIN
PARC
HUAWEI Confidential
Page 24
BoardGSCU
The GSCU is the switching control unit in the BSC6000. The active GSCU and
SCUa
the standby GSCU are inserted in slots 6 and 7 of the GMPS/GEPS/GTCS. The
RUN ALM ACT RESET
LINK ACT
GSCU board provides maintenance management of the subrack and GE switching platform for the subrack. The GSCU has the following functions: Performing maintenance management of the subrack Providing a GE platform for the subrack
0 1 2 3
LINK ACT
Providing clock information for the other boards in the same subrack
10/100/1000BASE-T
4 5
6 7
LINK ACT
8 9 10 11
TESTOUT
PARC
10M/100M/1000M Ethernet ports, used to connect subracks EHT08 ETH9 Connecting to the DEBUG port, used as a service path EHT1011 10M/100M/1000M Ethernet ports, used to connect subracks Connecting with the ETH9 port 10/100/1000BASE-T9, used DEBUG as a service path Clock source port, used to receive the 8 kHz clock signals CLKIN from the panel of the GGCU TESTOUT Clock test signal port, used to output clock test signals
CLKIN
COM
HUAWEI Confidential
Page 25
Board GTNU
GTNU
The GTNU is the TDM switching unit in the BSC6000. The active GTNU and the standby GTNU are inserted in slots 4 and slot 5 of the GMPS/GEPS/GTCS. The GTNU board performs the TDM switching function, which is the TDM switching
The GTNU has the following functions: Providing 128 K 128 K TDM switching Allocating TDM network resources, establishing, and releasing radio links
TNM3
TNM2
TNM1
Matching
Port Function connector
TNM4
TNM5
TDM05
TDM high-speed serial port, used to connect the GTNUs between subracks
DB14
PARC
HUAWEI Confidential
Page 26
BoardGXPUM
GXPU
The GXPUM is the main service processing unit in the BSC6000. The active GXPUM and the standby GXPUM are inserted in slots 0 and 1 of the GMPS or GEPS. One GXPUM has four built-in CPUs that perform central service processing function. The GXPUM has the following functions:
LINK ACT
Paging control System information management Channel assignment BTS common service management
0 1 2 3
10/100/1000BASE-T
Port
10/100/1000BASE-T03
PARC
Function
GE/FE Ethernet port, reserved
HUAWEI Confidential
Page 27
BoardGXPUC
GXPU
The GXPUC is the cell broadcast processing unit in the BSC6000. The active GXPUC and standby GXPUC are inserted in slots 8 and slot 9 in the GMPS or GEPS. The GXPUC performs the message cell broadcast function of the system. The GXPUC has the following functions: Providing a port for connecting the Cell Broadcast Center (CBC) Storing cell broadcast messages Scheduling cell broadcast messages based on the Cell Broadcast Channel (CBCH)
LINK ACT
0 1 2 3
10/100/1000BASE-T
Port
10/100/1000BASE-T03
PARC
HUAWEI Confidential
Page 28
TX
RX
E1/T1(24~31)
LOS
E1/T1(16~23)
The GEIU / GOIU can be categorized into the following types : The GEIUB/GOIUB is the GSM E1/T1 Interface Unit for the Abis interface. The GEIUP/GOIUP is the GSM E1/T1 Interface Unit for the Pb interface. The GEIUT/GOIUT is the GSM E1/T1 Interface Unit for the Ater interface. The GEIUA/GOIUA is the GSM E1/T1 Interface Unit for the A interface. The GEIU/GOIU has the following functions: Processing the SS7 MTP2 protocols Processing the Link Access Procedure on the D channel (LAPD) protocols Providing maintenance links when GTCS subracks are configured at the MSC side Performing inter-board Tributary Protect Switching (TPS) Matching connector DB44
Interface
E1/T1(8~15)
Function E1/T1 port, used to transmit and receive E1/T1 signals on routes 07 2.048 MHz clock source output port, used to output the
E1/T1(0 31)
E1/T1(0~7)
TESTOUT2M1 2M0
TESTOUT2M1 2M0
2M01
SMB male
connector
SMB male connector
TESTOUT
PARC
PARC
HUAWEI Confidential
Page 29
BoardGEIU
The DIP switches of the GEIU board is set through the 75-ohm coaxial cable transmission mode. Reset the DIP switches of the GEIU board if onsite engineers adopt other transmission modes.
