0% found this document useful (0 votes)
52 views1 page

Plant Shutdown Summary March, 13

The monthly plant shutdown report for March 2013 from Unique Power Plant Limited summarizes two shutdown incidents. The first shutdown occurred on March 22nd at 8:13 AM due to low control air pressure, lasting 1 hour and 44 minutes. The second shutdown happened on March 28th at 5:18 PM when generator load became unbalanced after a ball mill started during island mode operation, lasting 37 minutes. Both shutdowns were addressed by plant personnel and reports were prepared by the Assistant Plant Manager.

Uploaded by

masudalam
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views1 page

Plant Shutdown Summary March, 13

The monthly plant shutdown report for March 2013 from Unique Power Plant Limited summarizes two shutdown incidents. The first shutdown occurred on March 22nd at 8:13 AM due to low control air pressure, lasting 1 hour and 44 minutes. The second shutdown happened on March 28th at 5:18 PM when generator load became unbalanced after a ball mill started during island mode operation, lasting 37 minutes. Both shutdowns were addressed by plant personnel and reports were prepared by the Assistant Plant Manager.

Uploaded by

masudalam
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

UNIQUE POWER PLANT LIMITED

An enterprise of Meghna group of industries


Meghnaghat, Sonargaon, Narayangonj Date: 01.04.13

Monthly Plant shutdown report/Summary, March, 2013


SL No 1 2 28/03/2013 3 5:18PM Date 22/3/2013 Time 8:13AM 3:34PM Cause of Shutdown Arrange Shutdown Control air pressure low G-5 trip for under under frequency protection Plant Manager Downtime 1:44hr. 21min. Remarks Plant arrange shutdown due to L-5 HT cable connect with busbar. Engine-2 side control air regulator suddenly huge leakage. That time plant was island mode and fresh-3 ball mill start time generator load unbalanced. ... GM (Power Plant)

37min.