100% found this document useful (2 votes)
6K views3 pages

Brick Masonry Rate

This document provides a rate analysis for 230mm thick brick masonry construction using approved quality bricks, cement mortar with a ratio of 1 cement to 6 sand, and adequate soaking of bricks in water. It lists the unit rates and costs for materials like bricks, cement, sand, and construction water, as well as labor costs for masons, helpers, and unskilled workers. The total material and labor costs are calculated, with a 10% profit added to determine the effective cost per cubic meter of brick masonry construction.

Uploaded by

Sam Roger
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
6K views3 pages

Brick Masonry Rate

This document provides a rate analysis for 230mm thick brick masonry construction using approved quality bricks, cement mortar with a ratio of 1 cement to 6 sand, and adequate soaking of bricks in water. It lists the unit rates and costs for materials like bricks, cement, sand, and construction water, as well as labor costs for masons, helpers, and unskilled workers. The total material and labor costs are calculated, with a 10% profit added to determine the effective cost per cubic meter of brick masonry construction.

Uploaded by

Sam Roger
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

RATE ANALYSIS FOR BRICK MASONRY

PROVIDING & CONSTRUCTING 230 THK. BRICK MASONRY IN CEMENT MORTOR 1:6 USING DEFECTLESS,SHARP EDGED TABLE MOULDED WELL BURNT, UNIFORM SIZE, APPROVED QUALITY BRICKS ADEQUATELY SOAKED IN WATER BEFORE USE FOR SUPER STRUCTURE,ETC., INCLUDING RACKING, SCAFFOLDING, CURING ETC., COMPLETE AS DIRECTED UP TO 3.00 MTR ABOVE GROUND LEVEL.
SL NO Unit = Cum Taking output = 1.00 Cum DESCRIPTION UNIT QUANTITY RATE Rs COST Rs

a)

b)

Material Brick Cement Sand Construction water Labour Mate Mason Unskilled
Total cost ( Material Cost + Labour Cost ) Add 10% profit including PPE cost, tools and tackles, Administrative charges and other incidental charges etc. Total cost for 5 Cum c+d Effectivbe cost / 1 Cum

Nos Bags cum Ls day day day

500.00 1.56 0.33

7.00 300.00 1100.00

3500.00 468.00 363.00 50.00

0.10 0.80 1.60

346.39 312.40 284.58

33.25 249.92 455.33 5,119.5 512.0 5,631.5 5632

c) d) e)