Description
Used to select the impedance on E1/T1 links 07 Used to select the impedance on E1/T1 links 815 Used to select the impedance on E1/T1 links 1623
75 ON ON ON
4
58 S3 S4 S5 S6 18 18 18 18
ON
ON ON ON ON ON
OFF
OFF OFF OFF OFF OFF
HUAWEI Confidential
Page 30
BoardGDPUC
DPUa
The GDPUC is the circuit service processing unit in the BSC6000. The
RUN ALM ACT
GDPUC board can be inserted in slot 0 to slot 3, slot 8 to slot 13 of the GTCS subrack. The board performs the voice and data service processing functions. It works in resource pool mode. The GDPUC has the following functions: Encoding and decoding speech services Performing data service rate adaptation Performing Tandem Free Operation (TFO) Performing voice enhancement function Automatically detecting voice faults
PARC
HUAWEI Confidential
Page 31
GBAM
The GBAM is a server installed with OMU software, which is used to perform operation and maintenance for the BSC6000. It has the following functions: Controlling the communications between the LMT and boards, supporting data configuration for boards through the LMT; collecting and filtering performance and alarm data Responding to the commands from the LMT, processing the commands, and then forwarding the commands to the boards in the BSC6000 Filtering the results from boards and then returning the results to the LMT
HUAWEI Confidential
Page 32
Display port
and keyboard
Grounding screw
Page 33
HUAWEI Confidential
KVM
The KVM is a device integrating a keyboard, a display, and a mouse. It is the operating platform of the GBAM.
HUAWEI Confidential
Page 34
Fan Box
The PFPU board and the PFCU board are configured in the fan box. The PFPU is inserted in the rear part of the fan box. It provides power supply for nine fans, keeps the voltage stable through a stabilizing tube, and ensures normal operations of the fans. The PFCU is inserted in the front part of the fan box. It has the following functions: Monitoring the running status of the fans in the fan box Communicating with the GSCU and reporting the working status of the fan box Detecting the temperature of the fan box, collecting temperature data with a temperature sensor
HUAWEI Confidential
Page 35
HUAWEI Confidential
Page 36
Summary
Summary
This chapter describes the following contents: Structure of the BSC6000 rack Subrack Structures and functions of boards
HUAWEI Confidential
Page 37
HUAWEI Confidential
Page 38
Chapter 3 System Principle Module Function System Signal Flow Software Loading Alarm Channel
HUAWEI Confidential
Page 39
Service Control Subsystem Interface and Signaling Processing Subsystem Clock Subsystem
TDM switching subsystem
GE switching subsystem
HUAWEI Confidential
Page 40
Logical Unit TDM access bearer unit TDM switching unit TDM processing bearer unit
HUAWEI Confidential
Page 41
HUAWEI Confidential
Page 42
Trunk Cable
The trunk cable is categorized into the following types: 75 coaxial cable 75 Y-shaped coaxial cable 120 twisted pair cable 120Y-shaped twisted pair cable
HUAWEI Confidential
Page 43
Trunk Cable
Connecting the 75 Y-shaped coaxial cable
HUAWEI Confidential
Page 44
Slot 0
Slot 2
Slot 27
Connection between a board and the active GTNU through a backplane TDM path Connection between a board and the standby GTNU through a backplane TDM path
HUAWEI Confidential
Page 45
GTNU0
GTNU1
The GTNU to each slot: 4K; 24x4k=96k Six ports provided by the GTNU: 6x4k=24k 8k redundancy: 128k-96k-24k=8k
HUAWEI Confidential
Page 46
0
GTNU GTNU
3
GTNU GTNU
1
GTNU GTNU
2
GTNU GTNU
HUAWEI Confidential
Page 47
Pin14 A
3 Pin1 B W1 W3 X3 W2 W4 X4 Pin14 B
Pin1 A
X1
X2
HUAWEI Confidential
Page 48
HUAWEI Confidential
Page 49
GE Switching Subsystem
The Gigabit Ethernet (GE) switching subsystem performs GE switching of signaling and O&M interface. The hardware of the subsystem consists of the following entities: Backplane GSCU board GE interface units of the boards in the subsystem The GSCU performs operation and maintenance of its subrack and provides GE switching for the other boards in the same subrack.
HUAWEI Confidential
Page 50
GE Switching Unit
Intra-subrack active/standby GSCU boards: HiG interconnection; 30G bandwidth Intra-subrack GE switching: The GSCU board provides 48G GE switching capability. The slot 14, slot 15, slot 26, and slot 27 are distributed 1G respectively. The slot 6 and slot 7 are not distributed. Other slots are distributed 2G respectively.
