0% found this document useful (0 votes)
86 views

Testing Form

This document is a testing form from Nanurul Construction for an air cooled split unit installed at Sekolah Menengah Teknik in Dungun Terengganu. It records the equipment and serial numbers, make and model, type, and capacity of the unit. It checks that the mounting, alignment, noise, vibration, condensate drip collector, motor vibration isolator, electrical connections, and secure paneling all meet standards. Space is provided for signatures of the tester and witnesses.

Uploaded by

Nik Mohd Bazli
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views

Testing Form

This document is a testing form from Nanurul Construction for an air cooled split unit installed at Sekolah Menengah Teknik in Dungun Terengganu. It records the equipment and serial numbers, make and model, type, and capacity of the unit. It checks that the mounting, alignment, noise, vibration, condensate drip collector, motor vibration isolator, electrical connections, and secure paneling all meet standards. Space is provided for signatures of the tester and witnesses.

Uploaded by

Nik Mohd Bazli
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

NANURUL CONSTRUCTION

TR0020746-W LOT 106, KAMPUNG RHU MUDA, 21600 MARANG TERENGGANU TEL : 013 922 4260, OFF : 09 618 2328

TESTING FORM NANURUL CONSTRUCTION


LOCATION : SEKOLAH MENENGAH TEKNIK,DUNGUN TERENGGANU AIR COOLED SPLIT UNIT EQUIPMENT NO : SERIAL NO : LOCATION : INDOOR: 20555205-44650 RUANG PERSEDIAAN OUTDOOR:20561120-142485 MAKE/MODEL :AWM 10JN/ALC10CN TYPE :WALL MOUNTED CAPACITY: 1.0HP SECTION PRESS DISCHARGE OFF COIL TEMP. ROOM TEMP. DESIGN ACTUAL CHECK SATISFACTORY SATISFACTORY 1. MOUNTING AND ALIGNMENT 5. ELECTRICAL CONNECTIONS 2. NOISE AND VIBRATION 6. ALL PANEL SECURELY FASTENED 3.CONDENSATE DRIP COLLECTOR 4. MOTOR VIBRATION ISOLATOR REMARKS :

TEST BY :

WITNESS BY :

SIGN :
NAME :

SIGN : NAME :

SIGN : NAME :

SIGN :
NAME :

You might also like