GSCU Active
GSCU Standby
Slot 1
Slot 2
Slot 26
Connection between a board and the active GSCU through a backplane GE path Connection between a board and the standby GSCU through a backplane GE path HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential
Page 51
HiG interconnection
GE Switching Unit
Inter-subrack GE switching: start interconnection through crossover networks
HiG interconnection 30G bandwidth
GSCU0
GSCU1
GSCU1
Extension subrack
12
Port on the panel
GSCU0
48 48
12
GSCU0
GSCU1
main subrack
GE
GE
GSCU0
GSCU1
Extension subrack
GSCUs to slots: 48G The GSCU provides 12 ports for inter-subrack interconnection: 12 x 1G Total: 48G+12x1G=60G
HUAWEI Confidential
Page 52
To ease the cabling To realize inter-subrack interconnection through the GE0/GE1 ports To realize interconnection between the GSCU and GBAM through the GE10/GE11 ports
GE TRUNK1
GE 1
GE TRUNK2
GE 2 GE 3
GE 0 GE 1
GE 4
GE TRUNK3
GE 5
GE 0
GE 1
LMT
GE TRUNK4
GE 6 GE 7
CBC
GE 8
LanSwitch
M2000/NM center
GE 9
GE TRUNK5
GE 10
GBAM
GE TRUNK6 CPU FE
GE 11
FE
HUAWEI Confidential
Page 53
GTCS
Main GTCS
Ater interface Pb interface
GTCS GTCS
TC
Abis interface
GEPS GMPS
GEPS GEPS
BM
The subracks in the BSC6000V100R001 compose an interconnection switching network through cascades.
GSCU star interconnection GTNU full interconnection
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential
Page 54
HUAWEI Confidential
Page 55
HUAWEI Confidential
Page 56
Abis
BTS
GMPS/ GEPS
Ater
GTCS BSC
MSC
Pb
Cb
PCU
CBC
HUAWEI Confidential
Page 57
Clock Subsystem
The hardware entity of the clock subsystem is the GSM General ClocK Unit (GGCU). The clock sources of the BSC6000 are as follows: Building Integrated Timing Supply System (BITS) There are two types of BITS clock: 2 MHz clock and 2 Mbit/s clock. The 2 Mbit/s clock source has higher anti-interference capabilities than the 2 MHz clock source. Line clock
The line clock extracted from the A interface is processed and generates 2 MHz clock and 8
kHz clock. The 2 MHz clock signals output from the A interface panel and then are sent to the GGCU board in the GMPS subrack. Note: Local free-run clock
HUAWEI Confidential
Page 58
Clock Subsystem
GGCU Reference Clock Input To input the active-standby clock of the GGCU, you can use the signals provided by the BITS and the 2.048MHz clock signal extracted from the upper-level clock by the interface panel in the service subrack. The GGCU backplane uses the interface panel of the same subrack to extract the 8 KHz clock
Backplane transmission
GSCU
Backplane transmission
GSCU
Backplane transmission
GSCU
Backplane transmission
Service board
HUAWEI Confidential
Service board
Page 60
Service board
GEPS GMPS
GGCU GGCU Y-shaped cable GSCU GSCU
GEPS
GSCU
GSCU
HUAWEI Confidential
Page 61
Clock Cable
1 W2
1
8 1
8 1
X2 W1 X1 W3 X3
8 1
HUAWEI Confidential
Page 62
HUAWEI Confidential
Page 63
GSCU
GBAM
LMT
GGCU
HUAWEI Confidential
Page 64
Chapter 3 System Principle Module Function System Signal Stream Software Loading Alarm Path
HUAWEI Confidential
Page 65
BTS
Abis interface
G E I U B
G T N U
G E I U T
G E I U T
G T N U
GTCS
GMPS/GEPS
G D P U C
G E I U A
MSC
A interface
E1/T1 cable TDM switching on the backplane
HUAWEI Confidential
Page 66
BTS
G T N U
G E I U P Pb interface
Front board Rear board
PCU
Gb interface
E1/T1 cable
SGSN
GMPS/GEPS
HUAWEI Confidential
GEIUB
GTNU
64K
GEIUT
64K
GTNU
64K
GEIUA
64K
A interface
64K
16K Pb interface
GEIUP
64K
64K
GDPUC
BM subrack TC subrack
A interface
GEIUB Abis interface GTNU
64K
GEIUT
16K
GEIUT
64K
GTNU
64K
GEIUA
64K
64K 64K
BM subrack
Voice service, non-crossover subrack switch Voice service, crossover subrack switch
HUAWEI Confidential
Page 68
G X P U M
G S C U
G E I U T
Ater interface
G E I U T
G T N U
G E I U A
MSC
GMPS/GEPS
GTCS
A interface
Front board
Rear board
HUAWEI Confidential
Page 69
G X P U M
G S C U
G E I U B
The signals are processed through the LAPD, and then sent to the GXPUM in the mode of internal signaling flow
BTS
GMPS/GEPS
Abis interface
Front board
Rear board
HUAWEI Confidential
Page 70
G X P U M
G S C U
G E I U T
Ater interface
G E I U T
G S C U
GMPS/GEPS
GTCS
The signals are processed through the MTP2, and then sent to the GSCU in the mode of internal signaling flow Front board Rear board E1/T1 cable TDM switching on the backplane GE switching on the backplane
HUAWEI Confidential
Page 71
G X P U M
G S C U
G E I U P
Pb interface
The signals are processed through the LAPD, and then sent to the GXPUM in the mode of internal signaling flow
PCU
GMPS/GEPS
Front board
Rear board
HUAWEI Confidential
Page 72
HUAWEI Confidential
Page 73
O&M Flow
HDLC link
Service board
Service board
L M T
G B A M
G S C U
G E I U T
G E I U T
G S C U
GMPS
Ater interface
Main GTCSRemote
Service board
Service board
G S C U
G S C U
GEPS
Main GTCSLocal
Page 74
HUAWEI Confidential
O&M Flow
O&M path of the GMPS LMTGBAMGSCUboards of the GMPS O&M path of the GEPS LMT GBAM GSCUinter-subrack interconnection cableGSCUboards of the GEPS O&M path of the GTCS LMT GBAM GSCUGXPUMGSCUGEIUTHDLC GEIUT GSCUboards of the GTCS O&M path of the BTS LMT GBAM GSCUGXPUMGSCUGEIUBBTS
HUAWEI Confidential
Page 75
Chapter 3 System Principle Module Function System Signal Flow Software Loading Alarm Path
HUAWEI Confidential
Page 76
Software Loading
The loading process is the process that a board obtains program files and data files after the service subrack or the board starts or restarts. The process of loading has the following two phases: BOOTP phase: A board obtains its IP address, software loading control mode, and program software by sending a Bootstrap Protocol (BOOTP) request. LOAD phase: A board obtains its data files and other files. The BSC6000 software loading control system has two layers: The GBAM is the first-level center of the entire BSC software loading management. The loading and power-on of the GBAM are independent of other boards. The GBAM processes the loading control requests of the GSCU in the GMPS. The GSCU in the GMPS is the second-level center of the loading control system. The GSCU processes the loading control requests of the service boards in the GMPS, GEPS, and GTCS.
HUAWEI Confidential
Page 77
G B A M
G S C U
E I U T
Service board
GTCS
E I U T
G S C U
Service board
GMPS GEPS
Main Remote GTCS
extension GTCS
GE on the backplane
G S C U
GEPS
G S C U
GTCS
HUAWEI Confidential
Service board
Service board
Page 78
G S C U
GMPS GEPS
Main GTCS
Service board
Service board
extension GTCS
G S C U
GEPS
Service board
Service board
G S C U
GTCS
HUAWEI Confidential
Page 79
HUAWEI Confidential
Page 80
HUAWEI Confidential
Page 81
HUAWEI Confidential
Page 82
HUAWEI Confidential
Page 83
Chapter 3 System Principle Module Function System Signal Flow Software Loading Alarm Path
HUAWEI Confidential
Page 85
alarm indicators.
Convert
LMT
Alarm box
HUAWEI Confidential
Page 86
HUAWEI Confidential
Page 87
GTCS
Service board
HUAWEI Confidential
Page 88
GSCU
GBAM
LMT Convert
Alarm box
HUAWEI Confidential
Page 89
Summary
This chapter describes operating process of the BSC6000, including module function, software loading, system signal flow, and alarm path.
Summary
HUAWEI Confidential
Page 90
HUAWEI Confidential
Page 91
Configuration Principles
The GEIU/GOIU provide E1 port or STM-1 port. To ensure the orderliness of rack, insert the GEIU /GOIU boards at the rear of slots. The Abis interface supports four mulitiplexing modes, including 4: 1, 3: 1, 2: 1, and 1: 1. Each GEIUB board at most supports 256 Lapd links
The proportion between the number of the Ater interface boards and that of A interface boards is 1: 4,
so that the multiplexing capability of the Ater interface can be supported. Each GDPUC board can processes 968-way voice. The GDPUC board uses N+1 redundancy configuration. All the TC resources are shared through the resource pool.
HUAWEI Confidential
Page 92
Configuration Principles
Except the GTNU and the GSCU, other boards can be inserted at random. But, in the configuration operation provided by the LMT, each board should be inserted in the specified slots: Two GSCUs should be inserted in the slot 6 and slot 7 of the GMPS/GEPS/GTCS. They work in active/standby mode. Two GTNUs should be inserted in the slot 4 and slot 5 of the GMPS/GEPS/GTCS. They work in active/standby mode. Two GGCUs should be inserted in the slot 12 and slot 13 of the GMPS. They work in active/standby mode. The GXPUMs can be inserted in slot 0 and slo1 of the GMPS/GEPS according to requirements. The GXPUCs can be inserted in slot 8 and slot 9 of the GMPS/GEPS according to requirements. The GDPUCs can be inserted in slot 0 to slot 3 and slot 8 to slot 13 of the GTCS according to requirements.
HUAWEI Confidential
Page 93
Configuration Principles
Two GEIU boards must be configured into active board and standby board. The GEIUBs/GOIUBs can be inserted in slot 18 to slot 27 of the GMPS/GEPS according to requirements. The GEIUPs/GOIUPs can be inserted in slot 14 and slot 15 of the GMPS/GEPS according to requirements. The GEIUTs/GOIUTs can be inserted in slot 16 and slot 17 of the GMPS/GEPS and slot 14 to slot 17 of the GTCS according to requirements. The GEIUAs/GOIUAs can be inserted in slot 18 to slot 27 of the GTCS according to requirements.
HUAWEI Confidential
Page 94
Typical Configuration
Capacity of this configuration: The BSC supports 256TRX full rate/128TRX half rate; The EIUB is configured according to the number of BTS and the number of carrier. Based on the service capacity, the GDPUC is configured through N+1 redundancy. The EUIP is configured optionally according to actual services. The GXPUC is configured optionally according to the actual services.
HUAWEI Confidential
Page 95
Typical Configuration
Capacity of this configuration: The BSC supports 512TRX full rate/256TRX half rate ; The EIUB is configured according to the number of BTS and the number of carrier. Based on the service capacity, the GDPUC is configured through the N+1 redundancy. The EUIP is configured optionally according to actual services. The GXPUC is configured optionally according to actual services.
HUAWEI Confidential
Page 96
Typical Configuration
The capacity of this configuration: The BSC supports 1024TRX full rate/512TRX half rate. The EIUB is configured according to the number of BTS and the number of carrier. Based on service capacity, the GDPUC is configured through N+1 redundancy The EIUP is configured optionally according to actual services. The GXPUC is configured optionally according to actual services.
HUAWEI Confidential
Page 97
Typical Configuration
Capacity of full configuration: When a BSC6000 is fully configured, it supports 2048TRX full rate/1024TRX half rate.
HUAWEI Confidential
Page 98
Summary
Summary
This chapter describes the configuration principles of the BSC6000 and lists some typical configurations in the actual deployment.
HUAWEI Confidential
Page 99
Dec 31 2006
Thank You
www.huawei.com
www.huawei.com
HUAWEI Confidential
switch should be set up after the board receives data configuration. The switch can be modified if
the data configured is changed. Switch on the GTNU The switch is set up in every call connection course.
G E I U B
G T N U
G E I U T
G E I U T
G T N U
G D PD US CP
G E I U A
HUAWEI Confidential
Page 101
Then, set up the switch between the Ater and the Abis, which may cross the BM subrack.
HUAWEI Confidential
Page 102
G E I U B
G X P U M
G E I U T
G E I U T
G E I U A
G D P U C
G E I U T
HUAWEI Confidential
Page 103
G E I U B
G X P U M
G E I U T
G X P U M
G E I U T
G E I U A
G D P U C
G E I U T
Signaling Signal Flow Voice Signal Flow HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential
Page 104